JP2010203034A - Building repair/demolition device and building repair/demolition method - Google Patents

Building repair/demolition device and building repair/demolition method Download PDF

Info

Publication number
JP2010203034A
JP2010203034A JP2009046154A JP2009046154A JP2010203034A JP 2010203034 A JP2010203034 A JP 2010203034A JP 2009046154 A JP2009046154 A JP 2009046154A JP 2009046154 A JP2009046154 A JP 2009046154A JP 2010203034 A JP2010203034 A JP 2010203034A
Authority
JP
Japan
Prior art keywords
building
floor
outer body
outer peripheral
dismantling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009046154A
Other languages
Japanese (ja)
Other versions
JP5365843B2 (en
Inventor
Yukinori Fuse
幸則 布施
Masato Kawaguchi
正人 川口
Yoko Nachi
洋子 名知
Sumio Horiuchi
澄夫 堀内
Takashi Kunugi
隆 椚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2009046154A priority Critical patent/JP5365843B2/en
Publication of JP2010203034A publication Critical patent/JP2010203034A/en
Application granted granted Critical
Publication of JP5365843B2 publication Critical patent/JP5365843B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a building repair/demolition device and a building repair/demolition method for preventing asbestos from being scattered without fail and repairing or demolishing a building satisfactorily. <P>SOLUTION: This building repair/demolition device A is constituted by including an outer shell body 1 formed by a side wall part 1a on one side, a roof part 1b on an upper side, a floor part 1c on a lower side, and an opening part 8 on the other side, having a height H2 being larger than the height H1 of the highest story of the building T, and installed on an outer side of the building T to make the opening part 8 opposite to an outer peripheral part T1 by suspending and supporting by a crane installed in the uppermost part of the building T, a negative pressure dust removing device 7 for sucking air in the inside of the outer shell body 1, and elastic members 4, 5 provided to advance and retreat freely from end parts 1d, 1e of the roof part 1b and/or the floor part 1c forming the opening part 8 toward the outer peripheral part T1 while the outer shell body 1 is installed to let the opening part 8 oppose to the outer peripheral part T1. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、建物改修/解体用装置及び建物の改修/解体方法に関し、特に、カーテンウォールを含む外周部側にアスベスト含有材を用いて構築された建物を改修あるいは解体するための建物改修/解体用装置及び建物の改修/解体方法に関する。   The present invention relates to a building repair / dismantling apparatus and a building repair / dismantling method, and more particularly, a building repair / dismantling for repairing or dismantling a building constructed using an asbestos-containing material on the outer peripheral side including a curtain wall. The present invention relates to an apparatus for building and a method for repairing / dismantling a building.

従来、例えば中・高層ビルなどの非耐力壁(外壁)として、デザインの自由度が高いうえ、施工の効率化を図ることができるなどの多くの利点を有することから、カーテンウォールが多用されている。一方、我が国では、1960年代から盛んにカーテンウォールを採用した建物が構築されてきており、このようなカーテンウォールを用いた建物も経年劣化が生じるなどして改修/解体が必要になるケースが増えてきている。   Conventionally, curtain walls have been widely used as non-bearing walls (outer walls) such as medium- and high-rise buildings because they have many advantages such as high degree of freedom in design and efficiency in construction. Yes. On the other hand, in Japan, buildings that use curtain walls have been actively built since the 1960s, and buildings using such curtain walls also need to be refurbished / disassembled due to deterioration over time. It is coming.

そして、この種の建物を解体する方法として、建物内部に貫設されたエレベータホールにタワーを立て、マストクライミングクレーンで廃材を順次地上に吊り降ろすようにし、上階から順次建物を解体してゆく方法が提案、実用化されている(例えば、特許文献1参照)。   And as a method of dismantling this kind of building, a tower is set up in the elevator hall that penetrates inside the building, and waste materials are suspended on the ground with a mast climbing crane, and the building is dismantled sequentially from the upper floor. A method has been proposed and put into practical use (for example, see Patent Document 1).

特開2007−297867号公報JP 2007-297867 A

ところで、カーテンウォールの構造的特徴として(カーテンウォールを用いて構築する建物の耐火性や吸音性の確保、結露防止等を目的として)、例えば、カーテンウォールの裏面側(建物内部側)の支持部材(鉄骨梁やファスナーなど)に耐火処理を施したり、カーテンウォールの裏面とスラブの間に層間塞ぎ材を充填することなどが必要になる。そして、1960年代から1980年頃まで、腰パネル(カーテンウォール)の裏面吹付材、鉄骨梁の耐火被覆材、層間塞ぎ材、ファスナーの耐火被覆材、内部膳板裏打ち材などにアスベスト含有吹付材(アスベスト含有材、アスベスト)が使用されていた。   By the way, as a structural feature of the curtain wall (for the purpose of ensuring fire resistance and sound absorption of the building constructed using the curtain wall, prevention of condensation, etc.), for example, a support member on the back side of the curtain wall (inside the building) It is necessary to apply a fireproofing treatment (such as steel beams and fasteners) or to fill an interlayer sealing material between the back surface of the curtain wall and the slab. From the 1960s to around 1980, asbestos-containing spray materials (asbestos) were used for the back spray material of the waist panel (curtain wall), the fire-resistant coating material for steel beams, the interlaminar plugging material, the fire-resistant coating material for fasteners, and the inner side plate backing material. Containing material, asbestos) was used.

このため、この種の建物のカーテンウォールの改修、建物の解体を行う際には、事前にアスベスト含有材を除去することが求められるが、カーテンウォールを含む建物の外周部側に使用されたアスベスト含有材を完全に除去することができない場合が多々ある。これにより、例えば特許文献1に開示されるような解体方法を採用した場合には、外部にアスベストが飛散するおそれがあった。また、特に70mを超えるような高層建物では、建物の外周(外側)に総足場を構築し、作業エリアを隔離することも困難である。このため、建物の改修/解体時にアスベストの飛散を確実に防止できる手法が強く望まれていた。   For this reason, it is required to remove the asbestos-containing material in advance when refurbishing the curtain wall of this type of building or dismantling the building, but the asbestos used on the outer peripheral side of the building including the curtain wall There are many cases where the contained material cannot be completely removed. Thereby, for example, when the dismantling method as disclosed in Patent Document 1 is adopted, there is a possibility that asbestos is scattered outside. In particular, in a high-rise building exceeding 70 m, it is difficult to build a total scaffold on the outer periphery (outside) of the building and isolate the work area. For this reason, there has been a strong demand for a method that can reliably prevent the asbestos from being scattered during the renovation / demolition of a building.

本発明は、上記事情に鑑み、アスベストの飛散を確実に防止して建物の改修あるいは解体を行うことを可能にする建物改修/解体用装置及び建物の改修/解体方法を提供することを目的とする。   In view of the circumstances described above, an object of the present invention is to provide a building renovation / demolition apparatus and a building refurbishment / demolition method that can reliably prevent asbestos from being scattered and renovate or dismantle a building. To do.

上記の目的を達するために、この発明は以下の手段を提供している。   In order to achieve the above object, the present invention provides the following means.

本発明の建物改修/解体用装置は、カーテンウォールを含む外周部側にアスベスト含有材を使用して構築された建物を改修あるいは解体するための建物改修/解体用装置であって、一側に側壁部、上方に屋根部、下方に床部、他側に開口部を備えて形成されるとともに前記建物の最大階高よりも大きな高さを備えて形成され、前記建物の最上部に設けたクレーンで吊り下げ支持して、前記開口部が前記外周部に対向するように前記建物の外側に設置される外郭体と、前記外郭体の内部空気を吸引する負圧除塵装置と、前記開口部が前記外周部に対向するように前記外郭体を設置した状態で、前記開口部を形成する前記屋根部及び/又は前記床部の端部から前記外周部に向けて進退自在に設けられた弾性部材とを備えて構成されていることを特徴とする。   The building renovation / demolition apparatus according to the present invention is a building renovation / demolition apparatus for refurbishing or demolishing a building constructed using an asbestos-containing material on the outer peripheral side including the curtain wall. It is formed with a side wall, a roof part above, a floor part below, an opening on the other side, and a height greater than the maximum floor height of the building, and provided at the top of the building An outer body that is suspended and supported by a crane and is installed outside the building so that the opening faces the outer periphery, a negative pressure dust removing device that sucks air inside the outer body, and the opening In the state where the outer body is installed so as to face the outer peripheral portion, elasticity provided to be able to advance and retreat from the end of the roof portion and / or the floor portion forming the opening portion toward the outer peripheral portion. It is characterized by comprising To.

この発明においては、カーテンウォールの改修あるいは建物の解体を行う際に、建物の最上部に設けたクレーンによって、カーテンウォール及びアスベスト含有材(アスベスト)を撤去する所定階の外周部に外郭体の開口部が対向するように設置するとともに、弾性部材を進出させて外周部に密着させる。このとき、外郭体が建物の最大階高よりも大きな高さを備えて形成されているため、屋根部と床部の端部からそれぞれ進出した弾性部材は、所定階を挟んで、例えば上階のカーテンウォールと下階のカーテンウォールにそれぞれ当接して密着し、屋根部、床部の端部と建物の外周部の間の隙間を弾性部材によって塞ぐことができる(外郭体の内部と外部を弾性部材によって区画して不連続にすることができる)。また、負圧除塵装置で外郭体の内部空気を吸引することにより、外郭体の内部を負圧状態にすることができる。   In the present invention, when the curtain wall is repaired or the building is dismantled, the outer wall is opened to the outer periphery of the predetermined floor where the curtain wall and the asbestos-containing material (asbestos) are removed by the crane provided at the top of the building. While installing so that a part may oppose, an elastic member is advanced and it adheres to an outer peripheral part. At this time, since the outer body is formed to have a height greater than the maximum floor height of the building, the elastic members that have advanced from the ends of the roof portion and the floor portion respectively sandwich, for example, the upper floor. The curtain wall and the curtain wall of the lower floor are in contact with each other and closely contact each other, and the gap between the roof, the edge of the floor and the outer periphery of the building can be closed with an elastic member (the inside and outside of the outer body are It can be partitioned and made discontinuous by an elastic member). Moreover, the inside of an outer body can be made into a negative pressure state by attracting | sucking the internal air of an outer body with a negative pressure dust removal apparatus.

そして、外郭体の内部に入った作業者によって、所定階のカーテンウォールを取り外し、建物の外周部側のアスベスト(アスベスト含有材)を除去することができる。また、このとき、弾性部材によって前記隙間が塞がれ、さらに、負圧除塵装置によって外郭体の内部が負圧状態で保持されるとともに外郭体の内部に飛散したアスベストが回収される。このため、従来完全に除去することが困難であった建物の外周部側に使用されたアスベストを、外部に飛散することを確実に防止して除去することができる。また、弾性部材を退避させるとともに建物改修/解体用装置をクレーンで移動し、上記と同様に確実にアスベストの飛散を防止しながら別のカーテンウォールとアスベストを撤去してゆくことにより、建物改修/解体用装置を用いて新しいカーテンウォールを設置してカーテンウォールの改修を行ったり、建物を解体してゆくことが可能になる。   And the curtain wall of a predetermined floor can be removed and the asbestos (asbestos containing material) of the outer peripheral part side of a building can be removed by the operator who entered the inside of an outer shell. Further, at this time, the gap is closed by the elastic member, and the inside of the outer body is held in a negative pressure state by the negative pressure dust removing device, and asbestos scattered in the outer body is collected. For this reason, the asbestos used for the outer peripheral part side of the building which was difficult to remove completely in the past can be reliably prevented from being scattered outside and removed. In addition, by moving the building renovation / demolition device with a crane and removing another curtain wall and asbestos while reliably preventing the asbestos from being scattered in the same manner as described above, the elastic member is retracted and the building renovation / demolition device is moved. It will be possible to install a new curtain wall using a dismantling device, repair the curtain wall, or dismantle the building.

また、本発明の建物改修/解体用装置においては、前記外郭体が前記建物を囲繞するように環状に形成されていることが望ましい。   In the building renovation / dismantling apparatus of the present invention, it is desirable that the outer body is formed in an annular shape so as to surround the building.

この発明においては、外郭体が建物を囲繞するように環状に形成されているため、クレーンで吊り下げ支持した外郭体(建物改修/解体用装置)が風圧などの影響を受けにくくなり、安定した状態で建物の所定階に設置することが可能になる。   In this invention, since the outer body is formed in an annular shape so as to surround the building, the outer body (building repair / dismantling device) suspended and supported by the crane is less affected by wind pressure and the like, and is stable. It can be installed on a predetermined floor of the building in a state.

さらに、本発明の建物改修/解体用装置においては、断面コ字状に形成されるとともに、互いに平行配置された一辺側の開閉板部が他辺側の基端板部よりも大きな長さで形成された上階隔離用フードを備えており、前記上階隔離用フードは、前記基端板部の先端を回動可能に前記屋根部に繋げて設けられ、回動とともに前記開閉板部の先端側が前記外周部に密着するように構成されていることが望ましい。   Furthermore, in the building renovation / dismantling apparatus of the present invention, the one side opening / closing plate portion is formed in a U-shaped cross section and has a larger length than the other side base end plate portion. The upper floor isolation hood is formed, and the upper floor isolation hood is connected to the roof portion so that the distal end of the base end plate portion can be rotated. It is desirable that the front end side is configured to be in close contact with the outer peripheral portion.

この発明においては、外郭体の内部と外部を上階隔離用フードによって確実に区画して不連続にすることが可能になる。すなわち、例えばクレーンで外郭体(建物改修/解体用装置)を上階から下階に吊り降ろしながら、順次上階から下階の各階のカーテンウォール及びアスベストを撤去してゆく場合には、撤去するカーテンウォールがある所定階よりも上階のカーテンウォールが既に取り外され、屋根部の端部から進出させた弾性部材を外周部(上階のカーテンウォール)に密着させて隙間を塞ぐことができないおそれがある。これに対し、上階隔離用フードを備えている場合には、開閉板部の先端側を例えば上階のスラブ(外周部)に密着させるように回動することにより、この上階隔離用フードで外郭体の内部と外部を確実に区画して不連続にすることが可能になる。これにより、屋根部の端部と建物の外周部の間の隙間を通じて外部にアスベストが飛散することを確実に防止できる。   In the present invention, the inside and the outside of the outer body can be surely partitioned and made discontinuous by the upper floor isolation hood. That is, for example, if the curtain wall and asbestos on each floor from the upper floor to the lower floor are to be removed sequentially while hanging the outer body (building repair / dismantling device) from the upper floor to the lower floor with a crane, remove it. There is a possibility that the curtain wall on the upper floor is already removed from the predetermined floor where the curtain wall is located, and the elastic member advanced from the end of the roof part cannot be tightly adhered to the outer peripheral part (upper curtain wall) to close the gap There is. On the other hand, when the upper floor isolation hood is provided, the upper floor isolation hood is rotated by bringing the front end side of the opening and closing plate portion into close contact with, for example, the upper floor slab (outer peripheral portion). Thus, the inside and outside of the outer body can be reliably partitioned and made discontinuous. Thereby, it can prevent reliably that asbestos is scattered outside through the clearance gap between the edge part of a roof part, and the outer peripheral part of a building.

本発明の建物の改修/解体方法は、カーテンウォールを含む外周部側にアスベスト含有材を使用して構築された建物を改修あるいは解体する方法であって、前記建物の最上部にクレーンを設置するとともに前記建物の外周部側と内部側を区画する間仕切り壁を設置し、上記のいずれかに記載の建物改修/解体用装置の前記外郭体を前記開口部が前記外周部に対向するように前記クレーンで吊り下げ支持して設置し、前記屋根部及び/又は前記床部の端部から前記弾性部材を進出させて前記外周部に密着させ、及び/又は前記上階隔離用フードを回動して前記開閉板部の先端側を前記外周部に密着させて、前記外郭体の内部と外部を区画し、前記外郭体の内部空気を前記負圧除塵装置で吸引するとともに該外郭体の内部を負圧状態にして、前記カーテンウォール及び前記アスベスト含有材を撤去するようにしたことを特徴とする。   The building refurbishment / dismantling method of the present invention is a method of repairing or dismantling a building constructed using asbestos-containing material on the outer peripheral side including the curtain wall, and installing a crane at the top of the building And a partition wall that divides the outer peripheral side and the inner side of the building, and the outer body of the building repair / dismantling device according to any one of the above, with the opening facing the outer peripheral part Installed by hanging and supporting with a crane, the elastic member is advanced from the end of the roof and / or the floor, and is brought into close contact with the outer periphery, and / or the upper floor isolation hood is rotated. The opening and closing plate part is closely attached to the outer peripheral part to partition the inside and outside of the outer body, and the air inside the outer body is sucked by the negative pressure dust removing device and the inside of the outer body is In a negative pressure state, Characterized in that so as to remove the over ten wall and said asbestos-containing material.

この発明においては、上記の建物改修/解体用装置が奏功する作用効果を確実に得ることが可能になる。   In the present invention, it is possible to surely obtain the effect of the above-mentioned building renovation / dismantling apparatus.

本発明の建物改修/解体用装置及び建物の改修/解体方法によれば、弾性部材によって屋根部や床部の端部と建物の外周部との間の隙間が塞がれ、さらに、負圧除塵装置によって外郭体の内部が負圧状態で保持されるとともに外郭体の内部に飛散したアスベストが回収されるため、従来完全に除去することが困難であった建物の外周部側に使用されたアスベストを、外部に飛散することを確実に防止して除去することができる。また、弾性部材を退避させるとともに建物改修/解体用装置をクレーンで移動し、上記と同様に確実にアスベストの飛散を防止しながら別のカーテンウォールとアスベストを撤去してゆくことにより、建物改修/解体用装置を用いて新しいカーテンウォールを設置してカーテンウォールの改修を行ったり、建物を解体してゆくことが可能になる。   According to the building repair / dismantling apparatus and the building repair / dismantling method of the present invention, the elastic member closes the gap between the end of the roof or floor and the outer periphery of the building. Because the asbestos scattered inside the outer body is collected while the inside of the outer body is held in a negative pressure state by the dust remover, it was used on the outer peripheral side of the building, which was difficult to remove completely in the past. Asbestos can be reliably removed and prevented from being scattered outside. In addition, by moving the building repair / dismantling device with a crane and removing another curtain wall and asbestos while reliably preventing the asbestos from being scattered, the building repair / It will be possible to install a new curtain wall using a demolition device, repair the curtain wall, or demolish the building.

また、この建物改修/解体用装置を用いてカーテンウォールの改修を行う際に、省エネ機能を有する新たなカーテンウォールを設置するようにしたり、カーテンウォールの改修と同時に、耐震改修や設備改修を行うことが可能である。このため、カーテンウォールの改修と同時に、建物改修/解体用装置を用いて建物の耐震化や省エネルギー化などを図ることも可能である。   In addition, when a curtain wall is refurbished using this building refurbishment / dismantling device, a new curtain wall having an energy saving function is installed, and at the same time as the curtain wall is renovated, seismic renovation and equipment renovation are performed. It is possible. For this reason, it is possible to make the building earthquake-proof and energy-saving by using the building renovation / demolition device simultaneously with the renovation of the curtain wall.

本発明の一実施形態に係る建物改修/解体用装置を示す側断面図である。It is a sectional side view which shows the apparatus for building renovation / dismantling concerning one Embodiment of this invention. 本発明の一実施形態に係る建物改修/解体用装置を建物の所定階に設置した状態を示す側面図である。It is a side view which shows the state which installed the building repair / dismantling apparatus which concerns on one Embodiment of this invention in the predetermined floor of a building. 本発明の一実施形態に係る建物改修/解体用装置を吊り下げ支持するクレーンを設置した建物の最上部を示す平面図である。It is a top view which shows the uppermost part of the building which installed the crane which suspends and supports the apparatus for building renovation / dismantling concerning one Embodiment of this invention. 建物内部に構築した間仕切り壁を示す平断面図である。It is a plane sectional view which shows the partition wall constructed | assembled inside the building.

以下、図1から図4を参照し、本発明の一実施形態に係る建物改修/解体用装置及び建物の改修/解体方法について説明する。本実施形態は、特に、カーテンウォールを含む外周部側にアスベスト含有材を用いて構築された建物を改修するための建物改修/解体用装置及び建物の改修/解体方法に関するものである。   Hereinafter, a building repair / dismantling apparatus and a building repair / dismantling method according to an embodiment of the present invention will be described with reference to FIGS. The present embodiment particularly relates to a building repair / dismantling apparatus and a building repair / dismantling method for repairing a building constructed using an asbestos-containing material on the outer peripheral side including a curtain wall.

本実施形態の建物改修/解体用装置Aは、図1に示すように、外郭体1と、油圧シリンダ2、3の先端に取り付けられた中空ゴム(弾性部材)4、5と、上階隔離用フード6と、負圧除塵装置7とを備えて構成されている。   As shown in FIG. 1, the building repair / dismantling apparatus A of the present embodiment includes an outer body 1, hollow rubbers (elastic members) 4 and 5 attached to the tips of hydraulic cylinders 2 and 3, and upper floor isolation. The hood 6 and the negative pressure dust removing device 7 are provided.

外郭体1は、一側に側壁部1a、上方に屋根部1b、下方に床部1c、他側に開口部8を備えて断面コ字状に形成されるとともに、建物Tの最大階高(階高H1)よりも大きな高さH2を備えて形成されている。また、外郭体1は、図1から図3に示すように、建物Tを囲繞するように環状に形成され、すなわち、建物Tの外周部T1に沿って建物Tの四周を囲むように形成され、建物Tの最上部T2に設置したクレーン10で吊り下げ支持して、開口部8が外周部T1に対向するように建物Tの外側に設置される。   The outer body 1 has a side wall 1a on one side, a roof 1b on the upper side, a floor 1c on the lower side, and an opening 8 on the other side. It is formed with a height H2 larger than the floor height H1). Further, as shown in FIGS. 1 to 3, the outer body 1 is formed in an annular shape so as to surround the building T, that is, is formed so as to surround the four circumferences of the building T along the outer peripheral portion T1 of the building T. The suspension is supported by the crane 10 installed on the uppermost portion T2 of the building T, and is installed outside the building T so that the opening 8 faces the outer peripheral portion T1.

さらに、外郭体1は、図1に示すように、例えばその内部に開閉扉11aを有する隔離壁11が設けられ、この隔離壁11によって内周側(他側側、開口部8側)の作業室12と外周側(一側側、側壁部1a側)の搬送室13に区画して形成されている。さらに、搬送室13には、床部1cに開閉扉14が設けられるとともに、この開閉扉14を通じて、撤去したカーテンウォール15などを地上に降ろすための揚重機16が設けられている。なお、作業室12に複数の隔離壁11を設け、この作業室12を、アスベスト吹付材を除去する除去ヤード、カーテンウォール15を清浄化する清浄化ヤードなどにさらに細分化して区画するようにしてもよい。   Further, as shown in FIG. 1, the outer body 1 is provided with, for example, an isolation wall 11 having an opening / closing door 11 a therein, and the inner wall (the other side, the opening 8 side) is operated by the isolation wall 11. It is divided into a chamber 12 and a transfer chamber 13 on the outer peripheral side (one side, side wall portion 1a side). Further, the transfer chamber 13 is provided with an opening / closing door 14 on the floor portion 1c, and a lifting machine 16 for lowering the removed curtain wall 15 and the like through the opening / closing door 14 is provided. A plurality of isolation walls 11 are provided in the work chamber 12, and the work chamber 12 is further subdivided into a removal yard for removing asbestos spraying material, a cleaning yard for cleaning the curtain wall 15, and the like. Also good.

油圧シリンダ2、3は、外郭体1の屋根部1bと床部1cにそれぞれ、外郭体1の延設方向(建物Tの外周部T1に沿う水平方向)に所定の間隔をあけて複数配設されている。屋根部1bと床部1cのそれぞれに配設された複数の油圧シリンダ2、3の先端に、外郭体1の延設方向に沿って延びる中空ゴム4、5が取り付けられ、これら中空ゴム4、5が屋根部1bと床部1cにそれぞれ油圧シリンダ2、3を介して一体に配設されている。そして、中空ゴム4、5は、油圧シリンダ2、3の伸縮とともに進退し、開口部8が外周部T1に対向するように外郭体1を設置した状態で油圧シリンダ2、3を伸長すると、開口部8を形成する屋根部1bと床部1cの端部1d、1eから外周部T1に向けて進出するように設けられている。   A plurality of hydraulic cylinders 2 and 3 are arranged on the roof portion 1b and the floor portion 1c of the outer body 1 at predetermined intervals in the extending direction of the outer body 1 (horizontal direction along the outer peripheral portion T1 of the building T). Has been. Hollow rubbers 4 and 5 extending along the extending direction of the outer shell 1 are attached to the tips of a plurality of hydraulic cylinders 2 and 3 disposed on the roof portion 1b and the floor portion 1c, respectively. 5 is integrally disposed on the roof portion 1b and the floor portion 1c via hydraulic cylinders 2 and 3, respectively. The hollow rubbers 4 and 5 move forward and backward with the expansion and contraction of the hydraulic cylinders 2 and 3, and when the hydraulic cylinders 2 and 3 are extended with the outer body 1 installed so that the opening 8 faces the outer peripheral portion T 1, The roof portion 1b forming the portion 8 and the end portions 1d and 1e of the floor portion 1c are provided so as to advance toward the outer peripheral portion T1.

上階隔離用フード6は、断面コ字状に形成されるとともに、互いに平行配置された一辺側の開閉板部6aが他辺側の基端板部6bよりも大きな長さで形成されている。また、開閉板部6aの先端側にはゴム(弾性部材)17が取り付けられている。さらに、この上階隔離用フード6は、基端板部6bの先端を外郭体1の屋根部1bに回動可能に繋げて設けられている。このとき、上階隔離用フード6は、外郭体1の延設方向に沿う回動軸線O1回りに回動するように設けられている。そして、上階隔離用フード6は、開口部8が外周部T1に対向するように外郭体1を設置した状態で回動するとともに、開閉板部6aが外郭体1の開口部8を形成する屋根部1bの端部1dから外側に配され、開閉板部6aの先端側が外周部T1に密着するように構成されている。さらに、本実施形態では、外郭体1の屋根部1bにウインチ18が設けられ、このウインチ18によって上階隔離用フード6が回動するように構成されている。   The upper floor isolation hood 6 is formed in a U-shaped cross-section, and one side opening / closing plate 6a arranged in parallel to each other is formed to be longer than the other side base end plate 6b. . A rubber (elastic member) 17 is attached to the front end side of the opening / closing plate portion 6a. Further, the upper floor isolation hood 6 is provided with the distal end of the base end plate portion 6b rotatably connected to the roof portion 1b of the outer body 1. At this time, the upper floor isolation hood 6 is provided so as to rotate around the rotation axis O <b> 1 along the extending direction of the outer body 1. The upper floor isolation hood 6 rotates in a state in which the outer body 1 is installed so that the opening 8 faces the outer peripheral portion T1, and the opening / closing plate 6a forms the opening 8 of the outer body 1. It arrange | positions outside from the edge part 1d of the roof part 1b, and is comprised so that the front end side of the opening-and-closing board part 6a may closely_contact | adhere to the outer peripheral part T1. Furthermore, in this embodiment, the winch 18 is provided in the roof part 1b of the outer casing 1, and the upper floor isolation hood 6 is configured to rotate by the winch 18.

負圧除塵装置7は、HEPAフィルタ内蔵型の集塵機であり、例えば外郭体1の屋根部1bに取り付けて設けられ、外郭体1の作業室12側の内部空気を吸引して集塵するとともに、この外郭体1の作業室12側の内部を外部に対して負圧状態にする。   The negative pressure dust removing device 7 is a dust collector with a built-in HEPA filter, and is attached to the roof portion 1b of the outer body 1, for example, and sucks and collects internal air on the working chamber 12 side of the outer body 1. The inside of the outer casing 1 on the working chamber 12 side is brought into a negative pressure state with respect to the outside.

ついで、上記構成からなる建物改修/解体用装置Aを用い、カーテンウォール15を取り除くとともに建物Tの外周部T1側に使用されたアスベスト含有吹付材を除去して、建物Tの改修を行う方法について説明するとともに、本実施形態の建物改修/解体用装置A及び建物の改修/解体方法の作用及び効果について説明する。   Next, a method for repairing the building T by using the building repair / dismantling apparatus A having the above-described configuration, removing the curtain wall 15 and removing the asbestos-containing spray material used on the outer peripheral portion T1 side of the building T. While explaining, the operation | movement and effect of the building repair / dismantling apparatus A and the building repair / dismantling method of this embodiment are demonstrated.

本実施形態の建物改修/解体用装置Aを用いて建物Tのカーテンウォール15を改修する際には、はじめに、建物Tの最上部T2にクレーン10を設置する。ここで、最上部T2に設備機器などがあり、そのままクレーン10を設置することができない場合には、図2及び図3に示すように、この最上部T2に仮設スラブ20を施工し、この仮設スラブ20上にクレーン10を設置する。   When repairing the curtain wall 15 of the building T using the building repair / dismantling apparatus A of the present embodiment, first, the crane 10 is installed on the uppermost portion T2 of the building T. Here, when there is equipment or the like at the uppermost part T2 and the crane 10 cannot be installed as it is, a temporary slab 20 is constructed on the uppermost part T2 as shown in FIGS. The crane 10 is installed on the slab 20.

また、図2に示すように、建物T近傍の地上Gに作業ヤード21を構築するとともに、建物Tを囲繞するように外郭体1(建物改修/解体用装置A)を地組みする。さらに、図1及び図4に示すように、カーテンウォール15の改修を行う所定階の建物Tの内部に、外周部T1側と建物内部T3側とを区画するための間仕切り壁22を構築する。そして、図1及び図2に示すように、建物Tの最上部T2に設置したクレーン10を用いて建物改修/解体用装置A(外郭体1)を吊り上げ、カーテンウォール15の改修を行う所定階に配置する。このとき、改修を行う所定階を挟んで、上階側に屋根部1b、下階側に床部1cが配されるように建物改修/解体用装置Aを配置する。   Further, as shown in FIG. 2, a work yard 21 is constructed on the ground G in the vicinity of the building T, and the outer body 1 (building repair / dismantling apparatus A) is grounded so as to surround the building T. Furthermore, as shown in FIG.1 and FIG.4, the partition wall 22 for partitioning the outer peripheral part T1 side and the building interior T3 side is built in the inside of the building T of the predetermined floor which repairs the curtain wall 15. As shown in FIG. Then, as shown in FIGS. 1 and 2, the building repair / dismantling apparatus A (outer body 1) is lifted by using a crane 10 installed at the uppermost part T <b> 2 of the building T, and the curtain floor 15 is repaired. To place. At this time, the building renovation / dismantling apparatus A is arranged so that the roof 1b is arranged on the upper floor side and the floor 1c is arranged on the lower floor side across the predetermined floor to be repaired.

ついで、図1に示すように、外郭体1の屋根部1bと床部1cにそれぞれ配設された油圧シリンダ2、3を伸長させて先端に設けた中空ゴム4、5を所定階のカーテンウォール15を挟んで上階のカーテンウォール15と下階のカーテンウォール15に密着させる。このとき、既に所定階を挟んで上階のカーテンウォール15が撤去されている場合には、屋根部1bに設けたウインチ18を駆動して上階隔離用フード6を回動させ、開閉板部6aの先端側のゴム17を上階のスラブ23等に密着させる。これにより、外郭体1の内部が上下階のカーテンウォール15(外周部T1)に密着した中空ゴム4、5、あるいは下階のカーテンウォール15(外周部T1)に密着した中空ゴム5と上階隔離用フード6によって密閉される。また、このように外郭体1の内部を密閉するとともに、外郭体1の床部1cの端部1e側と建物Tのカーテンウォール15の間に架け渡して落下防止部材24を設置する。   Next, as shown in FIG. 1, the hydraulic cylinders 2 and 3 disposed on the roof portion 1b and the floor portion 1c of the outer body 1 are extended to form hollow rubbers 4 and 5 provided at the tips of the curtain walls on a predetermined floor. 15 is closely attached to the curtain wall 15 on the upper floor and the curtain wall 15 on the lower floor. At this time, when the curtain wall 15 on the upper floor is already removed with the predetermined floor in between, the winch 18 provided on the roof portion 1b is driven to rotate the upper floor isolation hood 6, and the opening / closing plate portion The rubber 17 on the tip side of 6a is brought into close contact with the slab 23 on the upper floor. Accordingly, the hollow rubber 4 and 5 in which the inside of the outer body 1 is in close contact with the curtain wall 15 (outer peripheral portion T1) on the upper and lower floors, or the hollow rubber 5 and upper floor in close contact with the lower curtain wall 15 (outer peripheral portion T1). Sealed by an isolation hood 6. In addition, the inside of the outer body 1 is sealed in this way, and the fall prevention member 24 is installed between the end 1e side of the floor 1c of the outer body 1 and the curtain wall 15 of the building T.

さらに、負圧除塵装置7を駆動して、外郭体1の内部空気の吸引を開始し、外郭体1の作業室12側の内部を外部に対して負圧状態にする。そして、このように所定階に設置した建物改修/解体用装置Aは、外郭体1が建物Tの外周に沿って環状に形成されているため(建物Tの四周を囲むように形成されているため)、風圧などの影響を受けにくく、安定した状態で設置される。また、所定階の建物T内部に間仕切り壁22が設けられているため、階段室などからの煙突効果による風圧が建物改修/解体用装置Aに作用することもなく、確実に安定した状態で建物改修/解体用装置Aが設置されることになる。   Further, the negative pressure dust removing device 7 is driven to start the suction of the internal air of the outer body 1, and the inside of the outer body 1 on the working chamber 12 side is brought into a negative pressure state with respect to the outside. The building repair / dismantling apparatus A installed on the predetermined floor in this way is formed so as to surround the four circumferences of the building T because the outer body 1 is formed in an annular shape along the outer periphery of the building T. Therefore, it is not affected by wind pressure and is installed in a stable state. In addition, since the partition wall 22 is provided inside the building T on the predetermined floor, the wind pressure due to the chimney effect from the staircase or the like does not act on the building renovation / dismantling apparatus A, and the building is reliably stable. The repair / dismantling apparatus A will be installed.

ついで、上記のように建物改修/解体用装置Aを所定階に設置した段階で、外郭体1の作業室12内に入った作業者が所定階のカーテンウォール15を取り外すとともに、このカーテンウォール15の裏面吹き付け材、鉄骨梁25の耐火被覆材、層間塞ぎ材、ファスナー被覆材などの従来完全除去が困難であったアスベスト含有吹付材(アスベスト)を順次はつるなどして除去してゆく。   Next, when the building renovation / demolition apparatus A is installed on a predetermined floor as described above, an operator who enters the work room 12 of the outer body 1 removes the curtain wall 15 on the predetermined floor, and this curtain wall 15 The asbestos-containing spray material (asbestos), which has been difficult to completely remove, such as the back surface spray material, the fire-resistant coating material of the steel beam 25, the interlayer sealing material, and the fastener coating material, is sequentially removed.

そして、このとき、中空ゴム4、5によって外郭体1の屋根部1bや床部1cの端部1d、1eと建物Tの外周部T1の間の隙間が塞がれ、又は上階隔離用フード6によって外郭体1の内部と外部を区画して不連続とされ、外郭体1の作業室12側の内部が密閉されている。また、負圧除塵装置7によって外郭体1の内部が負圧状態で保持されるとともに外郭体1の内部に飛散したアスベスト(アスベストを含む粉塵)が集塵される。さらに、建物T内部に間仕切り壁22が設けられている。このため、アスベストが外部に飛散することがない。また、外郭体1の床部1cの端部1e側と建物Tのカーテンウォール15の間に落下防止部材24が架設されているため、除去したアスベストが床部1c側を密閉する中空ゴム5上に落下するようなこともない。   At this time, the hollow rubbers 4 and 5 close the gaps between the roof portion 1b of the outer body 1 and the end portions 1d and 1e of the floor portion 1c and the outer peripheral portion T1 of the building T, or the upper floor isolation hood. 6, the inside and outside of the outer body 1 are partitioned and made discontinuous, and the inside of the outer body 1 on the working chamber 12 side is sealed. Further, the inside of the outer body 1 is held in a negative pressure state by the negative pressure dust removing device 7, and asbestos (dust containing asbestos) scattered inside the outer body 1 is collected. Furthermore, a partition wall 22 is provided inside the building T. For this reason, asbestos is not scattered outside. Moreover, since the fall prevention member 24 is constructed between the end 1e side of the floor 1c of the outer shell 1 and the curtain wall 15 of the building T, the removed asbestos seals the floor 1c side on the hollow rubber 5 There is no such thing as falling.

そして、建物Tから取り外してアスベストを除去したカーテンウォール15を作業室12内で清浄化し、また、作業室12内のアスベスト(アスベスト含有廃材)を収集して梱包し、これら清浄化したカーテンウォール15と梱包したアスベストを、隔離壁11の開閉扉11aを開いて、キャスター付き台車を用いたり、外郭体1内に敷設した軌道を走行する台車を用いるなどして搬送室13に搬送する。このとき、作業室12内が負圧除塵装置7によって負圧状態で保持されているため、万一作業室12内にアスベストが残存していた場合であっても、隔離壁11の開閉扉11aを開放した際に搬送室13へのアスベストの飛散(漏出)が防止される。そして、隔離壁11の開閉扉11aを閉じ、外郭体1の床部1cに設けた開閉扉14を開いて、揚重機16で清浄化したカーテンウォール15と梱包したアスベストを地上に降ろし、作業ヤード21に搬入する。   Then, the curtain wall 15 removed from the building T to remove asbestos is cleaned in the work chamber 12, and asbestos (asbestos-containing waste material) in the work chamber 12 is collected and packed, and these cleaned curtain walls 15 are collected. The asbestos packed in the container is transferred to the transfer chamber 13 by opening the opening / closing door 11a of the isolation wall 11 and using a cart with casters, or using a cart traveling on a track laid in the outer body 1. At this time, since the inside of the work chamber 12 is held in a negative pressure state by the negative pressure dust remover 7, even if asbestos remains in the work chamber 12, the open / close door 11a of the isolation wall 11 Asbestos is prevented from being scattered (leakage) into the transfer chamber 13. Then, the door 11a of the isolation wall 11 is closed, the door 14 provided on the floor 1c of the outer body 1 is opened, the curtain wall 15 cleaned with the lifting machine 16 and the packed asbestos are lowered to the ground, and the work yard Carry into 21.

さらに、カーテンウォール15の裏面吹き付け材、鉄骨梁25の耐火被覆材、層間塞ぎ材、ファスナー被覆材などとしてアスベストを含有していない吹付材等、例えばロックウール吹付材、ロックウールシート、耐火塗料等を使用して改修を行い、新しいカーテンウォール15を設置する。このとき、省エネ機能を有するカーテンウォールを用いたり、耐震改修や設備改修を合わせて行うようにしてもよく、このようにすることで、アスベストの除去(カーテンウォール15の改修)と同時に、建物Tの高機能化(高耐震化、省エネルギー化など)を図ることも可能になる。ここで、ペリカウンターを利用したファンコイルユニットなどではユニット内の外壁側断熱としてアスベスト含有吹付材(石綿吹付け)が利用されている場合もあり、劣化状況にもよるがファンコイルユニットの送風にアスベストが混ざるおそれも考えられる。このため、このような設備の改修もカーテンウォール15の改修と同時に行うことが望ましい。   Further, a spraying material that does not contain asbestos, such as a rockwool spraying material, a rockwool sheet, a fireproof paint, etc. The new curtain wall 15 is installed by renovation using At this time, a curtain wall having an energy saving function may be used, or an earthquake-resistant repair and facility repair may be performed together. By doing so, asbestos removal (curtain wall 15 repair) is performed simultaneously with the building T. It is also possible to improve the functionality of the system (high earthquake resistance, energy saving, etc.). Here, asbestos-containing spray material (asbestos spray) may be used as the outer wall side heat insulation in the unit in fan coil units using a peri counter, etc. There is a possibility that asbestos is mixed. For this reason, it is desirable to perform such a repair of the equipment at the same time as the repair of the curtain wall 15.

そして、このように所定階のカーテンウォール15の改修及びアスベストの除去作業等が完了した段階で、油圧シリンダ2、3を縮長して中空ゴム4、5を退避させ、建物Tの外周部T1への密着状態を解除したり、ウインチ18を駆動して上階隔離用フード6を元の位置に戻して、外郭体1の密閉状態を解除する。これとともに、最上部T2に設置したクレーン10によって新たにカーテンウォール15の改修及びアスベストの除去作業を行う階に建物改修/解体用装置Aを移動し、上記と同様に作業を行う。また、順次、クレーン10によって例えば上階から下階に建物改修/解体用装置Aを移動しながら、カーテンウォール15の改修及びアスベストの除去作業等を行ってゆく。   When the repair of the curtain wall 15 on the predetermined floor and the removal of asbestos are completed in this way, the hydraulic cylinders 2 and 3 are contracted to retract the hollow rubbers 4 and 5, and the outer peripheral portion T1 of the building T The close contact state is released, or the winch 18 is driven to return the upper floor isolation hood 6 to the original position, and the sealed state of the outer body 1 is released. At the same time, the building repair / dismantling apparatus A is moved to the floor where the crane wall 15 is newly repaired and the asbestos removal work is newly performed by the crane 10 installed at the uppermost portion T2, and the same operation as described above is performed. In addition, while the building repair / dismantling apparatus A is moved from the upper floor to the lower floor by the crane 10 for example, the curtain wall 15 is repaired and asbestos is removed.

したがって、本実施形態の建物改修/解体用装置A及び建物の改修/解体方法によれば、中空ゴム4、5によって屋根部1bや床部1cの端部1d、1eと建物Tの外周部T1との間の隙間が塞がれ、さらに、負圧除塵装置7によって外郭体1の内部が負圧状態で保持されるとともに外郭体1の内部に飛散したアスベストが回収される。このため、従来完全に除去することが困難であった建物Tの外周部T1側に使用されたアスベストを、外部に飛散することを確実に防止して除去することができる。また、中空ゴム4、5を退避させるとともに建物改修/解体用装置Aをクレーン10で移動し、上記と同様に確実にアスベストの飛散を防止しながら別のカーテンウォール15とアスベストを撤去してゆくことにより、建物改修/解体用装置Aを用いて新しいカーテンウォール15を設置してカーテンウォール15の改修を行ってゆくことが可能になる。   Therefore, according to the building repair / dismantling apparatus A and the building repair / dismantling method of the present embodiment, the end portions 1d and 1e of the roof portion 1b and the floor portion 1c and the outer peripheral portion T1 of the building T are formed by the hollow rubbers 4 and 5. Further, the inside of the outer body 1 is held in a negative pressure state by the negative pressure dust removing device 7 and the asbestos scattered inside the outer body 1 is collected. For this reason, asbestos used on the outer peripheral portion T1 side of the building T, which has been difficult to remove completely in the past, can be reliably prevented from being scattered to the outside. Further, the hollow rubbers 4 and 5 are evacuated and the building repair / dismantling apparatus A is moved by the crane 10 to remove another curtain wall 15 and asbestos while preventing the asbestos from being scattered in the same manner as described above. Thus, it becomes possible to install the new curtain wall 15 using the building repair / dismantling apparatus A and repair the curtain wall 15.

また、この建物改修/解体用装置Aを用いてカーテンウォール15の改修を行う際に、省エネ機能を有する新たなカーテンウォール15を設置するようにしたり、カーテンウォール15の改修と同時に、耐震改修や設備改修を行うことが可能である。このため、カーテンウォール15の改修と同時に、建物改修/解体用装置Aを用いて建物Tの耐震化や省エネルギー化などを図ることも可能である。これにより、地球環境保全にも大きく貢献することが可能になる。   Further, when the curtain wall 15 is repaired using the building repair / dismantling apparatus A, a new curtain wall 15 having an energy saving function may be installed, or at the same time as the repair of the curtain wall 15, It is possible to repair the equipment. For this reason, it is possible to make the building T earthquake-proof and energy-saving by using the building repair / dismantling apparatus A simultaneously with the repair of the curtain wall 15. This makes it possible to greatly contribute to global environmental conservation.

また、本実施形態の建物改修/解体用装置A及び建物の改修/解体方法においては、外郭体1が建物Tを囲繞するように環状に形成されているため、クレーン10で吊り下げ支持した外郭体1(建物改修/解体用装置A)が風圧などの影響を受けにくくなり、安定した状態で建物Tの所定階に設置することが可能になる。   Further, in the building renovation / dismantling apparatus A and the building renovation / dismantling method of the present embodiment, the outer body 1 is formed in an annular shape so as to surround the building T. The body 1 (building repair / dismantling apparatus A) is less susceptible to wind pressure and the like, and can be installed on a predetermined floor of the building T in a stable state.

さらに、例えばクレーン10で外郭体1(建物改修/解体用装置A)を上階から下階に吊り降ろしながら、順次上階から下階の各階のカーテンウォール15及びアスベストを撤去してゆく際に、撤去するカーテンウォール15がある所定階よりも上階のカーテンウォール15が既に取り外されて、屋根部1bの端部1dから進出させた中空ゴム4を外周部T1(上階のカーテンウォール15)に密着させて隙間を塞ぐことができないおそれがある。これに対し、本実施形態では、上階隔離用フード6を備えているため、開閉板部6aの先端側を例えば上階のスラブ23(外周部T1)に密着させるように回動することにより、この上階隔離用フード6で外郭体1の内部と外部を確実に区画して不連続にすることが可能になる。これにより、屋根部1bの端部1dと建物Tの外周部T1の間の隙間を通じて外部にアスベストが飛散することを確実に防止できる。   Further, for example, when removing the curtain wall 15 and asbestos on each floor from the upper floor to the lower floor while suspending the outer body 1 (building repair / dismantling apparatus A) from the upper floor to the lower floor with the crane 10, for example. The curtain wall 15 on the floor above the predetermined floor where the curtain wall 15 to be removed is already removed, and the hollow rubber 4 advanced from the end 1d of the roof portion 1b is moved to the outer peripheral portion T1 (curtain wall 15 on the upper floor). There is a possibility that the gap cannot be closed by closely adhering to. On the other hand, in this embodiment, since the upper floor isolation hood 6 is provided, by rotating the front end side of the opening / closing plate portion 6a so as to be in close contact with the upper floor slab 23 (outer peripheral portion T1), for example. The upper floor isolation hood 6 can reliably separate the inside and the outside of the outer body 1 and make them discontinuous. Thereby, it can prevent reliably that asbestos is scattered outside through the clearance gap between the edge part 1d of the roof part 1b, and the outer peripheral part T1 of the building T. FIG.

以上、本発明に係る建物改修/解体用装置及び建物の改修/解体方法の一実施形態について説明したが、本発明は上記の一実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。例えば、本実施形態では、建物改修/解体用装置Aの外郭体1が建物Tの外周部T1を囲繞するように(建物Tの四周を囲むように)環状に形成されているものとしたが、建物Tの一部の外周部T1を覆うように外郭体1(建物改修/解体用装置A)を形成してもよい。この場合には、建物Tのコーナー部等に仮設固定支持させるようにしたり、建物Tのゴンドラレールから支持力を得るなどすることで、風圧などの影響を受けないようにし、安定した状態で建物改修/解体用装置Aを設置することが可能である。   As mentioned above, although one embodiment of the building renovation / demolition apparatus and the building renovation / demolition method according to the present invention has been described, the present invention is not limited to the above-described embodiment, and does not depart from the spirit of the present invention. It can be changed as appropriate. For example, in the present embodiment, the outer body 1 of the building repair / dismantling apparatus A is formed in an annular shape so as to surround the outer peripheral portion T1 of the building T (so as to surround the four circumferences of the building T). The outer shell 1 (building repair / dismantling apparatus A) may be formed so as to cover a part of the outer peripheral portion T1 of the building T. In this case, the building is kept in a stable state so that it is not affected by wind pressure, etc. by temporarily supporting it at the corners of the building T or by obtaining support from the gondola rail of the building T. It is possible to install the repair / dismantling apparatus A.

また、本実施形態では、上階から下階に向けて順次カーテンウォール及びアスベストを撤去して改修を行うように説明を行ったが、勿論、本発明に係る建物改修/解体用装置及び建物の改修/解体方法は、建物Tの局所的な改修に適用してもよい。   In this embodiment, the curtain wall and asbestos are sequentially removed from the upper floor to the lower floor, and the renovation is performed. However, of course, the building repair / dismantling apparatus and the building according to the present invention are described. The repair / dismantling method may be applied to local repair of the building T.

さらに、本実施形態では、外郭体1の内部(作業室)でアスベストの除去を行うように説明を行ったが、例えばカーテンウォールを取り外すとともに外郭体1の内部でアスベストが飛散しないように梱包し、作業ヤード21に搬送した段階でアスベストを除去するようにしてもよい。   Further, in the present embodiment, the description has been made so that the asbestos is removed inside the outer body 1 (working chamber). However, for example, the curtain wall is removed and the asbestos is not scattered inside the outer body 1. The asbestos may be removed at the stage where the work yard 21 is conveyed.

また、本実施形態では、建物改修/解体用装置Aを用い、建物Tの改修(カーテンウォール15の改修)を行うものとして説明を行ったが、本発明に係る建物改修/解体用装置Aは、建物Tを解体する際に用いてもよい。すなわち、上階から下階に向けて建物Tの架構などを順次解体する際に、本発明に係る建物改修/解体用装置Aを用いて上階から下階のカーテンウォール15及びアスベストを順次撤去してゆくようにしてもよい。この場合においても、本実施形態と同様に、アスベストが外部に飛散することを確実に防止して、建物Tの解体作業を行うことが可能である。また、このとき、例えば外郭体1の屋根部1bを、建物Tの最上部T2を覆うように形成し、この屋根部1bにH形鋼などの搬送用ガイドレールを取り付けて、建物Tの架構などを解体した内部解体材を建物改修/解体用装置Aに搬送し、揚重機16によって地上Gに搬出するようにしてもよい。そして、このように外郭体1の屋根部1bを、建物Tの最上部T2を覆うように形成した場合には、天候に左右されることなく解体作業を行うことが可能になり、全天候型解体工法として適用することも可能になる。   In the present embodiment, the building repair / dismantling apparatus A has been described as repairing the building T (curtain wall 15 repair). However, the building repair / dismantling apparatus A according to the present invention is described below. It may be used when the building T is dismantled. That is, when the frame of the building T is sequentially demolished from the upper floor to the lower floor, the curtain wall 15 and asbestos from the upper floor to the lower floor are sequentially removed using the building repair / dismantling apparatus A according to the present invention. You may make it go. Even in this case, as in the present embodiment, it is possible to reliably prevent the asbestos from being scattered to the outside and perform the dismantling work of the building T. At this time, for example, the roof portion 1b of the outer body 1 is formed so as to cover the uppermost portion T2 of the building T, and a guide rail for transportation such as H-shaped steel is attached to the roof portion 1b, so The internal dismantling material that has been dismantled may be transported to the building repair / dismantling apparatus A and carried out to the ground G by the lifting machine 16. And when the roof part 1b of the outer shell 1 is formed so as to cover the uppermost part T2 of the building T in this way, it becomes possible to perform the dismantling work without being influenced by the weather, and the all-weather dismantling It can also be applied as a construction method.

さらに、本実施形態では、本発明に係る弾性部材を中空ゴム4、5とし、油圧シリンダ2、3によって屋根部1bや床部1cの端部1d、1eから外周部T1に向けて進退自在に設けられているものとした。これに対し、例えば圧縮空気を弾性部材(中空ゴム4、5)に供給するとともに外周部T1に向けて膨出(進出)させて、屋根部1bや床部1cの端部1d、1eと外周部T1の間の隙間を塞ぐように構成されていてもよく、本発明にかかる弾性部材を進退させる機構及び弾性部材の種類は、必ずしも本実施形態に示したものに限定されるものではない。   Further, in the present embodiment, the elastic members according to the present invention are hollow rubbers 4 and 5, and the hydraulic cylinders 2 and 3 are movable forward and backward from the end portions 1d and 1e of the roof portion 1b and the floor portion 1c toward the outer peripheral portion T1. It was assumed that it was provided. On the other hand, for example, compressed air is supplied to the elastic members (hollow rubbers 4 and 5) and bulged (expanded) toward the outer peripheral portion T1, so that the end portions 1d and 1e of the roof portion 1b and the floor portion 1c and the outer periphery are expanded. It may be configured to close the gap between the portions T1, and the mechanism for moving the elastic member according to the present invention and the type of the elastic member are not necessarily limited to those shown in the present embodiment.

1 外郭体
1a 側壁部
1b 屋根部
1c 床部
1d 屋根部の端部
1e 床部の端部
2 油圧シリンダ
3 油圧シリンダ
4 中空ゴム(弾性部材)
5 中空ゴム(弾性部材)
6 上階隔離用フード
6a 開閉板部
6b 基端板部
7 負圧除塵装置
8 開口部
10 クレーン
11 隔離壁
11a 開閉扉
12 作業室
13 搬送室
14 開閉扉
15 カーテンウォール
16 揚重機
17 ゴム(弾性部材)
18 ウインチ
20 仮設スラブ
21 作業ヤード
22 間仕切り壁
A 建物改修/解体用装置
H1 建物の最大階高(階高)
H2 外郭体の高さ
T 建物
T1 外周部
T2 最上部
T3 建物の内部
DESCRIPTION OF SYMBOLS 1 Outer body 1a Side wall part 1b Roof part 1c Floor part 1d End part 1e of a roof part End part 2 of a floor part Hydraulic cylinder 3 Hydraulic cylinder 4 Hollow rubber (elastic member)
5 Hollow rubber (elastic member)
6 Upper floor isolation hood 6a Opening / closing plate 6b Base end plate 7 Negative pressure dust removal device 8 Opening 10 Crane 11 Isolation wall 11a Opening / closing door 12 Work chamber 13 Transfer chamber 14 Opening / closing door 15 Curtain wall 16 Lifting machine 17 Rubber (elastic) Element)
18 Winch 20 Temporary slab 21 Work yard 22 Partition wall A Building repair / dismantling device H1 Maximum floor height of the building (floor height)
H2 Outer body height T Building T1 Outer part T2 Top part T3 Inside the building

Claims (4)

カーテンウォールを含む外周部側にアスベスト含有材を使用して構築された建物を改修あるいは解体するための建物改修/解体用装置であって、
一側に側壁部、上方に屋根部、下方に床部、他側に開口部を備えて形成されるとともに前記建物の最大階高よりも大きな高さを備えて形成され、前記建物の最上部に設けたクレーンで吊り下げ支持して、前記開口部が前記外周部に対向するように前記建物の外側に設置される外郭体と、
前記外郭体の内部空気を吸引する負圧除塵装置と、
前記開口部が前記外周部に対向するように前記外郭体を設置した状態で、前記開口部を形成する前記屋根部及び/又は前記床部の端部から前記外周部に向けて進退自在に設けられた弾性部材とを備えて構成されていることを特徴とする建物改修/解体用装置。
A building repair / dismantling device for repairing or dismantling a building constructed using asbestos-containing material on the outer peripheral side including the curtain wall,
It is formed with a side wall part on one side, a roof part on the upper side, a floor part on the lower side, and an opening on the other side, and is formed with a height larger than the maximum floor height of the building, and the uppermost part of the building An outer body installed on the outside of the building so that the opening is opposed to the outer periphery,
A negative pressure dust removing device for sucking air inside the outer body;
In a state where the outer body is installed so that the opening portion faces the outer peripheral portion, the opening portion is provided so as to freely advance and retract from the end of the roof portion and / or the floor portion toward the outer peripheral portion. A building refurbishment / dismantling apparatus, characterized by comprising an elastic member.
請求項1記載の建物改修/解体用装置において、
前記外郭体が前記建物を囲繞するように環状に形成されていることを特徴とする建物改修/解体用装置。
The building renovation / demolition device according to claim 1,
A building refurbishing / dismantling apparatus, wherein the outer body is formed in an annular shape so as to surround the building.
請求項1または請求項2に記載の建物改修/解体用装置において、
断面コ字状に形成されるとともに、互いに平行配置された一辺側の開閉板部が他辺側の基端板部よりも大きな長さで形成された上階隔離用フードを備えており、
前記上階隔離用フードは、前記基端板部の先端を回動可能に前記屋根部に繋げて設けられ、回動とともに前記開閉板部の先端側が前記外周部に密着するように構成されていることを特徴とする建物改修/解体用装置。
In the building renovation / demolition device according to claim 1 or 2,
It is formed in a U-shaped cross section, and has an upper floor isolation hood in which the opening and closing plate portions on one side arranged in parallel to each other are formed with a length longer than the base end plate portion on the other side,
The upper floor isolation hood is provided such that the tip of the base end plate portion is rotatably connected to the roof portion, and the tip end side of the opening / closing plate portion is in close contact with the outer peripheral portion with the rotation. Equipment for building renovation / demolition characterized by
カーテンウォールを含む外周部側にアスベスト含有材を使用して構築された建物を改修あるいは解体する方法であって、
前記建物の最上部にクレーンを設置するとともに前記建物の外周部側と内部側を区画する間仕切り壁を設置し、
請求項1から請求項3のいずれかに記載の建物改修/解体用装置の前記外郭体を前記開口部が前記外周部に対向するように前記クレーンで吊り下げ支持して設置し、
前記屋根部及び/又は前記床部の端部から前記弾性部材を進出させて前記外周部に密着させ、及び/又は前記上階隔離用フードを回動して前記開閉板部の先端側を前記外周部に密着させて、前記外郭体の内部と外部を区画し、
前記外郭体の内部空気を前記負圧除塵装置で吸引するとともに該外郭体の内部を負圧状態にして、前記カーテンウォール及び前記アスベスト含有材を撤去するようにしたことを特徴とする建物の改修/解体方法。
A method of repairing or dismantling a building constructed using asbestos-containing material on the outer peripheral side including the curtain wall,
Install a crane at the top of the building and install a partition wall that partitions the outer peripheral side and the inner side of the building,
The suspension and dismantling apparatus according to any one of claims 1 to 3, wherein the outer body is suspended and supported by the crane so that the opening faces the outer periphery,
The elastic member is advanced from the end of the roof portion and / or the floor portion to be in close contact with the outer peripheral portion, and / or the upper floor isolation hood is rotated so that the front end side of the opening / closing plate portion is Adhering to the outer periphery, partition the inside and outside of the outer body,
A renovation of a building characterized in that the internal air of the outer body is sucked by the negative pressure dust removing device and the inside of the outer body is in a negative pressure state so that the curtain wall and the asbestos-containing material are removed. / Dismantling method.
JP2009046154A 2009-02-27 2009-02-27 Building renovation / demolition equipment and building renovation / demolition method Active JP5365843B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009046154A JP5365843B2 (en) 2009-02-27 2009-02-27 Building renovation / demolition equipment and building renovation / demolition method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009046154A JP5365843B2 (en) 2009-02-27 2009-02-27 Building renovation / demolition equipment and building renovation / demolition method

Publications (2)

Publication Number Publication Date
JP2010203034A true JP2010203034A (en) 2010-09-16
JP5365843B2 JP5365843B2 (en) 2013-12-11

Family

ID=42964786

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009046154A Active JP5365843B2 (en) 2009-02-27 2009-02-27 Building renovation / demolition equipment and building renovation / demolition method

Country Status (1)

Country Link
JP (1) JP5365843B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101828318B1 (en) * 2016-06-09 2018-03-30 김태성 Removal Device of The Decrepit Structure and the Removal Method
JP2018145740A (en) * 2017-03-08 2018-09-20 太平電業株式会社 Dismantling method of chimney cylinder

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6661482B2 (en) * 2016-06-30 2020-03-11 株式会社クリーンクロックス Safety device for exterior wall repair work using gondola

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6282644U (en) * 1985-11-12 1987-05-26
JPS6282645U (en) * 1985-11-12 1987-05-26
JPH10169209A (en) * 1996-12-13 1998-06-23 Mitsui Constr Co Ltd Repair method for building
JP2002349077A (en) * 2001-05-22 2002-12-04 Nishimatsu Constr Co Ltd Method for repairing building
JP3135373U (en) * 2007-07-02 2007-09-13 株式会社桑本総合設計 Suspended work table
JP2007303153A (en) * 2006-05-11 2007-11-22 Taisei Corp Asbestos removing work vehicle
JP2008303540A (en) * 2007-06-05 2008-12-18 Shimizu Corp Chimney demolishing method, dust collecting hat, and chimney block piece disposal yard

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6282644U (en) * 1985-11-12 1987-05-26
JPS6282645U (en) * 1985-11-12 1987-05-26
JPH10169209A (en) * 1996-12-13 1998-06-23 Mitsui Constr Co Ltd Repair method for building
JP2002349077A (en) * 2001-05-22 2002-12-04 Nishimatsu Constr Co Ltd Method for repairing building
JP2007303153A (en) * 2006-05-11 2007-11-22 Taisei Corp Asbestos removing work vehicle
JP2008303540A (en) * 2007-06-05 2008-12-18 Shimizu Corp Chimney demolishing method, dust collecting hat, and chimney block piece disposal yard
JP3135373U (en) * 2007-07-02 2007-09-13 株式会社桑本総合設計 Suspended work table

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101828318B1 (en) * 2016-06-09 2018-03-30 김태성 Removal Device of The Decrepit Structure and the Removal Method
JP2018145740A (en) * 2017-03-08 2018-09-20 太平電業株式会社 Dismantling method of chimney cylinder

Also Published As

Publication number Publication date
JP5365843B2 (en) 2013-12-11

Similar Documents

Publication Publication Date Title
JP5146772B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JP5365843B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JP4936168B2 (en) Chimney dismantling method, dust collecting hat, and chimney block piece processing yard
JP5365844B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JP5812907B2 (en) Dust diffusion suppression method and diffusion suppression device
JP4122015B2 (en) Plant cleaning method, asbestos removal method and dismantling treatment method
JP5104177B2 (en) Deposit processing apparatus and deposit processing method
JP2009091083A (en) Deposit treatment equipment and deposit treatment method
JP6143221B2 (en) Demolition method
JP2013139689A (en) Splash prevention structure and method for removing outside sprayed object
JP2004144392A (en) Chimney deconstructing method
JP2007107359A (en) Asbestos removal method and asbestos removal device
JP2007016402A (en) Construction method for preventing exfoliation at structure surface
CN206467815U (en) Fireproof plugging structure below raised flooring
JP6061339B2 (en) Structure reconstruction method and structure reconstruction system
JP4971006B2 (en) Clean room renovation method and temporary facilities for renovation
JP7077821B2 (en) How to dismantle the structure
JP5927835B2 (en) How to remove deposits
JP5779870B2 (en) Method for treating deposit, method for installing partition wall, and partition wall
JP5445653B2 (en) Asbestos removal method
JP2009084049A (en) Asbestos removing work method in elevator shaft
CN108159799A (en) A kind of dedusting environment friendly equipment and operating method
JP5779868B2 (en) Partition wall, partition wall installation method, and deposit disposal method
JP2006132181A (en) Scaffold device for construction and demolition of tower-like building and demolition method for tower-like building by use of this device
JP2009235882A (en) Scaffolding structure and removal method of coating using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110623

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121018

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121023

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121218

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130806

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130828

R150 Certificate of patent or registration of utility model

Ref document number: 5365843

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150