KR20090025737A - A prefabricated foothold - Google Patents
A prefabricated foothold Download PDFInfo
- Publication number
- KR20090025737A KR20090025737A KR1020070090816A KR20070090816A KR20090025737A KR 20090025737 A KR20090025737 A KR 20090025737A KR 1020070090816 A KR1020070090816 A KR 1020070090816A KR 20070090816 A KR20070090816 A KR 20070090816A KR 20090025737 A KR20090025737 A KR 20090025737A
- Authority
- KR
- South Korea
- Prior art keywords
- frame
- scaffold
- horizontal
- scaffolding
- hoist
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/002—Ramps
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G27/00—Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps
Abstract
Description
The present invention relates to an access scaffold of a hoist protective fence that is hypothesized during construction of various buildings, and more specifically, because the inclined scaffold and horizontal scaffold for the hoist boarding are provided in a prefabricated structure, convenience of disassembly, assembly and transportation, It relates to a prefabricated entry platform of a hoist guard that provides excellent economics due to reuse.
In general, in order to construct a building, as the height of the building increases, it is required to continuously supply and transport various equipment or materials to the construction floor.
It is the hoist used at this time.
The hoist moves and descends along the building floor by the driving unit, and the worker loads and supplies various materials and equipment to the construction work floor.
However, since the risk of safety accidents due to various falling objects is exposed at the hoist's moving position, the protective layer is usually installed on the ground floor for the safety of the worker.
The protective shield is to form a frame frame of the box shape on the ground layer, and to install a safety plate, safety net, etc. in the side and the upper side of the frame frame to ensure the safety around the hoist.
At this time, the barrier is provided with an access scaffold for using a hoist, which consists of a structure that combines a horizontal scaffold having a predetermined height for the hoist boarding, and an inclined scaffold for entering the horizontal scaffold.
By the way, since the access scaffold provided in the conventional protection fence is provided by welding the horizontal scaffolding and the inclined scaffolding integrally, the overall volume is very large, and there is a great inconvenience due to the difficulty of manufacturing, transportation, and construction.
In particular, when the installation position of the protective fence is to be changed during the construction of the building, it is required to change the installation position of the access scaffolding unit with the protective enclosure, but the overall inconvenience of the reuse and recycling is very large due to the large volume of the access scaffolding. there was.
The present invention has been made to solve the problems of the prior art as described above, since the access footrest for the hoist boarding in the protective enclosure provides a prefabricated structure of the inclined scaffold and horizontal scaffold and each component, disassemble, assemble and transport Its purpose is to provide excellent economics due to its convenience and reuse.
This invention,
The horizontal scaffolding and the inclined scaffolding are configured to enter the hoist on the protective enclosure, and the horizontal scaffolding is installed by installing a plurality of scaffolding on the upper part of the frame by installing a horizontal frame of a square shape at a predetermined height from the ground,
The inclined scaffolding is achieved by assembling and installing a plurality of scaffolding on the top of the inclined frame of the rectangular shape inclined by hanging from the front or side of the frame with the hook formed on the upper end of the inclined frame.
The present invention is characterized in that the horizontal frame and the inclined scaffolding of the horizontal frame and the inclined frame is fixed to the circular support rods installed along the upper end of the hooks formed on both ends of each scaffold assembly to install.
The present invention is characterized in that the inclined frame lower side of the inclined frame is assembled to install an auxiliary inclined footrest having a hook on one side with a support rod.
The present invention provides an inclined scaffolding and horizontal scaffolding that constitutes an access scaffold for the hoist boarding in a protective enclosure of a construction building in a prefabricated structure, thereby providing excellent convenience of disassembly, assembly and transport as compared to a conventional integrated type. Of course, it is possible to re-use and move the installation location of the shield has the effect of providing excellent economics.
Hereinafter, with reference to the accompanying drawings, a preferred embodiment of the present invention will be described in detail.
That is, the prefabricated access step stand of the present invention is horizontal for the hoist entry on the barrier (1) to provide safety against falling objects to the top and side of the box-shaped frame (2), as shown in Figures 1 to 4 It consists of a platform and a platform.
The
The
At this time, the
In addition,
In addition, the lower
As
Next will be described the operation and action of the present invention configured as described above.
The present invention is characterized in that the
The assembly process of the present invention will be specifically shown.
First, the
In this case, the
A plurality of
That is, the
In this way, the
Next, the
The
At this time, the
In addition, the
This is to hang the
The present invention as described above because the entry step for the hoist boarding in the protective fence (1) consists of a
1 is a front view showing the overall configuration of the present invention.
2 is a front view of main parts of FIG. 1;
3 is a plan view showing an example of the present invention.
4 is a plan view showing another example of the present invention.
5 is an exploded perspective view of main parts of the present invention.
** Description of the symbols for the main parts of the drawings **
1: Protective enclosure 10: Horizontal platform
12:
16,21,26,32: hook
20: inclined scaffolding 22: inclined frame
24: handrail
30: auxiliary ramp
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070090816A KR20090025737A (en) | 2007-09-07 | 2007-09-07 | A prefabricated foothold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070090816A KR20090025737A (en) | 2007-09-07 | 2007-09-07 | A prefabricated foothold |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20090025737A true KR20090025737A (en) | 2009-03-11 |
Family
ID=40694016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070090816A KR20090025737A (en) | 2007-09-07 | 2007-09-07 | A prefabricated foothold |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20090025737A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700842A (en) * | 2017-08-14 | 2018-02-16 | 上海二十冶建设有限公司 | High-rise Group of suspended buildings speed of application control method under the conditions of multistage abrupt slope |
JP2019116728A (en) * | 2017-12-26 | 2019-07-18 | 大和ハウス工業株式会社 | Temporary passage and construction method thereof |
KR102084781B1 (en) * | 2019-06-15 | 2020-03-04 | 이혜옥 | The disabled person passing inclination footpath plate for high place and method of this |
KR102084780B1 (en) * | 2019-03-20 | 2020-05-15 | 이혜옥 | The disabled person passing inclination footpath plate for high place and method of this |
CN111173315A (en) * | 2020-02-25 | 2020-05-19 | 中建四局第一建筑工程有限公司 | Climb tower crane pedestrian access structure on frame |
KR20210000186U (en) | 2019-07-15 | 2021-01-25 | 박종화 | Toe plate for hoist |
KR102268866B1 (en) * | 2021-04-20 | 2021-06-24 | (주)신동아건축종합건축사사무소 | A safety scaffold of the hoister for construction |
-
2007
- 2007-09-07 KR KR1020070090816A patent/KR20090025737A/en not_active Application Discontinuation
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700842A (en) * | 2017-08-14 | 2018-02-16 | 上海二十冶建设有限公司 | High-rise Group of suspended buildings speed of application control method under the conditions of multistage abrupt slope |
CN107700842B (en) * | 2017-08-14 | 2019-09-13 | 上海二十冶建设有限公司 | High-rise Group of suspended buildings speed of application control method under the conditions of multistage abrupt slope |
JP2019116728A (en) * | 2017-12-26 | 2019-07-18 | 大和ハウス工業株式会社 | Temporary passage and construction method thereof |
KR102084780B1 (en) * | 2019-03-20 | 2020-05-15 | 이혜옥 | The disabled person passing inclination footpath plate for high place and method of this |
KR102084781B1 (en) * | 2019-06-15 | 2020-03-04 | 이혜옥 | The disabled person passing inclination footpath plate for high place and method of this |
KR20210000186U (en) | 2019-07-15 | 2021-01-25 | 박종화 | Toe plate for hoist |
CN111173315A (en) * | 2020-02-25 | 2020-05-19 | 中建四局第一建筑工程有限公司 | Climb tower crane pedestrian access structure on frame |
KR102268866B1 (en) * | 2021-04-20 | 2021-06-24 | (주)신동아건축종합건축사사무소 | A safety scaffold of the hoister for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20090025737A (en) | A prefabricated foothold | |
JP2023085392A (en) | safety rail system | |
JP2009541612A (en) | Construction site stairs | |
KR101289048B1 (en) | Built-up high load safety stair using temporary bent | |
JP2010189891A (en) | Working scaffold | |
KR200467252Y1 (en) | cage for exterior works of building | |
KR200445310Y1 (en) | Clamp for fixing footstool in a climbing typed construction frame | |
KR100559118B1 (en) | Working tower for a high place | |
KR101895535B1 (en) | Safety work table | |
KR100397522B1 (en) | a scaffolding | |
KR102167622B1 (en) | Foot plate for plugging gap in hanging scaffold | |
CN210316278U (en) | Multifunctional safety protection stair | |
EP2325416A1 (en) | Perimeter protection system for construction sites | |
JP2001171964A (en) | Method of constructing passenger conveyer and equipment for curing passenger conveyer | |
JP4884429B2 (en) | Platform railing | |
KR100901016B1 (en) | Safety bracket to external wall scaffolding for a structure | |
JP2016204983A5 (en) | ||
JP4986419B2 (en) | Temporary staircase | |
KR200378403Y1 (en) | Working tower for a high place | |
CN217840841U (en) | High-altitude movable ladder-hanging type auxiliary construction system | |
KR200445362Y1 (en) | Lower support of the safety netting device | |
JP3008167B2 (en) | Simple scaffold and its installation method | |
KR200276904Y1 (en) | Safety construction of pier for bridge's inspection | |
KR101105255B1 (en) | Construction materials lifting system device using guide rail | |
JP2016204982A (en) | Temporary staircase scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |