JP2009176304A - 電力制御システム - Google Patents

電力制御システム Download PDF

Info

Publication number
JP2009176304A
JP2009176304A JP2009012694A JP2009012694A JP2009176304A JP 2009176304 A JP2009176304 A JP 2009176304A JP 2009012694 A JP2009012694 A JP 2009012694A JP 2009012694 A JP2009012694 A JP 2009012694A JP 2009176304 A JP2009176304 A JP 2009176304A
Authority
JP
Japan
Prior art keywords
power
server
data center
power consumption
power control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009012694A
Other languages
English (en)
Inventor
Daniel H Greene
エイチ.グリーン ダニエル
Bryan T Preas
ティー.プリーズ ブライアン
Maurice Chu
チュー モーリス
Haitham Hindi
ヒンディ ハイサム
Nitin Parekh
パレク ニティン
James E Reich
イー.ライク ジェイムズ
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Palo Alto Research Center Inc
Original Assignee
Palo Alto Research Center Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Palo Alto Research Center Inc filed Critical Palo Alto Research Center Inc
Publication of JP2009176304A publication Critical patent/JP2009176304A/ja
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Power Sources (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

【課題】本発明は、データセンタにおける電力制御システムを提供する。
【解決手段】データセンタにおける電力制御システムであって、局部制御装置を有する、少なくとも1つの物理サーバと、物理サーバに結合された、少なくとも1つの仮想サーバと、サービス要求の品質、及び、電力消費量によって少なくとも一部が決定される、タスク負荷であって、物理サーバ上のタスク負荷を、仮想サーバによって制御するサーバ/電力制御装置と、を備える。
【選択図】図1

Description

本発明は、電力制御システムに関し、より詳細には、データセンタにおける統合型エネルギー節約、及び、業務動作に関する。
多くの事業者では、多様な目的のためにデータセンタが使用されている。電話会社、ケーブルネットワーク、電力会社、小売業者などのようなサービス提供者は、顧客のデータを、より大きい「サーバファーム」又はデータセンタに記憶し、アクセスする。ここでの「データセンタ」とは、遠隔通信及び記憶システムのようなコンピュータシステム及び関連構成要素を収容するために使用される設備を意味している。データセンタには、一般に、単なるコンピュータシステムだけではなく、バックアップ用電源供給装置、重複データ通信接続部、空調及び消火装置のような環境制御部、及び、セキュリティ用のシステム及び装置もまた含まれる。
データセンタは、一般に、顧客サービスレベルを中心に動作する。例えば、特定の顧客は、顧客の演算、又は、データ通信のために、特定のサービス品質を有する契約を有してもよい。このサービス品質(QoS)は、異なる顧客によって異なってもよい。例えば、一人の顧客について、サービス品質は、その主要素に、アプリケーションが遠隔でアクセスされた場合の素早い応答を含んでいてもよい。別の顧客については、サービス品質は、顧客の加入者へ提供される接続の速度、又は、帯域を含んでいてもよい。
データセンタの動作管理者は、一般に、タスクのローディングが最適化されるように管理し、管理者の顧客について規定されたQoS要求を満たすように処理を行う。動作管理者は、歳月にわたって変化する顧客要求と、処理負荷に関連する条件とに応じて、処理タスクなどを分配してもよい。管理者は、一般的に、顧客のさまざまな要求に応じたエネルギー消費による影響を考慮に入れることはなく、また、特定の顧客の業務の「真のコスト」を考慮に入れることもない。
例えば、顧客は、高い優先権で、毎日限られた時間に複数のサーバにて作動する複数の高負荷プロセスをもたらす特定のサービス品質要求を有している場合がある。他の時間においては、サービス品質要求は最小限のプロセス要求まで徐々に減少してもよい。一般的には、顧客のサービスレベル契約(SLA)は、限られた時間におけるプロセスの可能性を保証するとともに、より多くの金額を顧客に請求する規定を備えている。
これに対して、比較的低いが安定したサービス品質要求を有する顧客がいる。サーバは、この顧客の要求を満たすために常に作動するが、サービス品質要求が比較的低いため、この顧客には先の顧客よりも少ない金額が請求されてもよい。
この種のビジネスモデルは、一定の電力が必要であるため、実際には、後者の顧客の負荷は、データセンタにとって費用のかかることを考慮していない。代わりに、後者の顧客は、負荷の予測可能性のため、動作のコストは、実際より低いことが理解される。しかしながら、データシステムと、多くのサーバが高速で作動する場合必要な空調などの必要なサポートシステムのためのエネルギーのコストを考慮し、監視しなければ、この種の決定を行うためにデータを得ることは出来ない。
更に、データセンタは、すでに切迫している電力及びエネルギー源にとって、増大する負担となっている。現在の推定値では、データセンタの電力消費量は、国全体の消費量の1〜2パーセントであることを示している。より多くの事業者がデータセンタに依存するであろうこと、及び、増加する人口によって、この数は増えるであろう。コストに関していくつかの決定を行なうことと同様に、データセンタの電力消費量をより効率的に管理することは、これら問題の助けとなるであろう。
本発明は、データセンタにおける電力制御システムを提供することを目的としている。
本発明の第1の態様は、データセンタにおける電力制御システムであって、局部制御装置を有する少なくとも1つの物理サーバと、物理サーバに結合された少なくとも1つの仮想サーバと、サービス要求の品質、及び、電力消費量によって少なくとも一部が決定されるタスク負荷であって、物理サーバ上のタスク負荷を仮想サーバによって制御するサーバ/電力制御装置と、を備える。
本発明の第2の態様は、第1の態様のデータセンタにおける電力制御システムであって、サーバ/電力制御装置と通信状態にある、環境制御システムと、を更に備える。
本発明の第3の態様は、第1の態様のデータセンタにおける電力制御システムであって、データセンタへ結合された、データラインと、を更に備える。
本発明の第4の態様は、第1の態様のデータセンタにおける電力制御システムであって、データセンタへ結合された、少なくとも1つの外部電力供給ラインと、を更に備える。
データセンタのための電力制御システムの実施形態を示している。 サービス/電力制御プロセスの実施形態のブロック図を示している。 制御パスの実施形態のフローチャートを示している。 不具合を有する制御パスの実施形態のフローチャートを示している。 電力消費量及び性能に基づくリソース分配のためのプロセスの実施形態のフローチャートを示している。 データセンタにおける電力消費量の予測可能性を監視するプロセスの実施形態のフローチャートを示している。 データセンタにおける電力消費量及び関連コストを監視するためのプロセスの実施形態のフローチャートを示している。 電力消費量に関する外的要因の影響に基づくデータセンタの業務を調整するためのプロセスの実施形態のフローチャートを示している。
図1は、データセンタのためのアーキテクチャ10を示している。この実施形態では、データセンタは、多数の物理サーバを含んでいる。物理サーバとは、特定のサービスを提供する、クアッドコア、デュアルコア、又は、シングルコアのコンピュータシステムのような、実際の機械である。これらの例には、通信サーバ、データベースサーバ、アプリケーションサーバなどが含まれる。
物理サーバは、仮想サーバとは大きく異なる。仮想サーバは、アクセスする事業者には、単一サーバに見えるものでありが、実際には、物理サーバのパーティション、又は、サブセットであってもよい。また、単一サーバとして見えるが、実際にはいくつかの物理サーバから構成されてもよい。仮想サーバは、仮想化プロセスによって作り出される。
「仮想化」とは、コンピュータ処理用リソースの物理的特性を、他のシステム、アプリケーション、又は、エンドユーザがそれらのリソースを相互利用することから、隠すための技術として定義できる。これには、サーバ、オペレーティングシステム(OS)、アプリケーション、又は、記憶装置等の単一の物理リソースを、多数の論理リソースとして機能するように見せることも含まれる。仮想化には、記憶装置、又は、サーバのような多数の物理リソースを、単一の論理リソースとして見せることも含まれる。仮想化には、また、いくつかの異なる特徴を備えた1つの物理リソースを、1つの論理リソースとして見せることも含まれる。
仮想サーバの使用は、仮想サーバによってサービスが提供されている、ユーザ、プロセス、別のコンピュータなどのコンシューマ(consumer)に意識させること無く、処理タスクを、他の物理サーバ、又は、リソースへ移行可能とする。「コンシューマ」とは、電力制御システムの内部でプロセス、又は、サービスを使用する、任意の実体である。これは、データセンタがサービスレベル契約によって、サービスを提供する特定の実体である「顧客(customer)」と、対比される。性能レベルは、一般に、顧客によって追跡される。
図1における14のような物理サーバは、その上で運用される17のようないくつかの仮想サーバを有して表現される。仮想サーバは、例えば、オペレーティングシステム上で作動する、アプリケーションであってもよい。これは、単に例証的な目的のためのものであり、また、場所、又は、論理階層の制限を意図するものでも、暗示するものでもない。仮想サーバ17は、サービス/電力制御装置18が、物理サーバに、物理サーバの電力消費量/エネルギー使用量の一部基づく処理タスクを伴う仕事(task)を課すことを許可する。これによって、データセンタの電力消費に関する業務の最適化が可能となる。
記述を簡略化するために、サービス/電力制御装置18を、電力制御装置とすることがある。電力制御装置18は、サービス品質の要望と電力消費との関係を調整して、顧客に要望されたサービスと顧客に支払われたサービスとのバランスをとるとともに、プロセスによって規定された制限内で電力消費と分配とを管理するという点で、サービス/電力制御装置である。
同様に、電力制御装置18は、単一の制御装置であるとして示されているが、実際には、複数のコンピュータ、処理用コアなどにわたって、割り当てられてもよい。電力制御装置18に加えて、14のような1つ以上の個別物理サーバには、16のような局部(local)制御装置が備わっていてもよい。更に、この図に表現された装置は、サーバだけであるが、電源装置、記憶アレイ、又は、テープデッキ等の他の記憶装置等、他の装置が含まれていてもよい。
集中的制御装置18は、データライン20へ結合されてもよい。データセンタの機能は、一般に、いくつかの種類のデータ処理を中心に繰り広げられ、また、制御装置は、データラインと同一の電力分配構造の中に単に存在してもよく、又は、電力制御装置は、データラインの動作を監視するか、又は、その動作に影響を及ぼすものであってもよい。
同様に、電力制御装置は、電力供給ライン22と同一の電力構造の中に単に存在してもよく、又は、電力制御装置18は、電力供給ラインとともに、いっそう活発な役割を負ってもよい。電力供給ライン22は、「送電系統(gird)」、すなわち、一般には、伝送回線、変換器、変圧器、電源スイッチなどが含まれる局部電力構造基盤から供給される。
システムは、また、環境入力ライン24へ結合されてもよい。これらのラインは、加熱/換気/空調(HVAC)システム、照明装置、他の温度センサーなどへの接続であってもよい。電力制御装置は、外的要因に基づいた決定を行う場合、システムを使用することができるが、このことについては、後にいっそう詳しく論述される。環境制御部15として示されるように、これらの装置は、保守及び動作に関するサーバファーム(server farm)の中に存在してもよい。環境制御システム21は、これらの装置を制御することができる。これらの例には、HVACのような温度調整システム、警報装置、スプリンクラー、泡消化剤散布装置などのような消火システム、保安システム、更には、照明装置が含まれる。電力制御装置は、冷却が必要であるサーバの活動レベル、作業者による占有時間、などに応じて、システムの動作を制限してもよい。
論述を容易にするために、図2は、電力制御装置、又は、電力制御プロセスと称される、図1におけるサービス/電力制御装置、又は、サブシステムによって実行される、サービス/電力制御プロセス30の実施形態のブロック図を示している。この電力制御プロセスの1つの重要な点は、性能要件を満たす要求と、電力消費量の減少の要望、又は、要求と、のバランスをとることである。
これらの性能要件は、一般に、顧客によって規定される。データセンタの管理者は、「このサービスでは、あなたは、専用サーバと同等の仮想プロセッシングを受けられます。あなたは、5つの専用サーバと同等のものをいつでも受けられます。ただし、それらの負荷が50%以上の場合、サーバ数は、自動的に5から、最大20まで拡張されます。」との内容で、顧客に対して36のような製品文書を書いてもよい。
これは、顧客が理解できる製品文書である。管理者は、その後、手引きのサービス品質(QoS)仕様書38を書くか、又は、ライブラリーから選択する。このQoS仕様書は、製品文書よりも正確なものであり、また、顧客についてのデータセンタの性能要件を規定するために、図2の電力制御プロセス30によって使用される。たいていのデータセンタは、外部か、又は、内部に、多数の顧客を有している。
プロセスの他方の側面には、電力モデル及び電力制御部がある。この相互作用は、図3及び図4に示されるような制御フロー図を参照することで、いっそう理解される。図3において、電力のための制御パスは、負荷レベル40で始まる。負荷とは、電力を消費して熱を発生し、システムに負荷を与える任意の装置である。負荷には、一般に、電力を管理し、性能目標を満たすための局部制御装置42が備わっている。局部制御は、迅速な作動と、集中的制御より複雑ではない信頼性のある制御と、を提供する。更に、局部制御は、データセンタの従来(legacy)の要素を、電力制御プロセスの中へ含めることを許可しても良い。
電力モデルは、図2の局部制御装置32と電力の中央制御装置管理部30との間に存在してもよい。電力モデルは、負荷と電力消費との関係を記載している。電力モデルは、物理サーバの全体の記載のように、複数の局部電力制御装置を統合してもよい。
図1の18のようなサービス/電力制御装置は、この情報を、図2の電力制御プロセスの電力サイドから受けると(図3の44)、負荷へ分配された処理用タスクを再配列させ、電力及び動作目標を最適化(46)する。集中的制御は、より高いレベルの電力モデルによる局部自律制御と関連している。集中的制御は、性能要件/動作目標と電力節減目標との間のバランスをとる。
図4は、制御階層(hierarychy)の理解を支援するための、1つのシナリオを明示している。負荷に不具合が生じる(40)。例えば、負荷が、変速ファンであると仮定する。局部制御装置は、負荷不具合(load failure)を識別する(42)か、又は、独立センサーによって識別される。電力モデルは、例えば不具合に陥ったファンに関連したサーバの中のプロセッサは作動すべきでない、又は、加熱を防止するために軽く負荷すべきであるとの決定等による負荷の状態を反映するために、更新する(44)。電力モデルは、その後、この情報を中央制御装置へ知らせ、そして、中央制御装置は、処理を他の機械へ割り当てるとともに、電力節減目標の観点から動作目標を管理し続ける。
図2に戻ると、論述は、サービス/電力制御装置プロセス30への入力部に焦点が合わされた。電力制御装置プロセスには、また、いくつかの出力部も備わっている。例えば、電力制御装置は、サーバを仮想化するための、機会(opportunity)を認識する、及び、計画する、又は、予定してもよい。例えば、不具合に陥ったファンが備わったサーバはそこから移行したプロセスを有している、及び、サーバがもはや必要でないという決定が行なわれてもよい。物理サーバは、仮想サーバの中へ仮想化されているため、仮想サーバのサービスを受ける顧客には、サーバの排除は気づかれない(transparent)。
電力制御プロセスは、電力消費量に応じて、他のサーバへのプロセス/タスクの直接移行を指示してもよい。これは、シャットダウンのための準備、又は、単に電力消費による理由のために生じる。例えば、比較的高いレベルで作動する場合、多くの電力を消費するサーバがあり、サーバの処理レベルを低下させるために、プロセスをサーバから離すように移行する。これによって、電力消費量が削減される。この場合、サーバをシャットダウンする意図はなく、移行は電力消費量のバランスをとるために行われる。
電力制御プロセスは、また、電力消費量に基づいたタスクを最適化する。比較的高い電力を消費するアプリケーションが作動しており、新しく高電力消費タスクが開始される場合、電力消費量が「抑制」されないように、より低い電力を消費するタスクを平行に作動させてもよい。
図1及び図2の電力制御プロセス及びアーキテクチャによれば、エネルギー管理を考慮に入れながら、データセンタにおける動作目標を満たすことが可能となる。ここでの論述は、データセンタの動作を行うときに使用されるエネルギーを調整するために、電力消費量に言及されている。ここに開示されたようなこの発明と、データセンタの動作の最適化の手順との相違点は、電力消費量及びサービス品質が、データセンタの管理における主要な考慮事項であるということである。
電力消費量を追跡し、管理する機能は、電力消費を目標内に留めるため、特定サービスレベルを顧客に提供するための真のコストを見積もるため、顧客へ電力消費量の特定の特性に報いる、又は、特定の特性を提供するために、動機を提供するために、及び、外的要因を考慮したタスク割り当てを調整するために、処理用リソースを割り当てる機会をもたらす。加えて、電力消費量の監視は、リソースを仮想化するための認識できるフレームワークを提供し、性能を最大限にコストを最小限にするための仮想化計画の動的調整を可能にし、正確な見積もりを提供し、サービスの真のコストを追跡し、また、サービス提供及びリソース拡張において行われる将来の決定を支持する、ことを提供する。電力消費量を最小限にする一方でサービス品質を維持するための機会もまた提供される。
図5は、電力消費量に基づいた処理負荷を調整するための実施形態のフローチャートを示している。電力制御装置は、電力モデルから提供された電力消費量データを監視する(60)。QoS要求からの入力値は、タスクの性能要件になる(62)。電力消費量データと性能目標を満たす必要性とに基づいて、タスク処理は、上記の仮想サーバを使用することで物理サーバにわたって調整される。
仮想化プロセス68には、仮想サーバの「背後にある」物理サーバの動作の調整に関する、異なる多くの選択肢が含まれていてもよい。処理用リソースの調整は、すでに仮想化されているため、ユーザには、気づかれないであろう。
1つの仮想化の可能性は、シャットダウンのため、物理サーバを解放するために、タスクを再分配(reallocated)することである(680)。サーバに作用するタスクがいったん再分配されるか、又は、他のサーバに移行されると、物理サーバはシャットダウンされ、電力消費量が削減される。仮想サーバの顧客には、この変化は気づかれないであろう。
別の仮想化の機会は、サーバの型、電気的特性、地理的要件などによって、サーバ自体をクラスタ化(clustering)することである(684)。クラスタ化されたサーバは、より低い電力消費量として、最終的に反映される効率に利点をもたらす。例えば、一人の特定の顧客によって使用されたすべてのサーバを、地理的要件に応じて互いにクラスタ化することで、HVACシステムの局部制御化をもたらす。一方で、地理的に分散されたサーバは、信頼性を増大させる。クラスタ化は、類似性規則を用いて行なわれても良い。
動作側を調整するのに加えて、調整は、要件に対して行なわれてもよい。QoS仕様書は、「あなたは、月2日以内であれば、暫定的に5つ以上のサーバを有してもよい」というような、サービス期間のある部分を超えることのない、より低いレベルのQoS、又は、性能要件(686)について、許容してもよい。これは、システムに,電力消費量を削減するため、必要に応じたサーバの仮想化を可能にする。
サーバへ機能的に行われた変更に加えて、リソース分配に基づいて環境制御部を変更してもよい(66)。電力制御装置は、一例として、サーバがより低いレベルで作動しており、熱がほとんど発生しないため、特定の期間空気調節はほぼ必要ない、と決定してもよい。
電力消費量に基づくリソース分配に加えて、顧客へのサービスレベル契約を、彼らの処理要求及び電力消費量の予測可能性に基づいて調整してもよい。予測可能性のレベルが高ければ、要求される処理の全体レベルが高い場合においても、より低いコストとなる場合がある。予測可能性は、また、リソースを付加することに関して、より良好な投資決定を与えることが出来る。
例えば、ある顧客の業務が、多くの時間、処理要求のほぼ中間のレベルで遂行され、かつ、顧客の業務が増大している場合、データセンタの管理者は、より多くのリソースを投資してもよい。しかしながら、ある顧客の業務が、長い時間にわたって低いレベルで遂行され、かつ、きわめて高いレベルの処理要求のランダムスパイクを持っている場合、リソースを付加することが賢明な投資であるかを決定することは、困難である。予測可能性がサービスレベル契約における誘因を提供する場合、顧客がやり方を変えることが可能である。代わりに、予測不可能な顧客についての価格を引き上げると、顧客の一気集中的活動が起きるまで、ほとんど使用されず維持される新しいリソースを仕入れるために、コストが支払われる。
顧客の電力消費量が、どの程度予測できるかを決定するために、多くの予測モデルを使用することができる。一般に、これらのモデルには、予測を行うことと、その後、予測レベルと実際のレベルとを比較することが含まれている。この種のプロセスの実施形態が、図6に示されている。
プロセスは,電力消費量を監視する(70)。なお、明細書に記載された実施形態の多くにおける監視は、進行中のプロセスであってもよい、ということに留意しなければならない。これらの方法の実施形態は、必ずしも電力監視とともに「開始」されるものではない。より正確には、これらの方法は、上記の電力監視機能を利用するものである。
プロセスは、次いで、将来における特定の時刻での電力使用量を予測する(72)。時刻は、今から10秒後であっても、今から10分後であっても、他であってもよい。所望の期間には、動的手法で負荷の適用及び調整に足りる短い期間が含まれる、いくつかの要因に左右される。実際の予測時刻での電力消費量が、その後測定される(74)。
予測された電力消費量と実際の電力消費量とが比較され、予測可能性データが得られる(76)。データは、価格閾値などに組み込まれる予測可能性評価の形状をとることができる。決定された予測可能性データ(78)は、その後、価格調整(80)、電力消費量の変化が差し迫っていると予測される場合の積極的な方法での負荷調整(82)、及び、予測可能性の判定に使用される期間の調整(84)、のような事態に影響を及ぼす。
上記のように、予測を行うために使用されるモデルには、異なるいくつかの方法が採用されてもよい。例えば、10分間の使用に予測された電力消費量は、現在の電力消費量に基づいていてもよい。代わりに、電力消費量は、電力消費量の履歴に基づいていてもよい。例えば、特定の顧客は、毎晩、深夜に、システムの更新を実行するかもしれない。もし、その時刻が、午後11時50分であれば、12時00分での予測電力消費量は、現在の電力レベルとは大きいに異なっているであろうし、その予測を現在の電力レベルで行う必要はほとんどない。それどころか、電力消費量の履歴によれば、きわめて高いレベルの電力消費量が予測できる。
特定の顧客の電力消費量の予測可能性に基づく電力消費量を予測することができるとともに、サービスレベル契約の価格を決定できるのに加えて、データセンタの管理者は、サービスレベル契約の価格を電力消費量に基づいてより適切に決定できる。例えば、サービスレベル契約の価格決定に使用される業務のコストには、一般に、特定のサービスレベル契約を満たすために必要なリソースのコストの決定が含まれている。これらのコストには、サーバの仕入れ費の定期償還、装置自体の使用、及び、設備の諸費用が含まれている。電力消費量のコストに付加される機能は、コストをいっそう正確なものにするとともに、業務の真のコストを決定する機能をもたらす。
図7には、電力消費量を追跡して業務の真のコストを決定する方法の実施形態が示されている。電力消費量は、上で論述したように監視される(90)。電力消費量のコストは、データセンタが電力を受ける送電系統の電力供給業者から提供された価格を利用して決定される(92)。価格決定は、送電系統の状況、日時、月日などによって変動する。電力制御装置は、顧客の電力消費量のコストを、顧客のサポート動作の間で計算する。
システムは、次いで、コストに基づいて業務のコストを調整する(94)。システムは、調整を電力制御システムレベルで遂行よりも、それを遂行できる会計システムへのアクセス権を有してもよい。この情報は、その後、おそらくは、顧客に請求する価格と(96)で決定された業務の調整コストとの比較(98)、又は、顧客の価格決定を変更するための勧告(recommendation)(100)などで示される自動化レポートとして、データセンタの管理者へ提供される。この情報は、価格決定が顧客の業務の真のコストの観点から適切であると思われる、採算が取れるクライエント、最も効果的に価格決定されたクライエント、又は、適切に供給された顧客の識別表示として提供されてもよい(98)。
1つの実施形態では、これらのプロセスは、全体的に自動化されてもよい。顧客は、特定の範囲内で価格の変動性について許容される、複数のサービスレベル契約を持っている。システムは、価格決定を、業務の真のコストによって動的に調整できる(102)。
価格決定の自動調整は、データセンタの動作の異なるレベルでの管理をシステムが支援することを、更に示している。電力監視から集められた情報は、戦略的に、経営的に、又は、企画立案のために、利用されてもよい。戦略的な利用には、集められた情報を将来のサービス提供における決定と、リソース拡張における投資と、を行うために利用することが一般に含まれている。経営的な利用を表わす上記の例は、真正の価格決定ではない動的調整を可能にするが、仮想化の動的調整も含まれてもよい。企画立案のための利用には、仮想化の機会の識別表示、実証、及び、実施が一般に含まれる。
処理用負荷及び価格決定の調整に加えて、電力制御は、外的要因に基づいた業務の調整を可能にする。外的要因には、データセンタまでの外部の送電系統の状態、データセンタの冷却要件などに影響を及ぼす外気温度のような、環境因子が含まれる。図8には、この種の調整の一例が示されている。
図8において、電力消費量は監視される(110)。システムは、また、外的要因を監視する(112)。これらの外的要因の影響は評価される(114)。これには、今日の外気温度か、又は、例えば明日の予想外気温度かのいずれかに基づいて、HVAC制御調整を決定することが含まれる。価格決定が送電系統に関する要望によって変動するため、送電系統の状態もまた、業務に関して影響を及ぼす。
送電系統に存在する1つ特定状態は、例えば、要望応答状態と称されるものである。要望応答状態は、送電系統に関する要望が所定の負荷に達し、消費量を削減することのできるパワーコンシューマが、消費量を削減する誘因である場合に生じる。要望応答状態が120で存在して場合、電力制御装置は、それらの処理用タスクを他の処理用タスクよりも低い品質のサービス要求に縮小することができる。これによって、データセンタは、優遇価格決定を受けるとともに、コストを削減することができる。
114に戻れば、上記影響の評価によって、その後、予測した影響、又は、実際の影響に基づく業務の調整(116)がもたらされる。この調整には、負荷の分配、サーバのシャットダウン、又は、シャットダウンされたであろうサーバの非シャットダウン、HVACシステム制御の操作などが含まれる。
データセンタにおけるすべての装置の電力消費量を監視する機能は、データセンタのより良好な管理を可能にする。監視は、リソースの仮想化と組み合わされて、電力制御装置が、データセンタの電力消費量を最小限にするために必要に応じて業務、価格決定及び仮想化を調整することを可能にする。
電力制御装置は、図1に示されるように、少なくとも1つのプロセッサが備わっている、独立型演算処理装置として実施できる。明細書に記載された方法は、コンピュータ制御による方法として実施できる。加えて、それらは、明細書に記載された方法が、コンピュータが遂行するように実行された場合、コンピュータ読取型媒体に記憶された指示として、実施できる。

Claims (4)

  1. データセンタにおける電力制御システムであって、
    局部制御装置を有する、少なくとも1つの物理サーバと、
    前記物理サーバに結合された、少なくとも1つの仮想サーバと、
    サービス要求の品質、及び、電力消費量によって少なくとも一部が決定される、タスク負荷であって、前記物理サーバ上の前記タスク負荷を、前記仮想サーバによって制御するサーバ/電力制御装置と、
    を備える電力制御システム。
  2. 前記サーバ/電力制御装置と通信状態にある、環境制御システムと、を更に備える請求項1に記載の電力制御システム。
  3. 前記データセンタへ結合された、データラインと、を更に備える請求項1に記載の電力制御システム。
  4. 前記データセンタへ結合された、少なくとも1つの外部電力供給ラインと、を更に備える請求項1に記載の電力制御システム。
JP2009012694A 2008-01-23 2009-01-23 電力制御システム Pending JP2009176304A (ja)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/018,737 US8447993B2 (en) 2008-01-23 2008-01-23 Integrated energy savings and business operations in data centers

Publications (1)

Publication Number Publication Date
JP2009176304A true JP2009176304A (ja) 2009-08-06

Family

ID=40460792

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009012694A Pending JP2009176304A (ja) 2008-01-23 2009-01-23 電力制御システム

Country Status (3)

Country Link
US (2) US8447993B2 (ja)
EP (1) EP2083383A1 (ja)
JP (1) JP2009176304A (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5621928B2 (ja) * 2011-06-22 2014-11-12 日本電気株式会社 サーバ、電源管理システム、電源管理方法、およびプログラム

Families Citing this family (82)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006015245A2 (en) * 2004-07-29 2006-02-09 Modius, Inc. Universal configurable device gateway
US9003211B2 (en) * 2007-03-20 2015-04-07 Power Assure, Inc. Method and apparatus for holistic power management to dynamically and automatically turn servers, network equipment and facility components on and off inside and across multiple data centers based on a variety of parameters without violating existing service levels
US8127297B2 (en) 2007-10-31 2012-02-28 International Business Machines Corporation Smart virtual objects of a virtual universe independently select display quality adjustment settings to conserve energy consumption of resources supporting the virtual universe
US8013861B2 (en) 2007-10-31 2011-09-06 International Business Machines Corporation Reducing a display quality of an area in a virtual universe to conserve computing resources
US8214750B2 (en) 2007-10-31 2012-07-03 International Business Machines Corporation Collapsing areas of a region in a virtual universe to conserve computing resources
US8127235B2 (en) 2007-11-30 2012-02-28 International Business Machines Corporation Automatic increasing of capacity of a virtual space in a virtual world
US8145761B2 (en) * 2008-03-03 2012-03-27 Microsoft Corporation Load skewing for power-aware server provisioning
JP5211778B2 (ja) * 2008-03-17 2013-06-12 富士通株式会社 ジョブ割当装置、並列計算機システム、ジョブ割当方法、及び、ジョブ割当プログラム
US8032767B2 (en) * 2008-04-02 2011-10-04 Microsoft Corporation Power-efficient state setting of data-center elements
JP4724730B2 (ja) * 2008-04-09 2011-07-13 株式会社日立製作所 情報処理システムの運用管理方法、運用管理プログラム、および運用管理装置、ならびに情報処理システム
US7970561B2 (en) * 2008-04-14 2011-06-28 Power Assure, Inc. Method to calculate energy efficiency of information technology equipment
US8260928B2 (en) * 2008-05-05 2012-09-04 Siemens Industry, Inc. Methods to optimally allocating the computer server load based on the suitability of environmental conditions
US8199145B2 (en) * 2008-05-06 2012-06-12 International Business Machines Corporation Managing use limitations in a virtual universe resource conservation region
US20090281885A1 (en) * 2008-05-08 2009-11-12 International Business Machines Corporation Using virtual environment incentives to reduce real world energy usage
US9268385B2 (en) * 2008-08-20 2016-02-23 International Business Machines Corporation Introducing selective energy efficiency in a virtual environment
US8285423B2 (en) * 2008-10-06 2012-10-09 Ca, Inc. Aggregate energy management system and method
US20100169227A1 (en) * 2008-12-31 2010-07-01 International Business Machines Corporation ENERGY MANAGEMENT AND QUALITY OF SERVICE (QoS)
US9778718B2 (en) 2009-02-13 2017-10-03 Schneider Electric It Corporation Power supply and data center control
US9519517B2 (en) * 2009-02-13 2016-12-13 Schneider Electtic It Corporation Data center control
US8397088B1 (en) 2009-07-21 2013-03-12 The Research Foundation Of State University Of New York Apparatus and method for efficient estimation of the energy dissipation of processor based systems
US20110040417A1 (en) * 2009-08-13 2011-02-17 Andrew Wolfe Task Scheduling Based on Financial Impact
US8751844B2 (en) * 2009-09-24 2014-06-10 Citrix Systems, Inc. Systems and methods for attributing an amount of power consumption to a workload
US8365176B2 (en) * 2009-10-15 2013-01-29 International Business Machines Corporation Data center job migration and scheduling based on server chassis fan speed threshold
EP2502121B1 (en) * 2009-11-18 2018-12-26 Pacecontrols, LLC Controller for automatic control and optimization of duty cycled hvac&r equipment, and systems and methods using same
KR101303690B1 (ko) * 2009-12-09 2013-09-04 한국전자통신연구원 전력 관리 장치 및 그 방법, 전력 제어 시스템
US9360914B2 (en) * 2010-01-12 2016-06-07 Oracle America, Inc. System and method for controlling energy usage in a server
US8402140B2 (en) * 2010-01-13 2013-03-19 Nec Laboratories America, Inc. Methods and apparatus for coordinated energy management in virtualized data centers
US8789061B2 (en) * 2010-02-01 2014-07-22 Ca, Inc. System and method for datacenter power management
US20110230979A1 (en) * 2010-03-19 2011-09-22 Microsoft Corporation Scalable and flexible control system having symmetrical control units
US8515967B2 (en) * 2010-03-29 2013-08-20 International Business Machines Corporation Cost and power efficient storage area network provisioning
US10067549B1 (en) 2010-04-20 2018-09-04 Modius Inc Computed devices
US8589932B2 (en) * 2010-07-02 2013-11-19 International Business Machines Corporation Data processing workload control
US8825858B1 (en) * 2010-11-04 2014-09-02 Sprint Communications Company L.P. Virtual server resource monitoring and management
US9256900B2 (en) * 2010-11-15 2016-02-09 International Business Machines Corporation Managing service demand load relative to infrastructure capacity in a networked computing environment
JP5582016B2 (ja) * 2010-12-15 2014-09-03 ソニー株式会社 タスク管理装置、タスク管理方法、及びプログラム
WO2012082349A2 (en) * 2010-12-16 2012-06-21 Intel Corporation Workload scheduling based on a platform energy policy
WO2012113438A1 (de) * 2011-02-21 2012-08-30 Siemens Aktiengesellschaft Optimierter betrieb eines rechenzentrums
US9276773B2 (en) 2013-03-14 2016-03-01 Tso Logic Inc. Control system for power control
US9746911B2 (en) 2011-03-02 2017-08-29 Tso Logic Inc. Same linking
US9639144B2 (en) 2011-03-02 2017-05-02 Tso Logic Inc. Power state adjustment
US8589929B2 (en) 2011-05-06 2013-11-19 International Business Machines Corporation System to provide regular and green computing services
US20130110564A1 (en) * 2011-10-26 2013-05-02 Chris D. Hyser Spot pricing to reduce workload in a data center
US9081373B2 (en) 2011-11-15 2015-07-14 Palo Alto Research Center Incorporated Using model communication as a protocol in a managed electrical system
US9411329B2 (en) 2011-11-15 2016-08-09 Palo Alto Research Center Incorporated Hierarchical model communication and control in a managed electrical system
US9933843B2 (en) 2011-12-22 2018-04-03 Schneider Electric It Corporation Systems and methods for reducing energy storage requirements in a data center
US9513696B2 (en) * 2012-03-08 2016-12-06 Hewlett-Packard Development Company, L.P. Migrating applications across a group of personal mobile devices based on battery usage
US20150261898A1 (en) * 2012-07-23 2015-09-17 Arizona Board Of Regents, For And On Behalf Of, Arizona State University Systems, methods, and media for energy usage simulators
US9235253B2 (en) 2013-03-14 2016-01-12 Tso Logic Inc. Control system for power control
US9691112B2 (en) * 2013-05-31 2017-06-27 International Business Machines Corporation Grid-friendly data center
IN2013CH05013A (ja) 2013-11-07 2015-05-08 Schneider Electric It Corp
US9436258B1 (en) * 2013-11-21 2016-09-06 Google Inc. Dynamic service level objective power control in distributed process
US20150154048A1 (en) * 2013-12-04 2015-06-04 International Business Machines Corporation Managing workload to provide more uniform wear among components within a computer cluster
US9869982B1 (en) * 2014-10-17 2018-01-16 Google Inc. Data center scale utility pool and control platform
US9948513B2 (en) 2015-03-13 2018-04-17 International Business Machines Corporation Managing servers with quality of service assurances
US10078610B2 (en) * 2015-05-04 2018-09-18 Dell Products, L.P. System and method for optimized thermal control for management controller offline
US10268523B2 (en) * 2016-03-11 2019-04-23 City University Of Hong Kong System and method for operating a server farm
US20180081629A1 (en) * 2016-09-16 2018-03-22 Sevone, Inc. Method and apparatus for providing ordered sets of arbitrary percentile estimates for varying timespans
US9959149B1 (en) * 2016-10-11 2018-05-01 City University Of Hong Kong Server farm and method for operating the same
CN106886274B (zh) * 2017-01-22 2019-10-29 青海大学 一种数据中心能耗的管理方法及装置
US11574372B2 (en) 2017-02-08 2023-02-07 Upstream Data Inc. Blockchain mine at oil or gas facility
US11349339B1 (en) * 2017-04-27 2022-05-31 EMC IP Holding Company LLC Usage-based cost structuring system and method
GB201711223D0 (en) * 2017-07-12 2017-08-23 Univ Leeds Innovations Ltd Data centre utilisation forecasting system and method
KR102091481B1 (ko) * 2017-11-29 2020-03-20 국민대학교산학협력단 동적 신경망 학습 방법 및 이를 수행하는 동적 신경망 학습 장치
CA3088184A1 (en) 2018-01-11 2019-07-18 Lancium Llc Method and system for dynamic power delivery to a flexible datacenter using unutilized energy sources
US11031787B2 (en) 2018-09-14 2021-06-08 Lancium Llc System of critical datacenters and behind-the-meter flexible datacenters
US11025060B2 (en) 2018-09-14 2021-06-01 Lancium Llc Providing computational resource availability based on power-generation signals
US11016553B2 (en) 2018-09-14 2021-05-25 Lancium Llc Methods and systems for distributed power control of flexible datacenters
US10873211B2 (en) 2018-09-14 2020-12-22 Lancium Llc Systems and methods for dynamic power routing with behind-the-meter energy storage
US10367353B1 (en) 2018-10-30 2019-07-30 Lancium Llc Managing queue distribution between critical datacenter and flexible datacenter
US11031813B2 (en) 2018-10-30 2021-06-08 Lancium Llc Systems and methods for auxiliary power management of behind-the-meter power loads
US10452127B1 (en) 2019-01-11 2019-10-22 Lancium Llc Redundant flexible datacenter workload scheduling
US11128165B2 (en) 2019-02-25 2021-09-21 Lancium Llc Behind-the-meter charging station with availability notification
US11023287B2 (en) * 2019-03-27 2021-06-01 International Business Machines Corporation Cloud data center with reduced energy consumption
CA3183109A1 (en) 2019-05-15 2020-11-19 Upstream Data Inc. Portable blockchain mining system and methods of use
US11868106B2 (en) 2019-08-01 2024-01-09 Lancium Llc Granular power ramping
US11397999B2 (en) 2019-08-01 2022-07-26 Lancium Llc Modifying computing system operations based on cost and power conditions
US10618427B1 (en) 2019-10-08 2020-04-14 Lancium Llc Behind-the-meter branch loads for electrical vehicle charging
US11016458B2 (en) 2019-10-28 2021-05-25 Lancium Llc Methods and systems for adjusting power consumption based on dynamic power option agreement
US11042948B1 (en) 2020-02-27 2021-06-22 Lancium Llc Computing component arrangement based on ramping capabilities
CN112994037B (zh) * 2021-02-02 2022-08-09 青海大学 智能电网环境中数据中心功耗调节方法、系统、介质及设备
US11723178B2 (en) * 2021-06-22 2023-08-08 State Grid Jiangsu Electric Power Co., Ltd. Information & Telecommunication Branch Power grid-friendly control method and system for data center cooling system
CN115581056B (zh) * 2022-11-09 2023-03-21 宁波亮控信息科技有限公司 一种适用于数据中心水冷系统的节能预测控制方法及系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006208000A (ja) * 2005-01-28 2006-08-10 Hewlett-Packard Development Co Lp 熱/電力管理装置
JP2007310791A (ja) * 2006-05-22 2007-11-29 Hitachi Ltd 計算機システムの消費電力低減方法、及びそのプログラム

Family Cites Families (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5396635A (en) * 1990-06-01 1995-03-07 Vadem Corporation Power conservation apparatus having multiple power reduction levels dependent upon the activity of the computer system
US6366581B1 (en) * 1997-04-02 2002-04-02 Fujitsu Network Communications, Inc. Method and apparatus for generating permanent virtual connections using graphical user interface
US5999888A (en) * 1997-06-09 1999-12-07 Alternate Energy Corporation Automated control system for managing multiple energy sources
US5924486A (en) * 1997-10-29 1999-07-20 Tecom, Inc. Environmental condition control and energy management system and method
JP3591300B2 (ja) * 1998-04-24 2004-11-17 株式会社日立製作所 電力供給制御装置
US6553418B1 (en) * 1999-01-02 2003-04-22 Daniel J. Collins Energy information and control system
US6535859B1 (en) * 1999-12-03 2003-03-18 Ultrawatt Energy System, Inc System and method for monitoring lighting systems
JP3823055B2 (ja) * 1999-12-30 2006-09-20 ノキア コーポレイション 有効なマルチリンク流の取り扱い
US6775267B1 (en) * 1999-12-30 2004-08-10 At&T Corp Method for billing IP broadband subscribers
US7356817B1 (en) * 2000-03-31 2008-04-08 Intel Corporation Real-time scheduling of virtual machines
US6697951B1 (en) * 2000-04-26 2004-02-24 General Electric Company Distributed electrical power management system for selecting remote or local power generators
US6985937B1 (en) * 2000-05-11 2006-01-10 Ensim Corporation Dynamically modifying the resources of a virtual server
JP4034498B2 (ja) * 2000-05-11 2008-01-16 大阪瓦斯株式会社 受電計画作成支援方法
JP2002092098A (ja) * 2000-09-20 2002-03-29 Hitachi Ltd 省エネルギー設備費用の回収方法及び回収システム
US7822967B2 (en) * 2000-09-27 2010-10-26 Huron Ip Llc Apparatus, architecture, and method for integrated modular server system providing dynamically power-managed and work-load managed network devices
US20030074110A1 (en) * 2000-11-08 2003-04-17 Lawrence Silverman System and method for user control of electrical utility demand - side management
US7225441B2 (en) * 2000-12-27 2007-05-29 Intel Corporation Mechanism for providing power management through virtualization
JP4333048B2 (ja) * 2001-03-30 2009-09-16 コニカミノルタビジネステクノロジーズ株式会社 画像入力装置及びその制御方法及びその制御プログラム
US7003279B2 (en) * 2002-02-27 2006-02-21 Gateway Inc. Peak time indicator
JP2003309929A (ja) * 2002-04-12 2003-10-31 Toshiba It Solution Corp 電力サービスシステム及び電力サービス用サーバ
JP3994910B2 (ja) * 2003-05-08 2007-10-24 株式会社日立製作所 電力売買支援システム
JP4219292B2 (ja) * 2004-03-23 2009-02-04 大阪瓦斯株式会社 電力消費地点の気温予測システム及び方法
US8156490B2 (en) * 2004-05-08 2012-04-10 International Business Machines Corporation Dynamic migration of virtual machine computer programs upon satisfaction of conditions
US7401240B2 (en) * 2004-06-03 2008-07-15 International Business Machines Corporation Method for dynamically managing power in microprocessor chips according to present processing demands
JP2006158189A (ja) * 2004-11-04 2006-06-15 Tokyo Electric Power Co Inc:The 電力取引と分散電源を組み合わせたコスト最小化電力管理システム
JP2006153411A (ja) * 2004-12-01 2006-06-15 Chugoku Electric Power Co Inc:The 蓄熱設備制御システム
US7636801B1 (en) * 2005-06-20 2009-12-22 Symantec Operating Corporation Coordination of quality of service in a multi-layer virtualized storage environment
US7861098B2 (en) * 2006-06-30 2010-12-28 Intel Corporation Method and apparatus for user-activity-based dynamic power management and policy creation for mobile platforms
US7574491B2 (en) * 2005-07-29 2009-08-11 Scalent Systems Virtual data center for network resource management
US7626994B2 (en) * 2005-11-14 2009-12-01 Broadcom Corporation Multiple node applications cooperatively managing a plurality of packet switched network pathways
EP1916599A1 (en) * 2006-10-26 2008-04-30 Intellectual Business Machines Corporation Method, system and computer program for configuring server farms at minimum cost
US7844839B2 (en) * 2006-12-07 2010-11-30 Juniper Networks, Inc. Distribution of network communications based on server power consumption
TWI326818B (en) * 2006-12-15 2010-07-01 Inst Information Industry Dynamic voltage scheduling method, system thereof and record medium
US20080167033A1 (en) * 2007-01-04 2008-07-10 Telefonaktiebolaget Lm Ericsson (Publ) Method and Apparatus for Cost-Based Network Selection
US20080320482A1 (en) * 2007-06-20 2008-12-25 Dawson Christopher J Management of grid computing resources based on service level requirements
US20090094097A1 (en) * 2007-10-03 2009-04-09 Seth Gardenswartz Network-based optimization of services
US20090106571A1 (en) * 2007-10-21 2009-04-23 Anthony Low Systems and Methods to Adaptively Load Balance User Sessions to Reduce Energy Consumption
EP2223235A4 (en) * 2007-11-06 2011-12-21 Credit Suisse Securities Usa Llc PREDICTION AND RESOURCE ALLOCATION MANAGEMENT ACCORDING TO LEVEL OF SERVICE CONTRACTS
JP4902501B2 (ja) * 2007-11-12 2012-03-21 株式会社日立製作所 電力制御方法、計算機システム、及びプログラム
US9395786B2 (en) * 2007-11-20 2016-07-19 Hewlett Packard Enterprise Development Lp Cross-layer power management in a multi-layer system
US8819675B2 (en) * 2007-11-28 2014-08-26 Hitachi, Ltd. Virtual machine monitor and multiprocessor system
US20090150700A1 (en) * 2007-12-06 2009-06-11 International Business Machines Corporation Method of controlling power to a plurality of servers
JP4839328B2 (ja) * 2008-01-21 2011-12-21 株式会社日立製作所 サーバの消費電力制御装置、サーバの消費電力制御方法及びコンピュータプログラム
JP4922255B2 (ja) * 2008-06-30 2012-04-25 株式会社日立製作所 情報処理システムおよびそのシステムにおける省電力制御方法
US8782655B2 (en) * 2008-07-01 2014-07-15 Hewlett-Packard Development Company, L.P. Controlling computing resource consumption
US20100010688A1 (en) * 2008-07-08 2010-01-14 Hunter Robert R Energy monitoring and management
US9830670B2 (en) * 2008-07-10 2017-11-28 Apple Inc. Intelligent power monitoring
JP5153503B2 (ja) * 2008-07-31 2013-02-27 インターナショナル・ビジネス・マシーンズ・コーポレーション 消費電力を推定するシステムおよび方法
KR101012863B1 (ko) * 2008-09-25 2011-02-08 한국전력공사 고객기준부하 산출을 위한 부하 예측 비교 분석 시스템
US8656404B2 (en) * 2008-10-16 2014-02-18 Palo Alto Research Center Incorporated Statistical packing of resource requirements in data centers
US8352094B2 (en) * 2009-03-17 2013-01-08 Palo Alto Research Center Incorporated Technique for aggregating loads with time-varying operating cycles
US8190744B2 (en) * 2009-05-28 2012-05-29 Palo Alto Research Center Incorporated Data center batch job quality of service control

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006208000A (ja) * 2005-01-28 2006-08-10 Hewlett-Packard Development Co Lp 熱/電力管理装置
JP2007310791A (ja) * 2006-05-22 2007-11-29 Hitachi Ltd 計算機システムの消費電力低減方法、及びそのプログラム

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
CSNG200401704027; 杉木 章義 ほか Akiyoshi SUGIKI et.al.: 'ディペンダブルなインターネット・サーバを実現するクラスタ用ミドルウェアの基本設計 Basic Design of Cu' 先進的計算基盤システムシンポジウム SACSIS2003 論文集 Symposium on Advanced Computing Sy 第2003巻 第8号 Vol.2003, No.8, 20030528, 267〜274頁, 社団法人情報処理学会 Information Processing Socie *
CSNG200700489007; 畑崎恵介,高本良史 Keisuke HATASAKI Yoshifumi TAKAMOTO: 'サーバ仮想化を用いたシステムの省電力ポリシー運用技術 Power saving technology with virtualization' 電子情報通信学会技術研究報告(CPSY2006-44) IEICE Technical Report 第106巻 第436号, 20061215, 37〜42頁, 社団法人電子情報通信学会 The Institute of Electro *
JPN6013014754; 畑崎恵介,高本良史 Keisuke HATASAKI Yoshifumi TAKAMOTO: 'サーバ仮想化を用いたシステムの省電力ポリシー運用技術 Power saving technology with virtualization' 電子情報通信学会技術研究報告(CPSY2006-44) IEICE Technical Report 第106巻 第436号, 20061215, 37〜42頁, 社団法人電子情報通信学会 The Institute of Electro *
JPN6013052751; 杉木 章義 ほか Akiyoshi SUGIKI et.al.: 'ディペンダブルなインターネット・サーバを実現するクラスタ用ミドルウェアの基本設計 Basic Design of Cu' 先進的計算基盤システムシンポジウム SACSIS2003 論文集 Symposium on Advanced Computing Sy 第2003巻 第8号 Vol.2003, No.8, 20030528, 267〜274頁, 社団法人情報処理学会 Information Processing Socie *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5621928B2 (ja) * 2011-06-22 2014-11-12 日本電気株式会社 サーバ、電源管理システム、電源管理方法、およびプログラム
US9317098B2 (en) 2011-06-22 2016-04-19 Nec Corporation Server, power management system, power management method, and program

Also Published As

Publication number Publication date
US20130246313A1 (en) 2013-09-19
EP2083383A1 (en) 2009-07-29
US8447993B2 (en) 2013-05-21
US20090187782A1 (en) 2009-07-23

Similar Documents

Publication Publication Date Title
JP2009176304A (ja) 電力制御システム
US9451013B1 (en) Providing instance availability information
US20090119673A1 (en) Predicting and managing resource allocation according to service level agreements
US8499066B1 (en) Predicting long-term computing resource usage
US8745218B1 (en) Predictive governing of dynamic modification of program execution capacity
US9571347B2 (en) Reactive auto-scaling of capacity
US10128684B2 (en) Energy control via power requirement analysis and power source enablement
CA2900948C (en) Cost-minimizing task scheduler
US9235441B2 (en) Optimizing energy use in a data center by workload scheduling and management
JP5662057B2 (ja) データ・センタのバッチ・ジョブのサービスの質コントロール
Goudarzi et al. Geographical load balancing for online service applications in distributed datacenters
Wang et al. Datacenters as controllable load resources in the electricity market
US20080244607A1 (en) Economic allocation and management of resources via a virtual resource market
US9306814B1 (en) Providing instance availability information
US20220382603A1 (en) Generating predictions for host machine deployments
US20130110564A1 (en) Spot pricing to reduce workload in a data center
Shetti et al. E-VM: An elastic virtual machine scheduling algorithm to minimize the total cost of ownership in a hybrid cloud
Khodayarseresht et al. Energy and carbon-aware initial VM placement in geographically distributed cloud data centers
Wong et al. Spa: Harnessing availability in the aws spot market
Yuan et al. Availability-aware virtual resource provisioning for infrastructure service agreements in the cloud
Wanis et al. Modeling and pricing cloud service elasticity for geographically distributed applications
US20230418687A1 (en) Data center with energy-aware workload placement
Pelluri et al. Energy Saving in Cloud by Using Enhanced Instance Based Learning (EIBL) for Resource Prediction
Basmadjian et al. Demand-Side Flexibility and Supply-Side Management: The Use Case of Data Centers and Energy Utilities
EP2966567A1 (en) Accounting for virtualized IT infrastructure and innovative electrical power saving rules

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120118

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121120

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130402

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130701

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20131029