JP2010262361A - Business management system - Google Patents

Business management system Download PDF

Info

Publication number
JP2010262361A
JP2010262361A JP2009110925A JP2009110925A JP2010262361A JP 2010262361 A JP2010262361 A JP 2010262361A JP 2009110925 A JP2009110925 A JP 2009110925A JP 2009110925 A JP2009110925 A JP 2009110925A JP 2010262361 A JP2010262361 A JP 2010262361A
Authority
JP
Japan
Prior art keywords
business
task
progress
business flow
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009110925A
Other languages
Japanese (ja)
Inventor
Hisanao Takei
久直 武井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumisho Computer Systems Corp
Original Assignee
Sumisho Computer Systems Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumisho Computer Systems Corp filed Critical Sumisho Computer Systems Corp
Priority to JP2009110925A priority Critical patent/JP2010262361A/en
Publication of JP2010262361A publication Critical patent/JP2010262361A/en
Pending legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To effectively prevent work from being delayed in each person in charge, in a system for assigning optional business from a business flow chart, to conduct required processing. <P>SOLUTION: A business management system includes a business flow display part 12 for displaying the business flow chart allocated with an operation button for indicating processing of a task as to corresponding business to an area displayed with individual business names, as a menu screen for selecting the business, a progress situation management part 15 for managing progress situations for one or more of the tasks included in each business of a business flow, and a progress situation display part 17 for displaying the progress situations of the tasks, the person in charge of the business in each stage displays the progress situations of the tasks to be confirmed, irrespective of generation of a change in the progress situations of the tasks, and the person in charge confirms thereby own task to be performed, and performs it without being delayed. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は業務管理システムに関し、特に、各種業務の管理を業務フローに従って行うことを支援するシステムに用いて好適なものである。   The present invention relates to a business management system, and is particularly suitable for use in a system that supports management of various business operations according to a business flow.

一般に、企業内での各種業務は、あらかじめ設定された複数の段階からなる業務フローに従って行われる。例えば、貿易取引では、成約、輸出事務、輸入事務、出荷、在庫管理、伝票発行、経理などの各種段階の流れに従って業務が行われる。業務の流れについて管理計画された業務フローを円滑に進行するためには、業務フローの各段階における業務の進捗状況の管理が必要となる。従来、業務フローに従って行われる各段階の業務管理を支援するシステムがいくつか提供されている(例えば、特許文献1,2を参照)。   In general, various operations in a company are performed according to a plurality of preset workflows. For example, in trade transactions, operations are performed in accordance with the flow of various stages such as contracts, export affairs, import affairs, shipping, inventory management, slip issuance, and accounting. In order to smoothly progress the business flow that is planned for management of the business flow, it is necessary to manage the progress of the business at each stage of the business flow. Conventionally, several systems that support business management at each stage performed according to a business flow have been provided (see, for example, Patent Documents 1 and 2).

特許文献1に記載の業務管理システムでは、業務の流れを示す業務フロー図を表示し、当該業務フロー図の特定の領域がユーザにより選択されると、その領域に対応する業務の入力画面を表示し、当該入力画面において文書の登録処理ができるようになされている。特許文献2に記載の業務管理システムでは、進捗状況を迅速に把握して円滑な業務フローの進行を促すことを目的として、業務フローの進捗状況の変化に応じて、その進捗状況を関連する送信先に送信して表示するようになされている。   In the business management system described in Patent Document 1, a business flow diagram showing a business flow is displayed, and when a specific area of the business flow diagram is selected by a user, a business input screen corresponding to that area is displayed. The document registration process can be performed on the input screen. In the business management system described in Patent Document 2, for the purpose of promptly grasping the progress status and prompting the smooth progress of the business flow, transmission related to the progress status according to the change in the progress status of the business flow. It is made to send and display first.

特開2001−92904号公報JP 2001-92904 A 特開2005−173884号公報JP 2005-173848 A

上記特許文献1に記載の技術によれば、業務処理の流れを表した業務フロー図を視覚的に分かりやすいメニュー画面として利用し、当該メニュー画面から任意の業務を指定して必要な処理を行うことができる。このため、各段階の業務の担当者が自分の担当業務を行う際の操作性が向上するという利点がある。しかしながら、業務を行うか否かは基本的に担当者任せであるため、担当者毎の作業遅延が発生する可能性があるという問題があった。   According to the technique described in Patent Document 1, a business flow diagram showing a flow of business processing is used as a visually easy-to-understand menu screen, and an arbitrary business is designated from the menu screen to perform necessary processing. be able to. For this reason, there is an advantage that the operability when the person in charge of the work at each stage performs his or her work is improved. However, since it is up to the person in charge whether or not to perform the business, there is a problem that work delays may occur for each person in charge.

これに対して、特許文献2に記載の技術によれば、業務フローの進捗状況に変化が生じたときに、関連する送信先に進捗状況が送信されて表示されるため、これが送信先に対する業務の実行を促すメッセージとして作用し、円滑な業務フローの進行が促進される。しかしながら、進捗状況を受信した送信先の担当者は、その進捗状況の通知を受ける度にすぐに担当業務を行えるとは限らず、時間の余裕ができたときに行うことが多い。その場合、やるべき未処理の業務が蓄積されていくが、それらについては進捗の変化がないので、再びメッセージが届くことはない。そのため、どの業務から優先して処理すべきかが分からず、優先度の高い業務について更に作業が遅延してしまう可能性があるという問題があった。   On the other hand, according to the technique described in Patent Document 2, when a change occurs in the progress status of the business flow, the progress status is transmitted to the related transmission destination and displayed. It acts as a message that prompts the execution of, and facilitates the smooth progress of the business flow. However, the person in charge of the transmission destination who has received the progress is not always able to perform the work in charge every time a notification of the progress is received, and is often performed when time is available. In that case, unprocessed work to be done is accumulated, but since there is no change in the progress of these, the message will not arrive again. For this reason, there is a problem that it is not possible to know which business should be prioritized and there is a possibility that the work may be further delayed for a high-priority business.

本発明は、このような問題を解決するために成されたものであり、業務フロー図をメニュー画面として表示し、当該メニュー画面から任意の業務を指定して必要な処理を行うことができるようになされたシステムにおいて、担当者毎の作業遅延をより効果的に防止できるようにすることを目的とする。   The present invention has been made to solve such a problem, and displays a workflow diagram as a menu screen so that a desired process can be performed by designating an arbitrary task from the menu screen. An object of the present invention is to more effectively prevent work delays for each person in charge.

上記した課題を解決するために、本発明では、各業務の流れを視覚的に表した業務フロー図を業務選択用のメニュー画面として表示するとともに、業務フローの各業務に含まれる1以上のタスクの進捗状況を管理し、タスクの進捗状況を表示するようにしている。例えば、業務フローの各業務の中から指定された業務に関する1以上の未処理タスクの進捗状況を表示する。   In order to solve the above-described problems, in the present invention, a business flow diagram visually representing the flow of each business is displayed as a menu screen for business selection, and at least one task included in each business in the business flow. The progress of the task is managed and the progress of the task is displayed. For example, the progress status of one or more unprocessed tasks related to the business specified from each business in the business flow is displayed.

上記のように構成した本発明によれば、各段階の業務の担当者は、各業務の流れが視覚的に分かりやすい業務フロー図から自分の担当業務を指定して必要な処理を行うことができるので、操作性がよく、業務の効率化を図ることができる。また、タスクの進捗状況に変化が生じたかどうかに関係なく、各業務のタスクの進捗状況を表示して確認することができるので、担当者は自分が行うべきタスクを必要に応じていつでも確認することでき、担当者毎の作業遅延をより効果的に防止することができるようになる。   According to the present invention configured as described above, the person in charge of each stage of business can perform the necessary processing by designating his / her work in charge from a business flow diagram in which the flow of each work is visually easy to understand. Because it is possible, it is easy to operate and can improve work efficiency. In addition, regardless of whether the progress of the task has changed, the progress of each task can be displayed and checked, so the person in charge can check the tasks he / she needs to perform at any time. Therefore, the work delay for each person in charge can be prevented more effectively.

本実施形態による業務管理システムの機能構成例を示すブロック図である。It is a block diagram which shows the function structural example of the business management system by this embodiment. 貿易取引に関する業務フローを定義した本実施形態の業務フロー定義情報の一例を示している。An example of business flow definition information of the present embodiment in which a business flow related to a trade transaction is defined is shown. 本実施形態の業務フロー表示部によって業務選択用のメニュー画面として表示装置に表示される業務フロー図の例を示す図である。It is a figure which shows the example of the work flow figure displayed on a display apparatus as a menu screen for work selection by the work flow display part of this embodiment. 本実施形態の進捗情報記憶部に記憶されるタスク進捗情報の例を示す図である。It is a figure which shows the example of the task progress information memorize | stored in the progress information storage part of this embodiment. 本実施形態の進捗状況表示部によって表示装置に表示されるナビゲーション画面の例を示す図である。It is a figure which shows the example of the navigation screen displayed on a display apparatus by the progress condition display part of this embodiment.

以下、本発明の一実施形態を図面に基づいて説明する。図1は、本実施形態による業務管理システムの機能構成例を示すブロック図である。本実施形態の業務管理システム10は、その機能構成として、業務フロー定義情報記憶部11、業務フロー表示部12、操作受付部13、対応業務処理部14、進捗状況管理部15、進捗情報記憶部16および進捗状況表示部17を備えて構成されている。   Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram illustrating a functional configuration example of a business management system according to the present embodiment. The business management system 10 according to the present embodiment includes, as its functional configuration, a business flow definition information storage unit 11, a business flow display unit 12, an operation reception unit 13, a corresponding business processing unit 14, a progress status management unit 15, and a progress information storage unit. 16 and a progress status display unit 17.

なお、業務フロー定義情報記憶部11および進捗情報記憶部16は、ハードディスクや半導体メモリ等の記録媒体により構成されている。また、それ以外の業務フロー表示部12、指定操作受付部13、対応業務処理部14、進捗状況管理部15および進捗状況表示部17の各機能構成は、例えばソフトウェアによって実現される。すなわち、本実施形態の業務管理システム10は、実際にはコンピュータのCPUあるいはMPU、RAM、ROMなどを備えて構成され、上述の各機能構成はRAMやROMに記憶されたプログラムが動作することによって実現される。   The business flow definition information storage unit 11 and the progress information storage unit 16 are configured by a recording medium such as a hard disk or a semiconductor memory. The other functional configurations of the business flow display unit 12, the designated operation reception unit 13, the corresponding business processing unit 14, the progress status management unit 15, and the progress status display unit 17 are realized by software, for example. That is, the business management system 10 of the present embodiment is actually configured with a CPU or MPU of a computer, a RAM, a ROM, etc., and each of the functional configurations described above is performed by operating a program stored in the RAM or the ROM. Realized.

業務フロー定義情報記憶部11は、あらかじめ設定された複数段階の業務からなる業務フローを定義した業務フロー定義情報を記憶する。この業務フロー定義情報は、業務フローに沿った各業務を特定する業務情報と、当該各業務の流れの順序を特定する順序情報とを少なくとも含んでいる。   The business flow definition information storage unit 11 stores business flow definition information that defines a business flow including a plurality of stages of business set in advance. The business flow definition information includes at least business information for identifying each business along the business flow and order information for identifying the order of the flow of each business.

図2は、業務フロー定義情報記憶部11に記憶される業務フロー定義情報の一例を示す図である。なお、図2は、貿易取引に関する業務フローを定義した業務フロー定義情報の例を示している。図2に示すように、業務フロー定義情報は、レコード内の項目として業務ID、業務カテゴリ、業務、1つ後の業務を含んでいる。このうち、業務カテゴリおよび業務が上述の業務情報に相当し、1つ後の業務が上述の順序情報に相当する。   FIG. 2 is a diagram illustrating an example of business flow definition information stored in the business flow definition information storage unit 11. FIG. 2 shows an example of business flow definition information that defines a business flow related to a trade transaction. As shown in FIG. 2, the business flow definition information includes a business ID, a business category, a business, and a subsequent business as items in the record. Among these, the business category and the business correspond to the above-described business information, and the next business corresponds to the above-described order information.

項目「業務ID」は、業務フローに沿った各業務の1つ1つをユニークに識別するための情報である。項目「業務カテゴリ」は、各業務の大まかな分類を表す情報である。例えば、貿易取引の場合、「成約」「輸出事務」「輸入事務」「出荷」「在庫管理」「伝票発行」「経理」の1つ1つが業務カテゴリに該当する。項目「業務」は、各業務カテゴリに属する具体的な業務を示す情報である。すなわち、各々の業務は何れかの業務カテゴリに属する。例えば、「出荷」という業務カテゴリの中には“出荷依頼”“出荷完了”という2つの業務が含まれている。また、「伝票発行」という業務カテゴリの中には、“仕入売上伝票発行”“仕入伝票発行”“売上伝票発行”“請求書発行”という4つの業務が含まれている。なお、以下では業務カテゴリを「」で記述し、個々の業務を“”で記述するものとする。   The item “business ID” is information for uniquely identifying each business according to the business flow. The item “business category” is information representing a rough classification of each business. For example, in the case of a trade transaction, “contract”, “export affairs”, “import affairs”, “shipment”, “inventory management”, “issue slip”, and “accounting” correspond to business categories. The item “business” is information indicating a specific business belonging to each business category. That is, each business belongs to any business category. For example, the business category “shipment” includes two business operations “shipment request” and “shipment completion”. In addition, the business category of “issue slip” includes four tasks of “issue of purchase sales slip”, “issue of purchase slip”, “issue of sales slip”, and “issue of invoice”. In the following description, the business category is described by “”, and each business is described by “”.

また、項目「1つ後の業務」は、当該レコード(業務ID)の業務よりも作業の流れが1つの後の順序に相当する業務を示す情報である。なお、1つ後の業務は、1つである場合もあるし、複数である場合もある。また、業務フローの最後の業務(具体的には、「経理」の業務カテゴリに属する“計上指示”“売買大括”の2つの業務)に関しては、1つ後の業務は存在しない。   In addition, the item “one job after” is information indicating a job corresponding to the order after one job flow than the job of the record (work ID). Note that there may be one or more tasks after one. In addition, for the last business in the business flow (specifically, two businesses of “accounting instruction” and “buy and sell general” belonging to the “accounting” business category), there is no next business.

業務フロー表示部12は、業務フロー定義情報記憶部11に記憶されている業務フロー定義情報に基づいて、各業務の流れを視覚的に表した業務フロー図を表示装置20に表示するよう制御する。この業務フロー図は、業務フロー上の各業務の表示領域が当該各業務に対応するタスクの処理を指示するための操作領域(操作ボタン)に割り当てられたメニュー画面として機能する。   Based on the business flow definition information stored in the business flow definition information storage unit 11, the business flow display unit 12 controls to display a business flow diagram that visually represents the flow of each business on the display device 20. . This business flow diagram functions as a menu screen in which the display area of each business in the business flow is assigned to an operation area (operation button) for instructing processing of a task corresponding to each business.

図3は、業務フロー表示部12によって業務選択用のメニュー画面として表示装置20に表示される業務フロー図の例を示す図である。本実施形態では、図3に示すように、業務カテゴリとそれに属する個々の業務との関係や、個々の業務の流れが一見して識別できるように業務フロー図を表示している。図3において、各業務の横方向の並びは作業の流れを示している。縦方向に一列に並んだ複数の業務(具体的には、「成約」の業務カテゴリに属する“売買成約”“売成約”“買成約”“パターン”の4つの業務、「伝票発行」の業務カテゴリに属する“仕入売上伝票発行”“仕入伝票発行”“売上伝票発行”“請求書発行”の4つの業務、「経理」の業務カテゴリに属する“計上指示”“売買大括”の2つの業務)は、この中の何れか1つを選択して処理することを意味している。   FIG. 3 is a diagram illustrating an example of a business flow diagram displayed on the display device 20 as a business selection menu screen by the business flow display unit 12. In the present embodiment, as shown in FIG. 3, a business flow diagram is displayed so that the relationship between the business category and each business belonging to it and the flow of each business can be identified at a glance. In FIG. 3, the horizontal arrangement of the tasks indicates the work flow. Multiple operations arranged in a line in the vertical direction (specifically, four transactions of “sales contract”, “sales contract”, “purchase contract” and “pattern” belonging to the business category of “contract”, “issue of slip” 4 operations of “Purchase sales slip issuance”, “Purchase voucher issuance”, “Sales voucher issuance” and “Invoice issuance” belonging to the category, “Accounting” business category “Accounting instruction” “Buying and selling” 2 "One job" means to select and process any one of them.

図3に示す業務フロー図では、各業務の表示領域(矩形領域)の1つ1つが、当該各業務に対応するタスクの入力画面の表示(対応業務に関するタスクの処理)を指示するための操作ボタン(以下、業務処理指示ボタンという)となっている。また、図3に示すメニュー画面には、後述するナビゲーション画面の表示を指示するためのナビゲーションボタン30が設けられている。これら各業務の業務処理指示ボタンまたはナビゲーションボタン30は、マウスなどの操作部40を操作することによって押下することができるようになっている。   In the business flow diagram shown in FIG. 3, each of the display areas (rectangular areas) of each business is an operation for instructing display of a task input screen corresponding to the business (task processing related to the business). Buttons (hereinafter referred to as business processing instruction buttons). Further, the menu screen shown in FIG. 3 is provided with a navigation button 30 for instructing display of a navigation screen described later. These business process instruction buttons or navigation buttons 30 for each business can be pressed by operating an operation unit 40 such as a mouse.

操作受付部13は、操作部40の操作を受け付ける。例えば、操作受付部13は、上述した業務処理指示ボタンまたはナビゲーションボタン30の押下操作を受け付ける。また、操作受付部13は、ナビゲーションボタン30の押下操作によって表示されるナビゲーション画面上に表示した業務指定ボタンやタスク指定ボタン(これらについては後述する)の押下操作も受け付ける。また、操作受付部13は、業務処理指示ボタンの押下操作によって表示される入力画面に対する種々の情報入力操作も受け付ける。   The operation reception unit 13 receives an operation of the operation unit 40. For example, the operation reception unit 13 receives a pressing operation of the business process instruction button or the navigation button 30 described above. The operation accepting unit 13 also accepts a press operation of a task designation button or a task designation button (these will be described later) displayed on the navigation screen displayed by the push operation of the navigation button 30. The operation accepting unit 13 also accepts various information input operations for an input screen displayed by pressing the business process instruction button.

対応業務処理部14は、業務処理指示ボタンの押下操作が操作受付部13により受け付けられたときに、操作された業務処理指示ボタンに対応するタスクの入力画面を表示装置20に表示する。あるいは、対応業務処理部14は、ナビゲーション画面上のタスク指定ボタンの押下操作が操作受付部13により受け付けられたときに、操作されたタスク指定ボタンに対応するタスクに関する入力画面を表示装置20に表示する。   When the operation receiving unit 13 receives a pressing operation of the business process instruction button, the corresponding business process unit 14 displays a task input screen corresponding to the operated business process instruction button on the display device 20. Alternatively, the corresponding task processing unit 14 displays an input screen related to the task corresponding to the operated task designation button on the display device 20 when the operation accepting unit 13 accepts the pressing operation of the task designation button on the navigation screen. To do.

ここで入力画面の表示対象とするタスクは、業務フローの最初の業務(「成約」の業務カテゴリに属する“売買成約”“売成約”“買成約”“パターン”の4つの業務)に関しては、業務処理指示ボタンの押下に応じて対応業務処理部14が新規に生成する。一方、業務フローの2番目以降の業務に関しては、1つ前の業務の完了時に対応業務処理部14により生成された未処理タスクが対象となる。この未処理タスクは、具体的には、進捗情報記憶部16にステータスが未処理として登録されているタスクである。   Here, the tasks to be displayed on the input screen are the first business in the business flow (the four business operations of “sales contract”, “sales contract”, “purchase contract”, and “pattern” belonging to the “contract” business category). In response to pressing of the business process instruction button, the corresponding business process unit 14 newly generates. On the other hand, regarding the second and subsequent business operations in the business flow, unprocessed tasks generated by the corresponding business processing unit 14 when the previous business operation is completed are targeted. Specifically, the unprocessed task is a task whose status is registered as unprocessed in the progress information storage unit 16.

なお、業務処理指示ボタンの押下により指定された業務に関して未処理タスクが複数存在する場合(進捗情報記憶部16にステータスが未処理として登録されているタスクが複数存在する場合)、対応業務処理部14は、例えば、複数の未処理タスクをタスク選択画面にて一覧表示して何れか1つをユーザに選択させ、選択された未処理タスクの入力画面を表示する。   In addition, when there are a plurality of unprocessed tasks related to the business specified by pressing the business processing instruction button (when there are a plurality of tasks whose status is registered as unprocessed in the progress information storage unit 16), the corresponding business processing unit 14 displays, for example, a list of a plurality of unprocessed tasks on the task selection screen, causes the user to select one of them, and displays an input screen for the selected unprocessed task.

対応業務処理部14は、未処理タスクの入力画面を表示装置20に表示した後、操作部40の操作を通じて当該入力画面に入力された情報を用いて、当該未処理タスクの処理を実行する。その実行内容はタスクの種類によって異なる。すなわち、入力画面を通じて入力された情報を図示しないデータベースに登録する処理、入力された情報を指定先のコンピュータにネットワーク送信する処理、入力された情報を用いて伝票を発行する処理など、タスクの実行処理は様々である。対応業務処理部14は、未処理タスクについてこれらの処理を実行し終わると、当該処理が完了したタスクの次に処理すべき未処理タスクを生成する。   The corresponding business processing unit 14 displays an unprocessed task input screen on the display device 20, and then executes processing of the unprocessed task using information input to the input screen through an operation of the operation unit 40. The execution contents differ depending on the type of task. That is, execution of tasks such as processing to register information input through the input screen in a database (not shown), processing to transmit the input information to a specified computer, and processing to issue a slip using the input information Processing is various. When the corresponding task processing unit 14 finishes executing these processes for the unprocessed task, it generates an unprocessed task to be processed next to the task for which the process has been completed.

すなわち、対応業務処理部14は、未処理タスクの処理が完了したときに、業務フロー定義情報記憶部11に記憶されている業務フロー定義情報を参照して、処理が完了したタスクの業務の次に処理すべき業務を確認する。そして、その次に処理すべき業務の未処理タスクを生成し、その旨を進捗状況管理部15に通知する。このとき対応業務処理部14は、次に処理すべき未処理タスクのタスクIDも進捗状況管理部15に通知する。   That is, when the processing of the unprocessed task is completed, the corresponding business processing unit 14 refers to the business flow definition information stored in the business flow definition information storage unit 11 and next to the task of the task that has been processed. Confirm the work to be processed. Then, an unprocessed task for the business to be processed next is generated, and a notification to that effect is sent to the progress status management unit 15. At this time, the corresponding task processing unit 14 also notifies the progress status management unit 15 of the task ID of the unprocessed task to be processed next.

進捗状況管理部15は、業務フローの各業務に含まれる1以上のタスクの進捗状況を管理する。具体的には、進捗状況管理部15は、対応業務処理部14により新規の未処理タスクが生成されたときに、当該未処理タスクの進捗状況を特定するタスク進捗情報を、レコードを1つ追加して進捗情報記憶部16に新たに記憶する。新規の未処理タスクが生成されるのは、上述したように、業務フローの最初の業務が業務処理指示ボタンの押下により指定されたとき、または、未処理タスクの処理を実行し終わったときである。前者の場合は、指定された業務の未処理タスクが新規に生成される。後者の場合は、処理が完了したタスクの次に処理すべき未処理タスクが新規に生成される。   The progress status management unit 15 manages the progress status of one or more tasks included in each business in the business flow. Specifically, the progress management unit 15 adds one record of task progress information that identifies the progress of the unprocessed task when a new unprocessed task is generated by the corresponding task processing unit 14. Then, it is newly stored in the progress information storage unit 16. As described above, a new unprocessed task is generated when the first task in the workflow is specified by pressing the task processing instruction button or when processing of the unprocessed task has been executed. is there. In the former case, a new unprocessed task for the specified job is generated. In the latter case, an unprocessed task to be processed next to a task for which processing has been completed is newly generated.

また、進捗状況管理部15は、対応業務処理部14による未処理タスクの処理が完了したときに、当該処理が完了したタスクの進捗状況を未処理から処理済に更新する。すなわち、進捗情報記憶部16に記憶されているタスク進捗情報のステータスを未処理から処理済に書き換えることにより、未処理タスクを処理済タスクに更新する。また、進捗状況管理部15は、こうして未処理タスクから更新された処理済タスクのレコードに対し、当該未処理タスクの処理日を記憶する。   Further, when the corresponding task processing unit 14 completes the processing of the unprocessed task, the progress status management unit 15 updates the progress status of the task for which the processing has been completed from unprocessed to processed. That is, by updating the status of the task progress information stored in the progress information storage unit 16 from unprocessed to processed, the unprocessed task is updated to the processed task. In addition, the progress management unit 15 stores the processing date of the unprocessed task for the record of the processed task updated from the unprocessed task in this way.

進捗情報記憶部16は、進捗状況管理部15により管理される業務フローの進捗状況を表す業務フロー進捗情報であって、上述のタスク進捗情報を記憶する。図4は、進捗情報記憶部16に記憶されるタスク進捗情報の例を示す図である。図4に示すように、タスク進捗情報は、レコード内の項目として業務ID、タスクID、ステータス、前タスクID、タスク生成日およびタスク処理日を含んでいる。項目「業務ID」は、図2に示した業務IDと同じものである。項目「タスクID」は、対応業務処理部14により生成される各タスクの1つ1つをユニークに識別するための情報である。   The progress information storage unit 16 is business flow progress information indicating the progress status of the business flow managed by the progress status management unit 15, and stores the above-described task progress information. FIG. 4 is a diagram illustrating an example of task progress information stored in the progress information storage unit 16. As shown in FIG. 4, the task progress information includes a business ID, task ID, status, previous task ID, task generation date, and task processing date as items in the record. The item “business ID” is the same as the business ID shown in FIG. The item “task ID” is information for uniquely identifying each task generated by the corresponding task processing unit 14.

項目「ステータス」は、そのタスクが未処理であるか処理済であるかの進捗状況を表す情報である。このステータスが未処理となっているものが未処理タスクであり、処理済となっているものが処理済タスクである。このステータスが、進捗状況管理部15により適宜更新される。すなわち、タスクの生成時はステータスが未処理となっている。一方、その未処理タスクが対応業務処理部14により実行されると、進捗状況管理部15によりステータスが処理済に更新される。   The item “status” is information indicating the progress status of whether the task is unprocessed or processed. Those whose status is not processed are unprocessed tasks, and those which have been processed are processed tasks. This status is appropriately updated by the progress management unit 15. That is, the status is not processed when the task is generated. On the other hand, when the unprocessed task is executed by the corresponding job processing unit 14, the status is updated by the progress management unit 15 to have been processed.

項目「前タスクID」は、未処理タスクの処理完了時に対応業務処理部14により新規に生成された未処理タスクの1つ前のタスク(つまり、当該処理の完了により処理済タスクとされたタスク)のタスクIDを示す情報である。項目「タスク生成日」は、対応業務処理部14により未処理タスクが新規に生成された日を示す情報である。項目「タスク処理日」は、対応業務処理部14により未処理タスクの処理が行われた日、すなわち、未処理タスクの処理完了日を示す情報である。   The item “previous task ID” is a task immediately preceding the unprocessed task newly generated by the corresponding business processing unit 14 when the processing of the unprocessed task is completed (that is, the task that has been processed by the completion of the processing) ) Of the task ID. The item “task generation date” is information indicating a date when an unprocessed task is newly generated by the corresponding job processing unit 14. The item “task processing date” is information indicating the date when the unprocessed task is processed by the corresponding task processing unit 14, that is, the processing completion date of the unprocessed task.

進捗状況表示部17は、業務フロー図上のナビゲーションボタン30の押下操作が操作受付部13により受け付けられたときに、ナビゲーション画面を表示装置20に表示するよう制御する。そして、進捗状況表示部17は、このナビゲーション画面上において、業務フロー定義情報記憶部11に記憶されている業務フロー定義情報および進捗情報記憶部16に記憶されているタスク進捗情報に基づいて、タスクの進捗状況を表示装置20に表示するよう制御する。   The progress status display unit 17 controls to display a navigation screen on the display device 20 when an operation of pressing the navigation button 30 on the workflow diagram is received by the operation receiving unit 13. On the navigation screen, the progress status display unit 17 performs a task based on the task progress information stored in the task flow definition information storage unit 11 and the task progress information stored in the progress information storage unit 16. To display the progress status on the display device 20.

また、進捗状況表示部17は、ナビゲーション画面上の業務指定ボタンの押下操作が操作受付部13により受け付けられたとき、つまり、業務フローの各業務の中から何れかを指定するための操作が操作受付部13により受け付けられたときに、指定された業務に関する未処理タスクを一覧表示するよう制御する。このとき進捗状況表示部17は、指定された業務の未処理タスクについて、その業務よりも1つの前に処理された業務の名称を未処理タスクの進捗状況として一覧表示するよう制御する。   Further, the progress status display unit 17 is operated when an operation for pressing a task designation button on the navigation screen is accepted by the operation accepting unit 13, that is, an operation for designating any one of the tasks in the workflow. When received by the receiving unit 13, control is performed to display a list of unprocessed tasks related to the specified job. At this time, for the unprocessed task of the designated job, the progress status display unit 17 performs control so that the name of the job processed one before the job is displayed as a progress status of the unprocessed task.

具体的には、進捗状況表示部17は、進捗情報記憶部16に記憶されているタスク進捗情報を参照して、指定された業務でステータスが未処理となっているレコードを抽出し、抽出した各レコードから前タスクIDを得る。そして、進捗状況表示部17は、取得した前タスクIDと同じタスクIDを持つ処理済タスクのレコードから業務IDを取得し、その業務IDに対応する業務名を業務フロー定義情報記憶部11から取得してナビゲーション画面上に一覧表示する。   Specifically, the progress status display unit 17 refers to the task progress information stored in the progress information storage unit 16 and extracts a record whose status is unprocessed in the specified job, and extracts it. The previous task ID is obtained from each record. Then, the progress status display unit 17 acquires the business ID from the record of the processed task having the same task ID as the acquired previous task ID, and acquires the business name corresponding to the business ID from the business flow definition information storage unit 11. List on the navigation screen.

図5は、表示装置20に表示されるナビゲーション画面の例を示す図である。図5に示すように、ナビゲーション画面は、業務フロー図上のナビゲーションボタン30の押下に応じて業務フローの各業務毎にタスクの進捗状況を数値として表示する第1の領域51と、ナビゲーション画面上の業務指定ボタン53の押下に応じて指定業務の未処理タスクを一覧表示する第2の領域52とを有している。   FIG. 5 is a diagram illustrating an example of a navigation screen displayed on the display device 20. As shown in FIG. 5, the navigation screen includes a first area 51 for displaying the progress of a task as a numerical value for each business in the business flow in response to pressing of the navigation button 30 on the business flow diagram, And a second area 52 for displaying a list of unprocessed tasks of the designated job in response to pressing of the job designation button 53.

第1の領域51では、業務フローの中の1つあるいは複数の業務をまとめた所定単位毎に、未処理タスクの件数を数値として表示している。例えば、“通関手配”という業務については、現在処理可能となっている(処理すべき)未処理タスクが6件あることを示している。   In the first area 51, the number of unprocessed tasks is displayed as a numerical value for each predetermined unit in which one or a plurality of tasks in the workflow are collected. For example, for the task of “customs clearance arrangement”, there are six unprocessed tasks that are currently processable (to be processed).

本実施形態では、この6件の処理済タスクを3つのカテゴリに分けて件数表示している。3つのカテゴリは、未処理タスクのタスク生成日からの経過日数に応じて分けたものである。経過日数が大きいほど、未処理タスクの処理が遅延していることを意味するので、当該未処理タスクを処理すべき緊急度が高くなる。すなわち、3つのカテゴリは、未処理タスクの処理の緊急度を表している。図5の例では、“通関手配”という業務に関する未処理タスクが合計6件あり、その内訳は緊急度の高いものが3件、緊急度が中くらいのものが2件、緊急度が低いものが1件あることを示している。   In the present embodiment, the six processed tasks are divided into three categories and displayed as the number of cases. The three categories are divided according to the number of days elapsed from the task creation date of the unprocessed task. The larger the elapsed days, the more delayed the processing of the unprocessed task, and the higher the urgency with which the unprocessed task should be processed. That is, the three categories represent the urgency of processing of unprocessed tasks. In the example of FIG. 5, there are a total of 6 unprocessed tasks related to the business of “customs clearance arrangement”, of which 3 are high urgency, 2 are medium urgency, and are low urgency Indicates that there is one.

なお、上述したように、「伝票発行」の業務カテゴリに属する4つの業務“仕入売上伝票発行”“仕入伝票発行”“売上伝票発行”“請求書発行”は、この中の何れか1つを選択して処理するものである。したがって、図5のナビゲーション画面上では、これら4つの業務をまとめた業務カテゴリについて、未処理タスクの件数を数値として表示している。すなわち、「伝票発行」という業務カテゴリについては、当該業務カテゴリに属する4つの業務に関する未処理タスクの合計件数(緊急度の高いものが2件、緊急度が中くらいのものが3件、緊急度が低いものが7件)を数値として表示している。   As described above, one of the four business operations “issue of purchase sales slip”, “issue of purchase slip”, “issue of sales slip”, and “issue of invoice” belonging to the business category of “issue of slip” is any one of them. One is selected and processed. Therefore, on the navigation screen of FIG. 5, the number of unprocessed tasks is displayed as a numerical value for the business category in which these four businesses are combined. In other words, for the business category “issue slip”, the total number of unprocessed tasks related to the four businesses belonging to the business category (two with high urgency, three with medium urgency, urgency 7 items with low values are displayed as numerical values.

第1の領域51において、業務名または複数の業務をまとめた単位名を表示している領域の1つ1つが、業務指定ボタン53に割り当てられている。第2の領域52には、この業務指定ボタン53の押下操作により指定された業務(または、指定された所定単位に属する複数の業務)に関する未処理タスクについて、その業務よりも1つの前に処理された業務の名称が未処理タスクの進捗状況として一覧表示される。図5の例は、「伝票発行」の業務カテゴリに関する業務指定ボタン53が押下されたときの表示状態を示している。   In the first area 51, each area displaying a business name or a unit name in which a plurality of work is collected is assigned to the work designation button 53. In the second area 52, an unprocessed task related to a task (or a plurality of tasks belonging to a specified unit) designated by pressing the task designation button 53 is processed one before the task. The name of the assigned job is displayed as a list of the progress status of the unprocessed task. The example of FIG. 5 shows a display state when the business designation button 53 related to the business category “issue slip” is pressed.

すなわち、図5の第2の領域52には、「伝票発行」に関する合計12件の未処理タスクが、伝票発行よりも1つ前の4つの業務“船積完了”“出荷完了”“出庫完了”“荷捌完了”まで処理済という表現形式で1行ずつ一覧表示されている。この第2の領域52では、合計12件の未処理タスクをそのタスク生成日からの経過日数(すなわち、未処理タスクの処理すべき緊急度)に応じて上から順番に1行ずつ表示している。また、合計12件の未処理タスクを処理すべき緊急度に応じて3つのカテゴリ別に色分けして表示している。   That is, in the second area 52 of FIG. 5, a total of twelve unprocessed tasks related to “issue slip” are four tasks “shipping completed”, “shipping completed”, and “shipping completed” one before the voucher issuance. A list is displayed line by line in the expression format “processing completed” until “loading completed”. In this second area 52, a total of 12 unprocessed tasks are displayed one line at a time from the top in accordance with the number of days elapsed since the task generation date (that is, the degree of urgency for the unprocessed tasks to be processed). Yes. Also, a total of 12 unprocessed tasks are displayed in different colors according to the three categories according to the urgency with which the tasks should be processed.

このように表示された未処理タスクの1行1行(各レコード)が、タスク指定ボタンに割り当てられている。すなわち、何れかの行を押下すると、そのことが操作受付部13を通じて対応業務処理部14に通知される。この通知を受けて対応業務処理部14は、指定された未処理タスクの入力画面を表示装置20に表示する。   One line and one line (each record) of the unprocessed task displayed in this way is assigned to the task designation button. That is, when any line is pressed, this is notified to the corresponding task processing unit 14 through the operation receiving unit 13. Upon receiving this notification, the corresponding task processing unit 14 displays an input screen for the designated unprocessed task on the display device 20.

なお、第2の領域52に表示される未処理タスクの情報には、1つ前の業務の名称、処理基準日、処理基準日からの経過日数または処理基準日までの残日数が含まれる。ここで、処理基準日は、未処理タスクの目安となる処理日を示すものである。例えば、未処理タスクの生成日から所定日後が処理基準日として設定される。処理基準日からの経過日数は、ナビゲーション画面を開いている時点において処理基準日から何日経過しているかを示すものである。また、処理基準日までの残日数は、ナビゲーション画面を開いている時点において処理基準日まであと何日残っているかを示すものである。   The unprocessed task information displayed in the second area 52 includes the name of the previous task, the processing reference date, the number of days elapsed from the processing reference date, or the remaining number of days until the processing reference date. Here, the processing reference date indicates a processing date that is a measure of an unprocessed task. For example, a predetermined date after the generation date of the unprocessed task is set as the processing reference date. The number of days elapsed from the processing reference date indicates how many days have elapsed from the processing reference date when the navigation screen is opened. The remaining number of days until the processing reference date indicates how many days remain until the processing reference date when the navigation screen is opened.

以上詳しく説明したように、本実施形態では、各業務の流れを視覚的に表した業務フロー図を業務選択用のメニュー画面として表示し、業務フロー図において個々の業務名が表示されている領域を、対応業務に関するタスクの処理を指示するための操作ボタン(業務処理指示ボタン)に割り当てている。また、本実施形態では、業務フローの各業務に含まれる1以上のタスクの進捗状況を管理し、業務毎にタスクの進捗状況をナビゲーション画面に表示するようにしている。   As described above in detail, in the present embodiment, a business flow diagram that visually represents the flow of each business is displayed as a menu screen for selecting a business, and each business name is displayed in the business flow diagram. Are assigned to operation buttons (business process instruction buttons) for instructing processing of tasks related to the corresponding business. In the present embodiment, the progress of one or more tasks included in each business in the business flow is managed, and the progress of the task is displayed on the navigation screen for each business.

このように構成した本実施形態によれば、各段階の業務の担当者は、各業務の流れが視覚的に分かりやすい業務フロー図から自分の担当業務を指定して必要な処理を行うことができるので、操作性がよく、業務の効率化を図ることができる。また、タスクの進捗状況に変化が生じたかどうかに関係なく、各業務のタスクの進捗状況をナビゲーション画面に表示して確認することができるので、担当者は自分が行うべきタスクをいつでも確認することでき、担当者毎の作業遅延をより効果的に防止することができるようになる。   According to this embodiment configured as described above, the person in charge of each stage of business can perform the necessary processing by designating his / her work in charge from a business flow diagram in which the flow of each work is visually easy to understand. Because it is possible, it is easy to operate and can improve work efficiency. Regardless of whether or not the task progress has changed, the progress of each task can be displayed on the navigation screen and checked so that the person in charge can check the tasks that he / she should perform at any time. This makes it possible to more effectively prevent work delays for each person in charge.

10 業務管理システム
11 業務フロー定義情報記憶部
12 業務フロー表示部
13 操作受付部
14 対応業務処理部
15 進捗状況管理部
16 進捗情報記憶部
17 進捗状況表示部
DESCRIPTION OF SYMBOLS 10 Business management system 11 Business flow definition information storage part 12 Business flow display part 13 Operation reception part 14 Corresponding business process part 15 Progress status management part 16 Progress information storage part 17 Progress status display part

Claims (2)

業務フローを定義する業務フロー定義情報であって、上記業務フローに沿った各業務を特定する業務情報および当該各業務の流れの順序を特定する順序情報を含んだ業務フロー定義情報を記憶する業務フロー定義情報記憶部と、
上記業務フロー定義情報記憶部に記憶されている上記業務フロー定義情報に基づいて、上記各業務の流れを視覚的に表した業務フロー図であって、当該業務フロー図内の各業務の表示領域が当該各業務に対応するタスクの処理を指示するための操作領域に割り当てられたメニュー画面として機能する業務フロー図を表示するよう制御する業務フロー表示部と、
上記業務フローの各業務に含まれる1以上のタスクの進捗状況を管理する進捗状況管理部と、
上記進捗状況管理部により管理される上記業務フローの進捗状況を表す情報であって、上記各業務のタスク毎の進捗状況を特定するタスク進捗情報を記憶する進捗情報記憶部と、
上記業務フロー定義情報記憶部に記憶されている上記業務フロー定義情報および上記進捗情報記憶部に記憶されている上記タスク進捗情報に基づいて、上記タスクの進捗状況を表示するよう制御する進捗状況表示部とを備えたことを特徴とする業務管理システム。
Business flow definition information that defines the business flow, and stores business flow definition information that includes business information that identifies each business along the business flow and sequence information that identifies the order of the flow of each business flow A flow definition information storage unit;
A business flow diagram visually representing the flow of each business based on the business flow definition information stored in the business flow definition information storage unit, and a display area for each business in the business flow diagram A business flow display unit that controls to display a business flow diagram that functions as a menu screen assigned to an operation area for instructing processing of tasks corresponding to each business,
A progress status management unit that manages the progress status of one or more tasks included in each business of the business flow;
A progress information storage unit for storing task progress information for specifying a progress status of each task of the business, which is information indicating the progress status of the business flow managed by the progress status management unit;
A progress status display for controlling to display the progress status of the task based on the business flow definition information stored in the business flow definition information storage section and the task progress information stored in the progress information storage section. A business management system characterized by comprising a department.
上記業務フローの各業務の中から何れかを指定するための操作を受け付ける操作受付部を更に備え、
上記進捗状況表示部は、上記操作受付部により受け付けられた指定に係る業務の未処理タスクについて、その未処理タスクよりも1つの前に処理されたことが上記タスク進捗情報により示されている1以上の業務を上記未処理タスクの進捗状況として一覧表示するよう制御することを特徴とする請求項1に記載の業務管理システム。
An operation accepting unit that accepts an operation for designating one of the operations in the business flow;
In the progress status display section, the task progress information indicates that the unprocessed task of the job related to the designation received by the operation reception section has been processed one before the unprocessed task 1 The business management system according to claim 1, wherein the business management is controlled to display a list of the above business as the progress status of the unprocessed task.
JP2009110925A 2009-04-30 2009-04-30 Business management system Pending JP2010262361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009110925A JP2010262361A (en) 2009-04-30 2009-04-30 Business management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009110925A JP2010262361A (en) 2009-04-30 2009-04-30 Business management system

Publications (1)

Publication Number Publication Date
JP2010262361A true JP2010262361A (en) 2010-11-18

Family

ID=43360387

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009110925A Pending JP2010262361A (en) 2009-04-30 2009-04-30 Business management system

Country Status (1)

Country Link
JP (1) JP2010262361A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016004384A (en) * 2014-06-16 2016-01-12 パナソニックIpマネジメント株式会社 Shop management system and shop management method
JP2017107616A (en) * 2012-09-14 2017-06-15 東日本メディコム株式会社 Progress state management system and program
JP2020009340A (en) * 2018-07-12 2020-01-16 カシオ計算機株式会社 Information processing device and program
JP2020102155A (en) * 2018-12-25 2020-07-02 株式会社オービック Real estate business management device, real estate business management method, and real estate business management program

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017107616A (en) * 2012-09-14 2017-06-15 東日本メディコム株式会社 Progress state management system and program
JP2019036355A (en) * 2012-09-14 2019-03-07 東日本メディコム株式会社 Information display system, information display method and program
JP2016004384A (en) * 2014-06-16 2016-01-12 パナソニックIpマネジメント株式会社 Shop management system and shop management method
JP2020009340A (en) * 2018-07-12 2020-01-16 カシオ計算機株式会社 Information processing device and program
JP7275485B2 (en) 2018-07-12 2023-05-18 カシオ計算機株式会社 Information processing device, business support method and program
JP2020102155A (en) * 2018-12-25 2020-07-02 株式会社オービック Real estate business management device, real estate business management method, and real estate business management program
JP7261004B2 (en) 2018-12-25 2023-04-19 株式会社オービック Real estate business management device, real estate business management method, and real estate business management program

Similar Documents

Publication Publication Date Title
US20050262112A1 (en) Method and apparatus to convert project plans into workflow definitions
JP2008299762A (en) Production management program
JP5949231B2 (en) Printing / packing work control device, program and printing / packing work management system
JP4577035B2 (en) Business instruction management system and program
JP2010262361A (en) Business management system
JP6742125B2 (en) Business management device, information processing method, and business management program
JP6447611B2 (en) Schedule management apparatus and method
JP7210951B2 (en) Worker assignment device, worker assignment method, program
WO2017082367A1 (en) Product manufacturing system, method and program
US20170052656A1 (en) Work support system, work support method and computer-readable recording medium
JP7226117B2 (en) Order entry device, order entry method and order entry program
JP2022097622A (en) Information processing device, information processing method and information processing program
JP2008129973A (en) Service management device
US20200089200A1 (en) Production management support apparatus and production management support method
JP4268151B2 (en) Production management apparatus, production management program, and production management method
JP6626327B2 (en) Gantt chart generation program, Gantt chart generation device, and Gantt chart generation method
JP2007080065A (en) Integrated progress management system
JP2016099952A (en) Document data management device, document data management program, and document data management method
JP2009211242A (en) Business management device, business management program, business management system and business management method
JP2007011758A (en) Insurance data management device and method, and program
JP5716704B2 (en) Data linkage flow management device and data integration device
US20160224916A1 (en) Methods and systems for auditing overstock in a retail environment
JP2017220002A (en) Duty shift making support system and duty shift making support program
JP4960430B2 (en) Information management system
JP2008077608A (en) System for managing progress in business