JP2008248611A - Support fixing structure of shield tunnel - Google Patents

Support fixing structure of shield tunnel Download PDF

Info

Publication number
JP2008248611A
JP2008248611A JP2007092570A JP2007092570A JP2008248611A JP 2008248611 A JP2008248611 A JP 2008248611A JP 2007092570 A JP2007092570 A JP 2007092570A JP 2007092570 A JP2007092570 A JP 2007092570A JP 2008248611 A JP2008248611 A JP 2008248611A
Authority
JP
Japan
Prior art keywords
support
bolt
fixed
shield tunnel
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007092570A
Other languages
Japanese (ja)
Other versions
JP4298763B2 (en
Inventor
Takuo Shinomiya
卓夫 四宮
Mitsuharu Mizuno
光晴 水野
Masahiko Tomori
方彦 友利
Tomoichiro Moroji
友一郎 諸治
Keiichi Kobayashi
敬一 小林
Kenji Koike
健司 小池
Naotoshi Okamura
直利 岡村
Yutaro Koyanagi
祐太郎 小柳
Daisuke Tsuchida
大輔 土田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Totetsu Kogyo Co Ltd
Original Assignee
East Japan Railway Co
Totetsu Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co, Totetsu Kogyo Co Ltd filed Critical East Japan Railway Co
Priority to JP2007092570A priority Critical patent/JP4298763B2/en
Publication of JP2008248611A publication Critical patent/JP2008248611A/en
Application granted granted Critical
Publication of JP4298763B2 publication Critical patent/JP4298763B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To fix a support by the use of a joint board of a segment only by using one special-purpose tool in the repair lining work of a shield tunnel. <P>SOLUTION: A bolt member 2 which is projected to the inside of segment rings is fixed to the joint board 31 connecting the segment rings to each other, and the support 1 is fixed to the bolt member 2. To be more specific, the bolt member 2 is integrally provided with a fastener clip 22 which is welded on the connection end surface of the joint board 31. Then the support 1 which is H-shaped steel is fixed by fastening a nut 24 to the bolt member 2 which is inserted through a fixation hole 11 formed in its flange. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、シールドトンネルの支保工固定構造に関する。   The present invention relates to a support structure for supporting a shield tunnel.

シールドトンネルのセグメント覆工として、例えば特許文献1に開示されるパーシャルセグメント覆工工法がある。特許文献1のパーシャルセグメント覆工工法は、あらかじめコンクリートセグメント2の内側に締結用ボルトナット30で取り付けられている彎曲H鋼支保部材10をガイドに鋼製セグメント内型枠11を枠組みして、コンクリートセグメント2の円周方向の間に鋼製セグメント内型枠11等で覆工材注入空間16を形成し、覆工材を注入して覆工するものである。   As a segment lining of a shield tunnel, there is a partial segment lining method disclosed in Patent Document 1, for example. In the partial segment lining method of Patent Document 1, a steel segment inner form 11 is framed using a bent H steel support member 10 which is previously attached to the inside of the concrete segment 2 with a fastening bolt and nut 30 as a guide. A lining material injection space 16 is formed between the circumferential direction of the segment 2 by the steel inner mold 11 and the like, and the lining material is injected to perform the lining.

また、シールドトンネルの補修覆工として、例えば特許文献2に開示される専用の取付具を用いる方法がある。特許文献2の補修ボードの取付具は、セグメントA間の連結ボルトBのボルト頭部CやナットDに取り付けるもので、角穴筒11と、外筒13とよりなり、角穴筒11は円盤の内部に、角穴12を開口した円盤であり、かつ、この角穴12はセグメントAの連結ボルトBの頭部C、あるいはナットDの外形と等しい外形の多角形状の穴によって構成したものである。角穴筒11の外周に嵌合する外筒13は、内部に角穴筒11の外形と等しい貫通孔を開口した円筒体であり、外筒13には、筒の中心から放射する方向にアンカーボルト14をネジ止で取り付けて構成したものである。   Further, as a shield tunnel repair lining, there is a method of using a dedicated fixture disclosed in Patent Document 2, for example. The fixture of the repair board of patent document 2 is attached to the bolt head C and the nut D of the connecting bolt B between the segments A, and is composed of a square hole cylinder 11 and an outer cylinder 13, and the square hole cylinder 11 is a disk. Is a disk having a square hole 12 opened therein, and this square hole 12 is constituted by a polygonal hole having an outer shape equal to the outer shape of the head C of the connecting bolt B of the segment A or the nut D. is there. The outer cylinder 13 fitted to the outer periphery of the square-hole cylinder 11 is a cylindrical body having a through-hole that is equal to the outer shape of the square-hole cylinder 11 inside, and the outer cylinder 13 is anchored in a direction radiating from the center of the cylinder. The bolt 14 is configured to be attached with screws.

そして、特許文献2の取付具を利用する補修方法は、セグメントA間の連結ボルトBのボルト頭部C、およびナットDに角穴筒11の角穴12を嵌合し、角穴筒11の外周に、外筒13を嵌合し、外筒13に取り付けたアンカーボルト14を、セグメントAから離れる方向へ向けて位置させ、アンカーボルト14の露出端を、内側補修ボード3の貫通穴に貫通させ、外側からナットを締め付けることによって、内側補修ボード3をセグメントAの内面に押し付けて固定し、さらにアンカーボルト14を介して、内側補修ボード3の外側に、内側補修ボード3と平行に外側補修ボード3をとりつけ、内外2枚の補修ボード3・3を取り付けた後、内側補修ボード3と外側補修ボード3との間にモルタル4を充填するものである。   And the repair method using the fixture of patent document 2 fits the square hole 12 of the square hole cylinder 11 to the bolt head C of the connection bolt B between the segments A, and the nut D, and the square hole cylinder 11 The outer cylinder 13 is fitted to the outer periphery, the anchor bolt 14 attached to the outer cylinder 13 is positioned in a direction away from the segment A, and the exposed end of the anchor bolt 14 is penetrated through the through hole of the inner repair board 3. The inner repair board 3 is pressed and fixed to the inner surface of the segment A by tightening the nut from the outside, and further, the outer repair is performed in parallel with the inner repair board 3 on the outer side of the inner repair board 3 via the anchor bolts 14. After the board 3 is attached and the inner and outer repair boards 3 and 3 are attached, the mortar 4 is filled between the inner repair board 3 and the outer repair board 3.

また、特許文献2には、アンカーボルト14の露出端を、シールドトンネルの縦断方向の内側面に沿って取り付ける鋼材5の貫通穴に貫通させ、外側からナットの締め付けによって、鋼材5をセグメントAの内面に押し付けて、シールドトンネルの内面に縦断方向に、複数本の鋼材5を平行に取り付けたら、この鋼材5間にボルトによって補修ボード3を取り付ける方法も開示される。   In Patent Document 2, the exposed end of the anchor bolt 14 is passed through a through hole of the steel material 5 attached along the inner side surface in the longitudinal direction of the shield tunnel, and the steel material 5 is attached to the segment A by tightening a nut from the outside. A method is also disclosed in which a plurality of steel materials 5 are attached in parallel to the inner surface of the shield tunnel in a longitudinal direction by pressing against the inner surface, and the repair board 3 is attached between the steel materials 5 with bolts.

さらに、特許文献2には、アンカーボルト14の露出端を、シールドトンネルの縦断方向の内側面に沿って取り付けるH型鋼6のセグメント側のフランジの貫通穴に、アンカーボルト14を貫通させ、このアンカーボルト14の露出端をさらに内側補修ボード3の貫通穴に貫通させて、外側からナットを締め付けることによって、H型鋼6のセグメントA側のフランジと、内側補修ボード3とを固定し、H型鋼6のトンネル内側のフランジの間にボルトによって外側補修ボード3を取り付ける方法も開示される。   Further, in Patent Document 2, the anchor bolt 14 is passed through a through hole of a flange on the segment side of the H-shaped steel 6 where the exposed end of the anchor bolt 14 is attached along the inner side surface in the longitudinal direction of the shield tunnel. The flange 14 on the segment A side of the H-shaped steel 6 and the inner repair board 3 are fixed by passing the exposed end of the bolt 14 through the through hole of the inner repair board 3 and tightening the nut from the outside. A method of attaching the outer repair board 3 by bolts between the inner flanges of the tunnel is also disclosed.

また、コンポジットセグメントの場合、まず、その表面の鋼板に電動ドリルで穴を開けて、その穴から、電動ハンマードリルでセグメント内のコンクリートを削孔した後、アンカーボルトを打ち込んで、そのアンカーボルトにH鋼支保工を固定していた。
特公平4−60193号公報 特開2006−226039号公報
Also, in the case of a composite segment, first drill a hole in the steel plate on the surface with an electric drill, drill the concrete in the segment from the hole with an electric hammer drill, and then drive the anchor bolt into the anchor bolt. H steel support was fixed.
Japanese Patent Publication No. 4-60193 JP 2006-226039 A

しかし、シールドトンネルの補修覆工において、特許文献2のような専用の取付具、すなわち、セグメントA間の連結ボルトBのボルト頭部C及びナットDに取り付ける角穴筒11と外筒13を一セットずつ用いなければならないことから、コストが高くなってしまう。   However, in the repair lining of the shield tunnel, a dedicated fixture as in Patent Document 2, that is, the square hole cylinder 11 and the outer cylinder 13 attached to the bolt head C and the nut D of the connecting bolt B between the segments A are combined. Since it must be used for each set, the cost becomes high.

また、コンポジットセグメントの場合のように、その表面の鋼板に電動ドリルで穴を開けて、その穴から、電動ハンマードリルでコンクリートを削孔した後、アンカーボルトを打ち込むのは、施工性が悪く時間がかかり、コストも増加する。   Also, as in the case of composite segments, drilling holes in the steel plate on the surface with an electric drill, drilling concrete from the hole with an electric hammer drill, and then driving in anchor bolts is a poor workability and time. And costs increase.

本発明の課題は、シールドトンネルの補修覆工において、一つの専用具を用いるだけで、セグメントの継手板を利用して支保工を固定できるようにすることである。   An object of the present invention is to make it possible to fix a supporting work using a joint plate of a segment only by using one dedicated tool in the repair lining of a shield tunnel.

以上の課題を解決するため、請求項1に記載の発明は、セグメントリングを互いに接続する継手板に、セグメントリングの内方に突出するボルト部材を固定し、このボルト部材に支保工を固定した、シールドトンネルの支保工固定構造を特徴とする。   In order to solve the above problems, in the invention described in claim 1, a bolt member protruding inward of the segment ring is fixed to a joint plate that connects the segment rings to each other, and a support is fixed to the bolt member. , It features a shield tunnel fixing structure.

請求項2に記載の発明は、請求項1に記載のシールドトンネルの支保工固定構造であって、前記ボルト部材は、前記継手板の接続端面に溶接される固定金具を一体に備えることを特徴とする。   The invention according to claim 2 is the support construction fixing structure of the shield tunnel according to claim 1, wherein the bolt member is integrally provided with a fixing fitting welded to the connection end face of the joint plate. And

請求項3に記載の発明は、請求項1または2に記載のシールドトンネルの支保工固定構造であって、前記支保工は、H形鋼でそのフランジに形成された固定穴に通した前記ボルト部材にナットを締め付けて固定されることを特徴とする。   Invention of Claim 3 is the support construction fixing structure of the shield tunnel of Claim 1 or 2, Comprising: The said support construction is the said volt | bolt which passed the fixing hole formed in the flange with the H-shaped steel. The member is fixed by tightening a nut.

請求項4に記載の発明は、セグメントリングを互いに接続する継手板に、側方に位置するナット部材を固定し、このナット部材に支保工を固定した、シールドトンネルの支保工固定構造を特徴とする。   The invention according to claim 4 is characterized by a shield tunnel support fixing structure in which a nut member positioned on a side is fixed to a joint plate that connects the segment rings to each other, and a support is fixed to the nut member. To do.

請求項5に記載の発明は、請求項4に記載のシールドトンネルの支保工固定構造であって、前記ナット部材は、前記継手板の接続端面に溶接される固定板を一体に備えることを特徴とする。   The invention according to claim 5 is the shield tunnel support fixing structure according to claim 4, wherein the nut member is integrally provided with a fixing plate welded to the connection end face of the joint plate. And

請求項6に記載の発明は、請求項4または5に記載のシールドトンネルの支保工固定構造であって、前記支保工は、H形鋼でそのフランジを挟む取付板に形成された取付穴に通したボルトを前記ナット部材に締め込んで固定されることを特徴とする。   Invention of Claim 6 is the support construction fixing structure of the shield tunnel of Claim 4 or 5, Comprising: The said support is in the attachment hole formed in the attachment plate which pinches | interposes the flange with H-shaped steel. The passed bolt is fastened and fixed to the nut member.

請求項7に記載の発明は、請求項4に記載のシールドトンネルの支保工固定構造であって、前記ナット部材は、前記継手板に重ねる固定板を一体に備えるとともに、この固定板を継手板に押し付けて固定する調整ボルトナットを備えることを特徴とする。   The invention according to claim 7 is the shield tunnel support fixing structure according to claim 4, wherein the nut member is integrally provided with a fixing plate that overlaps the joint plate, and the fixing plate is connected to the joint plate. It is characterized by comprising an adjusting bolt and nut that is pressed against and fixed to.

請求項8に記載の発明は、請求項4または7に記載のシールドトンネルの支保工固定構造であって、前記支保工は、H形鋼でそのフランジに形成された固定穴に通したボルトを前記ナット部材に締め込んで固定されることを特徴とする。   The invention according to claim 8 is the support construction fixing structure of the shield tunnel according to claim 4 or 7, wherein the support construction is made of a bolt that is passed through a fixing hole formed in the flange of H-shaped steel. The nut member is fastened and fixed.

本発明によれば、シールドトンネルの補修覆工において、セグメントの継手板を利用して、ボルト部材またはナット部材による一つの専用具を用いるだけで支保工を固定できるため、施工性を向上して施工時間を短縮し、コストを低減できる。   According to the present invention, in the repair lining of the shield tunnel, it is possible to fix the support work by using only one dedicated tool by a bolt member or a nut member using the joint plate of the segment. Construction time can be shortened and costs can be reduced.

以下、図を参照して本発明を実施するための最良の形態を詳細に説明する。
〔第1実施形態〕
図1は本発明を適用した第1実施形態の構成としてH形鋼支保工1を例示したもので、図示のように、H形鋼支保工1は、図示しないシールドトンネルのセグメントリングの内周形状に対応した円弧形状に加工されている。このH形鋼支保工1において、11はフランジ中央の固定穴、12はウェブの開口部、13はフランジ片側の固定穴である。このH形鋼支保工1は、ボルト部材2を用いてセグメントリングの内周に設置される。
Hereinafter, the best mode for carrying out the present invention will be described in detail with reference to the drawings.
[First Embodiment]
FIG. 1 illustrates an H-shaped steel support 1 as a configuration of the first embodiment to which the present invention is applied. As shown in the figure, the H-shaped steel support 1 is an inner periphery of a segment ring of a shield tunnel (not shown). It is processed into an arc shape corresponding to the shape. In this H-shaped steel support 1, 11 is a fixing hole at the center of the flange, 12 is an opening of the web, and 13 is a fixing hole on one side of the flange. The H-shaped steel support 1 is installed on the inner periphery of the segment ring using a bolt member 2.

図2はボルト部材2の設置例を示したもので、図示のように、ボルト部材2は、雄ネジ21を角棒による固定金具22にねじ込んで一体化したものである。このボルト部材2は、その固定金具22が、隣り合うセグメントリングを構成するコンポジットセグメント3・3の継手板31・31の接続端面に溶接して固定される。この実施形態において、雄ネジ21をH形鋼支保工1のフランジ中央の固定穴11に通し、ウェブの開口部12において、雄ネジ21に座金23を当ててナット24を締め込むことで、セグメントリングにH形鋼支保工1が固定される。   FIG. 2 shows an example of the installation of the bolt member 2. As shown in the figure, the bolt member 2 is formed by screwing a male screw 21 into a fixing bracket 22 by a square bar and integrating them. The bolt member 2 is fixed by welding the fixing bracket 22 to the connection end surfaces of the joint plates 31 and 31 of the composite segments 3 and 3 constituting the adjacent segment rings. In this embodiment, the male screw 21 is passed through the fixing hole 11 at the center of the flange of the H-shaped steel support 1, and the nut 24 is tightened by applying a washer 23 to the male screw 21 in the web opening 12, thereby The H-shaped steel support 1 is fixed to the ring.

図3はセグメントリングに設置したH形鋼支保工1への型枠パネル4の設置例を示したもので、32は継手接続作業用凹部、33・34は継手板31・31同士の接続用のボルトナットである。なお、継手接続作業用凹部32はコンクリートで埋められている。
補修覆工用の型枠パネル4・4は、図示のように、H形鋼支保工1のフランジの両側を、型枠パネル4・4と取付板41・41との間に挟んでボルトナット42・43で夫々固定することで、H形鋼支保工1に設置される。なお、型枠パネル4・4には、取付板41・41の回り止めを行うストッパー44・44が夫々埋め込まれている。
FIG. 3 shows an example of installation of the formwork panel 4 to the H-shaped steel support 1 installed on the segment ring. 32 is a recess for joint connection work, 33 and 34 are for connecting the joint plates 31 and 31 to each other. Bolts and nuts. The joint connection recess 32 is filled with concrete.
As shown in the figure, the formwork panels 4 and 4 for repair lining are bolt nuts by sandwiching both sides of the flange of the H-beam support 1 between the formwork panels 4 and 4 and the mounting plates 41 and 41. By fixing with 42 and 43 respectively, it is installed in the H-section steel support 1. In addition, stoppers 44 and 44 for preventing rotation of the mounting plates 41 and 41 are embedded in the formwork panels 4 and 4, respectively.

このように、隣り合うセグメントリングを構成するコンポジットセグメント3・3の継手板31・31を利用し、その継手板31・31の接続端面に溶接するボルト部材2を用いるだけでH形鋼支保工1を固定できる。従って、シールドトンネルの補修覆工において、施工性を向上して施工時間を短縮でき、コスト低減を達成できる。   Thus, using the joint plates 31 and 31 of the composite segments 3 and 3 constituting the adjacent segment rings, and using the bolt member 2 welded to the connection end surface of the joint plates 31 and 31, the H-section steel support work is performed. 1 can be fixed. Therefore, in the repair lining of the shield tunnel, the workability can be improved, the construction time can be shortened, and the cost can be reduced.

〔第2実施形態〕
図4及び図5は本発明を適用した第2実施形態としてH形鋼支保工1の設置例を示したもので、前述した第1実施形態と同様の部分には同一符号を付してその説明を省略する。
すなわち、第2実施形態では、図示のように、雄ネジ21をH形鋼支保工1のフランジ片側の固定穴12に通し、雄ネジ21に座金23を当ててナット24を締め込むことで、セグメントリングにH形鋼支保工1が固定されている。
[Second Embodiment]
4 and 5 show an installation example of the H-section steel support 1 as a second embodiment to which the present invention is applied. The same reference numerals are given to the same parts as those in the first embodiment described above. Description is omitted.
That is, in the second embodiment, as shown in the figure, the male screw 21 is passed through the fixing hole 12 on one side of the flange of the H-shaped steel supporter 1, the washer 23 is applied to the male screw 21, and the nut 24 is tightened. An H-section steel support 1 is fixed to the segment ring.

〔第3実施形態〕
図6及び図7は本発明を適用した第3実施形態としてH形鋼支保工1の設置例を示したもので、前述した第1実施形態と同様の部分には同一符号を付してその説明を省略する。
第3実施形態では、前述したボルト部材2に代えて、ナット部材5を用いる。すなわち、ナット部材5は、図示のように、横長の添接板51の中央に角棒による固定金具52を溶接して一体化するとともに、添接板51の両側部で固定金具52と反対側面に重ね板53を溶接して一体化して、その重ね板53から添接板51に貫通する雌ネジ54を加工したものである。
[Third Embodiment]
6 and 7 show an installation example of the H-section steel support 1 as a third embodiment to which the present invention is applied, and the same reference numerals are given to the same parts as those in the first embodiment described above. Description is omitted.
In the third embodiment, a nut member 5 is used instead of the bolt member 2 described above. That is, as shown in the figure, the nut member 5 is integrated by welding a fixing bracket 52 made of a square bar to the center of a horizontally long attachment plate 51, and on the opposite side of the attachment plate 51 on both sides. The laminated plate 53 is welded and integrated, and the female screw 54 penetrating from the laminated plate 53 to the attachment plate 51 is processed.

このナット部材5は、その固定金具52が、隣り合うセグメントリングを構成するコンポジットセグメント3・3の継手板31・31の接続端面に溶接して固定される。この実施形態においては、添接板51にH形鋼支保工1のフランジを当てて、そのフランジの両側に重ねた取付板55・55の取付穴にボルト56・56を通して雌ネジ54・54に夫々締め込むことで、セグメントリングにH形鋼支保工1が固定される。   The nut member 5 is fixed by welding the fixing fitting 52 to the connection end surfaces of the joint plates 31 and 31 of the composite segments 3 and 3 constituting the adjacent segment rings. In this embodiment, the flange of the H-beam support 1 is applied to the attachment plate 51, and bolts 56 and 56 are passed through the mounting holes of the mounting plates 55 and 55 overlapped on both sides of the flange to the female screws 54 and 54. By tightening each, the H-beam support 1 is fixed to the segment ring.

このように、横長の添接板51を有するナット部材5を用いることで、H形鋼支保工1のフランジに固定穴を加工する必要がないことから、H形鋼支保工1の強度を落とすことがない。   Thus, by using the nut member 5 having the horizontally long attachment plate 51, it is not necessary to machine a fixing hole in the flange of the H-shaped steel support 1, so the strength of the H-shaped steel support 1 is reduced. There is nothing.

〔第4実施形態〕
図8及び図9は本発明を適用した第4実施形態としてナット部材6の設置例を示したもので、前述した第1実施形態と同様の部分には同一符号を付してその説明を省略する。
第4実施形態では、前述したボルト部材2に代えて、ナット部材6を用いる。すなわち、ナット部材6は、図示のように、長尺ナット61を固定板62の一面に溶接して一体化したものである。固定板62には、円穴63が形成されるとともに、長尺ナット61と同じ面にブリッジ板64が溶接して一体化されており、このブリッジ板64に調整ボルト65がねじ込まれて、調整ナット66により調整ボルト65の突出量が調整可能となっている。
[Fourth Embodiment]
FIG. 8 and FIG. 9 show an installation example of the nut member 6 as a fourth embodiment to which the present invention is applied. The same reference numerals are given to the same parts as those in the first embodiment, and the description thereof is omitted. To do.
In the fourth embodiment, a nut member 6 is used instead of the bolt member 2 described above. That is, the nut member 6 is integrated by welding a long nut 61 to one surface of the fixed plate 62 as shown. A circular hole 63 is formed in the fixing plate 62, and a bridge plate 64 is integrated by welding on the same surface as the long nut 61, and an adjustment bolt 65 is screwed into the bridge plate 64 for adjustment. The protruding amount of the adjusting bolt 65 can be adjusted by the nut 66.

以上のナット部材6は、その固定板62が、隣り合うセグメントリングを構成するコンポジットセグメント3・3の継手板31・31の側面に重ねられる。このとき、継手板31・31同士を結合するボルト33の頭部は、固定板62の円穴63内に位置している。そして、ブリッジ板64にねじ込まれた調整ボルト65の突出量を調整ナット66により調整して、調整ボルト65頭部の突出端を、コンポジットセグメント3の継手接続作業用凹部32の反対側の壁に押し付ける。この調整ボルト65により、継手板31に対し固定板62が押し付けられた固定状態に保持されるため、継手板31から固定板62が倒れるのを防止できる。   The fixing plate 62 of the nut member 6 is overlapped on the side surfaces of the joint plates 31 and 31 of the composite segments 3 and 3 constituting the adjacent segment rings. At this time, the head of the bolt 33 that joins the joint plates 31 and 31 is located in the circular hole 63 of the fixing plate 62. Then, the protruding amount of the adjusting bolt 65 screwed into the bridge plate 64 is adjusted by the adjusting nut 66, and the protruding end of the adjusting bolt 65 head is placed on the wall on the opposite side of the joint connecting work recess 32 of the composite segment 3. Press. The adjustment bolt 65 holds the fixing plate 62 against the joint plate 31 so that the fixing plate 62 is pressed against the joint plate 31, so that the fixing plate 62 can be prevented from falling from the joint plate 31.

この実施形態においては、H形鋼支保工1のフランジ片側の固定穴12にボルト67を通して長尺ナット61に締め込むことで、セグメントリングにH形鋼支保工1が固定されている。   In this embodiment, the H-shaped steel support 1 is fixed to the segment ring by tightening the long nut 61 through the bolt 67 in the fixing hole 12 on one side of the flange of the H-shaped steel support 1.

このように、ナット部材6の固定板62を、隣り合うセグメントリングを構成するコンポジットセグメント3・3の継手板31・31の側面に重ねて、調整ボルトナット65・66で押し付けて固定することで、シールドトンネルの補修覆工箇所において、湧き水のあるところで前記ボルト部材2や前記ナット部材5を溶接できない場合でも、H形鋼支保工1を設置するためのナット部材6を継手板31に固定できる。   In this way, the fixing plate 62 of the nut member 6 is overlapped on the side surfaces of the joint plates 31 and 31 of the composite segments 3 and 3 constituting the adjacent segment rings, and is pressed and fixed by the adjusting bolt nuts 65 and 66. Even if the bolt member 2 and the nut member 5 cannot be welded at the repair lining location of the shield tunnel in the presence of spring water, the nut member 6 for installing the H-shaped steel support 1 can be fixed to the joint plate 31. .

なお、以上の実施形態においては、支保工をH形鋼としたが、本発明はこれに限定されるものではなく、他の鋼材による支保工であっても良い。
また、実施形態では、コンポジットセグメントとしたが、他のセグメントであっても良く、その他、具体的な細部構造等についても適宜に変更可能であることは勿論である。
In addition, in the above embodiment, although the supporting work was made into the H-section steel, this invention is not limited to this, The supporting work by other steel materials may be sufficient.
In the embodiment, the composite segment is used. However, other segments may be used, and it is needless to say that other detailed structures can be appropriately changed.

本発明を適用した第1実施形態の構成を示すもので、支保工を例示した側面図(a)と、その矢印B−B線に沿った断面図(b)と、矢印C部の拡大詳細図(c)である。The structure of 1st Embodiment to which this invention is applied is shown, The side view which illustrated the support work (a), sectional drawing (b) along the arrow BB line, and the enlarged detail of the arrow C part It is a figure (c). 図1のボルト部材の設置例を示した要部斜視図(a)と、その正面図(b)と、その矢印C−C線に沿った断面図(c)と、図(b)の矢印D−D線に沿った断面図(d)である。The principal part perspective view (a) which showed the example of installation of the bolt member of FIG. 1, the front view (b), sectional drawing (c) along the arrow CC line, and the arrow of figure (b) It is sectional drawing (d) along the DD line. 図1の支保工への型枠の設置例を示した横断平面図(a)と、その矢印B−B線に沿った断面図(b)と、同矢印C−C線に沿った断面図(c)と、同矢印D−D線に沿った断面図(d)と、同矢印E−E線に沿った断面図(e)である。1 is a cross-sectional plan view (a) showing an example of installation of a formwork to the support in FIG. 1, a cross-sectional view (b) along the arrow BB line, and a cross-sectional view along the arrow CC line. They are (c), sectional drawing (d) along the arrow DD line, and sectional drawing (e) along the arrow EE line. 本発明を適用した第2実施形態を示すもので、支保工の設置例を示した要部斜視図である。The 2nd Embodiment to which this invention is applied is shown and it is the principal part perspective view which showed the example of installation of the support work. 図4の要部の横断平面図(a)と、その矢印B−B線に沿った断面図(b)と、同矢印C−C線に沿った断面図(c)と、同矢印D−D線に沿った断面図(d)と、同矢印E−E線に沿った断面図(e)である。A cross-sectional plan view (a) of the main part of FIG. 4, a cross-sectional view (b) along the arrow BB line, a cross-sectional view (c) along the arrow CC line, and an arrow D-- It is sectional drawing (d) along D line, and sectional drawing (e) along the arrow EE line. 本発明を適用した第3実施形態を示すもので、支保工の設置例を示した要部斜視図である。The 3rd Embodiment to which this invention is applied is shown and it is the principal part perspective view which showed the example of installation of the support work. 図6のナット部材の設置例を示した要部斜視図(a)と、そのナット部材の斜視図(b)である。It is the principal part perspective view (a) which showed the example of installation of the nut member of FIG. 6, and the perspective view (b) of the nut member. 本発明を適用した第4実施形態を示すもので、ナット部材の設置例を示した要部正面図である。The 4th Embodiment to which this invention is applied is shown and it is the principal part front view which showed the example of installation of a nut member. 図8のナット部材への支保工及び型枠の設置例を示した横断平面図(a)と、その矢印B−B線に沿った断面図(b)と、同矢印C−C線に沿った断面図(c)と、同矢印D−D線に沿った断面図(d)と、同矢印E−E線に沿った断面図(e)である。The cross-sectional plan view (a) which showed the example of installation to the nut member and formwork of FIG. 8, sectional drawing (b) along the arrow BB line, and along the arrow CC line They are sectional drawing (c), sectional drawing (d) along the arrow DD line, and sectional drawing (e) along the arrow EE line.

符号の説明Explanation of symbols

1 支保工
11 固定穴
12 開口部
13 固定穴
2 ボルト部材
21 雄ネジ
22 固定金具
23 座金
24 ナット
3 コンポジットセグメント
31 継手板
32 継手接続作業用凹部
33・34 ボルトナット
4 型枠パネル
41 取付板
42・43 ボルトナット
44 ストッパー
5 ナット部材
51 添接板
52 固定金具
53 重ね板
54 雌ネジ
55 取付板
56 ボルト
6 ナット部材
61 長尺ナット
62 固定板
63 円穴
64 ブリッジ板
65 調整ボルト
66 調整ナット
67 ボルト
DESCRIPTION OF SYMBOLS 1 Supporting work 11 Fixing hole 12 Opening part 13 Fixing hole 2 Bolt member 21 Male screw 22 Fixing bracket 23 Washer 24 Nut 3 Composite segment 31 Joint plate 32 Joint connection work recessed part 33/34 Bolt nut 4 Formwork panel 41 Mounting plate 42 43 bolt nut 44 stopper 5 nut member 51 fitting plate 52 fixing bracket 53 overlap plate 54 female screw 55 mounting plate 56 bolt 6 nut member 61 long nut 62 fixing plate 63 circular hole 64 bridge plate 65 adjustment bolt 66 adjustment nut 67 bolt

Claims (8)

セグメントリングを互いに接続する継手板に、セグメントリングの内方に突出するボルト部材を固定し、
このボルト部材に支保工を固定したことを特徴とするシールドトンネルの支保工固定構造。
A bolt member protruding inward of the segment ring is fixed to the joint plate that connects the segment rings to each other.
A shield tunnel support fixing structure characterized in that a support is fixed to the bolt member.
前記ボルト部材は、前記継手板の接続端面に溶接される固定金具を一体に備えることを特徴とする請求項1に記載のシールドトンネルの支保工固定構造。   2. The shield tunnel support fixing structure according to claim 1, wherein the bolt member integrally includes a fixing metal member welded to a connection end surface of the joint plate. 前記支保工は、H形鋼でそのフランジに形成された固定穴に通した前記ボルト部材にナットを締め付けて固定されることを特徴とする請求項1または2に記載のシールドトンネルの支保工固定構造。   3. The shield tunnel support fixing according to claim 1, wherein the support is fixed by tightening a nut to the bolt member that is passed through a fixing hole formed in a flange of the H-shaped steel. Construction. セグメントリングを互いに接続する継手板に、側方に位置するナット部材を固定し、
このナット部材に支保工を固定したことを特徴とするシールドトンネルの支保工固定構造。
Fix the nut member located on the side to the joint plate that connects the segment rings to each other,
A shield tunnel support fixing structure characterized in that a support is fixed to the nut member.
前記ナット部材は、前記継手板の接続端面に溶接される固定板を一体に備えることを特徴とする請求項4に記載のシールドトンネルの支保工固定構造。   5. The shield tunnel support fixing structure according to claim 4, wherein the nut member is integrally provided with a fixing plate welded to a connection end surface of the joint plate. 前記支保工は、H形鋼でそのフランジを挟む取付板に形成された取付穴に通したボルトを前記ナット部材に締め込んで固定されることを特徴とする請求項4または5に記載のシールドトンネルの支保工固定構造。   The shield according to claim 4 or 5, wherein the support is fixed by tightening a bolt, which is passed through a mounting hole formed in a mounting plate sandwiching the flange thereof with H-shaped steel, into the nut member. Tunnel support fixing structure. 前記ナット部材は、前記継手板に重ねる固定板を一体に備えるとともに、この固定板を継手板に押し付けて固定する調整ボルトナットを備えることを特徴とする請求項4に記載のシールドトンネルの支保工固定構造。   5. The shield tunnel support according to claim 4, wherein the nut member is integrally provided with a fixing plate that overlaps the joint plate, and an adjustment bolt nut that presses and fixes the fixing plate to the joint plate. Fixed structure. 前記支保工は、H形鋼でそのフランジに形成された固定穴に通したボルトを前記ナット部材に締め込んで固定されることを特徴とする請求項4または7に記載のシールドトンネルの支保工固定構造。   The support for the shield tunnel according to claim 4 or 7, wherein the support is fixed by tightening a bolt passed through a fixing hole formed in a flange of H-shaped steel into the nut member. Fixed structure.
JP2007092570A 2007-03-30 2007-03-30 Support structure for shield tunnel support Expired - Fee Related JP4298763B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007092570A JP4298763B2 (en) 2007-03-30 2007-03-30 Support structure for shield tunnel support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007092570A JP4298763B2 (en) 2007-03-30 2007-03-30 Support structure for shield tunnel support

Publications (2)

Publication Number Publication Date
JP2008248611A true JP2008248611A (en) 2008-10-16
JP4298763B2 JP4298763B2 (en) 2009-07-22

Family

ID=39973873

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007092570A Expired - Fee Related JP4298763B2 (en) 2007-03-30 2007-03-30 Support structure for shield tunnel support

Country Status (1)

Country Link
JP (1) JP4298763B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105650452A (en) * 2014-12-03 2016-06-08 威乐(中国)水泵系统有限公司 Coupling protective cover
CN107435548A (en) * 2017-07-17 2017-12-05 中铁隧道勘测设计院有限公司 A kind of waterproof structure of shield tunnel segment seam and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105650452A (en) * 2014-12-03 2016-06-08 威乐(中国)水泵系统有限公司 Coupling protective cover
CN107435548A (en) * 2017-07-17 2017-12-05 中铁隧道勘测设计院有限公司 A kind of waterproof structure of shield tunnel segment seam and its construction method

Also Published As

Publication number Publication date
JP4298763B2 (en) 2009-07-22

Similar Documents

Publication Publication Date Title
JP2015092114A (en) Clamps, and member-fixing structure using the same
JP2000144906A (en) Column/beam joint section between cft structural column and src structural beam and beam main bar fixing metal fixture
JP4298763B2 (en) Support structure for shield tunnel support
JP2007270511A (en) Reinforcement structure and steel plate for reinforcement of structure
JP4693737B2 (en) Interior panel mounting structure on the inner surface of steel shell submerged tunnel
JP2006138392A (en) Plate material joining method and joining structure
JP2012107416A (en) Beam joint structure
JP7409849B2 (en) Reinforcement structure of existing tunnel
JP2011021413A (en) Hold-down hardware
KR100370177B1 (en) Compression bracket for external prestressing reinforcement of girder
KR20040026598A (en) Joint structure of civil construction
JP2008127744A (en) Aseismic strengthening structure of existing building
JP2010242392A (en) Seismic strengthening structure
JP2017020540A (en) Bolt joint method for steel material
JP2006193996A (en) Fixing structure of column
KR200415020Y1 (en) connection assembly structure of mold panel
JP2009299379A (en) Method of attaching fire-resistant coating panel
JP4521550B2 (en) Repair board mounting tool and shield tunnel repair method
JP2000226938A (en) Earthquake resistance repair method for existing building
JPH1122393A (en) Joint method of steel-made segment
RU2736458C2 (en) Bolted connection of parts
KR20180098566A (en) Tension holders with adapters for coupling prefabricated concrete elements
JP2011006889A (en) Reinforcing fitting for wooden building
JP2002213191A (en) Joint structure for rc segments
JP2011106241A (en) Pile head joint structure

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090316

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090324

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090415

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120424

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130424

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130424

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140424

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees