JP2008503609A5 - - Google Patents

Download PDF

Info

Publication number
JP2008503609A5
JP2008503609A5 JP2007516592A JP2007516592A JP2008503609A5 JP 2008503609 A5 JP2008503609 A5 JP 2008503609A5 JP 2007516592 A JP2007516592 A JP 2007516592A JP 2007516592 A JP2007516592 A JP 2007516592A JP 2008503609 A5 JP2008503609 A5 JP 2008503609A5
Authority
JP
Japan
Prior art keywords
processing unit
unit module
liquefaction plant
processing
lng liquefaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007516592A
Other languages
Japanese (ja)
Other versions
JP2008503609A (en
Filing date
Publication date
Application filed filed Critical
Priority claimed from PCT/US2005/020674 external-priority patent/WO2006009646A2/en
Publication of JP2008503609A publication Critical patent/JP2008503609A/en
Publication of JP2008503609A5 publication Critical patent/JP2008503609A5/ja
Pending legal-status Critical Current

Links

Claims (77)

LNG液化プラントを用いて液化天然ガスを製造する方法であって、該LNG液化プラントが、複数の処理ユニットモジュール型を含み、該複数の処理ユニットモジュール型が、少なくとも、1またはそれ以上の第一処理ユニットモジュールを含む第一の処理ユニットモジュール型、および2またはそれ以上の、一体化された第二処理ユニットモジュールを含む第二の処理ユニットモジュール型を含み、更に少なくとも一つの該第一処理ユニットモジュールおよび少なくとも一つの該第二処理ユニットモジュールが、夫々の実質的に最大の処理効率をとるようなサイズで作られており、該LNG液化プラントが、2またはそれ以上の、一体化された処理ユニットモジュール型を含み、該方法が、該LNG液化プラントから、液化された天然ガスを製造する工程を含むことを特徴とする、上記液化天然ガスの製造方法。   A method for producing liquefied natural gas using an LNG liquefaction plant, the LNG liquefaction plant comprising a plurality of processing unit module types, wherein the plurality of processing unit module types is at least one or more first. A first processing unit module type including a processing unit module; and a second processing unit module type including two or more integrated second processing unit modules; and at least one first processing unit The module and at least one of the second processing unit modules are each sized to obtain substantially maximum processing efficiency, and the LNG liquefaction plant comprises two or more integrated processes A unit module type, wherein the method includes the step of producing liquefied natural gas from the LNG liquefaction plant. Wherein the manufacturing method of the liquefied natural gas. LNG液化プラントの設計方法であって、
A) 該LNG液化プラント内に含まれる、複数の処理ユニットモジュール型を識別する工程、ここで該複数の処理ユニットモジュール型は、少なくとも第一の処理ユニットモジュール型と、第二の処理ユニットモジュール型とを含み;
B) 該第一の処理ユニットモジュール型の第一処理ユニットモジュールに関する第一の最大処理効率および該第二の処理ユニットモジュール型の第二処理ユニットモジュールに関する第二の最大処理効率を決定する工程;および
C) 該LNG液化プラントを設計する工程を含み、該LNG液化プラントの設計が、該第一の最大処理効率を実質的に満足するサイズを持つ、1またはそれ以上の第一の処理ユニットモジュール、および該第二の最大処理効率を実質的に満足するサイズを持つ、1またはそれ以上の第二の処理ユニットモジュールを含むことを特徴とする、上記方法。
LNG liquefaction plant design method,
A) Identifying a plurality of processing unit module types included in the LNG liquefaction plant, wherein the plurality of processing unit module types are at least a first processing unit module type and a second processing unit module type Including:
B) determining a first maximum processing efficiency for the first processing unit module of the first processing unit module type and a second maximum processing efficiency for the second processing unit module of the second processing unit module type; and
C) one or more first processing unit modules comprising a step of designing the LNG liquefaction plant, the LNG liquefaction plant design having a size that substantially satisfies the first maximum processing efficiency; And one or more second processing unit modules having a size that substantially satisfies the second maximum processing efficiency.
既存のプラント最大供給材料処理能力を持つ、LNG液化プラントの拡張された処理能力の設計方法であって、
A) 該LNG液化プラントの既存の構成を準備する工程、ここで該LNG液化プラントは、複数の処理ユニットモジュール型を含み;
B) 付随的な最大供給材料処理能力を必要とする、第一の処理ユニットモジュール型を決定して、該既存のプラント最大供給材料処理能力を高める工程;
C) 該第一の処理ユニットモジュール型の、第一の処理ユニットモジュールの最大処理効率を決定する工程;および
D) 拡張されたLNG液化プラントを設計する工程を含み、該設計が、該最大処理効率を実質的に満足するサイズを持つ、1またはそれ以上の第一の処理ユニットモジュールの付加を含むことを特徴とする、上記方法。
A method for designing an expanded LNG liquefaction plant capacity that has the maximum feed capacity of existing plants,
A) preparing an existing configuration of the LNG liquefaction plant, wherein the LNG liquefaction plant includes a plurality of processing unit module types;
B) determining the first processing unit module type that requires ancillary maximum feed throughput and increasing the existing plant maximum feed throughput;
C) determining the maximum processing efficiency of the first processing unit module of the first processing unit module type; and
D) designing an expanded LNG liquefaction plant, the design comprising adding one or more first processing unit modules having a size that substantially satisfies the maximum processing efficiency. A method as described above, characterized.
複数の処理ユニットモジュール型を含み、該複数の処理ユニットモジュール型が、1またはそれ以上の第一の処理ユニットモジュールで構成される第一の処理ユニットモジュール型および2またはそれ以上の一体化された第二の処理ユニットモジュールで構成される第二の処理ユニットモジュール型を少なくとも含み、ここで少なくとも一つの該第一の処理ユニットモジュールおよび少なくとも一つの該第二の処理ユニットモジュールが、各々の実質的に最大の処理能力をとるようなサイズで形成されている、LNG液化プラントを稼動させる方法であって、該方法が、
A) 第一のプラント供給材料処理速度を測定する工程、
B) 該第一のプラント供給材料処理速度を満たすのに必要な、各処理ユニットモジュール型の処理ユニットモジュール数を決定する工程、
C) 少なくとも該工程B)において決定された数の、該第一プラント供給材料処理速度を満たすのに必要な、各処理ユニットモジュール型の各処理ユニットモジュールを稼動状態に就かせる工程、および
D) LNGを生産する工程、を含むことを特徴とする、上記方法。
A plurality of processing unit module types, wherein the plurality of processing unit module types are composed of one or more first processing unit modules and a first processing unit module type and two or more integrated At least a second processing unit module type comprising a second processing unit module, wherein at least one first processing unit module and at least one second processing unit module are each substantially Is a method of operating an LNG liquefaction plant, which is formed in a size that takes the maximum processing capacity,
A) measuring the first plant feed rate,
B) determining the number of processing unit modules of each processing unit module type required to satisfy the first plant feedstock processing rate;
C) putting each processing unit module of each processing unit module type into operation, as required to meet at least the number of steps B) determined in the first plant feedstock processing rate; and
D) A process as described above, comprising the step of producing LNG.
LNG液化プラントを用いてLNGを製造する方法であって、該LNG液化プラントが、複数の処理ユニットモジュール型で構成され、該複数の処理ユニットモジュール型各々が、1またはそれ以上の処理ユニットモジュールで構成されており、該方法が、
A) 該複数の処理ユニットモジュール型に含まれる、各処理ユニットモジュール型に対して、少なくとも一つの原処理ユニットモジュールを設ける工程、ここで1またはそれ以上の該原処理ユニットモジュールは、夫々の実質的に最大の処理効率をとるようなサイズで形成され、結果的に第一段階のLNG液化プラントを与え、
B) 該第一段階のLNG液化プラントに含まれる、1またはそれ以上の処理ユニットモジュール型に対して、1またはそれ以上の追加の処理ユニットモジュールを設ける工程、ここで該追加の処理ユニットモジュールは、該処理ユニットモジュール型内で、該原処理ユニットモジュールと一体化され、結果として第二段階のLNG液化プラントを与え、および
C) 該第二段階のLNG液化プラントから、LNGを製造する工程、を含むことを特徴とする、上記方法。
A method for producing LNG using an LNG liquefaction plant, wherein the LNG liquefaction plant is constituted by a plurality of processing unit module types, each of the plurality of processing unit module types being one or more processing unit modules. The method comprising:
A) providing at least one original processing unit module for each processing unit module type included in the plurality of processing unit module types, wherein one or more original processing unit modules are each substantive Is formed to a size that maximizes the processing efficiency, resulting in a first-stage LNG liquefaction plant,
B) providing one or more additional processing unit modules for one or more processing unit module types included in the first stage LNG liquefaction plant, wherein the additional processing unit modules are Integrated with the raw processing unit module within the processing unit module mold, resulting in a second stage LNG liquefaction plant, and
C) producing the LNG from the second stage LNG liquefaction plant.
液化天然ガスの製造方法であって、
A) 複数の製品サイズを持つ、処理ユニットモジュール型を含むLNG液化プラントを準備する工程、ここで該LNG液化プラントは、第一のプラント最大供給材料処理能力を有し;
B) 該製品サイズを持つ、処理ユニットモジュール型の少なくとも一つであるが、その全てよりも少ないものの、該最大供給材料処理能力を拡張して、該第一のプラント最大供給材料処理能力の10%以上である、第二のプラント最大供給材料処理能力を達成する工程、ここで該拡張は、少なくとも1つの追加の処理ユニットモジュールを追加することを含み;および
C) 該拡張段階(B)を開始した後に、該LNG液化プラント内でLNGを製造する工程、を含むことを特徴とする、上記方法。
A method for producing liquefied natural gas, comprising:
A) preparing an LNG liquefaction plant having a plurality of product sizes and including a processing unit module type, wherein the LNG liquefaction plant has a first plant maximum feed capacity;
B) At least one of the processing unit module types having the product size, but less than all of them, expands the maximum feedstock processing capacity to 10% of the first plant maximum feedstock processing capacity. Achieving a second plant maximum feedstock throughput that is greater than or equal to% , wherein the expansion includes adding at least one additional processing unit module ; and
C) producing the LNG in the LNG liquefaction plant after starting the expansion step (B).
LNG液化プラントを使用する液化天然ガスの製造方法であって、該LNG液化プラントが、複数の処理ユニットモジュール型で構成され、該複数の処理ユニットモジュール型各々が、1またはそれ以上の処理ユニットモジュールで構成されており、該方法が、
A) 該複数の処理ユニットモジュール型に含まれる、各処理ユニットモジュール型に対して、少なくとも一つの原処理ユニットモジュールを設け、結果的に第一段階のLNG液化プラントを与える工程;
B) 該第一段階のLNG液化プラントから第一のLNGを製造する工程;
C) 該第一段階のLNG液化プラントに含まれる、1またはそれ以上の処理ユニットモジュール型に対して、1またはそれ以上の追加の処理ユニットモジュールを構築し、一方で該製造段階(B)の少なくとも1部を完成させる工程;
D) 該1またはそれ以上の追加の処理ユニットモジュールを作動状態に置く工程、ここで該追加の処理ユニットモジュールは、該処理ユニットモジュール型内で、該原処理ユニットモジュールと一体化され、結果として第二段階のLNG液化プラントを与え;および
E) 該第二段階のLNG液化プラントから第二のLNGを製造する工程を含むことを特徴とする、上記方法。
A method for producing liquefied natural gas using an LNG liquefaction plant, wherein the LNG liquefaction plant is composed of a plurality of processing unit module types, each of the plurality of processing unit module types being one or more processing unit modules And the method comprises:
A) providing at least one raw processing unit module for each processing unit module type included in the plurality of processing unit module types, resulting in a first stage LNG liquefaction plant;
B) producing a first LNG from the first stage LNG liquefaction plant;
C) Build one or more additional processing unit modules for one or more processing unit module types included in the first stage LNG liquefaction plant, while the manufacturing stage (B) Completing at least one part;
D) placing the one or more additional processing unit modules in operation, wherein the additional processing unit modules are integrated with the original processing unit module within the processing unit module mold, resulting in Giving a second stage LNG liquefaction plant; and
E) The above method, comprising the step of producing a second LNG from the second stage LNG liquefaction plant.
液化天然ガスの製造方法であって、以下の諸工程:
A) 複数の処理ユニットモジュール型を含むLNG液化プラントを準備する工程、ここで該LNG液化プラントは、少なくとも一つの第一の冷媒回路を持ち、該第一の冷媒回路は、少なくとも一つの第一の冷媒圧縮機サービス型を含み、該第一の冷媒圧縮機サービス型は、並列状態にある、1またはそれ以上の第一の原冷媒圧縮機で構成され、該LNG液化プラントは、プラント最大供給材料処理能力を持ち;
B) 少なくとも一つの追加の第一冷媒圧縮機を、該第一の冷媒圧縮機サービス型に付加することによって、該LNG液化プラントの該プラント最大供給材料処理能力を拡張させる工程、ここで該追加の第一冷媒圧縮機は、該第一の冷媒圧縮機サービス型内で、1またはそれ以上の該原第一冷媒圧縮機と一体化されており;および
C) 該拡張工程(B)の開始後に、該LNG液化プラント内でLNGを製造する工程;を含むことを特徴とする、上記方法。
A method for producing liquefied natural gas comprising the following steps:
A) preparing an LNG liquefaction plant including a plurality of processing unit module types, wherein the LNG liquefaction plant has at least one first refrigerant circuit, and the first refrigerant circuit is at least one first refrigerant circuit. The first refrigerant compressor service type is composed of one or more first raw refrigerant compressors in parallel, and the LNG liquefaction plant has a maximum plant supply. Has material processing capability;
B) Expanding the plant maximum feed capacity of the LNG liquefaction plant by adding at least one additional first refrigerant compressor to the first refrigerant compressor service type, wherein the additional The first refrigerant compressor is integrated with one or more of the original first refrigerant compressors in the first refrigerant compressor service type; and
C) producing the LNG in the LNG liquefaction plant after the start of the expansion step (B).
LNG液化プラントを用いた液化天然ガスの製造方法であって、該LNG液化プラントが、複数の処理ユニットモジュール型を含み、該複数の処理ユニットモジュール型各々が、1またはそれ以上の処理ユニットモジュールを含み、該方法が以下の諸工程:
A) 該複数の処理ユニットモジュール型に含まれる、各処理ユニットモジュール型に対して、少なくとも一つの原処理ユニットモジュールを設けて、第一段階のLNG液化プラントを与える工程;
B) 該複数の処理ユニットモジュール型に含まれる、各処理ユニットモジュール型に対して、少なくとも一つの第二の処理ユニットモジュールを設けて、第二段階のLNG液化プラントを与える工程;
C) 2またはそれ以上の各処理ユニットモジュール型に対して、1またはそれ以上の該原処理ユニットモジュールと、1またはそれ以上の該第二の処理ユニットモジュールとを一体化する工程;および
D) 該一体化工程(C)を開始した後に、該LNG液化プラントからLNGを製造する工程;を含むことを特徴とする、上記方法。
A method for producing liquefied natural gas using an LNG liquefaction plant, wherein the LNG liquefaction plant includes a plurality of processing unit module types, and each of the plurality of processing unit module types includes one or more processing unit modules. Including the following steps:
A) providing at least one raw processing unit module for each processing unit module type included in the plurality of processing unit module types to provide a first stage LNG liquefaction plant;
B) Providing a second stage LNG liquefaction plant by providing at least one second processing unit module for each processing unit module type included in the plurality of processing unit module types;
C) integrating two or more of each processing unit module type with one or more of the original processing unit modules and one or more of the second processing unit modules; and
And D) producing the LNG from the LNG liquefaction plant after the integration step (C) is started.
該実質的に最大の処理効率が、実際の最大処理効率の25%以内である、請求項1〜9のいずれか1項記載の方法。 The method according to any one of claims 1 to 9 , wherein the substantially maximum processing efficiency is within 25% of an actual maximum processing efficiency. 該実質的に最大の処理効率が、実際の最大処理効率の10%以内である、請求項10記載の方法。 11. The method of claim 10 , wherein the substantially maximum processing efficiency is within 10% of the actual maximum processing efficiency. 該最大の処理効率が、処理ユニットモジュール能力の単位当たりの、全処理ユニットモジュールのライフサイクルコストを最小にする、各処理ユニットモジュール型に関する、該処理ユニットモジュールの能力サイズである、請求項11記載の方法。 Outermost sized processing efficiency, per unit of the processing unit module capacity, to minimize the life cycle cost of the total process unit module, for each processing unit module type is the ability size of the processing unit module, according to claim 11, wherein the method of. 該LNG液化プラントが、更に1またはそれ以上の、第三処理ユニットモジュールで構成される第三の処理ユニットモジュール型をも含む、請求項11記載の方法。 12. The method of claim 11 , wherein the LNG liquefaction plant further comprises a third processing unit module type comprised of one or more third processing unit modules. 該第二処理ユニットモジュール型の最大供給材料処理能力が、少なくとも該第一処理ユニットモジュール型の最大供給材料処理能力と等しい、請求項11記載の方法。 12. The method of claim 11 , wherein the maximum feed capacity of the second processing unit module type is at least equal to the maximum feed capacity of the first processing unit module type. 該第一および第二処理ユニットモジュール型が、最大供給材料処理能力の単位当たりの、第一および第二構築コストを持ち、該最大供給材料処理能力の単位当たりの、該第一の構築コストが、該最大供給材料処理能力の単位当たりの、該第二の構築コストを越える、請求項14記載の方法。 The first and second processing unit module types have first and second construction costs per unit of maximum feedstock throughput, and the first construction cost per unit of maximum feedstock throughput is 15. The method of claim 14 , wherein the second construction cost per unit of the maximum feedstock throughput is exceeded. 該LNG液化プラントが、並列状態にあり、複数の、実質上等しいサイズの、処理ユニットモジュールを有する、該処理ユニットモジュール型を少なくとも一つ含む、請求項13記載の方法。 14. The method of claim 13 , wherein the LNG liquefaction plant comprises at least one of the processing unit module types in parallel and having a plurality of substantially equal sized processing unit modules. 該LNG液化プラントが、並列状態にあり、複数の、実質上等しい形状で形成された、処理ユニットモジュールを有する、該処理ユニットモジュール型を少なくとも一つ含む、請求項16記載の方法。 17. The method of claim 16 , wherein the LNG liquefaction plant includes at least one of the processing unit module types having a processing unit module in parallel and formed in a plurality of substantially equal shapes. 該第三の処理ユニットモジュール型が、実質的に最大の処理効率をとるようなサイズで作られた、第三処理ユニットモジュールを含む、請求項13記載の方法。 14. The method of claim 13 , wherein the third processing unit module type comprises a third processing unit module that is sized to provide substantially maximum processing efficiency. 該第一の処理ユニットモジュールが、第一の型の装置で構成され、該第二の処理ユニットモジュールが、第二の処理装置型で構成され、かつ該第三の処理ユニットモジュールが、第三の処理装置型で構成されている、請求項13記載の方法。 The first processing unit module is composed of a first type of apparatus, the second processing unit module is composed of a second processing apparatus type, and the third processing unit module is a third type. 14. The method according to claim 13 , wherein the method comprises: 該各装置型の少なくとも幾つかが、実質上等しい形状で形成されている、請求項19記載の方法。 20. The method of claim 19 , wherein at least some of the device types are formed with substantially equal shapes. 該各装置型の少なくとも幾つかが、実質上等しいサイズで形成されている、請求項20記載の方法。 21. The method of claim 20 , wherein at least some of the device types are formed with substantially equal sizes. 該第一の処理ユニットモジュール型の該最大供給材料処理能力が、該第二の処理ユニットモジュール型の能力とは、10%を越えて異なっている、請求項13記載の方法。 14. The method of claim 13 , wherein the maximum feed capacity of the first processing unit module type differs from the capacity of the second processing unit module type by more than 10%. 該第二処理ユニットモジュール型が、該第一処理ユニットモジュール型の該最大供給材料処理能力の、85%未満の最大供給材料処理能力を持つ、請求項22記載の方法。 23. The method of claim 22 , wherein the second processing unit module type has a maximum feed capacity that is less than 85% of the maximum feed capacity of the first processing unit module type. 該第一の処理ユニットモジュール型が、該第二処理ユニットモジュール型の該最大供給材料処理能力の、85%未満の最大供給材料処理能力を持つ、請求項22記載の方法。 23. The method of claim 22 , wherein the first processing unit module type has a maximum feed capacity that is less than 85% of the maximum feed capacity of the second processing unit module type. 該処理ユニットモジュール型の少なくとも2つが、該第一処理ユニットモジュール型の該最大供給材料処理能力の、85%未満の最大供給材料処理能力を持つ、請求項22記載の方法。 24. The method of claim 22 , wherein at least two of the processing unit module types have a maximum feed capacity that is less than 85% of the maximum feed capacity of the first processing unit module type. 該処理ユニットモジュール型の少なくとも2つが、該第二処理ユニットモジュール型の該最大供給材料処理能力の、85%未満の最大供給材料処理能力を持つ、請求項22記載の方法。 23. The method of claim 22 , wherein at least two of the processing unit module types have a maximum feed capacity that is less than 85% of the maximum feed capacity of the second processing unit module type. 該LNG液化プラントが、液化ユニットを含み、該液化ユニットが、1またはそれ以上の極低温熱交換器、および複数の同様な役割を持つ冷媒圧縮機で構成される、請求項13記載の方法。 14. The method of claim 13 , wherein the LNG liquefaction plant comprises a liquefaction unit, the liquefaction unit being composed of one or more cryogenic heat exchangers and a plurality of similar function refrigerant compressors. 該複数の圧縮機の少なくとも2つが、並列に配置されている、請求項27記載の方法。 28. The method of claim 27 , wherein at least two of the plurality of compressors are arranged in parallel. 該液化ユニットが、複数の同様な役割を持つ極低温熱交換器を含み、該極低温熱交換器が、並列に配置されている、請求項28記載の方法。 29. The method of claim 28 , wherein the liquefaction unit comprises a plurality of cryogenic heat exchangers having a similar role, the cryogenic heat exchangers being arranged in parallel. 該複数の圧縮機各々が、2またはそれ以上の極低温熱交換器と流体接続関係にある、請求項29記載の方法。 30. The method of claim 29 , wherein each of the plurality of compressors is in fluid communication with two or more cryogenic heat exchangers. 該液化ユニットが、該複数の圧縮機各々を、該極低温熱交換器の何れかと流体接続関係で配置できるような形状に、形成されている、請求項30記載の方法。 32. The method of claim 30 , wherein the liquefaction unit is formed in a shape such that each of the plurality of compressors can be placed in fluid connection with any of the cryogenic heat exchangers. 該複数の極低温熱交換器が、1またはそれ以上のモジュール熱交換器を含む、請求項31記載の方法。 32. The method of claim 31 , wherein the plurality of cryogenic heat exchangers includes one or more modular heat exchangers. 該複数の極低温熱交換器が、1またはそれ以上のプレート-フィン熱交換器を含む、請求項32記載の方法。 35. The method of claim 32 , wherein the plurality of cryogenic heat exchangers include one or more plate-fin heat exchangers. 該複数の極低温熱交換器が、1またはそれ以上のスパイラル型熱交換器を含む、請求項32記載の方法。 35. The method of claim 32 , wherein the plurality of cryogenic heat exchangers include one or more spiral heat exchangers. 該LNG液化プラントが、プラント最大供給材料処理能力およびプラント最小供給材料処理能力を有し、該プラント最小供給材料処理能力が、該プラント最大供給材料処理能力の75%以下である、請求項13記載の方法。 The LNG liquefaction plant has a maximum feed processing capacity and a plant minimum feed processing capacity plant, said plant minimum feed processing capacity is 75% or less of said plant maximum feed processing capacity, according to claim 13, wherein the method of. 該プラント最小供給材料処理能力が、該プラント最大供給材料処理能力の55%以下である、請求項35記載の方法。 36. The method of claim 35 , wherein the plant minimum feed capacity is 55% or less of the plant maximum feed capacity. 該処理ユニットモジュール型の少なくとも一つが、速度可変圧縮機、速度可変エキスパンダ、またはこれらの組合せを含む、請求項13記載の方法。 14. The method of claim 13 , wherein at least one of the processing unit module types comprises a variable speed compressor, a variable speed expander, or a combination thereof. 該プラント最大供給材料処理能力が、1年当たり4百万トンを越える、請求項6記載の方法。 The method of claim 6 , wherein the plant maximum feedstock throughput exceeds 4 million tonnes per year. 該LNG液化プラントが、3またはそれ以上の、一体化された処理ユニットモジュール型を含む、請求項1〜9のいずれか1項記載の方法。 The method according to any one of claims 1 to 9, wherein the LNG liquefaction plant comprises three or more integrated processing unit module types. 該LNG液化プラント設計が、2またはそれ以上の、一体化された処理ユニットモジュール型を含む、請求項2〜9のいずれか1項記載の方法。 The method of any one of claims 2-9, wherein the LNG liquefaction plant design comprises two or more integrated processing unit module types. 更に、E) 第二のプラント供給材料処理速度を決定する工程;
F) 該第二のプラント供給材料処理速度を満たすのに必要とされる、各処理ユニットモジュール型の、処理ユニットモジュールの数を決定する工程;および
G) 少なくとも該工程(F)において決定された数の、該第二プラント供給材料処理速度を満たすのに必要な、各処理ユニットモジュール型の各処理ユニットモジュールを、稼動状態に就かせる工程、を更に含む、請求項4記載の方法。
And E) determining a second plant feedstock processing rate;
F) determining the number of processing unit modules of each processing unit module type required to meet the second plant feedstock processing rate; and
G) placing each processing unit module of each processing unit module type, which is required to satisfy at least the number of the second plant feed material processing rates determined in step (F), into operation; The method of claim 4 , further comprising:
該製品サイズを持つ、処理ユニットモジュール型が、酸性ガス除去接触器ユニット、脱水ユニット、脱エタン化ユニット、極低温熱交換器ユニット、冷媒圧縮機ユニット、窒素排除ユニット、液化ユニット、ヘリウム回収ユニット、およびこれらの組合せから選択される、請求項6記載の方法。 The processing unit module type having the product size is an acid gas removal contactor unit, a dehydration unit, a deethanization unit, a cryogenic heat exchanger unit, a refrigerant compressor unit, a nitrogen exclusion unit, a liquefaction unit, a helium recovery unit, 7. The method of claim 6 , wherein the method is selected from and combinations thereof. 該製品サイズを持つ、処理ユニットモジュール型が、1またはそれ以上の第一処理ユニットモジュールで構成される、少なくとも一つの第一の処理ユニットモジュール型、および2またはそれ以上の一体化された第二処理ユニットモジュールで構成される、第二の処理ユニットモジュール型を含み、ここで少なくとも一つの該第一の処理ユニットモジュールおよび少なくとも一つの該第二の処理ユニットモジュールが、その各々の実質的に最大の処理効率をとるようなサイズで作られている、請求項42記載の方法。 At least one first processing unit module type, and two or more integrated second units, wherein the processing unit module type having the product size is composed of one or more first processing unit modules. A second processing unit module type comprised of processing unit modules, wherein at least one of the first processing unit modules and at least one of the second processing unit modules are each substantially maximum 43. The method of claim 42 , wherein the method is sized to achieve a processing efficiency of: 該作動工程Dを稼動させ、かつ該工程Bで第一のLNGを製造する、請求項7記載の方法。 The method according to claim 7 , wherein the operation step D is operated, and the first LNG is produced in the step B. 該作動工程Dを、少なくとも部分的に稼動させ、かつ該工程Bで第一のLNGを製造する、請求項7記載の方法。 The method according to claim 7 , wherein the operation step D is at least partially operated, and the first LNG is produced in the step B. 該作動工程Dを、少なくとも部分的に稼動させ、かつ該工程Bで第一のLNGを製造しない、請求項7記載の方法。 8. The method of claim 7 , wherein the actuating step D is at least partially in operation and the step B does not produce a first LNG. 該作動工程Dを、少なくとも部分的に稼動させ、かつ10日未満の間、該工程Bで第一のLNGを製造しない、請求項46記載の方法。 48. The method of claim 46 , wherein the operating step D is at least partially in operation and the first LNG is not produced in the step B for less than 10 days. 該追加の処理ユニットモジュールの少なくとも一つが、各実質的に最大の処理効率をとるようなサイズで作られている、請求項7記載の方法。 8. The method of claim 7 , wherein at least one of the additional processing unit modules is sized to provide each substantially maximum processing efficiency. 該原および追加の処理ユニットモジュールが、実質的に等しい形状にて形成されている、請求項48記載の方法。 49. The method of claim 48 , wherein the original and additional processing unit modules are formed in substantially equal shapes. 該原処理ユニットモジュールが、原装置型で構成され、かつ該追加の処理ユニットモジュールが、追加の処理装置型で構成されている、請求項49記載の方法。 50. The method of claim 49 , wherein the raw processing unit module is configured with a raw device type and the additional processing unit module is configured with an additional processing device type. 少なくとも一つの該第一の原冷媒圧縮機および少なくとも一つの該追加の第一冷媒圧縮機が、実質的に等しい大きさのものである、請求項8記載の方法。 9. The method of claim 8 , wherein the at least one first raw refrigerant compressor and the at least one additional first refrigerant compressor are of substantially equal size. 少なくとも一つの該第一の原冷媒圧縮機および少なくとも一つの該追加の第一冷媒圧縮機が、実質的に等しく、機械的に形成されたものである、請求項51記載の方法。 52. The method of claim 51 , wherein the at least one first raw refrigerant compressor and the at least one additional first refrigerant compressor are substantially equal and mechanically formed. 該第一の原冷媒圧縮機が、複数の第一の冷媒圧縮機で構成されており、該複数の第一の原冷媒圧縮機が、最大総合処理能力を持つ、請求項52記載の方法。 53. The method of claim 52 , wherein the first raw refrigerant compressor comprises a plurality of first refrigerant compressors, and the plurality of first raw refrigerant compressors has a maximum overall throughput. 該最大総合処理能力が、最大の市販品として入手できる圧縮機の、処理能力未満である、請求項53記載の方法。 54. The method of claim 53 , wherein the maximum overall throughput is less than that of the largest commercially available compressor. 該複数の第一の原冷媒圧縮機各々が、最大の市販品として入手できる圧縮機の、処理能力未満の処理能力を持つ、請求項53記載の方法。 54. The method of claim 53 , wherein each of the plurality of first raw refrigerant compressors has a processing capacity less than that of the largest commercially available compressor. 該第一の原冷媒圧縮機が、電気駆動式圧縮機を含む、請求項53記載の方法。 54. The method of claim 53 , wherein the first raw refrigerant compressor comprises an electrically driven compressor. 該第一の原冷媒圧縮機がガスタービン駆動式圧縮機を含む、請求項52記載の方法。 53. The method of claim 52 , wherein the first raw refrigerant compressor comprises a gas turbine driven compressor. 該第一冷媒回路が、更に1またはそれ以上のプレート-フィン熱交換器をも含み、該プレート-フィン熱交換器が、該第一冷媒圧縮機によって圧縮された冷媒との熱交換を通して、天然ガス流を冷却するのに適している、請求項52記載の方法。 The first refrigerant circuit further includes one or more plate-fin heat exchangers, wherein the plate-fin heat exchangers pass through natural heat exchange with the refrigerant compressed by the first refrigerant compressor. 53. The method of claim 52 , wherein the method is suitable for cooling a gas stream. 該1またはそれ以上のプレート-フィン熱交換器が、冷却ボックス中に配列された、複数のプレート-フィン熱交換器を含む、請求項58記載の方法。 59. The method of claim 58 , wherein the one or more plate-fin heat exchangers comprise a plurality of plate-fin heat exchangers arranged in a cooling box. 該第一冷媒回路が、更に1またはそれ以上のスパイラル型熱交換器をも含み、該スパイラル型熱交換器が、該第一冷媒圧縮機によって圧縮された冷媒との熱交換を通して、天然ガス流を冷却するのに適している、請求項52記載の方法。 The first refrigerant circuit further includes one or more spiral heat exchangers through which the natural gas stream passes through heat exchange with the refrigerant compressed by the first refrigerant compressor. 53. The method of claim 52 , wherein the method is suitable for cooling. 該処理ユニットモジュール型は、1またはそれ以上の第一の処理ユニットモジュールで構成される、第一の処理ユニットモジュール型および2またはそれ以上の一体化された第二の処理ユニットモジュールで構成される、第二の処理ユニットモジュール型を少なくとも含み、ここで少なくとも一つの該第一の処理ユニットモジュールおよび少なくとも一つの該第二の処理ユニットモジュールが、その夫々の実質的に最大の処理効率をとるようなサイズで作られている、請求項8記載の方法。 The processing unit module type is composed of one or more first processing unit modules, a first processing unit module type and two or more integrated second processing unit modules. , At least a second processing unit module type, wherein at least one of the first processing unit modules and at least one of the second processing unit modules has their respective substantially maximum processing efficiency. 9. The method of claim 8 , wherein the method is made of any size. 該一体化工程Cが、3またはそれ以上の各処理ユニットモジュール型の、1またはそれ以上の該原処理ユニットモジュールと、1またはそれ以上の該第二の処理ユニットモジュールとを一体化する工程を含む、請求項9記載の方法。 The integration step C includes integrating one or more original processing unit modules and one or more second processing unit modules of each of three or more processing unit module types. 10. The method of claim 9 , comprising. 該一体化工程Cが、4またはそれ以上の各処理ユニットモジュール型の、1またはそれ以上の該原処理ユニットモジュールと、1またはそれ以上の該第二の処理ユニットモジュールとを一体化する工程を含む、請求項62記載の方法。 The integration step C includes integrating one or more original processing unit modules and one or more second processing unit modules of each of four or more processing unit module types. 64. The method of claim 62 , comprising. 該一体化工程Cが、該複数の処理ユニットモジュール型の全ての、1またはそれ以上の該原処理ユニットモジュールと、1またはそれ以上の該第二の処理ユニットモジュールとを一体化する工程を含む、請求項63記載の方法。 The integration step C includes the step of integrating all the one or more original processing unit modules and the one or more second processing unit modules of the plurality of processing unit module types. 64. The method of claim 63 . 該第二の処理ユニットモジュールが、その各実質的に最大の処理効率をとるようなサイズで作られている、請求項9記載の方法。 The method of claim 9 , wherein the second processing unit modules are sized such that each has a substantially maximum processing efficiency. 該同一の処理ユニットモジュール型の該原および第二処理ユニットモジュールが、実質上等しい形状で形成されている、請求項65記載の方法。 66. The method of claim 65 , wherein the original and second processing unit modules of the same processing unit module type are formed in substantially equal shapes. 該原処理ユニットモジュールが、原装置型で構成され、および該第二処理ユニットモジュールが、第二の処理装置型で構成される、請求項66記載の方法。 68. The method of claim 66 , wherein the raw processing unit module is configured with an original apparatus type and the second processing unit module is configured with a second processing apparatus type. 1またはそれ以上の構築コストの高い、製品サイズを持つ処理ユニットモジュール型および1またはそれ以上の構築コストの低い、製品サイズを持つ処理ユニットモジュール型で構成され、少なくとも一つの該低構築コストの、製品サイズを持つ処理ユニットモジュール型が、少なくとも一つの該高構築コストの、製品サイズを持つ処理ユニットモジュール型の持つ最大供給材料処理能力の、少なくとも110%の最大供給材料処理能力を持つことを特徴とする、LNG液化プラント。   One or more processing unit module types having a product size having a high construction cost and one or more processing unit module types having a product size having a low construction cost, and having at least one of the low construction costs, A processing unit module type with a product size has a maximum feed material processing capacity of at least 110% of the maximum feed material processing capacity of a processing unit module type with a product size of at least one of the high construction costs LNG liquefaction plant. 該高構築コストの、製品サイズを持つ処理ユニットモジュール型が、該低構築コストの、製品サイズを持つ処理ユニットモジュール型の最大供給材料処理能力の、単位当たりの全構築コストの1.25倍以上の、最大供給材料処理能力の、単位当たりの全構築コストを持つ、請求項68記載のLNG液化プラント。 The processing unit module type with the product size of the high construction cost is not less than 1.25 times the total construction cost per unit of the maximum feed material processing capacity of the processing unit module type with the product size of the low construction cost, 69. The LNG liquefaction plant of claim 68 , having a total construction cost per unit of maximum feedstock throughput. 該低構築コストの、製品サイズを持つ処理ユニットモジュール型が、酸性ガス除去ユニット、脱水ユニット、分別ユニット、窒素排除ユニット、およびヘリウム回収ユニットから選択される、請求項68記載のLNG液化プラント。 69. The LNG liquefaction plant of claim 68 , wherein the low build cost, product size processing unit module type is selected from an acid gas removal unit, a dehydration unit, a fractionation unit, a nitrogen exclusion unit, and a helium recovery unit. 該高構築コストの、製品サイズを持つ処理ユニットモジュール型が、導入設備ユニット、冷媒圧縮機ユニット、極低温熱交換器ユニット、および液化ユニットから選択される、請求項68記載のLNG液化プラント。 69. The LNG liquefaction plant of claim 68 , wherein the high construction cost, processing unit module type with product size is selected from an introduction equipment unit, a refrigerant compressor unit, a cryogenic heat exchanger unit, and a liquefaction unit. 該製品サイズを持つ、処理ユニットモジュール型が、1またはそれ以上の第一処理ユニットモジュールで構成される、第一の処理ユニットモジュール型、および2またはそれ以上の一体化された第二処理ユニットモジュールで構成される、第二の処理ユニットモジュール型を少なくとも含み、ここで少なくとも一つの該第一の処理ユニットモジュールおよび少なくとも一つの該第二の処理ユニットモジュールが、その各々の実質的に最大の処理効率をとるようなサイズで作られている、請求項68記載のLNG液化プラントA first processing unit module type having the product size, wherein the processing unit module type is composed of one or more first processing unit modules, and two or more integrated second processing unit modules; At least a second processing unit module type, wherein at least one of the first processing unit modules and at least one of the second processing unit modules are each substantially maximum processing. 69. The LNG liquefaction plant of claim 68 , sized for efficiency. 複数の処理ユニットモジュール型と、2またはそれ以上の一体化された処理ユニットモジュール型とを含み、ここで該複数の処理ユニットモジュール型は、1またはそれ以上の、第一の処理ユニットモジュールで構成される、第一の処理ユニットモジュール型および2またはそれ以上の、一体化された第二の処理ユニットモジュールで構成される、第二の処理ユニットモジュール型を、少なくとも含み、ここで少なくとも一つの該第一の処理ユニットモジュールおよび少なくとも一つの該第二の処理ユニットモジュールは、夫々の実質的に最大の処理効率をとるようなサイズで作られている、ことを特徴とするLNG液化プラント。   A plurality of processing unit module types and two or more integrated processing unit module types, wherein the plurality of processing unit module types comprise one or more first processing unit modules Comprising at least one second processing unit module type comprised of a first processing unit module type and two or more integrated second processing unit modules. An LNG liquefaction plant, wherein the first processing unit module and the at least one second processing unit module are each sized to obtain a substantially maximum processing efficiency. 該LNG液化プラントが、1またはそれ以上の、内部にて一体化された処理ユニットモジュールを含む、請求項1〜9の何れか1項に記載の方法。 10. A method according to any one of the preceding claims, wherein the LNG liquefaction plant comprises one or more internally integrated processing unit modules. 該LNG液化プラントが、1またはそれ以上の、内部にて一体化された処理ユニットモジュールを含む、請求項68又は73記載のLNG液化プラント。 74. An LNG liquefaction plant according to claim 68 or 73 , wherein the LNG liquefaction plant comprises one or more internally integrated processing unit modules. 該LNG液化プラントが、2またはそれ以上の、並列式に一体化された処理ユニットモジュールを含む、請求項1〜9の何れか1項記載の方法。 The method according to any one of claims 1 to 9 , wherein the LNG liquefaction plant comprises two or more processing unit modules integrated in parallel . 該LNG液化プラントが、2またはそれ以上の、並列式に一体化された処理ユニットモジュールを含む、請求項68又は73記載のLNG液化プラント。 74. An LNG liquefaction plant according to claim 68 or 73 , wherein the LNG liquefaction plant comprises two or more parallel integrated processing unit modules.
JP2007516592A 2004-06-18 2005-06-10 A liquefied natural gas plant with appreciable capacity Pending JP2008503609A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US58074604P 2004-06-18 2004-06-18
PCT/US2005/020674 WO2006009646A2 (en) 2004-06-18 2005-06-10 Scalable capacity liquefied natural gas plant

Publications (2)

Publication Number Publication Date
JP2008503609A JP2008503609A (en) 2008-02-07
JP2008503609A5 true JP2008503609A5 (en) 2008-07-24

Family

ID=34956194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007516592A Pending JP2008503609A (en) 2004-06-18 2005-06-10 A liquefied natural gas plant with appreciable capacity

Country Status (11)

Country Link
US (1) US20070193303A1 (en)
EP (1) EP1782008A4 (en)
JP (1) JP2008503609A (en)
KR (1) KR101244759B1 (en)
CN (1) CN101023308B (en)
AU (1) AU2005264908C1 (en)
BR (1) BRPI0512212A (en)
CA (1) CA2570835C (en)
MX (1) MXPA06014854A (en)
NO (1) NO20070307L (en)
WO (1) WO2006009646A2 (en)

Families Citing this family (77)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2624917C (en) 2005-10-05 2013-07-09 F. Hoffmann-La Roche Ag Non-fluorescent energy transfer
US7437889B2 (en) 2006-01-11 2008-10-21 Air Products And Chemicals, Inc. Method and apparatus for producing products from natural gas including helium and liquefied natural gas
CN101443616B (en) * 2006-05-15 2012-06-20 国际壳牌研究有限公司 Method and device for distributing liquefied hydrocarbon gas
EA013983B1 (en) * 2006-07-10 2010-08-30 Флуор Текнолоджиз Корпорейшн Method and plant for rich gas conditioning for ngl recovery
WO2008019999A2 (en) * 2006-08-14 2008-02-21 Shell Internationale Research Maatschappij B.V. Method and apparatus for cooling a hydrocarbon stream
AU2007298913C1 (en) * 2006-09-22 2011-09-01 Shell Internationale Research Maatschappij B.V. Method and apparatus for liquefying a hydrocarbon stream
AU2007298912B2 (en) * 2006-09-22 2010-07-22 Shell Internationale Research Maatschappij B.V. Method and apparatus for producing a cooled hydrocarbon stream
JP2010507771A (en) * 2006-10-23 2010-03-11 シエル・インターナシヨネイル・リサーチ・マーチヤツピイ・ベー・ウイ Method and apparatus for liquefying a hydrocarbon stream
NO328205B1 (en) * 2006-11-01 2010-01-11 Sinvent As Procedure and process plant for gas condensation
RU2464510C2 (en) * 2006-11-14 2012-10-20 Шелл Интернэшнл Рисерч Маатсхаппий Б.В. Method and device for hydrocarbon flow cooling
KR100804953B1 (en) * 2007-02-13 2008-02-20 대우조선해양 주식회사 Apparatus and method for reliquefying boil-off gas capable of refrigeration load variable operation
NO329177B1 (en) * 2007-06-22 2010-09-06 Kanfa Aragon As Process and system for forming liquid LNG
US9254448B2 (en) 2007-09-13 2016-02-09 Battelle Energy Alliance, Llc Sublimation systems and associated methods
US8899074B2 (en) 2009-10-22 2014-12-02 Battelle Energy Alliance, Llc Methods of natural gas liquefaction and natural gas liquefaction plants utilizing multiple and varying gas streams
US8061413B2 (en) * 2007-09-13 2011-11-22 Battelle Energy Alliance, Llc Heat exchangers comprising at least one porous member positioned within a casing
US9217603B2 (en) 2007-09-13 2015-12-22 Battelle Energy Alliance, Llc Heat exchanger and related methods
US8555672B2 (en) 2009-10-22 2013-10-15 Battelle Energy Alliance, Llc Complete liquefaction methods and apparatus
US9574713B2 (en) 2007-09-13 2017-02-21 Battelle Energy Alliance, Llc Vaporization chambers and associated methods
GB2454344A (en) * 2007-11-02 2009-05-06 Shell Int Research Method and apparatus for controlling a refrigerant compressor, and a method for cooling a hydrocarbon stream.
US20100293997A1 (en) * 2007-12-04 2010-11-25 Francois Chantant Method and apparatus for cooling and/or liquefying a hydrocarbon stream
WO2009101127A2 (en) * 2008-02-14 2009-08-20 Shell Internationale Research Maatschappij B.V. Method and apparatus for cooling a hydrocarbon stream
US8973398B2 (en) 2008-02-27 2015-03-10 Kellogg Brown & Root Llc Apparatus and method for regasification of liquefied natural gas
JPWO2009157434A1 (en) * 2008-06-23 2011-12-15 日揮株式会社 Carbon dioxide off-gas purification method, purification combustion catalyst, and natural gas production method
CN102378888B (en) * 2008-07-29 2014-09-17 国际壳牌研究有限公司 Method and apparatus for controlling a compressor and method of cooling a hydrocarbon stream
GB2473979B (en) * 2008-07-29 2012-09-26 Shell Int Research Method and apparatus for treating a hydrocarbon stream and method of cooling a hydrocarbon stream
US8232438B2 (en) * 2008-08-25 2012-07-31 Chevron U.S.A. Inc. Method and system for jointly producing and processing hydrocarbons from natural gas hydrate and conventional hydrocarbon reservoirs
CA2734853A1 (en) * 2008-10-07 2010-04-15 Exxonmobil Upstream Research Company Helium recovery from natural gas integrated with ngl recovery
US8522574B2 (en) * 2008-12-31 2013-09-03 Kellogg Brown & Root Llc Method for nitrogen rejection and or helium recovery in an LNG liquefaction plant
US20100175425A1 (en) * 2009-01-14 2010-07-15 Walther Susan T Methods and apparatus for liquefaction of natural gas and products therefrom
US7785399B2 (en) * 2009-01-16 2010-08-31 Uop Llc Heat integration for hot solvent stripping loop in an acid gas removal process
US10082331B2 (en) 2009-07-16 2018-09-25 Conocophillips Company Process for controlling liquefied natural gas heating value
US8011191B2 (en) 2009-09-30 2011-09-06 Thermo Fisher Scientific (Asheville) Llc Refrigeration system having a variable speed compressor
US20110094261A1 (en) * 2009-10-22 2011-04-28 Battelle Energy Alliance, Llc Natural gas liquefaction core modules, plants including same and related methods
US9046302B2 (en) 2009-10-27 2015-06-02 Shell Oil Company Apparatus and method for cooling and liquefying a fluid
CA2792331C (en) * 2010-03-05 2017-12-12 Exxonmobil Upstream Research Company Flexible liquefied natural gas plant
CN103140574B (en) * 2010-10-15 2015-01-28 大宇造船海洋株式会社 Method for producing pressurized liquefied natural gas, and production system used in same
NL2005598C2 (en) * 2010-10-29 2012-05-02 Louis Zuurhout Method and apparatus for cooling a hydrocarbon stream.
US10655911B2 (en) 2012-06-20 2020-05-19 Battelle Energy Alliance, Llc Natural gas liquefaction employing independent refrigerant path
AU2012216352B2 (en) 2012-08-22 2015-02-12 Woodside Energy Technologies Pty Ltd Modular LNG production facility
ITMI20121625A1 (en) * 2012-09-28 2014-03-29 Eni Spa REFRIGERANT CIRCUIT FOR THE LIQUEFATION OF NATURAL GAS
AU2014320450B2 (en) * 2013-09-13 2017-09-21 Shell Internationale Research Maatschappij B.V. Natural gas liquefaction system and method of producing a liquefied natural gas stream
CA2888026A1 (en) * 2013-09-21 2015-03-26 Woodside Energy Technologies Pty Ltd Expandable lng processing plant
US9709325B2 (en) * 2013-11-25 2017-07-18 Chevron U.S.A. Inc. Integration of a small scale liquefaction unit with an LNG plant to convert end flash gas and boil-off gas to incremental LNG
US9696086B2 (en) 2014-01-28 2017-07-04 Dresser-Rand Company System and method for the production of liquefied natural gas
EP2977430A1 (en) 2014-07-24 2016-01-27 Shell Internationale Research Maatschappij B.V. A hydrocarbon condensate stabilizer and a method for producing a stabilized hydrocarbon condenstate stream
EP2977431A1 (en) 2014-07-24 2016-01-27 Shell Internationale Research Maatschappij B.V. A hydrocarbon condensate stabilizer and a method for producing a stabilized hydrocarbon condenstate stream
US9939194B2 (en) * 2014-10-21 2018-04-10 Kellogg Brown & Root Llc Isolated power networks within an all-electric LNG plant and methods for operating same
US10443926B2 (en) 2014-11-19 2019-10-15 Dresser-Rand Company System and method for liquefied natural gas production
US20160187057A1 (en) * 2014-12-23 2016-06-30 Aspen Engineering Services, Llc Liquefied natural gas from rich natural gas
FR3034428B1 (en) * 2015-04-01 2020-01-10 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude HIGH-THROUGHPUT NATURAL GAS DEAZOTATION PROCESS
KR101722602B1 (en) * 2015-04-29 2017-04-03 대우조선해양 주식회사 Method of Supplying Electric Power
US10563914B2 (en) * 2015-08-06 2020-02-18 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Methods and systems for integration of industrial site efficiency losses to produce LNG and/or LIN
CA2998466C (en) * 2015-09-24 2021-06-29 Exxonmobil Upstream Research Company Treatment plant for hydrocarbon gas having variable contaminant levels
JP2018531356A (en) * 2015-10-06 2018-10-25 エクソンモービル アップストリーム リサーチ カンパニー Modularization of hydrocarbon processing plant
KR101766257B1 (en) 2016-04-07 2017-08-09 대우조선해양 주식회사 System and Method for Carbon Dioxide Conversion for Offshore Production Facilties
DE102016004606A1 (en) * 2016-04-14 2017-10-19 Linde Aktiengesellschaft Process engineering plant and process for liquefied gas production
US20180038642A1 (en) * 2016-08-05 2018-02-08 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process integration of a gas processing unit with liquefaction unit
US10634425B2 (en) * 2016-08-05 2020-04-28 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Integration of industrial gas site with liquid hydrogen production
US10393431B2 (en) * 2016-08-05 2019-08-27 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Method for the integration of liquefied natural gas and syngas production
US10411969B2 (en) * 2016-10-03 2019-09-10 Microsoft Technology Licensing, Llc Backend resource costs for online service offerings
WO2018083747A1 (en) * 2016-11-02 2018-05-11 日揮株式会社 Natural gas liquefaction facility
RU2754482C2 (en) 2017-02-28 2021-09-02 Шелл Интернэшнл Рисерч Маатсхаппий Б.В. Supplemented plant for production of liquefied natural gas and its operation method
US10627158B2 (en) 2017-03-13 2020-04-21 Baker Hughes, A Ge Company, Llc Coproduction of liquefied natural gas and electric power with refrigeration recovery
US10539364B2 (en) * 2017-03-13 2020-01-21 General Electric Company Hydrocarbon distillation
US20180259248A1 (en) * 2017-03-13 2018-09-13 General Electric Company System for Producing Vehicle Fuel
CN114909870A (en) * 2017-03-14 2022-08-16 伍德赛德能量科技私人有限公司 Containerized LNG liquefaction unit and related method of producing LNG
JP6516335B2 (en) * 2017-04-20 2019-05-22 株式会社新領域技術研究所 Target gas treatment system
GB201708514D0 (en) * 2017-05-26 2017-07-12 Bp Exploration Operating Systems and methods for liquefaction of a gas with the aid of an end flash system
CA3073035C (en) * 2017-08-24 2022-07-26 Exxonmobil Upstream Research Company Method and system for lng production using standardized multi-shaft gas turbines, compressors and refrigerant systems
US10571189B2 (en) 2017-12-21 2020-02-25 Shell Oil Company System and method for operating a liquefaction train
WO2019125672A1 (en) 2017-12-22 2019-06-27 Exxonmobil Upstream Research Company System and method of de-bottlenecking lng trains
CN110487024B (en) * 2018-05-14 2024-04-16 成都智合芯电科技开发有限公司 Helium compression purification unit system
WO2020033114A2 (en) * 2018-08-10 2020-02-13 Exxonmobil Upstream Research Company Improving the efficiency a gas conditioning system via hydrate inhibitor injection
WO2020036712A1 (en) 2018-08-14 2020-02-20 Exxonmobil Upstream Resarch Company (Emch-N1.4A.607) Boil-off gas recycle subsystem in natural gas liquefaction plants
US11986770B2 (en) * 2018-08-17 2024-05-21 Linde GmbM Method and arrangement for recovering a helium product from natural gas by membrane unit
EP3894906A1 (en) 2018-12-11 2021-10-20 ExxonMobil Upstream Research Company Training machine learning systems for seismic interpretation
CN111219157A (en) * 2020-01-07 2020-06-02 中海石油(中国)有限公司 Deepwater natural gas field floating production device and treatment process thereof

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1054489A (en) * 1964-07-15
US4087976A (en) * 1976-08-13 1978-05-09 Massachusetts Institute Of Technology Electric power plant using electrolytic cell-fuel cell combination
FR2714722B1 (en) * 1993-12-30 1997-11-21 Inst Francais Du Petrole Method and apparatus for liquefying a natural gas.
MY117899A (en) * 1995-06-23 2004-08-30 Shell Int Research Method of liquefying and treating a natural gas.
TW396254B (en) * 1997-06-20 2000-07-01 Exxon Production Research Co Pipeline distribution network systems for transportation of liquefied natural gas
DZ2535A1 (en) * 1997-06-20 2003-01-08 Exxon Production Research Co Advanced process for liquefying natural gas.
FR2772896B1 (en) * 1997-12-22 2000-01-28 Inst Francais Du Petrole METHOD FOR THE LIQUEFACTION OF A GAS, PARTICULARLY A NATURAL GAS OR AIR COMPRISING A MEDIUM PRESSURE PURGE AND ITS APPLICATION
FR2778232B1 (en) * 1998-04-29 2000-06-02 Inst Francais Du Petrole METHOD AND DEVICE FOR LIQUEFACTION OF A NATURAL GAS WITHOUT SEPARATION OF PHASES ON THE REFRIGERANT MIXTURES
TW421704B (en) * 1998-11-18 2001-02-11 Shell Internattonale Res Mij B Plant for liquefying natural gas
MY123311A (en) * 1999-01-15 2006-05-31 Exxon Production Research Co Process for producing a pressurized methane-rich liquid from a methane-rich gas
TW480325B (en) * 1999-12-01 2002-03-21 Shell Int Research Plant for liquefying natural gas
MY122625A (en) * 1999-12-17 2006-04-29 Exxonmobil Upstream Res Co Process for making pressurized liquefied natural gas from pressured natural gas using expansion cooling
EG23193A (en) * 2000-04-25 2001-07-31 Shell Int Research Controlling the production of a liquefied natural gas product stream.
US6510706B2 (en) * 2000-05-31 2003-01-28 Exxonmobil Upstream Research Company Process for NGL recovery from pressurized liquid natural gas
TW573112B (en) * 2001-01-31 2004-01-21 Exxonmobil Upstream Res Co Process of manufacturing pressurized liquid natural gas containing heavy hydrocarbons
US6526777B1 (en) * 2001-04-20 2003-03-04 Elcor Corporation LNG production in cryogenic natural gas processing plants
US6658892B2 (en) * 2002-01-30 2003-12-09 Exxonmobil Upstream Research Company Processes and systems for liquefying natural gas
US6647744B2 (en) * 2002-01-30 2003-11-18 Exxonmobil Upstream Research Company Processes and systems for liquefying natural gas
DE50313028D1 (en) * 2002-05-02 2010-10-14 Alstom Technology Ltd Catalytic burner
AU2003272748B2 (en) * 2002-09-30 2008-04-17 Bp Corporation North America Inc. A reduced carbon dioxide emission system and method for providing power for refrigerant compression and electrical power for a light hydrocarbon gas liquefaction process using cooled air injection to the turbines
EG24658A (en) * 2002-09-30 2010-04-07 Bpcorporation North America In All electric lng system and process
US7074322B2 (en) * 2002-09-30 2006-07-11 Bp Corporation North America Inc. System and method for liquefying variable selected quantities of light hydrocarbon gas with a plurality of light hydrocarbon gas liquefaction trains
AU2003275396C1 (en) * 2002-09-30 2010-12-23 Bp Corporation North America Inc. Modular LNG process
US6691531B1 (en) * 2002-10-07 2004-02-17 Conocophillips Company Driver and compressor system for natural gas liquefaction
US6640586B1 (en) * 2002-11-01 2003-11-04 Conocophillips Company Motor driven compressor system for natural gas liquefaction
EP1794262A4 (en) * 2004-06-18 2010-03-03 Exxonmobil Upstream Res Co Hydrocarbon fluid processing plant design

Similar Documents

Publication Publication Date Title
JP2008503609A5 (en)
JP6140713B2 (en) Multiple nitrogen expansion process for LNG production
CN110701870B (en) Air separation device and method utilizing LNG cold energy
EP3368630B1 (en) Low-temperature mixed--refrigerant for hydrogen precooling in large scale
JP2009529648A5 (en)
JP6351895B1 (en) Nitrogen production method and nitrogen production apparatus
US20230025321A1 (en) Co2 separation & liquefaction system and method
JP2020098092A5 (en)
KR101669729B1 (en) Air liquefaction system using lng cold energy with ejector expansion device entraining expanded vapor
US20080173043A1 (en) Method For the Liquefaction of a Hydrocarbon-Rich Stream
CN101268326A (en) Process and apparatus for the separation of air by cryogenic distillation
US20110094261A1 (en) Natural gas liquefaction core modules, plants including same and related methods
US9841229B2 (en) Process for cooling a hydrocarbon-rich fraction
EP0171951A1 (en) Refrigeration method
US2737784A (en) Apparatus for obtaining liquid oxygen
JP2024501105A (en) Liquefied hydrogen production process
RU2009117466A (en) METHOD AND DEVICE FOR COOLING A HYDROCARBON FLOW
JP5932127B2 (en) Carbon dioxide liquefaction equipment
US9989306B2 (en) Method and device for recovering high-pressure oxygen and high-pressure nitrogen
CN111288747A (en) LNG cold energy utilization air separation device system and design method thereof
RU2794011C1 (en) Method for liquefaction of helium
EP3271671B1 (en) Plant for the liquefaction of nitrogen using the recovery of cold energy deriving from the evaporation of liquefied natural gas
US11566841B2 (en) Cryogenic liquefier by integration with power plant
RU2012108588A (en) METHOD AND DEVICE FOR PRODUCING GAS-COMPRESSED OXYGEN PRODUCT BY LOW-TEMPERATURE AIR SEPARATION
US20230272971A1 (en) Single mixed refrigerant lng production process