Prior art keywords
frame member
tower
intermediate landing
divided
floor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2008062116A
Other languages
Japanese (ja)
Inventor
Yasuhiro Nakamura
保広 中村
Haruhiko Matsuura
晴彦 松浦
Takashi Yamagishi
隆史 山岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tomoe Corp
Tokyo Electric Power Company Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Tomoe Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Tomoe Corp filed Critical Tokyo Electric Power Co Inc
Priority to JP2008062116A priority Critical patent/JP2009215816A/en
Publication of JP2009215816A publication Critical patent/JP2009215816A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide an intermediate landing structure of a steel pipe pole tower for power transmission capable of eliminating removing and restoring constructions for an intermediate landing when a tower wiring construction is performed, improving working efficiency and safety, and reducing cost. <P>SOLUTION: The intermediate landing 10 comprises a floor plate 11 surrounding the outer periphery of a tower pole 2 excluding the portion of a ladder 4, a supporting member 12 for supporting the floor plate 11, and a handrail 13 installed on the outer periphery of the floor plate 11. The floor plate 11 is divided into a plurality of pieces in the circumferential direction of the tower pole 2, and any quantity of divided floor plates 20a among the divided floor plates 20 are attached to an outer frame member 31 with a hinge member to form the landing in an upwardly openable type. The necessary divided floor plate 20a of the openable type is opened to allow a wire and a member for wire installation to pass through an opening 33, and closed to use as the intermediate landing. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、送電用鋼管柱鉄塔の塔柱に設けられる中間踊場構造に関するものである。   The present invention relates to an intermediate landing structure provided on a tower pillar of a steel pipe pillar tower for power transmission.

単柱形式等の送電用鋼管柱鉄塔の塔柱には、メンテナンスのために梯子と中間踊場が設けられている。この中間踊場は、電線を支持する最下腕金から4〜5m下がった位置の塔柱外周にボルト止めで設置されており、外径4m程度のドーナツ状に加工した鋼製枠材に、エキスパンドメタルからなる床板(8分割程度)を溶接し、外周には高さ1m程度の棒鋼からなる手摺を設けて構成されている。   A ladder and an intermediate landing are provided for maintenance on the tower pillars of steel pipe pillars for transmission such as single pillars. This intermediate landing is bolted to the outer periphery of the tower column at a position 4 to 5m below the lowest brace that supports the wire, and is expanded to a steel frame processed into a donut shape with an outer diameter of about 4m. A floor plate made of metal (about 8 divisions) is welded, and a handrail made of bar steel having a height of about 1 m is provided on the outer periphery.

このような中間踊場は、架線工事等を行う際、電線架設のためのワイヤ(例えば特許文献1、2参照)や資機材荷揚げ用ワイヤの通り道の障害となることから、中間踊場を撤去して架線工事等を行い、工事完了後に中間踊場を設置しており、撤去・設置の工事が必要となる。   Such an intermediate landing is a hindrance to the wire for laying wires (for example, see Patent Documents 1 and 2) and the wire for unloading equipment when carrying out overhead wire construction. Overhead construction work is carried out, and an intermediate dance hall is set up after the construction is completed, which requires removal and installation work.

なお、本発明に関連する先行技術文献として特許文献3がある。この特許文献3の発明は、建屋や柱等の高所位置で壁面に対する各種作業をなす場合の作業スペースを確保するために用いられる足場装置および足場構築工法に関するものであり、水平足場に開口する昇降口を閉鎖可能に配置され足場本体の側縁にヒンジ結合した折曲げ起立可能なつま先板を有する開閉足場板を設け、昇降口がデッドスペースになっている点を改善したものである。   In addition, there exists patent document 3 as a prior art document relevant to this invention. The invention of Patent Document 3 relates to a scaffold device and a scaffold construction method used to secure a work space when performing various operations on a wall surface at a high position such as a building or a pillar, and opens to a horizontal scaffold. An open / close scaffolding plate having a toe plate that can be bent upright and is hingedly connected to the side edge of the scaffold main body so as to be able to close the lift is provided to improve the point that the lift is a dead space.

特開昭64−26315号公報JP-A 64-26315 特開2006−67769号公報JP 2006-67769 A 特開平9−287284号公報JP-A-9-287284

従来の中間踊場の場合、架線工事等における中間踊場の撤去・復旧に際しては、(1)仮設作業足場の設置・撤去が必要であり、(2)殆どが狭隘地での作業であり、塔上〜地上間の上げ下げに時間がかかり、(3)構造上部分撤去は不可能であることから、塔上での分割・組立作業となるため、工具・資材類の落下等のリスクが大きいなど、施工面・安全面において大きな問題があると共に、コストアップにもつながっている。   In the case of conventional intermediate landings, (1) installation / removal of temporary work platforms is necessary for removal / rehabilitation of intermediate landings in overhead wire construction, etc. (2) most of the work is in confined areas, -It takes time to raise and lower between the ground, (3) Since it is impossible to remove the part of the structure, because it is divided and assembled on the tower, there is a high risk of tools and materials falling, etc. There are major problems in terms of construction and safety, as well as an increase in costs.

本発明は、前述のような課題の解決を図ったものであり、鉄塔の架線工事等に際し、中間踊場の撤去・復旧工事が不要となり、施工性・安全性の向上およびコストの低減が図れる送電用鋼管柱鉄塔の中間踊場構造を提供することを目的としている。   The present invention is intended to solve the above-mentioned problems, and it is not necessary to remove or restore the intermediate landing for the construction work of the overhead tower, etc., so that the workability and safety can be improved and the cost can be reduced. The purpose is to provide an intermediate landing structure for steel pipe columns.

本発明の請求項1に係る発明は、送電用鋼管柱鉄塔の塔柱に設けられる中間踊場構造であり、塔柱を取り囲むように設けられる床板が塔柱の周方向に複数に分割され、分割床板のうち任意の数の分割床板が上方向に開閉可能に設けられていることを特徴とする送電用鋼管柱鉄塔の中間踊場構造である。   The invention according to claim 1 of the present invention is an intermediate landing structure provided in a tower pillar of a steel pipe pillar tower for power transmission, and a floor plate provided so as to surround the tower pillar is divided into a plurality in the circumferential direction of the tower pillar. An intermediate landing structure of a steel pipe pillar tower for power transmission, wherein any number of divided floor boards among the floor boards is provided so as to be openable and closable upward.

図1に示すように、送電用鋼管柱鉄塔の最下腕金の下方に設置される中間踊場に適用される。図2に示すように、塔柱には梯子が設けられているため、この梯子の左右両側は固定式の分割床板とし、残りの床板を開閉式の分割床板とするのが好ましい。図示例のように例えば6箇所を開閉式とし、例えば4箇所を電線架設のためのワイヤの通り道として、2箇所を資機材荷揚げ用ワイヤの通り道として使用する。開閉式の分割床板の開く方向は、塔柱に沿ってワイヤが配置されるため、外側に向かって開くようにするのが好ましいが、内側に向かって開くようにしてもよいし、周方向の横に向かって開くようにしてもよい。また、上方に向かって開くようにする。   As shown in FIG. 1, the present invention is applied to an intermediate landing set under the lower arm of the steel pipe pillar tower for power transmission. As shown in FIG. 2, since the tower columns are provided with ladders, it is preferable that the left and right sides of the ladders are fixed split floor boards and the remaining floor boards are open / closed split floor boards. As shown in the illustrated example, for example, six locations are openable / closable, for example, four locations are used as wires for wire installation, and two locations are used as materials and material unloading wires. The opening direction of the opening / closing type divided floor plate is preferably open toward the outside because the wires are arranged along the tower column, but may be opened toward the inside or in the circumferential direction. You may make it open toward the side. Also, it opens upward.

本発明の請求項2に係る発明は、請求項1に記載の中間踊場構造において、床板を支持する支持材を構成する、内側枠材と、外側枠材と、内側枠材と外側枠材を連結する連結枠材とにより、分割床板の平面形状に対応した平面形状の開口が塔柱の周囲に複数形成され、前記開口の外側枠材、内側枠材または連結枠材に分割床板の一辺がヒンジ部材を介して取り付けられ、少なくとも分割床板のヒンジ部材の辺に対向する辺の周縁部が枠材に上から係止されるように構成されていることを特徴とする送電用鋼管柱鉄塔の中間踊場構造である。   The invention according to claim 2 of the present invention is the intermediate landing structure according to claim 1, comprising an inner frame member, an outer frame member, an inner frame member, and an outer frame member that constitute a support member that supports the floor board. A plurality of planar openings corresponding to the planar shape of the divided floor board are formed around the tower column by the connecting frame material to be connected, and one side of the divided floor board is formed on the outer frame material, the inner frame material or the connecting frame material of the opening. A steel pipe pillar tower for power transmission, characterized in that it is attached via a hinge member and is configured such that at least a peripheral portion of a side facing the side of the hinge member of the divided floor plate is locked to the frame member from above. It is an intermediate landing structure.

図2、図3に示すように、内側枠材と外側枠材と連結枠材とにより開閉式の分割床板の支持フレームを形成し、また開閉式の分割床板が上方に開くようにした場合である。リング状の内側枠材と外側枠材との間に連結部材を円周方向に間隔をおいて配置してもよいし、図示例のようにリング状の内側枠材と外側枠材を円周方向に分割し、円弧状の内側枠材と外側枠材の両側に連結枠材を配置して各分割床板に対応した個別の支持フレームを配置するようにしてもよい。上方に開いた分割床板を閉じると、分割床板の周縁部が枠材に係止され、開閉式の分割床板の落下が防止される。分割床板の周縁部は枠材にボルトで固定する。枠材の裏面にはナットを固着しておけば、分割床板の上からボルトを締め付け、緩めることができる。   As shown in FIG. 2 and FIG. 3, the inner frame member, the outer frame member, and the connecting frame member form a support frame for the openable and detachable divided floor plate, and the openable and foldable divided floor plate is opened upward. is there. A connecting member may be arranged between the ring-shaped inner frame material and the outer frame material with a space in the circumferential direction, or the ring-shaped inner frame material and the outer frame material may be arranged circumferentially as shown in the example. It may be divided in the direction, and the connecting frame members may be arranged on both sides of the arc-shaped inner frame member and the outer frame member, and individual support frames corresponding to the divided floor plates may be arranged. When the divided floor board opened upward is closed, the peripheral edge portion of the divided floor board is locked to the frame member, and the fall of the open / close-type divided floor board is prevented. The peripheral edge of the divided floor plate is fixed to the frame member with bolts. If a nut is fixed to the back surface of the frame member, the bolt can be tightened and loosened from above the divided floor plate.

以上のような構成において、送電用鋼管柱鉄塔の架線工事や組立工事などに際し、ワイヤの通り道の確保に必要な範囲のみ分割床板を開き、形成された開口によりワイヤや部材を通過させる。開いた分割床板を閉じるだけで、中間踊場として使用できる。これにより従来のような中間踊場の撤去・復旧工事が不要となる。   In the configuration as described above, when performing overhead wire construction or assembly work of the steel pipe pillar tower for power transmission, the divided floor plate is opened only in a range necessary for securing the path of the wire, and the wire or member is allowed to pass through the formed opening. It can be used as an intermediate landing just by closing the open divided floor board. This eliminates the need to remove and restore the intermediate landing as in the past.

(1)送電用鋼管柱鉄塔の架線工事や組立工事などに際し、中間踊場の分割床板の開閉のみでワイヤや部材の通り道を確保することができ、従来のような中間踊場の撤去・復旧工事が不要となる。   (1) In the case of overhead wire construction and assembly work of steel pipe pillar towers for power transmission, it is possible to secure the passage of wires and members by simply opening and closing the divided floor plate of the intermediate landing, and the conventional removal and restoration work of the intermediate landing is not possible. It becomes unnecessary.

(2) 中間踊場の撤去・復旧工事が不要となることにより、a)仮設作業足場の設置・撤去が不要となり、b)中間踊場の撤去・復旧に伴う塔上〜地上間の上げ下げ作業が皆無となり、c)工具・資材類(特にボルト等の小物類)の落下等のリスクが低減されるなどから、施工性・安全性の向上およびコストの低減が図れる。   (2) By eliminating the need for removal and restoration of the intermediate landing, a) it is no longer necessary to install / remove the temporary work platform, and b) there is no up / down work between the tower and the ground associated with the removal / reconstruction of the intermediate landing. C) Since the risk of dropping tools and materials (particularly small items such as bolts) is reduced, it is possible to improve workability and safety and reduce costs.

(3) 分割床板とその支持材等からなる簡易で低コストの構造により、施工面・安全面・コスト面で多大な効果を有する中間踊場構造が得られる。   (3) A simple and low-cost structure consisting of divided floor boards and their supporting materials, etc., can provide an intermediate landing structure that has great effects in terms of construction, safety, and cost.

以下、本発明を図示する実施形態に基づいて説明する。図1は本発明の中間踊場構造が適用される単柱形式の送電用鋼管柱鉄塔の例を示す正面図である。図2は本発明の中間踊場構造の一例を示す平面図と展開側面図である。図3は図2の部分拡大平面図と各部の断面図である。   Hereinafter, the present invention will be described based on the illustrated embodiments. FIG. 1 is a front view showing an example of a single-column steel pipe pillar for power transmission to which the intermediate landing structure of the present invention is applied. FIG. 2 is a plan view and a developed side view showing an example of the intermediate landing structure of the present invention. FIG. 3 is a partially enlarged plan view of FIG. 2 and a sectional view of each part.

図1において、送電用鋼管柱鉄塔1の塔柱2の上部には高さ方向に間隔をおいて複数の腕金3が設けられ、塔柱2の腕金3の取り付かない一側面には地上から頂部に達する梯子4が設けられており、最下腕金3の下方に梯子4の部分を除く塔柱2の外周を取り囲む本発明の中間踊場10が設置される。   In FIG. 1, a plurality of armrests 3 are provided at an upper portion of a tower pillar 2 of a steel pipe pillar tower 1 for power transmission at intervals in the height direction. A ladder 4 reaching the top is provided, and an intermediate landing 10 of the present invention surrounding the outer periphery of the tower column 2 excluding the portion of the ladder 4 is installed below the lowermost arm 3.

中間踊場10は、図2に示すように、梯子4の部分を除く塔柱2の外周を取り囲む床板11と、この床板11を支持する支持材12と、床板11の外周に設けられる手摺13から構成されている。本発明では、床板11を塔柱2の円周方向に複数に分割し、分割床板20のうち任意の数の分割床板20を上方向に開閉可能な開閉式とする。この図示例では、分割床板8面のうち梯子4の両側を除く6面を開閉式の分割床板20aとし、梯子4の左右両側の2面を固定式の分割床板20bとしている。開閉式の分割床板20aは等分割により平面視形状が扇形となっている。   As shown in FIG. 2, the intermediate landing 10 includes a floor plate 11 that surrounds the outer periphery of the tower column 2 excluding the ladder 4, a support member 12 that supports the floor plate 11, and a handrail 13 provided on the outer periphery of the floor plate 11. It is configured. In the present invention, the floor board 11 is divided into a plurality in the circumferential direction of the tower column 2, and an arbitrary number of the divided floor boards 20 among the divided floor boards 20 are openable and closable. In this illustrated example, six surfaces of the divided floor plate 8 excluding both sides of the ladder 4 are open / close-type divided floor plates 20a, and two surfaces on the left and right sides of the ladder 4 are fixed-type divided floor plates 20b. The open / close-type divided floor plate 20a has a sector shape in plan view by equal division.

支持材12は、塔柱2の周囲近くに配置される内側枠材30と、この内側枠材30の外側に所定の距離をおいて配置される外側枠材31と、内側枠材30と外側枠材31との間に円周方向に等間隔をおいて複数配置されて内側枠材30と外側枠材31とを連結する連結枠材32から構成され、内側枠材30と外側枠材31と連結枠材32により分割床板20aの平面形状に対応した平面形状扇形の開口33が開閉式分割床板20aの数だけ6個形成されるように構成されている。   The support material 12 includes an inner frame member 30 disposed near the periphery of the tower column 2, an outer frame member 31 disposed at a predetermined distance outside the inner frame member 30, and the inner frame member 30 and the outer side. A plurality of connecting frame members 32 are arranged between the frame member 31 at equal intervals in the circumferential direction and connect the inner frame member 30 and the outer frame member 31, and the inner frame member 30 and the outer frame member 31. The connecting frame member 32 is configured to form six planar fan-shaped openings 33 corresponding to the planar shape of the divided floor plate 20a by the number of the open / close-type divided floor plates 20a.

図示例では、一部切り欠かれたリング状の内側枠材30と外側枠材31は円周方向に6分割されており、分割された内側枠材30と外側枠材31の両端部同士をそれぞれ連結枠材32で連結することにより扇形の支持フレームが形成されている(図2、図3参照)。隣接する連結枠材32、32の間に取付ブラケット34を挟み、この取付ブラケット34を塔柱2の外面にボルト止めすることで支持材12が塔柱2に固定される(図1、図2参照)。なお、内側枠材30と外側枠材31は分割した場合を示したが、一部切り欠かれたリング状のものに連結枠材32を配置するようにしてもよい。   In the illustrated example, the ring-shaped inner frame member 30 and the outer frame member 31 that are partially cut out are divided into six in the circumferential direction, and both end portions of the divided inner frame member 30 and outer frame member 31 are connected to each other. A fan-shaped support frame is formed by connecting the connecting frame members 32 (see FIGS. 2 and 3). A support bracket 12 is fixed to the tower column 2 by sandwiching a mounting bracket 34 between adjacent connecting frame members 32 and 32 and bolting the mounting bracket 34 to the outer surface of the tower column 2 (FIGS. 1 and 2). reference). In addition, although the case where the inner frame member 30 and the outer frame member 31 are divided is shown, the connecting frame member 32 may be arranged in a ring-shaped member partially cut away.

なお、固定式の分割床板20bは、内側枠材30´と外側枠材31´と一対の連結枠材32´で外枠を形成し、これにエキスパンドメタル等の踏み板40を設けることで構成することができる(図3参照)。   The fixed divided floor plate 20b is formed by forming an outer frame with an inner frame member 30 ', an outer frame member 31', and a pair of connecting frame members 32 ', and providing a step plate 40 such as an expanded metal. (See FIG. 3).

開閉式の分割床板20aは、図3に示すように、開口33を閉塞することができる平面形状が扇形のエキスパンドメタル等の踏み板40からなり、その周囲には踏み板40と一体または別体の内側枠板40aと外側枠板40bと一対の側部枠板40c、40cが設けられている。外側枠板40bをヒンジ部材50を介して支持材の外側枠材31に取り付けることにより、分割床板20aが上下方向に開閉自在に支持される。ヒンジ部材50は、外側枠材40bと外側枠材31にそれぞれ縦に取り付けた取付板50a、50bをボルト50cと割りピン付きの普通ナット50dを接合して構成され、左右の2箇所に配置される。   As shown in FIG. 3, the openable split floor plate 20 a is composed of a step plate 40 such as a fan-shaped expanded metal having a planar shape capable of closing the opening 33, and the periphery thereof is integrated with the step plate 40 or inside a separate body. A frame plate 40a, an outer frame plate 40b, and a pair of side frame plates 40c, 40c are provided. By attaching the outer frame plate 40b to the outer frame member 31 of the support member via the hinge member 50, the divided floor plate 20a is supported so as to be opened and closed in the vertical direction. The hinge member 50 is formed by joining mounting plates 50a and 50b vertically attached to the outer frame member 40b and the outer frame member 31, respectively, with bolts 50c and ordinary nuts 50d with split pins, and is arranged at two places on the left and right. The

また、内側枠板40aと一対の側部枠板40c、40cはそれぞれ内側枠材30、連結枠材32、32に上から重なるように配置され、支持材12を踏み板受けとして兼用し、踏み板40が落下しないようにしている。また、踏み板40を閉じたとき、内側枠板40aを内側枠材30にボルト51で固定できるようにしている。また、内側枠材30の裏面にはナット52を固着しておき、ボルト51を上から締め付け、緩めることができるようにしている。   The inner frame plate 40a and the pair of side frame plates 40c, 40c are arranged so as to overlap the inner frame member 30 and the connecting frame members 32, 32 from above, respectively, and the support member 12 is also used as a tread plate receiver. To prevent it from falling. Further, when the tread plate 40 is closed, the inner frame plate 40 a can be fixed to the inner frame member 30 with bolts 51. A nut 52 is fixed to the back surface of the inner frame member 30 so that the bolt 51 can be tightened and loosened from above.

なお、外側枠板40bと外側枠材31の間には、隙間ができるため、ここに落下防止板53をボルト止めしている。また、手摺13は、図1に示すように、外側枠材31の外側に床板11を取り囲むように配置され、取付板を介して外側枠材31に固定される。   Since there is a gap between the outer frame plate 40b and the outer frame member 31, the fall prevention plate 53 is bolted here. Moreover, the handrail 13 is arrange | positioned so that the floor board 11 may be surrounded on the outer side of the outer side frame material 31, as shown in FIG. 1, and it is fixed to the outer side frame material 31 via a mounting plate.

以上のような構成の中間踊場10において、架線工事や組立工事において塔柱2に沿ってワイヤ等を通す必要がある場合、必要な箇所の開閉式の分割床板20aを開いて起立させ、その開口33によりワイヤや部材を通過させる。工事が終了すれば、分割床板20aを閉じてボルト51で固定する。   In the intermediate landing 10 having the above-described configuration, when it is necessary to pass a wire or the like along the tower column 2 in the overhead wire work or the assembly work, the openable split floor board 20a is opened at a necessary location and the opening is opened. A wire or member is passed through 33. When the construction is completed, the divided floor board 20a is closed and fixed with bolts 51.

なお、以上は開閉式の分割床板をヒンジ部材で外側枠材に取り付け、上方に開く例について説明したが、これに限らず、内側枠材や側部枠材にヒンジ部材を介して取り付け、内側や周方向の横に向かって、上方に開くようにしてもよい。   In addition, although the above demonstrated the example which attaches an open / close-type division | segmentation floor board to an outer frame material with a hinge member, and opens upwards, it attaches to an inner frame material and a side frame material via a hinge member, and is not limited to this. Or you may make it open upward toward the side of the circumferential direction.

本発明の中間踊場構造が適用される単柱形式の送電用鋼管柱鉄塔の例を示す正面図である。It is a front view which shows the example of the steel pipe pillar tower for power transmission of the single pillar type to which the intermediate landing structure of this invention is applied. 本発明の中間踊場構造の一例を示す平面図と展開側面図である。It is the top view and expansion | deployment side view which show an example of the intermediate landing structure of this invention. 図2の部分拡大平面図と各部の断面図である。FIG. 3 is a partially enlarged plan view of FIG. 2 and a cross-sectional view of each part.

符号の説明Explanation of symbols

1…送電用鋼管柱鉄塔
2…塔柱
3…腕金
4…梯子
10…中間踊場
11…床板
12…支持材
13…手摺
20…分割床板
20a…開閉式の分割床板
20b…固定式の分割床板
30…内側枠材
31…外側枠材
32…連結枠材
33…開口
34…取付ブラケット
40…踏み板
40a…内側枠板
40b…外側枠板
40c…側部枠板
50…ヒンジ部材
50a…取付板
50b…取付板
50c…ボルト
50d…ナット
51…ボルト
52…ナット
53…落下防止板
DESCRIPTION OF SYMBOLS 1 ... Steel pipe pillar tower 2 for transmission 2 ... Tower pillar 3 ... Arm metal 4 ... Ladder 10 ... Intermediate landing 11 ... Floor board 12 ... Supporting material 13 ... Handrail 20 ... Divided floor board 20a ... Open / close-type divided floor board 20b ... Fixed division floor board DESCRIPTION OF SYMBOLS 30 ... Inner frame material 31 ... Outer frame material 32 ... Connection frame material 33 ... Opening 34 ... Mounting bracket 40 ... Tread plate 40a ... Inner frame plate 40b ... Outer frame plate 40c ... Side frame plate 50 ... Hinge member 50a ... Mounting plate 50b ... Mounting plate 50c ... Bolt 50d ... Nut 51 ... Bolt 52 ... Nut 53 ... Fall prevention plate

Claims (2)

送電用鋼管柱鉄塔の塔柱に設けられる中間踊場構造であり、塔柱を取り囲むように設けられる床板が塔柱の周方向に複数に分割され、分割床板のうち任意の数の分割床板が上方向に開閉可能に設けられていることを特徴とする送電用鋼管柱鉄塔の中間踊場構造。   This is an intermediate landing structure provided on the tower pillars of steel pipe pillars for power transmission, and the floorboards surrounding the tower pillars are divided into multiple pieces in the circumferential direction of the tower pillars. An intermediate landing structure of a steel pipe pillar tower for power transmission, characterized in that it can be opened and closed in the direction. 請求項1に記載の中間踊場構造において、床板を支持する支持材を構成する、内側枠材と、外側枠材と、内側枠材と外側枠材を連結する連結枠材とにより、分割床板の平面形状に対応した平面形状の開口が塔柱の周囲に複数形成され、前記開口の外側枠材、内側枠材または連結枠材に分割床板の一辺がヒンジ部材を介して取り付けられ、少なくとも分割床板のヒンジ部材の辺に対向する辺の周縁部が枠材に上から係止されるように構成されていることを特徴とする送電用鋼管柱鉄塔の中間踊場構造。
The intermediate landing structure according to claim 1, wherein the divided floor board is constituted by an inner frame member, an outer frame member, and a connecting frame member that connects the inner frame member and the outer frame member, which constitute a support member that supports the floor plate. A plurality of planar openings corresponding to the planar shape are formed around the tower column, and one side of the divided floor plate is attached to the outer frame member, inner frame member or connecting frame member of the opening via a hinge member, and at least the divided floor plate An intermediate landing structure for a steel pipe pillar tower for power transmission, characterized in that a peripheral portion of a side facing a side of the hinge member of the steel is configured to be locked to the frame member from above.
JP2008062116A 2008-03-12 2008-03-12 Intermediate landing structure of steel pipe pole tower for power transmission Withdrawn JP2009215816A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008062116A JP2009215816A (en) 2008-03-12 2008-03-12 Intermediate landing structure of steel pipe pole tower for power transmission

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008062116A JP2009215816A (en) 2008-03-12 2008-03-12 Intermediate landing structure of steel pipe pole tower for power transmission

Publications (1)

Publication Number Publication Date
JP2009215816A true JP2009215816A (en) 2009-09-24

Family

ID=41187939

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008062116A Withdrawn JP2009215816A (en) 2008-03-12 2008-03-12 Intermediate landing structure of steel pipe pole tower for power transmission

Country Status (1)

Country Link
JP (1) JP2009215816A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899126A (en) * 2014-03-24 2014-07-02 国家电网公司 Method for improving stability of power transmission tower
CN104110155A (en) * 2014-07-25 2014-10-22 邵卫国 Thin-wall steel tube tower and processing and construction methods thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899126A (en) * 2014-03-24 2014-07-02 国家电网公司 Method for improving stability of power transmission tower
CN103899126B (en) * 2014-03-24 2016-04-06 国家电网公司 A kind of method improving electric power pylon stability
CN104110155A (en) * 2014-07-25 2014-10-22 邵卫国 Thin-wall steel tube tower and processing and construction methods thereof
CN104110155B (en) * 2014-07-25 2016-02-10 邵卫国 A kind of thin-wall steel tube shaft tower and processing thereof and construction method

Similar Documents

Publication Publication Date Title
JP6021604B2 (en) Temporary scaffolding and its assembly method
KR100889022B1 (en) Bridge constructing method
JP6498075B2 (en) Overhang passage of steel structure
KR20090025737A (en) A prefabricated foothold
JP2009215816A (en) Intermediate landing structure of steel pipe pole tower for power transmission
JP7265967B2 (en) Cantilever device for bridge construction and bridge construction and demolition method
JP5398619B2 (en) Mobile safety belt mounting device for bridge construction
JP2012207379A (en) Structure demolition system
JP5940404B2 (en) Construction method of beam members
JP2012102468A (en) Movable scaffold for repairing bridge lower face and installation method for the same
JP2010090633A (en) Prefabricated work platform for cylindrical concrete structure
JP2008031667A (en) Funnel-shaped protective shelf device
JP4339778B2 (en) How to remove a bridge
KR200480362Y1 (en) Folding safety net assembly of gang form
JP2001171964A (en) Method of constructing passenger conveyer and equipment for curing passenger conveyer
JPWO2005007551A1 (en) Elevator work scaffold equipment
JP2016204983A5 (en)
JP4526999B2 (en) Handrail frame for framework scaffolding
JPH07102793A (en) Demolition of tower body and device therefor
JP7438806B2 (en) Construction method for equipment shelves
JP7240959B2 (en) Hanging jig and steel tower dismantling method
CN219794600U (en) Hanging basket for building curtain wall construction
JP2006307506A (en) Scaffolding
JP7148040B2 (en) Stair fixing method and stair structure
JP2018091098A (en) Temporary strut and construction method of roof frame structure

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20110607