US20130246313A1 - Integrated energy savings and business operations in data centers - Google Patents

Integrated energy savings and business operations in data centers Download PDF

Info

Publication number
US20130246313A1
US20130246313A1 US13/891,933 US201313891933A US2013246313A1 US 20130246313 A1 US20130246313 A1 US 20130246313A1 US 201313891933 A US201313891933 A US 201313891933A US 2013246313 A1 US2013246313 A1 US 2013246313A1
Authority
US
United States
Prior art keywords
customer
power
power consumption
cost
data center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/891,933
Inventor
Daniel H. Greene
Bryan T. Preas
Maurice K. Chu
Haitham Hindi
Nitin S. Parekh
James E. Reich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Palo Alto Research Center Inc
Original Assignee
Palo Alto Research Center Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Palo Alto Research Center Inc filed Critical Palo Alto Research Center Inc
Priority to US13/891,933 priority Critical patent/US20130246313A1/en
Publication of US20130246313A1 publication Critical patent/US20130246313A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management

Definitions

  • data center means a facility used to house computer systems and associated components, such as telecommunications and storage systems.
  • a data center generally includes not just the computer systems, but back up power supplies, redundant data communications connections, environmental controls such as air conditioning and fire suppression, and security systems and devices.
  • Data center operations generally revolve around customer service levels. For example, a particular customer may have an agreement to have a particular quality of service for that customer's computations or data communications.
  • the quality of service may have different requirements for different customers. For example, for one customer, the key measure of the quality of service may involve how fast an application responds when accessed remotely. For another customer, the quality of service may involve the speed or bandwidth of connections provided to that customer's subscriber.
  • Data center operations managers will generally optimize and manage the loading of tasks and processing based upon meeting the defined QoS requirements for the manager's customers.
  • the manager may distribute processing task, etc., in response to changing customer requirements over time and conditions that relate to the processing load.
  • the manager does not generally take into account the impact on energy consumption of the various customer requirements, nor does the manager take into account the ‘true cost’ of operations for a particular customer.
  • a customer may have a particular quality of service requirement that generally results in several high-load processes running on several different servers during a limited time every day with high priority. During other times, the quality of service requirement may taper off to a minimal processing requirement. That customer's service level agreement (SLA) would generally have a provision guaranteeing the availability of the processes during the limited time and may charge the customer more.
  • SLA service level agreement
  • This type of business model does not take into account that the second customer's load may actually cost the data center more, because of the constant power requirement. Alternatively, one could find that the second customer does actually result in a lower cost of operations due to the predictable nature of the load. However, without monitoring and taking into account the cost of the energy for the data systems and the necessary supporting systems, such as increased air conditioning needs when many servers are running at high speeds, one will not have data to make these types of decisions.
  • FIG. 1 shows an embodiment of a power control system for a data center.
  • FIG. 2 shows a block diagram of an embodiment of a service/power controller process.
  • FIG. 3 shows a flowchart of an embodiment of a control path.
  • FIG. 4 shows a flowchart of an embodiment of a control path having a failure.
  • FIG. 5 shows a flowchart of an embodiment of a process for allocating resources based upon power consumption and performance.
  • FIG. 6 shows a flowchart of an embodiment of a process for monitoring predictability of power consumption in a data center.
  • FIG. 7 shows a flowchart of an embodiment of a process for monitoring power consumption and the associated cost in a data center.
  • FIG. 8 shows a flowchart of an embodiment of a process for adjusting operations of a data center based upon the impact of external factors on power consumption.
  • FIG. 1 shows an architecture 10 for a data center.
  • the data center includes multiple physical servers.
  • a physical server is an actual machine, such as a quad, dual or single core computing system that provides a particular service. Examples include communications servers, database servers, applications servers, etc.
  • a physical server differs greatly from a virtual server.
  • a virtual server is one that appears to entities accessing it to be a single server, while it may actually be a partition or subset of a physical server. It may also appear as a single server, but actually be comprised of several physical servers.
  • a virtual server is created through a virtualization process.
  • Virtualization may be defined as a technique for hiding the physical characteristics of computing resources from the way in which other systems, applications, or end users interact with those resources. This includes making a single physical resource such as a server, an operating system, an application, or storage device, appear to function as multiple logical resources. Virtualization may also include making multiple physical resources such as storage devices or servers appear as a single logical resource. It may also include making one physical resource to appear, with somewhat different characteristics, as one logical resource.
  • Using virtual servers enables the migration of processing tasks to other physical servers or resources transparently to the consumers of the services provided by the virtual server, where the consumer may be a user, a process, another computer, etc.
  • a ‘consumer’ is any entity that uses a process or service within the power control system. This is contrasted with a ‘customer’ which is an identified entity to which the data center provides services according to a service level agreement. Performance levels are generally tracked by customers.
  • the physical servers, such as 14 in FIG. 1 is depicted as being having several virtual servers such as 17 operating on it.
  • a virtual server may be an application running on top of an operating system, for example. This is merely for demonstrative purposes and no limitation of location or logical hierarchy is intended, nor should one be implied.
  • the virtual server 17 allows the service/power controller 18 to task the physical servers with processing tasks based in part on the power consumption/energy usage of the physical servers. This in turn allows optimization of the operation of the data center with regard to power consumption.
  • the service/power controller 18 may be referred to as the power controller.
  • the controller 18 is a service/power controller, in that is controls the relationship between the quality of service demands and power consumption to balance the services demanded and paid for by customers while also managing the power consumption and distribution within the limits defined by the process.
  • controller 18 is shown as being a single controller, while it may actually be distributed across several computers, processing cores, etc.
  • one or more of the individual physical servers such as 14 may have local controllers such as 16 .
  • the only devices depicted in the diagram are servers, other types of devices may be included, such as power supplies, storage arrays or other storage, tape decks, etc.
  • the centralized controller 18 may be coupled to data lines 20 .
  • the functions of the data center generally revolves around data processing of some sort, and the controller may merely exist in the same power distribution structure as the data lines, or the power controller may monitor or affect the operation of the data lines.
  • the power controller may merely exist in the same power structure as the power lines 22 , or the power controller 18 may take a more active role with the power lines.
  • the power lines 22 come in from ‘the grid,’ or the local power infrastructure that generally includes transmission lines, converters, transformers, power switches, etc.
  • the system may also couple to environmental input lines 24 . These may be connections to the heating/ventilation/air conditioning (HVAC) system, lighting, other temperature sensors, etc.
  • HVAC heating/ventilation/air conditioning
  • the power controller may use this in making determinations based upon external factors, as will be discussed in more detail later.
  • Devices may exist in the server farm related to its maintenance and operation, shown as environmental control 15 .
  • the environmental control system 21 may control these devices. Examples include climate control systems such as HVAC; fire suppression systems, such as alarms, sprinklers, foam distributors, etc.; security systems and possibly even lighting.
  • the power controller may regulate the operation of these systems in response to server level activity that may require cooling, hours of occupancy by operators, etc.
  • FIG. 2 shows a block diagram of an embodiment of a service/power control process 30 such as might be executed by the service/power controller device or subsystem in FIG. 1 , again referred to as the power controller or power control process for ease of discussion.
  • a service/power control process 30 such as might be executed by the service/power controller device or subsystem in FIG. 1 , again referred to as the power controller or power control process for ease of discussion.
  • One of the concerns of the power control process is balancing the need to meet performance requirements with the desire or need to reduce power consumption.
  • the performance requirements are generally defined by customers.
  • the data center manager may write a product description such as 36 for a customer that reads something like, “In this service, you will receive virtual processing equivalent to dedicated servers. You will receive the equivalent of 5 dedicated servers all of the time, but when their load is greater than 50%, the equivalent server count will expand automatically from 5 to as many as 20.”
  • QoS quality of service
  • a control path for power begins at the load level 40 .
  • a load is any device that consumes power and generates heat, thereby loading the system.
  • the load will generally have a local controller 42 to manage power to meet performance objectives.
  • Local control provides a fast acting and reliable control with lower complexity than centralized control. Further, the local control may allow inclusion of legacy elements of the data center into the power control process.
  • a power model may exist between the local controller 32 and the central controller management of power at 30 of FIG. 2 .
  • the power model describes the relationship between loads and power consumption.
  • the power model may aggregate local power controllers, such as describing an entire physical server.
  • the service/power controller such as 18 in FIG. 1 then receives this information from the power side of the power control process of FIG. 2 , at 44 of FIG. 3 , and may rearrange the processing tasks distributed to the loads to optimize power and business objectives at 46 .
  • the centralized control relates to local autonomous control via higher level power models. The centralized control performs the balancing between the performance requirements/business objectives and the power savings goals.
  • FIG. 4 demonstrates one scenario to assist in understanding of the control hierarchy.
  • a load fails. For example, assume the load was a variable speed fan.
  • the local controller identifies the load failure at 42 , or it is identified by independent sensors.
  • This power model updates at 44 to reflect the status of the load, such as by determining that the processor in the server associated with the failed fan should not run, or should be lightly loaded to avoid overheating.
  • the power model then communicates this information to the central controller and the central controller reallocates processing to other machines, while still managing business objectives in light of the power saving targets.
  • the power controller process has several outputs as well.
  • the power controller may identify and plan for or schedule opportunities to virtualize servers.
  • the server with the failed fan may have processes migrated from it and a determination may be made in which that server is no longer necessary. Because that physical server was virtualized into virtual servers, the elimination of that server is transparent to the consumers of the virtual server's services.
  • the power control process may direct migration of processes/tasks to other servers depending upon power consumption. This may occur as a preparation for a shut down, or merely for power consumption reasons. For example, there may be a server that consumes more power when running at a relatively high level, so a process may be migrated off of that server to lower the over all processing level for the server, thereby reducing the power consumption. In this instance, there is no intention of shutting down the server, the migration was done to balance the power consumption.
  • the power control process may also optimize tasks based upon power consumption. If a relatively high power consuming application is currently running, a lower power consuming task may be run in parallel so as to not ‘spike’ the power consumption, as would occur if a new, high power consuming task were to be launched.
  • FIGS. 1 and 2 can now enable business objectives to be met in a data center while taking into account energy management.
  • the discussion here will refer to power consumption to address the regulation of energy used in operating the data center.
  • One difference between the current invention as set out here and current procedures for optimization of operation of data centers is that power consumption and quality of service here become primary considerations in management of the data center.
  • monitoring power consumption provides a framework in which resources may be identified for virtualization, allows dynamic adjustment of virtualization schedules to maximize performance and minimize costs, provides accurate costing, tracks real costs of services and supports future decision making on service offerings and resource expansion. Opportunities are also provided to maintain quality of service while minimizing power consumption.
  • FIG. 5 shows a flowchart of an embodiment to adjust processing loads based at least partially on power consumption.
  • the power controller monitors power consumption data passed to it from the power models.
  • the inputs from the QoS requirements become performance requirements for the tasks. Based upon the power consumption data and the need to meet performance objectives, the task processing is adjusted across the physical servers using the virtual servers discussed above.
  • the virtualization process 68 may involve many different options with regard to adjusting the operation of the physical servers ‘behind’ the virtual servers. The adjustments in processing resources will remain transparent to the user because of the virtualization that has already occurred.
  • one virtualization possibility would be to reallocate tasks to free up a physical server for shut down. Once any tasks operating on that server were reallocated or migrated to other servers, the physical server would be shut down, reducing power consumption. Again, to the consumers of the virtual server, this change would be transparent.
  • Clustering servers may provide some advantages in efficiency that may ultimately reflect as lower power consumption. For example, clustering all of the servers used by one particular customer geographically together may provide for localized control of the HVAC system for that region. Alternatively, distributing servers geographically may increase reliability. Clustering may be done using affinity rules, as well.
  • the QoS specification may have allowances for lower levels of QoS or performance requirements at 686 , not to exceed some portion of the service period, such as, “you may occasionally have as few as 5 servers assigned to you, but not more than 2 days a month.” This would allow the system to virtualize additional servers as needed to reduce power consumption.
  • changes may be made to the environmental controls based upon the resource allocation at 66 .
  • the power controller may determine that less air conditioning is needed at particular periods of time because the servers are running at a lower level and therefore generating less heat, as an example.
  • a data center manager may be more likely to invest in more resources.
  • a customer's business runs at lower levels for long periods of time and has random spikes of very high level processing required, it is more difficult to determine if additional resources would be a wise investment. If predictability were to provide incentives in the service level agreements, it is possible that the customer may alter the behavior. Alternatively, raising the prices for the unpredictable customer would defray the costs of purchasing new resources that may remain largely idle until that customer's burst of activity hits.
  • the process monitors power consumption. It must be noted that this monitoring that occurs in many of the embodiments described herein may be an ongoing process. The embodiments of the methods do not necessarily ‘start’ with power monitoring. More accurately, the methods access the power monitoring capabilities described above.
  • the process would then predict power usage at a particular time in the future at 72 .
  • the time may be 10 seconds from now, 10 minutes from now, etc.
  • the desired time period may depend upon several factors including having a short enough time period to allow for adaptation and adjustment of loads in a dynamic fashion.
  • the actual power consumption at the predicted time would then be measured.
  • the predicted and actual power consumption may be compared to result in some sort of predictability data.
  • This data may take the form of a predictability rating that feeds into pricing thresholds, etc.
  • the predictability data determined at 78 would then also affect such things as price adjustments at 80 , load adjustments in a proactive fashion when a change in power consumption is predicted to be imminent at 82 , and adjustments in a period of time used for judging predictability at 84 .
  • the model used to make the prediction may employ several different methods.
  • the power consumption predicted to be used in 10 minutes may be based upon the current power consumption.
  • the power consumption may be based upon a power consumption history. For example, a particular customer may perform updates to its system at midnight every night. If it is 11:50 pm, the predicted power consumption at 12:00 would be vastly different than the current power level and the prediction would have little to do with the current power level. Instead, the power consumption history would predict a much higher level of power consumption.
  • the data center manager may be able to price service level agreements more appropriately based on power consumption.
  • a cost of operations used in pricing service level agreements generally involves determining the cost of the resources necessary to meet a particular service level agreement. These costs may include amortization of the purchase of the server, use of the devices themselves and an overhead cost of the facility. The ability to add in the cost of power consumption would make these costs more accurate and provide an ability to determine a true cost of operations.
  • FIG. 7 shows an embodiment of a method to track power consumption and determine a true cost of operation.
  • the power consumption is monitored at 90 , as discussed above.
  • the cost of the power consumption is determined, generally using the price provided from the power supplier of the grid from which the data center receives power. This pricing may vary depending upon grid conditions, time of the day, day of the month, etc.
  • the power controller would compute the cost of power consumption for the customer during operations in support of the customer.
  • the system would then adjust the cost of operations based on this cost at 94 .
  • the system may also have access to an accounting system that can perform this adjustment, rather than performing it at the power control system level.
  • This information would then be provided to the data center manager at 98 , possibly as an automated report showing a comparison of the price charged that customer versus the adjusted cost of operations determined at 96 or a recommendation to change the customer's pricing, etc. at 100 .
  • the information may be provided at 98 as an identification of the profitable clients, most efficiently priced clients, or the properly provisioned customer, which would be those whose pricing is appropriate in light of the true cost of that customer's operations.
  • this process may be entirely automated.
  • the customer would have a service level agreement that allowed for some variability in the price within some agreed upon range.
  • the system could dynamically adjust the pricing depending upon the true costs of operation at 102 .
  • This automatic adjustment of the pricing further illustrates that the system assists at different levels of managing the data center operations.
  • This information gathered from the power monitoring can be used strategically, operationally or for planning Strategic use would generally include using the information gathered to make decisions on future service offerings, and investments in resource expansion.
  • the example above demonstrates an operational use, allowing dynamic adjustment of not just pricing, but can also include dynamic adjustment of virtualization.
  • Planning use generally includes identification, demonstration and implementations of virtualization opportunities.
  • power control In addition to adjustment of the processing loads and pricing, power control also allows for adjustment of operations based upon external factors. External factors may include the state of the power grid external to the data center, environmental factors such as the outside temperature, as that affects the cooling requirements of the data center, etc. FIG. 8 shows an example of this type of adjustment.
  • the power consumption is monitored at 110 .
  • the system also monitors external factors at 112 .
  • the impact of these external factors is evaluated at 114 . This may include determining HVAC control adjustments based upon an outside temperature, either for today, or for example, for tomorrow's expected temperature.
  • the state of the grid may also have an impact on operations, as the pricing may fluctuate depending upon the demands on the grid.
  • a demand response condition occurs when the demand on the grid hits a predetermined load and power consumers that can reduce their consumption are given incentives to do so. If a demand response condition exists at 120 , the power controller can scale back those processing tasks with lower quality of service requirements than other processing tasks. This would allow the data center to receive preferential pricing and reduce costs.
  • the evaluation of the impact can then result in adjustment of operations based upon the predicted or actual impact at 116 .
  • the adjustment may include distribution of loads, shutting down a server, or not shutting down a server that would otherwise have been shut down, manipulation of the HVAC system controls, etc.
  • the ability to monitor power consumption of all of the devices in a data center can then allow better management of the data center.
  • This monitoring combined with virtualization of the resources, allows the power controller to adjust operations, pricing and virtualization as needed to minimize power consumption of the data center.
  • the power controller may be implemented as a stand alone computing device, having at least one processor as shown in FIG. 1 .
  • the methods described here may be implemented as computer-controlled methods. Additionally, they may be implemented as instructions stored on a computer-readable medium, that when executed cause a computer to perform the methods described here.

Abstract

A computer-controlled method of determining costs of power consumption in a data center includes monitoring power consumption for a customer, determine a cost of the power consumption for the customer, adjusting a cost of operation for the customer to include the cost of power consumption to produce an adjusted cost of operation for the customer, and comparing the adjusted cost of operation for the customer to a price for the customer.

Description

    CROSS REFERENCE TO RELATED APPLICATION
  • This application is a division of U.S. patent application Ser. No. 12/018,737, filed on Jan. 23, 2008, which is incorporated herein in its entirety.
  • BACKGROUND
  • Many entities use data centers for multiple purposes. Service providers, such as phone companies, cable networks, power companies, retailers, etc., store and access customers' data in larger ‘server farms,’ or data centers. For purposes of discussion here, ‘data center’ means a facility used to house computer systems and associated components, such as telecommunications and storage systems. A data center generally includes not just the computer systems, but back up power supplies, redundant data communications connections, environmental controls such as air conditioning and fire suppression, and security systems and devices.
  • Data center operations generally revolve around customer service levels. For example, a particular customer may have an agreement to have a particular quality of service for that customer's computations or data communications. The quality of service (QoS) may have different requirements for different customers. For example, for one customer, the key measure of the quality of service may involve how fast an application responds when accessed remotely. For another customer, the quality of service may involve the speed or bandwidth of connections provided to that customer's subscriber.
  • Data center operations managers will generally optimize and manage the loading of tasks and processing based upon meeting the defined QoS requirements for the manager's customers. The manager may distribute processing task, etc., in response to changing customer requirements over time and conditions that relate to the processing load. The manager does not generally take into account the impact on energy consumption of the various customer requirements, nor does the manager take into account the ‘true cost’ of operations for a particular customer.
  • For example, a customer may have a particular quality of service requirement that generally results in several high-load processes running on several different servers during a limited time every day with high priority. During other times, the quality of service requirement may taper off to a minimal processing requirement. That customer's service level agreement (SLA) would generally have a provision guaranteeing the availability of the processes during the limited time and may charge the customer more.
  • Contrast this with a customer that has a quality of service requirement that is relatively low, but steady state. The servers are constantly running to meet the customer's requirement, but because the quality of service requirements is relatively low, the customer may be charged less than the previous customer.
  • This type of business model does not take into account that the second customer's load may actually cost the data center more, because of the constant power requirement. Alternatively, one could find that the second customer does actually result in a lower cost of operations due to the predictable nature of the load. However, without monitoring and taking into account the cost of the energy for the data systems and the necessary supporting systems, such as increased air conditioning needs when many servers are running at high speeds, one will not have data to make these types of decisions.
  • Further, data centers are becoming an increasing burden on the already strained power and energy resources. Current estimates show the power consumption of data centers to be between 1 and 2 percent of the national consumption. With increasingly more entities relying upon data centers, and the growing population, this number will rise. Some way to make decisions with regard to costs, as well as more efficiently manage the power consumption of data centers would assist in these issues.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows an embodiment of a power control system for a data center.
  • FIG. 2 shows a block diagram of an embodiment of a service/power controller process.
  • FIG. 3 shows a flowchart of an embodiment of a control path.
  • FIG. 4 shows a flowchart of an embodiment of a control path having a failure.
  • FIG. 5 shows a flowchart of an embodiment of a process for allocating resources based upon power consumption and performance.
  • FIG. 6 shows a flowchart of an embodiment of a process for monitoring predictability of power consumption in a data center.
  • FIG. 7 shows a flowchart of an embodiment of a process for monitoring power consumption and the associated cost in a data center.
  • FIG. 8 shows a flowchart of an embodiment of a process for adjusting operations of a data center based upon the impact of external factors on power consumption.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS
  • FIG. 1 shows an architecture 10 for a data center. In this embodiment, the data center includes multiple physical servers. A physical server is an actual machine, such as a quad, dual or single core computing system that provides a particular service. Examples include communications servers, database servers, applications servers, etc.
  • A physical server differs greatly from a virtual server. A virtual server is one that appears to entities accessing it to be a single server, while it may actually be a partition or subset of a physical server. It may also appear as a single server, but actually be comprised of several physical servers. A virtual server is created through a virtualization process.
  • ‘Virtualization’ may be defined as a technique for hiding the physical characteristics of computing resources from the way in which other systems, applications, or end users interact with those resources. This includes making a single physical resource such as a server, an operating system, an application, or storage device, appear to function as multiple logical resources. Virtualization may also include making multiple physical resources such as storage devices or servers appear as a single logical resource. It may also include making one physical resource to appear, with somewhat different characteristics, as one logical resource.
  • Using virtual servers enables the migration of processing tasks to other physical servers or resources transparently to the consumers of the services provided by the virtual server, where the consumer may be a user, a process, another computer, etc. A ‘consumer’ is any entity that uses a process or service within the power control system. This is contrasted with a ‘customer’ which is an identified entity to which the data center provides services according to a service level agreement. Performance levels are generally tracked by customers.
  • As such, the physical servers, such as 14 in FIG. 1 is depicted as being having several virtual servers such as 17 operating on it. A virtual server may be an application running on top of an operating system, for example. This is merely for demonstrative purposes and no limitation of location or logical hierarchy is intended, nor should one be implied. The virtual server 17 allows the service/power controller 18 to task the physical servers with processing tasks based in part on the power consumption/energy usage of the physical servers. This in turn allows optimization of the operation of the data center with regard to power consumption.
  • For ease of discussion, the service/power controller 18 may be referred to as the power controller. The controller 18 is a service/power controller, in that is controls the relationship between the quality of service demands and power consumption to balance the services demanded and paid for by customers while also managing the power consumption and distribution within the limits defined by the process.
  • Similarly, the controller 18 is shown as being a single controller, while it may actually be distributed across several computers, processing cores, etc. In addition to the central controller 18, one or more of the individual physical servers such as 14 may have local controllers such as 16. Further, while the only devices depicted in the diagram are servers, other types of devices may be included, such as power supplies, storage arrays or other storage, tape decks, etc.
  • The centralized controller 18 may be coupled to data lines 20. The functions of the data center generally revolves around data processing of some sort, and the controller may merely exist in the same power distribution structure as the data lines, or the power controller may monitor or affect the operation of the data lines.
  • Similarly, the power controller may merely exist in the same power structure as the power lines 22, or the power controller 18 may take a more active role with the power lines. The power lines 22 come in from ‘the grid,’ or the local power infrastructure that generally includes transmission lines, converters, transformers, power switches, etc.
  • The system may also couple to environmental input lines 24. These may be connections to the heating/ventilation/air conditioning (HVAC) system, lighting, other temperature sensors, etc. The power controller may use this in making determinations based upon external factors, as will be discussed in more detail later. Devices may exist in the server farm related to its maintenance and operation, shown as environmental control 15. The environmental control system 21 may control these devices. Examples include climate control systems such as HVAC; fire suppression systems, such as alarms, sprinklers, foam distributors, etc.; security systems and possibly even lighting. The power controller may regulate the operation of these systems in response to server level activity that may require cooling, hours of occupancy by operators, etc.
  • FIG. 2 shows a block diagram of an embodiment of a service/power control process 30 such as might be executed by the service/power controller device or subsystem in FIG. 1, again referred to as the power controller or power control process for ease of discussion. One of the concerns of the power control process is balancing the need to meet performance requirements with the desire or need to reduce power consumption.
  • The performance requirements are generally defined by customers. The data center manager may write a product description such as 36 for a customer that reads something like, “In this service, you will receive virtual processing equivalent to dedicated servers. You will receive the equivalent of 5 dedicated servers all of the time, but when their load is greater than 50%, the equivalent server count will expand automatically from 5 to as many as 20.”
  • This is a product description that the customer understands. The manager would then write, or choose from a library, a companion quality of service (QoS) description 38. This QoS specification is more precise than the product description and is used by the power control process 30 of FIG. 2 to define the performance requirements of the data center with regard to that customer. Most data center will have multiple customers, either external or internal.
  • On the other side of the process is the power model and power control. This interaction may be better understood with reference to control flow diagrams, such as those shown in FIGS. 3 and 4. In FIG. 3, a control path for power begins at the load level 40. A load is any device that consumes power and generates heat, thereby loading the system. The load will generally have a local controller 42 to manage power to meet performance objectives. Local control provides a fast acting and reliable control with lower complexity than centralized control. Further, the local control may allow inclusion of legacy elements of the data center into the power control process.
  • A power model may exist between the local controller 32 and the central controller management of power at 30 of FIG. 2. The power model describes the relationship between loads and power consumption. The power model may aggregate local power controllers, such as describing an entire physical server.
  • The service/power controller such as 18 in FIG. 1 then receives this information from the power side of the power control process of FIG. 2, at 44 of FIG. 3, and may rearrange the processing tasks distributed to the loads to optimize power and business objectives at 46. The centralized control relates to local autonomous control via higher level power models. The centralized control performs the balancing between the performance requirements/business objectives and the power savings goals.
  • FIG. 4 demonstrates one scenario to assist in understanding of the control hierarchy. At 40, a load fails. For example, assume the load was a variable speed fan. The local controller identifies the load failure at 42, or it is identified by independent sensors. This power model updates at 44 to reflect the status of the load, such as by determining that the processor in the server associated with the failed fan should not run, or should be lightly loaded to avoid overheating. The power model then communicates this information to the central controller and the central controller reallocates processing to other machines, while still managing business objectives in light of the power saving targets.
  • Returning to FIG. 2, the discussion has focused on the inputs to the service/power controller process 30. The power controller process has several outputs as well. For example, the power controller may identify and plan for or schedule opportunities to virtualize servers. For example, the server with the failed fan may have processes migrated from it and a determination may be made in which that server is no longer necessary. Because that physical server was virtualized into virtual servers, the elimination of that server is transparent to the consumers of the virtual server's services.
  • The power control process may direct migration of processes/tasks to other servers depending upon power consumption. This may occur as a preparation for a shut down, or merely for power consumption reasons. For example, there may be a server that consumes more power when running at a relatively high level, so a process may be migrated off of that server to lower the over all processing level for the server, thereby reducing the power consumption. In this instance, there is no intention of shutting down the server, the migration was done to balance the power consumption.
  • The power control process may also optimize tasks based upon power consumption. If a relatively high power consuming application is currently running, a lower power consuming task may be run in parallel so as to not ‘spike’ the power consumption, as would occur if a new, high power consuming task were to be launched.
  • The power control process and the architecture of FIGS. 1 and 2 can now enable business objectives to be met in a data center while taking into account energy management. The discussion here will refer to power consumption to address the regulation of energy used in operating the data center. One difference between the current invention as set out here and current procedures for optimization of operation of data centers is that power consumption and quality of service here become primary considerations in management of the data center.
  • This ability to track and manage power consumption provides opportunities to allocate processing resources to stay within power consumption targets, figure out the true cost of providing a customer a particular service level, reward or provide incentives to customers with particular characteristics of power consumption, and to adjust task allocation to account for external factors. In addition, monitoring power consumption provides a framework in which resources may be identified for virtualization, allows dynamic adjustment of virtualization schedules to maximize performance and minimize costs, provides accurate costing, tracks real costs of services and supports future decision making on service offerings and resource expansion. Opportunities are also provided to maintain quality of service while minimizing power consumption.
  • FIG. 5 shows a flowchart of an embodiment to adjust processing loads based at least partially on power consumption. At 60, the power controller monitors power consumption data passed to it from the power models. At 62, the inputs from the QoS requirements become performance requirements for the tasks. Based upon the power consumption data and the need to meet performance objectives, the task processing is adjusted across the physical servers using the virtual servers discussed above.
  • The virtualization process 68 may involve many different options with regard to adjusting the operation of the physical servers ‘behind’ the virtual servers. The adjustments in processing resources will remain transparent to the user because of the virtualization that has already occurred.
  • At 680, one virtualization possibility would be to reallocate tasks to free up a physical server for shut down. Once any tasks operating on that server were reallocated or migrated to other servers, the physical server would be shut down, reducing power consumption. Again, to the consumers of the virtual server, this change would be transparent.
  • At 684, another virtualization opportunity may present itself in clustering servers geographically, by server type, by electrical characteristic, etc. Clustering servers may provide some advantages in efficiency that may ultimately reflect as lower power consumption. For example, clustering all of the servers used by one particular customer geographically together may provide for localized control of the HVAC system for that region. Alternatively, distributing servers geographically may increase reliability. Clustering may be done using affinity rules, as well.
  • In addition to adjusting the operational side, adjustments could be made to the requirements as well. The QoS specification may have allowances for lower levels of QoS or performance requirements at 686, not to exceed some portion of the service period, such as, “you may occasionally have as few as 5 servers assigned to you, but not more than 2 days a month.” This would allow the system to virtualize additional servers as needed to reduce power consumption.
  • In addition to the changes made functionally to the servers, changes may be made to the environmental controls based upon the resource allocation at 66. The power controller may determine that less air conditioning is needed at particular periods of time because the servers are running at a lower level and therefore generating less heat, as an example.
  • In addition to allocating resources based upon power consumption, it is also possible to adjust service level agreements with customers based upon the predictability of their processing requirements and power consumption. Higher levels of predictability may result in lower costs, even though the overall level of processing required is high. Predictability also lends itself to better investment decisions with regard to adding resources.
  • For example, if a customer's business runs at a fairly medium level of processing requirements the majority of the time, and the customer's business is growing, a data center manager may be more likely to invest in more resources. However, if a customer's business runs at lower levels for long periods of time and has random spikes of very high level processing required, it is more difficult to determine if additional resources would be a wise investment. If predictability were to provide incentives in the service level agreements, it is possible that the customer may alter the behavior. Alternatively, raising the prices for the unpredictable customer would defray the costs of purchasing new resources that may remain largely idle until that customer's burst of activity hits.
  • Of course, many predictive models may be used to determine how predictable a customer's power consumption is. Generally, the models will involve making a prediction and then comparing the predicted level with the actual level. An embodiment of this type of process is shown in FIG. 6.
  • At 70, the process monitors power consumption. It must be noted that this monitoring that occurs in many of the embodiments described herein may be an ongoing process. The embodiments of the methods do not necessarily ‘start’ with power monitoring. More accurately, the methods access the power monitoring capabilities described above.
  • The process would then predict power usage at a particular time in the future at 72. The time may be 10 seconds from now, 10 minutes from now, etc. The desired time period may depend upon several factors including having a short enough time period to allow for adaptation and adjustment of loads in a dynamic fashion. At 74, the actual power consumption at the predicted time would then be measured.
  • At 76 the predicted and actual power consumption may be compared to result in some sort of predictability data. This data may take the form of a predictability rating that feeds into pricing thresholds, etc. The predictability data determined at 78 would then also affect such things as price adjustments at 80, load adjustments in a proactive fashion when a change in power consumption is predicted to be imminent at 82, and adjustments in a period of time used for judging predictability at 84.
  • As mentioned above, the model used to make the prediction may employ several different methods. For example, the power consumption predicted to be used in 10 minutes may be based upon the current power consumption. Alternatively, the power consumption may be based upon a power consumption history. For example, a particular customer may perform updates to its system at midnight every night. If it is 11:50 pm, the predicted power consumption at 12:00 would be vastly different than the current power level and the prediction would have little to do with the current power level. Instead, the power consumption history would predict a much higher level of power consumption.
  • In addition to being able to predict power consumption and price service level agreements based upon the predictability of power consumption for a particular customer, the data center manager may be able to price service level agreements more appropriately based on power consumption. For example, a cost of operations used in pricing service level agreements generally involves determining the cost of the resources necessary to meet a particular service level agreement. These costs may include amortization of the purchase of the server, use of the devices themselves and an overhead cost of the facility. The ability to add in the cost of power consumption would make these costs more accurate and provide an ability to determine a true cost of operations.
  • FIG. 7 shows an embodiment of a method to track power consumption and determine a true cost of operation. The power consumption is monitored at 90, as discussed above. At 92, the cost of the power consumption is determined, generally using the price provided from the power supplier of the grid from which the data center receives power. This pricing may vary depending upon grid conditions, time of the day, day of the month, etc. The power controller would compute the cost of power consumption for the customer during operations in support of the customer.
  • The system would then adjust the cost of operations based on this cost at 94. The system may also have access to an accounting system that can perform this adjustment, rather than performing it at the power control system level. This information would then be provided to the data center manager at 98, possibly as an automated report showing a comparison of the price charged that customer versus the adjusted cost of operations determined at 96 or a recommendation to change the customer's pricing, etc. at 100. The information may be provided at 98 as an identification of the profitable clients, most efficiently priced clients, or the properly provisioned customer, which would be those whose pricing is appropriate in light of the true cost of that customer's operations.
  • In one embodiment, this process may be entirely automated. The customer would have a service level agreement that allowed for some variability in the price within some agreed upon range. The system could dynamically adjust the pricing depending upon the true costs of operation at 102.
  • This automatic adjustment of the pricing further illustrates that the system assists at different levels of managing the data center operations. This information gathered from the power monitoring can be used strategically, operationally or for planning Strategic use would generally include using the information gathered to make decisions on future service offerings, and investments in resource expansion. The example above demonstrates an operational use, allowing dynamic adjustment of not just pricing, but can also include dynamic adjustment of virtualization. Planning use generally includes identification, demonstration and implementations of virtualization opportunities.
  • In addition to adjustment of the processing loads and pricing, power control also allows for adjustment of operations based upon external factors. External factors may include the state of the power grid external to the data center, environmental factors such as the outside temperature, as that affects the cooling requirements of the data center, etc. FIG. 8 shows an example of this type of adjustment.
  • In FIG. 8, the power consumption is monitored at 110. The system also monitors external factors at 112. The impact of these external factors is evaluated at 114. This may include determining HVAC control adjustments based upon an outside temperature, either for today, or for example, for tomorrow's expected temperature. The state of the grid may also have an impact on operations, as the pricing may fluctuate depending upon the demands on the grid.
  • One special condition that may exist on the grid, for example, is what is referred to as a demand response condition. A demand response condition occurs when the demand on the grid hits a predetermined load and power consumers that can reduce their consumption are given incentives to do so. If a demand response condition exists at 120, the power controller can scale back those processing tasks with lower quality of service requirements than other processing tasks. This would allow the data center to receive preferential pricing and reduce costs.
  • Returning to 114, the evaluation of the impact can then result in adjustment of operations based upon the predicted or actual impact at 116. The adjustment may include distribution of loads, shutting down a server, or not shutting down a server that would otherwise have been shut down, manipulation of the HVAC system controls, etc.
  • The ability to monitor power consumption of all of the devices in a data center can then allow better management of the data center. This monitoring, combined with virtualization of the resources, allows the power controller to adjust operations, pricing and virtualization as needed to minimize power consumption of the data center.
  • The power controller may be implemented as a stand alone computing device, having at least one processor as shown in FIG. 1. The methods described here may be implemented as computer-controlled methods. Additionally, they may be implemented as instructions stored on a computer-readable medium, that when executed cause a computer to perform the methods described here.
  • It will be appreciated that several of the above-disclosed and other features and functions, or alternatives thereof, may be desirably combined into many other different systems or applications. Also that various presently unforeseen or unanticipated alternatives, modifications, variations, or improvements therein may be subsequently made by those skilled in the art which are also intended to be encompassed by the following claims.

Claims (5)

What is claimed is:
1. A computer-controlled method of determining costs of power consumption in a data center, comprising:
monitoring power consumption for a customer;
determine a cost of the power consumption for the customer;
adjusting a cost of operation for the customer to include the cost of power consumption to produce an adjusted cost of operation for the customer; and
comparing the adjusted cost of operation for the customer to a price for the customer.
2. The computer-controlled method of claim 1, further comprising making a price adjustment for the customer based upon the adjusted cost of operation.
3. The computer-controlled method of claim 1, further comprising performing the method for multiple customers.
4. The computer-controlled method of claim 3, further comprising identifying at least one of profitable customers, unprofitable customers, properly provisioned customers and customers having efficient quality of service requirements.
5. The computer-controlled method of claim 4, further comprising providing a result of the comparing to a data center manager.
US13/891,933 2008-01-23 2013-05-10 Integrated energy savings and business operations in data centers Abandoned US20130246313A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/891,933 US20130246313A1 (en) 2008-01-23 2013-05-10 Integrated energy savings and business operations in data centers

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/018,737 US8447993B2 (en) 2008-01-23 2008-01-23 Integrated energy savings and business operations in data centers
US13/891,933 US20130246313A1 (en) 2008-01-23 2013-05-10 Integrated energy savings and business operations in data centers

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US12/018,737 Division US8447993B2 (en) 2008-01-23 2008-01-23 Integrated energy savings and business operations in data centers

Publications (1)

Publication Number Publication Date
US20130246313A1 true US20130246313A1 (en) 2013-09-19

Family

ID=40460792

Family Applications (2)

Application Number Title Priority Date Filing Date
US12/018,737 Active 2029-10-17 US8447993B2 (en) 2008-01-23 2008-01-23 Integrated energy savings and business operations in data centers
US13/891,933 Abandoned US20130246313A1 (en) 2008-01-23 2013-05-10 Integrated energy savings and business operations in data centers

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US12/018,737 Active 2029-10-17 US8447993B2 (en) 2008-01-23 2008-01-23 Integrated energy savings and business operations in data centers

Country Status (3)

Country Link
US (2) US8447993B2 (en)
EP (1) EP2083383A1 (en)
JP (1) JP2009176304A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11349339B1 (en) * 2017-04-27 2022-05-31 EMC IP Holding Company LLC Usage-based cost structuring system and method

Families Citing this family (82)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006015245A2 (en) * 2004-07-29 2006-02-09 Modius, Inc. Universal configurable device gateway
US9003211B2 (en) * 2007-03-20 2015-04-07 Power Assure, Inc. Method and apparatus for holistic power management to dynamically and automatically turn servers, network equipment and facility components on and off inside and across multiple data centers based on a variety of parameters without violating existing service levels
US8013861B2 (en) 2007-10-31 2011-09-06 International Business Machines Corporation Reducing a display quality of an area in a virtual universe to conserve computing resources
US8127297B2 (en) 2007-10-31 2012-02-28 International Business Machines Corporation Smart virtual objects of a virtual universe independently select display quality adjustment settings to conserve energy consumption of resources supporting the virtual universe
US8214750B2 (en) 2007-10-31 2012-07-03 International Business Machines Corporation Collapsing areas of a region in a virtual universe to conserve computing resources
US8127235B2 (en) 2007-11-30 2012-02-28 International Business Machines Corporation Automatic increasing of capacity of a virtual space in a virtual world
US8145761B2 (en) * 2008-03-03 2012-03-27 Microsoft Corporation Load skewing for power-aware server provisioning
JP5211778B2 (en) * 2008-03-17 2013-06-12 富士通株式会社 Job allocation apparatus, parallel computer system, job allocation method, and job allocation program
US8032767B2 (en) * 2008-04-02 2011-10-04 Microsoft Corporation Power-efficient state setting of data-center elements
JP4724730B2 (en) * 2008-04-09 2011-07-13 株式会社日立製作所 Information processing system operation management method, operation management program, operation management apparatus, and information processing system
US7970561B2 (en) * 2008-04-14 2011-06-28 Power Assure, Inc. Method to calculate energy efficiency of information technology equipment
US8260928B2 (en) * 2008-05-05 2012-09-04 Siemens Industry, Inc. Methods to optimally allocating the computer server load based on the suitability of environmental conditions
US8199145B2 (en) * 2008-05-06 2012-06-12 International Business Machines Corporation Managing use limitations in a virtual universe resource conservation region
US20090281885A1 (en) * 2008-05-08 2009-11-12 International Business Machines Corporation Using virtual environment incentives to reduce real world energy usage
US9268385B2 (en) 2008-08-20 2016-02-23 International Business Machines Corporation Introducing selective energy efficiency in a virtual environment
US8285423B2 (en) * 2008-10-06 2012-10-09 Ca, Inc. Aggregate energy management system and method
US20100169227A1 (en) * 2008-12-31 2010-07-01 International Business Machines Corporation ENERGY MANAGEMENT AND QUALITY OF SERVICE (QoS)
US9778718B2 (en) 2009-02-13 2017-10-03 Schneider Electric It Corporation Power supply and data center control
US9519517B2 (en) * 2009-02-13 2016-12-13 Schneider Electtic It Corporation Data center control
US8631411B1 (en) 2009-07-21 2014-01-14 The Research Foundation For The State University Of New York Energy aware processing load distribution system and method
US20110040417A1 (en) * 2009-08-13 2011-02-17 Andrew Wolfe Task Scheduling Based on Financial Impact
US8751844B2 (en) * 2009-09-24 2014-06-10 Citrix Systems, Inc. Systems and methods for attributing an amount of power consumption to a workload
US8365176B2 (en) * 2009-10-15 2013-01-29 International Business Machines Corporation Data center job migration and scheduling based on server chassis fan speed threshold
CA2780801C (en) * 2009-11-18 2021-09-07 Pacecontrols, Llc Controller for automatic control and optimization of duty cycled hvac&r equipment, and systems and methods using same
KR101303690B1 (en) * 2009-12-09 2013-09-04 한국전자통신연구원 Power management apparatus and its method, power control system
US9360914B2 (en) * 2010-01-12 2016-06-07 Oracle America, Inc. System and method for controlling energy usage in a server
US8402140B2 (en) * 2010-01-13 2013-03-19 Nec Laboratories America, Inc. Methods and apparatus for coordinated energy management in virtualized data centers
US8789061B2 (en) * 2010-02-01 2014-07-22 Ca, Inc. System and method for datacenter power management
US20110230979A1 (en) * 2010-03-19 2011-09-22 Microsoft Corporation Scalable and flexible control system having symmetrical control units
US8515967B2 (en) * 2010-03-29 2013-08-20 International Business Machines Corporation Cost and power efficient storage area network provisioning
US10067549B1 (en) 2010-04-20 2018-09-04 Modius Inc Computed devices
US8589932B2 (en) * 2010-07-02 2013-11-19 International Business Machines Corporation Data processing workload control
US8825858B1 (en) * 2010-11-04 2014-09-02 Sprint Communications Company L.P. Virtual server resource monitoring and management
US9256900B2 (en) * 2010-11-15 2016-02-09 International Business Machines Corporation Managing service demand load relative to infrastructure capacity in a networked computing environment
JP5582016B2 (en) * 2010-12-15 2014-09-03 ソニー株式会社 Task management apparatus, task management method, and program
WO2012082349A2 (en) * 2010-12-16 2012-06-21 Intel Corporation Workload scheduling based on a platform energy policy
WO2012113438A1 (en) * 2011-02-21 2012-08-30 Siemens Aktiengesellschaft Optimized operation of a computing center
US9276773B2 (en) 2013-03-14 2016-03-01 Tso Logic Inc. Control system for power control
US9639144B2 (en) 2011-03-02 2017-05-02 Tso Logic Inc. Power state adjustment
US9746911B2 (en) 2011-03-02 2017-08-29 Tso Logic Inc. Same linking
US8589929B2 (en) 2011-05-06 2013-11-19 International Business Machines Corporation System to provide regular and green computing services
US9317098B2 (en) * 2011-06-22 2016-04-19 Nec Corporation Server, power management system, power management method, and program
US20130110564A1 (en) * 2011-10-26 2013-05-02 Chris D. Hyser Spot pricing to reduce workload in a data center
US9081373B2 (en) 2011-11-15 2015-07-14 Palo Alto Research Center Incorporated Using model communication as a protocol in a managed electrical system
US9411329B2 (en) 2011-11-15 2016-08-09 Palo Alto Research Center Incorporated Hierarchical model communication and control in a managed electrical system
EP2795424A4 (en) 2011-12-22 2016-06-01 Schneider Electric It Corp Systems and methods for reducing energy storage requirements in a data center
CN104487912B (en) 2012-03-08 2017-10-31 惠普发展公司,有限责任合伙企业 The virtual electrochemical cell between one group of personal mobile device
WO2014018555A1 (en) * 2012-07-23 2014-01-30 Arizona Board Of Regents, For And On Behalf Of, Arizona State University Systems, methods, and media for energy usage simulators
US9235253B2 (en) * 2013-03-14 2016-01-12 Tso Logic Inc. Control system for power control
US9691112B2 (en) * 2013-05-31 2017-06-27 International Business Machines Corporation Grid-friendly data center
IN2013CH05013A (en) 2013-11-07 2015-05-08 Schneider Electric It Corp
US9436258B1 (en) * 2013-11-21 2016-09-06 Google Inc. Dynamic service level objective power control in distributed process
US20150154048A1 (en) * 2013-12-04 2015-06-04 International Business Machines Corporation Managing workload to provide more uniform wear among components within a computer cluster
US9869982B1 (en) * 2014-10-17 2018-01-16 Google Inc. Data center scale utility pool and control platform
US9948513B2 (en) 2015-03-13 2018-04-17 International Business Machines Corporation Managing servers with quality of service assurances
US10078610B2 (en) * 2015-05-04 2018-09-18 Dell Products, L.P. System and method for optimized thermal control for management controller offline
US10268523B2 (en) * 2016-03-11 2019-04-23 City University Of Hong Kong System and method for operating a server farm
US20180081629A1 (en) * 2016-09-16 2018-03-22 Sevone, Inc. Method and apparatus for providing ordered sets of arbitrary percentile estimates for varying timespans
US9959149B1 (en) * 2016-10-11 2018-05-01 City University Of Hong Kong Server farm and method for operating the same
CN106886274B (en) * 2017-01-22 2019-10-29 青海大学 A kind of management method and device of consumption of data center
WO2018145201A1 (en) 2017-02-08 2018-08-16 Upstream Data Inc. Blockchain mine at oil or gas facility
GB201711223D0 (en) * 2017-07-12 2017-08-23 Univ Leeds Innovations Ltd Data centre utilisation forecasting system and method
KR102091481B1 (en) * 2017-11-29 2020-03-20 국민대학교산학협력단 Method for dynamic neural network learning and apparatus for the same
WO2019139632A1 (en) 2018-01-11 2019-07-18 Lancium Llc Method and system for dynamic power delivery to a flexible datacenter using unutilized energy sources
US11025060B2 (en) 2018-09-14 2021-06-01 Lancium Llc Providing computational resource availability based on power-generation signals
US10873211B2 (en) 2018-09-14 2020-12-22 Lancium Llc Systems and methods for dynamic power routing with behind-the-meter energy storage
US11016553B2 (en) 2018-09-14 2021-05-25 Lancium Llc Methods and systems for distributed power control of flexible datacenters
US11031787B2 (en) 2018-09-14 2021-06-08 Lancium Llc System of critical datacenters and behind-the-meter flexible datacenters
US11031813B2 (en) 2018-10-30 2021-06-08 Lancium Llc Systems and methods for auxiliary power management of behind-the-meter power loads
US10367353B1 (en) 2018-10-30 2019-07-30 Lancium Llc Managing queue distribution between critical datacenter and flexible datacenter
US10452127B1 (en) 2019-01-11 2019-10-22 Lancium Llc Redundant flexible datacenter workload scheduling
US11128165B2 (en) 2019-02-25 2021-09-21 Lancium Llc Behind-the-meter charging station with availability notification
US11023287B2 (en) * 2019-03-27 2021-06-01 International Business Machines Corporation Cloud data center with reduced energy consumption
AU2020276342A1 (en) 2019-05-15 2021-12-16 Upstream Data Inc. Portable blockchain mining system and methods of use
US11868106B2 (en) 2019-08-01 2024-01-09 Lancium Llc Granular power ramping
US11397999B2 (en) 2019-08-01 2022-07-26 Lancium Llc Modifying computing system operations based on cost and power conditions
US10618427B1 (en) 2019-10-08 2020-04-14 Lancium Llc Behind-the-meter branch loads for electrical vehicle charging
US10608433B1 (en) 2019-10-28 2020-03-31 Lancium Llc Methods and systems for adjusting power consumption based on a fixed-duration power option agreement
US11042948B1 (en) 2020-02-27 2021-06-22 Lancium Llc Computing component arrangement based on ramping capabilities
CN112994037B (en) * 2021-02-02 2022-08-09 青海大学 Method, system, medium and device for adjusting power consumption of data center in smart grid environment
US11723178B2 (en) * 2021-06-22 2023-08-08 State Grid Jiangsu Electric Power Co., Ltd. Information & Telecommunication Branch Power grid-friendly control method and system for data center cooling system
CN115581056B (en) * 2022-11-09 2023-03-21 宁波亮控信息科技有限公司 Energy-saving prediction control method and system suitable for water cooling system of data center

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6535859B1 (en) * 1999-12-03 2003-03-18 Ultrawatt Energy System, Inc System and method for monitoring lighting systems
US20030074110A1 (en) * 2000-11-08 2003-04-17 Lawrence Silverman System and method for user control of electrical utility demand - side management

Family Cites Families (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5396635A (en) * 1990-06-01 1995-03-07 Vadem Corporation Power conservation apparatus having multiple power reduction levels dependent upon the activity of the computer system
US6366581B1 (en) * 1997-04-02 2002-04-02 Fujitsu Network Communications, Inc. Method and apparatus for generating permanent virtual connections using graphical user interface
US5999888A (en) * 1997-06-09 1999-12-07 Alternate Energy Corporation Automated control system for managing multiple energy sources
US5924486A (en) * 1997-10-29 1999-07-20 Tecom, Inc. Environmental condition control and energy management system and method
JP3591300B2 (en) * 1998-04-24 2004-11-17 株式会社日立製作所 Power supply control device
US6553418B1 (en) * 1999-01-02 2003-04-22 Daniel J. Collins Energy information and control system
US6775267B1 (en) * 1999-12-30 2004-08-10 At&T Corp Method for billing IP broadband subscribers
ES2255770T3 (en) * 1999-12-30 2006-07-01 Nokia Corporation EFFECTIVE MANAGEMENT OF A MULTI-LINK FLOW.
US7356817B1 (en) * 2000-03-31 2008-04-08 Intel Corporation Real-time scheduling of virtual machines
US6697951B1 (en) * 2000-04-26 2004-02-24 General Electric Company Distributed electrical power management system for selecting remote or local power generators
JP4034498B2 (en) * 2000-05-11 2008-01-16 大阪瓦斯株式会社 Power reception plan creation support method
US6985937B1 (en) * 2000-05-11 2006-01-10 Ensim Corporation Dynamically modifying the resources of a virtual server
JP2002092098A (en) * 2000-09-20 2002-03-29 Hitachi Ltd Method for recovering energy saving facility cost and system for the same
US7822967B2 (en) * 2000-09-27 2010-10-26 Huron Ip Llc Apparatus, architecture, and method for integrated modular server system providing dynamically power-managed and work-load managed network devices
US7225441B2 (en) * 2000-12-27 2007-05-29 Intel Corporation Mechanism for providing power management through virtualization
JP4333048B2 (en) * 2001-03-30 2009-09-16 コニカミノルタビジネステクノロジーズ株式会社 Image input apparatus, control method therefor, and control program therefor
US7003279B2 (en) * 2002-02-27 2006-02-21 Gateway Inc. Peak time indicator
JP2003309929A (en) * 2002-04-12 2003-10-31 Toshiba It Solution Corp Power service system and power service server
JP3994910B2 (en) * 2003-05-08 2007-10-24 株式会社日立製作所 Electricity trading support system
JP4219292B2 (en) * 2004-03-23 2009-02-04 大阪瓦斯株式会社 Temperature prediction system and method for power consumption point
US8156490B2 (en) * 2004-05-08 2012-04-10 International Business Machines Corporation Dynamic migration of virtual machine computer programs upon satisfaction of conditions
US7401240B2 (en) * 2004-06-03 2008-07-15 International Business Machines Corporation Method for dynamically managing power in microprocessor chips according to present processing demands
JP2006158189A (en) * 2004-11-04 2006-06-15 Tokyo Electric Power Co Inc:The Cost minimization power control system using combination of electric power transaction and distributed power supply
JP2006153411A (en) * 2004-12-01 2006-06-15 Chugoku Electric Power Co Inc:The Heat storage facility control system
US20060168975A1 (en) * 2005-01-28 2006-08-03 Hewlett-Packard Development Company, L.P. Thermal and power management apparatus
US7636801B1 (en) * 2005-06-20 2009-12-22 Symantec Operating Corporation Coordination of quality of service in a multi-layer virtualized storage environment
US7861098B2 (en) * 2006-06-30 2010-12-28 Intel Corporation Method and apparatus for user-activity-based dynamic power management and policy creation for mobile platforms
US7574491B2 (en) * 2005-07-29 2009-08-11 Scalent Systems Virtual data center for network resource management
US7626994B2 (en) * 2005-11-14 2009-12-01 Broadcom Corporation Multiple node applications cooperatively managing a plurality of packet switched network pathways
JP4800837B2 (en) * 2006-05-22 2011-10-26 株式会社日立製作所 Computer system, power consumption reduction method thereof, and program thereof
EP1916599A1 (en) * 2006-10-26 2008-04-30 Intellectual Business Machines Corporation Method, system and computer program for configuring server farms at minimum cost
US7844839B2 (en) * 2006-12-07 2010-11-30 Juniper Networks, Inc. Distribution of network communications based on server power consumption
TWI326818B (en) * 2006-12-15 2010-07-01 Inst Information Industry Dynamic voltage scheduling method, system thereof and record medium
US20080167033A1 (en) * 2007-01-04 2008-07-10 Telefonaktiebolaget Lm Ericsson (Publ) Method and Apparatus for Cost-Based Network Selection
US20080320482A1 (en) * 2007-06-20 2008-12-25 Dawson Christopher J Management of grid computing resources based on service level requirements
US20090094097A1 (en) * 2007-10-03 2009-04-09 Seth Gardenswartz Network-based optimization of services
US20090106571A1 (en) * 2007-10-21 2009-04-23 Anthony Low Systems and Methods to Adaptively Load Balance User Sessions to Reduce Energy Consumption
CN101911047A (en) * 2007-11-06 2010-12-08 瑞士信贷证券(美国)有限责任公司 Distribute according to service level agreement prediction and management resource
JP4902501B2 (en) * 2007-11-12 2012-03-21 株式会社日立製作所 Power control method, computer system, and program
US9395786B2 (en) * 2007-11-20 2016-07-19 Hewlett Packard Enterprise Development Lp Cross-layer power management in a multi-layer system
US8819675B2 (en) * 2007-11-28 2014-08-26 Hitachi, Ltd. Virtual machine monitor and multiprocessor system
US20090150700A1 (en) * 2007-12-06 2009-06-11 International Business Machines Corporation Method of controlling power to a plurality of servers
JP4839328B2 (en) * 2008-01-21 2011-12-21 株式会社日立製作所 Server power consumption control apparatus, server power consumption control method, and computer program
JP4922255B2 (en) * 2008-06-30 2012-04-25 株式会社日立製作所 Information processing system and power saving control method in the system
US8782655B2 (en) * 2008-07-01 2014-07-15 Hewlett-Packard Development Company, L.P. Controlling computing resource consumption
US20100010688A1 (en) * 2008-07-08 2010-01-14 Hunter Robert R Energy monitoring and management
US9830670B2 (en) * 2008-07-10 2017-11-28 Apple Inc. Intelligent power monitoring
JP5153503B2 (en) * 2008-07-31 2013-02-27 インターナショナル・ビジネス・マシーンズ・コーポレーション System and method for estimating power consumption
KR101012863B1 (en) * 2008-09-25 2011-02-08 한국전력공사 Load forecasting analysis system for generation of customer baseline load
US8656404B2 (en) * 2008-10-16 2014-02-18 Palo Alto Research Center Incorporated Statistical packing of resource requirements in data centers
US8352094B2 (en) * 2009-03-17 2013-01-08 Palo Alto Research Center Incorporated Technique for aggregating loads with time-varying operating cycles
US8190744B2 (en) * 2009-05-28 2012-05-29 Palo Alto Research Center Incorporated Data center batch job quality of service control

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6535859B1 (en) * 1999-12-03 2003-03-18 Ultrawatt Energy System, Inc System and method for monitoring lighting systems
US20030074110A1 (en) * 2000-11-08 2003-04-17 Lawrence Silverman System and method for user control of electrical utility demand - side management

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11349339B1 (en) * 2017-04-27 2022-05-31 EMC IP Holding Company LLC Usage-based cost structuring system and method

Also Published As

Publication number Publication date
EP2083383A1 (en) 2009-07-29
US8447993B2 (en) 2013-05-21
US20090187782A1 (en) 2009-07-23
JP2009176304A (en) 2009-08-06

Similar Documents

Publication Publication Date Title
US8447993B2 (en) Integrated energy savings and business operations in data centers
Vasques et al. A review on energy efficiency and demand response with focus on small and medium data centers
US9411393B2 (en) System and method for managing energy consumption in a compute environment
US8046767B2 (en) Systems and methods for providing capacity management of resource pools for servicing workloads
CN103473139B (en) Cluster virtual machine resource allocation scheduling method
US9250962B2 (en) Optimizing energy use in a data center by workload scheduling and management
US9342375B2 (en) Managing workload at a data center
US20090119673A1 (en) Predicting and managing resource allocation according to service level agreements
Goudarzi et al. Geographical load balancing for online service applications in distributed datacenters
US20190376713A1 (en) Energy management system and energy managing method
Li et al. CSL-driven and energy-efficient resource scheduling in cloud data center
Hou et al. Power grab in aggressively provisioned data centers: What is the risk and what can be done about it
Mao et al. A resource scheduling method for cloud data centers based on thermal management
US20130110564A1 (en) Spot pricing to reduce workload in a data center
Agusti-Torra et al. On the feasibility of collaborative green data center ecosystems
Chen et al. A cyber-physical integrated system for application performance and energy management in data centers
Xu et al. Optimal pricing and capacity planning of a new economy cloud computing service class
Charalambous et al. A min-max framework for CPU resource provisioning in virtualized servers using ℋ∞ Filters
Wong et al. Spa: Harnessing availability in the aws spot market
Acharya et al. Cloud computing architectures and dynamic provisioning mechanisms
Huang et al. A prediction based server cluster capacity planning strategy
Velusamy Energy-Delay Aware Web Request Routing Using Learning Automata
NL2007098C2 (en) Method of distributing a data processing load.
EP2966567A1 (en) Accounting for virtualized IT infrastructure and innovative electrical power saving rules
Basmadjian et al. Demand-Side Flexibility and Supply-Side Management: The Use Case of Data Centers and Energy Utilities

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION