JP2009235882A - Scaffolding structure and removal method of coating using the same - Google Patents

Scaffolding structure and removal method of coating using the same Download PDF

Info

Publication number
JP2009235882A
JP2009235882A JP2008086805A JP2008086805A JP2009235882A JP 2009235882 A JP2009235882 A JP 2009235882A JP 2008086805 A JP2008086805 A JP 2008086805A JP 2008086805 A JP2008086805 A JP 2008086805A JP 2009235882 A JP2009235882 A JP 2009235882A
Authority
JP
Japan
Prior art keywords
isolation
asbestos
work
work floor
sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008086805A
Other languages
Japanese (ja)
Inventor
Hiroyuki Ori
洋行 小里
Hiroshi Harashima
浩 原島
Masashi Kozutsumi
正志 小堤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yashima Kogyo KK
Original Assignee
Yashima Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yashima Kogyo KK filed Critical Yashima Kogyo KK
Priority to JP2008086805A priority Critical patent/JP2009235882A/en
Publication of JP2009235882A publication Critical patent/JP2009235882A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To greatly reduce the number of days for constructing a scaffolding installed for the removal work of asbestos or the like, and also to secure the operation of a factory or the like without being influenced by the existence, assembling, dismantlement, transfer or the like of the scaffolding, and furthermore to achieve the efficiency of the local removal of the asbestos or the like in a high place. <P>SOLUTION: When a runway rail 10 and a ceiling crane 11 travelable along the runway rail 10 are installed in a building 1, a scaffolding configuration efficiently locally removes the coating of the asbestos or the like in the building 1 using the ceiling crane 11. Such scaffolding structure has a safety handrail 3 on a work floor 2 installed on the ceiling crane 11 and an isolating curing 5 executed in a place 4 where the asbestos is removed. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、天井クレーンが設置されている建屋のアスベスト等に対する除去作業用の足場構造及びこれを用いたアスベスト等の除去方法に関する。   The present invention relates to a scaffold structure for removing work from asbestos and the like of a building in which an overhead crane is installed, and a method for removing asbestos and the like using the same.

石綿(アスベスト)は、人体に与える悪影響が明らかになり現在では原則として製造等が禁止されているが、以前より建物等の防音材、断熱材、保温材として使用されてきた。その結果、今日では建物の解体等でのアスベストの飛散や、その吸込が大きな社会問題となっている。
このため労働安全衛生法等の法律により飛散防止等が図られ、また、非特許文献1のように、詳細な飛散防止技術指針が発表され、その周知が図られている。
Asbestos (asbestos) has been used as a soundproofing material, heat insulating material, and heat insulating material for buildings, etc., although it has been banned from being manufactured as a general rule because of its negative effects on the human body. As a result, asbestos splattering and suctioning during building demolition and the like are now a major social problem.
For this reason, scattering prevention etc. are aimed at by laws, such as the occupational safety and health law, and the detailed scattering prevention technical guideline is announced like the nonpatent literature 1, and the well-known thing is aimed at.

非特許文献1には、高所に施工されているアスベストの除去作業に関し、つり足場等の組立等の基準が示されている。
しかし、広い建屋内にアスベストの除去対象場所が点在している場合には、除去対象場所毎に足場の組立、解体及び移動等を繰り返す必要があり、足場の組立のコストや工期が長くなるという課題があった。
Non-Patent Document 1 discloses a standard for assembling a suspension scaffold and the like regarding the removal work of asbestos constructed at a high place.
However, when asbestos removal target sites are scattered in a large building, it is necessary to repeat assembly, disassembly, and movement of the scaffolds for each removal target site, which increases the cost and construction period of the scaffold assembly. There was a problem.

特許文献1には、天井部分のアスベストを除去する場合に、天井部分の全領域のアスベスト除去作業を可能とならしめる足場ステージを設置する方法が示されている。   Patent Document 1 discloses a method of installing a scaffold stage that makes it possible to remove asbestos in the entire area of the ceiling portion when removing asbestos in the ceiling portion.

しかし、天井部分における全領域が広ければ、これに対応させて足場も広くさせる必要があり「足場ステージ」の設置の費用や施工日数が増大してしまい、また「足場ステージ」の存在により、工場などの操業に支障がきたされる。
改訂 既存建築物の吹付けアスベスト粉じん飛散防止処理技術指針・同解説2006 平成18年9月15日第1版第1刷 財団法人 日本建築センター発行 特開2007−218059
However, if the entire area of the ceiling part is wide, it is necessary to make the scaffolding corresponding to this, so the cost and construction days of installing the `` scaffolding stage '' increase, and the presence of the `` scaffolding stage '' The operation will be hindered.
Revised Technology Guidelines for Spraying Asbestos Dust Spattering for Existing Buildings and Explanations 2006 September 15, 2006, 1st edition, 1st edition, issued by Nippon Building Center JP2007-218059

出願人は、アスベスト等の除去技術のパイオニアとして、従来より種々の技術開発を行い、且つ、アスベストの除去技術を特許出願等により積極的に公開している。
今回の本発明は、アスベスト等の除去作業用に設置する足場の施工日数を大幅に削減すること、足場の存在や足場の組立、解体、移動等に左右されずに工場等の操業を確保すること、高所でのアスベスト等の局所除去の効率化を追及すること、また、養生を施す時間を短縮させ、足場の施工日数の短縮化と共に、総合的な施工日数を短縮させること等を目的とする。
As a pioneer of asbestos removal technology, the applicant has developed various technologies and actively disclosed asbestos removal technology through patent applications and the like.
This time, the present invention will greatly reduce the number of working days for scaffolds installed for the removal of asbestos, etc., and will ensure the operation of factories, etc., regardless of the presence of scaffolds, assembly, dismantling, movement of scaffolds, etc. In order to improve the efficiency of local removal of asbestos, etc. at high altitudes, and to shorten the time required for curing, shorten the scaffold construction days, and shorten the total construction days And

本発明は、天井クレーンを備えている建屋の被覆物に対する除去作業用の足場構造であって、前記天井クレーン上に設置される作業床とこの作業床に取付けられる安全手摺を設けると共に、この安全手摺の内側に除去対象場所を密閉する隔離養生を施したことを特徴とする足場構造とした(請求項1の発明)。   The present invention is a scaffold structure for removing work from a covering of a building including an overhead crane, and includes a work floor installed on the overhead crane and a safety handrail attached to the work floor. The scaffold structure is characterized in that an isolation curing is performed to seal the location to be removed inside the handrail (invention of claim 1).

上記発明の隔離養生は、除去対象場所に対応する作業床及びその作業床から天井までの空間を密閉可能な隔離シートと、この隔離シートの端部を天井の屋根板との間で接着可能なタイトフレームと、このタイトフレームを支持する支持枠と、この支持枠の高さを調整可能なサポートを備えていることを特徴とする(請求項2の発明)。   The isolation curing according to the invention is capable of bonding the work sheet corresponding to the place to be removed and the space from the work floor to the ceiling, and the edge of the work sheet between the ceiling roof plate. A tight frame, a support frame for supporting the tight frame, and a support capable of adjusting the height of the support frame are provided (invention of claim 2).

上記発明の隔離シートに、被覆物に対する除去作業用の開口部及びこの開口部に連続するグローブを設けたことを特徴とする(請求項3の発明)。   The isolation sheet according to the present invention is provided with an opening for removing the covering and a glove continuous with the opening (invention of claim 3).

上記発明の足場構造を用いた被覆物に対する除去方法は、ランウェイレールに沿って走行可能な天井クレーンを備えている建屋の被覆物に対する除去方法であって、前記天井クレーンに作業床を設置し、この作業床を前記天井クレーンにより被覆物の除去対象場所に移動可能にする共に、前記除去対象場所毎に、作業床上に配置した安全手摺の内側に、その除去対象場所を密閉する隔離養生を設けることを特徴とした(請求項4の発明)   The removal method for the covering using the scaffold structure of the invention is a removal method for the covering of a building including an overhead crane that can travel along a runway rail, and a work floor is installed on the overhead crane, The work floor can be moved to a place where the covering is to be removed by the overhead crane, and an isolation curing for sealing the place to be removed is provided inside the safety handrail arranged on the work floor for each place to be removed. (Invention of claim 4)

上記発明の隔離養生は、除去対象場所に対応する作業床及びその作業床から天井までの空間を密閉可能な隔離シートと、この隔離シートの端部を天井の屋根板との間で接着可能なタイトフレームと、このタイトフレームを支持する支持枠と、この支持枠の高さを調整可能なサポートを備えていることを特徴とする(請求項5の発明)。   The isolation curing according to the invention is capable of bonding the work sheet corresponding to the place to be removed and the space from the work floor to the ceiling, and the edge of the work sheet between the ceiling roof plate. A tight frame, a support frame for supporting the tight frame, and a support capable of adjusting the height of the support frame are provided (invention of claim 5).

上記発明の隔離シートに、被覆物に対する除去作業用の開口部及びこの開口部に連続するグローブを設けたことを特徴とする(請求項6の発明)。   The isolation sheet according to the present invention is provided with an opening for removing the covering and a glove continuous with the opening (invention of claim 6).

本発明の足場構造及びこれを用いた被覆物の除去方法によれば、
(1) 天井レール上に一旦、足場を設置すれば、天井クレーンにより足場を移動させることができるので、足場の解体、移動及び組立が不要となり、アスベスト等の除去作業用の足場施工日数を大幅に削減することができる。
(2) 天井クレーンの下方では、足場の存在や足場の組立、解体、移動等に左右されずに工場等の操業を確保することができる。
(3) 建屋の高所に局所的に点在するアスベスト等の除去作業毎に、足場の組立、解体、移動等を行う必要がなく、高所でのアスベスト等の局所除去の効率化を図ることができる。
(4) 足場施工日数を大幅に削減でき、またタイトフレーム、支持枠及びサポートを用いて隔離養生を施すことで、養生を施す時間を短縮させ、総合的にアスベスト除去の施工日数を短縮させることができる。
According to the scaffold structure of the present invention and the method for removing a covering using the same,
(1) Once the scaffold is installed on the ceiling rail, the scaffold can be moved by the overhead crane, so there is no need to dismantle, move and assemble the scaffold, greatly increasing the number of days of scaffold construction for removing asbestos, etc. Can be reduced.
(2) Below the overhead crane, operations of factories and the like can be secured without being affected by the presence of scaffolding, assembly, disassembly, or movement of scaffolds.
(3) There is no need to assemble, disassemble, move, etc. scaffolds for every removal of asbestos, etc. that are locally scattered in the high place of the building, and to improve the efficiency of local removal of asbestos, etc. at high places. be able to.
(4) The time required for scaffolding can be greatly reduced, and by applying isolation curing using a tight frame, support frame, and support, the time required for curing can be shortened, and the number of days for removing asbestos can be reduced overall. Can do.

以下に、本発明に係る足場の構造及びこれを用いた被覆物の除去方法を図面に基づき説明する。
図1は実施形態に係る足場構造の斜視図、図2は同足場構造が配された建物の横断面図、図3は同足場構造の安全手摺の斜視図、図4は同足場構造の隔離養生に用いられるタイトフレーム等の斜視図、図5は同隔離養生の隔離シートへの開口部及びグローブの取付図である。
なお、前記各図及び後述の各図において、同一の符号は同一の構成を示すものとし、重複した説明は避けることとする。
Hereinafter, the structure of the scaffold according to the present invention and the method for removing the covering using the same will be described with reference to the drawings.
1 is a perspective view of a scaffold structure according to the embodiment, FIG. 2 is a cross-sectional view of a building in which the scaffold structure is arranged, FIG. 3 is a perspective view of a safety handrail of the scaffold structure, and FIG. 4 is an isolation of the scaffold structure. FIG. 5 is a perspective view of a tight frame or the like used for curing, and FIG. 5 is an attachment diagram of an opening and a glove to the isolation sheet of the isolation curing.
In the drawings and the drawings to be described later, the same reference numerals indicate the same configuration, and redundant description is avoided.

実施形態に係る足場構造は、図1及び図2に示したように、建屋1内にランウェイレール10と、このランウェイレール10に沿って走行可能な天井クレーン11が設置されている場合に、この天井クレーン11を利用して、建屋1内のアスベスト等の被覆物を効率的に、また、局所的に除去するための構成である。
かかる足場構造は、前記天井クレーン11上に設置される作業床2に安全手摺3を配置すると共に、除去対象場所4に施された隔離養生5を備えている。
なお、通常、前記天井クレーン11に付属される吊下げ装置(ホイスト)、このホイストに対する配線等の図示は省略する。
As shown in FIGS. 1 and 2, the scaffold structure according to the embodiment includes a runway rail 10 and an overhead crane 11 that can travel along the runway rail 10 in the building 1. This is a configuration for efficiently and locally removing a covering such as asbestos in the building 1 using the overhead crane 11.
The scaffold structure includes a safety handrail 3 on a work floor 2 installed on the overhead crane 11 and an isolation curing 5 applied to a removal target place 4.
In addition, illustration of the suspension apparatus (hoist) normally attached to the said overhead crane 11, wiring with respect to this hoist, etc. is abbreviate | omitted.

図2に図示されている前記天井クレーン11は、軌条型天井クレーンであるが、ランウェイレール10の下に天井クレーン11を吊り下げて走行させる懸垂型天井クレーンのものでもよい。
前記天井クレーン11の形状は、断面ボックス形状のもの、縦梁と横梁を組合わせた矩形状のもの、その他、作業床2を設置する上で支障のないものであればよい。
また、前記天井クレーン11の短手方向の幅が狭い場合には、2本の天井クレーン11、11に作業床2を掛け渡してもよい。
The overhead crane 11 illustrated in FIG. 2 is a rail-type overhead crane, but may be a suspended overhead crane that suspends and travels the overhead crane 11 under the runway rail 10.
The shape of the overhead crane 11 may be a box shape in section, a rectangular shape in which vertical beams and horizontal beams are combined, or any other shape that does not hinder the installation of the work floor 2.
Further, when the width of the overhead crane 11 in the short direction is narrow, the work floor 2 may be stretched over the two overhead cranes 11 and 11.

前記作業床2は、アスベスト等の被覆物に対する除去作業のベースとなるもので、枠材等に合板を組付けたり、固定したりして、作業面20をフラットに構成したもので、枠材等が天井クレーン11に固定されている。
なお、記天井クレーン11に手摺等が固定されている場合には、これを避けるように前記作業床2を設けるようにする。
The work floor 2 serves as a base for removal work on a covering such as asbestos, and is constructed by assembling or fixing a plywood to a frame material or the like to form the work surface 20 flat. Etc. are fixed to the overhead crane 11.
In addition, when the handrail etc. are being fixed to the overhead crane 11, the said work floor 2 is provided so that this may be avoided.

前記安全手摺3は、前記作業床2の四周に配置されるもので、図3のように本柱30と支持柱31からなり、本柱30の基部32が作業床2に固定され、この基部32を中心に支持柱31側に倒れ込むことが規制され、その反対側の内側への折り畳みが可能となっている。   The safety handrail 3 is arranged around the work floor 2 and includes a main column 30 and a support column 31 as shown in FIG. 3, and a base 32 of the main column 30 is fixed to the work floor 2. Inclination to the support column 31 side around 32 is restricted, and folding to the inner side on the opposite side is possible.

前記隔離養生5は、図2等に示したように作業床2を隔離シート50で覆う養生、作業床2から除去対象場所4(例えば天井)までの360度の周囲を隔離シート(壁面シートとも称する)51で覆う養生及び天井の養生からなる。
天井の養生は、屋根板6等の形状にフットするタイトフレーム7と、このタイトフレーム7を支持する枠8と、この枠8の高さを調整するジョッキ付きサポート9を用い、前記タイトフレーム7により前記壁面シート51の端部を屋根板6等との間で接着させることにより行う。
As shown in FIG. 2 and the like, the isolation curing 5 is a curing that covers the work floor 2 with the isolation sheet 50, and the isolation sheet (also referred to as a wall surface sheet) around 360 degrees from the work floor 2 to the removal target place 4 (for example, the ceiling). It consists of the curing covered with 51 and the curing of the ceiling.
Curing of the ceiling uses a tight frame 7 that has a foot shape such as a roof plate 6, a frame 8 that supports the tight frame 7, and a support 9 with a mug that adjusts the height of the frame 8. By adhering the end portion of the wall sheet 51 to the roof plate 6 or the like.

前記タイトフレーム7は、図4に図示されているように、屋根板6等に対向する対向面70が屋根板6等の形状と略同一形状に形成され、当接面71が支持枠8に当接される。また前記対向面70はクッション材及び/又は接着材を設けた貼着部72を備えている。
この実施形態ではタイトフレーム7の対向面70は、縦葺きの折板屋根板にフットするように形成されており、図1及び図2のように、その長手が屋根板6の桁行き方向に配され、且つ軒側と棟側にそれぞれ配置される。
一方、前記屋根板6の軒棟方向での壁面シート51の端部は、屋根板6に接着テープ等でシールされている。
As shown in FIG. 4, the tight frame 7 has a facing surface 70 facing the roof plate 6 and the like substantially the same shape as the roof plate 6 and the like, and a contact surface 71 on the support frame 8. Abutted. Moreover, the said opposing surface 70 is provided with the sticking part 72 which provided the cushioning material and / or the adhesive material.
In this embodiment, the opposing surface 70 of the tight frame 7 is formed so as to be footed on the vertically folded folded roof plate, and the longitudinal direction thereof is in the direction of the roof plate 6 as shown in FIGS. It is arranged on the eaves side and the ridge side.
On the other hand, the end of the wall surface sheet 51 in the eaves ridge direction of the roof plate 6 is sealed to the roof plate 6 with an adhesive tape or the like.

屋根全体にアスベストがない場合に、アスベストを効率的に、局所的に除去するため、全面的に養生せずに、図1や図2のように吹付けアスベストが存在する除去対象場所4のみに隔離養生5を行う。
この場合、図5に示したように前記壁面シート51には、除去対象場所4への除去作業を行い易い所定個所に、開口部52を設け、その開口部52に壁面シート51の外側から除去作業を行うことができるグローブ53を連続させて取付ける。予めグローブ等が取付けられた隔離シートを用いてもよい(以上、グローブバック方式とも称する)。
When there is no asbestos on the entire roof, in order to remove asbestos efficiently and locally, it is not cured completely, but only on the removal target place 4 where sprayed asbestos exists as shown in FIG. 1 and FIG. Isolation curing 5 is performed.
In this case, as shown in FIG. 5, the wall surface sheet 51 is provided with an opening 52 at a predetermined location where the removal work to the removal target place 4 is easily performed, and the opening 52 is removed from the outside of the wall surface sheet 51. A glove 53 capable of performing work is attached continuously. You may use the isolation sheet | seat with which the glove | globe etc. were previously attached (it is also called the glove back system above).

図6のように、前記隔離養生5が行われる空間54に対しては負圧集じん機55により、除去対象場所4でのアスベストの粉じんの低減と散出を防ぐ必要がある。この場合、隔離シート50,51が負圧により内側に萎むことを防ぐために、隔離シート51とサポート9の間、またはサポート9間に掛け渡したパイプ90との間を両面テープ等56を介して、隔離シート51とサポート9等を連結させる。   As shown in FIG. 6, it is necessary to prevent reduction and scattering of asbestos dust at the removal target place 4 by a negative pressure dust collector 55 in the space 54 where the isolation curing 5 is performed. In this case, in order to prevent the isolation sheets 50 and 51 from deflating inward due to negative pressure, a double-sided tape or the like 56 is interposed between the isolation sheet 51 and the support 9 or between the pipe 90 spanned between the supports 9. Then, the isolation sheet 51 and the support 9 are connected.

なお、アスベスト等の被覆物を除去する除去対象場所4が、切り妻屋根のむね等、より高所の位置にある場合には、前記作業床2の中央に2段目の作業床2を設置する。
そして、この2段目の作業床2に安全手摺3を取付け、この安全手摺3の内側に隔離養生5を施すようにする。
また、天井の形状が、例えば横葺き屋根板の場合には、その形状にフィットするように、タイトフレーム7の対向面70を形成する共に、タイトフレーム7の長手を軒棟方向に配置し、且つ、桁行き方向に2本のタイトフレーム7をそれぞれ配置すればよい。
In addition, when the removal target place 4 for removing the covering such as asbestos is at a higher position such as a gable roof, a second work floor 2 is installed at the center of the work floor 2. To do.
And the safety handrail 3 is attached to the work floor 2 of the second stage, and the isolation curing 5 is applied to the inside of the safety handrail 3.
In addition, when the shape of the ceiling is, for example, a horizontal roofing board, the opposing surface 70 of the tight frame 7 is formed so as to fit the shape, and the length of the tight frame 7 is arranged in the eaves ridge direction, In addition, two tight frames 7 may be arranged in the direction of the beam.

以上のような足場構造によれば、図7に図示したように、屋根全体にアスベストがない場合には、作業床2に局所的に隔離養生5を施し、グローブバック方式により壁面シート51の外側からグローブ53を使い母屋等に吹き付けられたアスベスト等を効率良く除去することができる。
図8に図示したように、安全手摺3の内側に全面的に隔離養生5を施す場合には隔離シート50、51内に作業者が入って除去作業を行う。
According to the above-described scaffold structure, as shown in FIG. 7, when there is no asbestos on the entire roof, the work floor 2 is locally subjected to the isolation curing 5, and the outside of the wall surface sheet 51 by the glove back method. The asbestos blown to the purlin etc. using the glove 53 can be efficiently removed.
As shown in FIG. 8, when the isolation curing 5 is applied entirely inside the safety handrail 3, an operator enters the isolation sheets 50 and 51 to perform the removal operation.

以上のような足場構造の作用効果は次のようである。
A. 天井レール11上に一旦、作業床2を設置すれば、天井クレーン11を走行させて足場を移動させることができる。よって、アスベスト等の除去作業用の足場施工日数を大幅に削減することができ、また、建屋1の高所に局所的にアスベスト等が点在する場合には、アスベスト等の除去作業毎に足場の解体、移動及び組立が不要となり、高所でのアスベスト等の局所除去の効率化を図ることができる。
B. 天井クレーン11の下方では、足場の存在や足場の組立、解体、移動等に左右されないため、工場等の操業に対する影響を最低限に抑えることができる。
C. 足場の設置等のコストに関し、アスベスト除去面積が大きいほど、そのコストを抑えることができる。
D. グローブバック方式の場合には、アスベストの除去工事の施工範囲及び工事期間が短期で終了するため、作業床も短期間で移動可能となり、効率的なアスベストの除去工事が可能となる。
E. 前記タイトフレーム7、支持枠8及びサポート9により、前記壁面シート51の端部が前記タイトフレーム7に接着されるので、その養生が容易である。よって、隔離養生を施す時間を短縮させ、総合的にアスベスト除去の施工日数を短縮させることができる。
The effects of the scaffold structure as described above are as follows.
A. Once the work floor 2 is installed on the ceiling rail 11, the overhead crane 11 can be run to move the scaffold. Therefore, the number of days for asbestos removal work can be significantly reduced. Also, when asbestos is scattered locally at the high place of the building 1, the scaffold is removed for each asbestos removal work. This eliminates the need for dismantling, moving and assembling, and can improve the efficiency of local removal of asbestos and the like at high locations.
B. Below the overhead crane 11, it is not affected by the presence of a scaffold or the assembly, disassembly, movement, etc. of the scaffold, so that the influence on the operation of a factory or the like can be minimized.
C. Regarding the cost of installing a scaffold, etc., the larger the asbestos removal area, the lower the cost.
D. In the case of the glove back method, since the construction range and construction period of asbestos removal work are completed in a short time, the work floor can also be moved in a short period of time, and efficient asbestos removal work can be performed.
E. Since the end of the wall surface sheet 51 is bonded to the tight frame 7 by the tight frame 7, the support frame 8 and the support 9, curing thereof is easy. Therefore, the time for performing the isolation curing can be shortened, and the construction days for removing asbestos can be shortened comprehensively.

次に上記足場構造の設置から、新たな除去対象場所4への作業床2の移動までの手順としての被覆物に対する除去方法を図9に基づいて説明する。
まず、必要機器、資材の準備等の事前準備を経て、前記作業床2を設置する(ステップ1)。
次に、安全手摺3を前記作業床2の四周に設置し固定する(ステップ2)。
その安全手摺3の内側にて、隔離養生5を施し、負圧集じん機の設置等を行う(ステップ3)。
次に、除去対象場所4に対して粉じん飛散抑制剤の吹き付け後に、アスベストを除去する(ステップ4)。
次に除去したアスベストをプラスチック袋に二重梱包し、搬出する(ステップ5)。
なお、グローブバック方式により隔離養生5の外側からグローブ等を用いてアスベストの除去を行う場合には、隔離シート50等が除去したアスベストの収納エリヤとなり、それらの隔離シート50等をプラスチック袋に二重梱包し、搬出する(ステップ6)こともできる。この場合、ステップ5とステップ6は一体のものとなる。
Next, a removal method for the covering as a procedure from the installation of the scaffold structure to the movement of the work floor 2 to a new removal target place 4 will be described with reference to FIG.
First, the work floor 2 is installed through preparations such as preparation of necessary equipment and materials (step 1).
Next, the safety handrail 3 is installed and fixed around the work floor 2 (step 2).
Inside the safety handrail 3, the isolation curing 5 is performed, and a negative pressure dust collector is installed (step 3).
Next, asbestos is removed after spraying the dust scattering inhibitor onto the removal target place 4 (step 4).
Next, the removed asbestos is double-packed in a plastic bag and carried out (step 5).
When removing asbestos using a glove or the like from the outside of the isolation curing 5 by the glove back method, the isolation sheet 50 or the like serves as a storage area for the removed asbestos, and the isolation sheet 50 or the like is stored in a plastic bag. It is also possible to carry out heavy packing and carry out (step 6). In this case, step 5 and step 6 are integrated.

次に、タイトフレーム7等を作業床2から搬出して、安全手摺3を倒して、天井クレーン11により作業床2を移動させる(ステップ7)。
作業床2の移動の範囲は、図10に示したように施工可能範囲である除去対象場所4が隣接するように行う。
その後上記ステップ3〜7の各工程を建屋のアスベスト除去工事が終了するまで、繰り返すこととなる。
Next, the tight frame 7 and the like are unloaded from the work floor 2, the safety handrail 3 is tilted, and the work floor 2 is moved by the overhead crane 11 (step 7).
The range of movement of the work floor 2 is performed such that the removal target place 4 that is a workable range is adjacent as shown in FIG.
Thereafter, the above steps 3 to 7 are repeated until the asbestos removal work for the building is completed.

以上のような被覆物に対する除去方法によれば、次のような作用効果を奏することができる。
上記各効果A〜Eと同様の作用効果を奏するほか、
F. 作業床2の移動後に、直ちに隔離養生5を施すことができるので、アスベスト除去に要する施工期間も短縮させることができる。
According to the removal method for the covering as described above, the following effects can be obtained.
In addition to the same effects as the effects A to E above,
F. Since the isolation curing 5 can be performed immediately after the work floor 2 is moved, the construction period required for removing asbestos can also be shortened.

上記足場構造及びこれを用いたアスベスト等の除去方法に関しては、保護衣の着用、呼吸用保護具の着用、その他は上述の「既存建築物の吹付けアスベスト粉じん飛散防止処理技術指針」等に準拠して行われる。   Regarding the above scaffolding structure and asbestos removal method using this scaffolding, wearing protective clothing, wearing respiratory protective equipment, etc., comply with the above "Technical Guidelines for Preventing Sprayed Asbestos Dust Spattering of Existing Buildings", etc. Done.

実施形態に係る足場構造の斜視図、The perspective view of the scaffold structure concerning an embodiment, 同足場構造を配置した建屋の横断面図、Cross-sectional view of the building with the same scaffold structure, 同構造に用いられる安全手摺の斜視図、A perspective view of a safety handrail used in the structure, 同構造に用いられるタイトフレーム等の斜視図、A perspective view of a tight frame used for the structure, 同構造の隔離養生の側面図、Side view of the isolation curing of the same structure, 同構造の隔離養生の斜視図、A perspective view of the isolation curing of the same structure, 同構造による除去作業の説明図、Explanatory drawing of removal work by the structure, 同構造による除去作業の説明図、Explanatory drawing of removal work by the structure, 同構造を用いた除去作業の手順を示すフロー図、Flow chart showing the procedure of removal work using the same structure, 同除去作業のステップ7の説明図である。It is explanatory drawing of step 7 of the removal operation | work.

符号の説明Explanation of symbols

1 建屋
2 作業床 20 作業面
3 安全手摺 30 本柱
31 支持柱 32 基部
4 除去対象場所
5 隔離養生 50 隔離シート
51 隔離シート(壁面シート) 52 開口部
53 グローブ 54 空間
55 負圧集じん機 56 両面テープ等
6 屋根板
7 タイトフレーム 70 対向面
71 当接面 72 貼着部
8 支持枠
9 サポート 90 パイプ

10 ランウェイレール 11 天井クレーン
DESCRIPTION OF SYMBOLS 1 Building 2 Work floor 20 Work surface 3 Safety handrail 30 Main pillar 31 Support pillar 32 Base 4 Removal target place 5 Isolation curing 50 Isolation sheet 51 Isolation sheet (wall surface sheet) 52 Opening 53 Globe 54 Space 55 Negative pressure dust collector 56 Double-faced tape, etc. 6 Roof plate 7 Tight frame 70 Opposing surface 71 Abutting surface 72 Adhering portion 8 Support frame 9 Support 90 Pipe

10 runway rails 11 overhead cranes

Claims (6)

天井クレーンを備えている建屋の被覆物に対する除去作業用の足場構造であって、
前記天井クレーン上に設置される作業床とこの作業床に取付けられる安全手摺を設けると共に、この安全手摺の内側に除去対象場所を密閉する隔離養生を施したことを特徴とする足場構造。
Scaffolding structure for removing work on the covering of a building equipped with an overhead crane,
A scaffold structure characterized in that a work floor installed on the overhead crane and a safety handrail attached to the work floor are provided, and an isolation curing for sealing a place to be removed is provided inside the safety handrail.
前記隔離養生は、除去対象場所に対応する作業床及びその作業床から天井までの空間を密閉可能な隔離シートと、この隔離シートの端部を天井の屋根板との間で接着可能なタイトフレームと、このタイトフレームを支持する支持枠と、この支持枠の高さを調整可能なサポートを備えていることを特徴とする請求項1に記載の足場構造。   The isolation curing includes a work sheet corresponding to the place to be removed and an isolation sheet capable of sealing a space from the work floor to the ceiling, and a tight frame capable of bonding an end of the isolation sheet between the ceiling roof plate. The scaffold structure according to claim 1, further comprising: a support frame that supports the tight frame; and a support that can adjust a height of the support frame. 前記隔離シートに、被覆物に対する除去作業用の開口部及びこの開口部に連続するグローブを設けたことを特徴とする請求項2に記載の足場構造。   The scaffold structure according to claim 2, wherein the isolation sheet is provided with an opening for removing the covering and a glove continuous with the opening. ランウェイレールに沿って走行可能な天井クレーンを備えている建屋の被覆物に対する除去方法であって、
前記天井クレーンに作業床を設置し、この作業床を前記天井クレーンにより被覆物の除去対象場所に移動可能にする共に、
前記作業床上に配置した安全手摺の内側に前記除去対象場所を密閉する隔離養生を施すことを特徴とする被覆物に対する除去方法。
A method for removing a covering of a building having an overhead crane that can travel along a runway rail,
A work floor is installed in the overhead crane, and the work floor can be moved to a place to be covered by the overhead crane.
The removal method with respect to the covering characterized by performing the isolation curing which seals the said removal object place inside the safety handrail arrange | positioned on the said work floor.
前記隔離養生は、除去対象場所に対応する作業床及びその作業床から天井までの空間を密閉可能な隔離シートと、この隔離シートの端部を天井の屋根板との間で接着可能なタイトフレームと、このタイトフレームを支持する支持枠と、この支持枠の高さを調整可能なサポートを備えていることを特徴とする請求項4に記載の被覆物に対する除去方法。   The isolation curing includes a work sheet corresponding to a place to be removed and an isolation sheet capable of sealing a space from the work floor to the ceiling, and a tight frame capable of bonding the end of the isolation sheet between the ceiling roof plate. And a support frame for supporting the tight frame and a support capable of adjusting the height of the support frame. 前記隔離シートに、被覆物に対する除去作業用の開口部及びこの開口部に連続するグローブを設けたことを特徴とする請求項5に記載の被覆物に対する除去方法。   6. The method for removing a covering according to claim 5, wherein the separator sheet is provided with an opening for removing the covering and a glove continuous with the opening.
JP2008086805A 2008-03-28 2008-03-28 Scaffolding structure and removal method of coating using the same Pending JP2009235882A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008086805A JP2009235882A (en) 2008-03-28 2008-03-28 Scaffolding structure and removal method of coating using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008086805A JP2009235882A (en) 2008-03-28 2008-03-28 Scaffolding structure and removal method of coating using the same

Publications (1)

Publication Number Publication Date
JP2009235882A true JP2009235882A (en) 2009-10-15

Family

ID=41250158

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008086805A Pending JP2009235882A (en) 2008-03-28 2008-03-28 Scaffolding structure and removal method of coating using the same

Country Status (1)

Country Link
JP (1) JP2009235882A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498566A (en) * 2013-09-30 2014-01-08 攀钢集团工程技术有限公司 Constructing method for steel structure workshop and concrete or brick wall workshop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498566A (en) * 2013-09-30 2014-01-08 攀钢集团工程技术有限公司 Constructing method for steel structure workshop and concrete or brick wall workshop

Similar Documents

Publication Publication Date Title
JP4704123B2 (en) Climbing scaffold
JP5146772B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JP5569560B2 (en) Roof replacement unit and roof replacement method for existing buildings
JP2009235882A (en) Scaffolding structure and removal method of coating using the same
US20050066609A1 (en) Preassembled roof and floor deck panel system
JP6970610B2 (en) Building construction method
JP5764073B2 (en) Scatter prevention structure and method of removing external spray
JP5205868B2 (en) Roof replacement unit and roof replacement method for existing buildings
JP6061339B2 (en) Structure reconstruction method and structure reconstruction system
JP6151528B2 (en) Air conditioning unit construction method
JP4971006B2 (en) Clean room renovation method and temporary facilities for renovation
JP2010203034A (en) Building repair/demolition device and building repair/demolition method
JP5574335B2 (en) Seismic reinforcement method for roof
US4404782A (en) Suspended modular floor assembly
JP5377986B2 (en) Construction method of unit type building
JP5569559B2 (en) Roof replacement unit and roof replacement method for existing buildings
JP4541837B2 (en) Curtain wall structure by ALC plate with steel frame and its construction method
JP5927835B2 (en) How to remove deposits
JP5365844B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JPWO2018011955A1 (en) Elevator and elevator renewal method
JP5705024B2 (en) Roof panel and unit building construction method
JP2022190180A (en) Temporary scaffold for construction and temporary scaffold installation method for construction
JP2020183683A (en) Roof structure of fire-proof building
JP5965205B2 (en) Building beam structure
JP3883873B2 (en) Clean room wall structure