JP2009018118A - Microbubble generator - Google Patents

Microbubble generator Download PDF

Info

Publication number
JP2009018118A
JP2009018118A JP2007184843A JP2007184843A JP2009018118A JP 2009018118 A JP2009018118 A JP 2009018118A JP 2007184843 A JP2007184843 A JP 2007184843A JP 2007184843 A JP2007184843 A JP 2007184843A JP 2009018118 A JP2009018118 A JP 2009018118A
Authority
JP
Japan
Prior art keywords
water
tank
channel
water supply
bathtub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007184843A
Other languages
Japanese (ja)
Other versions
JP5121336B2 (en
Inventor
Fumio Kokayu
文雄 小粥
Tadashi Nakajima
忠司 中島
Masayuki Okuyama
誠之 奥山
Takashi Iida
隆史 飯田
Kenzo Fukuyoshi
憲三 福吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rinnai Corp
Gastar Co Ltd
Toho Gas Co Ltd
Original Assignee
Rinnai Corp
Gastar Co Ltd
Toho Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rinnai Corp, Gastar Co Ltd, Toho Gas Co Ltd filed Critical Rinnai Corp
Priority to JP2007184843A priority Critical patent/JP5121336B2/en
Publication of JP2009018118A publication Critical patent/JP2009018118A/en
Application granted granted Critical
Publication of JP5121336B2 publication Critical patent/JP5121336B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Medical Bathing And Washing (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a microbubble generator capable of finishing an air introduction step for a short time. <P>SOLUTION: This microbubble generator is provided with a tank, an air introduction passage, a valve for opening/closing the air introduction passage, a bathtub water supply passage having an upstream end connected to the tank and a downstream end connectable to the bathtub, a decompression nozzle, a tank water supply passage having an upstream end connectable to a water supply source and a downstream end connected to the tank, a first pump for sending water in the tank water supply passage, a tank drainage passage having an upstream end connected to the tank and a downstream end connectable to a drainage destination, a second pump for sending water in the tank drainage passage, and a control device. The control device executes a step for opening an air valve, actuating the second pump, discharging water in the tank and introducing air in the tank; and a step for closing the air valve, actuating the first pump and supplying water to the inside of the tank. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、空気を溶解している加圧水を浴槽に供給し、溶解空気から得られる微細気泡を浴槽内で発生させる装置に関する。   The present invention relates to an apparatus for supplying pressurized water dissolving air to a bathtub and generating fine bubbles obtained from the dissolved air in the bathtub.

浴槽内に微細気泡を発生させる微細気泡発生装置が知られている。特許文献1に、従来技術に係る微細気泡発生装置が開示されている。この微細気泡発生装置は、タンクと、循環水路と、空気導入路と、制御装置を備えている。循環水路は、タンク給水路と浴槽給水路を備えている。タンク給水路は、上流端が浴槽に接続されており、下流端がタンクに接続されている。タンク給水路には、タンク給水路内の水を下流側へ送り出すポンプが介装されている。浴槽給水路は、上流端がタンクに接続されており、下流端が浴槽に接続されている。浴槽給水路と浴槽の接続部には、減圧ノズル(噴出ノズル)が設置されている。空気導入路には、空気導入路を開閉する空気弁が介装されている。制御装置は、ポンプと空気弁を制御する。   2. Description of the Related Art A fine bubble generator that generates fine bubbles in a bathtub is known. Patent Document 1 discloses a microbubble generator according to the prior art. The fine bubble generating device includes a tank, a circulation water channel, an air introduction channel, and a control device. The circulating water channel includes a tank water channel and a bathtub water channel. The tank water supply channel has an upstream end connected to the bathtub and a downstream end connected to the tank. A pump for sending water in the tank water supply channel to the downstream side is interposed in the tank water supply channel. The bathtub water supply channel has an upstream end connected to the tank and a downstream end connected to the bathtub. A decompression nozzle (a jet nozzle) is installed at the connection between the bathtub water supply channel and the bathtub. An air valve that opens and closes the air introduction path is interposed in the air introduction path. The control device controls the pump and the air valve.

この微細気泡発生装置は、水が貯められている浴槽に空気を溶解している加圧水を供給することによって、浴槽内に微細気泡を発生させる(すなわち、浴槽内の水の中に微細気泡を発生させる)。
この微細気泡発生装置を使用する際には、最初に空気弁を開く。すると、タンク内の水が自重によって浴槽給水路に流れ込む。浴槽給水路に流れ込んだ水は、減圧ノズルを通って浴槽内に流れ込む。すなわち、タンク内の水が浴槽に排出される。これによって、タンク内の水位が下がる。タンク内の水位が下がると、それに伴って、空気が空気導入路を通ってタンク内に導入される(空気導入ステップ)。
タンク内に空気を導入したら、空気弁を閉じるとともにポンプを作動させる。すると、浴槽内の水がタンク給水路を通ってタンク内に供給される。すなわち、タンク給水路からタンク内に水が放出される。このとき、ポンプによって加圧された水がタンク内に勢いよく放出される。タンク内に放出された水は、浴槽給水路と減圧ノズルを通って浴槽内に流れ込む。しかしながら、減圧ノズルの通水抵抗が高いので、浴槽内に流れ込む水量は、タンク給水路からタンク内に放出される水量に比べて少ない。したがって、タンク内の圧力が上昇する。タンク内の圧力が上昇すると、タンク内に放出された水がタンク内を飛翔している間や、放出された水がタンク内に貯まっている水の水面等に衝突するときに、水の中に空気が溶解する。タンク内で空気が溶解した水(以下では、空気溶解加圧水という)は、浴槽給水路と減圧ノズルを通って浴槽内に流れ込む。すなわち、空気溶解加圧水が浴槽に供給される(給水ステップ)。浴槽内に流れ込んだ空気溶解加圧水は、減圧ノズルを通過したときに急激に減圧される。すると、水に溶解していた空気が微細気泡となる。すなわち、浴槽内に多量の微細気泡が発生する。浴槽内に微細気泡が発生すると、浴槽内の水が白濁する。
上述したように、減圧ノズルの通水抵抗が高いので、浴槽内に流れ込む水量は、タンク水路からタンク内に放出される水量に比べて少ない。したがって、給水ステップでは、タンク内の水位が徐々に上昇する。タンク内の水位が満水に近い水位にまで上昇すると、タンク内の空気がほとんど無くなる。そのために、タンク内の水に空気を溶解させることができなくなる。したがって、制御装置は、タンク内の水位が所定水位まで上昇したら、再度、空気導入ステップを実行する。空気導入ステップと給水ステップを交互に繰り返し実行することで、浴槽内に微細気泡を断続的に発生させることができる。
This microbubble generator generates microbubbles in the tub by supplying pressurized water that dissolves air to the tub in which water is stored (that is, generates microbubbles in the water in the tub) )
When using this microbubble generator, the air valve is first opened. Then, the water in the tank flows into the bathtub water supply channel by its own weight. The water that flows into the bathtub water supply channel flows into the bathtub through the pressure reducing nozzle. That is, the water in the tank is discharged to the bathtub. This lowers the water level in the tank. When the water level in the tank drops, air is introduced into the tank through the air introduction path (air introduction step).
When air is introduced into the tank, the air valve is closed and the pump is activated. Then, the water in the bathtub is supplied into the tank through the tank water supply channel. That is, water is discharged from the tank water supply channel into the tank. At this time, the water pressurized by the pump is discharged into the tank vigorously. The water discharged into the tank flows into the bathtub through the bathtub water supply channel and the pressure reducing nozzle. However, since the water flow resistance of the decompression nozzle is high, the amount of water flowing into the bathtub is small compared to the amount of water released into the tank from the tank water supply channel. Therefore, the pressure in the tank increases. If the pressure in the tank rises, the water released into the tank will fly in the tank or when the released water collides with the surface of the water stored in the tank. Air dissolves. Water in which air is dissolved in the tank (hereinafter referred to as air-dissolved pressurized water) flows into the bathtub through the bathtub water supply channel and the pressure reducing nozzle. That is, air-dissolved pressurized water is supplied to the bathtub (water supply step). The air-dissolved pressurized water that has flowed into the bathtub is rapidly decompressed when it passes through the decompression nozzle. Then, the air dissolved in the water becomes fine bubbles. That is, a large amount of fine bubbles are generated in the bathtub. When fine bubbles are generated in the bathtub, the water in the bathtub becomes cloudy.
As described above, since the flow resistance of the pressure reducing nozzle is high, the amount of water flowing into the bathtub is smaller than the amount of water discharged from the tank water channel into the tank. Therefore, in the water supply step, the water level in the tank gradually rises. When the water level in the tank rises to a level close to full water, there is almost no air in the tank. Therefore, it becomes impossible to dissolve air in the water in the tank. Therefore, the control device executes the air introduction step again when the water level in the tank rises to a predetermined water level. By repeatedly executing the air introduction step and the water supply step alternately, fine bubbles can be intermittently generated in the bathtub.

特開2001−170618号公報JP 2001-170618 A

上述したように、従来の微細気泡発生装置では、空気導入ステップにおいて、水の自重によってタンク内の水を浴槽に排出する。水の自重によってタンク内の水を排出するので、タンク内の水位が下がるのに時間がかかる。すなわち、空気導入ステップに長い時間を要する。
空気導入ステップの実行中は、浴槽内に微細気泡が発生しない。浴槽内の微細気泡は、時間の経過とともに消滅する。したがって、空気導入ステップが長いと(すなわち、浴槽内に微細気泡が発生しない期間が長いと)、浴槽内の微細気泡がほとんど消滅してしまう。したがって、浴槽内の水を白濁した状態に維持することができない。すなわち、従来の微細気泡発生装置は、空気導入ステップに時間を要するため、浴槽内の水を白濁した状態に維持することができないという問題があった。
As described above, in the conventional microbubble generator, the water in the tank is discharged into the bathtub by the weight of the water in the air introduction step. Since the water in the tank is discharged by its own weight, it takes time to lower the water level in the tank. That is, a long time is required for the air introduction step.
During execution of the air introduction step, fine bubbles are not generated in the bathtub. The fine bubbles in the bathtub disappear with time. Therefore, when the air introduction step is long (that is, when the period during which fine bubbles are not generated in the bathtub is long), the fine bubbles in the bathtub are almost disappeared. Therefore, the water in the bathtub cannot be maintained in a cloudy state. That is, the conventional fine bubble generating device has a problem that the air introduction step takes time, and thus the water in the bathtub cannot be maintained in a cloudy state.

本発明は、上記の実情に鑑みてなされたものであり、短時間で空気導入ステップを終了させることができる微細気泡発生装置を提供することを目的とする。   The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a fine bubble generating device capable of completing the air introduction step in a short time.

本発明の微細気泡発生装置は、空気を溶解している加圧水を浴槽に供給し、溶解空気から得られる微細気泡を浴槽内で発生させる。この微細気泡発生装置は、タンクと、空気導入路と、空気弁と、浴槽給水経路と、減圧ノズルと、タンク給水経路と、第1ポンプと、タンク排水経路と、第2ポンプと、制御装置を備えている。空気導入路は、タンク内に空気を導入する。空気弁は、空気導入路を開閉する。浴槽給水経路は、上流端がタンクに接続されており、下流端が浴槽に接続可能である。減圧ノズルは、浴槽給水経路と浴槽の接続部に設置される。タンク給水経路は、上流端が水供給源に接続可能であり、下流端がタンクに接続されている。第1ポンプは、タンク給水経路に介装されており、タンク給水経路内の水を下流側へ送り出す。タンク排水経路は、上流端がタンクに接続されており、下流端が排水先に接続可能である。第2ポンプは、タンク排水経路に介装されており、タンク排水経路内の水を下流側へ送り出す。制御装置は、空気弁と、第1ポンプと、第2ポンプを制御する。そして、制御装置は、空気弁を開くとともに第2ポンプを作動させることによって、タンク内の水を排水先に排出するとともに空気をタンク内に導入する空気導入ステップと、空気弁を閉じるとともに第1ポンプを作動させることによって、水をタンク内に供給する給水ステップを実行する。
なお、「接続」とは、一方の構成物から他方の構成物へ水または空気が流れることが可能な状態にすることをいう。例えば、「一方の構成物と他方の構成物が接続されている」との表現は、「一方の構成物と他方の構成物が物理的に直接接続されており、それらの構成物間を水(または空気)が流れることが可能な状態」のみならず、「一方の構成物と他方の構成物が水路(または空気路)を介して接続されており、それらの構成物間を水(または空気)が流れることが可能な状態」をも意味する。
The fine bubble generating apparatus of the present invention supplies pressurized water dissolving air to the bathtub, and generates fine bubbles obtained from the dissolved air in the bathtub. The fine bubble generating apparatus includes a tank, an air introduction path, an air valve, a bathtub water supply path, a pressure reducing nozzle, a tank water supply path, a first pump, a tank drainage path, a second pump, and a control device. It has. The air introduction path introduces air into the tank. The air valve opens and closes the air introduction path. The bathtub water supply path has an upstream end connected to the tank and a downstream end connectable to the bathtub. A decompression nozzle is installed in the connection part of a bathtub water supply path and a bathtub. The tank water supply path has an upstream end that can be connected to a water supply source, and a downstream end that is connected to the tank. The first pump is interposed in the tank water supply path and sends out water in the tank water supply path to the downstream side. The tank drainage path has an upstream end connected to the tank and a downstream end connectable to the drainage destination. The second pump is interposed in the tank drainage path and sends out water in the tank drainage path to the downstream side. The control device controls the air valve, the first pump, and the second pump. Then, the control device opens the air valve and operates the second pump, thereby discharging water in the tank to the drainage destination and introducing air into the tank, and closing the air valve and the first. A water supply step of supplying water into the tank is performed by operating the pump.
Note that “connection” refers to a state in which water or air can flow from one component to the other component. For example, the expression “one component and the other component are connected” means that “one component and the other component are physically connected directly, and there is water between the components. (Or a state in which air (or air) can flow ”as well as“ one component and the other component are connected via a water channel (or air channel), and water (or It also means “a state in which air can flow”.

この微細気泡発生装置では、制御装置が、給水ステップと、空気導入ステップを実行する。
空気導入ステップは、タンク内に水が貯まっている状態で実行する。空気導入ステップでは、空気弁を開くとともに、第2ポンプを作動させる。すると、第2ポンプがタンク排水経路内の水を下流側へ送り出すので、タンクからタンク排水経路に水が流れ出す。タンク排水経路に流れ出した水は、タンク排水経路を下流側へ流れて排水先に排出される。すなわち、タンク内の水が排水先に排出される。したがって、タンク内の水位が下がる。タンク内の水位が下がると、タンク内の圧力が低下する。タンク内の圧力が低下すると、それに伴って空気が空気導入路を通ってタンク内に導入される。
給水ステップは、タンク内に空気が導入された後に実行する。給水ステップでは、空気弁を閉じるとともに第1ポンプを作動させる。すると、第1ポンプの加圧によって、タンク給水経路からタンク内に水が勢いよく放出される。タンク内に放出された水は、浴槽給水経路と減圧ノズルを通って浴槽内に流れ込む。しかしながら、減圧ノズルの通水抵抗が高いので、浴槽内に流れ込む水量は、タンク給水経路からタンク内に放出される水量に比べて少ない。したがって、タンク内の圧力が上昇して高圧となる。タンク内の圧力が高圧な状態でタンク内に水が勢いよく放出されることによって、タンク内で空気溶解加圧水が生成される。生成された空気溶解加圧水は、浴槽給水経路と減圧ノズルを通って浴槽内に流れ込む。したがって、浴槽内に多量の微細気泡が発生する。
In this fine bubble generating device, the control device executes a water supply step and an air introduction step.
The air introduction step is executed in a state where water is stored in the tank. In the air introduction step, the air valve is opened and the second pump is operated. Then, since a 2nd pump sends out the water in a tank drainage path to the downstream, water flows out from a tank to a tank drainage path. The water that flows out to the tank drainage path flows downstream through the tank drainage path and is discharged to the drainage destination. That is, the water in the tank is discharged to the drainage destination. Therefore, the water level in the tank is lowered. When the water level in the tank drops, the pressure in the tank decreases. When the pressure in the tank decreases, air is introduced into the tank through the air introduction path.
The water supply step is performed after air is introduced into the tank. In the water supply step, the air valve is closed and the first pump is operated. Then, the water is vigorously discharged from the tank water supply path into the tank by pressurization of the first pump. The water discharged into the tank flows into the bathtub through the bathtub water supply path and the pressure reducing nozzle. However, since the water flow resistance of the decompression nozzle is high, the amount of water flowing into the bathtub is small compared to the amount of water released into the tank from the tank water supply path. Therefore, the pressure in the tank rises and becomes high pressure. When the pressure in the tank is high, water is released into the tank vigorously, thereby generating air-dissolved pressurized water in the tank. The generated air-dissolved pressurized water flows into the bathtub through the bathtub water supply path and the decompression nozzle. Therefore, a large amount of fine bubbles are generated in the bathtub.

以上に説明したように、本発明の微細気泡発生装置は、空気導入ステップにおいて、第2ポンプによってタンク内の水を排出する。したがって、タンク内の水を高速で排出することができる。すなわち、空気導入ステップを短時間で終了させることができる。空気導入ステップが短時間であるので、微細気泡発生装置を連続運転(給水ステップと空気導入ステップの繰り返し運転)したときに、浴槽内に微細気泡が発生しない時間が短い。したがって、浴槽内の水を白濁した状態に維持することができる。   As described above, the fine bubble generator of the present invention discharges water in the tank by the second pump in the air introduction step. Therefore, the water in the tank can be discharged at a high speed. That is, the air introduction step can be completed in a short time. Since the air introduction step is a short time, when the fine bubble generating device is continuously operated (repeated operation of the water supply step and the air introduction step), the time during which the fine bubbles are not generated in the bathtub is short. Therefore, the water in the bathtub can be maintained in a cloudy state.

上述した微細気泡発生装置は、第2ポンプが、熱源機に搭載されているポンプにより構成されていてもよい。
すなわち、通常の浴槽(微細気泡発生装置が設置されていない浴槽)には、浴槽に温水を供給する熱源機が設置されている。熱源機は、上流端が水供給源に接続されており、下流端が浴槽に接続されている水路(すなわち、浴槽に水を供給する水路)と、水路内の水を下流側へ送り出すポンプと、水路内の水を加熱する加熱器を備えている。したがって、上述した微細気泡発生装置を、熱源機を備えている浴槽に設置する場合には、第2ポンプを熱源機のポンプにより構成することができる。例えば、熱源機の水路を微細気泡発生装置のタンク排水経路の一部として利用することによって、熱源機のポンプを第2ポンプとして使用することができる。このように、熱源機の構成を利用して微細気泡発生装置を設置すれば、新たに第2ポンプを設置する必要がない。
In the fine bubble generating apparatus described above, the second pump may be configured by a pump mounted on the heat source device.
That is, the heat source machine which supplies warm water to a bathtub is installed in the normal bathtub (the bathtub in which the fine bubble generator is not installed). The heat source machine has an upstream end connected to a water supply source and a downstream end connected to a bathtub (that is, a water path that supplies water to the bathtub), a pump that sends water in the water channel to the downstream side, and A heater for heating the water in the water channel is provided. Therefore, when installing the fine bubble generator mentioned above in the bathtub provided with the heat source machine, a 2nd pump can be comprised with the pump of a heat source machine. For example, the pump of the heat source device can be used as the second pump by using the water channel of the heat source device as a part of the tank drainage path of the fine bubble generating device. Thus, if the microbubble generator is installed using the configuration of the heat source machine, it is not necessary to newly install the second pump.

また、本発明は、短時間で空気導入ステップ終了させることができる新たな微細気泡発生装置を提供する。この微細気泡発生装置は、タンクと、空気導入路と、空気弁と、浴槽給水路と、減圧ノズルと、タンク給水路と、タンク排水路と、タンク給排水路と、給排水ポンプと、水源水路と、第1切換弁と、排出水路と、第2切換弁と、制御装置を備えている。空気導入路は、タンク内に空気を導入する。空気弁は、空気導入路を開閉する。浴槽給水路は、上流端がタンクに接続されており、下流端が浴槽に接続可能である。減圧ノズルは、浴槽給水路と浴槽の接続部に設置される。タンク給水路は、下流端がタンクに接続されている。タンク排水路は、上流端がタンクに接続されている。タンク給排水路は、上流端がタンク排水路の下流端に接続されており、下流端がタンク給水路の上流端に接続されている。以下では、タンク排水路とタンク給排水路の接続部を第1接続部といい、タンク給排水路とタンク給水路の接続部を第2接続部という。給排水ポンプは、タンク給排水路に介装されており、タンク給排水路内の水を下流側へ送り出す。水源水路は、上流端が水供給源に接続可能であり、下流端が第1接続部に接続されている。第1切換弁は、第1接続部に介装されており、タンク排水路からタンク給排水路に水が流れる状態と、水源水路からタンク給排水路に水が流れる状態とを切り換える。排出水路は、上流端が第2接続部に接続されており、下流端が排水先に接続可能である。第2切換弁は、第2接続部に介装されており、タンク給排水路からタンク給水路に水が流れる状態と、タンク給排水路から排出水路に水が流れる状態とを切り換える。制御装置は、空気弁と、給排水ポンプと、第1切換弁と、第2切換弁を制御する。そして、制御装置は、空気弁を開き、第1切換弁をタンク排水路からタンク給排水路に水が流れる状態とし、第2切換弁をタンク給排水路から排出水路に水が流れる状態とし、給排水ポンプを作動させることによって、タンク内の水を排水先に排出するとともに空気をタンク内に導入する空気導入ステップと、空気弁を閉じ、第1切換弁を水源水路からタンク給排水路に水が流れる状態とし、第2切換弁をタンク給排水路からタンク給水路に水が流れる状態とし、給排水ポンプを作動させることによって、水を水供給源からタンク内に供給する給水ステップを実行する。   In addition, the present invention provides a new fine bubble generator that can complete the air introduction step in a short time. The fine bubble generating device includes a tank, an air introduction channel, an air valve, a bathtub water supply channel, a pressure reducing nozzle, a tank water supply channel, a tank drainage channel, a tank water supply / drainage channel, a water supply / drainage pump, and a water source waterway. The 1st switching valve, the discharge water channel, the 2nd switching valve, and the control apparatus are provided. The air introduction path introduces air into the tank. The air valve opens and closes the air introduction path. The bathtub water supply path has an upstream end connected to the tank and a downstream end connectable to the bathtub. A decompression nozzle is installed in the connection part of a bathtub water supply channel and a bathtub. The tank water supply channel has a downstream end connected to the tank. The upstream end of the tank drainage channel is connected to the tank. The tank water supply / drainage channel has an upstream end connected to the downstream end of the tank drainage channel and a downstream end connected to the upstream end of the tank water supply channel. Below, the connection part of a tank drainage channel and a tank supply / drainage channel is called a 1st connection part, and the connection part of a tank supply / drainage channel and a tank supply channel is called a 2nd connection part. The water supply / drainage pump is interposed in the tank water supply / drainage channel, and sends water in the tank water supply / drainage channel downstream. The upstream end of the water source channel is connectable to a water supply source, and the downstream end is connected to the first connection portion. The first switching valve is interposed in the first connection portion and switches between a state in which water flows from the tank drainage channel to the tank supply / drainage channel and a state in which water flows from the water source channel to the tank supply / drainage channel. The upstream end of the drainage channel is connected to the second connection portion, and the downstream end can be connected to the drainage destination. The second switching valve is interposed in the second connection portion, and switches between a state in which water flows from the tank water supply / drainage channel to the tank water supply channel and a state in which water flows from the tank water supply / drainage channel to the discharge waterway. The control device controls the air valve, the water supply / drainage pump, the first switching valve, and the second switching valve. The control device opens the air valve, sets the first switching valve in a state where water flows from the tank drainage channel to the tank water supply / drainage channel, sets the second switching valve in a state where water flows from the tank water supply / drainage channel to the discharge water channel, , The air introduction step for discharging the water in the tank to the drainage destination and introducing the air into the tank, the air valve is closed, and the first switching valve is in a state where water flows from the water source water channel to the tank water supply / drainage channel Then, the water supply step of supplying water from the water supply source into the tank is performed by setting the second switching valve in a state where water flows from the tank water supply / drainage channel to the tank water supply channel and operating the water supply / drainage pump.

図6は、上記の構成を有する微細気泡発生装置の一例を模式的に示している。なお、図6は、微細気泡発生装置を浴槽に取り付けた状態を示している。図6では、参照番号410がタンク、参照番号412がタンク排水路、参照番号414が第1切換弁、参照番号416が水源水路、参照番号418が水供給源、参照番号420がタンク給排水路、参照番号422が給排水ポンプ、参照番号424が第2切換弁、参照番号426が排出水路、参照番号428が排水先、参照番号430がタンク給水路、参照番号432が空気導入路、参照番号434が空気弁、参照番号436が浴槽給水路、参照番号438が減圧ノズル、参照番号440が浴槽を示している。図6では、制御装置の図示を省略している。なお、図6は、この構成を有する微細気泡発生装置を例示するものであって、請求項2の構成を限定するものではない。また、図6の構成は、原理的に成立する最小の構成を示すものであって、実際の製品にはその他の弁や水路等が付加されていることがある。   FIG. 6 schematically shows an example of a microbubble generator having the above-described configuration. In addition, FIG. 6 has shown the state which attached the microbubble generator to the bathtub. In FIG. 6, reference numeral 410 is a tank, reference numeral 412 is a tank drainage channel, reference numeral 414 is a first switching valve, reference numeral 416 is a water source channel, reference numeral 418 is a water supply source, reference numeral 420 is a tank feed channel, Reference number 422 is a water supply / drainage pump, reference number 424 is a second switching valve, reference number 426 is a drainage channel, reference number 428 is a drainage destination, reference number 430 is a tank water supply channel, reference number 432 is an air introduction channel, reference number 434 is An air valve, reference numeral 436 indicates a bathtub water supply channel, reference numeral 438 indicates a pressure reducing nozzle, and reference numeral 440 indicates a bathtub. In FIG. 6, illustration of the control device is omitted. FIG. 6 exemplifies a fine bubble generating apparatus having this configuration, and does not limit the configuration of claim 2. Moreover, the structure of FIG. 6 shows the minimum structure established in principle, and other valves and water channels may be added to the actual product.

上述したように、この微細気泡発生装置では、制御装置が空気導入ステップにおいて以下の状態に各部を制御する。
・空気弁434:開
・第1切換弁414:タンク排水路412からタンク給排水路420に水が流れる状態
・第2切換弁424:タンク給排水路420から排出水路426に水が流れる状態
・給排水ポンプ422:作動
このように各部が制御されると、矢印450に示すように、タンク排水路412と、タンク給排水路420と、排出水路426によって、タンク410内の水を排出するタンク排水経路が形成される。給排水ポンプ422の作動によって、タンク410内の水がタンク排水経路を流れて排水先428に排出される。したがって、空気が矢印452に示すように空気導入路432を通ってタンク410内に導入される。
また、給水ステップにおいては、制御装置は、以下の状態に各部を制御する。
・空気弁434:閉
・第1切換弁414:水源水路416からタンク給排水路420に水が流れる状態
・第2切換弁424:タンク給排水路420からタンク給水路430に水が流れる状態
・給排水ポンプ422:作動
このように各部が制御されると、矢印460に示すように、水源水路416と、タンク給排水路420と、タンク給水路430によって、タンク410に水を供給するタンク給水経路が形成される。給排水ポンプ422の作動によって、水供給源418からタンク給水経路を介してタンク410に水が供給される。したがって、タンク410内で空気溶解加圧水が生成される。生成された空気溶解加圧水は、矢印462に示すように浴槽給水路436を流れ、減圧ノズル438から浴槽440内に放出される。したがって、浴槽440内に微細気泡が発生する。
As described above, in this fine bubble generating device, the control device controls each part in the following state in the air introduction step.
Air valve 434: Open First switching valve 414: Water flows from tank drainage channel 412 to tank water supply / drainage channel 420 Second switching valve 424: Water flows from tank water supply / drainage channel 420 to discharge water channel 426 422: Operation When each part is controlled as described above, a tank drainage path for discharging water in the tank 410 is formed by the tank drainage path 412, the tank supply / drainage path 420, and the drainage path 426 as indicated by an arrow 450. Is done. By the operation of the water supply / drainage pump 422, the water in the tank 410 flows through the tank drainage path and is discharged to the drainage destination 428. Accordingly, air is introduced into the tank 410 through the air introduction path 432 as indicated by an arrow 452.
Moreover, in a water supply step, a control apparatus controls each part in the following states.
Air valve 434: Closed First switching valve 414: Water flows from water source water channel 416 to tank water supply / drainage channel 420 Second switching valve 424: Water flows from tank water supply / drainage channel 420 to tank water supply channel 430 422: Operation When each part is controlled as described above, a tank water supply path for supplying water to the tank 410 is formed by the water source water path 416, the tank water supply / drainage path 420, and the tank water supply path 430 as indicated by an arrow 460. The By the operation of the water supply / drainage pump 422, water is supplied from the water supply source 418 to the tank 410 via the tank water supply path. Therefore, air-dissolved pressurized water is generated in the tank 410. The generated air-dissolved pressurized water flows through the bathtub water supply path 436 as indicated by an arrow 462 and is discharged from the decompression nozzle 438 into the bathtub 440. Accordingly, fine bubbles are generated in the bathtub 440.

以上に説明したように、この微細気泡発生装置によっても、空気導入ステップと給水ステップを実行することができる。また、空気導入ステップでは、給排水ポンプ422によってタンク内の水を排出する。したがって、短時間で空気導入ステップを終了させることができる。
また、給水ステップにおいては給排水ポンプ422がタンク410に水を供給する給水ポンプとして機能し、空気導入ステップにおいては給排水ポンプ422がタンク410から水を排出する排水ポンプとして機能する。したがって、給水ポンプと排水ポンプを別個に設置する必要がない。微細気泡発生装置をより簡略化することができる。
As described above, the air introduction step and the water supply step can be executed also by this fine bubble generating device. In the air introduction step, water in the tank is discharged by the water supply / drainage pump 422. Therefore, the air introduction step can be completed in a short time.
In the water supply step, the water supply / drainage pump 422 functions as a water supply pump that supplies water to the tank 410, and in the air introduction step, the water supply / drainage pump 422 functions as a drainage pump that discharges water from the tank 410. Therefore, it is not necessary to install a water supply pump and a drainage pump separately. The microbubble generator can be further simplified.

上述した微細気泡発生装置は、給排水ポンプが、熱源機に搭載されているポンプにより構成されていてもよい。
すなわち、上述した微細気泡発生装置を、熱源機を備えている浴槽に設置する場合には、給排水ポンプを、熱源機に搭載されているポンプにより構成することができる。例えば、図6の微細気泡発生装置においては、範囲500に示されている構成(すなわち、タンク給排水路420と、給排水ポンプ422と、水源水路416)を、熱源機の水路とポンプを用いて構成することができる。このように、熱源機の構成を利用して微細気泡発生装置を設置すれば、新たに給排水ポンプを設置する必要がない。
In the fine bubble generating device described above, the water supply / drainage pump may be constituted by a pump mounted on the heat source device.
That is, when the above-described fine bubble generating device is installed in a bathtub provided with a heat source device, the water supply / drainage pump can be configured by a pump mounted on the heat source device. For example, in the microbubble generator of FIG. 6, the configuration shown in range 500 (that is, tank supply / drainage channel 420, supply / drainage pump 422, and water source water channel 416) is configured using the water channel and pump of the heat source machine. can do. Thus, if the microbubble generator is installed using the configuration of the heat source machine, there is no need to newly install a water supply / drainage pump.

本発明の微細気泡発生装置によると、空気導入ステップを短時間で終了させることができる。したがって、微細気泡発生装置の連続運転時に浴槽内の水が白濁している状態を維持することができる。   According to the fine bubble generator of the present invention, the air introduction step can be completed in a short time. Therefore, the state in which the water in the bathtub is cloudy can be maintained during continuous operation of the fine bubble generating device.

下記に詳細に説明する実施例の主要な特徴を最初に列記する。
(特徴1)浴槽給水路には、浴槽給水路を開閉する給水弁が介装されている。
(特徴2)空気導入ステップにおいては給水弁が閉じ、給水ステップにおいては給水弁が開く。
The main features of the embodiments described in detail below are listed first.
(Characteristic 1) The water supply valve which opens and closes a bathtub water supply path is interposed in the bathtub water supply path.
(Feature 2) The water supply valve is closed in the air introduction step, and the water supply valve is opened in the water supply step.

本発明の微細気泡発生装置の実施例について、図面を参照しながら説明する。図1は、実施例の微細気泡発生装置10の回路図を示している。図示するように、微細気泡発生装置10は、浴槽150と水道水供給源200に接続されている。微細気泡発生装置10は、微細気泡発生機110と、熱源機120によって構成されている。熱源機120は、予め浴槽150に設置されていたものである。すなわち、既設の浴槽150と既設の熱源機120の間に微細気泡発生機110を後から追加することで、微細気泡発生機110と熱源機120からなる微細気泡発生装置10が構成されている。   Embodiments of the microbubble generator of the present invention will be described with reference to the drawings. FIG. 1 shows a circuit diagram of a microbubble generator 10 of the embodiment. As shown in the figure, the microbubble generator 10 is connected to a bathtub 150 and a tap water supply source 200. The fine bubble generator 10 includes a fine bubble generator 110 and a heat source device 120. The heat source device 120 is previously installed in the bathtub 150. That is, the fine bubble generator 10 including the fine bubble generator 110 and the heat source device 120 is configured by adding the fine bubble generator 110 between the existing bathtub 150 and the existing heat source device 120 later.

(微細気泡発生装置10の構成)
微細気泡発生装置10は、タンク130と、空気導入路140と、第1水路〜第10水路と、減圧ノズル160と、制御装置170を備えている。
(Configuration of microbubble generator 10)
The fine bubble generating apparatus 10 includes a tank 130, an air introduction path 140, first to tenth water paths, a pressure reducing nozzle 160, and a control device 170.

タンク130は、内部に水を貯めることができる。タンク130の上部には、第1水路11の下流端と空気導入路140の下流端が接続されている。タンク130の下部には、第2水路21の上流端が接続されている。
タンク130の上部には、噴射ノズル131が設置されている。噴射ノズル131には、第1水路11の下流端が接続されている。噴射ノズル131は、第1水路11から供給される水をタンク130内に噴射する。
タンク130の内部には、タンク130の上面から下方に伸びる水位電極132a、132bが設置されている。水位電極132aは、水位電極132bに比べて長い。図示していないが、水位電極132a、132bは、制御装置170と電気的に接続されている。水位電極132a、132bは、タンク130内に貯まっている水の水面に接触すると、制御装置170に信号を出力する。
The tank 130 can store water therein. A downstream end of the first water passage 11 and a downstream end of the air introduction passage 140 are connected to the upper portion of the tank 130. The upstream end of the second water channel 21 is connected to the lower part of the tank 130.
An injection nozzle 131 is installed on the upper portion of the tank 130. A downstream end of the first water channel 11 is connected to the injection nozzle 131. The spray nozzle 131 sprays water supplied from the first water channel 11 into the tank 130.
Inside the tank 130, water level electrodes 132a and 132b extending downward from the upper surface of the tank 130 are installed. The water level electrode 132a is longer than the water level electrode 132b. Although not shown, the water level electrodes 132 a and 132 b are electrically connected to the control device 170. When the water level electrodes 132 a and 132 b come into contact with the water surface of the water stored in the tank 130, a signal is output to the control device 170.

空気導入路140は、上流端が外部に開放されており、下流端がタンク130の上部に接続されている。空気導入路140は、タンク130内に空気を導入する。
空気導入路140には、空気逆止弁141が介装されている。空気逆止弁141は、空気導入路140内を空気が逆流することを阻止する。
空気導入路140の空気逆止弁141より下流側には、空気弁142が介装されている。空気弁142は、空気導入路140を開閉する。図示していないが、空気弁142は制御装置170と電気的に接続されている。空気弁142の開閉は、制御装置170によって制御される。
The air introduction path 140 has an upstream end open to the outside and a downstream end connected to the upper portion of the tank 130. The air introduction path 140 introduces air into the tank 130.
An air check valve 141 is interposed in the air introduction path 140. The air check valve 141 prevents air from flowing back through the air introduction path 140.
An air valve 142 is interposed downstream of the air check valve 141 in the air introduction path 140. The air valve 142 opens and closes the air introduction path 140. Although not shown, the air valve 142 is electrically connected to the control device 170. Opening and closing of the air valve 142 is controlled by the control device 170.

第1水路11は、上流端が切換弁70に連結されており、下流端がタンク130の噴射ノズル131に接続されている。後に詳述するが、第1水路11の上流端は、微細気泡発生装置10の各部の弁を切り替えることによって、水供給源(浴槽150または水道水供給源200のいずれか)に接続される。
第1水路11には、ポンプ12が介装されている。ポンプ12は、第1水路11内の水を下流側へ送り出す。図示していないが、ポンプ12は、制御装置170と電気的に接続されている。ポンプ12の作動は、制御装置170によって制御される。
第1水路11のポンプ12より下流側には、逆止弁13が介装されている。逆止弁13は、第1水路11内の水が逆流することを阻止する。
The first water channel 11 has an upstream end connected to the switching valve 70 and a downstream end connected to the injection nozzle 131 of the tank 130. As will be described in detail later, the upstream end of the first water channel 11 is connected to a water supply source (either the bathtub 150 or the tap water supply source 200) by switching the valve of each part of the fine bubble generating device 10.
A pump 12 is interposed in the first water channel 11. The pump 12 sends out the water in the first water channel 11 to the downstream side. Although not shown, the pump 12 is electrically connected to the control device 170. The operation of the pump 12 is controlled by the controller 170.
A check valve 13 is interposed downstream of the pump 12 in the first water channel 11. The check valve 13 prevents the water in the first water channel 11 from flowing backward.

第2水路21の上流端は、タンク130の下部に接続されている。第2水路21の下流端は、分岐して第3水路31と第4水路41となっている。   The upstream end of the second water channel 21 is connected to the lower part of the tank 130. The downstream end of the second water channel 21 is branched into a third water channel 31 and a fourth water channel 41.

第3水路31の下流端は、切換弁20に連結されている。   The downstream end of the third water channel 31 is connected to the switching valve 20.

第4水路41の下流端は、浴槽150に接続されている。
第4水路41と浴槽150との接続部には、減圧ノズル160が設置されている。減圧ノズル160は、第2水路21から供給される水を浴槽150内に噴出する。減圧ノズル160は、流路の断面積が小さい。したがって、したがって、減圧ノズル160は、通水抵抗が非常に高い。
第4水路41の途中には、給水弁42が介装されている。給水弁42は、第4水路41を開閉する。図示していないが、給水弁42は制御装置170と電気的に接続されている。給水弁42の開閉は、制御装置170によって制御される。
The downstream end of the fourth water channel 41 is connected to the bathtub 150.
A decompression nozzle 160 is installed at the connection between the fourth water channel 41 and the bathtub 150. The decompression nozzle 160 ejects water supplied from the second water passage 21 into the bathtub 150. The decompression nozzle 160 has a small cross-sectional area of the flow path. Therefore, the pressure reducing nozzle 160 has a very high water flow resistance.
A water supply valve 42 is interposed in the middle of the fourth water channel 41. The water supply valve 42 opens and closes the fourth water channel 41. Although not shown, the water supply valve 42 is electrically connected to the control device 170. Opening and closing of the water supply valve 42 is controlled by the control device 170.

第5水路51の上流端は、切換弁20に連結されている。第5水路51の下流端は、第6水路61の下流端と、第7水路71の上流端の双方に接続されている。   The upstream end of the fifth water channel 51 is connected to the switching valve 20. The downstream end of the fifth water channel 51 is connected to both the downstream end of the sixth water channel 61 and the upstream end of the seventh water channel 71.

第6水路61の上流端は、水道水供給源200に接続されている。第6水路61の下流端は、第5水路51の下流端と、第7水路71の上流端の双方に接続されている。
第6水路61には、加熱器62が設置されている。加熱器62は、第6水路61内を流れる水を加熱する。図示していないが、加熱器62は、制御装置170と電気的に接続されている。加熱器62の作動は、制御装置170によって制御される。
第6水路61の加熱器62の下流側には、注水弁63が介装されている。注水弁63は、第6水路61を開閉する。図示していないが、注水弁63は制御装置170と電気的に接続されている。注水弁63の開閉は、制御装置170によって制御される。
The upstream end of the sixth water channel 61 is connected to the tap water supply source 200. The downstream end of the sixth water channel 61 is connected to both the downstream end of the fifth water channel 51 and the upstream end of the seventh water channel 71.
A heater 62 is installed in the sixth water channel 61. The heater 62 heats the water flowing through the sixth water channel 61. Although not shown, the heater 62 is electrically connected to the control device 170. The operation of the heater 62 is controlled by the control device 170.
A water injection valve 63 is interposed on the downstream side of the heater 62 in the sixth water channel 61. The water injection valve 63 opens and closes the sixth water channel 61. Although not shown, the water injection valve 63 is electrically connected to the control device 170. Opening and closing of the water injection valve 63 is controlled by the control device 170.

第7水路71の上流端は、第5水路51の下流端と、第6水路61の下流端の双方に接続されている。第7水路71の下流端は、切換弁70に連結されている。
第7水路71には、ポンプ72が介装されている。ポンプ72は、第7水路71内の水を下流側へ送り出す。図示していないが、ポンプ72は、制御装置170と電気的に接続されている。ポンプ72の作動は、制御装置170によって制御される。
第7水路71のポンプ72より下流側には、加熱器73が設置されている。加熱器73は、第7水路71内を流れる水を加熱する。図示していないが、加熱器73は、制御装置170と電気的に接続されている。加熱器73の作動は、制御装置170によって制御される。
The upstream end of the seventh water channel 71 is connected to both the downstream end of the fifth water channel 51 and the downstream end of the sixth water channel 61. The downstream end of the seventh water channel 71 is connected to the switching valve 70.
A pump 72 is interposed in the seventh water channel 71. The pump 72 sends out the water in the seventh water channel 71 to the downstream side. Although not shown, the pump 72 is electrically connected to the control device 170. The operation of the pump 72 is controlled by the controller 170.
A heater 73 is installed downstream of the pump 72 in the seventh water channel 71. The heater 73 heats the water flowing in the seventh water channel 71. Although not shown, the heater 73 is electrically connected to the control device 170. The operation of the heater 73 is controlled by the control device 170.

第8水路81の上流端は、切換弁70に連結されている。第8水路81の下流端は、第9水路91の上流端と、第10水路101の一端の双方に接続されている。   The upstream end of the eighth water channel 81 is connected to the switching valve 70. The downstream end of the eighth water channel 81 is connected to both the upstream end of the ninth water channel 91 and one end of the tenth water channel 101.

第9水路91の上流端は、第8水路81の下流端と、第10水路101の一端の双方に接続されている。第9水路91の下流端は、切換弁20に連結されている。
第9水路91には、逆止弁92が介装されている。逆止弁92は、第9水路91内の水が逆流すること(図1の矢印95に示す方向に水が流れること)を阻止する。
The upstream end of the ninth water channel 91 is connected to both the downstream end of the eighth water channel 81 and one end of the tenth water channel 101. The downstream end of the ninth water channel 91 is connected to the switching valve 20.
A check valve 92 is interposed in the ninth water channel 91. The check valve 92 prevents the water in the ninth water passage 91 from flowing backward (water flowing in the direction indicated by the arrow 95 in FIG. 1).

第10水路101の一端は、第8水路81の下流端と、第9水路91の上流端の双方に接続されている。第10水路101の他端は、浴槽150に接続されている。   One end of the tenth water channel 101 is connected to both the downstream end of the eighth water channel 81 and the upstream end of the ninth water channel 91. The other end of the tenth water channel 101 is connected to the bathtub 150.

切換弁70には、第1水路11の上流端と、第7水路71の下流端と、第8水路81の上流端が連結されている。切換弁70は、第7水路71から第1水路11に水が流れる状態(すなわち、第7水路71と第1水路11とを接続した状態)と、第7水路71から第8水路81に水が流れる状態(すなわち、第7水路71と第8水路81とを接続した状態)とを切り替える。図示していないが、切換弁70は、制御装置170と電気的に接続されている。切換弁70の切換えは、制御装置170によって制御される。   The switching valve 70 is connected to the upstream end of the first water channel 11, the downstream end of the seventh water channel 71, and the upstream end of the eighth water channel 81. The switching valve 70 is configured such that water flows from the seventh water channel 71 to the first water channel 11 (that is, a state in which the seventh water channel 71 and the first water channel 11 are connected), and water from the seventh water channel 71 to the eighth water channel 81. Is switched (that is, a state where the seventh water channel 71 and the eighth water channel 81 are connected). Although not shown, the switching valve 70 is electrically connected to the control device 170. Switching of the switching valve 70 is controlled by the control device 170.

切換弁20には、第3水路31の下流端と、第5水路51の上流端と、第9水路91の下流端が連結されている。切換弁20は、第3水路31から第5水路51に水が流れる状態(すなわち、第3水路31と第5水路51とを接続した状態)と、第9水路91から第5水路51に水が流れる状態(すなわち、第9水路91と第5水路51とを接続した状態)とを切り替える。図示していないが、切換弁20は、制御装置170と電気的に接続されている。切換弁20の切換えは、制御装置170によって制御される。   The selector valve 20 is connected to the downstream end of the third water channel 31, the upstream end of the fifth water channel 51, and the downstream end of the ninth water channel 91. The switching valve 20 has a state in which water flows from the third water channel 31 to the fifth water channel 51 (that is, a state in which the third water channel 31 and the fifth water channel 51 are connected), and water from the ninth water channel 91 to the fifth water channel 51. Is switched (that is, a state in which the ninth water channel 91 and the fifth water channel 51 are connected). Although not shown, the switching valve 20 is electrically connected to the control device 170. Switching of the switching valve 20 is controlled by the control device 170.

上述したように、制御装置170は、水位電極132a、132b、ポンプ12、72、空気弁142、給水弁42、注水弁63、切換弁20、70及び加熱器62、73と電気的に接続されている。また、制御装置170は、図示していない入力装置とも電気的に接続されている。微細気泡発生装置10のユーザが入力装置を操作することで、制御装置170に制御信号が入力される。制御装置170は、入力装置から入力される制御信号と、水位電極132a、132bから入力される信号に応じて、ポンプ12、72、空気弁142、給水弁42、注水弁63、切換弁20、70及び加熱器62、73を制御する。   As described above, the control device 170 is electrically connected to the water level electrodes 132a and 132b, the pumps 12 and 72, the air valve 142, the water supply valve 42, the water injection valve 63, the switching valves 20 and 70, and the heaters 62 and 73. ing. The control device 170 is also electrically connected to an input device (not shown). When the user of the fine bubble generating device 10 operates the input device, a control signal is input to the control device 170. The control device 170 responds to a control signal input from the input device and a signal input from the water level electrodes 132a and 132b, and the pumps 12, 72, the air valve 142, the water supply valve 42, the water injection valve 63, the switching valve 20, 70 and heaters 62 and 73 are controlled.

(微細気泡発生装置10の動作)
次に、微細気泡発生装置10の動作について説明する。微細気泡発生装置10は、タンク130に空気を導入する空気導入ステップと、水道水供給源200を水供給源としてタンク130に水を供給する第1給水ステップと、浴槽150を水供給源としてタンク130に水を供給する第2給水ステップを実行することができる。
(Operation of the microbubble generator 10)
Next, the operation of the fine bubble generator 10 will be described. The microbubble generator 10 includes an air introduction step for introducing air into the tank 130, a first water supply step for supplying water to the tank 130 using the tap water supply source 200 as a water supply source, and a tank using the bathtub 150 as a water supply source. A second water supply step for supplying water to 130 may be performed.

(空気導入ステップ)
空気導入ステップは、タンク130が略満水の状態(すなわち、水位電極132bが水面と接触する水位までタンク130内に水が貯まっている状態)のときに実行される。空気導入ステップでは、タンク130内の水を浴槽150に排出するとともに、タンク130内に空気を導入する。図1は、空気導入ステップ実行中の微細気泡発生装置10の状態を示している。図1中の矢印(矢印95を除く)は、空気導入ステップ実行中における水の流れを示している。空気導入ステップでは、制御装置170は、以下の状態に微細気泡発生装置10の各部を制御する。
・ポンプ12:停止
・空気弁142:開
・給水弁42:閉
・切換弁20:第3水路31と第5水路51とを接続している状態
・切換弁70:第7水路71と第8水路81とを接続している状態
・ポンプ72:作動
・注水弁63:閉
・加熱器73:停止
・加熱器62:停止
(Air introduction step)
The air introduction step is executed when the tank 130 is substantially full (that is, the state where water is stored in the tank 130 up to the water level at which the water level electrode 132b contacts the water surface). In the air introduction step, water in the tank 130 is discharged to the bathtub 150 and air is introduced into the tank 130. FIG. 1 shows a state of the fine bubble generating device 10 during execution of the air introduction step. The arrows (excluding the arrow 95) in FIG. 1 indicate the flow of water during the air introduction step. In the air introduction step, the control device 170 controls each part of the fine bubble generating device 10 in the following state.
Pump 12: Stop, Air valve 142: Open, Water supply valve 42: Closed, Switching valve 20: State in which the third water channel 31 and the fifth water channel 51 are connected Switch valve 70: Seventh water channel 71 and eighth A state where the water channel 81 is connected. Pump 72: Operation / Water injection valve 63: Closed / heater 73: Stop / heater 62: Stop

図1に示すように、空気導入ステップでは、タンク130から、第2水路21、第3水路31、第5水路51、第7水路71、第8水路81及び第10水路101を経て浴槽150に到達するタンク排水経路(すなわち、請求項1のタンク排水経路)が形成される。空気導入ステップでは、ポンプ72がタンク排水経路(第7水路71)内の水を下流側へ送り出すので、タンク130内の水はタンク排水経路を流れて浴槽150に排出される(ポンプ72が、請求項1の第2ポンプとして機能する)。
すなわち、タンク130内の水は、第2水路21へ流れる。第4水路41では給水弁42が閉じているので、水は第2水路21から第3水路31へ流れる。切換弁20は第3水路31と第5水路51を接続しているので、水は第3水路31から第5水路51へ流れる。第6水路61では注水弁63が閉じているので、水は第5水路51から第7水路71へ流れる。切換弁70は第7水路71と第8水路81を接続しているので、水は第7水路71から第8水路81へ流れる。第9水路91は切換弁20によって下流端が閉じられているので、水は第8水路81から第10水路101へ流れる。そして第10水路101から浴槽150に排出される。
As shown in FIG. 1, in the air introduction step, from the tank 130 to the bathtub 150 through the second water channel 21, the third water channel 31, the fifth water channel 51, the seventh water channel 71, the eighth water channel 81, and the tenth water channel 101. A reaching tank drainage path (that is, the tank drainage path of claim 1) is formed. In the air introduction step, since the pump 72 sends the water in the tank drainage path (seventh waterway 71) downstream, the water in the tank 130 flows through the tank drainage path and is discharged to the bathtub 150 (the pump 72 It functions as the second pump of claim 1).
That is, the water in the tank 130 flows to the second water channel 21. Since the water supply valve 42 is closed in the fourth water channel 41, water flows from the second water channel 21 to the third water channel 31. Since the switching valve 20 connects the third water channel 31 and the fifth water channel 51, water flows from the third water channel 31 to the fifth water channel 51. Since the water injection valve 63 is closed in the sixth water channel 61, water flows from the fifth water channel 51 to the seventh water channel 71. Since the switching valve 70 connects the seventh water channel 71 and the eighth water channel 81, water flows from the seventh water channel 71 to the eighth water channel 81. Since the downstream end of the ninth water channel 91 is closed by the switching valve 20, water flows from the eighth water channel 81 to the tenth water channel 101. Then, the water is discharged from the tenth water channel 101 to the bathtub 150.

タンク130内の水が浴槽150に排出されるにしたがって、タンク130内の水位は低下する。タンク130内の圧力は、水位の低下ととともに減少する。また、空気導入ステップでは、空気弁142が開いている。タンク130内の圧力が大気圧以下となると、空気導入路140を通ってタンク130内に空気が流入する。したがって、タンク130内の水面より上側は、略大気圧の空気で満たされる。   As the water in the tank 130 is discharged to the bathtub 150, the water level in the tank 130 decreases. The pressure in the tank 130 decreases as the water level decreases. In the air introduction step, the air valve 142 is open. When the pressure in the tank 130 becomes equal to or lower than the atmospheric pressure, air flows into the tank 130 through the air introduction path 140. Accordingly, the upper side of the water surface in the tank 130 is filled with air at substantially atmospheric pressure.

制御装置170は、タンク130内の水位が、水位電極132aが水面と非接触となる水位となるまで空気導入ステップを継続する。上述したように、微細気泡発生装置10では、ポンプ72がタンク130内の水を排出する排出ポンプとして作動するので、タンク130内の水は高速で排出される。本実施例では、空気導入ステップは約5秒で終了する。   The control device 170 continues the air introduction step until the water level in the tank 130 reaches a water level at which the water level electrode 132a is not in contact with the water surface. As described above, in the fine bubble generating apparatus 10, the pump 72 operates as a discharge pump that discharges the water in the tank 130, so that the water in the tank 130 is discharged at a high speed. In this embodiment, the air introduction step is completed in about 5 seconds.

なお、上述した空気導入ステップでは、給水弁42を閉じていた。これは、給水弁42(すなわち、第4水路41)を閉じておかないと、ポンプ72の作動によって浴槽150内の水が第4水路41を逆流し、第3水路31に流れ込んでしまうからである。このように、浴槽150内の水が第3水路31に流れ込むと、タンク130内の水を排出する効率が低下してしまう。
しかしながら、各水路の位置関係によっては、給水弁42を開いても浴槽150内の水が第4水路41を逆流しない場合がある(例えば、浴槽150より高い位置に、第2水路21と第3水路31と第4水路41の接続部がある場合等)。この場合、タンク130から第2水路21に流出した水の一部が第4水路41へ流れ込み、浴槽150に排出される。このように水が流れると、タンク130内の水を排出する効率が上昇する。したがって、各水路が上記の現象が得られる位置関係にある場合には、空気導入ステップにおいて給水弁42を開いてもよい。
In the air introduction step described above, the water supply valve 42 is closed. This is because if the water supply valve 42 (that is, the fourth water channel 41) is not closed, the water in the bathtub 150 flows back through the fourth water channel 41 and flows into the third water channel 31 by the operation of the pump 72. is there. Thus, when the water in the bathtub 150 flows into the 3rd waterway 31, the efficiency which discharges the water in the tank 130 will fall.
However, depending on the positional relationship between the water channels, the water in the bathtub 150 may not flow back through the fourth water channel 41 even when the water supply valve 42 is opened (for example, the second water channel 21 and the third water channel are positioned higher than the bathtub 150). For example, when there is a connecting portion between the water channel 31 and the fourth water channel 41). In this case, part of the water flowing out from the tank 130 to the second water channel 21 flows into the fourth water channel 41 and is discharged to the bathtub 150. When the water flows in this way, the efficiency of discharging the water in the tank 130 increases. Therefore, when each water channel is in a positional relationship where the above phenomenon is obtained, the water supply valve 42 may be opened in the air introduction step.

(第1給水ステップ)
第1給水ステップは、タンク130がほぼ空の状態(すなわち、水位電極132aが水面と非接触となる程度までタンク130内の水位が低下している状態)のときに実行される。第1給水ステップでは、水道水供給源200からタンク130に水を供給して空気溶解加圧水を生成する。そして、生成した空気溶解加圧水をタンク130から浴槽150に供給し、浴槽150内に微細気泡を発生させる。図2は、第1給水入ステップ実行中の微細気泡発生装置10の状態を示している。図2中の矢印は、第1給水ステップ実行中における水の流れを示している。第1給水ステップでは、制御装置170は、以下の状態に微細気泡発生装置10の各部を制御する。
・ポンプ12:作動
・空気弁142:閉
・給水弁42:開
・切換弁20:第9水路91と第5水路51とを接続している状態(すなわち、第3水路31の下流端を閉じている状態)
・切換弁70:第7水路71と第1水路11とを接続している状態
・ポンプ72:作動
・注水弁63:開
・加熱器73:停止
・加熱器62:作動
(First water supply step)
The first water supply step is executed when the tank 130 is almost empty (that is, a state where the water level in the tank 130 is lowered to the extent that the water level electrode 132a is not in contact with the water surface). In the first water supply step, water is supplied from the tap water supply source 200 to the tank 130 to generate air-dissolved pressurized water. Then, the generated air-dissolved pressurized water is supplied from the tank 130 to the bathtub 150, and fine bubbles are generated in the bathtub 150. FIG. 2 shows a state of the fine bubble generating device 10 during execution of the first water supply step. The arrows in FIG. 2 indicate the flow of water during execution of the first water supply step. In the first water supply step, the control device 170 controls each part of the fine bubble generating device 10 in the following state.
Pump 12: Actuation Air valve 142: Closed Water supply valve 42: Opening / switching valve 20: A state where the ninth water channel 91 and the fifth water channel 51 are connected (that is, the downstream end of the third water channel 31 is closed) State)
・ Switching valve 70: a state in which the seventh water passage 71 and the first water passage 11 are connected. ・ Pump 72: operation. ・ Water injection valve 63: open. ・ Heater 73: stop.

図2に示すように、第1給水ステップでは、水道水供給源200から、第6水路61、第7水路71、第1水路11、タンク130に到達するタンク給水経路(すなわち、請求項1のタンク給水経路(水道水供給源200を水供給源とした場合のタンク給水経路))が形成される。また、タンク130から、第2水路21及び第4水路41を経て、浴槽150に到達する浴槽給水経路(すなわち、請求項1の浴槽給水経路)が形成される。第1給水ステップでは、水道水供給源200から水の供給圧力が加わるとともに、ポンプ12とポンプ72の両者がタンク給水経路(第1水路11、第7水路71)内の水を下流側へ送り出す(ポンプ12とポンプ72が、請求項1の第1ポンプとして機能する)。したがって、水道水供給源200から供給される水は、タンク給水経路を流れてタンク130に供給され、タンク130から浴槽給水経路を流れて浴槽150に供給される。
すなわち、注水弁63が開いているので、水道水供給源200から第6水路61内に水が流入する。第6水路61に流入した水は、第5水路51と第7水路71との接続部に流入する。第5水路51の上流端は、切換弁20によって第9水路91に接続されているが、第9水路91は逆止弁92によって逆流が阻止されている。したがって、水は第6水路61から第7水路71へ流れる。切換弁70は第7水路71と第1水路11を接続しているので、水は第7水路71から第1水路11へ流れる。そして、第1水路11の下流端に接続されている噴射ノズル131からタンク130内に噴射される。タンク130内での水の動きについては後に詳述するが、タンク130内に噴射された水は第2水路21へ流れる。第4水路41の給水弁42が開いており、第3水路31の下流端が切換弁20によって閉じられているので、水は第4水路41へ流れる。そして、減圧ノズル160から浴槽150内へ水が放出される。
As shown in FIG. 2, in the first water supply step, a tank water supply path that reaches from the tap water supply source 200 to the sixth water path 61, the seventh water path 71, the first water path 11, and the tank 130 (that is, according to claim 1). A tank water supply path (a tank water supply path when the tap water supply source 200 is used as a water supply source) is formed. Further, a bathtub water supply path (that is, a bathtub water supply path of claim 1) that reaches the bathtub 150 from the tank 130 through the second water channel 21 and the fourth water channel 41 is formed. In the first water supply step, water supply pressure is applied from the tap water supply source 200, and both the pump 12 and the pump 72 send water in the tank water supply path (first water path 11, seventh water path 71) to the downstream side. (Pump 12 and pump 72 function as the first pump of claim 1). Therefore, water supplied from the tap water supply source 200 flows through the tank water supply path and is supplied to the tank 130, and flows from the tank 130 through the bathtub water supply path and is supplied to the bathtub 150.
That is, since the water injection valve 63 is open, water flows into the sixth water channel 61 from the tap water supply source 200. The water that has flowed into the sixth water channel 61 flows into the connecting portion between the fifth water channel 51 and the seventh water channel 71. The upstream end of the fifth water channel 51 is connected to the ninth water channel 91 by the switching valve 20, but the ninth water channel 91 is prevented from flowing back by the check valve 92. Accordingly, water flows from the sixth water channel 61 to the seventh water channel 71. Since the switching valve 70 connects the seventh water channel 71 and the first water channel 11, water flows from the seventh water channel 71 to the first water channel 11. And it injects in the tank 130 from the injection nozzle 131 connected to the downstream end of the 1st water channel 11. FIG. The movement of water in the tank 130 will be described in detail later, but the water injected into the tank 130 flows to the second water channel 21. Since the water supply valve 42 of the fourth water channel 41 is open and the downstream end of the third water channel 31 is closed by the switching valve 20, water flows to the fourth water channel 41. Then, water is discharged from the decompression nozzle 160 into the bathtub 150.

上述したように、水道水供給源200から供給される水は、水道水供給源200からの水の供給圧力と、ポンプ12とポンプ72が水を送り込む圧力によってタンク130へ送られる。したがって、水は非常に高い圧力でタンク130に供給される。すなわち、噴射ノズル131からタンク130内に非常に高い圧力で水が噴射される。このとき、空気弁142は閉じているので、タンク130は第2水路21を除いて密閉されている。タンク130内の水は第2水路21を経て減圧ノズル160から浴槽150内へ放出されるが、上述したように、減圧ノズル160の通水抵抗は高い。したがって、減圧ノズル160から浴槽150内に放出される水量よりも、噴射ノズル131からタンク130内に噴射される水量の方が多くなる。したがって、タンク130内の圧力が上昇する。噴射ノズル131から噴射される水の圧力が非常に高いので、タンク130内の圧力は短時間で高圧となる。タンク130内に噴射された水がタンク130内に貯まっている水の水面等に衝突するとき等には、水の中に空気が巻き込まれる。このとき、タンク130内の圧力が高いので、水の中に巻き込まれた空気は水に溶解する。したがって、タンク130内で空気溶解加圧水が生成される。タンク130内で生成された空気溶解加圧水は、第2水路21と第4水路41を介して、減圧ノズル160から浴槽150内に放出される。浴槽150内に放出された空気溶解加圧水は、減圧ノズル160を通過した瞬間に急激に減圧される。すると、水に溶解していた空気が、直径20μm程度の微細気泡となる。すなわち、浴槽150内に多量の微細気泡が発生し、水が白濁する。
なお、浴槽150に供給される水は、第6水路61内を流れるときに加熱器62によって加熱されている。したがって、浴槽150には温水が供給される。
As described above, the water supplied from the tap water supply source 200 is sent to the tank 130 by the supply pressure of the water from the tap water supply source 200 and the pressure at which the pump 12 and the pump 72 send water. Therefore, water is supplied to the tank 130 at a very high pressure. That is, water is injected from the injection nozzle 131 into the tank 130 at a very high pressure. At this time, since the air valve 142 is closed, the tank 130 is sealed except for the second water passage 21. The water in the tank 130 is discharged from the decompression nozzle 160 into the bathtub 150 through the second water passage 21, but as described above, the water flow resistance of the decompression nozzle 160 is high. Therefore, the amount of water injected from the injection nozzle 131 into the tank 130 is larger than the amount of water discharged from the decompression nozzle 160 into the bathtub 150. Therefore, the pressure in the tank 130 increases. Since the pressure of water sprayed from the spray nozzle 131 is very high, the pressure in the tank 130 becomes high in a short time. When the water sprayed into the tank 130 collides with the surface of the water stored in the tank 130, air is caught in the water. At this time, since the pressure in the tank 130 is high, the air entrained in the water dissolves in the water. Therefore, air-dissolved pressurized water is generated in the tank 130. The air-dissolved pressurized water generated in the tank 130 is discharged from the decompression nozzle 160 into the bathtub 150 through the second water channel 21 and the fourth water channel 41. The air-dissolved pressurized water released into the bathtub 150 is rapidly depressurized at the moment when it passes through the depressurizing nozzle 160. Then, air dissolved in water becomes fine bubbles having a diameter of about 20 μm. That is, a large amount of fine bubbles are generated in the bathtub 150, and the water becomes cloudy.
In addition, the water supplied to the bathtub 150 is heated by the heater 62 when flowing in the sixth water channel 61. Accordingly, hot water is supplied to the bathtub 150.

上述したように、第1給水ステップでは、減圧ノズル160から浴槽150内に放出される水量よりも、噴射ノズル131からタンク130内に噴射される水量の方が多い。したがって、タンク130内の水位は、第1給水ステップを実行している間に徐々に上昇する。制御装置170は、タンク130内の水位が、水位電極132bが水面と接触する水位となるまで第1給水ステップを継続する。   As described above, in the first water supply step, the amount of water injected from the injection nozzle 131 into the tank 130 is larger than the amount of water discharged from the decompression nozzle 160 into the bathtub 150. Accordingly, the water level in the tank 130 gradually rises while the first water supply step is being performed. The control device 170 continues the first water supply step until the water level in the tank 130 reaches the water level at which the water level electrode 132b contacts the water surface.

以上に説明した第1給水ステップと空気導入ステップを実行する場合、微細気泡発生装置10の各部は以下のように機能する。
第7水路71は、空気導入ステップ実行中にはタンク130から排出する水が流れ、第1給水ステップ実行中にはタンク130に供給する水が流れる水路である。すなわち、第7水路71は、請求項3のタンク給排水路として機能する。
第1水路11は、第1給水ステップ実行中に、タンク給排水路(第7水路71)から供給される水をタンク130に供給する。すなわち、第1水路11は、請求項3のタンク給水路として機能する。
第2水路21と第4水路41は、第1給水ステップ実行中に、タンク130内の水を浴槽150へ供給する。すなわち、第2水路21と第4水路41は、請求項3の浴槽給水路として機能する。
第6水路61は、第1給水ステップ実行中に、水供給源(水道水供給源200)から供給される水をタンク給排水路(第7水路71)に供給する。すなわち、第6水路61は、請求項3の水源水路として機能する。
第2水路21、第3水路31及び第5水路51は、空気導入ステップ実行中に、タンク130内の水をタンク給排水路(第7水路71)に供給する。すなわち、第2水路21、第3水路31及び第5水路51は、請求項3のタンク排水路として機能する。上述したように、第2水路21は、浴槽給水路としても機能する。第2水路21は、浴槽給水路でもあり、タンク排水路でもある。
第8水路81と第10水路101は、空気導入ステップ実行中に、タンク給排水路(第7水路71)から供給される水を排水先(浴槽150)に排出する。すなわち、第8水路81と第10水路101は、請求項3の排出水路として機能する。
空気導入ステップの実行中には、注水弁63が閉じ、切換弁20が第3水路31と第5水路51を接続する。これによって、タンク排水路(第2水路21、第3水路31及び第5水路51)からタンク給排水路(第7水路71)に水が流れる状態となる。一方、第1給水ステップの実行中には、注水弁63が開き、切換弁20がタンク排水路(第2水路21、第3水路31及び第5水路51)を閉じる(すなわち、第3水路31から第5水路51に水が流れない状態とする)。これによって、水源水路(第6水路61)からタンク給排水路(第7水路71)に水が流れる状態となる。すなわち、注水弁63と切換弁20によって、タンク排水路からタンク給排水路に水が流れる状態と、水源水路からタンク給排水路に水が流れる状態とを切り換える第1切換弁(請求項3の第1切換弁)が構成されている。
切換弁70は、タンク給排水路(第7水路71)とタンク給水路(第1水路11)を接続している状態と、タンク給排水路(第7水路71)と排出水路(第8水路81)を接続している状態とを切り換える。すなわち、切換弁70は、請求項3の第2切換弁として機能する。
ポンプ72は、タンク給排水路(第7水路71)内の水を下流側へ送り出す。すなわち、ポンプ72は、請求項3の給排水ポンプとして機能する。なお、タンク給排水路(第7水路71)は、タンク給水経路の一部でもあり、タンク排水経路の一部でもある。したがって、ポンプ72は、請求項1の第1ポンプでもあり、第2ポンプでもある。
When performing the 1st water supply step and air introduction step which were demonstrated above, each part of the microbubble generator 10 functions as follows.
The seventh water channel 71 is a water channel through which water discharged from the tank 130 flows during the air introduction step, and water supplied to the tank 130 flows during the first water supply step. That is, the seventh water channel 71 functions as a tank water supply / drainage channel according to claim 3.
The first water channel 11 supplies water supplied from the tank water supply / drainage channel (seventh water channel 71) to the tank 130 during execution of the first water supply step. That is, the first water channel 11 functions as a tank water channel according to claim 3.
The second water channel 21 and the fourth water channel 41 supply the water in the tank 130 to the bathtub 150 during execution of the first water supply step. That is, the 2nd waterway 21 and the 4th waterway 41 function as a bathtub water supply channel of Claim 3.
The sixth water channel 61 supplies water supplied from the water supply source (tap water supply source 200) to the tank water supply / drainage channel (seventh water channel 71) during execution of the first water supply step. That is, the sixth water channel 61 functions as the water source water channel of claim 3.
The second water channel 21, the third water channel 31, and the fifth water channel 51 supply the water in the tank 130 to the tank water supply / drainage channel (seventh water channel 71) during execution of the air introduction step. That is, the 2nd waterway 21, the 3rd waterway 31, and the 5th waterway 51 function as a tank drainage channel of Claim 3. As described above, the second water channel 21 also functions as a bathtub water channel. The second water channel 21 is also a bathtub water supply channel and a tank drainage channel.
The eighth water channel 81 and the tenth water channel 101 discharge water supplied from the tank water supply / drainage channel (seventh water channel 71) to the drainage destination (tub 150) during the air introduction step. That is, the eighth water channel 81 and the tenth water channel 101 function as the discharge water channel of claim 3.
During the execution of the air introduction step, the water injection valve 63 is closed, and the switching valve 20 connects the third water channel 31 and the fifth water channel 51. As a result, water flows from the tank drainage channel (second water channel 21, third water channel 31, and fifth water channel 51) to the tank water supply / drainage channel (seventh water channel 71). On the other hand, during the execution of the first water supply step, the water injection valve 63 is opened, and the switching valve 20 closes the tank drainage channels (the second water channel 21, the third water channel 31, and the fifth water channel 51) (that is, the third water channel 31). To the fifth water channel 51). As a result, water flows from the water source water channel (sixth water channel 61) to the tank water supply / drainage channel (seventh water channel 71). That is, the first switching valve that switches between a state in which water flows from the tank drainage channel to the tank water supply / drainage channel and a state in which water flows from the water source channel to the tank water supply / drainage channel by the water injection valve 63 and the switching valve 20. A switching valve).
The switching valve 70 is connected to the tank water supply / drainage channel (seventh waterway 71) and the tank water supply channel (first waterway 11), and the tank water supply / drainage channel (seventh waterway 71) and the discharge waterway (eighth waterway 81). Switch between connected and. That is, the switching valve 70 functions as the second switching valve of claim 3.
The pump 72 sends out water in the tank water supply / drainage channel (seventh water channel 71) to the downstream side. That is, the pump 72 functions as a water supply / drainage pump according to claim 3. The tank water supply / drainage channel (seventh waterway 71) is both a part of the tank water supply route and a part of the tank drainage route. Therefore, the pump 72 is both the first pump and the second pump of claim 1.

(第2給水ステップ)
第2給水ステップは、タンク130がほぼ空の状態(すなわち、水位電極132aが水面と非接触となる程度までタンク130内の水位が低下している状態)のときに実行される。第2給水ステップでは、浴槽150からタンク130に水を供給して空気溶解加圧水を生成する。そして、生成した空気溶解加圧水をタンク130から浴槽150に戻し、浴槽150内に微細気泡を発生させる。図3は、第2給水入ステップ実行中の微細気泡発生装置10の状態を示している。図3中の矢印は、第2給水ステップ実行中における水の流れを示している。第2給水ステップでは、制御装置170は、以下の状態に微細気泡発生装置10の各部を制御する。
・ポンプ12:作動
・空気弁142:閉
・給水弁42:開
・切換弁20:第9水路91と第5水路51とを接続している状態
・切換弁70:第7水路71と第1水路11とを接続している状態
・ポンプ72:作動
・注水弁63:閉
・加熱器73:停止
・加熱器62:停止
(Second water supply step)
The second water supply step is executed when the tank 130 is almost empty (that is, a state where the water level in the tank 130 is lowered to the extent that the water level electrode 132a is not in contact with the water surface). In a 2nd water supply step, water is supplied to the tank 130 from the bathtub 150, and air melt | dissolution pressurized water is produced | generated. Then, the generated air-dissolved pressurized water is returned from the tank 130 to the bathtub 150, and fine bubbles are generated in the bathtub 150. FIG. 3 shows a state of the fine bubble generator 10 during execution of the second water supply step. The arrows in FIG. 3 indicate the flow of water during execution of the second water supply step. In the second water supply step, the control device 170 controls each part of the fine bubble generating device 10 in the following state.
Pump 12: Actuation Air valve 142: Closed Water supply valve 42: Open / Switching valve 20: A state in which the ninth water channel 91 and the fifth water channel 51 are connected. A switching valve 70: the seventh water channel 71 and the first. A state where the water channel 11 is connected. Pump 72: Operation / Water injection valve 63: Closed / heater 73: Stop / heater 62: Stop

図3に示すように、第2給水ステップでは、浴槽150から、第10水路101、第9水路91、第5水路51、第7水路71、第1水路11、タンク130に到達するタンク給水経路(すなわち、請求項1のタンク給水経路(浴槽150を水供給源とした場合のタンク給水経路))が形成される。また、タンク130から、第2水路21及び第4水路41を経て、浴槽150に到達する浴槽給水経路(すなわち、請求項1の浴槽給水経路)が形成される。第2給水ステップでは、ポンプ12とポンプ72がタンク給水経路(第1水路11と第7水路71)内の水を下流側へ送り出す(ポンプ12とポンプ72が、請求項1の第1ポンプとして機能する)。したがって、浴槽150内の水はタンク給水経路を流れてタンク130に供給され、タンク130から浴槽給水経路を流れて浴槽150に戻される。
すなわち、浴槽150内の水は、第10水路101へ流れる。第8水路81は切換弁70によって上流端が閉じられているので、水は第10水路101から第9水路91へ流れる。切換弁20が第9水路91と第5水路51を接続しているので、水は第9水路91から第5水路51へ流れる。注水弁63が閉じているので、水は第5水路51から第7水路71へ流れる。切換弁70が第7水路71と第1水路11を接続しているので、水は第7水路71から第1水路11へ流れる。そして、第1水路11の下流端に接続されている噴射ノズル131からタンク130内に噴射される。タンク130内では、第1給水ステップと同様にして、空気溶解加圧水が生成される。生成された空気溶解加圧水は、第2水路21へ流れる。第4水路41の給水弁42が開いており、第3水路31の下流端が切換弁20によって閉じられているので、水は第4水路41へ流れる。そして、減圧ノズル160から浴槽150内へ水が放出される。すなわち、浴槽150内に空気溶解加圧水が放出され、浴槽150内に多量の微細気泡が発生する。
As shown in FIG. 3, in the second water supply step, a tank water supply path that reaches from the bathtub 150 to the tenth water channel 101, the ninth water channel 91, the fifth water channel 51, the seventh water channel 71, the first water channel 11, and the tank 130. (That is, a tank water supply path of claim 1 (a tank water supply path when the bathtub 150 is used as a water supply source)) is formed. Further, a bathtub water supply path (that is, a bathtub water supply path of claim 1) that reaches the bathtub 150 from the tank 130 through the second water channel 21 and the fourth water channel 41 is formed. In the second water supply step, the pump 12 and the pump 72 send the water in the tank water supply passage (the first water passage 11 and the seventh water passage 71) downstream (the pump 12 and the pump 72 serve as the first pump of claim 1). Function). Therefore, the water in the bathtub 150 flows through the tank water supply path and is supplied to the tank 130, and flows from the tank 130 through the bathtub water supply path to the bathtub 150.
That is, the water in the bathtub 150 flows to the tenth water channel 101. Since the upstream end of the eighth water channel 81 is closed by the switching valve 70, water flows from the tenth water channel 101 to the ninth water channel 91. Since the switching valve 20 connects the ninth water channel 91 and the fifth water channel 51, water flows from the ninth water channel 91 to the fifth water channel 51. Since the water injection valve 63 is closed, water flows from the fifth water channel 51 to the seventh water channel 71. Since the switching valve 70 connects the seventh water channel 71 and the first water channel 11, water flows from the seventh water channel 71 to the first water channel 11. And it injects in the tank 130 from the injection nozzle 131 connected to the downstream end of the 1st water channel 11. FIG. In the tank 130, air-dissolved pressurized water is generated in the same manner as in the first water supply step. The generated air-dissolved pressurized water flows to the second water channel 21. Since the water supply valve 42 of the fourth water channel 41 is open and the downstream end of the third water channel 31 is closed by the switching valve 20, water flows to the fourth water channel 41. Then, water is discharged from the decompression nozzle 160 into the bathtub 150. That is, air-dissolved pressurized water is released into the bathtub 150, and a large amount of fine bubbles are generated in the bathtub 150.

タンク130内の水位は、第2給水ステップを実行している間に徐々に上昇する。制御装置170は、タンク130内の水位が、水位電極132bが水面と接触する水位となるまで第2給水ステップを継続する。   The water level in the tank 130 gradually rises while performing the second water supply step. The control device 170 continues the second water supply step until the water level in the tank 130 reaches a water level at which the water level electrode 132b is in contact with the water surface.

以上に説明した第2給水ステップと空気導入ステップを実行する場合、微細気泡発生装置10の各部は以下のように機能する。
第5水路51と第7水路71は、空気導入ステップ実行中にはタンク130から排出する水が流れ、第2給水ステップ実行中にはタンク130に供給する水が流れる水路である。すなわち、第5水路51と第7水路71は、請求項3のタンク給排水路として機能する。
第1水路11は、第2給水ステップ実行中に、タンク給排水路(第7水路71)から供給される水をタンク130に供給する。すなわち、第1水路11は、請求項3のタンク給水路として機能する。
第2水路21と第4水路41は、第2給水ステップ実行中に、タンク130内の水を浴槽150へ供給する。すなわち、第2水路21と第4水路41は、請求項3の浴槽給水路として機能する。
第9水路91と第10水路101は、第2給水ステップ実行中に、水供給源(浴槽150)から供給される水をタンク給排水路(第5水路51)に供給する。すなわち、第9水路91と第10水路101は、請求項3の水源水路として機能する。
第2水路と第3水路31は、空気導入ステップ実行中に、タンク130内の水をタンク給排水路(第5水路51)に供給する。すなわち、第2水路21と第3水路31は、請求項3のタンク排水路として機能する。上述したように、第2水路21は、浴槽給水路としても機能する。第2水路21は、浴槽給水路でもあり、タンク排水路でもある。
第8水路81と第10水路101は、空気導入ステップ実行中に、タンク給排水路(第7水路71)から供給される水を排水先(浴槽150)に排出する。すなわち、第8水路81と第10水路101は、請求項3の排出水路として機能する。上述したように、第10水路101は、水源水路としても機能する。第10水路101は、水源水路でもあり、排出水路でもある。
切換弁20は、タンク排水路(第3水路31)とタンク給排水路(第5水路51)を接続している状態と、水源水路(第9水路91)とタンク給排水路(第5水路51)を接続している状態とを切り換える。すなわち、切換弁20は、請求項3の第1切換弁として機能する。
切換弁70は、タンク給排水路(第7水路71)とタンク給水路(第1水路11)を接続している状態と、タンク給排水路(第7水路71)と排出水路(第8水路81)を接続している状態とを切り換える。すなわち、切換弁70は、請求項3の第2切換弁として機能する。
ポンプ72は、タンク給排水路(第7水路71)内の水を下流側へ送り出す。すなわち、ポンプ72は、請求項3の給排水ポンプとして機能する。
When performing the 2nd water supply step and air introduction step which were demonstrated above, each part of the microbubble generator 10 functions as follows.
The fifth water channel 51 and the seventh water channel 71 are water channels through which water discharged from the tank 130 flows during the air introduction step and water supplied to the tank 130 flows during the second water supply step. That is, the fifth water channel 51 and the seventh water channel 71 function as the tank water supply / drainage channel of claim 3.
The first water channel 11 supplies the water supplied from the tank water supply / drainage channel (seventh water channel 71) to the tank 130 during execution of the second water supply step. That is, the first water channel 11 functions as a tank water channel according to claim 3.
The second water channel 21 and the fourth water channel 41 supply water in the tank 130 to the bathtub 150 during execution of the second water supply step. That is, the 2nd waterway 21 and the 4th waterway 41 function as a bathtub water supply channel of Claim 3.
The ninth water channel 91 and the tenth water channel 101 supply water supplied from the water supply source (tub 150) to the tank water supply / drainage channel (fifth water channel 51) during execution of the second water supply step. That is, the ninth water channel 91 and the tenth water channel 101 function as the water source water channel of claim 3.
The second water channel and the third water channel 31 supply water in the tank 130 to the tank water supply / drainage channel (fifth water channel 51) during execution of the air introduction step. That is, the second water channel 21 and the third water channel 31 function as a tank drainage channel according to claim 3. As described above, the second water channel 21 also functions as a bathtub water channel. The second water channel 21 is also a bathtub water supply channel and a tank drainage channel.
The eighth water channel 81 and the tenth water channel 101 discharge water supplied from the tank water supply / drainage channel (seventh water channel 71) to the drainage destination (tub 150) during the air introduction step. That is, the eighth water channel 81 and the tenth water channel 101 function as the discharge water channel of claim 3. As described above, the tenth water channel 101 also functions as a water source water channel. The tenth water channel 101 is both a water source water channel and a discharge water channel.
The switching valve 20 is connected to the tank drainage channel (the third water channel 31) and the tank water supply / drainage channel (the fifth water channel 51), and the water source water channel (the ninth water channel 91) and the tank water supply / drainage channel (the fifth water channel 51). Switch between connected and. That is, the switching valve 20 functions as the first switching valve of claim 3.
The switching valve 70 is connected to the tank water supply / drainage channel (seventh waterway 71) and the tank water supply channel (first waterway 11), and the tank water supply / drainage channel (seventh waterway 71) and the discharge waterway (eighth waterway 81). Switch between connected and. That is, the switching valve 70 functions as the second switching valve of claim 3.
The pump 72 sends out water in the tank water supply / drainage channel (seventh water channel 71) to the downstream side. That is, the pump 72 functions as a water supply / drainage pump according to claim 3.

ユーザが入力装置で所定の操作を行うと、制御装置170に微細気泡供給運転の実行を指示する制御信号が入力される。制御装置170は、その制御信号の入力を受けると、上述の空気導入ステップ、第1給水ステップ及び第2給水ステップを実行する。制御装置170は、図4のフローチャートに従って各ステップを実行する。   When the user performs a predetermined operation with the input device, a control signal instructing the control device 170 to execute the fine bubble supply operation is input. When receiving the control signal, the control device 170 executes the air introduction step, the first water supply step, and the second water supply step described above. The control device 170 executes each step according to the flowchart of FIG.

図4に示すように、制御装置170は、最初に、空気導入ステップS2と第1給水ステップS4で構成される足し湯運転を実行する。これによって、水道水供給源200からタンク130に水が供給され、タンク130内で空気溶解加圧水が生成される。そして、浴槽150に空気溶解加圧水が供給され、浴槽150内に微細気泡が発生する。   As shown in FIG. 4, first, the control device 170 performs an addition hot water operation constituted by an air introduction step S2 and a first water supply step S4. As a result, water is supplied from the tap water supply source 200 to the tank 130, and air-dissolved pressurized water is generated in the tank 130. Then, the air-dissolved pressurized water is supplied to the bathtub 150, and fine bubbles are generated in the bathtub 150.

足し湯運転が終了すると、制御装置170は、空気導入ステップS6と第2給水ステップS8で構成される循環運転を実行する。これによって、浴槽150からタンク130に水が供給され、タンク130内で空気溶解加圧水が生成される。そして、浴槽150に空気溶解加圧水が供給され、浴槽150内に微細気泡が発生する。   When the additional hot water operation is completed, the control device 170 executes a circulation operation including the air introduction step S6 and the second water supply step S8. As a result, water is supplied from the bathtub 150 to the tank 130, and air-dissolved pressurized water is generated in the tank 130. Then, the air-dissolved pressurized water is supplied to the bathtub 150, and fine bubbles are generated in the bathtub 150.

制御装置170は、循環運転を3回実行すると(ステップS10でYES)、足し湯運転(空気導入ステップS12、第1給水ステップS14)を実行する。   When the controller 170 executes the circulation operation three times (YES in step S10), the controller 170 executes the additional hot water operation (air introduction step S12, first water supply step S14).

ステップS12、S14の足し湯運転は、ステップS2、S4の足し湯運転と同様にして行われる。ステップS12、S14で足し湯運転を実行することで、微細気泡発生装置10の水路内がクリーニングされる。すなわち、循環運転の実行時には、浴槽150から供給される水が微細気泡発生装置10の水路内を流れる。したがって、循環運転の終了後には、微細気泡発生装置10の水路内に異物等が残存していることが多い。循環運転の終了後に足し湯運転を実行し、水道水供給源200から供給される水を水路内に流すことで、微細気泡発生装置10の水路内をクリーニングすることができる。   The additional hot water operation of steps S12 and S14 is performed in the same manner as the additional hot water operation of steps S2 and S4. By executing the hot water operation in steps S12 and S14, the inside of the water channel of the fine bubble generating device 10 is cleaned. That is, when the circulation operation is executed, the water supplied from the bathtub 150 flows in the water channel of the fine bubble generating device 10. Therefore, after the circulation operation is finished, foreign matters or the like often remain in the water channel of the fine bubble generating device 10. By performing the additional hot water operation after the circulation operation is completed and flowing the water supplied from the tap water supply source 200 into the water channel, the inside of the water channel of the fine bubble generating device 10 can be cleaned.

以上に説明したように、実施例の微細気泡発生装置10では、空気導入ステップにおいて、ポンプ72によってタンク130内の水を排出する。したがって、タンク130内の水が高速で排出され、空気導入ステップを短時間で終了させることができる。図4のフローチャートのように、空気導入ステップと給水ステップ(第1給水ステップと第2給水ステップ)の繰り返し運転を実行したときには、浴槽150内に微細気泡が発生しない時間が短くなる。したがって、浴槽150内の水を白濁した状態に維持することができる。
また、タンク130内の水を、水の自重によらず、ポンプ72によって排出するので、タンク130を排水先(例えば、浴槽150)よりも低い位置に設置しても、タンク130内の水を排出することができる。
As described above, in the microbubble generator 10 of the embodiment, the water in the tank 130 is discharged by the pump 72 in the air introduction step. Therefore, the water in the tank 130 is discharged at a high speed, and the air introduction step can be completed in a short time. When the repeated operation of the air introduction step and the water supply step (the first water supply step and the second water supply step) is executed as in the flowchart of FIG. 4, the time during which fine bubbles are not generated in the bathtub 150 is shortened. Therefore, the water in the bathtub 150 can be maintained in a cloudy state.
Moreover, since the water in the tank 130 is discharged by the pump 72 regardless of the weight of the water, even if the tank 130 is installed at a position lower than the drainage destination (for example, the bathtub 150), the water in the tank 130 is discharged. Can be discharged.

また、この微細気泡発生装置10は、既設の熱源機120のポンプをポンプ72として使用する。したがって、微細気泡発生装置10を設置するときに、別個にポンプ72を設置する必要がない。   Further, the fine bubble generating apparatus 10 uses the existing heat source device 120 pump as the pump 72. Therefore, it is not necessary to separately install the pump 72 when the fine bubble generating device 10 is installed.

また、この微細気泡発生装置10は、ポンプ72のほかに、ポンプ12を備えている。したがって、タンク130により高い圧力で水を供給することができる。これによって、タンク130内でより効率的に空気溶解加圧水を生成することが可能となっている。   In addition to the pump 72, the fine bubble generator 10 includes a pump 12. Therefore, water can be supplied to the tank 130 at a high pressure. Thereby, it is possible to generate the air-dissolved pressurized water more efficiently in the tank 130.

なお、ポンプ12は、微細気泡発生機110内における第7水路71(例えば、第7水路71の下流端近傍(切換弁70の近傍))に設置してもよい。このような構成によれば、空気導入ステップにおいて、ポンプ72とともにポンプ12を作動させることで、タンク130内の水をポンプ72とポンプ12の両者によって排出することができる。したがって、より高速でタンク130内の水を排出することが可能となる。
また、既設の熱源機120のポンプ(すなわち、ポンプ72)が、タンク130内で空気溶解加圧水を生成するのに十分なポンプ能力(加圧能力)を有している場合には、ポンプ12を設置しなくてもよい。この場合、給水ステップにおいて、ポンプ72のみによってタンク130に水を送り出す。このような構成によっても、給水ステップと空気導入ステップを好適に実行することができる。また、微細気泡発生装置10の構成を簡略化することができる。
The pump 12 may be installed in the seventh water channel 71 (for example, near the downstream end of the seventh water channel 71 (near the switching valve 70)) in the fine bubble generator 110. According to such a configuration, the water in the tank 130 can be discharged by both the pump 72 and the pump 12 by operating the pump 12 together with the pump 72 in the air introduction step. Therefore, the water in the tank 130 can be discharged at a higher speed.
In addition, when the pump of the existing heat source device 120 (that is, the pump 72) has sufficient pumping capacity (pressurizing capacity) to generate the air-dissolved pressurized water in the tank 130, the pump 12 is turned on. It does not have to be installed. In this case, water is sent out to the tank 130 only by the pump 72 in the water supply step. Even with such a configuration, the water supply step and the air introduction step can be suitably executed. Moreover, the structure of the fine bubble generator 10 can be simplified.

なお、上述した給水ステップ(すなわち、第1給水ステップと第2給水ステップ)では、給水弁42を開いていた。しかしながら、給水ステップの開始直後においては給水弁42を閉じておき、給水ステップを開始してから所定時間経過後に給水弁42を開くようにしてもよい。このように給水弁42を開くタイミングを設定すると、給水ステップの開始後にタンク130内の圧力を急速に上昇させることができる。したがって、給水弁42を開いたときにより多くの空気を溶解している空気溶解加圧水が浴槽150に供給される。すなわち、浴槽150内により多くの微細気泡を発生させることができる。   In the above-described water supply step (that is, the first water supply step and the second water supply step), the water supply valve 42 is opened. However, the water supply valve 42 may be closed immediately after the start of the water supply step, and the water supply valve 42 may be opened after a predetermined time has elapsed since the start of the water supply step. Thus, if the timing which opens the water supply valve 42 is set, the pressure in the tank 130 can be raised rapidly after the start of a water supply step. Accordingly, when the water supply valve 42 is opened, air-dissolved pressurized water that dissolves more air is supplied to the bathtub 150. That is, more fine bubbles can be generated in the bathtub 150.

(参考例)
次に、従来の微細気泡発生装置に比べてより早くタンク内の水を排出することができる微細気泡発生装置を、参考例として説明する。図5は、参考例の微細気泡発生装置300を示している。
微細気泡発生装置300は、タンク330と、空気導入路340と、浴槽150からタンク330に水を供給するタンク給水路350と、タンク330から浴槽150に水を供給する浴槽給水路360を備えている。そして、浴槽給水路360の途中とタンク給水路350の途中(ポンプ312より浴槽150側)とを接続する排水路370を備えている。排水路370には、開閉弁372が介装されている。
(Reference example)
Next, a microbubble generator that can discharge water in a tank earlier than a conventional microbubble generator will be described as a reference example. FIG. 5 shows a microbubble generator 300 of a reference example.
The microbubble generator 300 includes a tank 330, an air introduction path 340, a tank water supply path 350 that supplies water from the bathtub 150 to the tank 330, and a bathtub water supply path 360 that supplies water from the tank 330 to the bathtub 150. Yes. And the drainage path 370 which connects the middle of the bathtub water supply path 360 and the middle of the tank water supply path 350 (the bathtub 150 side from the pump 312) is provided. An open / close valve 372 is interposed in the drainage channel 370.

この微細気泡発生装置300では、給水ステップにおいて、空気弁342を閉じ、開閉弁372を閉じるとともにポンプ312を作動させる。これによって、浴槽150内の水がタンク給水路350を通ってタンク130に供給される。タンク130内では、空気溶解加圧水が生成される。生成された空気溶解加圧水は、浴槽給水路360を通って浴槽150に供給される。
空気導入ステップでは、ポンプ312を停止し、空気弁342を開くとともに開閉弁372を開く。すると、タンク130内の水が自重によって浴槽給水路360へ流出する。減圧ノズル362の通水抵抗が高いので、浴槽給水路360へ流出した水の多くは、矢印390に示すように排水路370とタンク給水路350を通って浴槽150に流入する。これによって、タンク330内の水が排出され、タンク330内に空気が導入される。
In the fine bubble generating apparatus 300, in the water supply step, the air valve 342 is closed, the on-off valve 372 is closed, and the pump 312 is operated. Thereby, the water in the bathtub 150 is supplied to the tank 130 through the tank water supply channel 350. In the tank 130, air-dissolved pressurized water is generated. The generated air-dissolved pressurized water is supplied to the bathtub 150 through the bathtub water supply channel 360.
In the air introduction step, the pump 312 is stopped, the air valve 342 is opened, and the on-off valve 372 is opened. Then, the water in the tank 130 flows out into the bathtub water supply channel 360 by its own weight. Since the water flow resistance of the pressure reducing nozzle 362 is high, most of the water flowing out to the bathtub water supply channel 360 flows into the bathtub 150 through the drainage channel 370 and the tank water supply channel 350 as indicated by an arrow 390. As a result, water in the tank 330 is discharged, and air is introduced into the tank 330.

以上のように、微細気泡発生装置300では、空気導入ステップにおいて、タンク330内の水が排水路370とタンク給水路350を通って浴槽150に流入する。タンク給水路350と浴槽150との接続部には、減圧ノズルが設置されていないので、通水抵抗が低い。したがって、より早くタンク330内の水を排出することができる。   As described above, in the fine bubble generating apparatus 300, the water in the tank 330 flows into the bathtub 150 through the drainage channel 370 and the tank water supply channel 350 in the air introduction step. Since the pressure reducing nozzle is not installed at the connection portion between the tank water supply channel 350 and the bathtub 150, the water flow resistance is low. Therefore, the water in the tank 330 can be discharged earlier.

以上、本発明の具体例を詳細に説明したが、これらは例示にすぎず、特許請求の範囲を限定するものではない。特許請求の範囲に記載の技術には、以上に例示した具体例をさまざまに変形、変更したものが含まれる。
本明細書または図面に説明した技術要素は、単独であるいは各種の組み合わせによって技術的有用性を発揮するものであり、出願時請求項記載の組み合わせに限定されるものではない。また、本明細書または図面に例示した技術は複数目的を同時に達成するものであり、そのうちの一つの目的を達成すること自体で技術的有用性を持つものである。
Specific examples of the present invention have been described in detail above, but these are merely examples and do not limit the scope of the claims. The technology described in the claims includes various modifications and changes of the specific examples illustrated above.
The technical elements described in this specification or the drawings exhibit technical usefulness alone or in various combinations, and are not limited to the combinations described in the claims at the time of filing. In addition, the technology illustrated in the present specification or the drawings achieves a plurality of objects at the same time, and has technical utility by achieving one of the objects.

実施例の微細気泡発生装置10の空気導入ステップの実行中の状態を示す系統図。The system diagram which shows the state in execution of the air introduction | transduction step of the microbubble generator 10 of an Example. 実施例の微細気泡発生装置10の第1給水ステップの実行中の状態を示す系統図。The system diagram which shows the state in execution of the 1st water supply step of the microbubble generator 10 of an Example. 実施例の微細気泡発生装置10の第2給水ステップの実行中の状態を示す系統図。The systematic diagram which shows the state in execution of the 2nd water supply step of the microbubble generator 10 of an Example. 実施例の微細気泡発生装置10が実行する制御のフローチャート。The flowchart of the control which the microbubble generator 10 of an Example performs. 参考例の微細気泡発生装置10の系統図。The systematic diagram of the fine bubble generator 10 of a reference example. 請求項3の微細気泡発生装置の一例を示す系統図。The systematic diagram which shows an example of the microbubble generator of Claim 3.

符号の説明Explanation of symbols

10:微細気泡発生装置
11:第1水路
12:ポンプ
21:第2水路
31:第3水路
41:第4水路
42:給水弁
51:第5水路
61:第6水路
63:注水弁
71:第7水路
72:ポンプ
81:第8水路
91:第9水路
101:第10水路
110:微細気泡発生機
120:熱源機
130:タンク
140:空気導入路
142:空気弁
150:浴槽
160:減圧ノズル
200:水道水供給源
10: Fine bubble generator 11: 1st water channel 12: Pump 21: 2nd water channel 31: 3rd water channel 41: 4th water channel 42: Water supply valve 51: 5th water channel 61: 6th water channel 63: Water injection valve 71: 1st 7 water channel 72: pump 81: 8th water channel 91: 9th water channel 101: 10th water channel 110: fine bubble generator 120: heat source device 130: tank 140: air introduction channel 142: air valve 150: bathtub 160: pressure reducing nozzle 200 : Tap water supply source

Claims (4)

空気を溶解している加圧水を浴槽に供給し、溶解空気から得られる微細気泡を浴槽内で発生させる装置であって、
タンクと、
タンク内に空気を導入する空気導入路と、
空気導入路を開閉する空気弁と、
上流端がタンクに接続されており、下流端が浴槽に接続可能な浴槽給水経路と、
浴槽給水経路と浴槽の接続部に設置される減圧ノズルと、
上流端が水供給源に接続可能であり、下流端がタンクに接続されているタンク給水経路と、
タンク給水経路に介装されており、タンク給水経路内の水を下流側へ送り出す第1ポンプと、
上流端がタンクに接続されており、下流端が排水先に接続可能なタンク排水経路と、
タンク排水経路に介装されており、タンク排水経路内の水を下流側へ送り出す第2ポンプと、
空気弁と、第1ポンプと、第2ポンプを制御する制御装置を備えており、
その制御装置は、
空気弁を開くとともに第2ポンプを作動させることによって、タンク内の水を排水先に排出するとともに空気をタンク内に導入する空気導入ステップと、
空気弁を閉じるとともに第1ポンプを作動させることによって、水をタンク内に供給する給水ステップ、
を実行することを特徴とする微細気泡発生装置。
A device for supplying pressurized water dissolving air to the bathtub and generating fine bubbles obtained from the dissolved air in the bathtub,
A tank,
An air introduction path for introducing air into the tank;
An air valve for opening and closing the air introduction path;
A bathtub water supply path whose upstream end is connected to the tank and whose downstream end is connectable to the bathtub;
A pressure-reducing nozzle installed at the connection between the bathtub water supply path and the bathtub;
A tank water supply path whose upstream end can be connected to a water supply source and whose downstream end is connected to a tank;
A first pump that is interposed in the tank water supply path, and sends water in the tank water supply path to the downstream side;
A tank drainage path whose upstream end is connected to the tank and whose downstream end is connectable to the drainage destination;
A second pump that is interposed in the tank drainage path and sends water in the tank drainage path to the downstream side;
A control device for controlling the air valve, the first pump, and the second pump;
The control device is
An air introduction step for discharging water in the tank to a drainage destination and introducing air into the tank by opening the air valve and operating the second pump;
A water supply step of supplying water into the tank by closing the air valve and operating the first pump;
A microbubble generator characterized by performing the above.
前記第2ポンプは、熱源機に搭載されているポンプにより構成されていることを特徴とする請求項1に記載の微細気泡発生装置。   The said 2nd pump is comprised by the pump mounted in the heat source machine, The microbubble generator of Claim 1 characterized by the above-mentioned. 空気を溶解している加圧水を浴槽に供給し、溶解空気から得られる微細気泡を浴槽内で発生させる装置であって、
タンクと、
タンク内に空気を導入する空気導入路と、
空気導入路を開閉する空気弁と、
上流端がタンクに接続されており、下流端が浴槽に接続可能な浴槽給水路と、
浴槽給水路と浴槽の接続部に設置される減圧ノズルと、
下流端がタンクに接続されているタンク給水路と、
上流端がタンクに接続されているタンク排水路と、
上流端が第1接続部においてタンク排水路の下流端に接続されており、下流端が第2接続部においてタンク給水路の上流端に接続されているタンク給排水路と、
タンク給排水路に介装されており、タンク給排水路内の水を下流側へ送り出す給排水ポンプと、
上流端が水供給源に接続可能であり、下流端が第1接続部に接続されている水源水路と、
第1接続部に介装されており、タンク排水路からタンク給排水路に水が流れる状態と、水源水路からタンク給排水路に水が流れる状態とを切り換える第1切換弁と、
上流端が第2接続部に接続されており、下流端が排水先に接続可能な排出水路と、
第2接続部に介装されており、タンク給排水路からタンク給水路に水が流れる状態と、タンク給排水路から排出水路に水が流れる状態とを切り換える第2切換弁と、
空気弁と、給排水ポンプと、第1切換弁と、第2切換弁を制御する制御装置、
を備えており、
その制御装置は、
空気弁を開き、第1切換弁をタンク排水路からタンク給排水路に水が流れる状態とし、第2切換弁をタンク給排水路から排出水路に水が流れる状態とし、給排水ポンプを作動させることによって、タンク内の水を排水先に排出するとともに空気をタンク内に導入する空気導入ステップと、
空気弁を閉じ、第1切換弁を水源水路からタンク給排水路に水が流れる状態とし、第2切換弁をタンク給排水路からタンク給水路に水が流れる状態とし、給排水ポンプを作動させることによって、水を水供給源からタンク内に供給する給水ステップ、
を実行することを特徴とする微細気泡発生装置。
A device for supplying pressurized water dissolving air to the bathtub and generating fine bubbles obtained from the dissolved air in the bathtub,
A tank,
An air introduction path for introducing air into the tank;
An air valve for opening and closing the air introduction path;
A bathtub water supply channel whose upstream end is connected to the tank and whose downstream end is connectable to the bathtub;
A decompression nozzle installed at the connection between the bathtub waterway and the bathtub;
A tank water supply channel whose downstream end is connected to the tank;
A tank drainage channel whose upstream end is connected to the tank;
A tank supply / drainage channel having an upstream end connected to the downstream end of the tank drainage channel at the first connection portion and a downstream end connected to the upstream end of the tank supply channel at the second connection unit;
A water supply / drainage pump that is interposed in the tank water supply / drainage channel and sends the water in the tank water supply / drainage channel downstream,
A water source water channel whose upstream end is connectable to a water supply source and whose downstream end is connected to the first connection; and
A first switching valve that is interposed in the first connecting portion and switches between a state in which water flows from the tank drainage channel to the tank water supply / drainage channel and a state in which water flows from the water source channel to the tank water supply / drainage channel;
A drainage channel whose upstream end is connected to the second connecting portion and whose downstream end is connectable to a drainage destination;
A second switching valve that is interposed in the second connecting portion and switches between a state in which water flows from the tank water supply / drainage channel to the tank water supply channel and a state in which water flows from the tank water supply / drainage channel to the discharge waterway;
A control device for controlling the air valve, the water supply / drainage pump, the first switching valve, and the second switching valve;
With
The control device is
By opening the air valve, setting the first switching valve in a state where water flows from the tank drainage channel to the tank water supply / drainage channel, setting the second switching valve in a state where water flows from the tank supply / drainage channel to the discharge waterway, and operating the water supply / drainage pump, An air introduction step for discharging water in the tank to a drainage destination and introducing air into the tank;
By closing the air valve, setting the first switching valve in a state where water flows from the water source water channel to the tank water supply / drainage channel, setting the second switching valve in a state where water flows from the tank water supply / drainage channel to the tank water supply channel, and operating the water supply / drainage pump, A water supply step for supplying water from a water supply source into the tank;
A microbubble generator characterized by performing the above.
前記給排水ポンプは、熱源機に搭載されているポンプにより構成されていることを特徴とする請求項3に記載の微細気泡発生装置。   The fine bubble generating device according to claim 3, wherein the water supply / drainage pump is configured by a pump mounted on a heat source device.
JP2007184843A 2007-07-13 2007-07-13 Microbubble generator Active JP5121336B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007184843A JP5121336B2 (en) 2007-07-13 2007-07-13 Microbubble generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007184843A JP5121336B2 (en) 2007-07-13 2007-07-13 Microbubble generator

Publications (2)

Publication Number Publication Date
JP2009018118A true JP2009018118A (en) 2009-01-29
JP5121336B2 JP5121336B2 (en) 2013-01-16

Family

ID=40358262

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007184843A Active JP5121336B2 (en) 2007-07-13 2007-07-13 Microbubble generator

Country Status (1)

Country Link
JP (1) JP5121336B2 (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013017916A (en) * 2011-07-07 2013-01-31 Shibaura Mechatronics Corp Gas-liquid mixed fluid generation device, gas-liquid mixed fluid generation method, treatment device and treatment method
JP2013111503A (en) * 2011-11-25 2013-06-10 Gastar Corp Device with fine bubble generating function
JP2013111501A (en) * 2011-11-25 2013-06-10 Gastar Corp Pressurized container and device with fine bubble generating function including the same
JP2013111502A (en) * 2011-11-25 2013-06-10 Gastar Corp Device with fine bubble generating function
CN107621087A (en) * 2016-07-14 2018-01-23 艾欧史密斯(中国)热水器有限公司 Water-heater system and its control method
CN108314169A (en) * 2017-05-18 2018-07-24 崔真豪 Micro air bubble water generating device control system
JP2021090706A (en) * 2019-12-04 2021-06-17 リンナイ株式会社 Bubble generator and bubble generation method
JP2021094236A (en) * 2019-12-18 2021-06-24 リンナイ株式会社 Bubble generation device and bubble generation method
JP2021159588A (en) * 2020-04-02 2021-10-11 リンナイ株式会社 Bath device
JP2021164581A (en) * 2020-04-07 2021-10-14 リンナイ株式会社 Bath device
JP2021167708A (en) * 2020-04-13 2021-10-21 リンナイ株式会社 Bath device
KR20220079443A (en) 2020-12-03 2022-06-13 린나이가부시기가이샤 Fine bubble generating device
KR20220170728A (en) 2021-06-22 2022-12-30 린나이가부시기가이샤 Fine bubble generating device
KR20230011838A (en) 2021-07-14 2023-01-25 린나이가부시기가이샤 Fine bubble generating device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07190480A (en) * 1993-12-27 1995-07-28 Matsushita Electric Ind Co Ltd Bath apparatus
JP2000279335A (en) * 1999-03-30 2000-10-10 Noritz Corp Bathing system of occasional installation type
JP2001179240A (en) * 1999-12-22 2001-07-03 Noritz Corp Fine air bubble generator
JP2006136862A (en) * 2004-11-15 2006-06-01 Matsushita Electric Works Ltd Apparatus for generating ozone microbubble

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07190480A (en) * 1993-12-27 1995-07-28 Matsushita Electric Ind Co Ltd Bath apparatus
JP2000279335A (en) * 1999-03-30 2000-10-10 Noritz Corp Bathing system of occasional installation type
JP2001179240A (en) * 1999-12-22 2001-07-03 Noritz Corp Fine air bubble generator
JP2006136862A (en) * 2004-11-15 2006-06-01 Matsushita Electric Works Ltd Apparatus for generating ozone microbubble

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013017916A (en) * 2011-07-07 2013-01-31 Shibaura Mechatronics Corp Gas-liquid mixed fluid generation device, gas-liquid mixed fluid generation method, treatment device and treatment method
JP2013111503A (en) * 2011-11-25 2013-06-10 Gastar Corp Device with fine bubble generating function
JP2013111501A (en) * 2011-11-25 2013-06-10 Gastar Corp Pressurized container and device with fine bubble generating function including the same
JP2013111502A (en) * 2011-11-25 2013-06-10 Gastar Corp Device with fine bubble generating function
CN107621087A (en) * 2016-07-14 2018-01-23 艾欧史密斯(中国)热水器有限公司 Water-heater system and its control method
CN108314169A (en) * 2017-05-18 2018-07-24 崔真豪 Micro air bubble water generating device control system
JP2021090706A (en) * 2019-12-04 2021-06-17 リンナイ株式会社 Bubble generator and bubble generation method
JP7333157B2 (en) 2019-12-04 2023-08-24 リンナイ株式会社 BUBBLE GENERATION DEVICE AND BUBBLE GENERATION METHOD
JP7333156B2 (en) 2019-12-18 2023-08-24 リンナイ株式会社 BUBBLE GENERATION DEVICE AND BUBBLE GENERATION METHOD
JP2021094236A (en) * 2019-12-18 2021-06-24 リンナイ株式会社 Bubble generation device and bubble generation method
JP2021159588A (en) * 2020-04-02 2021-10-11 リンナイ株式会社 Bath device
JP7369658B2 (en) 2020-04-02 2023-10-26 リンナイ株式会社 bath equipment
JP2021164581A (en) * 2020-04-07 2021-10-14 リンナイ株式会社 Bath device
JP7411488B2 (en) 2020-04-07 2024-01-11 リンナイ株式会社 bath equipment
JP2021167708A (en) * 2020-04-13 2021-10-21 リンナイ株式会社 Bath device
JP7411490B2 (en) 2020-04-13 2024-01-11 リンナイ株式会社 bath equipment
KR20220079443A (en) 2020-12-03 2022-06-13 린나이가부시기가이샤 Fine bubble generating device
KR20220170728A (en) 2021-06-22 2022-12-30 린나이가부시기가이샤 Fine bubble generating device
KR20230011838A (en) 2021-07-14 2023-01-25 린나이가부시기가이샤 Fine bubble generating device

Also Published As

Publication number Publication date
JP5121336B2 (en) 2013-01-16

Similar Documents

Publication Publication Date Title
JP5121336B2 (en) Microbubble generator
JP5121331B2 (en) Microbubble generator
JP5080139B2 (en) Water supply system
JP5022772B2 (en) Fine bubble generator and fine bubble generation method
JP5569778B2 (en) Sanitary washing device
JP5121323B2 (en) Microbubble generator
WO2010092911A1 (en) Hygiene cleaning device
JP7265891B2 (en) Fine bubble generator
JP2013212262A (en) Bath system
CN217527059U (en) Micro-nano bubble liquid generation system and water heater
WO2017217157A1 (en) Gas dissolving apparatus
JP6210435B2 (en) Sanitary washing device
JP7369658B2 (en) bath equipment
JP7245731B2 (en) bath system
JP7411488B2 (en) bath equipment
JP4984267B2 (en) Sanitary washing device
JP2022034792A (en) Microbubble generation device
JP2023012783A (en) Fine bubble generation device
KR20220170728A (en) Fine bubble generating device
JP2022144710A (en) Circulation adaptor and hot water supply device
JP4069680B2 (en) Local cleaning equipment
JP5517856B2 (en) Method for controlling local cleaning apparatus and local cleaning apparatus
JP2000120139A (en) Private part cleaning device
JP2000129759A (en) Private part washing device
JPH0595983A (en) Apparatus for bubble bath

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100316

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120131

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120329

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121002

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121023

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151102

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5121336

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250