JP2010031577A JP2008196168A JP2008196168A JP2010031577A JP 2010031577 A JP2010031577 A JP 2010031577A JP 2008196168 A JP2008196168 A JP 2008196168A JP 2008196168 A JP2008196168 A JP 2008196168A JP 2010031577 A JP2010031577 A JP 2010031577A
Authority
JP
Japan
Prior art keywords
plate
panel zone
formwork
attached
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008196168A
Other languages
Japanese (ja)
Inventor
Eiji Matsuoka
英治 松岡
Hidekazu Takeuchi
秀和 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2008196168A priority Critical patent/JP2010031577A/en
Publication of JP2010031577A publication Critical patent/JP2010031577A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To obtain a form of a panel zone, which can flexibly adapt to a shape of a beam, different on each construction site, on a job site, which enables diversion, which can save labor for newly manufacturing the form, and which can enhance constructibility by facilitating the shape retention of the form by concrete lateral pressure in the placing of concrete. <P>SOLUTION: In this form of the panel zone as a beam-column joint, a plurality of horizontal battens 2 are mounted at proper spacings on the outside of a sheathing board 1; and an adjusting plate 3b, the height of which can be freely adjusted, is laterally mounted on the inside thereof in the state of being superposed in a free mounting position. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、柱梁接合部であるパネルゾーンの型枠に関するものである。   The present invention relates to a form of a panel zone which is a column beam joint.

鉄骨鉄筋コンクリート(SRC)柱部材と鉄骨造の梁部材とにより建築物における柱梁接合部(パネルゾーン)にコンクリートを打設する場合、柱梁の各々の部位の形状に応じて接合部をもれなく塞ぐような形状に加工した型枠をセットする必要がある。   When concrete is placed in a column-beam joint (panel zone) in a building with steel reinforced concrete (SRC) column members and steel beam members, the joints are completely plugged according to the shape of each part of the column beam. It is necessary to set the formwork processed into such a shape.

特許文献1はその一例を示し、パネルゾーンを塞ぐ型枠として柱断面に合致する塞ぎ板を梁の上下フランジ間に設けた取付け板によって保持するようにしている。   Patent Document 1 shows an example of this, and a closing plate that matches the column cross section is held by a mounting plate provided between the upper and lower flanges of the beam as a mold for closing the panel zone.

特許文献2は他の例を示し、鉄骨梁端部の両側に鉄筋コンクリート柱の外形輪郭に対応する位置で上下フランジ間にリブプレートを予め溶接しておき、鉄骨梁を十字状に接合した後に、仕口部にコンクリートを打設充填するための型枠兼接合部パネル材となるアングル状に曲げ加工した鋼鈑をリブプレートに対してボルト締結により取り付け、これにより鋼鈑でパネルゾーンを塞いでいる。
特開2005−188102号公報 特開2006−118201号公報
Patent Document 2 shows another example, after welding the rib plate in advance between the upper and lower flanges at positions corresponding to the outer contour of the reinforced concrete column on both sides of the steel beam end, and joining the steel beam in a cross shape, A steel plate that has been bent into an angle to be a formwork and joint panel material for placing and filling concrete into the joint is attached to the rib plate by bolting, thereby closing the panel zone with the steel plate. Yes.
JP 2005-188102 A JP 2006-118201 A

SRC造の柱と鉄骨梁との接合部の型枠工事において、各部位ごとにサイズを調整した型枠とそれを取り付けるための部材(取付け板やリブプレート)が必要となり、現場ごとに鉄骨梁のサイズが違えば各柱ごとにパネルゾーンの型枠を製作する必要がある。   In the construction work of the joint between the SRC column and the steel beam, the formwork whose size is adjusted for each part and the members (mounting plates and rib plates) for mounting it are required. If the size is different, it is necessary to make a panel zone form for each pillar.

よって、型枠の転用ができず、型枠製作にも手間を要し、新規材料のコストも嵩む。   Therefore, the formwork cannot be diverted, the work for producing the formwork is troublesome, and the cost of the new material increases.

また、コンクリートの打設時、コンクリート側圧に対する型枠の形状保持のために鉄骨部に引っ張り材(フォームタイなど)を溶接したり、または外周からの突っ張り(サポートなど)の作業が必要であり、これらの取り付け手間を要し、取り付け材料も嵩む。   In addition, when placing concrete, it is necessary to weld a pulling material (form tie, etc.) to the steel frame part, or to push from the outer periphery (support, etc.) in order to maintain the shape of the formwork against the concrete side pressure. These mounting efforts are required, and the mounting material is also bulky.

本発明は前記不都合を解消するものであり、施工場所ごとに異なる梁形状に現場で柔軟に対応でき、転用が可能であり、新規に型枠を制作する手間を省くことができ、また、コンクリート打設時におけるコンクリート側圧による型枠の形状保持も容易に行えて施工性を向上できるパネルゾーンの型枠を提供するものである。   The present invention eliminates the inconvenience, can flexibly cope with different beam shapes at each construction site, can be diverted, and can save time and labor for producing a new formwork. It is an object of the present invention to provide a panel zone formwork that can easily maintain the shape of the formwork by the concrete side pressure at the time of placing and improve the workability.

請求項1記載の本発明は、柱梁接合部であるパネルゾーンの型枠であり、せき板の外側に複数本の横端太を適宜間隔で取り付け、内側に高さ調整自在な調整プレートを横方向に取り付け位置自在に重ねて取り付けたことを要旨とするものである。   The present invention according to claim 1 is a formwork of a panel zone which is a beam-column joint, and a plurality of lateral end thicknesses are attached to the outer side of the plate at appropriate intervals, and an adjustment plate whose height is adjustable is provided on the inner side. The gist is that they are attached in a lateral direction so as to be freely mounted.

請求項1記載の本発明によれば、横端太を予め取り付けたせき板に、高さおよび横方向の幅調整が可能な調整プレートが組み合わさることにより、施工場所によって鉄骨梁のサイズが異なる場合、調整プレートで上下方向の高さ調整ができ、また、調整プレートとせき板との取り合いで左右水平方向の幅調整ができるから、異なる形状の梁に対して同じ型枠で対応でき、転用が可能となる。   According to the first aspect of the present invention, the size of the steel beam varies depending on the construction location by combining the adjustment plate capable of adjusting the height and the width in the width direction with the slat plate in which the lateral end thick is attached in advance. In the case, the height can be adjusted in the vertical direction with the adjustment plate, and the width in the horizontal direction can be adjusted with the adjustment plate and the platen. Is possible.

請求項2記載の本発明は、上下方向への突っ張り手段を備えたせき板固定部材を、前記せき板の外側で鉄骨梁の上下フランジ間に配設することを要旨とするものである。   The gist of the present invention described in claim 2 is that a siding plate fixing member provided with means for vertically stretching is disposed between the top and bottom flanges of the steel beam outside the siding plate.

請求項2記載の本発明によれば、パネルゾーンへのコンクリート打設時、コンクリート側圧に対する型枠保持のために、せき板の外側で上下フランジ間にせき板固定部材を上下方向に突っ張るようにして配設するだけでせき板を外側から簡単に押さえることができる。そして、この固定部材の設置は、上下フランジとの摩擦により固定されるから、従来のように溶接などの固定作業を省くことができ、施工性がよい。   According to the second aspect of the present invention, when the concrete is placed in the panel zone, the retaining plate fixing member is stretched in the vertical direction between the upper and lower flanges on the outside of the retaining plate in order to maintain the formwork against the concrete side pressure. It is possible to easily hold the weir plate from the outside simply by arranging it. And since installation of this fixing member is fixed by friction with an up-and-down flange, fixing work, such as welding, can be omitted like before, and workability is good.

請求項3記載の本発明は、せき板固定部材は棒材であり、突っ張り手段は調整ネジで構成することを要旨とするものである。   The gist of the present invention described in claim 3 is that the baffle fixing member is a bar, and the tension means is constituted by an adjusting screw.

請求項3記載の本発明によれば、せき板固定部材は突っ張り棒状に形成したので、所定位置に配置して調整ネジを回すだけの簡単な作業でせき板を外側から押さえて固定できる。   According to the third aspect of the present invention, since the dam plate fixing member is formed in the shape of a tension bar, the dam plate can be pressed and fixed from the outside by a simple operation by simply placing the adjustment screw by turning the adjustment screw.

以上述べたように本発明のパネルゾーンの型枠は、型枠をせき板と、このせき板に対して上下左右方向に長さ調整自在に組み合わさる調整プレートとの組み合わせで構成したので、調整プレートを上下左右方向に位置調整することで、施工場所ごとに異なる梁形状に現場で柔軟に対応でき、転用が可能であり、新規に型枠を制作する手間を省くことができ、また、コンクリート打設時におけるコンクリート側圧による型枠の形状保持も容易に行えて施工性を向上できるものである。   As described above, the panel zone mold according to the present invention is composed of a combination of a slat plate and an adjustment plate that is freely adjustable in length in the vertical and horizontal directions with respect to this sill plate. By adjusting the position of the plate in the vertical and horizontal directions, it is possible to flexibly respond to different beam shapes at each construction site, and it can be diverted, saving the effort of creating a new formwork, and concrete. The shape of the mold can be easily maintained by the concrete side pressure at the time of placing, and the workability can be improved.

以下、図面について本発明の実施形態を詳細に説明する。図1は本発明のパネルゾーンの型枠の実施形態を示す組み立てた状態の斜視図、図2は同上分解斜視図で、図中1は型枠本体であるNFボードなどによるせき板を示し、このせき板1の外側に適宜間隔で複数本の横端太2を取り付けた。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is an assembled perspective view showing an embodiment of a panel zone mold according to the present invention, FIG. 2 is an exploded perspective view of the same, and 1 in the figure shows a stencil board such as an NF board as a mold body, A plurality of lateral end thickenings 2 were attached to the outside of the dam plate 1 at appropriate intervals.

横端太2の取り付け間隔はコンクリート打設時にせき板1が外側にはらまないようにできるピッチとし、横端太2の長さは、端部がせき板1から突出する長さとする。   The width of the horizontal end thick 2 is set to a pitch that prevents the siding plate 1 from sticking to the outside when the concrete is placed, and the length of the horizontal end thick 2 is set to a length that protrudes from the sill plate 1.

図中3は、かかるせき板1の内側にスライド自在に組み合わされる高さおよび横幅の調整手段であり、本体である当てプレート3aの下部に上下方向にスライド自在に調整プレート3bを組み合わせた。当てプレート3aは、高さを鉄骨梁フランジ内法高さに等しく、横幅を鉄骨梁端部からウェブまでの縦長長方形に形成する。   Reference numeral 3 in the figure denotes height and width adjusting means that are slidably combined inside the dam plate 1, and an adjusting plate 3b that is slidable in the vertical direction is combined with the lower part of the abutting plate 3a that is the main body. The abutting plate 3a has a height equal to the normal height in the steel beam flange, and a lateral width formed in a vertically long rectangle from the end of the steel beam to the web.

そして、せき板1には、上下で左右いずれかの端部に切欠き1aを形成し、当てプレート3aおよび調整プレート3bに、せき板1に組み合わせたときに前記切欠き1aから外側に突出する水平突片5を折り曲げ加工により突設する。   And the notch 1a is formed in the board 1 in the edge part in either the right and left either up and down, and it protrudes outside from the said notch 1a when it combines with the board 1 to the contact plate 3a and the adjustment plate 3b. The horizontal protruding piece 5 is provided by bending.

当てプレート3aには脱型用のボルト4を取り付けた。   A demolding bolt 4 was attached to the abutting plate 3a.

図中7は2枚のせき板1を角度を持って接合するときの、せき板1の内側に取り付けられるコーナーアングル材を示し、固定用のネジ貫通孔7aが上部に穿設されている。   In the figure, reference numeral 7 denotes a corner angle member attached to the inner side of the dam plate 1 when the two dam plates 1 are joined at an angle, and a fixing screw through hole 7a is formed in the upper portion.

図中6は、パネルゾーン上部の上階スラブのコン止めアングルに事前に溶接される頭部固定ネジを示す。   In the figure, reference numeral 6 denotes a head fixing screw which is pre-welded to a con-stop angle of the upper floor slab above the panel zone.

図中8は、2枚のせき板1を直交させて組み合わせたときの角部を外側から押さえる角締めパイプであり、上部に上部引き止め金物9が挿入する挿入孔10が形成され、下部に下部引き止め金物11が挿入する縦長の調整ルーズ孔12が形成されている。   In the figure, 8 is a square-clamping pipe that presses the corner when the two plates 1 are orthogonally combined from the outside, and an insertion hole 10 is formed in the upper part to insert the upper retaining metal 9 in the lower part. A vertically long adjustment loose hole 12 into which the retaining metal 11 is inserted is formed.

下部引き止め金物11は、図3に示すように本体をネジ棒11aで形成し、このネジ棒11aの先端に水平突片11bを取り付け、その先端を角度をもって切欠き、この切欠き内に収まるようにして水平突片11bと直交する縦方向にアングル材11cを固定した。   As shown in FIG. 3, the lower clasp 11 has a main body formed by a screw rod 11a, a horizontal protrusion 11b is attached to the tip of the screw rod 11a, and the tip is notched at an angle so that it fits in the notch. Then, the angle member 11c was fixed in the vertical direction perpendicular to the horizontal protrusion 11b.

図中13はせき板1が外側にはらまないように固定する型枠固定突っ張り棒を示し、縦長のやや扁平な直方体形状であり、下部に高さ調整自在なように調整ボルト14が取り付けてある。   In the figure, reference numeral 13 denotes a formwork fixing strut for fixing the dam plate 1 so that it does not stick to the outside. It is a vertically long and slightly rectangular parallelepiped shape, and an adjustment bolt 14 is attached to the lower part so that the height can be adjusted. .

以上のような構成部材で構成される型枠をパネルゾーンで組み上げるには、せき板1の背面に配置される当てプレート3aに対して、調整プレート3bの取り付け高さを上下方向に調整し、また、調整プレート3bが取り付けられた当てプレート3aとせき板1との取り合いでせき板1に対する左右の位置調整を行う。   In order to assemble the formwork composed of the above components in the panel zone, the mounting height of the adjustment plate 3b is adjusted in the vertical direction with respect to the contact plate 3a arranged on the back surface of the dam plate 1, Further, the left and right positions are adjusted with respect to the dam plate 1 by the engagement between the contact plate 3a to which the adjustment plate 3b is attached and the dam plate 1.

これにより、せき板1と、これと一体の調整手段3との全体で、高さ方向および横幅方向が決定された型枠が形成され、施工現場の梁形状、サイズに合致して隙間の生じないような型枠が得られる。   As a result, a formwork in which the height direction and the width direction are determined is formed as a whole by the dam plate 1 and the adjustment means 3 integrated therewith, and a gap is generated in accordance with the beam shape and size of the construction site. No formwork is obtained.

かかるせき板1および調整手段3の2枚を組み、角部の内側にはコーナーアングル材7を配設して2枚のせき板1を接合する。   Two such plates 1 and adjusting means 3 are assembled, and a corner angle material 7 is disposed inside the corner portion to join the two plates 1 together.

前記角部の外側は横端太2がクロスするから、この交差部に角締めパイプ8を取り付け、上部引き止め金物9を挿入孔10およびネジ貫通孔7aに挿入し、また、下部引き止め金物11を調整ルーズ孔12に挿入して、角締めパイプ8をせき板1の外側角部に固定してせき板1を外側から押さえる。   Since the lateral end 2 crosses the outside of the corner portion, a square fastening pipe 8 is attached to this intersection portion, the upper retaining metal 9 is inserted into the insertion hole 10 and the screw through hole 7a, and the lower retaining metal 11 is It inserts in the adjustment loose hole 12, the square clamp pipe 8 is fixed to the outer corner part of the dam plate 1, and the dam plate 1 is pressed from the outer side.

下部引き止め金物11を角締めパイプ8に固定する場合、図4に示すように水平突片11bをすでに組み立てられている下部型枠15とせき板1との間に差込み、先端のアングル材11cを下部型枠15とせき板1とのそれぞれの背面に当接し、角締めパイプ8の側面を横端太2にあてがった状態でネジ棒11aを締める。   When fixing the lower clasp 11 to the square fastening pipe 8, as shown in FIG. 4, the horizontal protrusion 11b is inserted between the already-assembled lower mold 15 and the slat plate 1, and the angle member 11c at the tip is attached. The threaded rod 11a is tightened in a state where the lower mold 15 and the bottom plate 1 are in contact with the back surfaces of the lower mold 15 and the side plate 1 and the side surface of the square tightening pipe 8 is applied to the lateral end thick 2.

このとき、頭部固定ネジ6と下部型枠15とに反力をとって締める。これにより、下部引き止め金物11のアングル材11cがせき板1および下部型枠15に押し付けられ、角締めパイプ8が横端太2に押し付けられる。かかる角部の固定は、コーナーアングル材7と角締めパイプ8の単体により頭部固定ネジ6と下部型枠15に当てるだけのものであるから、精度出しが容易に行える。   At this time, a reaction force is applied to the head fixing screw 6 and the lower mold 15 to be tightened. As a result, the angle member 11 c of the lower retaining metal 11 is pressed against the dam plate 1 and the lower mold 15, and the square clamp pipe 8 is pressed against the lateral end thick 2. Since the corner portion is fixed only to the head fixing screw 6 and the lower mold 15 by the corner angle member 7 and the corner fastening pipe 8, the accuracy can be easily obtained.

さらに、図1に示すように型枠固定突っ張り棒13の側面を横端太2の外側にあてがう。このとき、型枠固定突っ張り棒13の下部は横梁の下部フランジの上に載っており、調整ボルト14で型枠固定突っ張り棒13の高さを調整してこの型枠固定突っ張り棒13の上端を横梁の上部フランジに当接させる。   Further, as shown in FIG. 1, the side surface of the formwork fixing tension bar 13 is applied to the outside of the lateral end thick 2. At this time, the lower part of the mold fixing tension bar 13 is placed on the lower flange of the cross beam, and the height of the mold fixing tension bar 13 is adjusted with the adjusting bolt 14 so that the upper end of the mold fixing tension bar 13 is adjusted. Abut on the upper flange of the cross beam.

この状態でせき板1は外側から型枠固定突っ張り棒13で押さえられ、型枠固定突っ張り棒13は上下フランジ間にあって上下フランジとの摩擦抵抗によって上下フランジ間に容易に固定される。   In this state, the dam plate 1 is pressed from the outside by the mold fixing tension bar 13, and the mold fixing tension bar 13 is located between the upper and lower flanges and is easily fixed between the upper and lower flanges by frictional resistance with the upper and lower flanges.

以上のようにしてパネルゾーンに組み立てられた型枠内にコンクリートを打設する。コンクリート打設による側圧はせき板1にかかり、横端太2に伝達され、さらに型枠固定突っ張り棒13と角締めパイプ8に伝わる。   Concrete is placed in the mold assembled in the panel zone as described above. The side pressure due to the concrete placement is applied to the dam 1 and transmitted to the lateral end 2, and further to the formwork fixing tension bar 13 and the square clamp pipe 8.

その結果、角締めパイプ8の足元には外側に開こうとする力がかかり、この力が下部引き止め金物11に挿入してあるネジ棒11aを外側に引っ張り、ネジ棒11aの先端に取り付けてあるアングル材11cが下部型枠15をさらに引っ張る。   As a result, a force to open the corner fastening pipe 8 to the outside is applied, and this force pulls the screw rod 11a inserted in the lower retaining hardware 11 to the outside and is attached to the tip of the screw rod 11a. The angle member 11c pulls the lower mold 15 further.

しかし、下部型枠15はチャンネルなどで補強された強固なものであり、移動しない。よって、せき板1は角締めパイプ8および下部引き止め金物11を介して下部型枠15の剛性により押さえられて外側にはらむことが阻止される。   However, the lower mold 15 is reinforced by a channel or the like and does not move. Therefore, the dam 1 is restrained by the rigidity of the lower mold 15 via the square fastening pipe 8 and the lower retaining metal 11, and is prevented from being caught outside.

脱型時、当てプレート3aには脱型用のボルト4が取り付けてあるから、解体時にこのボルト4をコンクリートに押し付ければ反力を得られるから、当てプレート3aを簡単に脱型できる。よって、当てプレート3aを従来のようにこじる必要がなく、鉄板厚を薄くでき軽量化が図れるとともに再利用できる。   At the time of demolding, since the bolt 4 for demolding is attached to the abutting plate 3a, a reaction force can be obtained by pressing this bolt 4 against the concrete at the time of dismantling, so that the abutting plate 3a can be easily demolded. Therefore, it is not necessary to twist the abutting plate 3a as in the conventional case, and the thickness of the iron plate can be reduced, the weight can be reduced, and it can be reused.

本発明のパネルゾーンの型枠の実施形態を示す斜視図である。It is a perspective view which shows embodiment of the formwork of the panel zone of this invention. 本発明のパネルゾーンの型枠の実施形態を示す分解斜視図である。It is a disassembled perspective view which shows embodiment of the formwork of the panel zone of this invention. 本発明のパネルゾーンの型枠の実施形態を示す要部である下部引き止め金物の斜視図である。It is a perspective view of the lower securing metal object which is the principal part which shows embodiment of the formwork of the panel zone of this invention. 本発明のパネルゾーンの型枠の実施形態を示す下部引き止め金物による固定部分の縦断側面図である。It is a vertical side view of the fixing | fixed part by the lower securing metal object which shows embodiment of the formwork of the panel zone of this invention.

符号の説明Explanation of symbols

1 せき板 1a 切欠き
2 横端太 3 調整手段
3a 当てプレート 3b 調整プレート
4 ボルト 5 水平突片
6 頭部固定ネジ 7 コーナーアングル材
7a ネジ貫通孔 8 角締めパイプ
9 上部引き止め金物 10 挿入孔
11 下部引き止め金物 11a ネジ棒
11b 水平突片 11c アングル材
12 調整ルーズ孔
13 型枠固定突っ張り棒 14 調整ボルト
15 下部型枠
DESCRIPTION OF SYMBOLS 1 Stop plate 1a Notch 2 Thick side edge 3 Adjustment means 3a Contact plate 3b Adjustment plate 4 Bolt 5 Horizontal protrusion 6 Head fixing screw 7 Corner angle material 7a Screw through-hole 8 Square clamp pipe 9 Upper retaining metal object 10 Insertion hole 11 Lower clamp hardware 11a Screw rod 11b Horizontal protrusion 11c Angle material 12 Adjustment loose hole 13 Mold frame fixing tension rod 14 Adjustment bolt 15 Lower mold

Claims (3)

柱梁接合部であるパネルゾーンの型枠であり、せき板の外側に複数本の横端太を適宜間隔で取り付け、内側に高さ調整自在な調整プレートを横方向に取り付け位置自在に重ねて取り付けたことを特徴とするパネルゾーンの型枠。   A panel zone formwork that is a column-beam joint. A plurality of horizontal end thicknesses are attached to the outside of the slats at appropriate intervals, and height-adjustable adjustment plates are attached to the inside in a horizontal direction. Panel zone formwork characterized by being attached. 上下方向への突っ張り手段を備えたせき板固定部材を、前記せき板の外側で鉄骨梁の上下フランジ間に配設する請求項1記載のパネルゾーンの型枠。   The form of the panel zone according to claim 1, wherein a siding plate fixing member provided with means for vertically stretching is disposed between the top and bottom flanges of the steel beam outside the siding plate. せき板固定部材は棒材であり、突っ張り手段は調整ネジで構成する請求項2記載のパネルゾーンの型枠。   3. The panel zone mold according to claim 2, wherein the baffle fixing member is a bar, and the tension means is an adjustment screw.
JP2008196168A 2008-07-30 2008-07-30 Form of panel zone Pending JP2010031577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008196168A JP2010031577A (en) 2008-07-30 2008-07-30 Form of panel zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008196168A JP2010031577A (en) 2008-07-30 2008-07-30 Form of panel zone

Publications (1)

Publication Number Publication Date
JP2010031577A true JP2010031577A (en) 2010-02-12

Family

ID=41736366

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008196168A Pending JP2010031577A (en) 2008-07-30 2008-07-30 Form of panel zone

Country Status (1)

Country Link
JP (1) JP2010031577A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410310A (en) * 2013-09-03 2013-11-27 张红亮 Splicing internal corner template for building
CN103612077A (en) * 2013-12-09 2014-03-05 张红亮 Process for processing connection type building template
CN106738233A (en) * 2016-12-19 2017-05-31 席成松 Concrete cast-in-situ post and wellhole assembling die and concrete mold
CN111946060A (en) * 2020-08-20 2020-11-17 中国建筑第二工程局有限公司 Template pouring device for building construction
CN115898017A (en) * 2022-09-26 2023-04-04 广东科信工程管理有限公司 Building engineering template fixing equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410310A (en) * 2013-09-03 2013-11-27 张红亮 Splicing internal corner template for building
CN103612077A (en) * 2013-12-09 2014-03-05 张红亮 Process for processing connection type building template
CN106738233A (en) * 2016-12-19 2017-05-31 席成松 Concrete cast-in-situ post and wellhole assembling die and concrete mold
CN111946060A (en) * 2020-08-20 2020-11-17 中国建筑第二工程局有限公司 Template pouring device for building construction
CN111946060B (en) * 2020-08-20 2021-10-26 中国建筑第二工程局有限公司 Template pouring device for building construction
CN115898017A (en) * 2022-09-26 2023-04-04 广东科信工程管理有限公司 Building engineering template fixing equipment
CN115898017B (en) * 2022-09-26 2023-10-31 广东科信工程管理有限公司 Building engineering template fixing equipment

Similar Documents

Publication Publication Date Title
JP2010031577A (en) Form of panel zone
KR102143636B1 (en) An assembly type supporting beam mold using form-panel, and method for constructing this same
JP2019007327A (en) Building bearing wall structure, fitting device, and plate construction method
KR101936335B1 (en) Connector for concrete mold
JP2010053661A (en) Corner-part mounting structure for wooden bracing
AU2016256678B2 (en) Creation of Surface-Mounted Sills or Hobs on Cast-in-situ Concrete Building Slabs
JP5574779B2 (en) building
JP4903110B2 (en) Opening reinforcement unit and fabric foundation
KR20070027432A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by fixing pin
JP4730598B2 (en) Outdoor floor
JP3547875B2 (en) Formwork corner fastening structure
KR200414639Y1 (en) Slab sheeting support for bridge
KR20130103420A (en) Structure for clean room using composite beam
JP2010216196A (en) Anchor bolt installation method for continuous footing, and anchor bolt-tool set
EP3249146B1 (en) An installation comprising a fastening device and method
JP2716357B2 (en) Rising section formwork fixing jig
KR102004130B1 (en) Supporting unit of girder panel
KR100276864B1 (en) Formwork corner bar and formwork installation method using the same
JP7365518B1 (en) Panel support material and formwork structure using it
KR200317314Y1 (en) Bracket for supporting beam-forms
JP2003286753A (en) Substructure for building
KR101138334B1 (en) Frame for mold panel
KR100404492B1 (en) Length adjustable coner form
JP2008297848A (en) External wall panel mounting structure
KR200213556Y1 (en) Steel form for cross beam concrete applicable to a P.C. beam method