JP2008221639A - Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client - Google Patents

Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client Download PDF

Info

Publication number
JP2008221639A
JP2008221639A JP2007063749A JP2007063749A JP2008221639A JP 2008221639 A JP2008221639 A JP 2008221639A JP 2007063749 A JP2007063749 A JP 2007063749A JP 2007063749 A JP2007063749 A JP 2007063749A JP 2008221639 A JP2008221639 A JP 2008221639A
Authority
JP
Japan
Prior art keywords
job
time
client
processing apparatus
notification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007063749A
Other languages
Japanese (ja)
Inventor
Shoji Yokoyama
昌二 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiko Epson Corp
Original Assignee
Seiko Epson Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Epson Corp filed Critical Seiko Epson Corp
Priority to JP2007063749A priority Critical patent/JP2008221639A/en
Publication of JP2008221639A publication Critical patent/JP2008221639A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Accessory Devices And Overall Control Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To enhance the possibility that a job processor of a printer etc. can complete a job by a time expected by a user. <P>SOLUTION: The client 5 notifies the printer 3 of an expected time 33 associated with a certain job and input by the user. Before the job is actually executed, the printer 3 estimates a time for the execution of the job, predicts whether or not the estimated time is delayed from the expected time, and transmits a delay notification 43 on the basis of a predicted effect to the clienet 5. The client displays the delay notification 43. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、プリンタのようにクライアントからジョブを受信するジョブ処理装置、及びそのようなジョブ処理装置とクライアントを有するシステムに関し、特に、ジョブ処理装置からクライアントにジョブの実行時間に関する情報を報告するための技術に関する。   The present invention relates to a job processing apparatus that receives a job from a client, such as a printer, and a system including such a job processing apparatus and a client, and more particularly, to report information related to a job execution time from the job processing apparatus to the client. Related to technology.

特許文献1には、この種のジョブ処理装置の一例であるネットワークプリンタとプリンタサーバとが組み合わさったシステムにおいて、プリンタサーバが、クライアントから受信した印刷ジョブに要する印刷時間を推定し、全ての印刷ジョブの推定印刷時間をクライアントへ通知すること、及び、印刷時間の短い文書を優先的に印刷することなどが開示されている。   In Patent Document 1, in a system in which a network printer, which is an example of this type of job processing apparatus, and a printer server are combined, the printer server estimates a printing time required for a print job received from a client, and all printing is performed. Notifying a client of an estimated print time of a job and preferentially printing a document with a short print time are disclosed.

特開2000−353060号公報JP 2000-353060 A

上記従来技術によれば、優先度が低い印刷ジョブは、印刷順位が次々と遅くなり、ユーザは自分の期待する時に印刷物を得ることができない場合が発生するという問題点がある。同様の問題は、プリンタに限らず、ジョブの実行にある程度の時間を要する他の種類のジョブ処理装置でもあるであろう。   According to the above-described prior art, there is a problem in that a print job with a low priority has a printing order that is delayed one after another, and the user may not be able to obtain a printed matter when he / she expects. A similar problem is not limited to a printer, but may be other types of job processing apparatuses that require a certain amount of time to execute a job.

従って、本発明の目的は、ジョブ処理装置において、ユーザの期待する時までにジョブを完了できる可能性を向上させることにある。   Therefore, an object of the present invention is to improve the possibility that a job can be completed by the time expected by the user in the job processing apparatus.

本発明の一つの側面に従うシステムは、ジョブを発生するクライアントと、前記クライアントから前記ジョブを受信し実行するためのジョブ処理装置とを備え、前記クライアントは、特定のジョブについての期待時間をユーザから入力する時間入力手段と、入力された前記期待時間を前記ジョブ処理装置へ通知する時間通知手段と、前記ジョブ処理装置から遅延通知を受信して表示する通知表示手段とを備え、前記ジョブ処理装置は、前記クライアントから前記期待時間の通知を受信する時間受信手段と、前記特定のジョブが実際に実行される前に、前記特定のジョブが実行されることになる時間が、通知された前記期待時間より遅延するか否かを予測する予測手段と、前記予測手段に応答して前記遅延通知を前記クライアントへ送信する遅延通知手段とを備える。   A system according to one aspect of the present invention includes a client that generates a job, and a job processing device that receives and executes the job from the client, and the client determines an expected time for a specific job from a user. The job processing apparatus comprising: a time input means for inputting; a time notification means for notifying the job processing apparatus of the input expected time; and a notification display means for receiving and displaying a delay notification from the job processing apparatus. A time receiving means for receiving a notification of the expected time from the client, and a time when the specific job is to be executed before the specific job is actually executed. A prediction means for predicting whether or not to delay from the time; and a delay for transmitting the delay notification to the client in response to the prediction means. And a notification means.

このシステムによれば、クライアントは、ジョブ処理装置から、或るジョブの実行がユーザの期待する時間より遅延するかどうかの通知を受けて、この通知を表示する。ユーザは、その表示された通知に応じて、例えば、そのジョブを別のジョブ処理装置に依頼するなどの対応を行うことが容易になるので、期待時までにジョブが完了する可能性が向上する。   According to this system, the client receives a notification from the job processing apparatus whether execution of a certain job is delayed from the time expected by the user, and displays this notification. In response to the displayed notification, for example, it becomes easy for the user to perform a response such as requesting the job to another job processing apparatus, so that the possibility of completing the job by the expected time is improved. .

上記システムは複数の前記ジョブ処理装置を有していてもよい。そして、前記クライアントの前記時間通知手段は、前記複数のジョブ処理装置に並行的に前記期待時間の通知を送ることができるようになっていてよい。これにより、複数のジョブ処理装置から、そのジョブの実行が期待時間より遅れるか否かの通知が得られるので、ユーザにとり、遅延が生じないジョブ処理装置を選んで、そのジョブ処理装置にジョブの実行を依頼することが容易である。   The system may include a plurality of the job processing devices. The time notification unit of the client may be configured to send the notification of the expected time in parallel to the plurality of job processing devices. As a result, a notification can be obtained from a plurality of job processing devices as to whether or not the execution of the job is delayed from the expected time. Therefore, for the user, a job processing device that does not cause a delay is selected, and the job processing device can receive the job It is easy to request execution.

本発明の別の側面に従う、クライアントからジョブを受信し実行するジョブ処理装置は、前記クライアントから特定のジョブについての期待時間の通知を受信する時間受信手段と、前記クライアントから受信された前記特定のジョブが実際に実行される前に、前記特定のジョブが実行されることになる時間が、通知された前記期待時間より遅延するか否かを予測する予測手段と、前記予測手段に応答して前記遅延通知を前記クライアントへ送信する遅延通知手段とを備える。   According to another aspect of the present invention, a job processing apparatus for receiving and executing a job from a client includes time receiving means for receiving a notification of an expected time for a specific job from the client, and the specific reception received from the client. In response to the prediction means, a prediction means for predicting whether or not the time that the specific job will be executed is delayed from the notified expected time before the job is actually executed. Delay notification means for transmitting the delay notification to the client.

このジョブ処理装置は、或るジョブの実行がユーザの期待する時間より遅延するかどうかをクライアントへ通知する。ユーザは、その通知に応じて、例えば、そのジョブを別のジョブ処理装置に依頼するなどの対応を行うことが容易になるので、期待時までにジョブが完了する可能性が向上する。   This job processing apparatus notifies the client whether execution of a certain job is delayed from the time expected by the user. In response to the notification, for example, the user can easily perform a response such as requesting the job to another job processing apparatus, so that the possibility that the job will be completed by the expected time is improved.

このジョブ処理装置の好適な実施形態では、前記予測手段は、前記特定のジョブの実行が行われる、完了する又は開始すると推定される時間である推定時間を計算する計算手段と、計算された前記推定時間が、前記期待時間より遅延するか否かを判断する判断手段とを有し、前記遅延通知手段は前記判断手段に応答して前記遅延通知を送信する。   In a preferred embodiment of the job processing apparatus, the predicting means includes a calculating means for calculating an estimated time, which is an estimated time for completion or start of execution of the specific job, and the calculated Determination means for determining whether or not the estimated time is delayed from the expected time, and the delay notification means transmits the delay notification in response to the determination means.

また、好適な実施形態では、前記計算手段は、前記推定時間と前記期待時間との差分をさらに計算し、前記遅延通知手段は、計算された前記差分を前記遅延通知に含ませる。   In a preferred embodiment, the calculation means further calculates a difference between the estimated time and the expected time, and the delay notification means includes the calculated difference in the delay notification.

また、好適な実施形態では、前記計算手段は、前記ジョブ処理装置内で1以上の待ちジョブが、所定の実行順序で実行されることを待っている場合、前記待ちジョブの各々の実行に要する時間であるジョブ時間を推定するジョブ時間推定手段と、前記実行順序にて前記特定のジョブより前順にある前記待ちジョブについて推定された前記ジョブ時間に基づいて、前記推定時間を計算する手段とを有する。   In a preferred embodiment, the calculation means is required to execute each of the waiting jobs when waiting for one or more waiting jobs to be executed in a predetermined execution order in the job processing apparatus. Job time estimating means for estimating a job time that is a time; and means for calculating the estimated time based on the job time estimated for the waiting job that is in the order of execution before the specific job in the execution order. Have.

また、好適な実施形態では、前記ジョブ時間推定手段は、各待ちジョブのジョブ属性を把握し、把握された前記ジョブ属性に基づいて、前記各待ちジョブの前記ジョブ時間を推定する。   In a preferred embodiment, the job time estimating means grasps the job attribute of each waiting job and estimates the job time of each waiting job based on the grasped job attribute.

また、好適な実施形態では、前記ジョブが印刷ジョブである場合、前記ジョブ属性は、モノクロ印刷かカラー印刷かの分類、両面印刷か片面印刷かの分類、印刷用紙のサイズ、及び印刷ページ数を含む。   In a preferred embodiment, when the job is a print job, the job attributes include monochrome printing or color printing classification, double-sided printing or single-sided printing classification, print paper size, and number of printed pages. Including.

本発明のまた別の側面に従う、ジョブ処理装置からクライアントへ、ジョブの実行に関する情報を通知するための方法は、前記クライアントが、特定のジョブについての期待時間をユーザから入力するステップと、前記クライアントが、入力された前記期待時間を前記ジョブ処理装置へ通知するステップと、前記ジョブ処理装置が、前記特定のジョブが実際に実行される前に、前記特定のジョブが実行されることになる時間が、前記クライアントから通知された前記期待時間より遅延するか否かを予測するステップと、前記ジョブ処理装置が、前記予測の結果に応答して遅延通知を前記クライアントへ送信するステップと、前記クライアントが、前記ジョブ処理装置からの前記遅延通知を表示するステップとを有する。   According to still another aspect of the present invention, a method for notifying a client of information related to job execution from a job processing apparatus to a client includes: a step in which the client inputs an expected time for a specific job; A step of notifying the job processing apparatus of the input expected time, and a time when the job processing apparatus is to execute the specific job before the specific job is actually executed. Predicting whether to delay from the expected time notified from the client, the job processing device transmitting a delay notification to the client in response to the prediction result, and the client Displaying the delay notification from the job processing apparatus.

本発明によれば、ユーザの期待する時までにジョブを完了させる可能性が向上する。   According to the present invention, the possibility of completing a job by the time expected by the user is improved.

図1は、本発明の一実施形態にかかる周辺機器としてのプリンタ3と、そのプリンタ1に印刷ジョブを送信するクライアント(例えば、汎用コンピュータ、デジタルカメラ、携帯電話機など)5とを備えるプリントシステム1の全体構成を示す。   FIG. 1 shows a printing system 1 including a printer 3 as a peripheral device according to an embodiment of the present invention and a client (for example, a general-purpose computer, a digital camera, a mobile phone, etc.) 5 that transmits a print job to the printer 1. The overall configuration of is shown.

プリンタ3とクライアント5は、通信ネットワークまたは専用ケーブルなどを介して、相互に通信可能である。プリンタ3は、ここでは1つの装置として説明するが、プリンタとプリンタサーバのような複数の装置の組み合わせからなるシステムであってもよい。   The printer 3 and the client 5 can communicate with each other via a communication network or a dedicated cable. Although the printer 3 is described here as a single device, it may be a system composed of a combination of a plurality of devices such as a printer and a printer server.

クライアント5は、プリンタドライバ7プリンタ3と通信するためのプリンタドライバ7を備える。プリンタドライバ7は、本発明に関連する機能として、ジョブ生成送信部11、時間入力部13、完了時間要求部15及び遅延表示部17を有する。プリンタ3は、本発明に関連する機能として、ジョブ受信待機部21、ジョブ実行部23、ジョブ時間推定部25及び遅延判断部27を有する。   The client 5 includes a printer driver 7 for communicating with the printer driver 7 and the printer 3. The printer driver 7 includes a job generation / transmission unit 11, a time input unit 13, a completion time request unit 15, and a delay display unit 17 as functions related to the present invention. The printer 3 includes a job reception standby unit 21, a job execution unit 23, a job time estimation unit 25, and a delay determination unit 27 as functions related to the present invention.

クライアント5のジョブ生成送信部11は、ユーザからの印刷要求に応答して、或るアプリケーションプログラム(図示省略)から特定の印刷ジョブの文書データを受け取り、受け取られた文書データから、その特定の印刷ジョブの印刷ジョブデータ31を生成して、その印刷ジョブデータ31をプリンタ3に送信する。   In response to a print request from the user, the job generation / transmission unit 11 of the client 5 receives document data of a specific print job from an application program (not shown), and receives the specific print from the received document data. Print job data 31 for the job is generated, and the print job data 31 is transmitted to the printer 3.

時間入力部13は、ジョブ生成送信部11に応答して、その特定の印刷ジョブについてユーザが期待する印刷ジョブの実行が完了する時間(例えば、印刷ジョブデータ31がプリンタ1へ送信された時点もしくは現時点からその印刷ジョブの全ページの印刷物が出力され終わるまでの時間長、又はその全ページの印刷物が出力され終わる時刻、に対するユーザの期待値)(以下、「期待完了時間」という)33を、ユーザに入力させ、そして、そのユーザ入力された期待完了時間33を完了時間要求部15に送る。ここで、ユーザに期待完了時間33を入力させる時期としては、典型的には、ジョブ生成送信部11がその特定の印刷ジョブの印刷ジョブデータ31の生成を開始する前を選ぶことができるが、必ずしもそうである必要はなく、印刷ジョブデータ31の生成中、あるいは、印刷ジョブデータ31の送信後の時期であってもよい。完了時間要求部15は、その特定の印刷ジョブについての期待完了時間33を組み込んだ完了時間要求35を生成し、その完了時間要求35を、所定の方法で(例えば、印刷ジョブデータ31の識別情報を完了時間要求35に組み込む、又は完了時間要求35を印刷ジョブデータ31自体に組み込むなどの方法)で印刷ジョブデータ31に関連付けた形で、プリンタ3へ送信する。送信された完了時間要求35は、プリンタ3の遅延判断部27に受信される。   In response to the job generation / transmission unit 11, the time input unit 13 completes execution of the print job expected by the user for the specific print job (for example, when the print job data 31 is transmitted to the printer 1 or The user's expected value for the length of time from the current time until the printout of all pages of the print job has been output, or the time at which the printout of all pages has been output) (hereinafter referred to as “expected completion time”) 33, The user inputs the expected completion time 33 input by the user and sends it to the completion time request unit 15. Here, typically, the time when the user inputs the expected completion time 33 can be selected before the job generation transmission unit 11 starts generating the print job data 31 of the specific print job. This is not necessarily the case, and it may be during generation of the print job data 31 or after transmission of the print job data 31. The completion time request unit 15 generates a completion time request 35 incorporating the expected completion time 33 for the specific print job, and the completion time request 35 is generated by a predetermined method (for example, identification information of the print job data 31). Is transmitted to the printer 3 in a form associated with the print job data 31 by a method such as incorporating the completion time request 35 into the completion time request 35 or incorporating the completion time request 35 into the print job data 31 itself. The transmitted completion time request 35 is received by the delay determination unit 27 of the printer 3.

プリンタ3では、ジョブ受信待機部21が、クライアント5から印刷ジョブデータ31を受信し、受信された印刷ジョブデータ31を記憶し、且つその印刷ジョブをジョブキュー(図示省略)に登録する。ジョブ実行部23は、ジョブキューから、印刷順序が1番目である1つの印刷ジョブを取り出し、取り出された印刷ジョブの印刷ジョブデータ37をジョブ受信待機部21から読み込み、そして、読み込まれた印刷ジョブデータ37を解釈して印刷を実行する。ジョブ実行部23は、ジョブキュー内に1つ以上の印刷ジョブが存在する限り、上記の動作を繰り返す。   In the printer 3, the job reception standby unit 21 receives the print job data 31 from the client 5, stores the received print job data 31, and registers the print job in a job queue (not shown). The job execution unit 23 extracts one print job having the first print order from the job queue, reads the print job data 37 of the extracted print job from the job reception standby unit 21, and then reads the read print job Data 37 is interpreted and printing is executed. The job execution unit 23 repeats the above operation as long as one or more print jobs exist in the job queue.

プリンタ3では、また、ジョブ時間推定部25が、クライアント5から送信された完了時間要求35に関連付けられた特定の印刷ジョブがどれであるかを把握し、ジョブ受信待機部21内のその特定の印刷ジョブの印刷ジョブデータ31から(例えば、印刷ジョブデータ31のヘッダから)、その特定の印刷ジョブの属性(以下、「ジョブ属性」という)39を把握し、そのジョブ属性39に基づいてその特定の印刷ジョブの実行に要する時間(すなわち、印刷ジョブデータ31がジョブ実行部23に読み込まれてからその印刷ジョブの全ページの印刷物が出力され終わるまでの所要時間)を推定する。ここで、上述したジョブ属性39とは、印刷ジョブ実行時間に影響を及ぼす印刷ジョブの属性であり、例えば、本実施例では、印刷ジョブのモード(例えば、モノクロ印刷かカラー印刷かの分類と、片面印刷か両面印刷かの分類と、及び印刷用紙のサイズの分類との組み合わせ)と印刷ジョブの量(例えば、印刷物のページ数)とを含む。ジョブ時間推定部25は、上記特定の印刷ジョブについて推定された印刷ジョブ実行時間(以下、「推定ジョブ時間」という)41を、遅延判断部27へ通知する。   In the printer 3, the job time estimation unit 25 also grasps which specific print job is associated with the completion time request 35 transmitted from the client 5, and the specific job in the job reception waiting unit 21. From the print job data 31 of the print job (for example, from the header of the print job data 31), the attribute (hereinafter referred to as “job attribute”) 39 of the specific print job is grasped, and the specification based on the job attribute 39 The time required for executing the print job (that is, the time required from the time when the print job data 31 is read into the job execution unit 23 until the output of all printed pages of the print job is completed) is estimated. Here, the above-described job attribute 39 is an attribute of the print job that affects the print job execution time. For example, in this embodiment, the print job mode (for example, monochrome printing or color printing, Including a classification of single-sided printing or double-sided printing and a classification of the size of the printing paper) and the amount of a print job (for example, the number of pages of a printed material). The job time estimation unit 25 notifies the delay determination unit 27 of a print job execution time (hereinafter referred to as “estimated job time”) 41 estimated for the specific print job.

遅延判断部27は、ジョブ時間推定部25から通知されたその特定の印刷ジョブの推定ジョブ時間41と、その特定の印刷ジョブより印刷順序が先である他の印刷ジョブの推定ジョブ時間41とに基づいて、その特定の印刷ジョブの実行が完了する時間(例えば、現在からその印刷ジョブの実行が完了するまでの待ち時間、又はその印刷ジョブの実行が完了する時刻)を推定する。そして、遅延判断部27は、推定されたその特定の印刷ジョブの実行完了時間(以下、「推定完了時間」という)と、クライアント5から受信されたその特定の印刷ジョブの完了時間要求35に含まれる期待完了時間33とを比較して、その印刷ジョブの推定完了時間が期待完了時間33より遅いか否かを判断する。そして、推定完了時間が期待完了時間33より遅いと判断された場合、遅延判断部27は、推定印刷完了時間が期待完了時間より遅延することをユーザに知らせるための遅延通知43をクライアント5へ送信する。ここで、遅延通知43には、望ましくは、単に遅延することだけでなく、推定印刷完了時間と期待完了時間との差分(遅延時間)の情報も含まれる。なお、推定完了時間が期待完了時間33より早いと判断された場合には、遅延判断部27は、本実施形態では、何の通知もクライアント5へ送信しないが、変形例として、期待完了時間内に印刷が完了することをユーザに知らせるための通知をクライアント5へ送信してもよい。   The delay determination unit 27 determines the estimated job time 41 of the specific print job notified from the job time estimation unit 25 and the estimated job time 41 of other print jobs whose printing order is earlier than the specific print job. Based on this, the time for which the execution of the specific print job is completed (for example, the waiting time until the execution of the print job is completed from the present time or the time when the execution of the print job is completed) is estimated. The delay determination unit 27 includes the estimated execution completion time of the specific print job (hereinafter referred to as “estimated completion time”) and the specific print job completion time request 35 received from the client 5. Is compared with the expected completion time 33 to determine whether the estimated completion time of the print job is later than the expected completion time 33. When it is determined that the estimated completion time is later than the expected completion time 33, the delay determination unit 27 transmits a delay notification 43 for notifying the user that the estimated printing completion time is delayed from the expected completion time to the client 5. To do. Here, the delay notification 43 preferably includes not only a delay but also information on a difference (delay time) between the estimated print completion time and the expected completion time. When it is determined that the estimated completion time is earlier than the expected completion time 33, the delay determination unit 27 does not transmit any notification to the client 5 in the present embodiment. A notification for notifying the user that printing is completed may be transmitted to the client 5.

クライアント5では、遅延表示部17が、プリンタ3からの遅延通知43を受信して、これをクライアント5のディスプレイスクリーン(図示省略)に表示する。ユーザは、表示された遅延通知43から、その特定の印刷ジョブの完了が期待完了時間より遅延することを知ることができる。また、遅延通知43に遅延時間が含まれている場合には、ユーザは、遅延時間がどの程度の長さなのかも知ることができる。その結果、ユーザは、時期に遅れることなく、プリンタ3へ送信済の印刷ジョブデータ31をキャンセルしたり、あるいは、クライアント5と通信可能な別のプリンタ(図示省略)へ印刷ジョブデータ31を送信し直したりするオプションを行うことができる。従って、ユーザが期待する時までにその印刷ジョブを完了させる可能性が向上する。なお、印刷ジョブをキャンセルする方法や別のプリンタへ送信し直す方法には、公知の方法が採用できるから、この明細書ではそれらの方法の説明は省略する。   In the client 5, the delay display unit 17 receives the delay notification 43 from the printer 3 and displays it on the display screen (not shown) of the client 5. The user can know from the displayed delay notification 43 that the completion of the specific print job is delayed from the expected completion time. When the delay notification 43 includes a delay time, the user can also know how long the delay time is. As a result, the user cancels the print job data 31 that has been transmitted to the printer 3 without delay, or transmits the print job data 31 to another printer (not shown) that can communicate with the client 5. You can make corrections and options. Therefore, the possibility of completing the print job by the time expected by the user is improved. Note that since a known method can be adopted as a method of canceling a print job or a method of re-sending to another printer, description of those methods is omitted in this specification.

図2は、図1に示されたプリンタ3内のジョブ時間推定部25の内部の機能構成の一例を示す。   FIG. 2 shows an example of the functional configuration inside the job time estimation unit 25 in the printer 3 shown in FIG.

図2に示されるように、ジョブ時間推定部25は、公称単位ジョブ時間記憶部51と、ジョブ量把握部53と、ジョブ時間計算部55とを有する。   As shown in FIG. 2, the job time estimation unit 25 includes a nominal unit job time storage unit 51, a job amount grasping unit 53, and a job time calculation unit 55.

公称単位ジョブ時間記憶部51は、印刷ジョブの種々のモード(以下、「ジョブモード」という)の各々毎に予め設定された公称単位ジョブ時間61が記憶されている。ここで、公称単位ジョブ時間とは、所定の単位量(例えば、1ページ)の印刷ジョブを実行するのに要する時間(単位ジョブ時間)の公称値又は平均値である。ジョブモードとは、単位ジョブ時間を変化させる要因となる印刷ジョブの属性であり、例えば、モノクロ印刷かカラー印刷かの分類と、片面印刷か両面印刷かの分類と、印刷用紙のサイズの分類との組み合わせのバリエーションである。各ジョブモードの公称単位ジョブ時間61は、図2に例示されたように、何秒というような具体的な時間値であってもよいし、あるいは、所定の時間を基準にした相対値とする(例えば、モノクロ、片面及びA4サイズのジョブモードだけで、具体的な時間値を設定して基準時間とし、他のジョブモードでは、その基準値に対する比率を設定する)こともできる。   The nominal unit job time storage unit 51 stores a nominal unit job time 61 set in advance for each of various modes of print jobs (hereinafter referred to as “job mode”). Here, the nominal unit job time is a nominal value or an average value of the time (unit job time) required to execute a print job of a predetermined unit amount (for example, one page). The job mode is a print job attribute that causes the unit job time to change. For example, the classification of monochrome printing or color printing, the classification of single-sided printing or double-sided printing, the classification of the size of printing paper, It is a variation of the combination. The nominal unit job time 61 in each job mode may be a specific time value such as how many seconds as illustrated in FIG. 2, or a relative value based on a predetermined time. (For example, only in monochrome, single-sided, and A4 size job modes, a specific time value is set as a reference time, and in other job modes, a ratio to the reference value is set).

ジョブ量把握部53は、図1に示したジョブ受信待機部21内の上記特定の印刷ジョブの印刷ジョブデータ31に記述されているジョブ属性39から、その特定の印刷ジョブの量(例えば、印刷すべきページ数)(以下、「ジョブ量」という)63を把握して、把握されたジョブ量63をジョブ時間計算部55に通知する。   The job amount grasping unit 53 uses the job attribute 39 described in the print job data 31 of the specific print job in the job reception waiting unit 21 shown in FIG. The number of pages to be obtained) (hereinafter referred to as “job amount”) 63 is grasped, and the grasped job amount 63 is notified to the job time calculation unit 55.

ジョブ時関計算部55は、上述した特定の印刷ジョブのジョブ属性39から、その特定の印刷ジョブのジョブモードを把握し、把握されたジョブモードの公称単位ジョブ時間65を、公称単位ジョブ時間記憶部51から読み込む。そして、ジョブ時関計算部55は、読み込まれた公称単位ジョブ時間65に、通知されたジョブ量63は掛け算することで、その特定の印刷ジョブの推定ジョブ時間(すなわち、印刷ジョブデータ31の実行に要する時間の推定値)41を計算する。算出された推定ジョブ時間41は、前述したように、遅延判断部27へ通知される。   The job time function calculating unit 55 grasps the job mode of the specific print job from the job attribute 39 of the specific print job described above, and stores the nominal unit job time 65 of the grasped job mode in the nominal unit job time storage. Read from the unit 51. Then, the job time function calculation unit 55 multiplies the read nominal unit job time 65 by the notified job amount 63 to estimate the estimated job time of the specific print job (that is, execution of the print job data 31). (Estimated value of time required) 41) is calculated. The calculated estimated job time 41 is notified to the delay determining unit 27 as described above.

なお、ジョブ時間の推定方法には、上述した方法以外に、複数の方法が知られているので、上述した方法に代えて、又は併用して、それらの公知の方法が採用されてもよい。   In addition to the method described above, a plurality of methods are known as the job time estimation method, and those known methods may be employed instead of or in combination with the method described above.

図3は、遅延判断部27の内部の機能構成の一例を示す。   FIG. 3 shows an example of the functional configuration inside the delay determination unit 27.

図3に示されるように、遅延判断部27は、未完了ジョブ時間記憶部71、期待完了時間記憶部73、トータル待ち時間計算部75、比較部77及び通知部79を有する。   As illustrated in FIG. 3, the delay determination unit 27 includes an incomplete job time storage unit 71, an expected completion time storage unit 73, a total waiting time calculation unit 75, a comparison unit 77, and a notification unit 79.

未完了ジョブ時間記憶部71は、ジョブ時間推定部25から通知された各印刷ジョブの推定ジョブ時間41を記憶する。未完了ジョブ時間記憶部71には、現在までに受信された印刷ジョブ中の未完了の印刷ジョブ(典型的には、例えば、現時点で前述のジョブキュー内に存在する印刷ジョブの全てと現在実行中の印刷ジョブ)のそれぞれの推定ジョブ時間81が、所定の方法でそれそれの印刷ジョブに関連付けられた形で(例えば、それぞれの印刷ジョブの識別(以下、「ジョブID」という)82とともに)、保存される。   The incomplete job time storage unit 71 stores the estimated job time 41 of each print job notified from the job time estimation unit 25. The incomplete job time storage unit 71 stores incomplete print jobs in the print jobs received so far (typically, for example, all print jobs currently present in the above-described job queue and the current executions). The estimated job time 81 of each of the print jobs in the form associated with the print job in a predetermined manner (eg, with each print job identification (hereinafter referred to as a “job ID”) 82). Saved.

期待完了時間記憶部73は、クラアイント5から上記特定の印刷ジョブについての完了時間要求35を受信し、受信された完了時間要求35から期待完了時間83を取り出し、取り出された期待完了時間83を、所定の方法でその特定の印刷ジョブに関連付けた形で(例えば、その印刷ジョブの識別(以下、「ジョブID」という)85とともに)記憶する。   The expected completion time storage unit 73 receives the completion time request 35 for the specific print job from the client 5, extracts the expected completion time 83 from the received completion time request 35, Stored in a predetermined manner in association with the specific print job (for example, together with the identification (hereinafter referred to as “job ID”) 85 of the print job).

トータル待ち時間計算部75は、期待完了時間記憶部73に記憶された期待完了時間83に対応する上記特定の印刷ジョブがどれであるかを把握し(例えば、期待完了時間83に対応するジョブID85を期待完了時間記憶部73から読み込み)、そして、その特定の印刷ジョブより印刷順序が先の未完了の印刷ジョブがどれであるかを、例えばジョブキュー(図示省略)を参照することで、把握する。そして、トータル待ち時間計算部75は、把握された上記特定の印刷ジョブとそれより印刷順序が先である未完了の印刷ジョブのそれぞれの推定ジョブ時間87を、未完了ジョブ時間記憶部71から読み込み、読み込まれた全ての推定ジョブ時間87を加算することで、現時点から上記特定の印刷ジョブの実行が完了するまでの待ち時間(以下、「トータル待時間」)を計算し、そして、算出されたトータル待ち時間を、上記特定の印刷ジョブの推定完了時間89として、比較部77に通知する。   The total waiting time calculation unit 75 grasps which specific print job corresponds to the expected completion time 83 stored in the expected completion time storage unit 73 (for example, a job ID 85 corresponding to the expected completion time 83). Is read from the expected completion time storage unit 73), and an uncompleted print job whose printing order is ahead of the specific print job is identified by referring to, for example, a job queue (not shown). To do. Then, the total waiting time calculation unit 75 reads from the incomplete job time storage unit 71 the estimated job time 87 of each of the identified specific print job and the uncompleted print job that precedes the print order. By adding all the estimated job times 87 that have been read, the waiting time (hereinafter referred to as “total waiting time”) from the current time until the execution of the specific print job is completed is calculated. The total waiting time is notified to the comparison unit 77 as the estimated completion time 89 of the specific print job.

比較部77は、期待完了時間記憶部73から、上記特定の印刷ジョブの期待完了時間83を読み込み、読み込まれた期待完了時間83を、上記通知された推定完了時間89と比較し、その比較結果91(すなわち、推定完了時間89が期待完了時間83より遅い(長い)か否か、及び/又は、両時間41と83の差分)を、通知部79に通知する。   The comparison unit 77 reads the expected completion time 83 of the specific print job from the expected completion time storage unit 73, compares the read expected completion time 83 with the notified estimated completion time 89, and compares the result. 91 (ie, whether or not the estimated completion time 89 is later (longer) than the expected completion time 83 and / or the difference between both times 41 and 83) is notified to the notification unit 79.

通知部79は、上記比較結果91が、推定完了時間89が期待完了時間83より遅い(長い)ことを示している場合には、遅延通知43をクライアント5へ送信する。前述したように、遅延通知43には、推定完了時間89と期待完了時間83の差分(遅延時間の長さ)も含まれていてよい。   When the comparison result 91 indicates that the estimated completion time 89 is later (longer) than the expected completion time 83, the notification unit 79 transmits a delay notification 43 to the client 5. As described above, the delay notification 43 may also include the difference between the estimated completion time 89 and the expected completion time 83 (the length of the delay time).

以上、本発明の実施形態の説明したが、上記実施形態は本発明の説明のための零時似ずぎず、本発明の範囲を上記実施形態に限定する趣旨ではない。本発明は、その要旨を逸脱しない範囲で、上記上記実施形態とは異なる形態で実施することが可能である。   As mentioned above, although embodiment of this invention was described, the said embodiment is not the same as midnight for description of this invention, and is not the meaning which limits the scope of the present invention to the said embodiment. The present invention can be implemented in a form different from the above-described embodiment without departing from the gist thereof.

例えば、上記実施形態は、ジョブの実行の「完了」に着眼して、ジョブの推定「完了」時間を計算して、その推定完了時間がユーザの期待した時間に間に合うか否かを判断する。しかし、変形例として、ジョブの実行の「開始」の時間に着眼して、ジョブの推定「開始」時間を計算し、その推定開始時間について同様の判断を行うようにしてもよいし、あるいは、ジョブの「開始」及び「完了」を厳密に区別せずに、ジョブの「実行」が行われる大凡の時間を推定し、その推定「実行」時間について同様の判断を行なってもよい。   For example, in the above embodiment, focusing on “completion” of job execution, the estimated “completion” time of the job is calculated, and it is determined whether or not the estimated completion time is in time for the time expected by the user. However, as a modification, focusing on the “start” time of job execution, the estimated “start” time of the job may be calculated, and a similar determination may be made for the estimated start time, or Instead of strictly distinguishing between “start” and “completion” of a job, it is possible to estimate the approximate time during which the “execution” of the job is performed, and make a similar determination regarding the estimated “execution” time.

また、別の変形例として、クライアント5が複数のプリンタと通信可能であるシステムにおいて、クライアント5が複数のプリンタに並行的にユーザの期待する時間を通知して、複数のプリンタから並行的にその期待時間に遅延するか否かの通知を受信するようにしてもよい。例えば、クライアント5が、或る印刷ジョブの印刷ジョブデータ31を送信する前に、ユーザ入力された期待時間を含んだ時間要求を複数のプリンタへ送る(この場合、まだ印刷ジョブの送信前なので、その時間要求は、上記の実施形態の場合のようにその印刷ジョブに関連付けられる必要はない)。複数のプリンタは、それぞれ、その印刷ジョブデータを受けたと仮定した場合のその印刷ジョブの推定「開始」時間を計算し(これは、既にそれぞれのプリンタ内で実行待ちをしている待ちジョブのジョブ時間から計算できる)、その推定開始時間が上記期待時間より遅れるか否かを判断し、その判断結果をクライアント5へ通知し、クライアント5は損判断結果を表示する。ユーザは、その表示をみて、期待時間に間に合うことができると考えられるプリンタを選んで、そのプリンタへ印刷ジョブデータ31を送る。これにより、期待時間内にジョブが完了できる可能性が向上する。   As another modification, in a system in which the client 5 can communicate with a plurality of printers, the client 5 notifies the plurality of printers of the time expected by the user in parallel, and the plurality of printers concurrently You may make it receive the notification of whether it delays in expected time. For example, before sending the print job data 31 of a certain print job, the client 5 sends time requests including the expected time input by the user to a plurality of printers (in this case, since the print job is not yet sent, The time request need not be associated with the print job as in the above embodiment). Each printer calculates the estimated “start” time of the print job assuming that it has received the print job data (this is the job of the waiting job already waiting for execution in each printer) It can be calculated from the time), it is determined whether the estimated start time is delayed from the expected time, the determination result is notified to the client 5, and the client 5 displays the loss determination result. The user sees the display, selects a printer that is considered to be in time for the expected time, and sends the print job data 31 to the printer. This improves the possibility that the job can be completed within the expected time.

本発明は、上記実施形態のような印刷ジョブを実行するプリンタ又はプリントシステムに関してだけでなく、別の種類のジョブ(例えば、種々の機械加工や情報処理など)を実行する装置についても適用可能である。   The present invention can be applied not only to a printer or a print system that executes a print job as in the above-described embodiment, but also to an apparatus that executes another type of job (for example, various machining and information processing). is there.

本発明の一実施形態にかかる周辺機器としてのプリンタ3と、そのプリンタ1に印刷ジョブを送信するクライアント3とを備えるプリントシステム1の全体構成を示すブロック図。1 is a block diagram illustrating an overall configuration of a printing system 1 including a printer 3 as a peripheral device according to an embodiment of the present invention and a client 3 that transmits a print job to the printer 1. 図1に示されたプリンタ3内のジョブ時間推定部25の内部構成の一例を示すブロック図。FIG. 2 is a block diagram showing an example of an internal configuration of a job time estimation unit 25 in the printer 3 shown in FIG. 図1に示されたプリンタ3内の遅延判断部27の内部構成の一例を示すブロック図。FIG. 2 is a block diagram showing an example of an internal configuration of a delay determination unit 27 in the printer 3 shown in FIG.

符号の説明Explanation of symbols

1 プリントシステム、 3 プリンタ、 5 クライアント、 13 時間入力部、 15 完了時間要求部、 17 遅延表示部、 21 ジョブ受信待機部、 25 ジョブ時間推定部、 27 遅延判断部、 33 期待完了時間、 35 完了時間要求、 39 ジョブ属性、 41 推定ジョブ時間、 43 遅延通知、 51 公称単位ジョブ時間記憶部、 53 ジョブ量把握部、 55 ジョブ時間計算部、 71 未完了ジョブ時間記憶部、 73 期待完了時間記憶部、 75 トータル待ち時間計算部、 77 比較部、 79 通知部。   DESCRIPTION OF SYMBOLS 1 Print system, 3 Printer, 5 Client, 13 time input part, 15 Completion time request part, 17 Delay display part, 21 Job reception waiting part, 25 Job time estimation part, 27 Delay judgment part, 33 Expected completion time, 35 Completion Time request, 39 Job attribute, 41 Estimated job time, 43 Delay notification, 51 Nominal unit job time storage unit, 53 Job amount grasping unit, 55 Job time calculation unit, 71 Incomplete job time storage unit, 73 Expected completion time storage unit 75 Total waiting time calculation section, 77 Comparison section, 79 Notification section.

Claims (9)

ジョブを発生するクライアントと、前記クライアントから前記ジョブを受信し実行するためのジョブ処理装置とを備えたシステムにおいて、
前記クライアントは、
特定のジョブについての期待時間をユーザから入力する時間入力手段と、
入力された前記期待時間を前記ジョブ処理装置へ通知する時間通知手段と、
前記ジョブ処理装置から遅延通知を受信して表示する通知表示手段と
を備え、
前記ジョブ処理装置は、
前記クライアントから前記期待時間の通知を受信する時間受信手段と、
前記特定のジョブが実際に実行される前に、前記特定のジョブが実行されることになる時間が、通知された前記期待時間より遅延するか否かを予測する予測手段と、
前記予測手段に応答して前記遅延通知を前記クライアントへ送信する遅延通知手段と
を備えるシステム。
In a system comprising a client that generates a job, and a job processing device for receiving and executing the job from the client,
The client
A time input means for inputting an expected time for a specific job from a user;
Time notification means for notifying the job processing apparatus of the input expected time;
Notification display means for receiving and displaying a delay notification from the job processing device,
The job processing device includes:
Time receiving means for receiving notification of the expected time from the client;
Predicting means for predicting whether or not the time at which the specific job is to be executed is delayed from the notified expected time before the specific job is actually executed;
A delay notification means for transmitting the delay notification to the client in response to the prediction means.
請求項1記載のシステムにおいて、
複数の前記ジョブ処理装置を有し、
前記クライアントの前記時間通知手段が、前記複数のジョブ処理装置に並行的に前記期待時間の通知を送る
システム。
The system of claim 1, wherein
A plurality of the job processing devices;
A system in which the time notification unit of the client sends notification of the expected time in parallel to the plurality of job processing devices.
クライアントからジョブを受信し実行するジョブ処理装置において、
前記クライアントから特定のジョブについての期待時間の通知を受信する時間受信手段と、
前記クライアントから受信された前記特定のジョブが実際に実行される前に、前記特定のジョブが実行されることになる時間が、通知された前記期待時間より遅延するか否かを予測する予測手段と、
前記予測手段に応答して前記遅延通知を前記クライアントへ送信する遅延通知手段と
を備えるジョブ処理装置。
In a job processing device that receives and executes a job from a client,
Time receiving means for receiving notification of expected time for a specific job from the client;
Prediction means for predicting whether or not the time at which the specific job is to be executed is delayed from the notified expected time before the specific job received from the client is actually executed When,
A job processing apparatus comprising: delay notification means for transmitting the delay notification to the client in response to the prediction means.
請求項3記載のジョブ処理装置において、
前記予測手段は、
前記特定のジョブの実行が行われる、完了する又は開始すると推定される時間である推定時間を計算する計算手段と、
計算された前記推定時間が、前記期待時間より遅延するか否かを判断する判断手段と
を有し、
前記遅延通知手段は前記判断手段に応答して前記遅延通知を送信するジョブ処理装置。
The job processing apparatus according to claim 3.
The prediction means includes
Calculating means for calculating an estimated time, which is an estimated time to complete or start, when execution of the specific job is performed;
Determining means for determining whether or not the calculated estimated time is delayed from the expected time;
The delay notification unit is a job processing apparatus that transmits the delay notification in response to the determination unit.
請求項4記載のジョブ処理装置において、
前記計算手段は、前記推定時間と前記期待時間との差分をさらに計算し、
前記遅延通知手段は、計算された前記差分を前記遅延通知に含ませる
ジョブ処理装置。
The job processing apparatus according to claim 4, wherein
The calculating means further calculates a difference between the estimated time and the expected time;
The delay notification unit is a job processing apparatus that includes the calculated difference in the delay notification.
請求項4記載のジョブ処理装置において、
前記計算手段は、
前記ジョブ処理装置内で1以上の待ちジョブが、所定の実行順序で実行されることを待っている場合、前記待ちジョブの各々の実行に要する時間であるジョブ時間を推定するジョブ時間推定手段と、
前記実行順序にて前記特定のジョブより前順にある前記待ちジョブについて推定された前記ジョブ時間に基づいて、前記推定時間を計算する手段と
を有するジョブ処理装置。
The job processing apparatus according to claim 4, wherein
The calculating means includes
Job time estimating means for estimating a job time that is required for each of the waiting jobs when one or more waiting jobs are waiting to be executed in a predetermined execution order in the job processing apparatus; ,
A job processing apparatus comprising: means for calculating the estimated time based on the job time estimated for the waiting job in the execution order before the specific job.
請求項6記載のジョブ処理装置において、
前記ジョブ時間推定手段は、各待ちジョブのジョブ属性を把握し、把握された前記ジョブ属性に基づいて、前記各待ちジョブの前記ジョブ時間を推定する
ジョブ処理装置。
The job processing apparatus according to claim 6.
The job time estimation unit is a job processing apparatus that grasps job attributes of each waiting job and estimates the job time of each waiting job based on the grasped job attributes.
請求項7記載のジョブ処理装置において、
前記ジョブが印刷ジョブである場合、前記ジョブ属性は、モノクロ印刷かカラー印刷かの分類、両面印刷か片面印刷かの分類、印刷用紙のサイズの分類、及び印刷ページ数を含む
ジョブ処理装置。
The job processing apparatus according to claim 7.
When the job is a print job, the job attribute includes a classification of monochrome printing or color printing, a classification of double-sided printing or single-sided printing, a classification of the size of printing paper, and the number of printed pages.
ジョブを発生するクライアントと、前記クライアントから前記ジョブを受信し実行するためのジョブ処理装置とを備えたシステムにおいて、前記ジョブ処理装置から前記クライアントへ、前記ジョブの実行に関する情報を通知するための方法において、
前記クライアントが、特定のジョブについての期待時間をユーザから入力するステップと、
前記クライアントが、入力された前記期待時間を前記ジョブ処理装置へ通知するステップと、
前記ジョブ処理装置が、前記特定のジョブが実際に実行される前に、前記特定のジョブが実行されることになる時間が、前記クライアントから通知された前記期待時間より遅延するか否かを予測するステップと、
前記ジョブ処理装置が、前記予測の結果に応答して遅延通知を前記クライアントへ送信するステップと、
前記クライアントが、前記ジョブ処理装置からの前記遅延通知を表示するステップと
を有する方法。
Method for notifying a client of information relating to execution of a job from the job processing device to a client in a system comprising a client that generates a job and a job processing device for receiving and executing the job from the client In
The client inputs an expected time for a specific job from a user;
The client notifying the job processing apparatus of the input expected time;
The job processing apparatus predicts whether the time that the specific job is to be executed is delayed from the expected time notified from the client before the specific job is actually executed. And steps to
The job processing device sending a delay notification to the client in response to the prediction result;
The client displaying the delay notification from the job processing device.
JP2007063749A 2007-03-13 2007-03-13 Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client Pending JP2008221639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007063749A JP2008221639A (en) 2007-03-13 2007-03-13 Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007063749A JP2008221639A (en) 2007-03-13 2007-03-13 Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client

Publications (1)

Publication Number Publication Date
JP2008221639A true JP2008221639A (en) 2008-09-25

Family

ID=39840798

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007063749A Pending JP2008221639A (en) 2007-03-13 2007-03-13 Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client

Country Status (1)

Country Link
JP (1) JP2008221639A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013256061A (en) * 2012-06-12 2013-12-26 Ricoh Co Ltd Image processor, job setting method, and program
US8705055B2 (en) 2011-03-16 2014-04-22 Infoprint Solutions Company Llc Print job completion estimation mechanism
JP2020030637A (en) * 2018-08-23 2020-02-27 富士ゼロックス株式会社 Information processing device, image processing device, information processing system, and program

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8705055B2 (en) 2011-03-16 2014-04-22 Infoprint Solutions Company Llc Print job completion estimation mechanism
JP2013256061A (en) * 2012-06-12 2013-12-26 Ricoh Co Ltd Image processor, job setting method, and program
JP2020030637A (en) * 2018-08-23 2020-02-27 富士ゼロックス株式会社 Information processing device, image processing device, information processing system, and program
JP7192306B2 (en) 2018-08-23 2022-12-20 富士フイルムビジネスイノベーション株式会社 Information processing device, image processing device, information processing system and program

Similar Documents

Publication Publication Date Title
US8885186B2 (en) Printer using a conversion server to perform printing
CN102147718B (en) Print job management apparatus, print job management method, and image forming apparatus
US11003401B2 (en) Non-transitory computer-readable recording medium storing computer-executable instructions for information processing device, and method of controlling information processing device
US20120081738A1 (en) Job execution system, job receiving apparatus and computer-readable medium
JP2010224768A (en) Printing system, control method for printing system, print server machine, control method for print server machine, and computer program
US8730506B2 (en) Image forming apparatus that can request ending time for processing print data by an external apparatus from the external apparatus and control method thereof
JP2017016480A (en) Communication control device, communication control driver, and communication control method
JP2008257632A (en) Information management device, information management method and program
JP2008221639A (en) Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client
US8270001B2 (en) Printing apparatus and canceling method
JP6067039B2 (en) Image processing apparatus, image processing method and program for obtaining predicted value of time required for printing
JP2015141608A (en) Image forming system, printing system, server for image forming system, and image forming method
JP2007025996A (en) Electronic file processor
JP2007087130A (en) Server device, print processing method of server device, storage medium and program
JP2012038076A (en) Information processing device, job processing system, job transmission path control method and program, and recording medium
JP2008282117A (en) Device driver and information processor
JP2002209035A (en) Image processing unit, information processing system, and data processing method
CN113312014B (en) Printing method and device
JP4876878B2 (en) Log information recording apparatus and program
US20070058193A1 (en) System and method for detecting and releasing selected document processing jobs
JP3897083B2 (en) Print processing apparatus and print processing method
US8526047B1 (en) Print control apparatus, image forming system, non-transitory computer readable medium
JP2009053841A (en) Image forming system and image forming apparatus
US8542387B2 (en) Printing apparatus, printing system and printer driver
JP2007241476A (en) Image forming system, load balancing device and load balancing method