JP2010281033A - Construction method for reinforcing masonry wall, and masonry structure - Google Patents

Construction method for reinforcing masonry wall, and masonry structure Download PDF

Info

Publication number
JP2010281033A
JP2010281033A JP2009132716A JP2009132716A JP2010281033A JP 2010281033 A JP2010281033 A JP 2010281033A JP 2009132716 A JP2009132716 A JP 2009132716A JP 2009132716 A JP2009132716 A JP 2009132716A JP 2010281033 A JP2010281033 A JP 2010281033A
Authority
JP
Japan
Prior art keywords
hole
masonry
wall
masonry wall
tension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009132716A
Other languages
Japanese (ja)
Other versions
JP5393263B2 (en
Inventor
Yasumasa Miyauchi
靖昌 宮内
Nagahito Kobayashi
長仁 木林
Yutaka Kitajima
裕 北嶋
Mitsuhiro Kurahashi
光弘 倉橋
Masato Yamamoto
正人 山本
Hassane Ousalem
ハッサン ウサレム
Hiroshi Takahashi
拡 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2009132716A priority Critical patent/JP5393263B2/en
Publication of JP2010281033A publication Critical patent/JP2010281033A/en
Application granted granted Critical
Publication of JP5393263B2 publication Critical patent/JP5393263B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To enhance earthquake-resisting performance of a masonry wall without shifting the masonry wall. <P>SOLUTION: An anchor plate 350 is attached to a lower end 306 of a prestressing bar 302 from a horizontal hole 210 which is formed in a foundation 200 of a brick wall 100, without shifting the existing brick wall 100. Subsequently, the anchor plate 350 is fixed by infilling high-early-strength concrete 212 into the horizontal hole 210. In other words, the anchor plate 350 functioning as a fixed end can be provided at the lower end 306 of the prestressing bar 302, without the relocation of the brick wall 100, by forming the horizontal hole 210 in the foundation 200. A compressive force is applied between the upper and lower ends 120 and 110 of the brick wall 100 by the plurality of prestressing bars 302 which penetrate between the upper and lower ends 120 and 110 of the brick wall 100 and to which a tensioning force is applied. <P>COPYRIGHT: (C)2011,JPO&amp;INPIT

Description

本発明は、組積造壁の補強工法及び組積造構造物に関する。   The present invention relates to a masonry wall reinforcing method and a masonry structure.

明治から昭和初期に建造された洋風のレンガ造に代表される古い組積造構造物を、景観保存の観点、文化財保存の観点、及び商業施設への転用の観点等から、保存活用する要望がある。しかし、古い組積造構造物の殆どが、現行の耐震基準を満足する設計が行なわれておらず、保存活用するためには、耐震補強を行なう必要がある。   Requests to preserve and utilize old masonry structures, such as Western bricks built in the Meiji to early Showa eras, from the viewpoint of landscape preservation, cultural property preservation, and diversion to commercial facilities There is. However, most old masonry structures have not been designed to meet the current seismic standards, and seismic reinforcement is required to preserve and utilize them.

そこで、特許文献1には、既存の組積造構造物の組積壁中を貫通し下端部が地盤中にグラウトで固定された棒鋼に、緊張力を付与することによって組積壁に圧縮力を付与し、組積造壁構造物を補強する方法が提案されている(特許文献1を参照)。   Therefore, in Patent Document 1, a compressive force is applied to the masonry wall by applying tension to a steel bar that penetrates the masonry wall of an existing masonry structure and has a lower end fixed by grout in the ground. And a method for reinforcing a masonry wall structure has been proposed (see Patent Document 1).

また、特許文献2には、組積造建物を構成する壁体の一部を分断して移設する際に耐震補強を行なう補強方法が提案されている。すなわち、新たに壁体を設置する移設箇所に新設した地中梁の上に壁体を立設し、移設する壁体に予め形成した貫通孔にPC鋼棒を挿通し、PC鋼棒の下端を新設した地中梁に固定すると共に、壁体の上端に鉄骨梁を設ける。そして、地中梁と鉄骨梁とを緊張端として、PC鋼棒に緊張力を付与することで、壁体を構成するレンガ等の組積材(ブロック)と目地材との間に圧縮力を作用させて、これらの間に剥離が生じることを防止する(特許文献2を参照)。   Patent Document 2 proposes a reinforcing method for performing seismic reinforcement when part of a wall constituting a masonry building is divided and moved. That is, the wall body is erected on the newly installed underground beam at the relocation site where the wall body is newly installed, the PC steel rod is inserted into the through-hole formed in the wall body to be relocated, and the lower end of the PC steel rod Is fixed to the newly installed underground beam and a steel beam is provided at the upper end of the wall. And by applying tension to the PC steel bar with the underground beam and steel beam as tension ends, compressive force is applied between the masonry material (block) such as bricks constituting the wall and the joint material. It is made to act and it prevents that peeling arises between these (refer patent document 2).

特開昭和54−10514号公報Japanese Patent Laid-Open No. 54-10514 特開平11−324341号公報JP 11-324341 A

しかし、特許文献1の補強方法では、基礎を貫通した緊張材(棒鋼)の下端部は、組積造壁に形成した貫通孔の上部や別途地盤に挿入したパイプの開口部から注入したグラウトで地盤中に固定することになる。またこのため、緊張材の下端部に固定端として機能する下部固定部を取り付けることが非常に困難である。よって、緊張材の下端部を固定する固定強度に限界がある。このため、緊張材に付与する緊張力の大きさに限界があり、この結果、組積造壁の耐震性能の向上に限界がある。
また、特許文献2の補強方法は、組積造壁(壁体)の移設箇所に地下梁を新設する必要があり、既設の組積造壁を移動することなく補強することはできない。
However, in the reinforcement method of patent document 1, the lower end part of the tension material (steel bar) which penetrated the foundation is grout injected from the upper part of the through hole formed in the masonry wall or the opening part of the pipe separately inserted into the ground. It will be fixed in the ground. For this reason, it is very difficult to attach a lower fixing portion that functions as a fixing end to the lower end portion of the tendon. Therefore, there is a limit to the fixing strength for fixing the lower end of the tendon. For this reason, there exists a limit in the magnitude | size of the tension | tensile_strength provided to a tension material, As a result, there exists a limit in the improvement of the seismic performance of a masonry wall.
Moreover, the reinforcement method of patent document 2 needs to newly install an underground beam in the transfer location of a masonry wall (wall body), and cannot reinforce an existing masonry wall without moving.

本発明は、上記を考慮し、組積造壁を移動させることなく、組積造壁の耐震性能を向上させることが目的である。   In view of the above, an object of the present invention is to improve the seismic performance of a masonry wall without moving the masonry wall.

請求項1の発明は、組積造壁の基礎部の側面に横穴を形成する横穴形成工程と、前記組積造壁の上端と下端との間を貫通する貫通孔を形成する貫通孔形成工程と、前記貫通孔に緊張材を挿通させ、前記緊張材の下端部を前記横穴まで到達させる緊張材挿通工程と、前記横孔から前記緊張材の下端部に下部固定部を取り付ける下部固定部設置工程と、前記横穴に充填材を充填し、前記下部固定部を取り付けた前記緊張材の下端部を固定する下端部固定工程と、前記緊張部材の上端部を固定する上部固定部を前記組積造壁の上端側に設ける上部固定部設置工程と、前記下部固定部を固定端とし、前記上部固定部を緊張端として前記緊張材に緊張力を付与し、前記組積造壁の上端と下端との間に圧縮力を付与する緊張力付与工程と、を備える。   The invention of claim 1 is a horizontal hole forming step of forming a horizontal hole in the side surface of the foundation portion of the masonry wall, and a through hole forming step of forming a through hole penetrating between the upper end and the lower end of the masonry wall. And a tension material insertion step of inserting a tension material through the through-hole and allowing the lower end portion of the tension material to reach the horizontal hole, and a lower fixing portion installation for attaching a lower fixing portion from the horizontal hole to the lower end portion of the tension material A step, a lower end fixing step of fixing a lower end portion of the tendon material, which is filled with a filler in the lateral hole, and the lower fixing portion is attached, and an upper fixing portion fixing the upper end portion of the tension member. An upper fixing portion installation step provided on the upper end side of the building wall, the lower fixing portion as a fixed end, a tension force is applied to the tendon with the upper fixing portion as a tension end, and the upper and lower ends of the masonry wall And a tension applying step for applying a compressive force between them.

請求項1の発明では、組積造壁を移動させることなく、組積造壁の基礎部に形成した横穴から緊張材の下端部に下部固定部を取り付けたのち、横穴に充填材を充填し、固定する。つまり、基礎部に横穴を形成することで、組積造壁を移設することなく、固定端として機能する下部固定部を緊張材の下端部に設けることができる。
そして、緊張材に緊張力を付与し、組積造壁の上端と下端との間に圧縮力に付与する。
According to the first aspect of the present invention, the lower fixing portion is attached to the lower end portion of the tension member from the horizontal hole formed in the foundation portion of the masonry building wall without moving the masonry building wall, and then the horizontal hole is filled with the filler. , Fix. That is, by forming a horizontal hole in the base portion, the lower fixing portion that functions as a fixing end can be provided at the lower end portion of the tension member without transferring the masonry wall.
And a tension | tensile_strength is provided to a tension material and it provides to a compressive force between the upper end and lower end of a masonry wall.

このとき、緊張材の下端部は、固定端として機能する下部固定部が取り付けられ、基礎部に固定(定着)されている。よって、緊張材の下端部が基礎部以外、例えば、基礎部の下の地盤中に固定(定着)されている構成と比較し、緊張材の下端部を固定する固定強度(定着強度)が大きい。これにより、緊張材に付与する緊張力を大きくし、組積造壁の上端と下端との間に付与する圧縮力を大きくすることができる。言いかえると、緊張材に所望の緊張力を付与して所望の圧縮力を付与することができ、その結果、所望の耐震性能を確保することができる。   At this time, a lower fixing portion that functions as a fixed end is attached to the lower end portion of the tendon, and is fixed (fixed) to the base portion. Therefore, the fixing strength (fixing strength) for fixing the lower end portion of the tendon material is larger than the configuration in which the lower end portion of the tendon material is fixed (fixed) in the ground below the base portion other than the base portion. . Thereby, the tension | tensile_strength provided to a tension | tensile_strength material can be enlarged, and the compressive force provided between the upper end of a masonry wall and a lower end can be enlarged. In other words, a desired tension can be applied to the tendon and a desired compressive force can be applied, and as a result, a desired seismic performance can be ensured.

したがって、組積造壁を移動させることなく、緊張材の下端部が基礎部以外に固定されている構成と比較し、組積造壁の耐震性能が向上する(所望の耐震性が確保される)。   Accordingly, the seismic performance of the masonry wall is improved (desired seismic resistance is ensured) as compared with a configuration in which the lower end portion of the tension member is fixed to other than the foundation without moving the masonry wall. ).

なお、上端及び下端とは、圧縮力によって補強されるべき組積造壁の上端と下端である。つまり、壁の頂点と底面との間の途中に上端と下端が設定されていてもよい。   In addition, an upper end and a lower end are the upper end and lower end of a masonry wall which should be reinforced by compressive force. That is, the upper end and the lower end may be set in the middle between the apex and the bottom of the wall.

また、各工程の順番は適宜変更可能である。また、各工程の間に必要に応じて他の工程を行なってもよい。
また、既存の組積造壁のみならず、新設の組積造壁や移設後の組積造壁にも適用できる。新設の場合はまず組積造壁を構築した後に、本工法を適用し、移設の場合は組積造壁を移設した後に本工法を適用する。つまり、既に構築された組積造壁に本工法を適用可能である。
また、新設や移設において、基礎部の側面に横穴を形成する横穴形成工程は、基礎部を造ったのち、横穴を形成してもよいし、基礎部を造る際に、予め横穴を、ボイド型枠などで形成しておいてもよい。
Moreover, the order of each process can be changed suitably. Moreover, you may perform another process between each process as needed.
Moreover, it can be applied not only to existing masonry walls, but also to new masonry walls and masonry walls after relocation. In the case of new construction, the masonry wall is first constructed and then this method is applied. In the case of relocation, this method is applied after the masonry wall is relocated. In other words, this method can be applied to masonry walls that have already been constructed.
In addition, in a new installation or relocation, the horizontal hole forming step for forming a horizontal hole on the side surface of the foundation part may form a horizontal hole after the foundation part is formed. You may form with a frame etc.

請求項2の発明は、前記横穴の内壁に沿って鉄筋を設ける鉄筋設置工程を備える。   The invention of claim 2 includes a reinforcing bar installation step of providing reinforcing bars along the inner wall of the horizontal hole.

請求項2の発明では、横穴の内壁に沿って鉄筋が設けない構成と比較し、充填材が充填された横穴の強度が向上する。その結果、横穴が埋め戻された後の基礎部の強度が向上する。
更に、緊張材を緊張することによって発生する、下部固定部から横穴内の充填材に加えられる圧縮応力に対して、横穴が埋め戻された後の基礎部の強度が向上する。
なお、鉄筋は、横穴の内壁に接触している必要はない。横穴の内壁と鉄筋との間に隙間があってもよい。
According to the second aspect of the present invention, the strength of the horizontal hole filled with the filler is improved as compared with the configuration in which the reinforcing bars are not provided along the inner wall of the horizontal hole. As a result, the strength of the foundation after the lateral hole is backfilled is improved.
Furthermore, the strength of the base portion after the horizontal hole is backfilled is improved against the compressive stress applied to the filler in the horizontal hole from the lower fixing portion, which is generated by tensioning the tension material.
The rebar does not need to be in contact with the inner wall of the horizontal hole. There may be a gap between the inner wall of the horizontal hole and the reinforcing bar.

請求項3の発明は、前記上部固定部は、前記組積造壁の上端を水平又は略水平にしてから設け、前記組積造壁の上端に設置した前記上部固定部に削孔装置を設置し、前記貫通孔を形成する。   According to a third aspect of the present invention, the upper fixing portion is provided after the upper end of the masonry wall is horizontal or substantially horizontal, and a drilling device is installed in the upper fixing portion installed at the upper end of the masonry wall. Then, the through hole is formed.

請求項3の発明では、組積造壁の上端を水平又は略水平に均してから設けられた上部固定部に、貫通孔を形成する削孔装置を設置することで、削孔装置の設置精度が向上する。よって、貫通孔を精度良く形成することがきる。
また、削孔装置を直接組積造壁に据え付けないため、組積造壁を傷つけないで、削孔装置を固定することができる。
In the invention of claim 3, the drilling device is installed by installing a drilling device in the upper fixing portion provided after leveling the upper end of the masonry wall horizontally or substantially horizontally. Accuracy is improved. Therefore, the through hole can be formed with high accuracy.
Further, since the hole drilling device is not directly installed on the masonry wall, the hole drilling device can be fixed without damaging the masonry wall.

なお、組積造壁の上端を水平又は略水平に均す方法としては、組積造壁の上端に均しモルタルなどのレベル調整部材を設ける方法や組積造壁の上端を水平又は略水平に削って均す方法がある。   As a method for leveling the upper end of the masonry wall horizontally or substantially horizontally, a level adjusting member such as a leveling mortar is provided on the upper end of the masonry wall, or the upper end of the masonry wall is horizontal or substantially horizontal. There is a way to sharpen and level.

請求項4の発明は、前記緊張材挿通工程において、平面視において、前記緊張材よりも大きな拡部を前記緊張材に取り付け、前記貫通孔の開口部には、前記緊張材よりも大きく且つ前記拡部よりも小さな隙間は又は孔が形成された落下防止部材を設け、前記緊張材を、前記落下防止部材に形成された隙間又孔に通して前記貫通孔に挿入する。   According to a fourth aspect of the present invention, in the tendon insertion process, in the plan view, an enlarged portion larger than the tendon is attached to the tendon, and the opening of the through hole is larger than the tendon and the A drop prevention member having a gap or a hole smaller than the enlarged portion is provided, and the tension material is inserted into the through hole through a gap or a hole formed in the drop prevention member.

請求項4の発明では、拡部が取り付けられた緊張材を、貫通孔の開口部に設けた落下防止部材の隙間又は孔に通して貫通孔に挿入する。よって、仮に挿入の際に緊張材が落下しても、緊張材に取り付けた拡部が落下防止部材に当り落下が防止される。   In the invention of claim 4, the tension material to which the expansion portion is attached is inserted into the through hole through the gap or hole of the fall prevention member provided in the opening of the through hole. Therefore, even if the tendon material falls during insertion, the expanded portion attached to the tendon material hits the fall preventing member and is prevented from falling.

ここで、緊張材を挿入し拡部が落下防止部材に当ると、これ以上挿入されないが、その都度、適宜対応すればよい。
例えば、拡部を着脱可能又は軸方向に移動可能としておき、緊張材の挿入量に応じて拡部を上方に適宜移動させたり、複数の拡部を緊張材に取り付け挿入量に応じて適宜取り外したりして、対応すればよい。
或いは、拡部が着脱可能又は移動可能でない場合であっても、例えば、拡部が落下防止部材に当ると、落下防止部材を一旦ずらしたり取り外したりすることで、適宜対応すればよい。
Here, when the tendon is inserted and the expanded portion hits the fall prevention member, it is not inserted any more, but it may be appropriately dealt with each time.
For example, the expansion part can be attached or detached or moved in the axial direction, and the expansion part is appropriately moved upward according to the insertion amount of the tension material, or a plurality of expansion parts are attached to the tension material and appropriately removed according to the insertion amount. Or just respond.
Or even if it is a case where an expansion part is not removable or movable, for example, if an expansion part contacts a fall prevention member, what is necessary is just to respond | correspond suitably by once shifting or removing a fall prevention member.

請求項5の発明は、複数の前記緊張材が接続部材で接続されることによって長尺化され、前記緊張材同士を接続する前記接続部材が、前記拡部を構成する。   According to a fifth aspect of the present invention, the plurality of tendon members are elongated by being connected by a connecting member, and the connecting member that connects the tendon members constitutes the expanding portion.

請求項5の発明では、緊張材同士を接続する接続部材が、落下防止の拡部を兼ねている。よって、別途、拡部を設ける必要がない。   In the invention of claim 5, the connecting member for connecting the tension members also serves as an expansion preventing part. Therefore, it is not necessary to provide an enlarged portion separately.

ここで、緊張材を挿入し接続部材が落下防止部材に当ると、これ以上挿入されないが、その都度、適宜対応すればよい。例えば、接続部材が落下防止部材に当ると、落下防止部材を一旦ずらしたり取り外したりすることで、適宜対応すればよい。   Here, if a tendon is inserted and the connecting member hits the fall prevention member, it will not be inserted any more, but it may be appropriately dealt with each time. For example, when the connection member hits the fall prevention member, the fall prevention member may be appropriately displaced by temporarily shifting or removing the fall prevention member.

請求項6の発明では、前記緊張材挿通工程において、平面視において、前記貫通孔の開口部よりも大きな拡部を前記緊張材に軸方向に移動可能又は着脱可能に取り付けて、前記貫通孔に挿入する。   In the invention of claim 6, in the tension material insertion step, an enlarged portion larger than the opening of the through hole is attached to the tension material so as to be movable or detachable in the axial direction in plan view. insert.

請求項6の発明では、移動部材が取り付けられた緊張材を、貫通孔に挿入する。よって、仮に挿入の際に緊張材が落下しても、緊張材に取り付けた移動部材が貫通孔の開口部に当り落下が防止される。   In the invention of claim 6, the tendon material to which the moving member is attached is inserted into the through hole. Therefore, even if the tendon material falls during insertion, the moving member attached to the tendon material hits the opening of the through hole, and the fall is prevented.

ここで、緊張材を挿入し移動部材が貫通孔の開口部に当ると、これ以上挿入されないが、その都度、適宜対応すればよい。例えば、緊張材の挿入量に応じて拡部を上方に適宜移動させたり、複数の拡部を緊張材に取り付け挿入量に応じて適宜取り外したりして、対応すればよい。   Here, when the tendon is inserted and the moving member hits the opening of the through-hole, it is not inserted any more. For example, the expansion portion may be appropriately moved upward according to the amount of tension material inserted, or a plurality of expansion portions may be attached to the tension material and appropriately removed according to the insertion amount.

請求項7の発明は、前記貫通孔形成工程において、前記貫通孔は、冷却気体を削孔装置の削孔工具に接触させて冷却する無水工法で形成する。   According to a seventh aspect of the present invention, in the through hole forming step, the through hole is formed by an anhydrous method in which a cooling gas is cooled by contacting a drilling tool of a drilling device.

請求項7の発明では、冷却水を用いることなく組積造壁に貫通孔をあけるので、組積造壁及び組積造壁の周囲を水で濡らすことがない。また、組積造壁を構成するレンガなどの組積材間の目地から水が染み出ることがない。   In the invention of claim 7, since the through-hole is made in the masonry wall without using cooling water, the masonry wall and the periphery of the masonry wall are not wetted with water. Moreover, water does not ooze out from the joints between masonry materials such as bricks constituting the masonry wall.

よって、水で濡れたり目地から水が染み出ることで問題が生じる組積造壁、例えば、歴史的な建築物であっても、本工法を適用し、耐震性能を向上することできる。   Therefore, even if it is a masonry wall where a problem occurs when it gets wet with water or the water oozes out from the joint, for example, a historic building, the construction method can be applied to improve the seismic performance.

請求項8の発明は、前記下部固定部は、平面視において、前記緊張材の下端部が挿通する挿通孔と、端部から前記挿通孔に切り込まれた切込部と、が形成された板状の定着板を有する。   In the invention of claim 8, the lower fixing portion is formed with an insertion hole through which a lower end portion of the tendon is inserted and a cut portion cut into the insertion hole from the end portion in plan view. It has a plate-shaped fixing plate.

請求項8の発明では、定着板の切込部から挿通孔に緊張材を通すことができる。よって、例えば、緊張材に定着板を固定するナットを緊張材に取り付けた状態であっても、緊張材を定着板の挿通孔に通すことができる。よって、定着板に切込部が形成されていない構成と比較し、緊張材に定着板を容易に取り付けることができる。   According to the eighth aspect of the present invention, the tendon can be passed from the cut portion of the fixing plate to the insertion hole. Therefore, for example, even when the nut for fixing the fixing plate to the tension member is attached to the tension member, the tension member can be passed through the insertion hole of the fixing plate. Therefore, the fixing plate can be easily attached to the tendon material as compared with the configuration in which the cut portion is not formed in the fixing plate.

請求項9の発明は、請求項1〜請求項8のいずれか1項に記載の組積造壁の補強工法によって補強された組積造壁を備える。   The invention of claim 9 includes a masonry wall reinforced by the masonry wall reinforcement method according to any one of claims 1 to 8.

請求項9の発明では、組積造構造物の組積造壁を移動させることなく、組積造壁の耐震性能を向上させ、その結果、組積造構造物の耐震性能が向上する。   In the invention of claim 9, the seismic performance of the masonry wall is improved without moving the masonry wall of the masonry structure, and as a result, the seismic performance of the masonry structure is improved.

請求項1に記載の発明によれば、組積造壁を移動させることなく、緊張材の下端部が基礎部以外に固定されている構成と比較し、組積造壁の耐震性能を向上させることができる。   According to the first aspect of the present invention, the seismic performance of the masonry wall is improved as compared with the configuration in which the lower end portion of the tendon is fixed to other than the foundation without moving the masonry wall. be able to.

請求項2に記載の発明によれば、横穴の内壁に沿って鉄筋が設けない構成と比較し、充填材が充填された横穴の強度を向上させることができる。   According to invention of Claim 2, compared with the structure which does not provide a reinforcing bar along the inner wall of a horizontal hole, the intensity | strength of the horizontal hole filled with the filler can be improved.

請求項3に記載の発明によれば、削孔装置の設置精度が向上するので、貫通孔を精度良く形成することがきる。   According to invention of Claim 3, since the installation precision of a hole-drilling apparatus improves, a through-hole can be formed with sufficient precision.

請求項4に記載の発明によれば、緊張材の落下を防止することができる。   According to invention of Claim 4, fall of a tendon can be prevented.

請求項5に記載の発明によれば、緊張材同士を接続する接続部材が、落下防止の拡部を兼ねているので、別途、拡部を設ける必要がない。   According to the fifth aspect of the present invention, since the connecting member for connecting the tension members also serves as the expansion portion for preventing the fall, it is not necessary to separately provide the expansion portion.

請求項6に記載の発明によれば、緊張材の落下を防止することができる。   According to invention of Claim 6, fall of a tendon can be prevented.

請求項7に記載の発明によれば、水で濡れたり目地から水が染み出ることで問題が生じる組積造壁、例えば、歴史的な建築物であっても、本工法を適用し、耐震性能を向上することできる。   According to the invention described in claim 7, even if it is a masonry wall where a problem arises when it gets wet with water or water oozes out from joints, for example, a historic building, The performance can be improved.

請求項8に記載の発明によれば、定着板に切込部が形成されていない構成と比較し、緊張材に定着板を容易に取り付けることができる。   According to the eighth aspect of the present invention, it is possible to easily attach the fixing plate to the tension material as compared with the configuration in which the cut portion is not formed in the fixing plate.

請求項9に記載の発明によれば、組積造構造物の組積造壁を移動させることなく、組積造壁の耐震性能を向上させ、組積造構造物の耐震性能を向上させることがきる。   According to the invention described in claim 9, the seismic performance of the masonry wall is improved without moving the masonry wall of the masonry structure, and the seismic performance of the masonry structure is improved. I'm going.

本発明に係る実施形態の補強構造が適用され耐震補強されたレンガ壁を示す断面斜視図である。1 is a cross-sectional perspective view showing a brick wall to which a reinforcing structure according to an embodiment of the present invention is applied and which is seismically reinforced. 図1に示す本発明に係る実施形態の補強構造が適用され耐震補強されたレンガ壁の面外方向に沿った縦断面図である。It is the longitudinal cross-sectional view along the out-of-plane direction of the brick wall by which the reinforcement structure of embodiment which concerns on this invention shown in FIG. 図1に示す本発明に係る実施形態の補強構造が適用され耐震補強されたレンガ壁の正面図である。It is a front view of the brick wall by which the reinforcement structure of embodiment which concerns on this invention shown in FIG. (A)は図1に示す本発明に係る実施形態の補強構造が適用され耐震補強されたレンガ壁の水平断面図であり、(B)はPC鋼棒の配置の変形例を示す水平断面図である。(A) is a horizontal sectional view of a brick wall to which the reinforcing structure of the embodiment according to the present invention shown in FIG. 1 is applied and is seismically reinforced, and (B) is a horizontal sectional view showing a modification of the arrangement of PC steel bars. It is. レンガ壁の上部を拡大した拡大縦断面図である。It is the expanded longitudinal cross-sectional view which expanded the upper part of the brick wall. レンガ壁の上部を拡大した拡大正面図である。It is the enlarged front view which expanded the upper part of the brick wall. レンガ壁の基礎を拡大した拡大縦断面図である。It is the expansion longitudinal cross-sectional view which expanded the foundation of the brick wall. レンガ壁を耐震補強する工程(A)〜(D)を説明する工程図である。It is process drawing explaining the process (A)-(D) which carries out earthquake-proof reinforcement of a brick wall. レンガ壁を耐震補強する工程(E)〜(H)を説明する工程図である。It is process drawing explaining the process (E)-(H) which carries out earthquake-proof reinforcement of a brick wall. レンガ壁を耐震補強する工程(I)〜(K)を説明する工程図である。It is process drawing explaining process (I)-(K) which carries out earthquake-proof reinforcement of a brick wall. (A)は定着板を示す平面図であり、(B)は定着板の変形例を示す平面図である。(A) is a plan view showing a fixing plate, and (B) is a plan view showing a modification of the fixing plate. 図9(A)の定着板をPC鋼棒の下端部に取り付ける様子を説明する斜視図である。It is a perspective view explaining a mode that the fixing board of FIG. 9 (A) is attached to the lower end part of PC steel rod. 確認実験に用いる試験体(レンガ壁)を示す正面図である。It is a front view which shows the test body (brick wall) used for confirmation experiment. 面内加力による荷重−変位曲線を示すグラフである。It is a graph which shows the load-displacement curve by in-plane applied force. 耐力と変位関係のグラフである。It is a graph of yield strength and displacement relationship. 面外加力による荷重−変位曲線を示すグラフである。It is a graph which shows the load-displacement curve by an out-of-plane applied force. 新設臥梁に削孔装置を設置した状態のレンガ壁の上部を拡大した拡大縦断面図である。It is the expanded longitudinal cross-sectional view which expanded the upper part of the brick wall of the state which installed the drilling apparatus in the newly installed girder. PC鋼棒の配置の変形例を説明するための、レンガ壁の正面図である。It is a front view of a brick wall for demonstrating the modification of arrangement | positioning of PC steel bar. 第一変形例の新設臥梁を示す縦断面図である。It is a longitudinal cross-sectional view which shows the newly installed girder of a 1st modification. (A)は第二変形例の新設臥梁を示す縦断面図であり、(B)は(A)の他の設置例を示す縦断面図である。(A) is a longitudinal cross-sectional view which shows the newly installed girder of a 2nd modification, (B) is a longitudinal cross-sectional view which shows the other example of installation of (A). 第三変形例の新設臥梁を示す縦断面図である。It is a longitudinal cross-sectional view which shows the newly installed girder of a 3rd modification. 本発明が適用された組積造構造物としてのレンガ造の洋館を模式的に示す斜視図である。It is a perspective view which shows typically the brick-style Western-style building as a masonry structure to which this invention was applied. 本発明に係る実施形態の補強構造が適用され耐震補強された他の例のレンガ壁の面外方向に沿った縦断面図である。It is a longitudinal cross-sectional view along the out-of-plane direction of the brick wall of the other example to which the reinforcement structure of embodiment which concerns on this invention was applied, and was seismically reinforced. レンガ壁の基礎の他の例を示す縦断面図である。It is a longitudinal cross-sectional view which shows the other example of the foundation of a brick wall. PC鋼棒の落下防止機構を示す、(A)は斜視図であり、(B)は平面図である。The fall prevention mechanism of PC steel bar is shown, (A) is a perspective view, and (B) is a top view. 図23(B)を拡大した拡大平面図である。FIG. 24 is an enlarged plan view enlarging FIG. (A)は落下防止機構を構成する落下防止部材の第一の変形例を示す図24に対応する拡大平面図であり、(B)第二の変形例を示す図24に対応する拡大平面図である。(A) is an enlarged plan view corresponding to FIG. 24 which shows the 1st modification of the fall prevention member which comprises a fall prevention mechanism, (B) The enlarged plan view corresponding to FIG. 24 which shows a 2nd modification. It is. PC鋼棒の落下防止機構の他の例を示す斜視図である。It is a perspective view which shows the other example of the fall prevention mechanism of PC steel bar.

まず、図1〜図3、図4(A)、図5〜図7、図20を用いて、本発明の実施形態に係る組積造壁の補強工法が適用され耐震補強された組積造のレンガ壁100について説明する。なお、各図面では、鉛直方向(レンガ10の積層方向)を矢印Zで示し、レンガ壁100の長手方向(正面視における左右方向)を矢印Xで示し、レンガ壁100の面外方向(レンガ壁100の厚み方向、レンガ壁100の面と直交する方向)を矢印Yで示す。   First, a masonry structure reinforced by earthquake resistance by applying the masonry wall reinforcement method according to the embodiment of the present invention with reference to FIGS. 1 to 3, 4 (A), 5 to 7, and 20. The brick wall 100 will be described. In each drawing, the vertical direction (the stacking direction of the bricks 10) is indicated by an arrow Z, the longitudinal direction of the brick wall 100 (the left-right direction in the front view) is indicated by an arrow X, and the out-of-plane direction of the brick wall 100 (the brick wall) The thickness direction of 100, the direction orthogonal to the surface of the brick wall 100) is indicated by an arrow Y.

図1〜図3に示すレンガ壁100は、図20に示す既設の組積造構造物としてのレンガ造の洋館70の外壁を構成している。レンガ壁100は、組積材としてのレンガ10を積み上げて造られている。レンガ10の積み方はどのような積み方であってよいが、本実施形態ではイギリス積とされている。レンガ10は、粘土や頁岩と泥を型に入れ、窯で焼き固めて、或いは圧縮して作られる直方体の建築材とされている。レンガ10とレンガ10と間の目地には目地材(モルタル、グラウトなど)12が充填されている。   A brick wall 100 shown in FIGS. 1 to 3 constitutes an outer wall of a brick-type Western-style building 70 as an existing masonry structure shown in FIG. The brick wall 100 is made by stacking bricks 10 as masonry materials. Any method of stacking the bricks 10 may be used, but in the present embodiment, the bricks are stacked in the UK. The brick 10 is a rectangular parallelepiped building material made by putting clay, shale, and mud into a mold, baked and hardened in a kiln, or compressed. The joints between the bricks 10 and 10 are filled with joint materials (mortar, grout, etc.) 12.

レンガ壁100は、地盤20の中に形成されたコンクリート製の基礎200の上に構築されている。レンガ壁100の下端部は地盤20中に埋設され、レンガ壁100の下端110が、この基礎200によって支えられている。
レンガ壁100の上端120における面外方向(矢印Y方向)の中央部分には、長手方向の略全域に沿って木製の既設臥梁50が設けられている(図1と図2参照)。なお、この木製の既設臥梁50は、耐震補強される前の屋根72(図20参照)を支える部材とされている。
The brick wall 100 is constructed on a concrete foundation 200 formed in the ground 20. The lower end of the brick wall 100 is embedded in the ground 20, and the lower end 110 of the brick wall 100 is supported by the foundation 200.
At the center portion of the upper end 120 of the brick wall 100 in the out-of-plane direction (arrow Y direction), a wooden existing girder 50 is provided along substantially the entire longitudinal direction (see FIGS. 1 and 2). The wooden existing girder 50 is a member that supports the roof 72 (see FIG. 20) before the seismic reinforcement.

図1〜図6に示すように、レンガ壁100の上端120(本実施形態では頂部)おける既設臥梁50の面外方向の両側は、均しモルタル122A,122Bによって、水平又は略水平に均されている。そして、均しモルタル122A,122Bの上に、断面がコ字状の溝形鋼材(チャンネル)で構成された新設臥梁250A,250Bが、長手方向に沿って設けられている。新設臥梁250A,250Bは、レンガ壁100の外側(面外方向外側)を開口側として配置されている。   As shown in FIGS. 1 to 6, both sides in the out-of-plane direction of the existing girder 50 at the upper end 120 (the top in the present embodiment) of the brick wall 100 are leveled horizontally or substantially horizontally by the leveling mortars 122A and 122B. Has been. Then, on the leveling mortars 122A and 122B, new bridge beams 250A and 250B made of channel steel having a U-shaped cross section are provided along the longitudinal direction. The newly installed beams 250 </ b> A and 250 </ b> B are arranged with the outside (outside in the out-of-plane direction) of the brick wall 100 as the opening side.

なお、以降、面外方向に離れて二つ設けられている部材等において、一方には符号の後にAを付し、他方には符号の後にBを付す。また、A,Bを区別する必要がない場合は、A,Bを省略する。   In the following, in two members or the like provided apart in the out-of-plane direction, one is denoted by A and the other is denoted by B after the symbol. If it is not necessary to distinguish between A and B, A and B are omitted.

新設臥梁250の上側のフランジ252の上面は、既設臥梁50の上面52と同じ高さか、既設臥梁50の上面52よりも若干高くなるように設定されている(図5参照)。
新設臥梁250におけるフランジ252、254とウエブ256で囲まれた中空部258には、縦リブ260が、長手方向に間隔をあけて、複数設けられている。なお、本実施形態においては、縦リブ260は、PC鋼棒300(詳細は後述する)の固定部位(図1、図2、図6を参照)と、固定部位間と、に設けられている。また、本実施形態においては、縦リブ260は、溶接にて接合されているが、他の方法、例えば、ボルトで固定されてもよい。
The upper surface of the upper flange 252 of the new girder 250 is set to be the same height as the upper surface 52 of the existing girder 50 or slightly higher than the upper surface 52 of the existing girder 50 (see FIG. 5).
A plurality of vertical ribs 260 are provided at intervals in the longitudinal direction in the hollow portion 258 surrounded by the flanges 252 and 254 and the web 256 in the newly installed beam 250. In the present embodiment, the vertical ribs 260 are provided between the fixing portions (see FIGS. 1, 2, and 6) of the PC steel rod 300 (details will be described later) and between the fixing portions. . In the present embodiment, the vertical ribs 260 are joined by welding, but may be fixed by other methods, for example, bolts.

レンガ壁100の新設臥梁250A,250Bの下側には、レンガ壁100の上端120と下端110との間を略鉛直方向に貫通する貫通孔150A,150Bが形成されている。よって、図1と図2とに示すように、側面視において、面外方向中心位置を間に挟んで貫通孔150Aと貫通孔150Bとが離れて形成されている(面外方向中心位置から貫通孔150A及び貫通孔150Bが面外方向にずれて配置されている)。また、図1と図3とに示すように、貫通孔150A,150Bは、長手方向に沿って間隔をあけて複数形成されている。つまり、図4(A)に示すように、貫通孔150Aの列Aと貫通孔150Bの列Bとが面外方向中心位置を間に挟んで互いに離れて配置されている(面外方向中心位置から列A及び列Bが面外方向にずれて配置されている)。なお、図4では、図が煩雑なるのを避けるため、断面を示す平行斜線(ハッチング)の図示を省略している。   Through holes 150 </ b> A and 150 </ b> B that penetrate between the upper end 120 and the lower end 110 of the brick wall 100 in a substantially vertical direction are formed below the newly installed beams 250 </ b> A and 250 </ b> B of the brick wall 100. Therefore, as shown in FIGS. 1 and 2, in a side view, the through hole 150 </ b> A and the through hole 150 </ b> B are separated from each other with the center position in the out-of-plane direction interposed therebetween (through the center position in the out-of-plane direction). The hole 150A and the through hole 150B are arranged so as to be shifted in the out-of-plane direction). As shown in FIG. 1 and FIG. 3, a plurality of through holes 150A and 150B are formed at intervals along the longitudinal direction. That is, as shown in FIG. 4A, the row A of the through-holes 150A and the row B of the through-holes 150B are arranged apart from each other with the center position in the out-of-plane direction therebetween (the center position in the out-of-plane direction). Column A and column B are displaced in the out-of-plane direction). In FIG. 4, in order to avoid complication of the drawing, illustration of parallel oblique lines (hatching) indicating a cross section is omitted.

図1〜図3に示すように、これら貫通孔150にPC鋼棒300が挿通されている。また、PC鋼棒300は、端部同士がカプラ310で接続され長尺化されている(図2参照)。なお、便宜上、PC鋼棒300の端部同士がカプラ310で接続され長尺化された状態をPC鋼棒302と記す。なお、PC鋼棒300の上端部と下端部には雄ネジ溝が形成されている。   As shown in FIGS. 1 to 3, the PC steel rod 300 is inserted into the through holes 150. Further, the end portions of the PC steel rod 300 are connected by a coupler 310 and are elongated (see FIG. 2). For convenience, a state in which the ends of the PC steel rod 300 are connected to each other by a coupler 310 and is elongated is referred to as a PC steel rod 302. In addition, the external thread groove is formed in the upper end part and lower end part of PC steel bar 300. FIG.

図1〜図3、図5、図6に示すように、PC鋼棒302の上端部304は、新設臥梁250の上側のフランジ252にナット311で固定されている。一方、図1〜図3、図7に示すように、PC鋼棒302の下端部306には、上下をナット312で挟み込まれ締結された定着板(反力プレート)350が取り付けられている(図9(A)も参照)。定着板350は、平面視において、貫通孔150よりも大きく設定されている。   As shown in FIGS. 1 to 3, 5, and 6, the upper end portion 304 of the PC steel bar 302 is fixed to the upper flange 252 of the newly installed girder 250 with a nut 311. On the other hand, as shown in FIG. 1 to FIG. 3 and FIG. 7, a fixing plate (reaction force plate) 350 is attached to the lower end portion 306 of the PC steel rod 302 by being clamped by a nut 312 at the top and bottom (reaction force plate). (See also FIG. 9A). The fixing plate 350 is set larger than the through hole 150 in a plan view.

定着板350は、コンクリート製の基礎200の側壁(側面)202に面外方向に形成された横穴210に設けられ、横穴210に充填された早強コンクリート212で固定されている(図1では図が煩雑になるのを避けるため早強コンクリート212の図示(ドット)を省略している)。つまり、PC鋼棒302の下端部306は基礎200に定着されている。なお、図7は早強コンクリート212を充填する前の図である。   The fixing plate 350 is provided in a lateral hole 210 formed in an out-of-plane direction on the side wall (side surface) 202 of the concrete base 200, and is fixed by fast-strength concrete 212 filled in the lateral hole 210 (see FIG. 1). (The illustration (dot) of the early strong concrete 212 is omitted in order to avoid complication). That is, the lower end portion 306 of the PC steel bar 302 is fixed to the foundation 200. FIG. 7 is a view before filling the early strong concrete 212.

横穴210に充填する早強コンクリート212は、早強コンクリート以外のコンクリートよりも早く固化し、所望の強度を早期に得ることができる。更に、早強コンクリート212は、合成繊維や鋼繊維などで補強されている繊維補強コンクリートとされている。
横穴210には、内壁214に沿って螺旋状に巻かれたスパイラル筋216が埋設されている。
The early high-strength concrete 212 filled in the horizontal hole 210 is solidified faster than concrete other than the early high-strength concrete, and a desired strength can be obtained at an early stage. Further, the early strong concrete 212 is a fiber reinforced concrete reinforced with synthetic fiber or steel fiber.
In the horizontal hole 210, a spiral line 216 wound spirally along the inner wall 214 is embedded.

また、貫通孔150には、PC鋼棒302を挿入したのち、グラウト158が充填されている(図1では図が煩雑になるのを避けるためグラウト158の図示(ドット)を省略している)。なお、貫通孔150にシース管を挿入し、シース管にグラウト158を充填してもよい。
そして、下端部304が基礎200に定着されたPC鋼棒302に、緊張力が付与され、レンガ壁100の上端120と下端110との間に圧縮力が付与されている。
Further, the grout 158 is filled in the through-hole 150 after the PC steel rod 302 is inserted (in FIG. 1, illustration (dots) of the grout 158 is omitted in order to avoid making the figure complicated). . A sheath tube may be inserted into the through-hole 150, and the sheath tube may be filled with grout 158.
A tension force is applied to the PC steel rod 302 with the lower end 304 fixed to the foundation 200, and a compressive force is applied between the upper end 120 and the lower end 110 of the brick wall 100.

また、新設臥梁250の中空部258にはモルタル259が充填されている(図1では図が煩雑になるのを避けるためモルタル259の図示(ドット)を省略している)。また、PC鋼棒302の上端部304は、防錆塗装が施され、キャップ257が被されている。なお、図5、図6は、中空部258にモルタル259が充填され、キャップ257が被せられる前の状態の図である。   Moreover, the mortar 258 is filled in the hollow part 258 of the newly installed girder 250 (in FIG. 1, the illustration (dot) of the mortar 259 is omitted in order to avoid making the figure complicated). Further, the upper end portion 304 of the PC steel rod 302 is subjected to rust-proof coating and is covered with a cap 257. 5 and 6 are views of the state before the hollow portion 258 is filled with the mortar 259 and the cap 257 is put on.

つぎに、本発明に係る実施形態の既存のレンガ壁100の耐震補強工法について、説明する。なお、図8〜図10を用いて、各工程を順番に説明する。   Below, the earthquake-proof reinforcement method of the existing brick wall 100 of embodiment which concerns on this invention is demonstrated. In addition, each process is demonstrated in order using FIGS. 8-10.

図8−1(A)には、耐震補強する前のレンガ壁100が示されている。なお、洋館70(図20参照)には、素屋根(図示略)を設けた上で、既存の屋根72(図20参照)を一時撤去する。
なお、既存の屋根72(図20参照)を撤去しなくても作業ができる場合は、当然撤去する必要はない。また、屋根72全体を撤去する必要はなく、PC鋼材302で耐震補強を行なう場所に対応する部分のみ撤去することも有効である。つまり、屋根72の一部のみを撤去してもよい。
図8−1(B)に示すように、地盤20に穴22を堀って、基礎200の側壁202を露出させる。基礎200の側壁202から面外方向に横穴210を形成する。
また、レンガ壁100の上端120を均しモルタル122A、122Bで水平又は略水平に均す。なお、レンガ壁100の上端120を削っても問題ない場合は、上端120を削って水平又は略水平にしてもよい。
図8−1(C)に示すように、均しモルタル122A,120Bの上に削孔装置80を設置し、貫通孔150を形成する。
ことのき、−5℃〜−40℃の冷却気体(例えば、固定二酸化炭素を気化させた二酸化炭素ガス)を、切刃等で構成された削孔工具82に吹き付けて冷却しながら削孔する。つまり、無水工法で貫通孔150A,150Bを形成する。無水工法によって削孔する装置及び工法としては、特開2007−160617号公報や特開2007−1069号公報等に記載の装置及び工法を適用することができる。
また、貫通孔150を形成後、シース管を挿入してもよい。
図8−1(D)に示すように、貫通孔150A,150Bの上に新設臥梁250A,250Bを設置する。
8-1 (A) shows the brick wall 100 before the earthquake-proof reinforcement. The Western-style building 70 (see FIG. 20) is provided with a bare roof (not shown) and the existing roof 72 (see FIG. 20) is temporarily removed.
If the work can be performed without removing the existing roof 72 (see FIG. 20), it is not necessary to remove it. Further, it is not necessary to remove the entire roof 72, and it is also effective to remove only the portion corresponding to the place where the PC steel material 302 is subjected to earthquake-proof reinforcement. That is, only a part of the roof 72 may be removed.
As shown in FIG. 8A, a hole 22 is dug in the ground 20 to expose the side wall 202 of the foundation 200. A lateral hole 210 is formed in the out-of-plane direction from the side wall 202 of the foundation 200.
Further, the upper end 120 of the brick wall 100 is leveled and leveled horizontally or substantially horizontally with the mortars 122A and 122B. If there is no problem even if the upper end 120 of the brick wall 100 is shaved, the upper end 120 may be shaved to be horizontal or substantially horizontal.
As shown in FIG. 8-1 (C), the hole drilling device 80 is installed on the leveling mortars 122A and 120B, and the through holes 150 are formed.
At that time, a cooling gas of −5 ° C. to −40 ° C. (for example, carbon dioxide gas obtained by vaporizing fixed carbon dioxide) is blown onto a drilling tool 82 composed of a cutting blade or the like to drill holes while cooling. . That is, the through holes 150A and 150B are formed by an anhydrous method. As the apparatus and method for drilling holes by the anhydrous method, the apparatuses and methods described in JP 2007-160617 A, JP 2007-1069 A, and the like can be applied.
Further, the sheath tube may be inserted after the through hole 150 is formed.
As shown in FIG. 8-1 (D), the newly installed beams 250A and 250B are installed on the through holes 150A and 150B.

図8−2(E)に示すように、貫通孔150A,150BにPC鋼棒300A,300Bを挿入する。このとき、PC鋼棒300の先端にはナット312を取り付けた状態で、挿入する。なお、新設臥梁250のフランジ252、254には、PC鋼棒300が挿通される孔が予め形成さている。
図8−2(F)に示すように、PC鋼棒300を途中まで挿入すると、カプラ310でPC鋼棒300を接続し、長尺のPC鋼棒302とする。
As shown in FIG. 8-2 (E), the PC steel bars 300A and 300B are inserted into the through holes 150A and 150B. At this time, the PC steel rod 300 is inserted with the nut 312 attached thereto. The flanges 252 and 254 of the newly installed girder 250 are previously formed with holes through which the PC steel rod 300 is inserted.
As shown in FIG. 8-2 (F), when the PC steel rod 300 is inserted halfway, the PC steel rod 300 is connected by a coupler 310 to form a long PC steel rod 302.

ここで、PC鋼棒300を挿入途中、PC鋼棒300の貫通孔150への落下を防止する落下防止機構について説明する。
図23に示すように、貫通孔150の開口部152には、板状の落下防止部材180が載せられている。落下防止部材180は、凹部182が形成され、平面視において、略U字形状とされている(略馬蹄形状とされている)。
図23に示すように、落下防止部材180の凹部182の幅Lは、PC鋼棒300の直径φ1よりも若干大きく、カプラ310の直径φ2よりも狭い。
Here, a fall prevention mechanism for preventing the PC steel bar 300 from dropping into the through hole 150 during the insertion of the PC steel bar 300 will be described.
As shown in FIG. 23, a plate-like fall prevention member 180 is placed on the opening 152 of the through hole 150. The fall prevention member 180 has a recess 182 and is substantially U-shaped in plan view (substantially horseshoe-shaped).
As shown in FIG. 23, the width L of the recess 182 of the fall prevention member 180 is slightly larger than the diameter φ1 of the PC steel rod 300 and narrower than the diameter φ2 of the coupler 310.

そして、図23に示すように、貫通孔150にPC鋼棒302を挿入する際に、落下防止部材180の凹部182を通して、挿入する。よって、仮にPC鋼棒310が落下してもカプラ310が落下防止材180に当り、これ以上の落下が防止される。
なお、PC鋼棒302を挿入し、カプラ310が落下防止部材180に当ると、これ以上挿入されないが、その都度、適宜対応すればよい。例えば、カプラ310が落下防止部材180に当ると、図24に示すように、落下防止部材180を矢印S1で示すように、一旦ずらしたり、或いは、取り外したりするなどして、カプラ310を通過させて、適宜対応すればよい。
Then, as shown in FIG. 23, when inserting the PC steel rod 302 into the through hole 150, it is inserted through the recess 182 of the fall prevention member 180. Therefore, even if the PC steel bar 310 falls, the coupler 310 hits the fall prevention member 180, and further drop is prevented.
In addition, when the PC steel rod 302 is inserted and the coupler 310 hits the fall prevention member 180, it is not inserted any more. For example, when the coupler 310 hits the fall prevention member 180, as shown in FIG. 24, the fall prevention member 180 is temporarily shifted or removed as shown by an arrow S1, and the coupler 310 is allowed to pass through. Therefore, it is sufficient to respond appropriately.

なお、落下防止部材は、どのような形状であってもよい。例えば、図25(A)に示す第一の変形例のように、間隔Lが調整可能なように、二枚の板状の落下防止部材181、183で構成されていてもよい。この場合、落下防止部材181、183を矢印S2で示すように、一旦ずらして二枚の落下防止部材181の間隔Lを大きくしてカプラ310を通過させる。
或いは、図25(B)に示す第二の変形例のように、PC鋼棒300の直径φ1よりも若干大きく、カプラ310の直径φ2よりも狭い直径φ3の孔189が形成された落下防止部材188であってもよい。なお、落下防止部材188は、部材185と部材187とで構成され分割可能とされている。この場合も同様に部材185、187を矢印S2で示すように、一旦ずらして孔189を広げてカプラ310を通過させる。
The fall preventing member may have any shape. For example, as in the first modification shown in FIG. 25A, the plate L may be configured by two plate-like fall prevention members 181 and 183 so that the distance L can be adjusted. In this case, as shown by the arrow S2, the fall prevention members 181 and 183 are shifted once to increase the distance L between the two fall prevention members 181 and allow the coupler 310 to pass.
Alternatively, as in the second modification shown in FIG. 25 (B), a fall prevention member in which a hole 189 having a diameter φ3 slightly larger than the diameter φ1 of the PC steel rod 300 and narrower than the diameter φ2 of the coupler 310 is formed. It may be 188. The fall prevention member 188 includes a member 185 and a member 187, and can be divided. In this case as well, the members 185 and 187 are shifted once as shown by the arrow S2 to widen the hole 189 and allow the coupler 310 to pass.

PC鋼棒302の高さのレベル調整を行い、PC鋼棒302の上端部304にナット311で新設臥梁250の上側のフランジ252に取り付ける。また、PC鋼棒302の下端部306に定着板350を取り付ける。   The level of the height of the PC steel bar 302 is adjusted, and the upper end 304 of the PC steel bar 302 is attached to the upper flange 252 of the newly installed girder 250 with a nut 311. Further, the fixing plate 350 is attached to the lower end portion 306 of the PC steel rod 302.

ここで、図9(A)に示すように、定着板350の平面視における中心部には、PC鋼棒150が挿通される挿通孔354が形成されている。また、定着板350には、端面352から挿通孔354まで切り込まれた切込部356が形成されている。なお、本実施形態においては、切込部356は平面視L字状とされている。
そして、図10に示すように、PC鋼棒302の下端部306におけるナット312間の軸部307を切込部356に通して定着板350の挿通孔354に挿通させる。挿通させた後、ナット312を締めて定着板3050を下端部306に取り付ける。
Here, as shown in FIG. 9A, an insertion hole 354 through which the PC steel rod 150 is inserted is formed at the center of the fixing plate 350 in plan view. Further, the fixing plate 350 is formed with a cut portion 356 cut from the end surface 352 to the insertion hole 354. In the present embodiment, the cut portion 356 is L-shaped in plan view.
Then, as shown in FIG. 10, the shaft portion 307 between the nuts 312 at the lower end portion 306 of the PC steel rod 302 is passed through the notch portion 356 and is inserted into the insertion hole 354 of the fixing plate 350. After the insertion, the nut 312 is tightened and the fixing plate 3050 is attached to the lower end 306.

図8−2(G)に示すように、螺旋状に巻かれたスパイラル筋216を横穴210に挿入する。
図8−2(H)に示すように、合成繊維や鋼繊維などで補強された早強コンクリート212を横穴210に充填する。そして、早強コンクリート212が固化し、所望の強度が得られることによって、定着板350が固定される。つまり、PC鋼棒302の下端部306が基礎200に定着する。
図8−3(I)に示すように、横穴210に充填された早強コンクリート212が固化し、所望の強度が発現されていることを確認し、地盤20に掘られた穴22を埋める。
ジャッキやテンションバー等で構成されている緊張力付与装置88を新設臥梁250の上に設置し、PC鋼棒302に緊張力を付与する。
As shown in FIG. 8-2 (G), the spiral muscle 216 wound spirally is inserted into the lateral hole 210.
As shown in FIG. 8-2 (H), the early hole concrete 212 reinforced with synthetic fiber, steel fiber or the like is filled in the horizontal hole 210. The fast-strength concrete 212 is solidified to obtain a desired strength, whereby the fixing plate 350 is fixed. That is, the lower end portion 306 of the PC steel bar 302 is fixed to the foundation 200.
As shown in FIG. 8-3 (I), it confirms that the early strong concrete 212 with which the horizontal hole 210 was filled is solidified, and the desired intensity | strength is expressed, The hole 22 dug in the ground 20 is filled.
A tension applying device 88 composed of a jack, a tension bar or the like is installed on the newly installed girder 250 to apply tension to the PC steel bar 302.

図8−3(J)に示すように、貫通孔150内にグラウト158を充填する(シース管が挿入されている場合は、シース管にグラウト158を充填する)。
図8−3(K)に示すように、新設臥梁250の中空部258にモルタル259を充填する。また、PC鋼棒302の上端部304における新設臥梁250の上に露出した部位とナット311に防錆塗装を施し、キャップ257を被せる。
そして、新設臥梁250の上に元の屋根72(図20参照)を設け、素屋根(図示略)を取り外し撤去する。
As shown in FIG. 8-3 (J), the grout 158 is filled in the through hole 150 (when the sheath tube is inserted, the grout 158 is filled in the sheath tube).
As shown in FIG. 8-3 (K), the hollow portion 258 of the newly installed girder 250 is filled with mortar 259. Further, a portion exposed on the newly installed girder 250 at the upper end 304 of the PC steel bar 302 and the nut 311 are subjected to rust-proof coating, and the cap 257 is put on.
Then, the original roof 72 (see FIG. 20) is provided on the newly installed girder 250, and the bare roof (not shown) is removed and removed.

なお、上記、工程は一例であって、これに限定されない。問題等が生じない限り各工程の順番を適宜入れ替えてもよい。
例えば、図8−3(I)と図8−3(J)との順番を入れ替えてもよい。つまり、貫通孔150内にグラウト158を充填し(図8−3(J))、グラウト158が固まらないうちに、PC鋼棒302に緊張力を付与してもよい(図8−3(I))。
また、各工程間に他の工程を適宜行なってもよい。
In addition, the said process is an example and is not limited to this. As long as no problem or the like occurs, the order of the steps may be appropriately changed.
For example, the order of FIG. 8-3 (I) and FIG. 8-3 (J) may be switched. That is, the grout 158 is filled in the through-hole 150 (FIG. 8-3 (J)), and tension may be applied to the PC steel rod 302 before the grout 158 is hardened (FIG. 8-3 (I )).
Moreover, you may perform another process suitably between each process.

つぎに、本実施形態の作用について説明する。
既設のレンガ壁100を移動させることなく、レンガ壁100の基礎200に形成した横穴210からPC鋼棒302の下端部306に定着板350を取り付けたのち、横穴210に早強コンクリート212を充填し、固定する。つまり、基礎200に横穴210を形成することで、レンガ壁100を移設することなく、固定端として機能する定着板350をPC鋼棒302の下端部306に設けることができる。
そして、レンガ壁100の上端120と下端110との間を貫通し緊張力が付与された複数のPC鋼棒302によって、レンガ壁100の上端120と下端110との間に圧縮力が付与される(図11を参照)。
Next, the operation of this embodiment will be described.
After the fixing plate 350 is attached to the lower end 306 of the PC steel rod 302 from the horizontal hole 210 formed in the foundation 200 of the brick wall 100 without moving the existing brick wall 100, the horizontal hole 210 is filled with the early strong concrete 212. , Fix. That is, by forming the horizontal hole 210 in the foundation 200, the fixing plate 350 functioning as a fixed end can be provided at the lower end portion 306 of the PC steel rod 302 without transferring the brick wall 100.
A compressive force is applied between the upper end 120 and the lower end 110 of the brick wall 100 by a plurality of PC steel bars 302 that pass through between the upper end 120 and the lower end 110 of the brick wall 100 and are given tension. (See FIG. 11).

このようにPC鋼棒302によって、レンガ壁100に付与される圧縮力によって、レンガ10の相互間、すなわちレンガ10と目地材12との界面に作用する摩擦力が向上し、レンガ壁100の面内変形が抑制される。言い換えると、レンガ10と目地材12との間に圧縮力を作用させて、これらの間に剥離が生じることが抑制される。つまり、レンガ壁100にプレストレスを加えることで、面内方向の荷重伝達(せん断力伝達)性能が向上する。   In this way, the friction force acting between the bricks 10, that is, the interface between the brick 10 and the joint material 12 is improved by the compressive force applied to the brick wall 100 by the PC steel bar 302, and the surface of the brick wall 100. Internal deformation is suppressed. In other words, a compressive force is applied between the brick 10 and the joint material 12 to prevent separation between them. That is, by applying prestress to the brick wall 100, the load transmission (shear force transmission) performance in the in-plane direction is improved.

このとき、PC鋼棒302の下端部306は、固定端として機能する定着板350が取り付けられ、基礎200に固定(定着)されている。よって、PC鋼棒302の下端部306が基礎200以外、例えば、基礎200の下の地盤20中に固定(定着)されている構成と比較し、PC鋼棒302の下端部306を固定(定着)する固定強度(定着強度)が大きい。これにより、PC鋼棒302に付与する緊張力を大きくし、レンガ壁100の上端120と下端110との間に付与する圧縮力を大きくすることができる。言いかえると、PC鋼棒302に所望の緊張力を付与して、レンガ壁100に所望の圧縮力を付与することができ、その結果、所望の耐震性能を確保することができる。   At this time, a fixing plate 350 that functions as a fixed end is attached to the lower end portion 306 of the PC steel rod 302 and is fixed (fixed) to the foundation 200. Therefore, the lower end portion 306 of the PC steel rod 302 is fixed (fixed) as compared with a configuration in which the lower end portion 306 of the PC steel rod 302 is fixed (fixed) in the ground 20 below the base 200 other than the base 200, for example. ) Fixing strength (fixing strength) is large. Thereby, the tension applied to the PC steel bar 302 can be increased, and the compressive force applied between the upper end 120 and the lower end 110 of the brick wall 100 can be increased. In other words, a desired tension force can be applied to the PC steel bar 302 and a desired compressive force can be applied to the brick wall 100, and as a result, a desired seismic performance can be ensured.

したがって、既設のレンガ壁100を移動させることなく、レンガ壁100の耐震性能が向上する(所望の耐震性能が得られる)。また、その結果、洋館70の耐震性能が向上する。
また、図23〜図25に示す落下防止機構によって、PC鋼棒300を貫通孔150に挿入する際の、PC鋼棒300の落下が防止される。
Therefore, the seismic performance of the brick wall 100 is improved without moving the existing brick wall 100 (a desired seismic performance can be obtained). As a result, the seismic performance of the Western-style building 70 is improved.
Moreover, the fall of the PC steel rod 300 when the PC steel rod 300 is inserted into the through hole 150 is prevented by the fall prevention mechanism shown in FIGS.

なお、本実施形態においては、側面視において、PC鋼棒302AとPC鋼棒302Bとは、レンガ壁100の面外方向に互いに離れて配置されている(図1、図2、図4(A)参照)。よって、レンガ壁100の面外変形を抑制する補強筋としての効果が発揮され、レンガ壁100の面外変形を抑制する効果が向上する(レンガ壁100の面外方向の耐力が向上する)。   In the present embodiment, the PC steel bar 302A and the PC steel bar 302B are disposed away from each other in the out-of-plane direction of the brick wall 100 in a side view (FIGS. 1, 2, and 4A). )reference). Therefore, the effect as a reinforcing bar which suppresses the out-of-plane deformation of the brick wall 100 is exhibited, and the effect of suppressing the out-of-plane deformation of the brick wall 100 is improved (the proof stress in the out-of-plane direction of the brick wall 100 is improved).

したがって、PC鋼棒302がレンガ壁100の面外方向に離れて配置されていない構成と比較し、PC鋼棒302によるレンガ壁100の面外変形の抑制効果が向上する。よって、耐震補強後のレンガ壁100の耐震性能が向上する(PC鋼棒302が引っ張り応力を負担し、伸び変形によってレンガ壁100全体の変形性能が向上する)。すなわち、レンガ造の洋館70(図20参照)の耐震性能が向上する。   Therefore, the effect of suppressing the out-of-plane deformation of the brick wall 100 by the PC steel rod 302 is improved as compared with a configuration in which the PC steel rod 302 is not arranged in the out-of-plane direction of the brick wall 100. Therefore, the seismic performance of the brick wall 100 after the seismic reinforcement is improved (the PC steel rod 302 bears a tensile stress, and the deformation performance of the entire brick wall 100 is improved by elongation deformation). That is, the seismic performance of the brick-made Western-style building 70 (see FIG. 20) is improved.

このように、面外方向に互いに離れて配置された複数のPC鋼棒302によって、面内方向のせん断耐力及び面外方向の曲げ耐力の向上が図られる。
更に、既存のレンガ壁100下のコンクリート製の基礎200にPC鋼棒302の下端部306を定着させることで、レンガ壁100の剛性を高め、地盤(支持地盤)20へ地震時の外力をスムーズに伝達させることができる。
As described above, the plurality of PC steel bars 302 arranged away from each other in the out-of-plane direction can improve the in-plane direction shear strength and the out-of-plane direction bending strength.
Furthermore, by fixing the lower end portion 306 of the PC steel bar 302 to the concrete base 200 under the existing brick wall 100, the rigidity of the brick wall 100 is increased, and the external force during the earthquake is smoothly applied to the ground (support ground) 20. Can be transmitted.

また、列A(図4(A)参照)の各PC鋼棒302Aの上端部304Aは、緊張端して機能する新設臥梁250Aに固定されている。同様に、列B(図4(A)参照)の各PC鋼棒302Bの上端部304Bは、緊張端として機能する新設臥梁250Bに固定されている。よって、PC鋼棒302毎に上端部30Bを固定し緊張端として機能する固定部材が設けられている構成と比較し、レンガ壁100の上端120に作用する圧縮応力が分散する。この結果、レンガ壁100に付与される圧縮力が長手方向に分散する。
これにより、レンガ壁100の長手方向に沿って配置するPC鋼棒302の間隔を広くすることができる。
Further, the upper end portion 304A of each PC steel rod 302A in the row A (see FIG. 4A) is fixed to a newly installed girder 250A that functions as a tension end. Similarly, the upper end portion 304B of each PC steel bar 302B in the row B (see FIG. 4A) is fixed to a newly installed girder 250B that functions as a tension end. Therefore, the compressive stress acting on the upper end 120 of the brick wall 100 is dispersed as compared with the configuration in which the fixing member that fixes the upper end portion 30B and functions as the tension end is provided for each PC steel bar 302. As a result, the compressive force applied to the brick wall 100 is dispersed in the longitudinal direction.
Thereby, the space | interval of the PC steel rod 302 arrange | positioned along the longitudinal direction of the brick wall 100 can be widened.

なお、本実施形態は、新設臥梁250をレンガ壁100の長手方向の略全域に亘って設けている(図1、図3等を参照)。よって、レンガ壁100の上端120に作用する圧縮応力が更に分散化する。また、レンガ壁100の長手方向の略全域に亘って新設臥梁250を設けることで、新設臥梁250を、壁頂に設ける臥梁と、PC鋼棒302の上端部304を固定し緊張端として機能する上部固定部材と、の両方の機能を兼ねることができる。   In the present embodiment, the newly installed girder 250 is provided over substantially the entire region of the brick wall 100 in the longitudinal direction (see FIGS. 1 and 3). Therefore, the compressive stress acting on the upper end 120 of the brick wall 100 is further dispersed. Further, by providing the newly installed girder 250 over substantially the entire longitudinal direction of the brick wall 100, the newly installed girder 250 is fixed to the girder provided on the top of the wall and the upper end portion 304 of the PC steel rod 302, and the tension end And the upper fixing member functioning as both.

また、緊張端として機能する新設臥梁(溝形鋼材)250の中空部258には、縦リブ260が設けられている(図1、図5、図6等参照)。よって、新設臥梁250は、縦リブ260によって上下方向の剛性が向上する。したがって、縦リブ260が設けられていない構成と比較し、圧縮応力がレンガ壁100の上端120により確実に伝達される。特に本実施形態のように、PC鋼棒302の上端部304の固定部位(図1、図2、図6を参照)に設けることで、圧縮応力がレンガ壁100の上端120に更に確実に伝達される。
なお、PC鋼棒302の上端部304を固定する固定部位(固定場所)には、PC鋼棒302が固定されている部位(場所)のみならず、その近傍を含む。例えば、PC鋼材302の長手方向両側50〜100mm程度の範囲に縦リブ260を設けることが望ましい。
Moreover, the vertical rib 260 is provided in the hollow part 258 of the newly installed girder (grooved steel) 250 that functions as a tension end (see FIGS. 1, 5, 6, etc.). Accordingly, the vertical girder 260 improves the vertical rigidity of the newly installed girder 250. Therefore, the compressive stress is reliably transmitted to the upper end 120 of the brick wall 100 as compared with the configuration in which the vertical ribs 260 are not provided. In particular, as in the present embodiment, the compression stress is more reliably transmitted to the upper end 120 of the brick wall 100 by providing the fixing portion (see FIGS. 1, 2, and 6) of the upper end 304 of the PC steel bar 302. Is done.
In addition, the fixing | fixed site | part (fixed place) which fixes the upper end part 304 of the PC steel bar 302 includes not only the site | part (place) where the PC steel bar 302 is fixed but its vicinity. For example, it is desirable to provide the vertical ribs 260 in the range of about 50 to 100 mm on both sides in the longitudinal direction of the PC steel material 302.

また、レンガ壁100の上端120に形成された水平又は略水平に均す均モルタル122の上に新設臥梁250が設けられているので、レンガ壁100の上端120に圧縮応力が均一に作用する。また、均しモルタル122で均されてから削孔装置80を設置することで、貫通孔150を鉛直方向に精度良く形成することができる。   Further, since the newly installed girder 250 is provided on the horizontal or substantially horizontal leveling mortar 122 formed on the upper end 120 of the brick wall 100, the compressive stress acts uniformly on the upper end 120 of the brick wall 100. . Moreover, the through-hole 150 can be accurately formed in the vertical direction by installing the hole drilling device 80 after being leveled by the leveling mortar 122.

また、PC鋼棒302の下端部306を固定し基礎200に定着させるための定着板350が、レンガ壁100の基礎200に形成された横穴210に設けられると共に、横穴210に充填された早強コンクリート212で固定されている。よって、既存のレンガ壁100を移動させることなく、基礎200に定着板350を設け、PC鋼棒302の下端部306を基礎200に定着することができる。   Further, a fixing plate 350 for fixing and fixing the lower end portion 306 of the PC steel rod 302 to the foundation 200 is provided in the lateral hole 210 formed in the foundation 200 of the brick wall 100, and the early strength filled in the lateral hole 210 is provided. It is fixed with concrete 212. Therefore, the fixing plate 350 can be provided on the foundation 200 and the lower end portion 306 of the PC steel rod 302 can be fixed to the foundation 200 without moving the existing brick wall 100.

また、定着板350の切込部356から挿通孔354に緊張材を通すことができる(図10参照)。よって、定着板350を締結するためのナット312をPC鋼棒302の下端部306に取り付けた状態であっても、定着板350の挿通孔354に通すことができる。よって、貫通孔150を挿通させたPC鋼棒302の下端部306に定着板350を容易に取り付けることができる。   Further, a tension material can be passed from the notch 356 of the fixing plate 350 into the insertion hole 354 (see FIG. 10). Therefore, even if the nut 312 for fastening the fixing plate 350 is attached to the lower end portion 306 of the PC steel rod 302, it can be passed through the insertion hole 354 of the fixing plate 350. Therefore, the fixing plate 350 can be easily attached to the lower end portion 306 of the PC steel rod 302 through which the through hole 150 is inserted.

また、基礎200の横穴210は、螺旋状に巻かれたスパイラル筋216で補強されている。よって、早強コンクリート212が充填され固化した状態における横穴210の強度、つまり基礎200の強度が向上する。なお、スパイラル筋216以外の鉄筋で補強してもよい。   Further, the lateral hole 210 of the foundation 200 is reinforced by a spiral muscle 216 wound in a spiral shape. Therefore, the strength of the horizontal hole 210 in a state where the early strong concrete 212 is filled and solidified, that is, the strength of the foundation 200 is improved. Note that reinforcing bars other than the spiral bars 216 may be used for reinforcement.

また、横穴210に充填するコンクリートを、固化するまでの時間が短い早強コンクリート212とすることで、定着板350が定着されるまでの時間が短縮される。よって、PC鋼棒302の下端部306が固定され、緊張力を付与するまでの時間が短縮される(図8−2(H)から図8−3(I)への時間が短縮される)。   In addition, by making the concrete filled in the horizontal holes 210 into the early strong concrete 212 having a short time until solidification, the time until the fixing plate 350 is fixed is shortened. Therefore, the lower end 306 of the PC steel rod 302 is fixed, and the time until the tension is applied is shortened (the time from FIG. 8-2 (H) to FIG. 8-3 (I) is shortened). .

また、早強コンクリート212は合成繊維や鋼繊維などで補強されているので、横穴210の強度が更に向上する。   Moreover, since the early strong concrete 212 is reinforced with synthetic fiber, steel fiber, or the like, the strength of the lateral hole 210 is further improved.

ここで、横穴210は所望の強度が確保されていればよい。よって、合成繊維や鋼繊維などで補強されることで所望の強度が確保されれば、スパイラル筋216を横穴210に設ける必要はない。或いは、スパイラル筋216を設けることで、強度が確保されれば、合成繊維や鋼繊維などで補強されていなくてもよい。更に、繊維での補強やスパイラル筋216を設けなくても、所望の強度が確保されれば、早強コンクリート212のみを充填してもよい。   Here, the horizontal hole 210 only needs to have a desired strength. Therefore, if the desired strength is ensured by reinforcement with synthetic fibers or steel fibers, the spiral streaks 216 need not be provided in the lateral holes 210. Alternatively, as long as the strength is ensured by providing the spiral muscles 216, the fibers need not be reinforced with synthetic fibers or steel fibers. Furthermore, it is possible to fill only the early high-strength concrete 212 as long as a desired strength is ensured without providing reinforcement with fibers and spiral reinforcement 216.

また、緊張力を付与するまでの時間を短縮する必要性が少ない場合などは、早強コンクリートでなく通常のコンクリートを横穴210に充填してもよい。
更に、所望の強度が確保されれば、コンクリート以外の充填材、例えば、モルタルやグラウトを横穴210に充填してもよい。
Moreover, when there is little necessity for shortening the time until tension | tensile_strength is provided, normal concrete may be filled into the horizontal hole 210 instead of early strong concrete.
Furthermore, if the desired strength is ensured, the lateral hole 210 may be filled with a filler other than concrete, for example, mortar or grout.

また、貫通孔150は、冷却気体を接触させて冷却した削孔工具82で削孔されている。つまり、冷却水を用いることなくレンガ壁100に貫通孔150を形成するので、レンガ壁100及びレンガ壁100の周囲を水で濡らすことがない。また、目地から水が染み出ることがない。
よって、水で濡れたり目地から水が染み出みでたりすることで問題が生じる組積造壁や組積造構造物、例えば、歴史的な建築物であっても、本発明の補強構造を適用して耐震性能を向上することできる。
The through-hole 150 is drilled with a drilling tool 82 cooled by contacting with a cooling gas. That is, since the through-hole 150 is formed in the brick wall 100 without using cooling water, the brick wall 100 and the periphery of the brick wall 100 are not wetted with water. In addition, water does not ooze from the joints.
Therefore, even in the case of masonry walls and masonry structures that cause problems due to water getting wet or seeping out from joints, for example, historic buildings, the reinforcing structure of the present invention is used. It can be applied to improve seismic performance.

なお、本実施形態では、洋館70の建物外周の外壁を構成するレンガ壁100の耐震補強を例にとって説明したが、これに限定されない。建物外周の外壁以外のレンガ壁、例えば、居室内の主要となる廊下沿いレンガ壁等、窓開口等を除く屋根階から基礎まで連続する壁にも適用できる。
また、レンガ壁100の内外に補強して痕跡を殆ど残さないので、歴史的な建造物であっても、本発明の補強構造を適用して耐震性能を向上することできる。更に、耐震補強工事中であっても、洋館70の居室内仕上げは略そのままで、内部の殆どの施設の利用が可能である。
また、レンガ壁100そのものの構造耐力を上げるので、剛床のための2階や屋根階の床補強が不要である。
In addition, although this embodiment demonstrated the earthquake-proof reinforcement of the brick wall 100 which comprises the outer wall of the outer periphery of the building of the western building 70 as an example, it is not limited to this. The present invention can also be applied to a brick wall other than the outer wall of the outer periphery of the building, for example, a brick wall along a corridor which is a main part of a living room, and a continuous wall from the roof floor to the foundation excluding window openings.
Moreover, since it reinforces inside and outside the brick wall 100 and hardly leaves a trace, even if it is a historical building, it can apply the reinforcement structure of this invention, and can improve seismic performance. Furthermore, even during the seismic retrofitting work, the interior finishing of the Western-style building 70 is almost the same, and most of the facilities inside can be used.
Further, since the structural strength of the brick wall 100 itself is increased, it is not necessary to reinforce the floor of the second floor or the roof floor for a rigid floor.

つぎに、レンガ壁における面内変形と面外変形の抑制効果の確認実験について説明する。
図11には、確認実験に用いる試験体(レンガ壁)101が示されている。試験体101には、レンガ壁100と同様の補強構造が適用される。つまり、PC鋼棒300が面外方向に互いに離して配置されている(図1、図4(A)参照)。また、試験体101はコンクリート製の壁脚部201の上に構築され、試験体101の上にはコンクリート製の加力スタブ251が設けられている。PC鋼棒300の下端部は、壁脚部201に埋設された定着板(図示略)に固定され壁脚部201に定着されている。PC鋼棒300の上端部は加力スタブ251の上に設けられた定着板(図示略)によって固定されている。そして、PC鋼棒300に、緊張力が付与され、試験体101に圧縮力が付与されている。
Next, a confirmation experiment of the effect of suppressing in-plane deformation and out-of-plane deformation in the brick wall will be described.
FIG. 11 shows a test body (brick wall) 101 used in the confirmation experiment. A reinforcing structure similar to that of the brick wall 100 is applied to the test body 101. That is, the PC steel bars 300 are arranged away from each other in the out-of-plane direction (see FIGS. 1 and 4A). The test body 101 is constructed on a concrete wall leg 201, and a concrete applied force stub 251 is provided on the test body 101. The lower end of the PC steel rod 300 is fixed to a wall leg 201 by being fixed to a fixing plate (not shown) embedded in the wall leg 201. The upper end portion of the PC steel bar 300 is fixed by a fixing plate (not shown) provided on the applied stub 251. A tension force is applied to the PC steel rod 300, and a compressive force is applied to the test body 101.

図12のグラフは、試験体101の壁脚部201を固定し、加力スタブ251に加える水平荷重Qと部材角Rとの関係(面内加力による荷重−変位曲線)を示している(図中の模式図を参照)。なお、部材角Rとは、部材が荷重を受け節点が移動して変形(変位)する際の、両端を直線で結んだときの元の位置との角度である。
また、グラフ中のBW−1はPC鋼棒300に緊張力を加えて、試験体101に圧縮応力度(プレストレス)を0.2N/mm付与した場合であり、グラフ中のBW−2はPC鋼棒300に緊張力を加えて、試験体101に圧縮応力度(プレストレス)を1.0N/mm付与した場合である。
The graph of FIG. 12 shows the relationship between the horizontal load Q applied to the applied stub 251 and the member angle R (load-displacement curve due to in-plane applied force) with the wall leg 201 of the test body 101 fixed. (See schematic diagram in the figure). The member angle R is an angle with the original position when both ends are connected with a straight line when the member receives a load and the node moves and deforms (displaces).
Further, BW-1 in the graph is a case where a tensile force is applied to the PC steel rod 300 and a compressive stress level (prestress) of 0.2 N / mm 2 is applied to the test body 101, and BW-2 in the graph Is a case where a tensile force is applied to the PC steel bar 300 and a compressive stress (prestress) of 1.0 N / mm 2 is applied to the test body 101.

BW−1(0.2N/mm2)は、初ひび割れ発生後、目地部にずれが生じ水平変位が進む。しかし、水平変形の増大に伴うPC鋼棒300のひずみ増大により水平荷重が若干増大し、最終的にQ=0.68×10kN(せん断応力度0.68N/mm)で最大荷重に達し、壁脚部201と試験体101との間の目地部ですべり破壊した。 In BW-1 (0.2 N / mm 2), after the initial crack is generated, the joint portion is displaced and the horizontal displacement proceeds. However, the horizontal load slightly increases due to the increase in strain of the PC steel rod 300 accompanying the increase in horizontal deformation, and finally the maximum load at Q 0 = 0.68 × 10 3 kN (shear stress degree 0.68 N / mm 2 ). The slippage was broken at the joint between the wall leg 201 and the test body 101.

BW−2(1.0N/mm2)は、初ひび割れが0.68×10kN(せん断応力度0.68N/mm)で発生し、最終的にQ=1.67×10kN(せん断応力度1.67N/mm)まで達して、耐力低下(すべり破壊)する前に試験を終了した。 BW-2 (1.0 N / mm 2) has an initial crack of 0.68 × 10 3 kN (shear stress 0.68 N / mm 2 ), and finally Q = 1.67 × 10 3 kN ( The test was completed before the yield strength was reduced (slip fracture) until the shear stress reached 1.67 N / mm 2 .

図13は、上記実験結果を模式的に判りやすく示した耐力と変位関係を示すグラフである。
このように、耐震補強した試験体101(レンガ壁100)のPC鋼棒300を緊張してプレストレス力を大きくすることで、せん断破壊する耐力が向上することが判る。つまり、PC鋼棒300に緊張力を付与し、試験体101(レンガ壁100)に圧縮力を付与することによって、面内方向の耐力が向上することが実験によって確認された。
FIG. 13 is a graph showing the relationship between the proof stress and the displacement, in which the above experimental results are schematically shown.
Thus, it can be seen that by increasing the pre-stress force by tensioning the PC steel rod 300 of the test body 101 (brick wall 100) subjected to seismic reinforcement, the proof strength against shearing is improved. That is, it was confirmed by an experiment that the proof stress in the in-plane direction is improved by applying tension to the PC steel bar 300 and applying compressive force to the test body 101 (brick wall 100).

図14のグラフは、試験体101の壁脚部201を固定し、加力スタブ251に対して面外方向に加える荷重Qと変位量との関係(面外加力による荷重−変位曲線)を示している。グラフ中のσの値はPC鋼棒300に付与した緊張力を示している。   The graph of FIG. 14 shows the relationship between the load Q applied to the force stub 251 in the out-of-plane direction and the amount of displacement (load-displacement curve due to the out-of-plane force) while the wall leg 201 of the test body 101 is fixed. ing. The value of σ in the graph indicates the tension applied to the PC steel bar 300.

この図14のグラフを見ると判るように、PC鋼棒300を緊張してプレストレス力を大きくするほど、破壊される最大荷重が大きくなることが判る。つまり、PC鋼棒300を面外方向に互いに離して配置し、PC鋼棒300に緊張力を付与し、試験体101(レンガ壁100)に圧縮力を付与することによって、面外方向の耐力が向上することが実験によって確認された。   As can be seen from the graph of FIG. 14, it can be seen that the maximum load to be destroyed increases as the PC steel rod 300 is tensioned to increase the prestress force. In other words, the PC steel rods 300 are arranged away from each other in the out-of-plane direction, the tensile force is applied to the PC steel rod 300, and the compressive force is applied to the test body 101 (brick wall 100), thereby allowing the yield strength in the out-of-plane direction. Has been confirmed by experiments.

このように、確認実験によると、本発明が適用されることで、試験体101における面内変形は1/200以上に、面外変形は1/30以上に、試験体101が変形をしても耐力低下が生じないことが確認された。   As described above, according to the confirmation experiment, by applying the present invention, the in-plane deformation in the test body 101 is 1/200 or more, the out-of-plane deformation is 1/30 or more, and the test body 101 is deformed. It was also confirmed that the yield strength did not decrease.

つぎに、本実施形態の変形例について説明する。
まず、補強工程の変形例について、図15を用いて説明する。
図15に示すように、新設臥梁250A,250Bの上に削孔装置80を設置してもよい。この場合、図8−1(B)の工程の後に図8−1(D)の工程を行い図15のように貫通孔150を形成する。
Next, a modification of this embodiment will be described.
First, a modification of the reinforcing process will be described with reference to FIG.
As shown in FIG. 15, a hole drilling device 80 may be installed on the newly installed beams 250A and 250B. In this case, the process of FIG. 8-1 (D) is performed after the process of FIG. 8-1 (B), and the through-hole 150 is formed like FIG.

なお、このように均しモルタル122A,122Bでレベル調整した新設臥梁250A,250Bの上に削孔装置80を設置すると、精度良く削孔装置80を据え付けることがきる。よって、貫通孔150を精度良く形成することができる(貫通孔150を鉛直方向に精度良く形成することができる)。   In addition, when the drilling device 80 is installed on the newly installed beams 250A and 250B whose levels are adjusted by the leveling mortars 122A and 122B in this way, the drilling device 80 can be installed with high accuracy. Therefore, the through hole 150 can be formed with high accuracy (the through hole 150 can be formed with high accuracy in the vertical direction).

また、削孔装置80を新設臥梁250A,250Bのフランジ252A,252Bに、挟込部材82で固定することで、レンガ壁100を傷つけることなく、削孔装置80を精度良く固定することができる。   Further, by fixing the drilling device 80 to the flanges 252A and 252B of the newly installed beams 250A and 250B with the sandwiching member 82, the drilling device 80 can be accurately fixed without damaging the brick wall 100. .

また、既設臥梁50があるため、レンガ壁100の上端120に、削孔装置80を設置する十分な設置スペースを確保することが困難な場合でも、既設臥梁50を取り外すことなく、設置スペースが確保される。   Moreover, since there is the existing girder 50, even if it is difficult to secure a sufficient installation space for installing the drilling device 80 at the upper end 120 of the brick wall 100, the installation space is not removed without removing the existing girder 50. Is secured.

つぎに、PC鋼棒300の落下防止機構の他の例について説明する。
図26に示すように、貫通孔150の開口部152よりも大きな拡部190をPC鋼棒300(302)に取り付けてもよい。拡部190には、中心部にカプラ310よりも若干大きい取付孔192が形成されている。この拡部190の取付孔192にカプラ310を通し、端部から取付孔192に達するネジ194を締め付けて固定する。そして、ネジ194を緩めると、拡部190が軸方向に移動可能となる。
なお、二点破線(想像線)で示すように、二つの部材191と部材193とに分割可能な構成とすることで、二つの部材191、193でPC鋼棒300を挟んで固定する構成がとしてもよい(この場合は、取付孔192は、カプラ310よりも若干小さい)。また、このような構成の場合は、予め複数箇所に拡部を取り付け適宜取り外しながら挿入してもよい。
なお、カプラ310でなく、PC鋼棒300の軸部に拡部190を取り付けるようにしてもよい。
Next, another example of the fall prevention mechanism for the PC steel rod 300 will be described.
As shown in FIG. 26, an enlarged portion 190 larger than the opening 152 of the through hole 150 may be attached to the PC steel rod 300 (302). The enlarged portion 190 is formed with a mounting hole 192 that is slightly larger than the coupler 310 at the center. The coupler 310 is passed through the mounting hole 192 of the enlarged portion 190, and a screw 194 reaching the mounting hole 192 from the end is tightened and fixed. When the screw 194 is loosened, the enlarged portion 190 can be moved in the axial direction.
In addition, as shown with a dashed-two dotted line (imaginary line), by setting it as the structure which can be divided | segmented into the two members 191 and the member 193, the structure which pinches | interposes and fixes the PC steel rod 300 with the two members 191 and 193 is possible. (In this case, the mounting hole 192 is slightly smaller than the coupler 310). Moreover, in such a structure, you may insert it, attaching an expansion part to several places previously and removing suitably.
In addition, you may make it attach the expansion part 190 to the axial part of PC steel bar 300 instead of the coupler 310. FIG.

また、上記実施形態では、PC鋼棒300を接続する接続部材としてのカプラ310が落下防止を行なうための拡部を兼ねていたが、これに限定されない。別途、PC鋼棒300よりも大きな拡部を取り付けてもよい。なお、複数のPC鋼棒300がカプラ310で接続されている長尺化されている場合は、カプラ310よりも大きな拡部とする。
なお、別部材構成の拡部の場合は、拡部を軸方向に移動可能又は着脱可能とすることで、PC鋼棒302の挿入量に応じて拡部を上方に適宜移動させたり、複数の拡部をPC鋼棒302の挿入量に応じて適宜取り外したりして、対応してもよい。
拡部が軸方向に移動可能な構成としては、例えば、ネジを緩めた状態で移動し、移動後ネジを締め付けることによって固定する構成が考えられる(図26参照)。また、拡部が着脱可能な構成としては、例えば、ネジで締結された二つの部材でPC鋼棒300を挟んで固定する構成が考えられる(図26参照)。
Moreover, in the said embodiment, although the coupler 310 as a connection member which connects the PC steel rod 300 served as the expansion part for performing fall prevention, it is not limited to this. Separately, an enlarged portion larger than the PC steel rod 300 may be attached. When the plurality of PC steel bars 300 are connected to each other by the coupler 310 and are elongated, the expanded portion is larger than the coupler 310.
In addition, in the case of an enlarged portion having a different member configuration, the enlarged portion can be moved or removed in the axial direction, so that the enlarged portion can be appropriately moved upward according to the amount of insertion of the PC steel rod 302, or a plurality of The expansion portion may be removed as appropriate according to the amount of insertion of the PC steel rod 302 to cope with it.
As a configuration in which the expansion portion is movable in the axial direction, for example, a configuration in which the screw is moved in a loosened state and fixed by tightening the screw after the movement is considered (see FIG. 26). Moreover, as a structure which can attach or detach an expansion part, the structure which pinches | interposes and fixes PC steel rod 300 with the two members fastened with the screw | thread is considered, for example (refer FIG. 26).

つぎに、PC鋼棒300の配置の変形例について、図4(B)と図16と用いて説明する。
図4(B)に示す変形例のように、面外方向に離れて配置されたPC鋼棒300A,300Bが、平面視において、面外方向に重ならないように、長手方向にずれて配置されていてもよい。言いかえると、平面視において、PC鋼棒が千鳥配置されていてもよい。
Next, a modified example of the arrangement of the PC steel bars 300 will be described with reference to FIG. 4B and FIG.
As in the modification shown in FIG. 4 (B), the PC steel bars 300A and 300B arranged away from each other in the out-of-plane direction are arranged shifted in the longitudinal direction so as not to overlap in the out-of-plane direction. It may be. In other words, the PC steel bars may be staggered in a plan view.

このように平面視において、面外方向に重ならないように、長手方向にずれて、千鳥状に配置されることで、少ない本数のPC鋼棒302で、面内変形の抑制効果と面外方向の抑制効果を両方を得ることができる。例えば、同数のPC鋼棒302を、平面視において、レンガ壁100の面外方向中央部分に長手方向に沿って一列に配置した構成と比較し、図4(B)に示すように千鳥状に配置することで、略同等の面内変形の抑制効果を確保しつつ、面外変形の抑制効果を向上させることができる。   As described above, in the plan view, by being shifted in the longitudinal direction so as not to overlap in the out-of-plane direction, and arranged in a staggered manner, the effect of suppressing in-plane deformation and the out-of-plane direction can be achieved with a small number of PC steel bars 302. Both of the suppression effects can be obtained. For example, compared with a configuration in which the same number of PC steel bars 302 are arranged in a line along the longitudinal direction in the center portion in the out-of-plane direction of the brick wall 100 in a plan view, as shown in FIG. By disposing, it is possible to improve the effect of suppressing the out-of-plane deformation while securing the substantially same effect of suppressing the in-plane deformation.

なお、図示は省略するが、図4(A)に示すように、列Aと列Bとの二列でなく、三列以上であってもよい。また、一列であってもよい。
なお、三列以上の場合においても、PC鋼棒の配置は、平面視において千鳥状に配置されていてもよい。
Although illustration is omitted, as shown in FIG. 4A, the number of rows may be three or more instead of the two rows A and B. Further, it may be a single row.
Even in the case of three or more rows, the PC steel rods may be arranged in a staggered manner in a plan view.

更に、PC鋼棒302は、鉛直方向に配置されていなくてもよい。斜めに配置されていてもよい。
また、図16に示す変形例のように、PC鋼棒302A,302B(及び貫通孔150A,150B)を正面視でX形状に配置してもよい。このようにX形状に配置すること、すなわち、筋交いのように、レンガ壁100に対角線状にPC鋼棒302A,302Bを配置することで、三角形を構成する構造部が形成され、面内変形を抑制する効果が向上する。
なお、この場合、PC鋼棒302の上端部304を固定する部材380には、PC鋼棒300を斜めに配置しても固定可能なように傾斜面382が形成されている。
Furthermore, the PC steel bar 302 may not be arranged in the vertical direction. You may arrange | position diagonally.
Moreover, you may arrange | position PC steel rod 302A, 302B (and through-hole 150A, 150B) in X shape by a front view like the modification shown in FIG. By arranging the PC steel bars 302A and 302B diagonally on the brick wall 100 like a brace, a structural part constituting a triangle is formed, and in-plane deformation is performed. The suppression effect is improved.
In this case, an inclined surface 382 is formed on the member 380 for fixing the upper end portion 304 of the PC steel bar 302 so that the PC steel bar 300 can be fixed even if it is disposed obliquely.

つぎに、新設臥梁250の変形例について説明する。
図17に示す第一変形例の新設臥梁510A,510Bは、断面がL形状の山形鋼材で構成されている。新設臥梁510のフランジ514を均しモルタル122の上に設置し、フランジ512を既設臥梁50に当接させるよう配置する。なお、フランジ514をレンガ壁100の上端100の端部よりも面外方向外側まで延在するよう設置し、その延在部分515を利用し、挟込部材82(図16参照)を用いて削孔装置80(図16参照)を固定することで、レンガ壁100を傷つけることなく、削孔装置80を固定することができる。
Next, a modified example of the newly installed girder 250 will be described.
The newly installed girder 510A, 510B of the first modification shown in FIG. 17 is made of an angle steel with an L-shaped cross section. The flange 514 of the newly installed girder 510 is leveled and installed on the mortar 122, and the flange 512 is disposed so as to contact the existing girder 50. The flange 514 is installed so as to extend out of the end of the upper end 100 of the brick wall 100 in the out-of-plane direction, and the extending portion 515 is used to cut using the sandwiching member 82 (see FIG. 16). By fixing the hole device 80 (see FIG. 16), the hole drilling device 80 can be fixed without damaging the brick wall 100.

図18(A)に示す第二変形例の新設臥梁520は、断面がH形状のH形鋼材で構成されている。そして、水平配置されたウエブ524に、PC鋼棒302Aの上端部304AとPC鋼棒302Bの上端部304Bとの両方が固定されている。よって、レンガ壁100の上端120に作用する面外方向の圧縮応力が分散する。
なお、図18(B)のように、レンガ壁100の上端120(均しモルタル122)の上に板鋼材140を設け、この板鋼材140の上にフランジ522の端部を載せることで、圧縮応力が分散される。
The newly installed girder 520 of the second modification shown in FIG. 18 (A) is made of an H-shaped steel material having a H-shaped cross section. Both the upper end portion 304A of the PC steel rod 302A and the upper end portion 304B of the PC steel rod 302B are fixed to the horizontally arranged web 524. Therefore, the compressive stress in the out-of-plane direction acting on the upper end 120 of the brick wall 100 is dispersed.
As shown in FIG. 18B, the steel plate 140 is provided on the upper end 120 (equalizing mortar 122) of the brick wall 100, and the end of the flange 522 is placed on the steel plate 140 to compress the brick. Stress is distributed.

図19に示す第三変形例の新設臥梁530は、下方に開口を向けて配置した溝形鋼材で構成されている。そして、水平配置されたウエブ534に、PC鋼棒302Aの上端部304AとPC鋼棒302Bの上端部304Bとの両方が固定されている。よって、レンガ壁100の上端120に作用する面外方向の圧縮応力が分散する。
なお、本変形例においても、図18(B)のように、レンガ壁100の上端120(均しモルタル122)の上に板鋼材140を設けてもよい。
The newly installed girder 530 of the third modified example shown in FIG. 19 is made of a channel steel material arranged with the opening facing downward. Both the upper end portion 304A of the PC steel rod 302A and the upper end portion 304B of the PC steel rod 302B are fixed to the horizontally arranged web 534. Therefore, the compressive stress in the out-of-plane direction acting on the upper end 120 of the brick wall 100 is dispersed.
Also in this modified example, as shown in FIG. 18B, the steel plate 140 may be provided on the upper end 120 (equalizing mortar 122) of the brick wall 100.

つぎに、PC鋼棒302の下端部306を固定する定着板の変形例について図9(B)を用いて説明する。
図9(B)に示す変形例の定着板351は、PC鋼棒302Aの下端部306Aが挿通される挿通孔354Aと、PC鋼棒302Bの下端部306Bが挿通される挿通孔354Bと、が形成されている。また、端面353から挿通孔354A,354Bまで切り込まれた切込部356A,356Bが形成されている。そして、PC鋼棒302A,302Bの下端部306A,306Bの両方を切込部356A,356Bに通して定着板351の挿通孔354A,354Bに挿通させる。つまり、一つの定着板351がPC鋼棒302Aの下端部306AとPC鋼棒302Bの下端部306Bとの両方が固定される。よって、1度の定着板351の取り付け作業で、複数本(本実施形態では2本)のPC鋼棒302の下端部306への取り付け作業ができるので、作業効率が向上する。
なお、長手方向に並んだ複数本のPC鋼棒302の下端部306が、一つの横穴210に固定(定着)される構成であってもよい。この場合、一つの定着板を長手方向に並んだ複数のPC鋼棒302の下端部306に取り付けてもよい。
Next, a modified example of the fixing plate for fixing the lower end portion 306 of the PC steel rod 302 will be described with reference to FIG.
The fixing plate 351 of the modification shown in FIG. 9B has an insertion hole 354A through which the lower end portion 306A of the PC steel rod 302A is inserted, and an insertion hole 354B through which the lower end portion 306B of the PC steel rod 302B is inserted. Is formed. In addition, cut portions 356A and 356B cut from the end surface 353 to the insertion holes 354A and 354B are formed. Then, both the lower ends 306A and 306B of the PC steel bars 302A and 302B are passed through the notches 356A and 356B and are inserted into the insertion holes 354A and 354B of the fixing plate 351. That is, one fixing plate 351 fixes both the lower end portion 306A of the PC steel rod 302A and the lower end portion 306B of the PC steel rod 302B. Therefore, since a plurality of (two in the present embodiment) PC steel bars 302 can be attached to the lower end portion 306 by a single attaching operation of the fixing plate 351, the working efficiency is improved.
In addition, the structure by which the lower end part 306 of the plurality of PC steel bars 302 arranged in the longitudinal direction is fixed (fixed) to one horizontal hole 210 may be employed. In this case, one fixing plate may be attached to the lower end portions 306 of the plurality of PC steel bars 302 arranged in the longitudinal direction.

なお、図示は省略するが、定着板350、351の切込部356の形状は、平面視L字形状以外の形状であってもよい。平面視直線状であってもよいし、平面視円弧状であってもよい。   Although illustration is omitted, the shape of the cut portion 356 of the fixing plates 350 and 351 may be a shape other than the L shape in plan view. The shape may be a straight line shape in a plan view or an arc shape in a plan view.

尚、本発明は上記実施形態に限定されない。本発明の要旨を逸脱しない範囲において種々なる態様で実施し得ることは言うまでもない。   The present invention is not limited to the above embodiment. Needless to say, various embodiments can be implemented without departing from the scope of the present invention.

例えば、上記実施形態では、基礎200は、面外方向の断面形状が略矩形状とされていたが、これに限定されない(図1等を参照)。どのような基礎であってもよい。
例えば、図22に示す基礎400のように、略逆T字形状の布基礎であってもよい。この場合、横穴210を形成する部位は、図に示すように、上部の立ち上り部402に形成してもよいし、図示は省略するが、逆T字形状の底辺のフーチング部404に横穴210を形成してもよい。
For example, in the above embodiment, the base 200 has a substantially rectangular cross-sectional shape in the out-of-plane direction, but is not limited thereto (see FIG. 1 and the like). It can be any basis.
For example, a substantially inverted T-shaped fabric foundation may be used, such as a foundation 400 shown in FIG. In this case, as shown in the drawing, the portion where the horizontal hole 210 is formed may be formed in the rising portion 402 at the top, and although not shown, the horizontal hole 210 is formed in the footing portion 404 at the bottom of the inverted T shape. It may be formed.

また、例えば、上記実施形態では、基礎200にPC鋼棒302の下端部306を固定したが、これに限定されない。レンガ壁100の地中部分や台座部に横穴を形成してPC鋼棒302の下端部306に定着板350を取り付けた後、横穴にコンクリート、モルタル、グラウト等の充填材を充填して固定(定着)してもよい。この場合、レンガ壁100の地中部分や台座部が基礎部となる。つまり、圧縮力を付与するレンガ壁100の下端よりも下側に配置され、レンガ壁100の下端を支える基礎部にPC鋼棒302の下端部306を固定すればよい。
なお、本明細書の基礎部とは、組積造壁の下部に存在する支持部を表し、地盤面より下に設けられるものの他、例えば、下階はRC造で組積造壁が当該RC造部材の上に支持されている場合は、基礎部=RC壁や梁の両者を含む概念である。
For example, in the said embodiment, although the lower end part 306 of PC steel rod 302 was fixed to the foundation 200, it is not limited to this. After forming a horizontal hole in the underground part or pedestal part of the brick wall 100 and attaching the fixing plate 350 to the lower end part 306 of the PC steel bar 302, the horizontal hole is filled with a filler such as concrete, mortar, grout, etc. and fixed ( Fixing). In this case, the underground part and the pedestal part of the brick wall 100 become the foundation part. That is, the lower end portion 306 of the PC steel rod 302 may be fixed to the base portion that is disposed below the lower end of the brick wall 100 to which the compressive force is applied and supports the lower end of the brick wall 100.
In addition, the foundation part of this specification represents the support part which exists in the lower part of a masonry wall, and other than what is provided below the ground surface, for example, the lower floor is RC structure, and the masonry wall is the RC When it is supported on the building member, it is a concept that includes both the foundation portion = RC wall and beam.

また、組積造壁(レンガ壁100)の上端及び下端とは、圧縮力によって補強されるべき組積造壁の上端と下端である。例えば、組積造壁の頂天部を上端としなくてもよい。すなわち、図21に示すように、組積造壁103においては、所定の高さ以上は圧縮力によって補強する必要がなければ、組積造壁103の上下方向の途中に面外方向に凹んだ棚部105を形成し、この棚部105の棚面107に緊張端として機能する上部固定部材251を設けてもよい。なお、この棚部105は、モルタルやコンクリートなどの充填材を充填してもよい。   Moreover, the upper end and lower end of the masonry wall (brick wall 100) are the upper end and the lower end of the masonry wall to be reinforced by compressive force. For example, the top of the masonry wall need not be the upper end. That is, as shown in FIG. 21, in the masonry wall 103, if it is not necessary to reinforce by a compressive force beyond a predetermined height, it is recessed in the out-of-plane direction in the middle of the masonry wall 103 in the vertical direction. The shelf part 105 may be formed, and the upper fixing member 251 that functions as a tension end may be provided on the shelf surface 107 of the shelf part 105. The shelf 105 may be filled with a filler such as mortar or concrete.

また、例えば、上記実施形態では、既存のレンガ壁100を移設することなく、耐震補強を行なったが、これに限定されない。
既設のレンガ壁100を別の場所に移設する際に、本発明を適用した耐震補強を行なってもよい。
或いは、新設のレンガ壁100に本発明の補強工法を適用してもよい。
For example, in the said embodiment, although the earthquake-proof reinforcement was performed without moving the existing brick wall 100, it is not limited to this.
When the existing brick wall 100 is moved to another place, seismic reinforcement to which the present invention is applied may be performed.
Alternatively, the reinforcing method of the present invention may be applied to the newly installed brick wall 100.

また、移設や新設の場合、密実な基礎200を打設してから横穴210を形成する。
或いは、基礎200を打設する際に、ボイド型枠などで横穴210を形成しておいてもよい。つまり、基礎200を打設したのち、横穴210をあけるのでなく、最初から横穴210を形成しておいてもよい。
Further, in the case of relocation or new installation, the horizontal hole 210 is formed after the dense foundation 200 is driven.
Alternatively, when the foundation 200 is placed, the lateral hole 210 may be formed with a void mold or the like. That is, instead of opening the horizontal hole 210 after placing the foundation 200, the horizontal hole 210 may be formed from the beginning.

また、上記実施形態では、組積造壁及び組積造構造物は、レンガ10を積み上げて構築されていたが、これに限定されない。レンガ以外の組積材を積み上げて構築されていてもよい。レンガ以外の組積材としては、コンクリートブロック、石材等を用いることができる。
また、組積造壁は、平面板状に限定されない。曲面板状(湾曲形状)であってもよい。
Moreover, in the said embodiment, although the masonry wall and the masonry structure were built by piling up the brick 10, it is not limited to this. It may be constructed by stacking masonry materials other than bricks. Concrete masonry, stone, etc. can be used as masonry materials other than bricks.
The masonry wall is not limited to a flat plate shape. It may be a curved plate (curved shape).

また、上記実施形態では、緊張材としてPC鋼棒を用いたがこれに限定されない。PC鋼棒以外のPC鋼材、例えば、PC鋼線であってもよい。或いは、PC鋼材以外の線状の部材で構成された緊張材であってもよい。   Moreover, in the said embodiment, although the PC steel rod was used as a tendon, it is not limited to this. PC steel materials other than PC steel bars, for example, PC steel wires may be used. Or the tension material comprised by linear members other than PC steel materials may be sufficient.

10 レンガ(組成材)
12 目地材
70 レンガ造の洋館(組積造構造物)
80 削孔装置
82 削孔工具
100 レンガ壁(組積造壁)
103 レンガ壁(組積造壁)
107 底面(上端)
110 上端
120 下端
122 均しモルタル(レベル調整部材)
150 貫通孔
152 開口部
180 落下防止部材
181 落下防止部材
182 凹部(隙間)
183 落下防止部材
188 落下防止部材
189 孔
190 拡部
200 基礎(基礎部)
202 側壁(壁面)
210 横穴
212 早強コンクリート(充填材、繊維補強コンクリート)
216 スパイラル筋(鉄筋)
250 新設臥梁(上部固定部材)
258 中空部
260 縦リブ
300 PC鋼棒(緊張材)
302 PC鋼棒(緊張材)
304 上端部
306 下端部
310 カプラ(接続部材、拡部)
350 定着板(下部固定部材)
351 定着板(下部固定部材)
354 挿通孔
356 切込部
510 新設臥梁(上部固定部材)
520 新設臥梁(上部固定部材)
530 新設臥梁(上部固定部材)
L 隙間
10 Bricks (composition material)
12 Joint material 70 Western-style brick building (masonry structure)
80 Drilling device 82 Drilling tool 100 Brick wall (masonry wall)
103 brick wall (masonry wall)
107 Bottom (top)
110 Upper end 120 Lower end 122 Leveling mortar (level adjustment member)
150 Through-hole 152 Opening 180 Fall prevention member 181 Fall prevention member 182 Concavity (gap)
183 Fall prevention member 188 Fall prevention member 189 Hole 190 Enlarged part 200 Foundation (foundation part)
202 Side wall
210 Horizontal hole 212 High-strength concrete (filler, fiber reinforced concrete)
216 Spiral rebar (rebar)
250 New beam (upper fixing member)
258 Hollow part 260 Vertical rib 300 PC steel bar (tension material)
302 PC steel bar (tension material)
304 Upper end portion 306 Lower end portion 310 Coupler (connection member, enlarged portion)
350 Fixing plate (lower fixing member)
351 Fixing plate (lower fixing member)
354 Insertion hole 356 Cut section 510 Newly installed girder (upper fixing member)
520 New construction beam (upper fixing member)
530 New construction beam (upper fixing member)
L gap

Claims (9)

組積造壁の基礎部の側面に横穴を形成する横穴形成工程と、
前記組積造壁の上端と下端との間を貫通する貫通孔を形成する貫通孔形成工程と、
前記貫通孔に緊張材を挿通させ、前記緊張材の下端部を前記横穴まで到達させる緊張材挿通工程と、
前記横孔から前記緊張材の下端部に下部固定部を取り付ける下部固定部設置工程と、
前記横穴に充填材を充填し、前記下部固定部を取り付けた前記緊張材の下端部を固定する下端部固定工程と、
前記緊張部材の上端部を固定する上部固定部を前記組積造壁の上端側に設ける上部固定部設置工程と、
前記下部固定部を固定端とし、前記上部固定部を緊張端として前記緊張材に緊張力を付与し、前記組積造壁の上端と下端との間に圧縮力を付与する緊張力付与工程と、
を備える組積造壁の補強工法。
A horizontal hole forming step of forming a horizontal hole on the side surface of the foundation of the masonry wall;
A through hole forming step of forming a through hole penetrating between the upper end and the lower end of the masonry wall;
A tension material insertion step of inserting a tension material into the through-hole and allowing the lower end of the tension material to reach the lateral hole;
A lower fixing portion installation step of attaching a lower fixing portion to the lower end portion of the tendon from the lateral hole;
A lower end fixing step of filling the lateral hole with a filler and fixing the lower end of the tendon to which the lower fixing portion is attached;
An upper fixing portion installation step of providing an upper fixing portion for fixing the upper end portion of the tension member on the upper end side of the masonry wall;
A tension applying step for applying a compressive force between an upper end and a lower end of the masonry wall by applying a tension to the tendon using the lower fixed portion as a fixed end, the upper fixed portion as a tension end, and ,
A masonry wall reinforcement method.
前記横穴の内壁に沿って鉄筋を設ける鉄筋設置工程を備える、
請求項1に記載の組積造壁の補強工法。
Comprising a reinforcing bar installation step of providing reinforcing bars along the inner wall of the horizontal hole,
The masonry wall reinforcement method according to claim 1.
前記上部固定部は、前記組積造壁の上端を水平又は略水平にしてから設け、
前記組積造壁の上端に設置した前記上部固定部に削孔装置を設置し、前記貫通孔を形成する、
請求項1又は請求項2に記載の組積造壁の補強工法。
The upper fixing portion is provided after the upper end of the masonry wall is horizontal or substantially horizontal,
Installing a drilling device in the upper fixed part installed at the upper end of the masonry wall, and forming the through hole;
A method for reinforcing masonry walls according to claim 1 or 2.
前記緊張材挿通工程において、
平面視において、前記緊張材よりも大きな拡部を前記緊張材に取り付け、
前記貫通孔の開口部には、前記緊張材よりも大きく且つ前記拡部よりも小さな隙間は又は孔が形成された落下防止部材を設け、
前記緊張材を、前記落下防止部材に形成された隙間又は孔に通して前記貫通孔に挿入する、
請求項1〜請求項3のいずれか1項に記載の組積造壁の補強工法。
In the tendon insertion process,
In plan view, an enlarged portion larger than the tendon is attached to the tendon,
The opening of the through hole is provided with a fall prevention member in which a gap or a hole larger than the tension material and smaller than the enlarged portion is formed,
The tension material is inserted into the through hole through a gap or hole formed in the fall prevention member.
The masonry wall reinforcing method according to any one of claims 1 to 3.
複数の前記緊張材が接続部材で接続されることによって長尺化され、
前記緊張材同士を接続する前記接続部材が、前記拡部を構成する、
請求項4に記載の組積造壁の補強工法。
The plurality of tendons are elongated by being connected by a connecting member,
The connecting member that connects the tendons together constitutes the expanding portion,
The masonry wall reinforcing method according to claim 4.
前記緊張材挿通工程において、
平面視において、前記貫通孔の開口部よりも大きな拡部を前記緊張材に軸方向に移動可能又は着脱可能に取り付けて、前記貫通孔に挿入する、
請求項1〜請求項3のいずれか1項に記載の組積造壁の補強工法。
In the tendon insertion process,
In plan view, an enlarged portion larger than the opening of the through hole is attached to the tendon so as to be movable or detachable in the axial direction, and inserted into the through hole.
The masonry wall reinforcing method according to any one of claims 1 to 3.
前記貫通孔形成工程において、前記貫通孔は、冷却気体を削孔装置の削孔工具に接触させて冷却する無水工法で形成する、
請求項1〜請求項6のいずれか1項に記載の組積造壁の補強工法。
In the through hole forming step, the through hole is formed by an anhydrous method in which cooling gas is cooled by contacting a drilling tool of a drilling device.
The reinforcement method for masonry walls according to any one of claims 1 to 6.
前記下部固定部は、
平面視において、前記緊張材の下端部が挿通する挿通孔と、端部から前記挿通孔に切り込まれた切込部と、が形成された板状の定着板を有する、
請求項1〜請求項7のいずれか1項に記載の組積造壁の補強工法。
The lower fixing part is
In plan view, it has a plate-like fixing plate in which an insertion hole through which the lower end portion of the tendon material is inserted and a cut portion cut into the insertion hole from the end portion are formed.
The reinforcement method for masonry walls according to any one of claims 1 to 7.
請求項1〜請求項8のいずれか1項に記載の組積造壁の補強工法によって補強された組積造壁を備える組積造構造物。   A masonry structure comprising a masonry wall reinforced by the masonry wall reinforcement method according to any one of claims 1 to 8.
JP2009132716A 2009-06-02 2009-06-02 Masonry wall reinforcement method and masonry structure. Active JP5393263B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009132716A JP5393263B2 (en) 2009-06-02 2009-06-02 Masonry wall reinforcement method and masonry structure.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009132716A JP5393263B2 (en) 2009-06-02 2009-06-02 Masonry wall reinforcement method and masonry structure.

Publications (2)

Publication Number Publication Date
JP2010281033A true JP2010281033A (en) 2010-12-16
JP5393263B2 JP5393263B2 (en) 2014-01-22

Family

ID=43538000

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009132716A Active JP5393263B2 (en) 2009-06-02 2009-06-02 Masonry wall reinforcement method and masonry structure.

Country Status (1)

Country Link
JP (1) JP5393263B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625742A (en) * 2016-02-17 2016-06-01 朱奎 Brick wall reinforcing structure
CN102864945B (en) * 2012-10-11 2016-08-17 北京筑福国际工程技术有限责任公司 A kind of reinforced structure of mortar anchor rod masonry and reinforcement means thereof
KR20170143100A (en) * 2016-06-20 2017-12-29 대진대학교 산학협력단 Tensile brace reinforcement system of masonry wall
JP2019078159A (en) * 2017-10-24 2019-05-23 株式会社竹中工務店 Reinforcement method of structure
JP2019090201A (en) * 2017-11-14 2019-06-13 東日本旅客鉄道株式会社 Station platform reinforcement structure and station platform reinforcement method
JP2020084429A (en) * 2018-11-16 2020-06-04 大成建設株式会社 Reinforcing structure of masonry building
JP7423218B2 (en) 2019-08-06 2024-01-29 清水建設株式会社 Reinforcement structure and reinforcement method for masonry structures

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5553156U (en) * 1978-10-05 1980-04-09
JPS55165062U (en) * 1979-05-16 1980-11-27
JPS58179318U (en) * 1982-05-26 1983-11-30 株式会社国代耐火工業所 Brick panel edge treatment structure
JPH0771080A (en) * 1993-09-03 1995-03-14 Hokushiyuu:Kk Clamping device for log house
JPH09273246A (en) * 1996-04-04 1997-10-21 Oriental Constr Co Ltd Construction method of prestress assembly structure
JPH11324341A (en) * 1998-05-18 1999-11-26 Shimizu Corp Reinforcement structure of masonry building and aseismatic modification method therefor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5553156U (en) * 1978-10-05 1980-04-09
JPS55165062U (en) * 1979-05-16 1980-11-27
JPS58179318U (en) * 1982-05-26 1983-11-30 株式会社国代耐火工業所 Brick panel edge treatment structure
JPH0771080A (en) * 1993-09-03 1995-03-14 Hokushiyuu:Kk Clamping device for log house
JPH09273246A (en) * 1996-04-04 1997-10-21 Oriental Constr Co Ltd Construction method of prestress assembly structure
JPH11324341A (en) * 1998-05-18 1999-11-26 Shimizu Corp Reinforcement structure of masonry building and aseismatic modification method therefor

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864945B (en) * 2012-10-11 2016-08-17 北京筑福国际工程技术有限责任公司 A kind of reinforced structure of mortar anchor rod masonry and reinforcement means thereof
CN105625742A (en) * 2016-02-17 2016-06-01 朱奎 Brick wall reinforcing structure
CN107386676A (en) * 2016-02-17 2017-11-24 朱奎 Brick wall reinforced construction method
CN105625742B (en) * 2016-02-17 2017-12-15 朱奎 Brick wall reinforcement structure
KR20170143100A (en) * 2016-06-20 2017-12-29 대진대학교 산학협력단 Tensile brace reinforcement system of masonry wall
KR101934159B1 (en) * 2016-06-20 2019-04-08 대진대학교 산학협력단 Tensile brace reinforcement system of masonry wall
JP2019078159A (en) * 2017-10-24 2019-05-23 株式会社竹中工務店 Reinforcement method of structure
JP7092288B2 (en) 2017-10-24 2022-06-28 株式会社竹中工務店 Structural reinforcement method
JP2019090201A (en) * 2017-11-14 2019-06-13 東日本旅客鉄道株式会社 Station platform reinforcement structure and station platform reinforcement method
JP2020084429A (en) * 2018-11-16 2020-06-04 大成建設株式会社 Reinforcing structure of masonry building
JP7175725B2 (en) 2018-11-16 2022-11-21 大成建設株式会社 Reinforcing structure of masonry building
JP7423218B2 (en) 2019-08-06 2024-01-29 清水建設株式会社 Reinforcement structure and reinforcement method for masonry structures

Also Published As

Publication number Publication date
JP5393263B2 (en) 2014-01-22

Similar Documents

Publication Publication Date Title
JP5393263B2 (en) Masonry wall reinforcement method and masonry structure.
JP7175725B2 (en) Reinforcing structure of masonry building
JP2011006947A (en) Reinforcing structure of masonry construction wall, masonry construction wall, masonry structure, and method of reinforcing masonry construction wall
WO2006038620A1 (en) Joined part structure of pedestal and method of joining pedestal
JP6166560B2 (en) Extension structure of seismic isolation building
JP5579403B2 (en) Masonry wall reinforcement structure and masonry structure
JP3677715B2 (en) Seismic isolation method for masonry buildings
JP2005090115A (en) Reinforcing construction method for existing floor slab by beam
JP2007270600A (en) Prestress introducing method to filling part between precast concrete members
JP7028728B2 (en) Joint structure of foundation pile and foundation slab
JP2006316495A (en) Foundation structure of bridge pier and its construction method
JP2006016893A (en) Shearing reinforcing method of existing structure
JP2007247302A (en) Reinforcement structure and reinforcement construction method of bridge pier
JP6172501B2 (en) Seismic reinforcement structure and seismic reinforcement method
JP5270255B2 (en) Foundation reinforcement method for existing wooden houses
JP6302222B2 (en) Horizontal force support structure and method for constructing horizontal force support structure
KR101298020B1 (en) Special prestressed method
JP5852475B2 (en) Pile foundation reconstruction method
JP6000414B2 (en) Pile foundation reconstruction method and pile foundation structure
KR101166127B1 (en) A method of construction for a bridge abutment using poor ground and a bridge abutment structureconstructed by the method
JP6895740B2 (en) Horizontal force restraint structure
JP7270412B2 (en) Reinforcement structure of masonry building
KR100530025B1 (en) Section enlargement repairing and reinforcing apparatus for reinforcing earing power of reinforced concrete structures by introducing prestress to entended section and repairing and reinforcing construction method using the apparatus
JP6220315B2 (en) Joining structure and joining method
JP2022120457A (en) Reinforcement structure of masonry structure wall and reinforcement method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120327

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130527

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131001

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131015

R150 Certificate of patent or registration of utility model

Ref document number: 5393263

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150