JP2010024742A - Bridge floor slab removing method - Google Patents

Bridge floor slab removing method Download PDF

Info

Publication number
JP2010024742A
JP2010024742A JP2008188652A JP2008188652A JP2010024742A JP 2010024742 A JP2010024742 A JP 2010024742A JP 2008188652 A JP2008188652 A JP 2008188652A JP 2008188652 A JP2008188652 A JP 2008188652A JP 2010024742 A JP2010024742 A JP 2010024742A
Authority
JP
Japan
Prior art keywords
floor slab
jack
girder
cutting line
jacks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008188652A
Other languages
Japanese (ja)
Other versions
JP5237710B2 (en
Inventor
Osamu Fukushima
修 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Active Co Ltd
Original Assignee
Active Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Active Co Ltd filed Critical Active Co Ltd
Priority to JP2008188652A priority Critical patent/JP5237710B2/en
Publication of JP2010024742A publication Critical patent/JP2010024742A/en
Application granted granted Critical
Publication of JP5237710B2 publication Critical patent/JP5237710B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To take the reaction of a jack without influencing a floor slab and to facilitate removal of the floor slab by lowering the degree of composition of a girder and the floor slab. <P>SOLUTION: Circular cut lines 20 are formed until reaching the girders 2 in opposed positions of the floor slab 1 on main girders 2 using a hole saw. Cut lines C1-C4 are formed on the concrete floor slab 1 along the main girders 2 to partition a removal area of suitable size. Holes 22 are formed in the floor slab 1 at intermediate parts between the oppositely provided circular cut lines 20, and threaded steel rods 42 are inserted therein and fixed to the bottom face of the floor slab 1. Jacks 3 are set into the positions of the circular cut lines 20, and a separation frame 4 is placed between the jacks 3 and fixed. The threaded steel rods 42 are fixed to the separation frame. The jacks are operated to lift the floor slab and to separate it from the girders for removal. Since the jacks 3 are installed on the main girders 2, sufficiently large reaction can be obtained, and the floor slab can be surely and rapidly removed. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、老朽化等により修繕が必要となった高架道路や橋梁等のコンクリート製床版及びジョイントを撤去する方法に関する。   The present invention relates to a method for removing concrete floor slabs and joints such as elevated roads and bridges that need to be repaired due to aging or the like.

交通荷重により損傷したり、老朽化した橋梁のコンクリート床版及びジョイントを補修・交換するため補修部分を解体撤去する必要がある。また、橋梁の設計基準の変更で設計荷重が引き上げられ、古い基準の床版を撤去して新基準に合わせて打ち替えする必要が生じてきた。
ブレーカ等で床版を破砕撤去するのは騒音・振動が大きく環境問題となったり、また、破砕片が落下しないように防護工事が必要なので効率が悪く、施工期間が長引きコストがかかった。
カッターで床版を切断し、クレーン等で引き上げる方法の場合、床版と桁の連結状態が強固なため、桁上の床版を残して床版を撤去し、残った桁上の床版を破砕して撤去するため安全柵等の防護工事が必要となり効率が悪かった。
It is necessary to dismantle and remove the repaired parts to repair or replace the concrete floor slabs and joints of bridges that have been damaged or deteriorated by traffic loads. In addition, the design load has been raised by changing the bridge design standards, and it has become necessary to remove the old standard floor slabs and replace them with new standards.
Breaking and removing a floor slab with a breaker, etc. caused a lot of noise and vibration, and it was not efficient because protection work was necessary to prevent the shredded pieces from falling, resulting in prolonged construction costs.
In the case of the method of cutting the floor slab with a cutter and pulling it up with a crane, etc., the connection between the floor slab and the girder is strong, so remove the floor slab leaving the floor slab on the girder and remove the floor slab on the remaining girder. Because it was crushed and removed, protective work such as a safety fence was required, which was inefficient.

そこで、撤去すべき部分の床版を適宜の大きさに切断し、ジャッキと持ち上げ用梁からなる撤去装置を利用し、床版にカッターで切断線を形成して画定した撤去領域を上方に持ち上げて床版と桁との結合を破壊解除する方法が特許文献1(特公平7−26369号公報)、及び、特許文献2(特公平7−26371号公報)で提案されている。
これらの工法は、図4に示すように、コンクリート床版にカッターで切断線を形成してブロックに分割し、ブロックを跨ぐ剥離架台を設置し、この剥離架台に設けたセンターホールジャッキでブロックを引き上げて、桁から床版を引き剥がしたり、図5に示すように、剥離架台をブロックを跨いで架け渡し、剥離架台とブロックを鋼棒で連結し、剥離架台の両端に配置したジャッキで剥離架台を持ち上げ、ブロックを桁から引き剥がすものである。
また、撤去に使用する撤去梁などを小型分割化した方法として特許文献3(特開2001−226914号公報)が提案されている。
Therefore, the floor slab of the part to be removed is cut to an appropriate size, and a removal device consisting of a jack and a lifting beam is used to lift the removal area defined by forming a cutting line on the floor slab with a cutter. Patent Document 1 (Japanese Patent Publication No. 7-26369) and Patent Document 2 (Japanese Patent Publication No. 7-26371) propose methods for breaking and releasing the connection between the floor slab and the girders.
As shown in FIG. 4, these construction methods form a cutting line with a cutter on a concrete floor slab and divide it into blocks, install a peeling frame that straddles the block, and block the block with a center hole jack provided on this peeling frame. Pull up and peel off the floor slab from the girder, or as shown in Fig. 5, bridge the peeling stand across the block, connect the peeling stand and the block with steel bars, and peel with the jacks placed at both ends of the peeling stand The platform is lifted and the block is peeled off from the beam.
Further, Patent Document 3 (Japanese Patent Laid-Open No. 2001-226914) has been proposed as a method in which a removal beam or the like used for removal is reduced in size.

特公平7−26369号公報Japanese Patent Publication No. 7-26369 特公平7−26371号公報Japanese Patent Publication No. 7-26371 特開2001−226914号公報JP 2001-226914 A

コンクリート製の床版は、ジベル等で桁に一体化されており、適宜の大きさに切断分割しても、床版を引き剥がすには大きな力を必要とする。大きな力が床版を持ち上げるジャッキに反力として作用すると、経年変化で劣化した床版が変形したり、床版が抜けるという事故が起きることがある。
本発明は、劣化した床版であっても床版が抜けたりすることがなく、確実にジャッキの反力が取れるようにすると共に、桁と床版の合成度を弱めることによって床版の撤去が容易におこなえるようにするものである。
A concrete floor slab is integrated into a girder by a gibber or the like, and requires a large force to peel off the floor slab even if it is cut and divided to an appropriate size. If a large force acts as a reaction force on the jack that lifts the floor slab, an accident may occur in which the floor slab deteriorated due to aging changes or the floor slab comes off.
The present invention prevents the floor slab from coming out even if it is a deteriorated floor slab, ensures that the reaction force of the jack can be taken, and removes the floor slab by reducing the degree of synthesis of the girder and the floor slab. Is easy to do.

主桁の上部においてジャッキを設置する領域を床版から縁切りし、平行する主桁上の床版に桁に達する切断線を形成すると共に主桁にほぼ直角に切断線を形成して床版の切断撤去領域を画定し、ジャッキと架台からなる撤去装置のジャッキを床版から縁切りした領域に設置し、ジャッキを作動させて切断線で画定した領域の床版を持ち上げて床版と桁との結合を解除することによって床版を簡易に撤去できるようにしたものである。   The area where the jack is installed at the upper part of the main girder is cut off from the floor slab, a cutting line reaching the girder is formed on the floor slab on the parallel main girder, and a cutting line is formed at a right angle to the main girder. Define the cutting and removal area, install the jack of the removal device consisting of the jack and the base in the area cut off from the floor slab, operate the jack and lift the floor slab of the area defined by the cutting line to connect the floor slab and the girder The floor slab can be easily removed by releasing the connection.

ジャッキが主桁の直上に設置してあり、床版を剥離する際のジャッキの反力が主桁に負担されるので、床版が抜け落ちるというようなことは排除することができると共に、主桁の上において床版に切断線を形成して床版と主桁の部分が他の床版部分と縁が切ってあることから、床版を桁から確実に剥離することができ、床版を確実かつ容易に撤去することができる。   The jack is installed directly above the main girder, and the reaction force of the jack when the floor slab is peeled off is borne by the main girder. Since a cutting line is formed in the floor slab and the edge of the floor slab and the main girder are cut off from the other floor slab parts, the floor slab can be securely peeled from the girder. It can be removed reliably and easily.

実施例1
図1及び図2に示すように、切断領域の主桁2の上の床版1にφ110mm〜φ200mmのホールソーで主桁2に達する円形切断線20を形成し、この円形切断線20の内側領域を床版1から縁を切った状態とする。この円形切断線20の直径は床版1の撤去に使用するジャッキ3の大きさに応じて選定するもので、円形切断線20内の領域にジャッキ3が納まるようにし、床版1を持ち上げる際にジャッキ3が床版1に干渉しないようにするものである。
Example 1
As shown in FIG. 1 and FIG. 2, a circular cutting line 20 reaching the main beam 2 is formed on the floor slab 1 on the main beam 2 of the cutting region with a hole saw of φ110 mm to φ200 mm, and an inner region of the circular cutting line 20 The edge is cut from the floor slab 1. The diameter of the circular cutting line 20 is selected according to the size of the jack 3 used for removing the floor slab 1. When the jack 3 is placed in the area within the circular cutting line 20 and the floor slab 1 is lifted, The jack 3 prevents the floor slab 1 from interfering.

図1の断面図及び図2の平面図に示すように、撤去する床版1の領域を画定するため、主桁2に沿って1点鎖線で示す切断線C1、C2を形成する。これらの切断線は主桁2に達する深さであり、床版1と主桁2の結合度を弱めることになる。次に横桁(図示しない)の上に切断線C1、C2に直角に切断線C3、C4を形成する。切断線C3、C4も横桁に達する深さであり、C1、C2、C3及びC4の切断線で、床版1に撤去領域が画定される。   As shown in the sectional view of FIG. 1 and the plan view of FIG. 2, cutting lines C <b> 1 and C <b> 2 indicated by alternate long and short dash lines are formed along the main beam 2 in order to define the region of the floor slab 1 to be removed. These cutting lines are deep enough to reach the main girder 2, and weaken the degree of coupling between the floor slab 1 and the main girder 2. Next, cutting lines C3 and C4 are formed on the cross beams (not shown) at right angles to the cutting lines C1 and C2. The cutting lines C3 and C4 are also deep enough to reach the cross beam, and the removal region is defined in the floor slab 1 by the cutting lines of C1, C2, C3, and C4.

なお、切断線C3、C4は横桁の上部に形成せずに任意の位置に形成してもよく、その場合は、切断線の形成の際の冷却水が床版1の底面から落下しないように、床版1の底面に切断線に沿って厚さ5cmの平板発泡スチロールを変成シリコーンで接着し、円形のカッターを高速回転させてコンクリート構造物を切断する。コンクリートカッター刃が床版1の底面から突出するが、発泡スチロールに切れ目が形成されるだけであり、冷却水が外部に流出することはない。   Note that the cutting lines C3 and C4 may be formed at arbitrary positions without being formed on the upper part of the cross beam. Next, a flat foam polystyrene having a thickness of 5 cm is bonded to the bottom surface of the floor slab 1 along the cutting line with modified silicone, and a concrete structure is cut by rotating a circular cutter at a high speed. Although the concrete cutter blade protrudes from the bottom surface of the floor slab 1, only a cut is formed in the polystyrene foam, and the cooling water does not flow out to the outside.

円形切断線20、または、主桁2の対向する位置に設けた円形切断線20、20の中間部の床版1にφ50mmの穴22を形成し、穴22の深さを計測して床版1の厚さを計測し、コンクリートカッターの切断深さを調節してコンクリートカッターが桁2に衝突して損傷することがないようにして主桁2に沿って床版1をカッターで切断して切断線を形成する。
次に、形成した穴22にネジ付き鋼棒42を挿入し、床版1の底面にナットで固定する。
A hole 22 having a diameter of 50 mm is formed in the floor slab 1 in the middle of the circular cutting line 20 or the circular cutting lines 20 and 20 provided at the position opposite to the main girder 2, and the depth of the hole 22 is measured to measure the floor slab. Measure the thickness of 1 and adjust the cutting depth of the concrete cutter so that the concrete cutter does not collide with the girder 2 and damage it. Cut the floor slab 1 along the main girder 2 with a cutter. A cutting line is formed.
Next, a threaded steel rod 42 is inserted into the formed hole 22 and fixed to the bottom surface of the floor slab 1 with a nut.

ついで、円形切断線20の内側にジャッキ3をセットし、ジャッキ3の間に、軸方向にスリット41が形成されている剥離架台4を架け渡して固定し、スリット41に既に床版1に固定してあるネジ付き鋼棒42を通して剥離架台4の上面にナットで固定する。   Next, the jack 3 is set inside the circular cutting line 20, and the peeling frame 4 in which the slit 41 is formed in the axial direction is bridged between the jacks 3 and fixed, and the floor 41 is already fixed to the slit 41. The nut is fixed to the upper surface of the peeling frame 4 through a threaded steel bar 42.

ジャッキ3を作動させ剥離架台4を上昇させ、この上昇力をネジ付き鋼棒42を介して床版1の下面に伝達して床版1の切断線C1〜C4で画定された領域を主桁2及び横桁から引き剥がし、床版1と主桁2及び横桁との結合が解除されたことを確認し、ジャッキ3の作動を解除して剥離した床版1の領域を元に戻し、剥離架台4とジャッキを移動させ、剥離された床版領域をフォークリフトやクレーンで撤去する。   The jack 3 is actuated to raise the peeling frame 4, and this lifting force is transmitted to the lower surface of the floor slab 1 through the threaded steel bar 42, so that the area defined by the cutting lines C1 to C4 of the floor slab 1 is the main girder. 2 and the horizontal girder are peeled off, it is confirmed that the connection between the floor slab 1 and the main girder 2 and the horizontal girder is released, the operation of the jack 3 is canceled, and the peeled area of the floor slab 1 is returned to the original state. The peeling cradle 4 and the jack are moved, and the peeled floor slab area is removed with a forklift or a crane.

実施例2
実施例1と同様に切断領域の主桁2の上の床版1にφ110mm〜φ200mmのホールソーで主桁2に達する円形切断線20を形成し、この円形切断線内部の円柱状のコアを撤去し、主桁2の上部の床版にジャッキ3を設置するための穴を形成したものであり、この穴内に設置したジャッキ3は、床版1とは縁を切った状態である。
この後の工程は、実施例1と同様であり、主桁2の上に主桁2に沿って切断線を形成し、更にこの切断線に直角に切断線を床版に形成して剥離領域を画定し、ジャッキ3を作動させて剥離領域の床版と桁の結合を解除するものである。
Example 2
As in Example 1, a circular cutting line 20 reaching the main beam 2 is formed on the floor slab 1 above the main beam 2 in the cutting area with a hole saw of φ110 mm to φ200 mm, and the cylindrical core inside the circular cutting line is removed. A hole for installing the jack 3 is formed in the floor slab above the main girder 2, and the jack 3 installed in the hole is in a state where the edge of the floor slab 1 is cut.
The subsequent steps are the same as those in the first embodiment. A cutting line is formed on the main beam 2 along the main beam 2, and a cutting line is formed on the floor slab perpendicularly to the cutting line. And the jack 3 is actuated to release the connection between the floor slab and the girder in the peeling area.

主桁の上のコンクリート床版に円形切断線を形成してジャッキを設置する領域を床版から縁切りし、剛性の大きな桁上に直接ジャッキを設置するようにしたので、十分大きな反力が得られ、能力の大きなジャッキの使用が可能となり、また、主桁上に切断線を形成して床版と桁の結合度を弱めてあるので、確実に、かつ、短時間で床版を桁から剥離することができ、補修工事の工期の短縮を図ることができる。また、床版の強度が大きくない歩道橋に対してもこの発明の方法は有効である。   The area where the jack is installed is cut from the floor slab by forming a circular cutting line on the concrete slab above the main girder, and the jack is installed directly on the rigid girder, so a sufficiently large reaction force can be obtained. It is possible to use a jack with a large capacity, and a cutting line is formed on the main girder to weaken the coupling between the floor slab and the girder, so that the floor slab can be removed from the girder reliably and in a short time. It can be peeled off, and the work period of repair work can be shortened. The method of the present invention is also effective for a pedestrian bridge where the strength of the floor slab is not large.

本発明の撤去作業時の断面図。Sectional drawing at the time of removal work of this invention. 本発明の撤去作業時の平面図。The top view at the time of the removal work of this invention. 本発明の他の実施例の断面図。Sectional drawing of the other Example of this invention. 従来例の断面図。Sectional drawing of a prior art example. 他の従来例の断面図。Sectional drawing of another prior art example.

符号の説明Explanation of symbols

1 コンクリート床版
11 撤去ブロック
2 主桁
20 円形切断線
3 ジャッキ
4 剥離架台
41 スリット
42 ネジ付き鋼棒
C 切断線
1 Concrete floor slab 11 Removal block 2 Main girder 20 Circular cutting line 3 Jack 4 Peeling frame 41 Slit 42 Threaded steel bar C Cutting line

Claims (3)

主桁の上部においてジャッキを設置する領域を床版から縁切りし、平行する主桁上の床版に桁に達する切断線を形成すると共に主桁にほぼ直角に切断線を形成して床版の切断撤去領域を画定し、ジャッキと架台からなる撤去装置のジャッキを床版から縁切りした領域に設置し、ジャッキを作動させて切断線で画定した領域の床版を持ち上げて床版と桁との結合を解除する橋梁床版の撤去方法。 The area where the jack is installed at the upper part of the main girder is cut off from the floor slab, a cutting line reaching the girder is formed on the floor slab on the parallel main girder, and a cutting line is formed at a right angle to the main girder. Define the cutting and removal area, install the jack of the removal device consisting of the jack and the gantry in the area cut from the floor slab, operate the jack and lift the floor slab in the area defined by the cutting line to connect the floor slab and the girder How to remove the bridge deck to release the bond. 請求項1において、主桁の上部において、床版にホールソーによって主桁の上面に達する円形切断線を形成することによって、ジャッキを設置する領域を床版から縁切りする橋梁床版の撤去方法。 2. The method for removing a bridge floor slab according to claim 1, wherein a circular cutting line that reaches the upper surface of the main girder is formed on the floor slab by a hole saw at the upper part of the main girder, thereby rimming an area where the jack is installed from the floor slab. 請求項2において、ホールソーで形成した円形切断線の内部の円柱コアを撤去して円形穴を形成し、この穴内にジャッキを設置する橋梁床版の撤去方法。 3. The method for removing a bridge deck according to claim 2, wherein a circular core is formed by removing a cylindrical core inside a circular cutting line formed by a hole saw, and a jack is installed in the hole.
JP2008188652A 2008-07-22 2008-07-22 Removal method of bridge deck Active JP5237710B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008188652A JP5237710B2 (en) 2008-07-22 2008-07-22 Removal method of bridge deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008188652A JP5237710B2 (en) 2008-07-22 2008-07-22 Removal method of bridge deck

Publications (2)

Publication Number Publication Date
JP2010024742A true JP2010024742A (en) 2010-02-04
JP5237710B2 JP5237710B2 (en) 2013-07-17

Family

ID=41730823

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008188652A Active JP5237710B2 (en) 2008-07-22 2008-07-22 Removal method of bridge deck

Country Status (1)

Country Link
JP (1) JP5237710B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014077279A (en) * 2012-10-10 2014-05-01 Akebono Sangyo:Kk Removal method for floor slab
CN114922104A (en) * 2022-05-27 2022-08-19 保利长大工程有限公司 Bridge hollow slab dismantling method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6682332B2 (en) * 2016-04-15 2020-04-15 日本車輌製造株式会社 Bridge removal method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6059209A (en) * 1983-09-08 1985-04-05 石川島播磨重工業株式会社 Replacing method of bridge reinforced concrete floor panel
JPS641865A (en) * 1987-06-24 1989-01-06 Fuji Ps Concrete Kk Removing method of floor slab concrete on steel girder
JPH09189011A (en) * 1996-01-10 1997-07-22 Ishikawajima Constr Materials Co Ltd Floor plate removing device and removing method
JPH11131427A (en) * 1997-10-31 1999-05-18 Mitsui Miike Mach Co Ltd Floor board replacing machine for concrete bridge
JP2001226914A (en) * 2000-02-18 2001-08-24 Nagata Kogyo Kk Method of removing bridge floor slab

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6059209A (en) * 1983-09-08 1985-04-05 石川島播磨重工業株式会社 Replacing method of bridge reinforced concrete floor panel
JPS641865A (en) * 1987-06-24 1989-01-06 Fuji Ps Concrete Kk Removing method of floor slab concrete on steel girder
JPH09189011A (en) * 1996-01-10 1997-07-22 Ishikawajima Constr Materials Co Ltd Floor plate removing device and removing method
JPH11131427A (en) * 1997-10-31 1999-05-18 Mitsui Miike Mach Co Ltd Floor board replacing machine for concrete bridge
JP2001226914A (en) * 2000-02-18 2001-08-24 Nagata Kogyo Kk Method of removing bridge floor slab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014077279A (en) * 2012-10-10 2014-05-01 Akebono Sangyo:Kk Removal method for floor slab
CN114922104A (en) * 2022-05-27 2022-08-19 保利长大工程有限公司 Bridge hollow slab dismantling method

Also Published As

Publication number Publication date
JP5237710B2 (en) 2013-07-17

Similar Documents

Publication Publication Date Title
JP6709037B2 (en) Floor removal method for composite girder
JP4709665B2 (en) Replacement method for bridge concrete slab and concrete slab.
JP2010007365A (en) Form timbering apparatus and form apparatus
JP5237710B2 (en) Removal method of bridge deck
JP2007320741A (en) Hanging unit for lifting
KR20060099484A (en) The use shelf with chemical anchor and high tention long bolt for bridge deck lifting method
JP2017218885A (en) Removal method of existing concrete floor slab
JP5439278B2 (en) How to remove temporary support concrete
JP4073454B2 (en) Floor plate disassembly method
JP6999295B2 (en) How to remove the deck
KR101095449B1 (en) Bridge deck dismembering method and its equipment
KR101060598B1 (en) Horizontal movable up-down type supporting post and rapid replacing method of the bridge using the same
CN110056205A (en) A method of using rope saw cut concrete inner support beam
JP6607218B2 (en) Existing concrete floor slab cutting equipment
JP2009228301A (en) Elongation method for bridge pier
JP5794539B2 (en) How to remove floor slab
JP4690764B2 (en) Removal method of expansion joint
CN115506371A (en) Construction method for dismantling ultrahigh inner support of deep foundation pit
JP6328736B1 (en) How to remove existing concrete from bridges
JPH06136722A (en) Bridge floor plate disassembly method and device therefor
JP4308896B2 (en) Removal method of bridge deck
JP6792415B2 (en) How to remove concrete slab and how to install new concrete slab
JP4339778B2 (en) How to remove a bridge
JP2008014067A (en) Method for removal of telescopic joint
JP6363343B2 (en) High-rise building demolition method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110614

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120723

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120731

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120917

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130319

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130329

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5237710

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160405

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250