JP2011111848A - Sc pile, method for manufacturing the same, and pile head joining method of the same - Google Patents

Sc pile, method for manufacturing the same, and pile head joining method of the same Download PDF

Info

Publication number
JP2011111848A
JP2011111848A JP2009271436A JP2009271436A JP2011111848A JP 2011111848 A JP2011111848 A JP 2011111848A JP 2009271436 A JP2009271436 A JP 2009271436A JP 2009271436 A JP2009271436 A JP 2009271436A JP 2011111848 A JP2011111848 A JP 2011111848A
Authority
JP
Japan
Prior art keywords
pile
reinforcing bar
anchor
steel pipe
end plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009271436A
Other languages
Japanese (ja)
Other versions
JP5349263B2 (en
Inventor
Takeshi Matsuda
剛 松田
Yoshimichi Tsushida
良通 津志田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Pile Corp
Original Assignee
Japan Pile Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Pile Corp filed Critical Japan Pile Corp
Priority to JP2009271436A priority Critical patent/JP5349263B2/en
Publication of JP2011111848A publication Critical patent/JP2011111848A/en
Application granted granted Critical
Publication of JP5349263B2 publication Critical patent/JP5349263B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an SC pile, which allows extremely easy joining operation of an anchor reinforcement embedded in the SC pile to a reinforcement of a structure foundation without affecting the quality of a pile body, a method for manufacturing the same, and a pile head joining method of the same. <P>SOLUTION: The SC pile has a cylindrical concrete layer on the inner periphery of a steel pipe 2, and an annular pile end plate 4 provided at a pile head end to cover an end portion of the concrete layer. A plurality of anchor reinforcements 5 are embedded in the concrete layer at the pile head portion at circumferential intervals so as to have a protruding portion 5a protruding out of the pile end plate 4, and a male thread portion is formed on the outer periphery of the protruding portion 5a of the anchor reinforcement 5. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

この発明は、SC杭、その製造方法及びその杭頭部接合方法に関し、より詳細には、アンカー鉄筋によって杭頭部と構造物基礎とを接合する技術に関する。   The present invention relates to an SC pile, a manufacturing method thereof, and a pile head joining method thereof, and more particularly, to a technique of joining a pile head and a structure foundation by anchor reinforcing bars.

近年、短工期とローコスト化の観点から、既製コンクリート杭の高支持力化が進み、従来の埋込み杭工法と比較すると同径の杭でも2〜3倍の支持力を持つようになった。このため、地震時に1本の杭が負担する水平力も従来よりも大きくなったことから、小口径でも大きな耐力を持つSC杭(外殻鋼管付きコンクリート杭)を採用する事例が増えてきた。   In recent years, from the viewpoints of short construction period and low cost, the support capacity of ready-made concrete piles has increased, and even with piles of the same diameter compared to conventional embedded pile construction methods, the support capacity has become 2-3 times greater. For this reason, since the horizontal force which one pile bears at the time of an earthquake became larger than before, the example which adopts SC pile (concrete pile with an outer shell steel pipe) which has a large yield strength with a small diameter has increased.

このようなSC杭の1つとして、杭頭部のコンクリート層に構造物基礎と接合するためのアンカー鉄筋をあらかじめ埋め込んだものが知られている(例えば特許文献1参照)。このアンカー鉄筋入りSC杭は、従来行われてきた杭施工後のアンカー鉄筋の鋼管への溶接作業が不要となるという利点がある。しかしながら、その一方、あらかじめコンクリート層に埋め込んだアンカー鉄筋を露出させなければならず、杭頭処理に多大な手間と労力を要する。すなわち、杭施工後、杭頭部の鋼管を周方向及び軸方向に切断したうえ、杭頭内部に破砕機を入れてコンクリートを破砕し、さらにはアンカー鉄筋まわりのコンクリートを斫り、杭端板とアンカー鉄筋との切断をする等の作業をしなければならない。   As one of such SC piles, one in which an anchor reinforcing bar for joining to a structure foundation is embedded in a concrete layer of a pile head in advance is known (see, for example, Patent Document 1). This SC pile with anchor reinforcement has the advantage that the welding work to the steel pipe of the anchor reinforcement after pile construction performed conventionally is unnecessary. However, on the other hand, the anchor reinforcing bars previously embedded in the concrete layer must be exposed, and the pile head processing requires a lot of labor and labor. That is, after the pile construction, the steel pipe of the pile head is cut in the circumferential direction and the axial direction, the crusher is put inside the pile head, the concrete is crushed, and the concrete around the anchor rebar is beaten, and the pile end plate It is necessary to work such as cutting the anchor and reinforcing bar.

特許文献2には、上記のような杭施工後の鋼管の切断作業やコンクリートの斫り作業を不要としたSC杭が開示されている。このSC杭は、上端にカプラーナットを予め螺着したアンカー鉄筋(ねじ鉄筋)をコンクリート層に埋め込んでおき、杭施工後にカプラーナットに構造物基礎側の鉄筋と連結するようにしたものである。   Patent Document 2 discloses an SC pile that eliminates the need for steel pipe cutting work or concrete turning work after pile construction as described above. In this SC pile, anchor reinforcing bars (threaded reinforcing bars) with a coupler nut screwed in advance at the upper end are embedded in the concrete layer, and after the pile construction, the coupler nut is connected to the reinforcing bar on the structure foundation side.

しかしながら、この特許文献2に記載のものは、カプラーナットがコンクリート層に埋め込まれるため、カプラーナット部分で十分なコンクリートのかぶり厚を得られないという問題がある。また、遠心成形によるコンクリート層の成形時にコンクリートが十分に回り込まず、品質の良い杭体を得られないという問題もある。   However, since the coupler nut is embedded in the concrete layer, the one disclosed in Patent Document 2 has a problem that a sufficient concrete cover thickness cannot be obtained at the coupler nut portion. Moreover, there is also a problem that the concrete does not sufficiently wrap around at the time of forming the concrete layer by centrifugal molding, and a high-quality pile body cannot be obtained.

特開平7−18675号公報Japanese Patent Laid-Open No. 7-18675 特開平5−306527号公報JP-A-5-306527

この発明は上記のような技術的背景に基づいてなされたものであって、次の目的を達成するものである。
この発明の目的は、SC杭に埋め込まれたアンカー鉄筋と構造物基礎の鉄筋との接合作業を極めて容易に行うことができ、しかも杭体の品質に悪影響を及ぼすことがないSC杭、その製造方法及びその杭頭部接合方法を提供することにある。
The present invention has been made based on the technical background as described above, and achieves the following object.
An object of the present invention is to provide an SC pile that can be very easily joined to an anchor reinforcing bar embedded in an SC pile and a structural foundation reinforcing bar, and that does not adversely affect the quality of the pile body, and its manufacture It is in providing the method and its pile head joining method.

この発明は上記課題を達成するために、次のような手段を採用している。
すなわち、この発明は、鋼管の内周に筒状のコンクリート層を有し、杭頭部端部に前記コンクリート層の端部を覆う環状の杭端板を有するSC杭であって、
前記杭頭部のコンクリート層には周方向に間隔を置いて、かつ前記杭端板から突出する突出部を有するように複数本のアンカー鉄筋が埋め込まれ、
前記アンカー鉄筋の前記突出部外周には雄ねじ部が形成されていることを特徴とするSC杭にある。
The present invention employs the following means in order to achieve the above object.
That is, this invention is a SC pile having a cylindrical concrete layer on the inner periphery of the steel pipe, and having an annular pile end plate covering the end of the concrete layer at the pile head end,
A plurality of anchor reinforcing bars are embedded in the concrete layer of the pile head at intervals in the circumferential direction so as to have a protruding portion protruding from the pile end plate,
The SC pile is characterized in that a male thread portion is formed on the outer periphery of the protruding portion of the anchor reinforcing bar.

より具体的には、前記アンカー鉄筋は、環状の鉄筋により一体化されている。また、前記アンカー鉄筋と鋼管との間にスペーサが設けられている。   More specifically, the anchor reinforcing bar is integrated by an annular reinforcing bar. A spacer is provided between the anchor reinforcing bar and the steel pipe.

また、この発明は、鋼管の内周に筒状のコンクリート層を有し、杭頭部端部に前記コンクリート層の端部を覆う杭端板を有するSC杭であって、次の製造工程を有することを特徴とするSC杭の製造方法にある。
a.周方向に間隔を置いた複数の孔を有する杭端板を作ること。
b.少なくとも一方の端部側に雄ねじ部が形成された複数本のアンカー鉄筋を、全体として円筒形となるように周方向に間隔を置いて配列し、これらアンカー鉄筋を環状の鉄筋により一体化して鉄筋籠を作ること。
c.前記アンカー鉄筋の雄ねじ部を前記杭端板の前記孔に貫通させて、アンカー鉄筋と杭端板とを一体化すること。
d.前記杭端板を有する前記鉄筋籠を鋼管内に挿入配置して、杭端板と鋼管とを一体化すること。
e.前記鉄筋籠が埋め込まれるように鋼管内にコンクリートを打設して前記コンクリート層を形成すること。
Moreover, this invention is SC pile which has a pile concrete board which has a cylindrical concrete layer in the inner periphery of a steel pipe, and covers the edge part of the said concrete layer in a pile head end part, Comprising: It is in the manufacturing method of SC pile characterized by having.
a. Making pile end plates with multiple holes spaced in the circumferential direction.
b. A plurality of anchor reinforcing bars with male threads formed on at least one end side are arranged at intervals in the circumferential direction so as to form a cylindrical shape as a whole, and these anchor reinforcing bars are integrated by an annular reinforcing bar. Make a kite.
c. The anchor reinforcing bar and the pile end plate are integrated by passing the male thread portion of the anchor reinforcing bar through the hole of the pile end plate.
d. The reinforcing bar rod having the pile end plate is inserted and arranged in a steel pipe, and the pile end plate and the steel pipe are integrated.
e. Placing concrete in a steel pipe so that the reinforcing bar is embedded to form the concrete layer.

より具体的には、前記アンカー鉄筋に前記鋼管との間に配置されるスペーサを取り付ける。   More specifically, a spacer disposed between the anchor rebar and the steel pipe is attached.

さらに、この発明は上記SC杭の杭頭部接合方法であって、
前記SC杭を地盤に埋設した後、前記アンカー鉄筋の前記突出部にカプラーナットを嵌合し、このカプラーナットを介して雄ねじ部を有する構造物基礎の鉄筋と連結することを特徴とするSC杭の杭頭部接合方法にある。
Furthermore, this invention is a pile head joining method of the SC pile,
After the SC pile is buried in the ground, a coupler nut is fitted to the projecting portion of the anchor reinforcing bar, and the SC pile is connected to a reinforcing bar of a structure foundation having a male screw portion via the coupler nut. In the pile head joining method.

この発明によれば、コンクリート層にはアンカー鉄筋のみが埋め込まれるだけで、これと構造物基礎の鉄筋とを連結するためのカプラーナットなどが埋め込まれないので、コンクリート層の成形時には打設コンクリートを鋼管内周全体に回り込ませることができ、コンクリート品質に悪影響を及ぼすことがない杭体を得ることができる。また、アンカー鉄筋と構造物基礎の鉄筋との連結は、アンカー鉄筋の突出部にカプラーナット嵌合し、これを介して互いに連結すればよく、杭頭部接合作業を極めて容易に行うことができる。   According to the present invention, only the anchor rebar is embedded in the concrete layer, and the coupler nut or the like for connecting this to the reinforcing bar of the structure foundation is not embedded. It is possible to obtain a pile body that can wrap around the entire inner circumference of the steel pipe and does not adversely affect the concrete quality. In addition, the anchor rebar and the structural foundation rebar can be connected to each other via a coupler nut fitted to the protruding portion of the anchor rebar, and can be connected to each other via this, so that the pile head joining work can be performed very easily. .

この発明によるSC杭の杭頭部を示す斜視図である。It is a perspective view which shows the pile head of the SC pile by this invention. 杭頭部の一部を示す軸方向断面図である。It is an axial sectional view showing a part of a pile head. 鉄筋籠の正面図である。It is a front view of a reinforcing bar rod. アンカー鉄筋と構造物基礎の鉄筋との連結を示す正面図である。It is a front view which shows the connection with an anchor reinforcement and the reinforcement of a structure foundation. 同上の一部を示す軸方向断面図である。It is an axial sectional view showing a part of the same.

この発明の実施形態を図面を参照しながら以下に説明する。図1,図2に示すように、SC杭は鋼管2の内周に筒状のコンクリート層3を有する既製杭である。図はSC杭の杭頭部1のみを示し、杭頭部1の端部には外周が鋼管2に溶接されてコンクリート層3の端部を覆う環状の杭端板4が設けられている。   Embodiments of the present invention will be described below with reference to the drawings. As shown in FIGS. 1 and 2, the SC pile is a ready-made pile having a cylindrical concrete layer 3 on the inner periphery of the steel pipe 2. The figure shows only the pile head 1 of the SC pile, and an end of the pile head 1 is provided with an annular pile end plate 4 whose outer periphery is welded to the steel pipe 2 and covers the end of the concrete layer 3.

杭頭部1のコンクリート層3には複数本のアンカー鉄筋5が周方向に間隔を置いて埋め込まれている。これらのアンカー鉄筋5はその軸方向全体に亘って外周に雄ねじ部が形成されたねじ鉄筋であり、杭端板4から突出する突出部5aを有している。アンカー鉄筋5は、図3に示す鉄筋籠6の主たる構成部材として組み立てられ、コンクリート層3に埋め込まれている。   A plurality of anchor reinforcing bars 5 are embedded in the concrete layer 3 of the pile head 1 at intervals in the circumferential direction. These anchor reinforcing bars 5 are screw reinforcing bars in which a male thread portion is formed on the outer periphery over the entire axial direction, and have a protruding portion 5 a protruding from the pile end plate 4. The anchor reinforcing bars 5 are assembled as main constituent members of the reinforcing bar 6 shown in FIG. 3 and embedded in the concrete layer 3.

全体として円筒形をなすアンカー鉄筋5群の内周にはフープ鉄筋7が配置され、各アンカー鉄筋5はフープ鉄筋7に図示しない結束線により固定されることにより一体化されている。これらアンカー鉄筋5のうち適宜のものに鋼管2との間の間隔を一定に保つためのスペーサ鉄筋8が杭軸方向に間隔を置いて複数設けられている。   A hoop rebar 7 is arranged on the inner periphery of a group of anchor rebars 5 having a cylindrical shape as a whole, and each anchor rebar 5 is integrated by being fixed to the hoop rebar 7 by a binding wire (not shown). A plurality of spacer reinforcing bars 8 for maintaining a constant distance from the steel pipe 2 are provided at appropriate intervals among these anchor reinforcing bars 5 in the pile axis direction.

上記SC杭は、次のようにして製造される。
(1) 杭端板
杭端板4は鋼管2の外径と等しい外径を有する鋼製の環状板である。この杭端板4に周方向に間隔を置いて複数の孔9(図1,図2参照)を開ける。
(2) 鉄筋籠
図3に示すように、フープ鉄筋7の外周に、複数本のアンカー鉄筋5を全体として円筒形になるように周方向に間隔を置いて配置し、図示しない結束線によりフープ鉄筋7に固定してこれらアンカー鉄筋5が一体化された鉄筋籠6を作る。
The SC pile is manufactured as follows.
(1) Pile end plate The pile end plate 4 is a steel annular plate having an outer diameter equal to the outer diameter of the steel pipe 2. A plurality of holes 9 (see FIGS. 1 and 2) are opened in the pile end plate 4 at intervals in the circumferential direction.
(2) Reinforcing bar 、 As shown in Fig. 3, a plurality of anchor reinforcing bars 5 are arranged on the outer periphery of the hoop reinforcing bar 7 at intervals in the circumferential direction so as to form a cylindrical shape as a whole. Reinforcing bar 6 is formed by fixing these reinforcing bars 5 to the reinforcing bars 7.

(3) 杭端板の取付け
突出部5aを形成するように、各アンカー鉄筋5を杭端板4の孔9にそれぞれ貫通させる。そして、突出部5aに図4,5に示すロックナット10を予め取り付けることにより、もしくは孔9内のアンカー鉄筋5の外周隙間にシール剤を注入することにより、各アンカー鉄筋5と杭端板4とを固定し、一体化する。また、適宜のフープ鉄筋7には軸方向に間隔を置いて複数のスペーサ鉄筋8を結束線あるいは溶接により取り付ける。
(4) 鉄筋籠の挿入・取付け
杭端板4を取り付けた鉄筋籠6を鋼管2内に挿入配置し、杭端板4の外周部を鋼管2の端部に溶接により固着する。
(5) コンクリート層の成形
鋼管2を水平状態にして、その内部にコンクリートを打設し、遠心成形によりコンクリート層3を成形する。このコンクリート層3の成形の際には、アンカー鉄筋5が鉄筋籠6として組み立てられ、また鋼管2との間にスペーサ鉄筋8が配置されているので、遠心力によりアンカー鉄筋が動揺することがない。
(3) Attaching the pile end plate Each anchor rebar 5 is penetrated through the hole 9 of the pile end plate 4 so as to form the protruding portion 5a. Then, by attaching the lock nut 10 shown in FIGS. 4 and 5 to the protruding portion 5a in advance, or by injecting a sealant into the outer peripheral gap of the anchor reinforcing bar 5 in the hole 9, each anchor reinforcing bar 5 and the pile end plate 4 Are fixed and integrated. In addition, a plurality of spacer reinforcing bars 8 are attached to appropriate hoop reinforcing bars 7 by binding wires or welding at intervals in the axial direction.
(4) Reinforcing rod insertion / attachment Reinforcing rod 6 with pile end plate 4 attached is inserted into steel pipe 2 and the outer periphery of pile end plate 4 is fixed to the end of steel pipe 2 by welding.
(5) Molding of the concrete layer The steel pipe 2 is placed in a horizontal state, concrete is placed therein, and the concrete layer 3 is formed by centrifugal molding. When the concrete layer 3 is formed, the anchor reinforcing bar 5 is assembled as the reinforcing bar 6 and the spacer reinforcing bar 8 is disposed between the steel pipe 2 and the anchor reinforcing bar is not shaken by centrifugal force. .

以上のようにして、SC杭が製造されるが、SC杭の施工現場までの運搬に際してはアンカー鉄筋5の突出部5aを保護し、また作業者の危険を回避するために、突出部5aが挿入される孔を有する発泡スチロール体を杭端板4に被覆するようにしてもよい。   As described above, the SC pile is manufactured. When the SC pile is transported to the construction site, the protruding portion 5a is provided to protect the protruding portion 5a of the anchor rebar 5 and avoid the danger of the operator. You may make it coat the pile end plate 4 with the polystyrene body which has the hole inserted.

上記SC杭と構造物基礎との接合は次のようにして行われる。図4,図5は地盤に埋設されたSC杭を示し、アンカー鉄筋5の突出部5aに杭端板4側から順にロックナット10及びカプラーナット11の下半部を嵌合する。そして、カプラーナット11の上半部に構造物基礎の鉄筋(ねじ鉄筋)12を嵌合し、このようにしてアンカー鉄筋5と構造物基礎の鉄筋12とを連結する。   The SC pile and the structure foundation are joined as follows. 4 and 5 show the SC pile embedded in the ground, and the lower half of the lock nut 10 and the coupler nut 11 are fitted into the protruding portion 5a of the anchor reinforcing bar 5 in order from the pile end plate 4 side. Then, a structural foundation rebar (screw rebar) 12 is fitted to the upper half of the coupler nut 11, and the anchor rebar 5 and the structural foundation rebar 12 are thus connected.

以上のように、この発明によれば、コンクリート層3にはアンカー鉄筋5のみが埋め込まれるだけで、これと構造物基礎の鉄筋とを連結するためのカプラーナットなどが埋め込まれないので、コンクリート層3の成形時には打設コンクリートを鋼管内周全体に回り込ませることができ、コンクリート品質に影響のない杭体を得ることができる。また、アンカー鉄筋5と構造物基礎の鉄筋12との連結は、カプラーナット11を介して互いに連結すればよく、杭頭部接合作業を極めて容易に行うことができる。   As described above, according to the present invention, only the anchor reinforcing bar 5 is embedded in the concrete layer 3, and the coupler nut for connecting the reinforcing bar 5 to the reinforcing bar of the structure is not embedded. At the time of forming 3, the cast concrete can be wound around the entire inner circumference of the steel pipe, and a pile body that does not affect the concrete quality can be obtained. Further, the anchor reinforcing bar 5 and the structural foundation reinforcing bar 12 may be connected to each other via the coupler nut 11, and the pile head joining work can be performed very easily.

上記実施形態は例示にすぎず、この発明は種々の改変が可能である。例えば、上記実施形態ではアンカー鉄筋として軸方向全体に亘って雄ねじ部が形成されたねじ鉄筋を用いたが、雄ねじ部は突出部にだけ形成してもよい。また、フープ鉄筋に代えてスパイラル鉄筋を用いてもよい。   The above embodiment is merely an example, and various modifications can be made to the present invention. For example, in the above-described embodiment, the threaded reinforcing bar in which the male thread part is formed over the entire axial direction is used as the anchor reinforcing bar, but the male thread part may be formed only in the protruding part. Further, a spiral reinforcing bar may be used instead of the hoop reinforcing bar.

1 杭頭部
2 鋼管
3 コンクリート層
4 杭端板
5 アンカー鉄筋
5a 突出部
7 フープ鉄筋
8 スペーサ
9 孔
10 ロックナット
11 カプラーナット
12 構造物基礎の鉄筋
DESCRIPTION OF SYMBOLS 1 Pile head 2 Steel pipe 3 Concrete layer 4 Pile end plate 5 Anchor reinforcement 5a Protrusion 7 Hoop reinforcement 8 Spacer 9 Hole 10 Lock nut 11 Coupler nut 12 Reinforcement of structure foundation

Claims (6)

鋼管の内周に筒状のコンクリート層を有し、杭頭部端部に前記コンクリート層の端部を覆う環状の杭端板を有するSC杭であって、
前記杭頭部のコンクリート層には周方向に間隔を置いて、かつ前記杭端板から突出する突出部を有するように複数本のアンカー鉄筋が埋め込まれ、
前記アンカー鉄筋の前記突出部外周には雄ねじ部が形成されていることを特徴とするSC杭。
SC pile having a cylindrical concrete layer on the inner periphery of the steel pipe, and an annular pile end plate covering the end of the concrete layer at the pile head end,
A plurality of anchor reinforcing bars are embedded in the concrete layer of the pile head at intervals in the circumferential direction so as to have a protruding portion protruding from the pile end plate,
An SC pile characterized in that a male thread portion is formed on the outer periphery of the protruding portion of the anchor reinforcing bar.
前記アンカー鉄筋は、環状の鉄筋により一体化されていることを特徴とする請求項1記載のSC杭。   The SC pile according to claim 1, wherein the anchor reinforcing bar is integrated by an annular reinforcing bar. 前記アンカー鉄筋と鋼管との間にスペーサが設けられていることを特徴とする請求項1又は2記載のSC杭。   The SC pile according to claim 1 or 2, wherein a spacer is provided between the anchor reinforcing bar and the steel pipe. 鋼管の内周に筒状のコンクリート層を有し、杭頭部端部に前記コンクリート層の端部を覆う杭端板を有するSC杭であって、次の製造工程を有することを特徴とするSC杭の製造方法。
a.周方向に間隔を置いた複数の孔を有する杭端板を作ること。
b.少なくとも一方の端部側に雄ねじ部が形成された複数本のアンカー鉄筋を、全体として円筒形となるように周方向に間隔を置いて配列し、これらアンカー鉄筋を環状の鉄筋により一体化して鉄筋籠を作ること。
c.前記アンカー鉄筋の雄ねじ部を前記杭端板の前記孔に貫通させて、アンカー鉄筋と杭端板とを一体化すること。
d.前記杭端板を有する前記鉄筋籠を鋼管内に挿入配置して、杭端板と鋼管とを一体化すること。
e.前記鉄筋籠が埋め込まれるように鋼管内にコンクリートを打設して前記コンクリート層を形成すること。
An SC pile having a cylindrical concrete layer on the inner periphery of a steel pipe and having a pile end plate covering the edge of the concrete layer at the pile head end, and having the following manufacturing process SC pile manufacturing method.
a. Making pile end plates with multiple holes spaced in the circumferential direction.
b. A plurality of anchor reinforcing bars with male threads formed on at least one end side are arranged at intervals in the circumferential direction so as to form a cylindrical shape as a whole, and these anchor reinforcing bars are integrated by an annular reinforcing bar. Make a kite.
c. The anchor reinforcing bar and the pile end plate are integrated by passing the male thread portion of the anchor reinforcing bar through the hole of the pile end plate.
d. The reinforcing bar rod having the pile end plate is inserted and arranged in a steel pipe, and the pile end plate and the steel pipe are integrated.
e. Placing concrete in a steel pipe so that the reinforcing bar is embedded to form the concrete layer.
前記アンカー鉄筋に前記鋼管との間に配置されるスペーサを取り付けることを特徴とする請求項4記載のSC杭の製造方法。   The SC pile manufacturing method according to claim 4, wherein a spacer disposed between the anchor rebar and the steel pipe is attached. 請求項1〜3のいずれか1に記載のSC杭の杭頭部接合方法であって、
前記SC杭を地盤に埋設した後、前記アンカー鉄筋の前記突出部にカプラーナットを嵌合し、このカプラーナットを介して雄ねじ部を有する構造物基礎の鉄筋と連結することを特徴とするSC杭の杭頭部接合方法。
It is a pile head joining method of SC pile according to any one of claims 1 to 3,
After the SC pile is buried in the ground, a coupler nut is fitted to the projecting portion of the anchor reinforcing bar, and the SC pile is connected to a reinforcing bar of a structure foundation having a male screw portion via the coupler nut. Pile head joining method.
JP2009271436A 2009-11-30 2009-11-30 SC pile, its manufacturing method and its pile head joining method Active JP5349263B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009271436A JP5349263B2 (en) 2009-11-30 2009-11-30 SC pile, its manufacturing method and its pile head joining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009271436A JP5349263B2 (en) 2009-11-30 2009-11-30 SC pile, its manufacturing method and its pile head joining method

Publications (2)

Publication Number Publication Date
JP2011111848A true JP2011111848A (en) 2011-06-09
JP5349263B2 JP5349263B2 (en) 2013-11-20

Family

ID=44234393

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009271436A Active JP5349263B2 (en) 2009-11-30 2009-11-30 SC pile, its manufacturing method and its pile head joining method

Country Status (1)

Country Link
JP (1) JP5349263B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015218481A (en) * 2014-05-16 2015-12-07 三谷セキサン株式会社 Steel composite concrete pile, and manufacturing method for steel composite concrete pile
JP2016003499A (en) * 2014-06-18 2016-01-12 大成建設株式会社 Steel pipe concrete pile junction structure
CN112127358A (en) * 2019-03-29 2020-12-25 天海钢棒(张家港)有限公司 Processing method of precast concrete pile and precast concrete pile
JP7537982B2 (en) 2020-10-13 2024-08-21 東亜建設工業株式会社 Pile head seismic isolation structure and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003306950A (en) * 2002-04-18 2003-10-31 Ps Mitsubishi Construction Co Ltd Pc well head connection structure
JP2009167597A (en) * 2008-01-10 2009-07-30 Okabe Co Ltd Connector of sc pile and joining structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003306950A (en) * 2002-04-18 2003-10-31 Ps Mitsubishi Construction Co Ltd Pc well head connection structure
JP2009167597A (en) * 2008-01-10 2009-07-30 Okabe Co Ltd Connector of sc pile and joining structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015218481A (en) * 2014-05-16 2015-12-07 三谷セキサン株式会社 Steel composite concrete pile, and manufacturing method for steel composite concrete pile
JP2016003499A (en) * 2014-06-18 2016-01-12 大成建設株式会社 Steel pipe concrete pile junction structure
CN112127358A (en) * 2019-03-29 2020-12-25 天海钢棒(张家港)有限公司 Processing method of precast concrete pile and precast concrete pile
JP7537982B2 (en) 2020-10-13 2024-08-21 東亜建設工業株式会社 Pile head seismic isolation structure and construction method thereof

Also Published As

Publication number Publication date
JP5349263B2 (en) 2013-11-20

Similar Documents

Publication Publication Date Title
JP5329364B2 (en) Precast steel pipe concrete composite pile and its manufacturing method
JP5036007B2 (en) SC pile, its manufacturing method and pile head processing method
CN103114717A (en) Formwork system of shear walls at two sides of extensible seam
JP5349263B2 (en) SC pile, its manufacturing method and its pile head joining method
JP6263873B2 (en) Pile head reinforcement structure
KR101056027B1 (en) Combined structure of edge prestressed concrete composite pile with tension member and expansion foundation
KR101414054B1 (en) Mold for phc pile and the manufacturing method for phc pile using the same and the method for reinforcement of phc pile using the same
JP5411950B2 (en) Manufacturing method of ready-made piles, rebar cage for ready-made piles
CN102619286B (en) Connecting joint of steel pipe concrete column and profile steel concrete beam
KR101290140B1 (en) Composite Pile and Construction Method thereof
KR101636225B1 (en) Lateral stiffness reinforced internal reinforced concrete ICP file and its construction method
JP2011058230A (en) Concrete pile with outer shell steel pipe, and pile head joint structure for the same
KR101305058B1 (en) Manufacturing Method of Composite Pile of Prestressed Hollow Concrete Pile and Steel Pipe
JP5809487B2 (en) Column structure and column reinforcement method
KR102000194B1 (en) Composite pile and manufacturing method thereof
JPH1018424A (en) Root wrapping reinforcing structure of column base of steel post or the like
KR101661274B1 (en) construction method of Reinforced PHC pile structure
KR101694964B1 (en) Composite Pile
JP2006083609A (en) Joint structure of pile head section and its construction method
JP6430146B2 (en) Steel pipe covered concrete pile
JP3959509B2 (en) Knotted pile and method for manufacturing knotted pile
KR102306687B1 (en) Slope concrete panel with composite fiber
WO2012138058A1 (en) Method for forming a cast-in-place concrete pile using a mold case
JP2018119385A (en) Sc pile having axial reinforcement, method for manufacturing sc pile having axial reinforcement, and method for exposing axial reinforcement of sc pile
KR20120130528A (en) PHC Pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121026

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130807

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130820

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130820

R150 Certificate of patent or registration of utility model

Ref document number: 5349263

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250