JP2011022734A - Information processor - Google Patents

Information processor Download PDF

Info

Publication number
JP2011022734A
JP2011022734A JP2009166232A JP2009166232A JP2011022734A JP 2011022734 A JP2011022734 A JP 2011022734A JP 2009166232 A JP2009166232 A JP 2009166232A JP 2009166232 A JP2009166232 A JP 2009166232A JP 2011022734 A JP2011022734 A JP 2011022734A
Authority
JP
Japan
Prior art keywords
management
managed
information
management target
date
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009166232A
Other languages
Japanese (ja)
Other versions
JP5332991B2 (en
Inventor
Tomohisa Suzuki
智久 鈴木
Tomonori Yamashita
智規 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2009166232A priority Critical patent/JP5332991B2/en
Publication of JP2011022734A publication Critical patent/JP2011022734A/en
Application granted granted Critical
Publication of JP5332991B2 publication Critical patent/JP5332991B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To reduce man-hours in a process management work concerning an organizational activity to be hierarchically process-managed. <P>SOLUTION: An information processor is equipped with: a management object storage part for storing information of management object items concerning processes to be managed and a plurality of low-order processes included in the processes; a confirmation scheduled date designating part for storing the confirmation scheduled deadline dates of the management object items concerning the processes; a calculation designating part for storing calculation procedures where the management object items of the respective low-order processes are reflected on the management object items of high-order processes including the low-order processes; and a management processing part for calculating information of the management object items of the low-order processes in response to the calculation procedures stored in the calculation designating part on the confirmation scheduled deadline dates of the processes, and storing the information in the management object storage part as information of the management object items of the processes. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、工程管理に係る情報処理技術に関する。   The present invention relates to information processing technology related to process management.

企業、学校、研究機関、役所等、様々な組織において、様々な活動が計画通りに進行しているかを管理する工程管理が行われている。そして、工程管理では、通常、情報処理装置上の管理ツールが利用される。   In various organizations such as companies, schools, research institutions, and government offices, process management is performed to manage whether various activities are proceeding as planned. In process management, a management tool on the information processing apparatus is usually used.

図1に、工程管理ツールを例示する。例えば、企業のプロジェクトは、並列に進行する複数の工程を含む。そして、工程ごとに担当者が、プロジェクト管理用のツール、表計算プログラム、ワードプロセッサ、電子メール等を利用し、それぞれの工程の進捗内容を管理者に報告する。そして、管理者は、報告された進捗内容を集計し、上位工程の管理者に報告とすることが多い。報告された進捗内容を管理者が集計し、上位工程の管理者に報告する場合、管理者は、報告された情報の集計作業、報告内容のまとめ作業を人手で実施する。   FIG. 1 illustrates a process management tool. For example, a corporate project includes a plurality of processes that proceed in parallel. Then, the person in charge reports the progress of each process to the manager using a project management tool, spreadsheet program, word processor, e-mail, etc. for each process. In many cases, the manager totals the reported progress and reports it to the manager of the upper process. When the manager summarizes the reported progress and reports it to the manager of the higher-level process, the manager manually performs the tabulation of the reported information and the summary of the report.

図2に、新製品開発時の設計工程を例示する。図2の例では、新製品開発プロジェクトは、システムV01の基本設計、機能設計、マニュアル設計、および各モジュールの開発工程を含む。図2では、さらに、モジュールとして、モジュールABCの開発工程が例示されている。そして、モジュールABCの開発工程は、機能設計、構成設計、コーディング、モジュールインターフェーステスト等の各工程を含む。さらに、モジュールABCの機能設計工程は、機能設計レビュー計画の作成、機能仕様書の作成を含む。同様に、モジュールABCの構成設計工程は、構成設計レビュー計画の作成、設計仕様書の作成、セキュリティ活動の監査、構成設計工程完了の承認等を含む。コーディング、モジュールインターフェーステストの工程も、それぞれの下位工程を含む。   FIG. 2 shows an example of a design process when developing a new product. In the example of FIG. 2, the new product development project includes a basic design of the system V01, a functional design, a manual design, and a development process of each module. In FIG. 2, the development process of module ABC is further illustrated as a module. The development process of the module ABC includes each process such as function design, configuration design, coding, and module interface test. Further, the function design process of module ABC includes creation of a function design review plan and creation of a function specification. Similarly, the configuration design process of module ABC includes creation of a configuration design review plan, creation of a design specification, audit of security activities, approval of completion of the configuration design process, and the like. The coding and module interface test processes also include respective sub-processes.

特開2006−72413号公報JP 2006-72413 A 特開平10−249683号公報Japanese Patent Laid-Open No. 10-249683

上記従来の技術では、1つの工程の管理者が、管理対象の工程を1つずつ確認し、各工程の進捗状況をまとめていくと、異なる工程数分×工程ごとの確認作業量=総まとめ作業量に相当する、まとめ作業が発生する。それぞれの工程の管理者は、定期的に、例えば、毎週まとめ作業を実施することになり、工程管理作業上の手間が問題となる。大規模なプロジェクトでは、極めて多数の工程が存在し、それぞれの工程の進捗状況をまとめる作業工数が増大している。従来の進捗状況をまとめる手順は、(1)各担当者の進捗報告の有無の確認、および進捗報告がない場合の報告依頼作業(2)各担当者の工程での管理対象項目それぞれについての進捗内容についての報告の有無の確認(3)報告された進捗内容、すなわち報告されたデータの妥当性確認(4)報告されたデータをまとめた内容の報告資料作成等である。従来の工程管理では、管理者が(1)〜(4)で例示される作業を階層単位で実施する。あるいは、管理者がそれぞれの工程での進捗報告のたびに、(1)〜(4)で例示される作業を実施するため、(1)〜(4)で例示される作業が、管理者にとって大きな負担になっている。   In the above conventional technology, when the manager of one process checks the process to be managed one by one and summarizes the progress of each process, the number of different processes x the amount of confirmation work for each process = total summary A summary work corresponding to the work amount occurs. The manager of each process regularly performs, for example, weekly summarization work, and the trouble in process management work becomes a problem. In a large-scale project, there are an extremely large number of processes, and the number of work steps for summarizing the progress of each process is increasing. The conventional procedure for summarizing the progress status is as follows: (1) Confirmation of the presence or absence of progress reports of each person in charge and report request work when there is no progress report (2) Progress for each item to be managed in the process of each person in charge Confirmation of whether or not there is a report on the contents (3) Reported progress, that is, the validity of the reported data (4) Preparation of report materials that summarize the reported data. In conventional process management, an administrator performs the operations exemplified in (1) to (4) in units of layers. Or, since the manager performs the work exemplified in (1) to (4) every time the progress report in each process is performed, the work exemplified in (1) to (4) It is a big burden.

開示の技術の目的は、階層的に工程管理される組織活動についての工程管理作業の工数を軽減することにある。   The purpose of the disclosed technique is to reduce the number of man-hours for process management work for organizational activities whose processes are managed hierarchically.

開示の技術の一側面は、被管理工程と被管理工程に含まれる複数の下位工程について、管理対象項目の情報を記憶する管理対象記憶部と、被管理工程について、管理対象項目の確認予定期限日を記憶する確認予定日指定部と、それぞれの下位工程の管理対象項目を、下位工程が含まれる上位工程の管理対象項目に反映する演算手順を記憶する演算指定部と、被管理工程の確認予定期限日に、演算指定部に記憶された演算手順にしたがって下位工程の管理対象項目の情報を演算し、被管理工程の管理対象項目の情報として管理対象記憶部に記憶させる管理処理部と、を備える情報処理装置として例示される。   One aspect of the disclosed technology is a management target storage unit that stores information on a management target item for a managed process and a plurality of sub-processes included in the controlled process, and a scheduled check date for the management target item for the managed process Confirmation date designation part for storing the date, calculation designation part for storing the calculation procedure for reflecting the management target item of each lower process in the management target item of the higher process including the lower process, and confirmation of the managed process A management processing unit that calculates information on the management target item of the lower process according to the calculation procedure stored in the calculation designation unit on the scheduled deadline date, and stores it in the management target storage unit as information on the management target item of the managed process; As an information processing apparatus.

本情報処理装置によれば、階層的に工程管理される組織活動についての工程管理作業の工数を軽減することができる。   According to this information processing apparatus, it is possible to reduce the number of man-hours for process management work for organizational activities that are hierarchically managed.

工程管理ツールを例示する図である。It is a figure which illustrates a process management tool. 新製品開発時の設計工程を例示する図である。It is a figure which illustrates the design process at the time of new product development. 情報処理装置が管理する複数の工程と、工程の進捗情報との関係を例示する図である。It is a figure which illustrates the relationship between the several process which information processing apparatus manages, and the progress information of a process. 情報処理装置の機能の構成図を例示する図である。It is a figure which illustrates the block diagram of the function of information processing apparatus. 情報処理装置でのデータフローを例示する図である。It is a figure which illustrates the data flow in information processing apparatus. ツリー情報レコードの構成を例示する図である。It is a figure which illustrates the composition of a tree information record. 確認予定日指定部に指定されるデータを例示する図である。It is a figure which illustrates the data designated by the check scheduled date designation | designated part. 進捗ルールテーブルの構成を例示する図である。It is a figure which illustrates the structure of a progress rule table. 演算の名称と演算方法を例示する図である。It is a figure which illustrates the name and calculation method of a calculation. 実施例2に係る情報処理装置の処理例(その1)である。10 is a process example (part 1) of the information processing apparatus according to the second embodiment. 実施例2に係る情報処理装置の処理例(その2)である。9 is a process example (part 2) of the information processing apparatus according to the second embodiment. 実施例2に係る情報処理装置の処理例(その3)である。9 is a process example (part 3) of the information processing apparatus according to the second embodiment. 実施例2の情報システムの構成を例示する図である。It is a figure which illustrates the structure of the information system of Example 2. 情報処理装置のハードウェア構成を例示する図である。It is a figure which illustrates the hardware constitutions of information processing apparatus. 実施例2の情報システムが実行する管理処理の処理フローを例示する図である。It is a figure which illustrates the processing flow of the management process which the information system of Example 2 performs.

以下、図面を参照して、一実施形態に係る情報処理装置について説明する。以下の実施形態の構成は例示であり、本情報処理装置は実施形態の構成には限定されない。   Hereinafter, an information processing apparatus according to an embodiment will be described with reference to the drawings. The configuration of the following embodiment is an exemplification, and the information processing apparatus is not limited to the configuration of the embodiment.

図3から図7を参照して、実施例1に係る情報処理装置を説明する。本情報処理装置は、組織の様々な活動の工程を管理する。工程管理では、例えば、工程の進捗を示す進捗情報の収集、確認、およびまとめ作業が実行される。図3に、本情報処理装置が管理する複数の工程と、工程の進捗情報との関係を例示する。   The information processing apparatus according to the first embodiment will be described with reference to FIGS. This information processing apparatus manages the process of various activities of the organization. In the process management, for example, progress information collection, confirmation, and summary work indicating the progress of the process is executed. FIG. 3 illustrates the relationship between a plurality of processes managed by the information processing apparatus and process progress information.

組織の活動は、複数の工程を含む場合が多い。また、それぞれの工程は、さらに、下位の工程を含むこともある。したがって、工程の管理は、最下層の作業、すなわち、当該作業よりもさらには分割されない作業単位の工程において個々に登録された報告内容をまとめて、上位の工程の管理者に報告する作業をすることが多い。   Organizational activities often include multiple processes. Each process may further include a lower process. Therefore, in the process management, the report contents registered individually in the work of the lowest layer, that is, the process of the work unit that is not further divided than the work, are collected and reported to the manager of the upper process. There are many cases.

例えば、図3の例では、組織の活動は、BLK1およびBLK2という2つの並列に実施される工程を有する。そして、例えば、工程BLK1は、さらに、下位の工程P1からP3を有する。そして、それぞれの下位工程P1からP3のそれぞれにおいて、進捗情報1から進捗情報3が報告される。工程BLK1の管理者は、それぞれの下位工程P1からP3に対する進捗情報1から3を集計し、さらに上位の工程に報告する。   For example, in the example of FIG. 3, the organization activity has two steps performed in parallel, BLK1 and BLK2. For example, the process BLK1 further includes lower processes P1 to P3. Then, the progress information 1 to the progress information 3 are reported in each of the lower processes P1 to P3. The manager of the process BLK1 tabulates the progress information 1 to 3 for each of the lower processes P1 to P3 and reports it to a higher process.

上位の工程への報告のため、工程BLK1の管理者は、例えば、以下の作業を実行する。
(1)個々の報告日の妥当性、および、前回報告よりも新しい報告が登録されているかのチェック;
(2)作業量や進捗の集計作業;
(3)スケジュールの遅延状況の確認;
(4)下位工程P1からP3に対する進捗情報1から3を基にまとめられた進捗情報の報告作業、例えば、メール等での内部連絡;
本情報処理装置は、(1)から(4)で例示される作業の自動化を実現する。図4に、本情報処理装置の機能の構成図を例示する。本情報処理装置は、図4の管理対象記憶部2、確認予定日指定部3、および演算指定部4を、例えばデータベース上に保持する。また、本情報処理装置は、図4の管理処理部1として、コンピュータプログラムを実行する。
In order to report to a higher-level process, the manager of the process BLK1 executes, for example, the following work.
(1) Check the validity of each reporting date, and whether a report newer than the previous report is registered;
(2) Work volume and progress counting work;
(3) Check schedule delay status;
(4) Progress information reporting work based on the progress information 1 to 3 for the sub-processes P1 to P3, for example, internal communication by e-mail;
This information processing apparatus realizes automation of work exemplified in (1) to (4). FIG. 4 illustrates a functional configuration diagram of the information processing apparatus. The information processing apparatus holds the management target storage unit 2, the scheduled check date designating unit 3, and the calculation designating unit 4 in FIG. 4 on, for example, a database. The information processing apparatus executes a computer program as the management processing unit 1 in FIG.

管理対象記憶部2は、被管理工程と被管理工程に含まれる複数の下位工程について、管理対象項目の情報を記憶する。被管理工程は、例えば、図3のBLK1、BLK2等であり、組織の活動の中で実施される工程である。なお、図3に示すように、被管理工程が複数あってもよい。図3に例示したように、被管理工程は、並列に実施される複数の下位工程を含む。管理対象項目の情報とは、被管理工程および被管理工程に含まれる複数の下位工程において、更新あるいは記録される情報の項目であり、例えば、組織の活動の進捗情報、累積作業量、成果物の量等である。   The management target storage unit 2 stores information on management target items for a managed process and a plurality of lower processes included in the managed process. The managed process is, for example, BLK1, BLK2, etc. in FIG. 3, and is a process performed in the activities of the organization. In addition, as shown in FIG. 3, there may be a plurality of managed processes. As illustrated in FIG. 3, the managed process includes a plurality of sub-processes executed in parallel. Managed item information is an item of information that is updated or recorded in a managed process and a plurality of sub-processes included in the managed process. For example, progress information, cumulative work amount, and deliverables of an organization's activities The amount of

以下、被管理工程と、被管理工程に含まれる複数の下位工程との関係をプロセス構成と呼ぶ。また、管理対象記憶部2が記憶する情報をツリー情報レコードと呼ぶ。ツリー情報レコードと呼ぶのは、被管理工程と、被管理工程に含まれる複数の下位工程との関係が階層的なツリー構造で記述されるからである。   Hereinafter, a relationship between a managed process and a plurality of sub-processes included in the managed process is referred to as a process configuration. Information stored in the management target storage unit 2 is called a tree information record. This is called a tree information record because the relationship between a managed process and a plurality of lower processes included in the managed process is described in a hierarchical tree structure.

確認予定日指定部3には、被管理工程について、管理対象項目の進捗登録予定日(確認予定期限日ともいう)が設定される。また、演算指定部4には、それぞれの下位工程の管理対象項目を、下位工程が含まれる上位工程の管理対象項目に反映する際の演算手順が設定される。確認予定日指定部3および演算指定部4は、例えば、記憶装置上の記憶領域として例示される。なお、管理対象記憶部2、確認予定日指定部3および演算指定部4を含めて、本情報処理装置が処理するデータの格納先をデータベースともいう。   In the scheduled check date designating unit 3, the progress registration scheduled date (also referred to as scheduled check deadline date) of the management target item is set for the managed process. The calculation specifying unit 4 is set with a calculation procedure for reflecting the management target item of each lower process in the management target item of the higher process including the lower process. The scheduled confirmation date specifying unit 3 and the calculation specifying unit 4 are exemplified as a storage area on the storage device, for example. The storage destination of data processed by the information processing apparatus including the management target storage unit 2, the scheduled check date specifying unit 3, and the calculation specifying unit 4 is also referred to as a database.

管理処理部1は、確認予定日指定部3に指定された被管理工程の進捗登録予定日に、演算指定部4に指定された演算手順にしたがって下位工程の管理対象項目の情報を演算し、被管理工程の管理対象項目の情報として管理対象記憶部2に記憶させる処理を実行する。より具体的には、管理処理部1は、例えば、(1)進捗情報の自動収集処理と、(2)進捗情報入力状態のチェック通知処理とを実行する。
(1)進捗情報の自動収集;
管理処理部1は、ツリー情報レコードと工程ごとに登録されている下位工程の管理レコードを元に、以下の処理を実施する。
The management processing unit 1 calculates the information of the management target item of the lower process according to the calculation procedure specified in the calculation specifying unit 4 on the scheduled progress registration date of the managed process specified in the scheduled check date specifying unit 3, Processing to be stored in the management target storage unit 2 as information on the management target item of the managed process is executed. More specifically, the management processing unit 1 executes, for example, (1) automatic progress information collection processing and (2) progress information input state check notification processing.
(1) Automatic collection of progress information;
The management processing unit 1 performs the following processing based on the tree information record and the management record of the lower process registered for each process.

まず、管理処理部1は、被管理工程において、進捗情報の登録処理、更新処理を実施するために、管理対象記憶部2のツリー情報レコードから、被管理工程に含まれる複数の下
位工程をピックアップする。そして、管理処理部1は、ピックアップした各下位工程の進捗内容をチェックする。下位工程の進捗内容は、管理対象記憶部2の管理レコードに保存されている。そして、管理処理部1は、進捗内容を収集し、データを加工する。そして、管理処理部1は、加工したデータを当該下位工程が含まれる被管理工程の進捗内容に反映する。すなわち、管理処理部1は、下位工程から収集した進捗情報を加工し、加工したデータを上位の被管理工程に登録し、あるいは、上位の被管理工程の進捗情報を更新する。ここで、下位工程から収集した進捗情報を加工する手順は、演算指定部4に指定されている。
First, the management processing unit 1 picks up a plurality of sub-processes included in the managed process from the tree information record of the management target storage unit 2 in order to perform progress information registration processing and update processing in the managed process. To do. And the management process part 1 checks the progress content of each subprocess picked up. The progress of the lower process is stored in the management record of the management target storage unit 2. Then, the management processing unit 1 collects the progress contents and processes the data. Then, the management processing unit 1 reflects the processed data in the progress contents of the managed process including the lower process. That is, the management processing unit 1 processes the progress information collected from the lower process, registers the processed data in the upper managed process, or updates the progress information of the upper managed process. Here, the procedure for processing the progress information collected from the lower processes is specified in the calculation specifying unit 4.

図5に、本情報処理装置でのデータフローを例示する。実施例1に例示される組織の活動では、下位工程の各担当者が、担当者用の画面を通じて、下位工程の進捗情報を入力する。各担当者が入力した進捗情報は、管理処理部1を通じて、データベースの管理対象記憶部2に格納される。一方、管理処理部1は、管理者用の画面を通じた管理者の指示にしたがって、被管理工程に対して、被管理工程に含まれる下位工程での進捗情報を管理対象記憶部2の管理レコードから収集する。そして、管理処理部1は、収集した進捗情報を加工し、被管理工程の進捗情報に反映するともに、管理者用の画面を表示する。   FIG. 5 illustrates a data flow in the information processing apparatus. In the activity of the organization exemplified in the first embodiment, each person in charge of the lower process inputs the progress information of the lower process through the screen for the person in charge. Progress information input by each person in charge is stored in the management target storage unit 2 of the database through the management processing unit 1. On the other hand, the management processing unit 1 sends the progress information in the sub-process included in the managed process to the management process in the management record of the management target storage unit 2 in accordance with the instructions of the manager through the administrator screen. Collect from. Then, the management processing unit 1 processes the collected progress information and reflects it in the progress information of the managed process, and displays a screen for the manager.

図6に、ツリー情報レコードと各下位工程の管理レコードの構成を例示する。管理処理部1は、下位工程ごとに入力される最新の進捗情報を図6のレコードとして個々に管理する。図6では、図面左側に、BLK0で例示される被管理工程と、被管理工程に含まれる下位工程(PRC1〜PRC3)との関係が示されている。図6の中央部に、被管理工程BLK0および下位工程PRC1〜PCR3に対するツリー情報レコードが示されている。このツリー情報レコードは、被管理工程BLK0に対する管理レコードL0と、下位工程PRC1〜PCR3に対する管理レコードL1〜L3とを含む。   FIG. 6 illustrates the configuration of a tree information record and a management record for each lower process. The management processing unit 1 individually manages the latest progress information input for each lower process as a record in FIG. In FIG. 6, the relationship between the managed process exemplified by BLK0 and the lower processes (PRC1 to PRC3) included in the managed process is shown on the left side of the drawing. A tree information record for the managed process BLK0 and the lower processes PRC1 to PCR3 is shown in the center of FIG. This tree information record includes a management record L0 for the managed process BLK0 and management records L1 to L3 for the lower processes PRC1 to PCR3.

管理対象記憶部2は、ツリー情報レコードとともに、レコード定義情報RD1を含む。レコード定義情報RD1は、下位工程PRC1〜PCR3に対する管理レコードL1〜L3の項目名と、項目の属性を定義する。図6では、例えば、管理レコードL1〜L3の項目名は、NAME、ITEM1、ITEM2、およびITEM3が定義されている。また、管理レコードL1〜L3の項目の属性としては、それぞれ、TEXT、TEXT、INT、INTが定義されている。ここで、TEXTは、項目に設定される情報がテキストであることを示す。また、INTは、項目に設定される情報が整数であることを指定する。   The management target storage unit 2 includes record definition information RD1 along with the tree information record. The record definition information RD1 defines the item names and item attributes of the management records L1 to L3 for the lower processes PRC1 to PCR3. In FIG. 6, for example, NAME, ITEM1, ITEM2, and ITEM3 are defined as item names of the management records L1 to L3. In addition, TEXT, TEXT, INT, and INT are defined as the attributes of the items of the management records L1 to L3, respectively. Here, TEXT indicates that the information set in the item is text. INT specifies that the information set in the item is an integer.

さらに、管理対象記憶部2は、管理レコードL1〜L3の更新日(UPDATE DATE)のフィールドを保持する。実施例1では、管理レコードL1〜L3の更新日のフィールドには、YY/MM/DDの形式で、最新の更新年月日が格納される。   Furthermore, the management target storage unit 2 holds a field of the update date (UPDATE DATE) of the management records L1 to L3. In the first embodiment, the latest update date is stored in the YY / MM / DD format in the update date field of the management records L1 to L3.

演算指定部4は、下位工程に対する管理レコードL1〜L3のそれぞれの項目の属性に応じて、実行すべき演算の種類を保持する。管理処理部1は、演算指定部4の指定にしたがって、下位工程に対する管理レコードL1〜L3のそれぞれの項目に入力された情報を演算し、被管理工程の管理レコードに反映する。演算としては、例えば、下位工程の項目を集計し、被管理工程に反映するための処理手順が定義される。例えば、テキスト属性の項目に対しては、各下位工程の項目の「テキストの結合」が演算指定部4に指定される。また、数値評価される項目については、例えば、合計、最小値、最大値、平均値等が、演算指定部4に、属性ごとに指定される。
(2)進捗情報入力状態のチェック通知;
管理処理部1は、被管理工程の管理レコードについて、進捗登録予定日に対して、過去の進捗登録日をチェックし、最新記事が入っていなければ対象者に対して通知し処理を促す。進捗登録予定日は、個々の日付の指定、あるいは、繰り返し指定等の形式で確認予定日指定部3に保持される。
The calculation designating unit 4 holds the type of calculation to be executed according to the attribute of each item of the management records L1 to L3 for the lower process. The management processing unit 1 calculates the information input to each item of the management records L1 to L3 for the lower process according to the specification of the calculation specifying unit 4 and reflects it in the management record of the managed process. As the calculation, for example, a processing procedure for counting the items of the lower processes and reflecting them in the managed process is defined. For example, for the text attribute item, the “text combination” of each sub-process item is specified in the calculation specifying unit 4. For items to be evaluated numerically, for example, the total, minimum value, maximum value, average value, and the like are specified for each attribute in the operation specifying unit 4.
(2) Check notification of progress information input status;
The management processing unit 1 checks the past progress registration date with respect to the progress registration scheduled date for the management record of the managed process, and if the latest article is not included, notifies the target person and prompts the processing. The scheduled progress registration date is held in the scheduled confirmation date designating unit 3 in the form of designation of individual dates or repeated designation.

図7に、確認予定日指定部3に指定されるデータを例示する。確認予定日指定部3は、進捗情報を登録する対象の被管理工程のID、登録予定日指定タイプ、および登録予定日の指定を含む。ここで、被管理工程のIDとは、進捗情報が管理される被管理工程を特定する情報である。また、登録予定日指定タイプは、登録予定日を指定する指定形式を定義する。指定形式としては、個々に登録予定日を指定する形式、繰り返し指定形式等が含まれる。   FIG. 7 illustrates data specified by the scheduled confirmation date specifying unit 3. The scheduled confirmation date designating unit 3 includes an ID of a managed process to register progress information, a scheduled registration date designation type, and designation of a scheduled registration date. Here, the ID of the managed process is information that identifies the managed process in which the progress information is managed. The scheduled registration date designation type defines a designation format for designating the scheduled registration date. The designation format includes a format for individually specifying the scheduled registration date, a repeat designation format, and the like.

ただし、図7では、(A)(B)2つの指定例が示されている。図7の(A)は、登録予定日を個々に指定する場合の指定例である。登録予定日が個々に指定される場合に、確認予定日指定部3は、登録予定日指定タイプとして、”DAY”を保持する。さらに、登録予定日が個々に指定される場合に、確認予定日指定部3は、登録予定日として、個々の日付を保持する。管理処理部1は、個々に指定された日付で、進捗情報の入力状態をチェックする。なお、確認予定日指定部3は、登録予定日に加えて、さらに、進捗情報の入力状態をチェックする時間を指定する情報を保持してもよい。   However, in FIG. 7, two designation examples (A) and (B) are shown. (A) of FIG. 7 is an example of designation in the case where individual registration scheduled dates are designated. When the scheduled registration date is individually designated, the scheduled confirmation date designating unit 3 holds “DAY” as the scheduled registration date designation type. Furthermore, when the scheduled registration date is individually designated, the scheduled confirmation date designating unit 3 holds each date as the scheduled registration date. The management processing unit 1 checks the input state of progress information on individually designated dates. In addition to the scheduled registration date, the scheduled confirmation date designating unit 3 may further hold information for designating a time for checking the input state of the progress information.

また、図7の(B)は、登録予定日が繰り返し指定される例である。登録予定日が繰り返し指定される場合に、確認予定日指定部3は、登録予定指定タイプとして、”LOOP”を保持する。また、繰り返し指定される場合には、確認予定日指定部3は、登録予定日として、開始日(START)と、繰り返しのインターバル(LOOPTIME)とを保持する。管理処理部1は、開始日に対応するカレンダーデータに、繰り返しのインターバルに相当する数値を加算することによって、登録予定日を算出し、算出した日付で、進捗情報の入力状態をチェックする。なお、確認予定日指定部3は、繰り返し指定に加えて、さらに、進捗情報の入力状態をチェックする時間を指定する情報を保持してもよい。また、確認予定日指定部3は、日単位ではなく、時間単位の分解能でインターバルを指定できるようにしてもよい。また、毎週○曜日、毎月第○日のように、週単位、あるいは、月単位で指定できるようにしてもよい。   FIG. 7B is an example in which the scheduled registration date is repeatedly specified. When the scheduled registration date is repeatedly designated, the scheduled confirmation date designating unit 3 holds “LOOP” as the registered schedule designation type. In addition, when repeatedly specified, the scheduled check date specifying unit 3 holds a start date (START) and a repeat interval (LOOPTIME) as the scheduled registration date. The management processing unit 1 calculates a scheduled registration date by adding a numerical value corresponding to a repetition interval to calendar data corresponding to the start date, and checks the input state of the progress information on the calculated date. In addition to the repeated designation, the scheduled confirmation date designation unit 3 may further hold information for designating a time for checking the input state of the progress information. Further, the scheduled confirmation date designating unit 3 may be configured to designate an interval with a resolution in units of hours instead of units in days. Moreover, you may enable it to designate on a weekly basis or a monthly basis like every weekday of the week and the first day of every month.

管理処理部1は、確認予定日指定部3での指定を基に、被管理工程のIDで指定される被管理工程に対して、進捗情報の更新がなされているか、否かを以下の手順で管理する。(a)管理処理部1は、それぞれの被管理工程に対して、確認予定日指定部3の登録予定日と、管理対象記憶部2の管理レコード、すなわち進捗情報の登録日を比較する。そして、被管理工程について、確認予定日指定部3の登録予定日を経過しても、登録予定日以降に、進捗情報が更新されていない場合には、管理処理部1は、次の(b)を実行する。
(b)管理処理部1は、(a)で進捗情報が更新されていないと判定した被管理工程に含まれる下位工程の管理レコード、すなわち、下位工程の進捗情報の登録日が、前回の登録予定日より新しい日付かを比較する。そして、前回の登録予定日以降に、下位工程の進捗情報が更新されていない場合、下位工程の担当者に、進捗情報の更新依頼を通知する。例えば、通知は、電子メールの送信によればよい。
The management processing unit 1 determines whether or not progress information has been updated for the managed process specified by the ID of the managed process based on the designation by the scheduled confirmation date designating unit 3 according to the following procedure. Manage with. (A) For each managed process, the management processing unit 1 compares the scheduled registration date of the scheduled confirmation date designating unit 3 with the management record of the management target storage unit 2, that is, the registration date of the progress information. If the progress information has not been updated after the scheduled registration date even after the scheduled registration date of the scheduled confirmation date designating unit 3 has elapsed for the managed process, the management processing unit 1 performs the following (b ).
(B) The management processing unit 1 determines that the management record of the lower process included in the managed process determined that the progress information has not been updated in (a), that is, the registration date of the progress information of the lower process is the previous registration Compare if the date is newer than the scheduled date. If the progress information of the lower process has not been updated since the previous scheduled registration date, the person in charge of the lower process is notified of the progress information update request. For example, the notification may be made by sending an e-mail.

以上述べたように、本実施例の情報処理装置によれば、組織の活動が被管理工程と、被管理工程に含まれる下位工程として把握される。そして、被管理工程および下位工程の進捗情報が管理対象記憶部2のツリー情報レコードに格納される。例えば、下位工程の担当者は、それぞれの工程の進捗情報を下位工程の管理レコードに入力する。一方、管理処理部1は、確認予定日指定部3に指定された登録日以降に、被管理工程の進捗情報の更新がなされているか、否かを判定する。そして、被管理工程の進捗情報の更新がなされていない場合に、被管理工程に含まれる下位工程について、前回の登録日以降に進捗情報の更新がなされているか、否かを判定する。   As described above, according to the information processing apparatus of the present embodiment, the activity of the organization is grasped as a managed process and a sub-process included in the managed process. Then, the progress information of the managed process and the lower process is stored in the tree information record of the management target storage unit 2. For example, the person in charge of the lower process inputs the progress information of each process into the management record of the lower process. On the other hand, the management processing unit 1 determines whether or not the progress information of the managed process has been updated after the registration date specified by the scheduled check date specifying unit 3. When the progress information of the managed process has not been updated, it is determined whether or not the progress information has been updated since the previous registration date for the sub-process included in the managed process.

そして、下位工程について、進捗情報の更新がなされていない場合には、管理処理部1
は、下位工程の担当者に、下位工程の進捗情報の入力、例えば、進捗情報の入力を電子メール等で要求する。
If the progress information has not been updated for the lower process, the management processing unit 1
Requests the person in charge of the lower process to input progress information of the lower process, for example, input of progress information by e-mail or the like.

一方、下位工程について、進捗情報の更新がなされている場合には、下位工程の進捗情報、すなわち、管理レコードの各項目の属性に応じた演算処理を実行し、その演算結果、すなわち、下位工程の進捗情報を加工したデータを下位工程が含まれる上位の被管理工程の管理レコードに反映する。下位工程の管理レコードの各項目の属性に応じた演算処理は、例えば、下位工程の管理レコードの項目がテキストの場合には、テキストを結合する処理である。また、下位工程の管理レコードの各項目の属性に応じた演算処理は、例えば、下位工程の管理レコードの項目が数値評価される項目の場合には、例えば、合計、最小値、最大値、平均値等の処理である。   On the other hand, when the progress information is updated for the lower process, the operation information corresponding to the attribute of each item of the management record is executed, and the calculation result, that is, the lower process is executed. The data obtained by processing the progress information is reflected in the management record of the upper managed process including the lower process. The calculation process according to the attribute of each item of the management record of the lower process is, for example, a process of combining the texts when the item of the management record of the lower process is text. In addition, the arithmetic processing according to the attribute of each item of the management record of the lower process, for example, in the case where the item of the management record of the lower process is an item to be numerically evaluated, for example, the total, the minimum value, the maximum value, the average Processing of values and the like.

したがって、本情報処理装置によれば、各下位工程の担当者が入力した情報を所定の登録予定日に、所定の演算処理にしたがって、加工したデータを生成し、上位の被管理工程の管理レコードに反映できる。したがって、本情報処理装置は、被管理工程と被管理工程に含まれる下位工程が多数におよぶ複雑な組織おいて、工程管理の負担を軽減できる。   Therefore, according to the information processing apparatus, the information input by the person in charge of each lower process is generated on the predetermined registration scheduled date according to the predetermined calculation process, and the management record of the upper managed process is generated. Can be reflected. Therefore, this information processing apparatus can reduce the burden of process management in a complex organization in which a managed process and a number of sub-processes included in the managed process are numerous.

図8から図14の図面を参照して、実施例2に係る情報処理装置を説明する。実施例1では、管理処理部1が、確認予定日指定部3で指定された登録予定日を基準に、ツリー情報レコードの下位工程の進捗情報を、演算指定部4に指定された演算処理にしたがって演算し、上位の被管理工程に反映する処理を説明した。実施例2では、下位工程の進捗情報を演算指定部4に指定された演算処理にしたがって演算し、上位の被管理工程に反映する他の処理を例示する。実施例2に係る情報処理装置の構成は、実施例1の場合と同様である。そこで、実施例2においても、情報処理装置の機能の構成は、図4によって例示し、その説明は省略する。   An information processing apparatus according to the second embodiment will be described with reference to FIGS. 8 to 14. In the first embodiment, the management processing unit 1 converts the progress information of the lower process of the tree information record to the calculation process specified by the calculation specifying unit 4 based on the scheduled registration date specified by the scheduled check date specifying unit 3. Therefore, the process of calculating and reflecting in the upper managed process has been described. In the second embodiment, the progress information of the lower process is calculated according to the calculation process specified in the calculation specifying unit 4, and other processes reflected in the higher managed process are exemplified. The configuration of the information processing apparatus according to the second embodiment is the same as that of the first embodiment. Therefore, also in the second embodiment, the functional configuration of the information processing apparatus is illustrated in FIG. 4 and description thereof is omitted.

<進捗ルールテーブル>
実施例2の情報処理装置の演算指定部4は、進捗ルールテーブルを保持する。図8に、進捗ルールテーブルの構成を例示する。図8のように、進捗ルールテーブルは、ツリー情報レコードの下位工程の管理レコードのそれぞれの項目に対する演算を指定する。なお、図8の例では、進捗ルールテーブルは、管理レコードのそれぞれの項目の属性を有しているが、属性を省略してもよい。
<Progress rule table>
The calculation specifying unit 4 of the information processing apparatus according to the second embodiment holds a progress rule table. FIG. 8 illustrates the configuration of the progress rule table. As shown in FIG. 8, the progress rule table specifies an operation for each item of the management record in the lower process of the tree information record. In the example of FIG. 8, the progress rule table has attributes of the respective items of the management record, but the attributes may be omitted.

図8の例では、例えば、項目”NAME”に対して、演算として、”CAT”、すなわち、結合が指定されている。また、項目”ITEM1”に対して、演算として、”CAT”、すなわち、結合が指定されている。また、項目”ITEM2”に対して、演算として、”SUM”、すなわち、合計が指定されている。また、項目”ITEM3”に対して、演算として、”AVE”、すなわち、平均が指定されている。   In the example of FIG. 8, for example, “CAT”, that is, join is designated as an operation for the item “NAME”. For the item “ITEM1”, “CAT”, that is, join is designated as an operation. For the item “ITEM2”, “SUM”, that is, the total is designated as an operation. For the item “ITEM3”, “AVE”, that is, an average is designated as an operation.

図9に、演算の名称と、演算方法の例を列挙する。図9の例では、演算として、”CAT”、”SUM”、”AVE”、”WORST”、”LATEST”、”DIFF”、”D−COMP”、”CUSTOM”が例示されている。   FIG. 9 lists calculation names and calculation method examples. In the example of FIG. 9, “CAT”, “SUM”, “AVE”, “WORD”, “LATEST”, “DIFF”, “D-COMP”, and “CUSTOM” are illustrated as operations.

すでに述べたように、”CAT”は、テキストの結合、すなわち、下位工程の管理レコードの項目に指定された文章を接続して1つの文章とし、上位の被管理工程の管理レコードに反映する処理を指定する。また、”SUM”は、下位工程の管理レコードの項目に指定された数値を合算し、上位の被管理工程の管理レコードに反映する処理を指定する。   As described above, “CAT” is a process of combining texts, that is, connecting sentences specified in the items of the management record of the lower process into one sentence and reflecting it in the management record of the upper managed process. Is specified. Further, “SUM” specifies a process to be added to the management record of the upper managed process by adding the numerical values specified in the items of the management record of the lower process.

同様に、”AVE”は、下位工程の管理レコードの項目に指定された数値を工程数で平
均し、上位の被管理工程の管理レコードに反映する処理を指定する。同様に、”WORST”は、下位工程の管理レコードの項目に指定された数値のうち、最大値を抽出する。ただし、”WORST”は、数値が大きいほど悪いことを示す項目、例えば、遅延日数、所要時間、所要人員、追加工数等に適用される。また、LATESTは、最新日時、すなわち、最も遅い日時を抽出することを指定する。
Similarly, “AVE” designates a process in which the numerical values designated in the management record item of the lower process are averaged by the number of processes and reflected in the management record of the upper managed process. Similarly, “WORST” extracts the maximum value from the numerical values specified in the management record item of the lower process. However, “WORST” is applied to items indicating that the larger the numerical value, the worse, for example, the number of days delayed, the required time, the required personnel, the additional man-hours, and the like. LATEST specifies that the latest date, that is, the latest date is extracted.

また、”DIFF”は、2つの管理項目間での差分を指定する。例えば、DIFFの演算対象として、下位工程の管理レコード中の1つの項目について、指定された登録日の進捗情報と、指定された登録日の前の登録日の進捗情報とを指定する。例えば、同一項目の異なる登録日の進捗情報の差分値を計算することで、工程の状態を解析できる。   “DIFF” designates a difference between two management items. For example, the progress information of the specified registration date and the progress information of the registration date before the specified registration date are specified for one item in the management record of the lower process as the DIFF calculation target. For example, the state of a process can be analyzed by calculating the difference value of the progress information of different registration dates of the same item.

また、”D−COMP”は、管理レコードの項目に指定された1つのデータと、他のデータとを比較し、一致、不一致を判定する。また、”CUSTOM”は、カスタマイズされた演算、すなわち、ユーザに、既存の演算を組み合わせて、ユーザ独自の演算を定義し、ユーザ指定の管理レコードの項目に適用する機能を提供する。   “D-COMP” compares one data specified in the item of the management record with the other data, and determines a match or mismatch. Also, “CUSTOM” provides a function that is customized operation, that is, a user's own operation is defined by combining an existing operation with a user and applied to the management record item specified by the user.

<処理例>
図10から図12に、実施例2に係る情報処理装置の処理例を示す。図10には、被管理工程BLK1と、被管理工程BLK1に含まれる下位工程P1〜P3が示されている。ツリー情報レコードは、被管理工程BLK1の管理レコードL10と、下位工程P1〜P3の管理レコードL11〜L13とを含む。それぞれの管理レコードは、いずれも、NAME、進捗率、見込み、予定、実績、内容の各項目を含む。
<Processing example>
10 to 12 show processing examples of the information processing apparatus according to the second embodiment. FIG. 10 shows a managed process BLK1 and lower processes P1 to P3 included in the managed process BLK1. The tree information record includes a management record L10 of the managed process BLK1 and management records L11 to L13 of the lower processes P1 to P3. Each management record includes items of NAME, progress rate, expectation, schedule, performance, and contents.

”NAME”の項目は、工程名を保持する。”進捗率”の項目は、各工程の担当者が入力した進捗率を保持する。”見込み”の項目は、計画時の完了予定日付である。”予定”の項目は、各工程の担当者が入力した完了予定日付である。”実績”は、実際に工程が完了した日付である。”内容”は、各工程に関する現在の状況を説明する説明文である。   The item “NAME” holds a process name. The “progress rate” item holds the progress rate input by the person in charge of each process. The item “prospect” is a scheduled completion date at the time of planning. The “schedule” item is a scheduled completion date input by the person in charge of each process. “Actual” is the date when the process is actually completed. “Content” is an explanatory text explaining the current situation regarding each process.

そして、図10の例では、”進捗率”に対する演算として、平均(AVE)が指定されている。また、”予定”に対して、一番遅れそうな値(LATEST)が指定されている。さらに、”内容”に対して、結合(CAT)が指定されている。   In the example of FIG. 10, the average (AVE) is designated as the calculation for “progress rate”. A value (LATEST) that is most likely to be delayed is designated for “schedule”. Further, a combination (CAT) is designated for “content”.

今、確認予定日指定部3に定義された登録予定日が、2009年2月20日であると仮定する。一方、図11のように、被管理工程BLK1の管理レコードの更新日付が2009年2月10日であったとする。なお、上記工程である被管理工程の情報の更新をまとめ登録と呼ぶ。2009年2月10日に被管理工程BLK1の管理レコードが更新され、2009年2月20日に至った場合、管理処理部1は、最新の情報が、被管理工程BLK1の管理レコードに反映されていないと判断する。   Assume that the scheduled registration date defined in the scheduled confirmation date designating unit 3 is February 20, 2009. On the other hand, as shown in FIG. 11, it is assumed that the update date of the management record of the managed process BLK1 is February 10, 2009. In addition, the update of the information of the management process which is the said process is called collective registration. When the management record of the process to be managed BLK1 is updated on February 10, 2009 and the process reaches the date of February 20, 2009, the management processing unit 1 reflects the latest information in the management record of the process to be managed BLK1. Judge that it is not.

そこで、管理処理部1は、被管理工程BLKに含まれる下位工程について、管理レコードを確認する。図12に、下位工程の管理レコードのデータを例示する。図12の例では、下位工程P1については、更新日付が2009年2月15日である。したがって、下位工程P1については、上位の被管理工程BLK1の最新の更新日である2009年2月10日以降に、さらに、新たな情報が入力されている。   Therefore, the management processing unit 1 confirms the management record for the lower processes included in the managed process BLK. FIG. 12 illustrates the data of the management record of the lower process. In the example of FIG. 12, the update date is February 15, 2009 for the sub-process P1. Therefore, new information is input to the lower process P1 after February 10, 2009, which is the latest update date of the upper managed process BLK1.

一方、下位工程P2については、更新日付が2009年2月8日であり、下位工程P3については、更新日付が2009年2月9日である。したがって、下位工程P2、およびP3については、上位の被管理工程BLK1の最新の更新日である2009年2月10日以降に、さらに、新たな情報が入力されていない。そこで、管理処理部1は、下位工程P2、およびP3の担当者に、下位工程P2、P3の管理レコードの更新を依頼する。   On the other hand, for the lower process P2, the update date is February 8, 2009, and for the lower process P3, the update date is February 9, 2009. Therefore, for the lower processes P2 and P3, new information is not input after February 10, 2009, which is the latest update date of the upper managed process BLK1. Therefore, the management processing unit 1 requests the person in charge of the lower processes P2 and P3 to update the management records of the lower processes P2 and P3.

そして、すべての下位工程の管理レコードについて、被管理工程BLK1の管理レコードの前回の更新日付(2009年2月10日)以降に、更新がなされると、管理処理部1は、下位工程の管理レコードのそれぞれの項目に指定された演算にしたがって、それぞれの項目を演算し、演算結果のデータを上位の被管理工程BLK1の管理レコードに反映する。すなわち、管理処理部1は、下位工程の管理レコードの更新後の情報を演算し、上位の管理レコードにまとめ登録する。   When the management records of all the lower processes are updated after the previous update date (February 10, 2009) of the management records of the managed process BLK1, the management processing unit 1 manages the lower processes. Each item is calculated according to the calculation specified for each item of the record, and the data of the calculation result is reflected in the management record of the higher-level managed process BLK1. In other words, the management processing unit 1 calculates the updated information of the management record of the lower process, and collectively registers it in the higher management record.

<システムの構成例>
図13に、実施例2の情報システムの構成を例示する。実施例2の情報システムは、情報処理装置10と、複数の端末20−1、20−2等を有する。情報処理装置10は、実施例1で説明した情報処理装置と同様であり、管理処理部1、およびデータベースを含む。また、データベースは、管理対象記憶部2、確認予定指定部3、および演算指定部4を含む。
<System configuration example>
FIG. 13 illustrates the configuration of the information system according to the second embodiment. The information system according to the second embodiment includes the information processing apparatus 10 and a plurality of terminals 20-1 and 20-2. The information processing apparatus 10 is the same as the information processing apparatus described in the first embodiment, and includes a management processing unit 1 and a database. The database includes a management target storage unit 2, a confirmation schedule designation unit 3, and a calculation designation unit 4.

情報処理装置10は、ネットワーク30を通じて、複数の端末20−1、20−2等と接続される。なお、複数の端末20−1、20−2等を総称する場合には、単に端末20と呼ぶ。   The information processing apparatus 10 is connected to a plurality of terminals 20-1 and 20-2 through the network 30. In addition, when naming several terminal 20-1, 20-2 etc. generically, it calls the terminal 20 only.

各工程の担当者は、自身の端末、例えば、端末20−1からネットワーク30を通じて、情報処理装置10にアクセスし、下位工程の進捗情報を入力する。入力された進捗情報は、データベース内の管理対象記憶部2の管理レコードに格納される。   The person in charge of each process accesses the information processing apparatus 10 from its own terminal, for example, the terminal 20-1 through the network 30, and inputs the progress information of the lower process. The input progress information is stored in the management record of the management target storage unit 2 in the database.

一方、上位工程、すなわち、被管理工程の管理者は、自身の端末、例えば、端末20−2からネットワーク30を通じて、情報処理装置10にアクセスし、管理処理の実行を起動する。管理処理の実行が起動されると、情報処理装置10は管理処理部1として機能する。管理処理部1は、被管理工程の進捗情報の更新日、および、被管理工程に含まれる下位工程の更新日を確認する。そして、例えば、図11に示したように、被管理工程の管理レコードが更新されていない場合には、管理処理部1は、図12に示したように、下位工程について、管理レコードの更新がなされているか否かを確認する。そして、下位工程の管理レコードの更新がなされていない場合には、更新がなされていない工程の担当者に電子メール等で管理レコードの更新を促す。また、下位工程の管理レコードの更新がなされているが、被管理工程の管理レコードが更新されていない場合には、管理処理部1は、演算指定部4の指定にしたがって、下位工程の管理レコードの項目を演算し、被管理工程の管理レコードに反映する。   On the other hand, the manager of the upper process, that is, the managed process accesses the information processing apparatus 10 from its own terminal, for example, the terminal 20-2 through the network 30, and starts execution of the management process. When the execution of the management process is activated, the information processing apparatus 10 functions as the management processing unit 1. The management processing unit 1 checks the update date of the progress information of the managed process and the update date of the lower process included in the managed process. For example, as shown in FIG. 11, when the management record of the managed process is not updated, the management processing unit 1 updates the management record for the lower process as shown in FIG. Check if it has been done. If the management record of the lower process has not been updated, the person in charge of the process that has not been updated is urged to update the management record by e-mail or the like. In addition, when the management record of the lower process is updated, but the management record of the managed process is not updated, the management processing unit 1 performs the management record of the lower process according to the designation of the calculation designating unit 4 Is calculated and reflected in the management record of the managed process.

<ハードウェア構成の例>
図14に、情報処理装置のハードウェア構成を例示する。情報処理装置10は、ネットワーク30に接続可能なコンピュータである。情報処理装置10は、CPU11、メモリ12、ハードディスクドライブ13等の外部記憶装置、ディスプレイ14、操作部15、通信部16、可搬型記憶媒体入出力装置17を有する。
<Example of hardware configuration>
FIG. 14 illustrates a hardware configuration of the information processing apparatus. The information processing apparatus 10 is a computer that can be connected to the network 30. The information processing apparatus 10 includes an external storage device such as a CPU 11, a memory 12, and a hard disk drive 13, a display 14, an operation unit 15, a communication unit 16, and a portable storage medium input / output device 17.

CPU11は、メモリ12に実行可能に展開されたコンピュータプログラムを実行し、情報処理装置10の機能を提供する。CPU11は、1個に限定されず、複数のコアを含むものでもよい。   The CPU 11 executes a computer program that is loaded in the memory 12 and provides the functions of the information processing apparatus 10. The CPU 11 is not limited to one and may include a plurality of cores.

メモリ12は、CPU11が実行するコンピュータプログラム、CPU11が処理するデータ等を記憶する。メモリ11は、不揮発性のROM(Read Only Memory)と、揮発性のDRAM(Dynamic Random Access Memory)とを含む。   The memory 12 stores a computer program executed by the CPU 11, data processed by the CPU 11, and the like. The memory 11 includes a nonvolatile ROM (Read Only Memory) and a volatile DRAM (Dynamic Random Access Memory).

ハードディスクドライブ13に駆動されるハードディスクには、メモリ12に展開されるコンピュータプログラム、あるいは、CPU11が処理するデータ等が格納される。ハードディスクドライブ13に代えて、フラッシュメモリ等、SSD(Solid State Drive
)を用いてもよい。ハードディスクドライブ13、あるいは、SSD等の外部記憶装置は、インターフェース13Aを通じて、CPU21に接続される。
The hard disk driven by the hard disk drive 13 stores a computer program expanded in the memory 12 or data processed by the CPU 11. Instead of the hard disk drive 13, an SSD (Solid State Drive) such as a flash memory
) May be used. The hard disk drive 13 or an external storage device such as an SSD is connected to the CPU 21 through the interface 13A.

インターフェース13Aは、例えば、USB(Universal Serial Bus)、IDE(Integrated Drive Electronics)、SCSI(Small Computer System Interface)、FC(Fibre Channel)等のインターフェースである。   The interface 13A is an interface such as USB (Universal Serial Bus), IDE (Integrated Drive Electronics), SCSI (Small Computer System Interface), or FC (Fibre Channel).

ディスプレイ14は、例えば、液晶ディスプレイ、エレクトロルミネッセンスパネル等である。ディスプレイ14は、インターフェース14Aを通じて、CPU21に接続される。インターフェース14Aは、例えば、VGA(Video Graphics Array)等のグラフィックスモジュール、DVI(Digital Visual Interface)等のインターフェースである。   The display 14 is, for example, a liquid crystal display or an electroluminescence panel. The display 14 is connected to the CPU 21 through the interface 14A. The interface 14A is, for example, a graphics module such as VGA (Video Graphics Array) or an interface such as DVI (Digital Visual Interface).

操作部15は、キーボード、マウス、タッチパネル、静電パッド等の入力装置である。静電パッドは、平面パッドを指等でなぞるユーザ操作を検知し、ユーザ操作に応じてディスプレイ上のカーソルの位置と移動状態とを制御するために使用される装置である。例えば、平面パッド下の電極の静電容量の変化によって、ユーザの指の動きが検知される。操作部15は、インターフェース15Aを通じて、CPU11に接続される。インターフェース15Aは、例えば、USBのインターフェースである。   The operation unit 15 is an input device such as a keyboard, a mouse, a touch panel, and an electrostatic pad. The electrostatic pad is a device used to detect a user operation of tracing a flat pad with a finger or the like, and to control the position and movement state of the cursor on the display in accordance with the user operation. For example, the movement of the user's finger is detected by a change in the capacitance of the electrode under the flat pad. The operation unit 15 is connected to the CPU 11 through the interface 15A. The interface 15A is, for example, a USB interface.

通信部16は、NIC(Network Interface Card)とも呼ばれる。通信部16は、例えば、LAN(Local Area Network)のインターフェースである。通信部16は、インターフェース16Aを通じて、CPU11に接続される。インターフェース16Aは、例えば、CPU11の内部バスに接続する拡張スロットである。   The communication unit 16 is also called a NIC (Network Interface Card). The communication unit 16 is, for example, a LAN (Local Area Network) interface. The communication unit 16 is connected to the CPU 11 through the interface 16A. The interface 16A is an expansion slot connected to the internal bus of the CPU 11, for example.

可搬型記憶装置17は、例えば、CD(Compact Disc)、DVD(Digital Versatile Disk)、ブルーレイディスク、フラッシュメモリカード等の入出力装置である。可搬型記憶装置17は、インターフェース17Aを通じて、CPU11に接続される。インターフェース17Aは、例えば、USB、SCSI等のインターフェースである。   The portable storage device 17 is, for example, an input / output device such as a CD (Compact Disc), a DVD (Digital Versatile Disk), a Blu-ray disc, or a flash memory card. The portable storage device 17 is connected to the CPU 11 through the interface 17A. The interface 17A is an interface such as USB or SCSI, for example.

なお、端末20の構成は、ほぼ、図13に示した情報処理装置10と同様である。すなわち、端末20は、CPU、メモリ、外部記憶装置、ディスプレイ、操作部、通信部、可搬型媒体入出力装置等を有する。   The configuration of the terminal 20 is almost the same as that of the information processing apparatus 10 shown in FIG. That is, the terminal 20 includes a CPU, a memory, an external storage device, a display, an operation unit, a communication unit, a portable medium input / output device, and the like.

<処理フロー>
図15に、実施例2の情報システムが実行する管理処理の処理フローを例示する。
<Processing flow>
FIG. 15 illustrates a processing flow of management processing executed by the information system according to the second embodiment.

被管理工程の管理者は、自身の端末、例えば、図13に示した端末20−2からネットワーク30を通じて、情報処理装置10にアクセスし、管理処理を起動する。管理処理は、例えば、端末20−2からネットワーク30を通じてアクセスされる情報処理装置10で起動される。管理処理では、情報処理装置10のCPU11は、図4に示した管理処理部1として、メモリ12上に実行可能に展開されたコンピュータプログラムを実行する。そこで、以下、情報処理装置10の処理を管理処理部1の処理として説明する。   The manager of the managed process accesses the information processing apparatus 10 from his / her terminal, for example, the terminal 20-2 shown in FIG. 13 through the network 30, and starts management processing. For example, the management process is started in the information processing apparatus 10 accessed from the terminal 20-2 through the network 30. In the management process, the CPU 11 of the information processing apparatus 10 executes a computer program that is executable on the memory 12 as the management processing unit 1 shown in FIG. Therefore, hereinafter, the process of the information processing apparatus 10 will be described as the process of the management processing unit 1.

管理処理部1は、端末20−2にまとめ進捗登録処理の画面を表示させる。そして、例えば、被管理工程の管理者が、端末20−2に表示された画面上のまとめ進捗登録処理実行ボタンの操作部15による押下、あるいは、まとめ進捗登録処理実行メニューの操作部15による選択を行う。すると、端末20−2から情報処理装置10に、まとめ進捗登録
処理の実行が指示されるので、情報処理装置10は、チェックルールにしたがったまとめ進捗登録処理を実行する。
The management processing unit 1 causes the terminal 20-2 to display a summary progress registration processing screen. Then, for example, the manager of the managed process presses the summary progress registration process execution button on the screen displayed on the terminal 20-2 with the operation unit 15, or selects with the operation unit 15 of the summary progress registration process execution menu. I do. Then, since execution of the summary progress registration process is instructed from the terminal 20-2 to the information processing apparatus 10, the information processing apparatus 10 executes the summary progress registration process according to the check rule.

管理処理部1は、まず、自動登録がONに設定されているか否かを判定する(F21)。自動登録がONかOFFかは、例えば、情報処理装置10が端末20−2に提供する管理者用の画面で管理者が指定できる。   The management processing unit 1 first determines whether or not automatic registration is set to ON (F21). Whether the automatic registration is ON or OFF can be specified by the administrator on the screen for the administrator that the information processing apparatus 10 provides to the terminal 20-2, for example.

自動登録がONに設定されている場合、管理処理部1は、自動登録モードで処理を実行する(F23)。以下、自動登録モードの処理を例示する。自動登録モードでは、管理処理部1は、現在の日時を情報処理装置10のOS(オペレーティングシステム)から取得する。そして、管理処理部1は、現在の日時が登録予定日を過ぎているか、否かを判定する(F24)。   When the automatic registration is set to ON, the management processing unit 1 executes the process in the automatic registration mode (F23). Hereinafter, processing in the automatic registration mode will be exemplified. In the automatic registration mode, the management processing unit 1 acquires the current date and time from the OS (operating system) of the information processing apparatus 10. Then, the management processing unit 1 determines whether or not the current date has passed the scheduled registration date (F24).

現在の日時が、登録予定日を過ぎていない場合、管理処理部1は、まとめ進捗処理をNGの戻り値で終了してよい。ただし、現在の日時が登録予定日を過ぎているか否かの判定処理を含むF23−F26の処理は、例えば、バックグラウンドのプロセスとして定期的に実行されるようにしてもよい。そして、登録予定日が過ぎたことをトリガとしてF25以下の処理が実行されるようにしてもよい。   When the current date and time does not pass the scheduled registration date, the management processing unit 1 may end the summary progress process with an NG return value. However, the processing of F23 to F26 including the determination processing of whether or not the current date and time is past the scheduled registration date may be periodically executed as a background process, for example. Then, the process from F25 onward may be executed when the scheduled registration date has passed.

現在の日時が、登録予定日を過ぎている場合、管理処理部1は、前回の登録日以降、被管理工程に含まれる下位工程に関する新たな報告があるか否かを判定する(F25)。前回の登録日とは、上位工程、すなわち、被管理工程についての管理レコードの最新の登録日をいう。前回の登録日以降、被管理工程に含まれる下位工程に関する新たな報告がない場合、管理処理部1は、下位工程の担当者に、下位工程に関する新たな報告の入力要求を通知する(F26)。入力要求は、例えば、メールを送信することによってなされる。入力要求は、登録予定日を過ぎている場合には、下位工程に関する新たな報告の入力が確認されるまで、定期的に、例えば、一日1回実行されるようにしてもよい。また、入力要求を定期的に実行する場合には、まとめ進捗処理自体は、一旦終了してもよい。あるいは、管理処理部1は、下位工程に関する新たな報告の入力が確認されるまで、まとめ進捗登録処理を継続し、新たな報告の入力が確認されると、管理処理部1は、OKの戻り値でまとめ登録処理を終了してもよい。   When the current date and time is past the scheduled registration date, the management processing unit 1 determines whether or not there is a new report related to the sub-process included in the managed process after the previous registration date (F25). The previous registration date refers to the latest registration date of the management record for the upper process, that is, the process to be managed. If there is no new report related to the lower process included in the managed process since the previous registration date, the management processing unit 1 notifies the person in charge of the lower process of an input request for a new report related to the lower process (F26). . The input request is made, for example, by transmitting a mail. When the scheduled registration date has passed, the input request may be executed periodically, for example, once a day until the input of a new report regarding the lower process is confirmed. Further, when the input request is periodically executed, the summary progress process itself may be temporarily ended. Alternatively, the management processing unit 1 continues the summary progress registration process until the input of a new report regarding the lower process is confirmed. When the input of the new report is confirmed, the management processing unit 1 returns the OK. The batch registration process may be terminated with the value.

一方、F25の判定で、前回の登録日以降、被管理工程に含まれる下位工程に関する新たな報告がある場合、管理処理部1は、OKの戻り値でまとめ登録処理を終了する。なお、被管理工程に含まれる下位工程が複数ある場合には、F24−F26の処理は、被管理工程に含まれる複数の下位工程に対して実行される。   On the other hand, if it is determined in F25 that there is a new report related to the lower process included in the managed process after the previous registration date, the management processing unit 1 ends the registration process with a return value of OK. In addition, when there are a plurality of sub-processes included in the managed process, the processing of F24 to F26 is executed for a plurality of sub-processes included in the managed process.

まとめ登録処理がOKの戻り値で終了すると、管理処理部1は、進捗情報収集処理を実行する(F3)。進捗情報収集処理では、管理処理部1は、被管理工程に含まれる下位工程、すなわち、各プロセスの管理レコードを読み込む(F31)。そして、管理処理部1は、進捗集計ルールを基に下位工程の管理レコードの項目情報を収集する(F32)。進捗集計ルールにしたがった処理とは、図9に示した演算により処理であり、図8のように、例えば、管理レコードの項目ごとに指定できる。管理処理部1は、情報が未収集のすべての下位工程の情報を収集するまで、F32の処理を繰り返す(F33)。そして、情報が未収集のすべての下位工程について、情報収集が完了すると、管理処理部1は、進捗情報収集処理を終了する(F33)。   When the summary registration process ends with an OK return value, the management processing unit 1 executes a progress information collection process (F3). In the progress information collection process, the management processing unit 1 reads the subordinate process included in the managed process, that is, the management record of each process (F31). And the management process part 1 collects the item information of the management record of a lower process based on a progress totalization rule (F32). The process according to the progress aggregation rule is a process by the calculation shown in FIG. 9, and can be specified for each item of the management record as shown in FIG. The management processing unit 1 repeats the process of F32 until it collects information of all lower processes whose information has not been collected (F33). Then, when information collection is completed for all the sub-processes for which information has not been collected, the management processing unit 1 ends the progress information collection process (F33).

次に、管理処理部1は、まとめ進捗登録処理および進捗情報収集処理で収集した情報を表示する(F4)。F4の処理では、例えば、下位工程の管理レコードを基に結合されたテキスト、数値の合計値、平均値、最大値、最低値、日程の最大遅延値、項目間の差分値
、ユーザ指定のカスタマイズ関数等により、スケジュールの遅延、完了予定日、現在の工数等、追加となる見込み工数等が表示される。その結果、スケジュール状況の遅延を示す進捗情報が抽出される。
Next, the management processing unit 1 displays the information collected in the summary progress registration process and the progress information collection process (F4). In the process of F4, for example, text combined based on the management record of the lower process, total value of numerical values, average value, maximum value, minimum value, maximum delay value of schedule, difference value between items, user-specified customization Depending on the function or the like, a schedule delay, a scheduled completion date, a current man-hour, and the like, an additional expected man-hour, etc. are displayed. As a result, progress information indicating the delay of the schedule status is extracted.

そして、例えば、管理者が端末20−2に表示された画面上の登録ボタンを押下し、あるいは、登録メニュー等を選択することにより、画面上の情報が、被管理工程の管理レコードとして、管理対象記憶部2に登録される。その後、管理処理部1は、処理を終了すればよい。   Then, for example, when the administrator presses a registration button on the screen displayed on the terminal 20-2 or selects a registration menu or the like, the information on the screen is managed as a management record of the managed process. Registered in the target storage unit 2. Thereafter, the management processing unit 1 may end the process.

一方、F2において、戻り値NGでまとめ進捗登録処理が終了した場合、管理処理部1は、そのまま処理を終了してもよい。   On the other hand, in F2, when the summary progress registration process ends with the return value NG, the management processing unit 1 may end the process as it is.

以上述べたように、本実施例の情報処理装置10によれば、複数の下位工程を含む被管理工程を管理する場合に、下位工程の各担当者への進捗情報の入力要求、進捗報告内容の確認、収集した進捗報告内容の被管理工程へのまとめ作業等の管理処理をCPU10がコンピュータプログラムにしたがって、管理処理部1として実行する。したがって、管理者は、例えば、端末20−2に表示された画面上の実行指示ボタンの押下、メニュー項目の選択等の操作によって、管理処理を実行できる。管理者は、端末20−2に表示された画面の進捗情報収集処理の結果を確認し、収集した情報の管理対象記憶部2への登録を指示すればよい。したがって、組織の活動が、階層構造をなす上位工程と下位工程の組み合わせで行われる場合も、組織の管理者の負担が軽減される。   As described above, according to the information processing apparatus 10 of the present embodiment, when managing a managed process including a plurality of sub-processes, a progress information input request to each person in charge of the sub-process and progress report contents The CPU 10 executes management processing such as confirmation of the collected information on the collected progress reports to the managed process as the management processing unit 1 according to the computer program. Therefore, the administrator can execute the management process by, for example, pressing an execution instruction button on the screen displayed on the terminal 20-2, selecting a menu item, or the like. The administrator may confirm the result of the progress information collection process on the screen displayed on the terminal 20-2 and instruct the registration of the collected information in the management target storage unit 2. Therefore, the burden on the manager of the organization is reduced even when the activity of the organization is performed by a combination of the upper process and the lower process having a hierarchical structure.

なお、実施例2では、被管理工程と被管理工程に含まれる下位工程を有する2階層の工程管理の例を示した。しかし、被管理工程にさらに、上位工程が存在する場合も、情報処理装置10は、実施例2と同様の処理を実行すればよい。また、下位工程にさらに、下位の孫工程が存在する場合も、情報処理装置10は、実施例2と同様の処理を実行すればよい。すなわち、実施例2に示した処理は、工程の階層が2階層に限定されることはなく、3以上のN階層の工程を含む組織の活動にも同様に適用できる。
《コンピュータが読み取り可能な記録媒体》
コンピュータその他の機械、装置(以下、コンピュータ等)に上記いずれかの機能を実現させるプログラムをコンピュータ等が読み取り可能な記録媒体に記録することができる。そして、コンピュータ等に、この記録媒体のプログラムを読み込ませて実行させることにより、その機能を提供させることができる。
In the second embodiment, an example of a two-level process management including a managed process and a lower process included in the managed process is shown. However, the information processing apparatus 10 may perform the same process as in the second embodiment even when a higher-level process exists in the managed process. Further, even when there is a lower grandchild process in the lower process, the information processing apparatus 10 may perform the same process as in the second embodiment. In other words, the processing shown in the second embodiment is not limited to two steps, and can be similarly applied to activities of an organization including three or more N steps.
<Computer-readable recording medium>
A program for causing a computer or other machine or device (hereinafter, a computer or the like) to realize any of the above functions can be recorded on a recording medium that can be read by the computer or the like. The function can be provided by causing a computer or the like to read and execute the program of the recording medium.

ここで、コンピュータ等が読み取り可能な記録媒体とは、データやプログラム等の情報を電気的、磁気的、光学的、機械的、または化学的作用によって蓄積し、コンピュータ等から読み取ることができる記録媒体をいう。このような記録媒体のうちコンピュータ等から取り外し可能なものとしては、例えばフレキシブルディスク、光磁気ディスク、CD−ROM、CD−R/W、DVD、ブルーレイディスク、DAT、8mmテープ、フラッシュメモリなどのメモリカード等がある。また、コンピュータ等に固定された記録媒体としてハードディスクやROM(リードオンリーメモリ)等がある。   Here, a computer-readable recording medium is a recording medium that stores information such as data and programs by electrical, magnetic, optical, mechanical, or chemical action and can be read from a computer or the like. Say. Examples of such a recording medium that can be removed from a computer or the like include a flexible disk, a magneto-optical disk, a CD-ROM, a CD-R / W, a DVD, a Blu-ray disk, a DAT, an 8 mm tape, a flash memory, and the like. There are cards. In addition, as a recording medium fixed to a computer or the like, there are a hard disk, a ROM (read only memory), and the like.

1 管理処理部
2 管理対象記憶部
3 確認予定日指定部
4 演算指定部
10 情報処理装置
20 端末
DESCRIPTION OF SYMBOLS 1 Management processing part 2 Management object memory | storage part 3 Confirmation scheduled date designation | designated part 4 Calculation designation | designated part 10 Information processing apparatus 20 Terminal

Claims (3)

被管理工程と前記被管理工程に含まれる複数の下位工程について、管理対象項目の情報を記憶する管理対象記憶部と、
前記被管理工程について、前記管理対象項目の確認予定期限日を記憶する確認予定日指定部と、
前記それぞれの下位工程の管理対象項目を、前記下位工程が含まれる上位工程の管理対象項目に反映する演算手順を記憶する演算指定部と、
前記被管理工程の確認予定期限日以後に、前記演算指定部に記憶された演算手順にしたがって前記下位工程の管理対象項目の情報を演算し、前記被管理工程の管理対象項目の情報として前記管理対象記憶部に記憶させる管理処理部と、を備える情報処理装置。
A managed object storage unit that stores information on managed items for a managed process and a plurality of sub-processes included in the managed process;
About the managed process, a scheduled confirmation date designating unit for storing a scheduled confirmation date of the management target item;
A calculation designating unit for storing a calculation procedure for reflecting the management target item of each of the lower processes in the management target item of the higher process including the lower process;
After the scheduled check due date of the managed process, information on the management target item of the lower process is calculated according to the calculation procedure stored in the calculation specifying unit, and the management target item information of the managed process is calculated as the management target item information. An information processing apparatus comprising: a management processing unit that is stored in a target storage unit.
コンピュータが、
被管理工程と前記被管理工程に含まれる複数の下位工程について、管理対象項目の情報を管理対象記憶部に記憶するステップと、
前記被管理工程について、前記管理対象項目の確認予定期限日を確認予定日指定部から読み出すステップと、
前記それぞれの下位工程の管理対象項目を、前記下位工程が含まれる上位工程の管理対象項目に反映する演算手順を演算指定部から読み出すステップと、
前記被管理工程の確認予定期限日に、前記演算指定部に記憶された演算手順にしたがって前記下位工程の管理対象項目の情報を演算し、前記被管理工程の管理対象項目の情報として前記管理対象記憶部に記憶させる管理処理ステップと、を実行する情報処理方法。
Computer
For the managed process and a plurality of sub-processes included in the managed process, storing information on the management target item in the management target storage unit;
For the process to be managed, a step of reading a scheduled confirmation date of the management target item from a scheduled confirmation date designation unit;
A step of reading out a calculation procedure for reflecting the management target item of each of the lower processes on the management target item of the upper process including the lower process from the calculation specifying unit;
The management target item information of the subordinate process is calculated according to the calculation procedure stored in the calculation specifying unit on the scheduled check date of the managed process, and the management target item is managed target item information of the managed process. An information processing method for executing management processing steps stored in a storage unit.
コンピュータに、
被管理工程と前記被管理工程に含まれる複数の下位工程について、管理対象項目の情報を管理対象記憶部に記憶するステップと、
前記被管理工程について、前記管理対象項目の確認予定期限日を確認予定日指定部から読み出すステップと、
前記それぞれの下位工程の管理対象項目を、前記下位工程が含まれる上位工程の管理対象項目に反映する演算手順を演算指定部から読み出すステップと、
前記被管理工程の確認予定期限日に、前記演算指定部に記憶された演算手順にしたがって前記下位工程の管理対象項目の情報を演算し、前記被管理工程の管理対象項目の情報として前記管理対象記憶部に記憶させる管理処理ステップと、を実行させるためのプログラム。
On the computer,
For the managed process and a plurality of sub-processes included in the managed process, storing information on the management target item in the management target storage unit;
For the process to be managed, a step of reading a scheduled confirmation date of the management target item from a scheduled confirmation date designation unit;
A step of reading out a calculation procedure for reflecting the management target item of each of the lower processes on the management target item of the upper process including the lower process from the calculation specifying unit;
The management target item information of the subordinate process is calculated according to the calculation procedure stored in the calculation specifying unit on the scheduled check date of the managed process, and the management target item is managed target item information of the managed process. A management processing step to be stored in the storage unit.
JP2009166232A 2009-07-15 2009-07-15 Information processing device Expired - Fee Related JP5332991B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009166232A JP5332991B2 (en) 2009-07-15 2009-07-15 Information processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009166232A JP5332991B2 (en) 2009-07-15 2009-07-15 Information processing device

Publications (2)

Publication Number Publication Date
JP2011022734A true JP2011022734A (en) 2011-02-03
JP5332991B2 JP5332991B2 (en) 2013-11-06

Family

ID=43632762

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009166232A Expired - Fee Related JP5332991B2 (en) 2009-07-15 2009-07-15 Information processing device

Country Status (1)

Country Link
JP (1) JP5332991B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014065277A1 (en) * 2012-10-25 2014-05-01 株式会社日立ハイテクノロジーズ Automatic analysis device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05131346A (en) * 1991-11-12 1993-05-28 Hitachi Ltd Work control method
JPH08212264A (en) * 1994-12-09 1996-08-20 Toshiba Corp Scheduling device and scheduling method
JPH0981636A (en) * 1995-09-14 1997-03-28 Toshiba Corp Project management assisting device
JPH1139383A (en) * 1997-07-22 1999-02-12 Fujitsu Ltd Device and method for managing project and program storage medium
JP2006195677A (en) * 2005-01-12 2006-07-27 Canon Inc Apparatus for managing project information
JP2008146182A (en) * 2006-12-06 2008-06-26 Mitsubishi Electric Corp Project management device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05131346A (en) * 1991-11-12 1993-05-28 Hitachi Ltd Work control method
JPH08212264A (en) * 1994-12-09 1996-08-20 Toshiba Corp Scheduling device and scheduling method
JPH0981636A (en) * 1995-09-14 1997-03-28 Toshiba Corp Project management assisting device
JPH1139383A (en) * 1997-07-22 1999-02-12 Fujitsu Ltd Device and method for managing project and program storage medium
JP2006195677A (en) * 2005-01-12 2006-07-27 Canon Inc Apparatus for managing project information
JP2008146182A (en) * 2006-12-06 2008-06-26 Mitsubishi Electric Corp Project management device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014065277A1 (en) * 2012-10-25 2014-05-01 株式会社日立ハイテクノロジーズ Automatic analysis device

Also Published As

Publication number Publication date
JP5332991B2 (en) 2013-11-06

Similar Documents

Publication Publication Date Title
JP4733461B2 (en) Computer system, management computer, and logical storage area management method
RU2498391C2 (en) Exchange of information between user interface of inner space of document editor and user interface of outer space of document editor
US20070162324A1 (en) Workflow management system
US7831929B2 (en) Method, system, and program product for controlling a display on a data editing screen
US20070261030A1 (en) Method and system for tracking and prioritizing applications
JPH08287162A (en) Work flow system
US20070192118A1 (en) Automatically-generated workflow report diagrams
JP2008517385A (en) System and method for process automation and implementation
JPH09138823A (en) Progress control method for design and development and its system, control method for designing and developing project and its system
US5842177A (en) Management of calendar events in a data processing system
US20060174216A1 (en) Providing additional hierarchical information for an object displayed in a tree view in a hierarchical relationship with other objects
CN109978392B (en) Agile software development management method and device, electronic equipment and storage medium
US20030046135A1 (en) Method and apparatus for automated timesheet and other related information recording, processing and visualisation
US20170337194A1 (en) Visualizing document activity
US20140279588A1 (en) Legal mandate system and method
WO2007131004A2 (en) Automated timesheet generation with auto summarizer
US20080140608A1 (en) Information Managing Apparatus, Method, and Program
US20170192662A1 (en) Displaying a series of reports within a single user interface
JP2017045238A (en) Information processing system, information processing device, and information processing method
JP2007272655A (en) Project management system and project management method
KR101725142B1 (en) Strategy map management method and device, and storage media storing the same
JP5332991B2 (en) Information processing device
JP5845961B2 (en) Information processing apparatus and information processing program
US20100094815A1 (en) Method and apparatus for performing type-aware change tracking in a document
JP2003331113A (en) System and method for autonomous improvement of business process

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120405

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130411

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130617

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130715

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees