JP2009146048A - Project management system - Google Patents

Project management system Download PDF

Info

Publication number
JP2009146048A
JP2009146048A JP2007321020A JP2007321020A JP2009146048A JP 2009146048 A JP2009146048 A JP 2009146048A JP 2007321020 A JP2007321020 A JP 2007321020A JP 2007321020 A JP2007321020 A JP 2007321020A JP 2009146048 A JP2009146048 A JP 2009146048A
Authority
JP
Japan
Prior art keywords
work
task
project
information management
development
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007321020A
Other languages
Japanese (ja)
Inventor
Katsuhiro Yoshioka
克浩 吉岡
Yasuyuki Kawakita
泰之 川北
Akio Nishijima
暁生 西島
Masafumi Nagae
雅史 長江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2007321020A priority Critical patent/JP2009146048A/en
Publication of JP2009146048A publication Critical patent/JP2009146048A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a project management system allowing progress management of a project with a task as a subject without previously inputting product information to the task in plan preparation. <P>SOLUTION: This project management system has: a project information management server holding a project information management part; and a worker terminal. The worker terminal has: a work task input part input with a task whose development work is presently performed; and a work recording part recording work in a work record. The project information management server has: a work result extraction part extracting a work result from the work record and the input to the work task input part associatively to the task, and recording it in a development process chart held in the project information management part in each task; and a task period calculation part comparing a work schedule and a recording situation of the work result about each task to comprehend progress. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、ソフトウェアおよびハードウェアの製品を開発する際のプロジェクト管理を支援する装置に関するものである。   The present invention relates to an apparatus for supporting project management when developing software and hardware products.

従来、ソフトウェアおよびハードウェアの製品を開発する際、プロジェクトの計画を管理し、開発の進捗状況の把握や遅れの警告を行うプロジェクト管理を支援するシステムが使用される。   2. Description of the Related Art Conventionally, when developing software and hardware products, a system that supports project management that manages project plans, grasps development progress status, and warns of delays is used.

例えば、特許文献1に示す技術によれば、プロジェクトを切り分けた開発作業の単位である各工程(以下、タスクという)によって導出される成果物を予め入力し、その成果物の工数を見積もり、開発の進行に伴い明らかになってくる工数の見積もり値と実際かかる見込み工数との差異を修正し、それに基づいて作業者の作業負担や成果物の期限設定などの点からプロジェクト計画を修正する。   For example, according to the technique shown in Patent Document 1, a product derived by each process (hereinafter referred to as a task), which is a unit of development work obtained by dividing a project, is input in advance, the man-hour of the product is estimated, and development is performed. The difference between the estimated number of man-hours that becomes apparent as the process progresses and the actual estimated man-hours are corrected, and the project plan is corrected based on the work load of the worker and the deadline setting of the deliverables.

特開平8−202773号公報Japanese Patent Laid-Open No. 8-202773

しかしながら、上記特許文献1の技術によれば、タスクによって得られる成果物を予め入力するので、計画作成にかかる負荷が高く、また、得られる成果物が入力されることによってプロジェクトの進捗状況が把握されるシステムとなっているので、成果物のないタスクの把握が出来ないという問題があった。   However, according to the technique of the above-mentioned Patent Document 1, since the deliverable obtained by the task is input in advance, the load for creating the plan is high, and the progress of the project is grasped by inputting the obtained deliverable. As a result, there was a problem that it was not possible to grasp tasks without deliverables.

本発明は、上記に鑑みてなされたものであって、計画作成においてタスクに対して成果物情報の入力を既定する必要なく、タスク主体でプロジェクトの進捗管理ができるプロジェクト管理システムを得ることを目的とする。   The present invention has been made in view of the above, and it is an object of the present invention to provide a project management system capable of managing the progress of a project by a task subject without the necessity of predetermining input of deliverable information for a task in creating a plan. And

上述した課題を解決し、目的を達成するために、本発明は、ソフトウェア開発およびハードウェア開発のプロジェクトを作業工程の単位であるタスクに分解した開発工程図として管理し、各タスクについて予め作業スケジュールが設定される開発工程図に基づいてプロジェクトの進捗状況を把握するプロジェクト管理システムにおいて、プロジェクト毎に開発工程図を保持するプロジェクト情報管理部を有するプロジェクト情報管理サーバと、該プロジェクト情報管理サーバにネットワークを通じて接続され、各タスクに設定されている開発作業が行われる作業者端末と、を備え、前記作業者端末は、前記プロジェクト情報管理部に保持される進行中のプロジェクトの開発工程図に記載されるタスクのうちの、開発作業が行われたタスクについて、タスク名、開発作業開始時間、および開発作業終了時間を含むタスク情報が入力され、該タスク情報を前記プロジェクト情報管理サーバに送信する作業タスク入力部と、自端末上のすべての作業を自端末内の作業記録に記録し、該作業記録をプロジェクト情報管理サーバに送信する作業記録部と、を備え、前記プロジェクト情報管理サーバは、前記作業者端末から受信した前記タスク情報および前記作業記録から、タスク毎の作業成果を抽出し、前記抽出された作業成果を、前記プロジェクト情報管理部に保持される前記進行中のプロジェクトの開発工程図に、タスクに関連付けて記録する作業成果抽出部と、各タスクについて前記作業成果の記録状況と前記作業スケジュールとを比較することによって進捗状況を把握するタスク期限算出部と、を備えることを特徴とする。   In order to solve the above-described problems and achieve the object, the present invention manages a software development and hardware development project as a development process diagram that is broken down into tasks that are units of work processes, and a work schedule for each task in advance. In a project management system for grasping the progress of a project based on a development process diagram in which a project information is set, a project information management server having a project information management unit that holds a development process diagram for each project, and a network connected to the project information management server And a worker terminal for performing development work set for each task, and the worker terminal is described in a development process diagram of an ongoing project held in the project information management unit Of the tasks to which development work has been performed. Task information including a task name, a development work start time, and a development work end time, and a work task input unit that transmits the task information to the project information management server, and all work on the terminal itself. A work recording unit that records the work record in a terminal and transmits the work record to a project information management server, the project information management server from the task information received from the worker terminal and the work record A work result extraction unit that extracts work results for each task, and records the extracted work results in association with a task in a development process diagram of the ongoing project held in the project information management unit; Task deadline for grasping the progress status by comparing the status of recording of the work results and the work schedule for each task Characterized by comprising a detecting section, a.

この発明によれば、作業者が作業者端末上でタスクを指定して開発作業を実施すると、該作業の内容がタスクと関連付けられた作業成果として開発工程図に記録され、該作業成果の記録状況とタスクの作業スケジュールとが比較されることによりプロジェクトの進捗状況が把握されるので、計画作成においてタスクに対して成果物情報の入力を既定する必要なく、タスク主体でプロジェクトの進捗管理ができるプロジェクト管理システムを得ることができるという効果を奏する。   According to the present invention, when the worker designates a task on the worker terminal and performs the development work, the content of the work is recorded in the development process diagram as a work result associated with the task, and the work result is recorded. Since the progress of the project is grasped by comparing the status and the work schedule of the task, it is possible to manage the progress of the project by the task subject without having to pre-set the input of deliverable information for the task in planning. There is an effect that a project management system can be obtained.

以下に、本発明にかかるプロジェクト管理システムの実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。   Embodiments of a project management system according to the present invention will be described below in detail with reference to the drawings. Note that the present invention is not limited to the embodiments.

実施の形態.
まず、本発明にかかるプロジェクト管理システムの実施の形態の機能構成を説明する。図1は、本実施の形態のプロジェクト管理システムの機能構成を説明する図である。
Embodiment.
First, the functional configuration of the embodiment of the project management system according to the present invention will be described. FIG. 1 is a diagram illustrating a functional configuration of the project management system according to the present embodiment.

図1において、プロジェクト管理システム100は、プロジェクト情報管理サーバ1および作業者端末7から構成される。作業者端末7は、作業者11がタスクの実行を行う際に使用する端末であり、ソフトウェア開発の場合はソフトウェア開発用のコンピュータ、ハードウェア開発の場合は工作機械や制御機械に付属のコンピュータに相当する。プロジェクト情報管理サーバ1は、作業者端末7から、実行中のタスクおよび作業記録を受信し、タスクの進捗状況を管理し、状況に応じて作業者端末7に警告や参考になる情報を送信する。   In FIG. 1, the project management system 100 includes a project information management server 1 and a worker terminal 7. The worker terminal 7 is a terminal used when the worker 11 executes a task. In the case of software development, the worker terminal 7 is a software development computer, and in the case of hardware development, a computer attached to a machine tool or a control machine. Equivalent to. The project information management server 1 receives the task being executed and the work record from the worker terminal 7, manages the progress of the task, and transmits warning or reference information to the worker terminal 7 according to the situation. .

プロジェクト情報管理サーバ1は、さらにプロジェクト情報管理部2、関連オブジェクト抽出部3、作業成果抽出部4、タスク期限算出部5、および関連オブジェクト算出部6を備える。また、作業者端末7は、作業記録部8、作業タスク入力部9、およびメッセージ表示部10を備える。   The project information management server 1 further includes a project information management unit 2, a related object extraction unit 3, a work result extraction unit 4, a task deadline calculation unit 5, and a related object calculation unit 6. The worker terminal 7 includes a work recording unit 8, a work task input unit 9, and a message display unit 10.

プロジェクト情報管理部2は、プロジェクトの開発工程情報として、プロジェクト毎の開発工程図(Work Breakdown Structure;以下、WBSという)を保持している。WBSを構成する各タスクは、作業項目名、計画日(開始/完了)、実績日(開始/完了)、および作業成果を保持している。作業項目名および計画日は、計画作成段階において作業計画者により入力されるスケジュール上のタスクの名前と作業予定である。実績日および作業成果は、作業開始後に各タスクの作業の進捗状況に応じて記録される情報である。ここで、作業成果は、特許文献1に示される技術における成果物のように作業により導出される設計結果だけではなく、各タスクでの作業中に参照したホームページやドキュメントなどを含む。また、プロジェクト情報管理部2は、関連オブジェクト抽出部3により抽出される、関連オブジェクト情報を保持する。作業成果および関連オブジェクト情報については後ほど詳しく説明する。プロジェクト情報管理部2は、さらに、作業中のWBSの進捗状況を評価するために、標準的なタスク構成と開発期間からなる標準のWBSと、過去に実行され、各タスクが実績日および作業成果の情報を有するWBSとを保持している。   The project information management unit 2 holds a development process diagram (Work Breakdown Structure; hereinafter referred to as WBS) for each project as project development process information. Each task constituting the WBS holds a work item name, a planned date (start / complete), an actual date (start / complete), and a work result. The work item name and the planning date are the name of the task and the work schedule on the schedule input by the work planner in the plan creation stage. The actual date and the work result are information recorded in accordance with the work progress of each task after the work is started. Here, the work result includes not only a design result derived by work like a product in the technique disclosed in Patent Document 1, but also a home page, a document, and the like referred to during work in each task. Further, the project information management unit 2 holds related object information extracted by the related object extraction unit 3. The work results and related object information will be described in detail later. The project information management unit 2 further executes a standard WBS consisting of a standard task configuration and a development period in the past and evaluates the progress date and work results of each task in order to evaluate the progress of the working WBS. And a WBS having the following information.

図2はプロジェクト情報管理システムで保持されるWBSの例を説明する図である。図2の例において、各WBSは、プロジェクト/タスクという階層で構成されている。また、各タスクは、さらに下位のタスクに分割されており、所属する全ての下位のタスクが完了すれば、上位のタスクが完了するようになっている。本実施の形態において、タスクとは、下位タスクのことを指していう。   FIG. 2 is a diagram for explaining an example of WBS held in the project information management system. In the example of FIG. 2, each WBS is configured in a hierarchy of project / task. Each task is further divided into lower tasks, and when all the lower tasks to which the tasks belong are completed, the upper tasks are completed. In this embodiment, a task refers to a subordinate task.

作業記録部8は、作業者端末7上でのファイル作成やWeb閲覧など、作業者11によるあらゆる作業内容を記録し、作業成果抽出部4に作業記録として送信する。図3は、作業記録の例を説明する図である。図3に示すように、作業記録部8は、作業者端末7上でアクティブになったアプリケーション名と、ファイル名・Webページ名などのアクティブなオブジェクト名をアクティブになった時刻とともに、記録している。作業者11により作成されたファイルに関しては、ファイル名のほか、ファイルサイズおよび頁数を記録する。   The work recording unit 8 records all work contents by the worker 11 such as file creation on the worker terminal 7 and Web browsing, and transmits it to the work result extracting unit 4 as a work record. FIG. 3 is a diagram illustrating an example of work recording. As shown in FIG. 3, the work recording unit 8 records an application name activated on the worker terminal 7 and an active object name such as a file name / web page name together with the time of activation. Yes. As for the file created by the operator 11, the file size and the number of pages are recorded in addition to the file name.

作業タスク入力部9は、作業者11により入力されるタスクの開始/完了の日時とそのタスク名とを、作業成果抽出部4へ送信する。作業タスク入力部9は、作業者11に対して、プロジェクト情報管理部2から取得したタスク名一覧を表示し、作業者11はいずれかのタスクを選択することで該タスクの作業開始時間の打刻が行われるようにするとよい。また、別のタスクに関する作業を実施する場合は、再びタスク名一覧から該当するタスクを選択して、該別のタスクの作業開始の打刻が行われるようにし、先に作業中としたタスクは、自動で作業終了設定とするとよい。またタスクそのものが完了した場合は、作業者11がタスク完了設定とすることもできるようにしてよい。   The work task input unit 9 transmits the start / completion date and time and the task name of the task input by the worker 11 to the work result extraction unit 4. The work task input unit 9 displays a list of task names acquired from the project information management unit 2 to the worker 11, and the worker 11 selects one of the tasks to set the work start time of the task. It is better to make a time stamp. Also, when performing work related to another task, select the corresponding task from the task name list again so that the start of the work of the other task is performed. It is better to set the work end automatically. In addition, when the task itself is completed, the worker 11 may be able to set the task completion setting.

図4は、作業者11が作業タスク入力部9に入力することによって作業成果抽出部4に送信されるタスクの情報をまとめた作業タスク記録の例を説明する図である。図4においては、作業者11がタスク1−1を開始設定し、次にタスク1−3を開始設定した場合、タスク名、作業ステータス、およびステータスが変更された時刻が記録されていることを示している。   FIG. 4 is a diagram illustrating an example of work task recording in which task information transmitted to the work result extraction unit 4 by the worker 11 inputting to the work task input unit 9 is collected. In FIG. 4, when the worker 11 starts and sets the task 1-1 and then starts the task 1-3, the task name, the work status, and the time when the status is changed are recorded. Show.

作業成果抽出部4は、作業記録部8から送信されてくる作業内容の時刻と、作業タスク入力部9から送信されてくるタスクの情報の時刻とを比較し、どのアクティブオブジェクトがどのタスクの作業であったかを関連付け、プロジェクト情報管理部2にタスク毎にオブジェクトを作業成果として記録する。   The work result extraction unit 4 compares the time of the work content transmitted from the work recording unit 8 with the time of the task information transmitted from the work task input unit 9, and which active object is associated with which task The object is recorded as a work result for each task in the project information management unit 2.

図5は、タスクに関連付けられたオブジェクトの例を説明する図である。図5において、図3における作業記録のオブジェクトDoc1.docは、07/06/12 08:30にアクティブになっており、図4のタスクの情報に記載されるタスク1−1が、同日08:29-10:58まで作業中であることから、Doc1.docはタスク1−1に割り当てられている。また、その作業時間は、図3にはDoc1.docは08:30-09:30と10:00-11:00の作業記録が記されているので、合計2.0hの作業時間と算出されている。作業成果抽出部4は、このように抽出されてまとめられたオブジェクトとタスクの関連付け記録から、プロジェクト情報管理部2の該当タスクに、オブジェクトを作業成果として、作業時間と合わせて記録する。オブジェクトが、作成したファイルである場合は、ファイルサイズおよび頁数も合わせて記録する。このように、本発明の実施の形態における成果物には、作業の結果として導出される成果だけでなく、作業中に行ったインターネット上のドキュメントの調査や既存のドキュメントの参照なども含むため、実際に導出される成果物がないタスクについても進捗状況の管理ができることとなる。   FIG. 5 is a diagram illustrating an example of an object associated with a task. In FIG. 5, the work record object Doc1.doc in FIG. 3 is active on 07/06/12 08:30, and the task 1-1 described in the task information in FIG. Since work is in progress until 29-10: 58, Doc1.doc is assigned to task 1-1. In addition, the work time for Doc1.doc is recorded as 08: 30-09: 30 and 10: 00-11: 00 in Figure 3, so it is calculated as a total work time of 2.0h. Yes. The work result extraction unit 4 records the object as a work result together with the work time in the corresponding task of the project information management unit 2 from the association record of the objects and tasks extracted and collected in this way. If the object is a created file, the file size and the number of pages are also recorded. As described above, the deliverables in the embodiment of the present invention include not only the results derived as a result of the work but also the investigation of documents on the Internet performed during the work and the reference of existing documents. It is possible to manage the progress of tasks that do not actually have deliverables.

関連オブジェクト抽出部3は、作業内容の前後関係から、各オブジェクトについて近い時間に作成/閲覧したオブジェクトを関連付けして抽出する。関連オブジェクト抽出部3は、作業記録の中で、時刻が近いとオブジェクト同士の関連が強いとし、オブジェクト同士の関連度を算出する。抽出されたオブジェクトとオブジェクト同士の関連度は、関連オブジェクト情報としてプロジェクト情報管理部2に記録される。   The related object extraction unit 3 associates and extracts objects created / viewed at a close time for each object from the context of the work content. In the work record, the related object extraction unit 3 determines that the relationship between objects is strong when the time is close, and calculates the degree of relationship between objects. The degree of association between the extracted object and the object is recorded in the project information management unit 2 as related object information.

図6は、図3に示す作業記録から抽出された関連オブジェクト情報の例を説明する図である。図6において、Doc1.docとXXページ及びDoc3.docは連続して作業されていることから最も強い関連度である関連度1とされている。Doc3.docとXXページは間にDoc1.docの作業があるため、関連度2とされている。関連記録の精度を上げるため、検索ページのように一般的なものを除外したい場合は、関連抽出の設定であらかじめ除外設定し、関連記録から除外することが可能になっており、ここでは、検索ページは、色々なタイミングで利用されるため、関連オブジェクト抽出の候補からは外す設定とされている。   FIG. 6 is a diagram illustrating an example of related object information extracted from the work record shown in FIG. In FIG. 6, Doc1.doc, XX page, and Doc3.doc are continuously processed, and thus the relevance level 1 is the strongest relevance level. Since Doc3.doc and XX page have Doc1.doc work between them, the relevance is 2. In order to improve the accuracy of related records, if you want to exclude general items such as search pages, you can exclude them from related records by excluding them in the related extraction settings in advance. Since the page is used at various timings, it is set to be excluded from the related object extraction candidates.

タスク期限算出部5は、各タスクへの作業成果の記録のペースを、タスクの作業スケジュール、およびプロジェクト情報管理部2に保持される標準的なWBSならびに過去に実施されたWBSで類似のWBSにおける該当するタスクの作業成果の記録ペースと比較し、遅延の問題のあるタスクを抽出する。タスクが抽出された場合は、メッセージ表示部10にタスク名と警告メッセージ表示を指示する。   The task deadline calculation unit 5 determines the pace of the recording of the work results for each task in the WBS similar to the work schedule of the task and the standard WBS held in the project information management unit 2 and the WBS performed in the past. The task with the problem of delay is extracted by comparing with the recording pace of the work result of the corresponding task. When a task is extracted, the task display unit 10 instructs the message display unit 10 to display a task name and a warning message.

関連オブジェクト算出部6は、作業者11が作業中のオブジェクトに対応して、プロジェクト情報管理部2の中から該オブジェクトに関連するオブジェクトを抽出する。関連オブジェクトが抽出された場合は、メッセージ表示部10に関連オブジェクトの名称を指示する。   The related object calculation unit 6 extracts an object related to the object from the project information management unit 2 corresponding to the object that the worker 11 is working on. When the related object is extracted, the message display unit 10 is instructed about the name of the related object.

メッセージ表示部10は、タスク期限算出部5からの警告メッセージ表示指示、又は関連オブジェクト算出部6からの関連成果物表示指示があれば、メッセージを表示する。   The message display unit 10 displays a message if there is a warning message display instruction from the task deadline calculation unit 5 or a related product display instruction from the related object calculation unit 6.

次に、本発明の実施の形態によるプロジェクト管理システムの動作を説明する。まず、各作業タスクの作業成果と、関連オブジェクトを自動収集する動作を説明する。図7は、本実施の形態におけるプロジェクト管理システムの作業成果と関連オブジェクトを収集する動作を説明するフローチャートである。   Next, the operation of the project management system according to the embodiment of the present invention will be described. First, the operation result of each work task and the operation of automatically collecting related objects will be described. FIG. 7 is a flowchart for explaining the operation of collecting work results and related objects of the project management system in the present embodiment.

図7において、まず、作業者11は、プロジェクト情報管理部2の命令により作業タスク入力部9に表示されているタスク一覧から、作業を開始するタスクを選択し、選択したタスクの作業に取り組む(ステップS1)。作業記録部8および作業タスク入力部9は、略リアルタイムで、夫々作業記録および現在作業者が作業しているタスクの情報を作業成果抽出部4に送信する(ステップS2)。作業成果抽出部4は、送信されてきた作業記録およびタスクの情報から、オブジェクトごとに、タスク名、作業時間、および作業量をまとめ、オブジェクトを成果物としてプロジェクト情報管理部2に登録する(ステップS3)。関連オブジェクト抽出部3は、作業成果抽出部4がまとめたオブジェクトの情報から、それぞれ登録された成果物に関連のあるオブジェクトを抽出し、プロジェクト情報管理部2に前記登録された成果物に関連付けて登録する(ステップS4)。   In FIG. 7, first, the worker 11 selects a task to start work from the task list displayed in the work task input unit 9 according to the command of the project information management unit 2, and tackles the work of the selected task ( Step S1). The work recording unit 8 and the work task input unit 9 transmit the work record and information on the task currently being worked by the worker to the work result extraction unit 4 in substantially real time (step S2). The work result extraction unit 4 summarizes the task name, the work time, and the work amount for each object from the transmitted work record and task information, and registers the object as a product in the project information management unit 2 (steps). S3). The related object extraction unit 3 extracts objects related to the respective registered products from the object information collected by the work result extraction unit 4 and associates them with the registered products in the project information management unit 2. Register (step S4).

次に、各タスクの作業成果の記録の状況を、予め設定された各タスクの作業スケジュール、標準のWBSおよび過去のWBSと比較して、略リアルタイムで作業者11に警告・注意を発する動作について説明する。   Next, an operation for issuing a warning / attention to the worker 11 in substantially real time by comparing the status of recording of the work results of each task with the preset work schedule of each task, standard WBS, and past WBS. explain.

タスク期限算出部5は、プロジェクト情報管理部2が管理している現在開発作業中のWBSについて、各タスクの作業成果の記録の有無を確認することによって、開始計画日を過ぎても開始されていないタスク、および完了計画日が過ぎても完了しないタスクを抽出する。また、現在開発作業中のWBSにおける各タスクへの作業成果登録ペースを、プロジェクト情報管理部2で管理している標準のWBSおよび過去に実施されたWBSにおける類似のタスクの開発期間と比較し、大きな乖離があるタスクを抽出する。抽出されたタスクがある場合は、タスク名、遅れ、標準や過去データにおけるタスクの開発期間との乖離の程度などの警告メッセージの表示をメッセージ表示部10に指示する。該メッセージを受信したメッセージ表示部10は、作業者11に対して、指定されたメッセージを表示する。   The task deadline calculation unit 5 is started even after the scheduled start date by checking whether or not the work results of each task are recorded for the WBS currently under development managed by the project information management unit 2. Extract tasks that do not complete and tasks that do not complete after the planned completion date. In addition, the work result registration pace for each task in the WBS currently under development is compared with the development period of similar tasks in the standard WBS managed in the project information management unit 2 and the WBS performed in the past, Extract tasks with large divergence. If there is an extracted task, the message display unit 10 is instructed to display a warning message such as the task name, delay, degree of deviation from the task development period in the standard or past data. The message display unit 10 that has received the message displays the designated message to the worker 11.

次に、作業中のオブジェクト関連するオブジェクトの情報を表示する動作について説明する。   Next, an operation for displaying information on an object related to the object being worked on will be described.

関連オブジェクト算出部6は、プロジェクト情報管理部2の中に蓄積している関連オブジェクト記録から、現在作業中のオブジェクトに関連する関連オブジェクトを抽出する。関連オブジェクトがある場合は、メッセージ表示部10に関連オブジェクトのオブジェクト名の表示を指示し、該指示を受信したメッセージ表示部10は該オブジェクト名を表示する。これにより、作業者11は、現在作業中のオブジェクトの関連オブジェクトを確認しながら開発作業を行うことができる。   The related object calculation unit 6 extracts a related object related to the currently working object from the related object record accumulated in the project information management unit 2. If there is a related object, the message display unit 10 is instructed to display the object name of the related object, and the message display unit 10 that has received the instruction displays the object name. Thereby, the worker 11 can perform the development work while confirming the related object of the object currently being worked on.

このように、実施の形態によるプロジェクト管理システムによれば、作業者が作業者端末上でタスクを指定して作業を実施すると、該作業の内容がタスクと関連付けられて作業成果として開発工程図に記録され、該作業成果の記録状況とタスクの作業スケジュールとが比較されることによりプロジェクトの進捗状況が把握されるように構成したので、計画作成においてタスクに対して成果物情報の入力を既定する必要がなく、また、成果物が無いタスクの管理ができるプロジェクト管理システムを得ることができる。   As described above, according to the project management system according to the embodiment, when a worker designates a task on the worker terminal and performs the work, the contents of the work are associated with the task and are displayed as a work result in the development process diagram. Since the progress of the project is grasped by comparing the recorded status of the work results and the work schedule of the task, the input of deliverable information for the task is defined in the plan creation. It is possible to obtain a project management system that can manage tasks that are not necessary and have no deliverables.

以上のように、本発明にかかるプロジェクト管理システムは、ソフトウェアおよびハードウェアの製品を開発する際のプロジェクトの管理を支援するプロジェクト管理システムに適用して有用である。   As described above, the project management system according to the present invention is useful when applied to a project management system that supports management of a project when developing software and hardware products.

本発明にかかる実施の形態のプロジェクト管理システムの機能構成を説明する図である。It is a figure explaining the functional structure of the project management system of embodiment concerning this invention. WBSの例を説明する図である。It is a figure explaining the example of WBS. 作業記録の例を説明する図である。It is a figure explaining the example of work recording. 作業タスク入力部が作業成果抽出部に送信するタスクの情報をまとめた作業タスク記録の例を説明する図である。It is a figure explaining the example of the work task record which put together the information of the task which a work task input part transmits to a work result extraction part. タスクに関連付けられたオブジェクトの例を説明する図である。It is a figure explaining the example of the object linked | related with the task. 関連オブジェクト情報の例を説明する図である。It is a figure explaining the example of related object information. 本発明にかかる実施の形態のプロジェクト管理システムの作業成果と関連オブジェクトとを収集する動作を説明するフローチャートである。It is a flowchart explaining the operation | movement which collects the work result and related object of the project management system of embodiment concerning this invention.

符号の説明Explanation of symbols

1 プロジェクト情報管理サーバ
2 プロジェクト情報管理部
3 関連オブジェクト抽出部
4 作業成果抽出部
5 タスク期限算出部
6 関連オブジェクト算出部
7 作業者端末
8 作業記録部
9 作業タスク入力部
10 メッセージ表示部
11 作業者
100 プロジェクト管理システム
DESCRIPTION OF SYMBOLS 1 Project information management server 2 Project information management part 3 Related object extraction part 4 Work result extraction part 5 Task time limit calculation part 6 Related object calculation part 7 Worker terminal 8 Work recording part 9 Work task input part 10 Message display part 11 Worker 100 Project management system

Claims (4)

ソフトウェア開発およびハードウェア開発のプロジェクトを作業工程の単位であるタスクに分解した開発工程図として管理し、各タスクについて予め作業スケジュールが設定される開発工程図に基づいてプロジェクトの進捗状況を把握するプロジェクト管理システムにおいて、
プロジェクト毎に開発工程図を保持するプロジェクト情報管理部を有するプロジェクト情報管理サーバと、該プロジェクト情報管理サーバにネットワークを通じて接続され、各タスクに設定されている開発作業が行われる作業者端末と、
を備え、
前記作業者端末は、
前記プロジェクト情報管理部に保持される進行中のプロジェクトの開発工程図に記載されるタスクのうちの、開発作業が行われたタスクについて、タスク名、開発作業開始時間、および開発作業終了時間を含むタスク情報が入力され、該タスク情報を前記プロジェクト情報管理サーバに送信する作業タスク入力部と、
自端末上のすべての作業を自端末内の作業記録に記録し、該作業記録をプロジェクト情報管理サーバに送信する作業記録部と、
を備え、
前記プロジェクト情報管理サーバは、
前記作業者端末から受信した前記タスク情報および前記作業記録から、タスク毎の作業成果を抽出し、前記抽出された作業成果を、前記プロジェクト情報管理部に保持される前記進行中のプロジェクトの開発工程図に、タスクに関連付けて記録する作業成果抽出部と、
各タスクについて前記作業成果の記録状況と前記作業スケジュールとを比較することによって進捗状況を把握するタスク期限算出部と、
を備えることを特徴とするプロジェクト管理システム。
A project that manages software development and hardware development projects as development process diagrams that are broken down into tasks, which are units of work processes, and grasps the progress of projects based on development process diagrams in which work schedules are set in advance for each task In the management system,
A project information management server having a project information management unit for holding a development process diagram for each project, an operator terminal connected to the project information management server through a network, and performing development work set for each task;
With
The worker terminal is
Among the tasks described in the development process diagram of the ongoing project held in the project information management unit, the task for which the development work has been performed includes the task name, the development work start time, and the development work end time. Task information is input, and the task information input unit that transmits the task information to the project information management server;
A work recording unit for recording all work on the terminal in a work record in the terminal, and transmitting the work record to the project information management server;
With
The project information management server
From the task information and the work record received from the worker terminal, work results for each task are extracted, and the extracted work results are stored in the project information management unit and the ongoing project development process In the figure, the work result extraction unit that records in association with the task,
A task deadline calculation unit that grasps the progress status by comparing the status of recording of the work results and the work schedule for each task;
A project management system comprising:
前記作業成果は、前記作業者端末上でアプリケーションを用いて作成、閲覧、または使用された、オブジェクトとしてのファイルまたはウェブページの、名称と、各オブジェクトの作成、閲覧、または使用にかかった通算の時間である作業時間と、オブジェクトが作成されたファイルである場合、該ファイルの頁数ならびにファイルサイズの情報と、を含むことを特徴とする請求項1に記載のプロジェクト管理システム。   The work result is the name of the file or web page as an object created, viewed, or used by using an application on the worker terminal, and the total number of each object created, viewed, or used. The project management system according to claim 1, comprising: a work time that is a time, and information on the number of pages and the file size of the file when the object is a created file. 前記作業者端末はメッセージ表示部をさらに備え、
前記プロジェクト情報管理部は、
標準的なタスク構成と開発期間からなる開発工程図である標準開発工程図と、過去に開発作業が実施されたプロジェクトの開発工程図である実績開発工程図と、をさらに保持し、
前記タスク期限算出部は、
前記進行中のプロジェクトの各タスクの作業成果の記録状況を、前記作業スケジュール、および前記標準開発工程図ならびに実績開発工程図における類似するタスクの開発期間と比較することによって遅延があるタスクを抽出し、抽出されたタスクを前記メッセージ表示部に警告メッセージとともに表示させる、
ことを特徴とする請求項2に記載のプロジェクト管理システム。
The worker terminal further includes a message display unit,
The project information management unit
A standard development process diagram, which is a development process diagram consisting of a standard task structure and development period, and an actual development process diagram, which is a development process diagram of a project for which development work has been carried out in the past, are further retained.
The task deadline calculation unit
A task with a delay is extracted by comparing the recording status of the work results of each task of the ongoing project with the work schedule, and the development period of similar tasks in the standard development process diagram and the actual development process diagram. , Display the extracted task together with a warning message on the message display unit,
The project management system according to claim 2.
前記プロジェクト情報管理サーバは、
前記作業記録から、各オブジェクトに関連するオブジェクトを、作業日時に基づいて抽出し、オブジェクトと該オブジェクトに関連するオブジェクトの情報を関連オブジェクト情報として前記プロジェクト情報管理部に記録する関連オブジェクト抽出部と、
現在作成または閲覧中のオブジェクトに関連するオブジェクトを前記プロジェクト情報管理部に記録される関連オブジェクト情報から算出し、算出された関連するオブジェクトを前記メッセージ表示部に表示させる関連オブジェクト算出部と、
をさらに備えることを特徴とする請求項3に記載のプロジェクト管理システム。
The project information management server
From the work record, an object related to each object is extracted based on the work date and time, and a related object extraction unit that records information on the object and the object related to the object as related object information in the project information management unit;
An object related to an object currently created or viewed is calculated from related object information recorded in the project information management unit, and a related object calculation unit that displays the calculated related object on the message display unit;
The project management system according to claim 3, further comprising:
JP2007321020A 2007-12-12 2007-12-12 Project management system Pending JP2009146048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007321020A JP2009146048A (en) 2007-12-12 2007-12-12 Project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007321020A JP2009146048A (en) 2007-12-12 2007-12-12 Project management system

Publications (1)

Publication Number Publication Date
JP2009146048A true JP2009146048A (en) 2009-07-02

Family

ID=40916608

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007321020A Pending JP2009146048A (en) 2007-12-12 2007-12-12 Project management system

Country Status (1)

Country Link
JP (1) JP2009146048A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012164069A (en) * 2011-02-04 2012-08-30 Aisin Aw Co Ltd Business and deliverable management system, and business and deliverable management method
WO2017006448A1 (en) * 2015-07-08 2017-01-12 株式会社日立製作所 Project management device and method
JP2020067758A (en) * 2018-10-23 2020-04-30 株式会社シンプルウェイ Program, information processing apparatus, and information processing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012164069A (en) * 2011-02-04 2012-08-30 Aisin Aw Co Ltd Business and deliverable management system, and business and deliverable management method
WO2017006448A1 (en) * 2015-07-08 2017-01-12 株式会社日立製作所 Project management device and method
JP2020067758A (en) * 2018-10-23 2020-04-30 株式会社シンプルウェイ Program, information processing apparatus, and information processing method

Similar Documents

Publication Publication Date Title
US8275653B2 (en) Industrial status viewer system and method
US8760691B2 (en) Devices and methods for print job tracking
US8786883B2 (en) Devices and methods for print job tracking using assignable mobile devices
US20080059967A1 (en) Workflow management system, workflow management method, workflow management program, and recording medium
JP5831604B2 (en) Apparatus and method for managing plant task information
US8065683B2 (en) Apparatus for tracking work process and computer product
JP2005050098A (en) Construction process visualization method
US8848220B2 (en) Devices and methods for using an electronic device as a print job ticket
JP2009146048A (en) Project management system
US20150294247A1 (en) Method of managing business description, apparatus and storage medium
US7707017B2 (en) System modeling facilitating method and apparatus
EP3762927A1 (en) Method and system for automatic work instruction creation
KR101794358B1 (en) Method of data fusion and providing information in a computer system
JP6606450B2 (en) Checklist creation device, work performance management system, and checklist creation method
JPH06348720A (en) Production development control display device
US7876324B2 (en) Method and system for developing a strategy for use in a controller and storage medium for storing instructions which effectuate the method
JP2007265315A (en) Business support device, and program used therefor
JP4583260B2 (en) General-purpose computer operation procedure creation device, program, and storage medium
JP2001262829A (en) Construction process control system
JP5854745B2 (en) DATA INTERFACE DEVICE, DATA INTERFACE METHOD, DATA INTERFACE PROGRAM, AND PROCESS MANAGEMENT SYSTEM FOR PROCESS MANAGEMENT TOOL
JP2011048459A (en) System and method for supporting project planning
JP5268400B2 (en) Process management system
JP2009048425A (en) Project management system, project management device, project management method, and project management program
JP2007193581A (en) Operation time calculation system
JP2007272497A (en) Progress management system of business process