JP7192306B2 - Information processing device, image processing device, information processing system and program - Google Patents

Information processing device, image processing device, information processing system and program Download PDF

Info

Publication number
JP7192306B2
JP7192306B2 JP2018156124A JP2018156124A JP7192306B2 JP 7192306 B2 JP7192306 B2 JP 7192306B2 JP 2018156124 A JP2018156124 A JP 2018156124A JP 2018156124 A JP2018156124 A JP 2018156124A JP 7192306 B2 JP7192306 B2 JP 7192306B2
Authority
JP
Japan
Prior art keywords
time
deadline
end date
expected end
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018156124A
Other languages
Japanese (ja)
Other versions
JP2020030637A (en
Inventor
和子 桐原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujifilm Business Innovation Corp
Original Assignee
Fuji Xerox Co Ltd
Fujifilm Business Innovation Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Xerox Co Ltd, Fujifilm Business Innovation Corp filed Critical Fuji Xerox Co Ltd
Priority to JP2018156124A priority Critical patent/JP7192306B2/en
Publication of JP2020030637A publication Critical patent/JP2020030637A/en
Application granted granted Critical
Publication of JP7192306B2 publication Critical patent/JP7192306B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、情報処理装置、画像処理装置、情報処理システム及びプログラムに関する。 The present invention relates to an information processing device, an image processing device, an information processing system, and a program.

特許文献1には、サービス指向アーキテクチャに基づいて構築されたWebシステムに対応し、業務系システムに必要なデッドラインスケジューリング機能を実現するサーバの運用・管理技術が記載されている。業務系Webシステムが所定の業務を処理するのに必要なWebサービスのリソースを見積もり、前記所定の業務が所定の日時までに完了すべきことを指示するポリシーを設定し、設定されたポリシーに基づいて業務系Webシステムを運用する。部署、役職、あるいは業務毎に、Webサービスを実行するのに必要なリソースを予め測定しておき、指定されたポリシーを遂行するのに必要なリソースを事前に確保しておくことで、処理が集中しても決められた時間内に業務を処理する。 Patent Literature 1 describes a server operation/management technique that supports a Web system constructed based on a service-oriented architecture and implements a deadline scheduling function required for a business system. Estimate the web service resources required for the business web system to process a given job, set a policy to instruct that the given job should be completed by a given date and time, and based on the set policy to operate the business web system. By measuring in advance the resources required to execute the Web service for each department, position, or task, and securing in advance the resources required to carry out the specified policy, processing can be facilitated. Even if you concentrate, you will process the work within the determined time.

特開2006-99162号公報JP-A-2006-99162

Webサービス等のサービスサーバのリソースを見積もったとしても、サービスサーバの実際の負荷状況、すなわち混雑具合や多重化の運用状況についてはユーザ側から把握することは困難であり、ユーザ側から処理の終了日時(デッドライン)を指示したとしても当該デッドラインまでに業務を処理できない事態が生じ得る。 Even if the resource of a service server such as a Web service is estimated, it is difficult for the user to grasp the actual load status of the service server, that is, the degree of congestion and the operational status of multiplexing. Even if a date and time (deadline) is specified, a situation may arise in which the business cannot be processed by the deadline.

本発明は、サーバ等の情報処理装置での負荷状況を踏まえて処理のデッドラインを設定できる技術を提供することを目的とする。 SUMMARY OF THE INVENTION It is an object of the present invention to provide a technique capable of setting a processing deadline based on the load status of an information processing apparatus such as a server.

請求項1に記載の発明は、画像処理装置から処理の指示及びデッドラインを受信する受信手段と、前記処理の予想終了日時を算出する算出手段と、算出された前記予想終了日時が前記デッドライン以前である場合は前記画像処理装置に前記処理を受け付けた旨を通知し、算出された前記予想終了日時が前記デッドラインより後である場合は前記画像処理装置に前記デッドラインの調整の必要性及び算出された前記予想終了日時を通知する通知手段と、算出された前記予想終了日時及び前記デッドラインをスケジュールとして登録する登録手段と、を備え、前記登録手段は、複数の処理のそれぞれの予想終了日時とそれぞれのデッドラインを登録し、前記複数の処理のいずれかが取り消された場合に、取り消された処理よりも時間的に後に登録された処理のうち最短で処理すべき処理の予想終了日時を、他の処理のデッドラインを維持しつつ調整して再登録する情報処理装置である。 According to a first aspect of the present invention, there is provided: a receiving means for receiving a processing instruction and a deadline from an image processing apparatus; a calculating means for calculating an expected end date and time of the processing; If it is before the deadline, notify the image processing device that the processing has been accepted, and if the calculated expected end date and time is later than the deadline, notify the image processing device of the necessity of adjusting the deadline. and a notification means for notifying the calculated expected end date and time, and a registration means for registering the calculated expected end date and time and the deadline as a schedule, wherein the registration means is configured to provide an estimate for each of a plurality of processes. An end date and time and respective deadlines are registered, and when one of the plurality of processes is canceled, an expected end of the process that should be processed in the shortest time among the processes registered after the canceled process. An information processing apparatus that adjusts and re-registers a date and time while maintaining deadlines for other processes .

請求項2に記載の発明は、前記算出手段は、前記予想終了日時として最短日時を算出する請求項1に記載の情報処理装置である。 The invention according to claim 2 is the information processing apparatus according to claim 1, wherein the calculating means calculates the shortest date and time as the expected end date and time.

請求項3に記載の発明は、前記受信手段は、さらに、前記画像処理装置から調整後のデッドラインを受信する請求項1,2のいずれかに記載の情報処理装置である。 The invention according to claim 3 is the information processing apparatus according to any one of claims 1 and 2, wherein the receiving means further receives the adjusted deadline from the image processing apparatus.

請求項に記載の発明は、前記登録手段は、前記予想終了日時と前記デッドラインとの間に猶予がある場合に、前記デッドラインを維持しつつ前記予想終了日時を調整して再登録する請求項に記載の情報処理装置である。 According to a fourth aspect of the present invention, when there is a grace period between the expected end date and time and the deadline, the registration means adjusts the expected end date and time while maintaining the deadline and re-registers the expected end date and time. An information processing apparatus according to claim 1 .

請求項に記載の発明は、画像処理装置と、前記画像処理装置と通信手段を介して接続された情報処理装置と、を備え、前記画像処理装置は、処理の指示及びデッドラインを前記情報処理装置に送信する送信手段と、前記情報処理装置からの、処理を受け付けた旨、あるいは前記デッドラインの調整の必要性及び算出された予想終了日時の通知を受信する受信手段と、前記デッドラインの調整の必要性及び算出された前記予想終了日時の通知を受信した場合に、前記処理の取消、あるいは調整後のデッドラインを前記情報処理装置に再送信する再送信手段と、を備え、前記情報処理装置は、前記画像処理装置から処理の指示及びデッドラインを受信する受信手段と、前記処理の前記予想終了日時を算出する算出手段と、算出された前記予想終了日時が前記デッドライン以前である場合は前記画像処理装置に前記処理を受け付けた旨を通知し、算出された前記予想終了日時が前記デッドラインより後である場合は前記画像処理装置に前記デッドラインの調整の必要性及び算出された前記予想終了日時を通知する通知手段と、算出された前記予想終了日時と、前記デッドラインあるいは調整後のデッドラインをスケジュールとして登録する登録手段と、前記登録手段に登録された前記スケジュールに従って前記処理を実行する処理手段と、を備え、 前記登録手段は、複数の処理のそれぞれの予想終了日時とそれぞれのデッドラインを登録し、前記複数の処理のいずれかが取り消された場合に、取り消された処理よりも時間的に後に登録された処理のうち最短で処理すべき処理の予想終了日時を、他の処理のデッドラインを維持しつつ調整して再登録する情報処理システムである。 According to a fifth aspect of the present invention, there is provided an image processing apparatus, and an information processing apparatus connected to the image processing apparatus via a communication means, wherein the image processing apparatus transmits a processing instruction and a deadline to the information. transmitting means for transmitting to a processing device; receiving means for receiving notification from the information processing device indicating that the process has been accepted or the necessity of adjusting the deadline and the calculated expected end date; and the deadline retransmitting means for retransmitting the cancellation of the process or the adjusted deadline to the information processing apparatus when receiving the notification of the necessity of adjustment of and the calculated expected end date and time; The information processing apparatus comprises receiving means for receiving a processing instruction and a deadline from the image processing apparatus, calculating means for calculating the expected end date and time of the processing, and the calculated expected end date and time before the deadline. If so, notify the image processing device that the processing has been accepted, and if the calculated expected end date and time is later than the deadline, notify the image processing device of the necessity of adjusting the deadline and the calculation. notification means for notifying the estimated end date and time calculated; registration means for registering the calculated estimated end date and time, the deadline or the adjusted deadline as a schedule, and according to the schedule registered in the registration means and processing means for executing the processes, wherein the registration means registers the expected end dates and deadlines of each of the plurality of processes, and when any of the plurality of processes is canceled, the cancellation is performed. This information processing system adjusts and re-registers the expected end date and time of a process that should be processed at the shortest time out of processes that were registered later than a process that has been registered while maintaining deadlines for other processes .

請求項に記載の発明は、コンピュータを、画像処理装置から処理の指示及びデッドラインを受信する受信手段と、前記処理の予想終了日時を算出する算出手段と、算出された前記予想終了日時が前記デッドライン以前である場合は前記画像処理装置に前記処理を受け付けた旨を通知し、算出された前記予想終了日時が前記デッドラインより後である場合は前記画像処理装置に前記デッドラインの調整の必要性及び算出された前記予想終了日時を通知する通知手段と、算出された前記予想終了日時及び前記デッドラインをスケジュールとして登録する登録手段として機能させ、前記登録手段は、複数の処理のそれぞれの予想終了日時とそれぞれのデッドラインを登録し、前記複数の処理のいずれかが取り消された場合に、取り消された処理よりも時間的に後に登録された処理のうち最短で処理すべき処理の予想終了日時を、他の処理のデッドラインを維持しつつ調整して再登録するように機能させるためのプログラムである。 According to a sixth aspect of the present invention, a computer comprises: receiving means for receiving a processing instruction and a deadline from an image processing apparatus; calculating means for calculating an expected end date and time of the processing; If it is before the deadline, the image processing device is notified that the processing has been accepted, and if the calculated expected end date and time is after the deadline, the image processing device is adjusted to the deadline. and a registration means for registering the calculated expected end date and time and the deadline as a schedule, wherein the registration means functions as a schedule for each of a plurality of processes. When one of the plurality of processes is canceled, the shortest process to be processed among the processes registered after the canceled process is registered. This is a program that adjusts and re-registers the expected end date and time while maintaining deadlines for other processes .

請求項1,2,3,5,6に記載の発明によれば、情報処理装置での負荷状況を踏まえて処理のデッドラインを設定し得る。さらに、登録されたスケジュールに従って処理を実行し、複数の処理のいずれかが取り消された場合に、最短で処理すべき処理をリスケジューリングし得る。 According to the inventions of Claims 1, 2, 3, 5 , and 6, the processing deadline can be set based on the load status of the information processing apparatus. Further, the processes are executed according to the registered schedule, and when any one of a plurality of processes is canceled, the shortest process to be processed can be rescheduled.

請求項に記載の発明によれば、さらに、デッドラインを維持しつつリスケジューリングし得る。 According to the fourth aspect of the invention, rescheduling can be performed while maintaining the deadline.

実施形態のシステム構成図である。1 is a system configuration diagram of an embodiment; FIG. 実施形態の処理フローチャート(その1)である。4 is a processing flowchart (part 1) of the embodiment; 実施形態の処理フローチャート(その2)である。2 is a processing flowchart (part 2) of the embodiment; 実施形態の処理フローチャート(その3)である。3 is a processing flowchart (part 3) of the embodiment; 実施形態の画像処理装置の画面例(その1)である。4 is an example (part 1) of a screen of the image processing apparatus according to the embodiment; 実施形態の画像処理装置の画面例(その2)である。7 is an example screen (2) of the image processing apparatus according to the embodiment; 実施形態の画像処理装置の画面例(その3)である。3 is a screen example (part 3) of the image processing apparatus according to the embodiment; 実施形態の画像処理装置の画面例(その4)である。4 is an example screen (4) of the image processing apparatus according to the embodiment; 実施形態の画像処理装置の画面例(その5)である。FIG. 10 is a screen example (No. 5) of the image processing apparatus according to the embodiment; FIG. 実施形態の端末の画面例である。It is a screen example of the terminal of the embodiment. 実施形態のリスケジューリング説明図(その1)である。FIG. 10 is an explanatory diagram (part 1) of rescheduling according to the embodiment; 実施形態のリスケジューリング説明図(その2)である。FIG. 11 is an explanatory diagram (part 2) of rescheduling according to the embodiment; 実施形態の他のリスケジューリング説明図(その1)である。FIG. 11 is another rescheduling explanatory diagram (Part 1) of the embodiment; 実施形態の他のリスケジューリング説明図(その2)である。FIG. 11 is another rescheduling explanatory diagram (part 2) of the embodiment; 変形例の画像処理装置の画面例である。It is an example of a screen of the image processing apparatus of a modification.

以下、図面に基づき本発明の実施形態について説明する。 An embodiment of the present invention will be described below with reference to the drawings.

図1は、本実施形態のシステム構成を示す。システムは、端末10、画像処理装置12、及びサーバ14を備え、これらは通信ネットワーク16を介してデータ送受信可能に接続される。なお、図ではサーバとしてサーバ14のみを示しているが、さらに他のサーバが通信ネットワーク16に接続されていてもよい。 FIG. 1 shows the system configuration of this embodiment. The system includes a terminal 10, an image processing device 12, and a server 14, which are connected via a communication network 16 so as to be able to transmit and receive data. Although only the server 14 is shown as a server in the drawing, other servers may be connected to the communication network 16 as well.

端末10は、本システムを利用するユーザが操作する端末であり、操作部及び表示部に加え、通知受信部101を備える。通知受信部101は、通信ネットワーク16を介してサーバ14からの通知を受信する。通知は、サーバ14における処理の終了日時の通知である。通知受信部101は、サーバ14からの通知を受信すると、表示部に当該通知を表示してユーザに報知する。 A terminal 10 is a terminal operated by a user who uses this system, and includes an operation unit, a display unit, and a notification reception unit 101 . Notification receiving unit 101 receives notifications from server 14 via communication network 16 . The notification is notification of the end date and time of processing in the server 14 . Upon receiving the notification from the server 14, the notification receiving unit 101 displays the notification on the display unit to notify the user.

端末10は、PC(パーソナルコンピュータ)やタブレット、スマートフォン等で構成され得る。 The terminal 10 may be configured by a PC (personal computer), tablet, smartphone, or the like.

画像処理装置12は、本システムを利用するユーザが操作する装置であり、ユーザからの依頼に応じてサーバ14及び必要に応じてその他のサーバと連携して画像に対する一連の処理フローを実行する。画像処理装置12は、操作部、表示部、及び各種機能を実行する実行部に加え、処理指示送信部121、終了日時指示/修正部122、通知受信部123、ユーザ情報管理部124を備える。 The image processing device 12 is a device operated by a user who uses this system, and executes a series of processing flows for images in cooperation with the server 14 and other servers as necessary in response to a request from the user. The image processing apparatus 12 includes a processing instruction transmission section 121, an end date/time instruction/correction section 122, a notification reception section 123, and a user information management section 124, in addition to an operation section, a display section, and an execution section that executes various functions.

処理指示送信部121は、ユーザからの操作に応じ、サーバ14に対して処理の実行を指示する。例えば、処理指示送信部121は、画像処理装置12で原文書をスキャン処理して得られた電子化データに対し、翻訳処理やフォーマット変換処理を指示する。 The processing instruction transmission unit 121 instructs the server 14 to execute processing according to an operation from the user. For example, the processing instruction transmission unit 121 instructs translation processing and format conversion processing for electronic data obtained by scanning an original document with the image processing device 12 .

終了日時指示/修正部122は、ユーザが希望する処理の終了日時をデッドラインとしてサーバ14に送信する。また、終了日時指示/修正部122は、サーバ14からデッドラインの調整が必要である旨の応答があった場合に、ユーザにより修正され調整されたデッドラインをサーバ14に送信する。ここで、「デッドライン」とは、ユーザが所望する処理の最終完了日時であり、サーバ14において処理が完了しなければならない日時である。 The end date/time designation/correction unit 122 transmits the end date/time of the process desired by the user to the server 14 as a deadline. Further, when the server 14 responds that the deadline needs to be adjusted, the end date/time designation/correction unit 122 transmits the adjusted deadline corrected by the user to the server 14 . Here, the "deadline" is the final date and time of completion of the processing desired by the user, and is the date and time at which the processing must be completed in the server 14 .

通知受信部123は、サーバ14からの通知を受信する。サーバ14からの通知は、処理の指示を受け付けた旨や、デッドラインの調整が必要である旨の通知である。終了日時指示/修正部122は、通知受信部123でデッドラインの調整が必要である旨の通知を受信したことに応じて、ユーザにより修正され調整されたデッドラインをサーバ14に再送信する。 The notification receiving unit 123 receives notifications from the server 14 . The notification from the server 14 is a notification to the effect that a processing instruction has been received, or to the effect that the deadline needs to be adjusted. When the notification receiving unit 123 receives the notification that the deadline needs to be adjusted, the end date/time designation/correction unit 122 retransmits the adjusted deadline corrected by the user to the server 14 .

ユーザ情報管理部124は、ユーザのIDやパスワードの認証情報、連絡先、ユーザが携帯する端末10のアドレス等を管理する。 The user information management unit 124 manages authentication information such as user IDs and passwords, contact information, addresses of terminals 10 carried by users, and the like.

画像処理装置12は、スキャン、ファックス、コピー、プリント、メール送受信等の複数の機能を実行する複合機で構成され得る。 The image processing device 12 may be configured as a multifunction device that performs multiple functions such as scanning, faxing, copying, printing, and sending and receiving e-mail.

サーバ14は、情報処理装置として機能し、画像処理装置12からの依頼に応じてジョブを実行するサービスサーバである。サーバ14は、ジョブを実行する処理部に加え、指示受信部141、所要時間算出部142、終了日時通知部143、及びスケジュール管理部144を備える。 The server 14 is a service server that functions as an information processing device and executes jobs in response to requests from the image processing device 12 . The server 14 includes an instruction receiving unit 141 , a required time calculating unit 142 , an end date/time notifying unit 143 , and a schedule managing unit 144 in addition to a processing unit that executes jobs.

指示受信部141は、画像処理装置12からの処理の指示、処理対象データ及びデッドラインを受信する。処理対象データは、画像処理装置12で処理されサーバ14で処理すべきデータであり、例えば画像処理装置12でスキャン処理して得られた電子化データである。処理対象データには、処理すべきデータの属性、例えばデータ量等が含まれる。 The instruction receiving unit 141 receives a processing instruction, processing target data, and a deadline from the image processing apparatus 12 . The data to be processed is data to be processed by the image processing device 12 and to be processed by the server 14 , for example, digitized data obtained by scanning processing by the image processing device 12 . The data to be processed includes attributes of the data to be processed, such as the amount of data.

所要時間算出部142は、指示受信部141で受信した処理の指示を実行するために要する時間を算出する。所要時間は、処理すべきデータ量と、処理を実行するプロセッサの能力及び負荷により算出される。 The required time calculation unit 142 calculates the time required to execute the processing instruction received by the instruction reception unit 141 . The required time is calculated from the amount of data to be processed and the capacity and load of the processor that executes the process.

終了日時通知部143は、所要時間算出部142で算出された処理の所要時間を用いて処理の予想終了日時を算出し、算出された予想終了日時と画像処理装置12から指示されたデッドラインを比較し、比較結果に応じて画像処理装置12に通知する。すなわち、算出された予想終了日時がデッドライン以前であれば、当該処理をデッドライン内に処理できるため、予想終了日時として当該デッドラインを通知する。具体的には、「デッドラインまでの処理で受け付けました。」等と通知する。他方で、算出された予想終了日時がデッドラインより後であれば、当該処理をデッドライン内に処理できないため、算出された予想終了日時を通知する。具体的には、「デッドラインまでに処理を終了できません。予想終了日時までに処理を終了できます。」等と通知する。 The end date and time notification unit 143 calculates the expected end date and time of the process using the required time for the process calculated by the required time calculation unit 142, and combines the calculated expected end date and time with the deadline specified by the image processing apparatus 12. It compares and notifies the image processing device 12 according to the comparison result. That is, if the calculated expected end date and time is before the deadline, the deadline is notified as the expected end date and time because the process can be processed within the deadline. Specifically, it notifies, for example, that the processing has been accepted until the deadline. On the other hand, if the calculated expected end date and time is after the deadline, the calculated expected end date and time is notified because the process cannot be processed within the deadline. Specifically, it notifies that "the process cannot be completed by the deadline. The process can be completed by the expected end date and time."

スケジュール管理部144は、画像処理装置12からの処理の指示及びデッドライン、あるいは調整されたデッドライン、算出された予想終了日時を用いて処理を実行するためのスケジュールをスケジュールテーブルに登録して管理する。例えば、処理1及び処理2が指示された場合において、処理1の処理開始日時、処理終了日時(予想終了日時)、デッドラインをテーブルに登録し、かつ、処理2の処理開始日時、処理終了日時(予想終了日時)、デッドラインをテーブルに登録する。サーバ14の処理部は、スケジュール管理部144で登録されたスケジュールに従って処理を順次実行する。 The schedule management unit 144 registers and manages a schedule for executing processing in a schedule table using processing instructions and deadlines from the image processing apparatus 12, or adjusted deadlines, and calculated expected end dates and times. do. For example, when processing 1 and processing 2 are instructed, the processing start date and time, processing end date and time (expected end date and time), and deadline of processing 1 are registered in the table, and the processing start date and time and processing end date and time of processing 2 are registered in the table. (Expected end date and time), and register the deadline in the table. The processing unit of the server 14 sequentially executes processing according to the schedule registered by the schedule management unit 144 .

サーバ14は、サーバコンピュータとしての構成を備え、具体的には1又は複数のプロセッサ、ROM、RAM、HDD(ハードディスクドライブ)やSDD(ソリッドステートドライブ)等の記憶装置、入出力インターフェイス、通信インターフェイス等を備える。入出力インターフェイスは指示受信部141を実現する。サーバ14のプロセッサは、ROMやHDD等のプログラムメモリに記憶された処理プログラムを読み出して実行することで、所要時間算出部142、終了日時通知部143、及びスケジュール管理部144を実現するとともに、指示された処理を実行する処理部を実現する。処理部における処理の内容はサーバ14により決定され、例えばサーバ14が翻訳サーバであれば処理部では処理プログラムに従って翻訳処理を実行する。プロセッサによる処理の結果物は、サーバ14の記憶装置に格納される。サーバ14の記憶装置は、スケジュールを登録するためのテーブルも記憶する。さらに、画像処理装置12のユーザ情報管理部124で管理されているユーザ情報を取得して記憶する。ユーザ情報は例えば端末10のアドレスである。当該アドレスは、サーバ14から端末10に通知する際に参照される。 The server 14 has a configuration as a server computer, and specifically includes one or more processors, ROMs, RAMs, storage devices such as HDDs (hard disk drives) and SDDs (solid state drives), input/output interfaces, communication interfaces, and the like. Prepare. The input/output interface implements the instruction receiving unit 141 . The processor of the server 14 reads out and executes a processing program stored in a program memory such as a ROM or HDD to implement a required time calculation unit 142, an end date/time notification unit 143, and a schedule management unit 144, and It implements a processing unit that executes the specified processing. The contents of processing in the processing section are determined by the server 14. For example, if the server 14 is a translation server, the processing section executes translation processing according to a processing program. The results of processing by the processor are stored in the storage of server 14 . The storage device of the server 14 also stores a table for registering schedules. Furthermore, the user information managed by the user information management unit 124 of the image processing apparatus 12 is obtained and stored. User information is, for example, the address of the terminal 10 . The address is referred to when notifying the terminal 10 from the server 14 .

なお、画像処理装置12は、公知の複合機としての構成を備え、具体的には1又は複数のプロセッサ、ROM、RAM、HDD(ハードディスクドライブ)やSDD(ソリッドステートドライブ)等の記憶装置、入出力インターフェイス、通信インターフェイス等を備える。操作部や表示部等の入出力インターフェイスは処理指示送信部121、終了日時指示/修正部122、通知受信部123を実現する。プロセッサは、ROMやHDD等のプログラムメモリに記憶された処理プログラムを読み出して実行することで、ユーザ情報管理部124及び処理を実行する処理部を実現する。画像処理装置12の記憶装置は、ユーザ情報を記憶する。また、画像処理装置12の記憶部は、サーバ14の情報を記憶する。サーバ14の情報は、サーバ14のアドレスやサービス内容等である。プロセッサは、サーバ14の情報を参照することで、ユーザ操作に応じてサーバ14を特定し処理の指示を送信する。サーバ14はデフォルトサーバとして記憶装置に記憶され得る。 Note that the image processing apparatus 12 has a configuration as a known multifunction machine, and specifically includes one or more processors, ROM, RAM, storage devices such as HDD (Hard Disk Drive) and SDD (Solid State Drive), input It has an output interface, a communication interface, and the like. An input/output interface such as an operation unit and a display unit implements a processing instruction transmission unit 121 , an end date/time instruction/correction unit 122 and a notification reception unit 123 . The processor reads out and executes a processing program stored in a program memory such as a ROM or HDD, thereby realizing the user information management unit 124 and a processing unit that executes processing. The storage device of the image processing device 12 stores user information. Also, the storage unit of the image processing device 12 stores information of the server 14 . The information of the server 14 is the address of the server 14, service contents, and the like. The processor refers to the information of the server 14 to identify the server 14 according to the user's operation, and transmits a processing instruction. Server 14 may be stored in storage as a default server.

図2及び図3は、本実施形態の処理フローチャートを示す。画像処理装置12及びサーバ14の処理であり、画像処理装置12で文書をスキャンして電子化データとし、この電子化データをサーバ14に送信してサーバ14で処理するフローである。 2 and 3 show processing flowcharts of the present embodiment. This processing is performed by the image processing device 12 and the server 14, and is a flow in which the image processing device 12 scans a document into electronic data, transmits the electronic data to the server 14, and the server 14 processes the data.

まず、図2において、ユーザは、画像処理装置12を操作して処理に関する指示を入力するとともに、当該処理の終了日時としてのデッドラインを入力する(S101)。デッドラインは、基本的には日時であるが、明日の午前中、あるいは2日後まで、あるいは今週末等であってもよい。さらに、「最短」であってもよい。 First, in FIG. 2, the user operates the image processing apparatus 12 to input an instruction regarding processing, and also inputs a deadline as the end date and time of the processing (S101). The deadline is basically a date and time, but it may be tomorrow morning, two days later, this weekend, or the like. Furthermore, it may be "shortest".

画像処理装置12は、処理に関する指示とデッドラインを受け付けると、入力された文書をスキャンして電子化データを生成する。画像処理装置12は、電子化データを生成すると、当該電子化データ、入力文書の属性(白黒/カラー情報、データサイズ情報、フォーマット)、及びデッドラインをサーバ14に送信する(S102)。 When the image processing apparatus 12 receives an instruction and deadline regarding processing, it scans the input document and generates electronic data. After generating the electronic data, the image processing apparatus 12 transmits the electronic data, attributes of the input document (monochrome/color information, data size information, format), and deadline to the server 14 (S102).

サーバ14は、画像処理装置12からの電子化データ、入力文書の属性(白黒/カラー情報、データサイズ情報、フォーマット)、及びデッドラインを受け付けると、これらの情報と負荷状況から、当該処理の所要時間及び予想終了日時を算出する(S201)。 When the server 14 receives the electronic data from the image processing device 12, the attributes of the input document (black and white/color information, data size information, format), and the deadline, the server 14 determines the processing requirements based on this information and the load status. The time and expected end date and time are calculated (S201).

予想終了日時を算出すると、次に、「最短」の指示があるか否かを判定する(S202)。「最短」の指示があれば(S202でYES)、S201で算出された予想終了日時はいずれにせよ「最短」であるので、S201で算出された予想終了日時にて処理を受け付けてスケジュールに登録する(S203)。そして、画像処理装置12に対して処理を受け付けた旨を応答する(S204)。このとき、「最短」で受け付けた旨を応答するとともに、S201で算出した予想終了日時を通知してもよい。また、画像処理装置12に応答することに代えて、ユーザが指定する場合には端末10に通知してもよい。 Once the expected end date and time have been calculated, it is next determined whether or not there is an instruction for "shortest" (S202). If there is an instruction of "shortest" (YES in S202), the expected end date and time calculated in S201 is the "shortest" anyway, so processing is accepted and registered in the schedule at the expected end date and time calculated in S201 (S203). Then, it responds to the image processing device 12 that the process has been accepted (S204). At this time, it may be possible to notify the expected completion date and time calculated in S201 together with responding that the request was received at the "shortest time". Alternatively, instead of responding to the image processing device 12, the terminal 10 may be notified if the user specifies.

S202でNO、つまり「最短」の指示がなければ、次に、S201で算出された予想終了日時がデッドライン以内か否かを判定する(S205)。予想終了日時がデッドライン以内であれば(S205でYES)、指示されたデッドラインにて処理を受け付けてスケジュールに登録する(S206)。そして、画像処理装置12に対してデッドライン以内で処理を受け付けた旨を応答する(S204)。 If NO in S202, that is, if there is no "shortest" instruction, then it is determined whether or not the expected end date and time calculated in S201 is within the deadline (S205). If the expected end date and time is within the deadline (YES at S205), the processing is accepted at the instructed deadline and registered in the schedule (S206). Then, it responds to the image processing apparatus 12 that the process has been accepted within the deadline (S204).

S205でNO、つまりS201で算出された予想終了日時がデットライン以内でなければ、デッドラインにて仮に受け付けてスケジュールに仮登録し(S207)、画像処理装置12に対してデッドライン以内に処理が終了しないため調整が必要である旨、及び現時点における最短終了時間としてS201で算出された予想終了日時を応答する(S208)。この場合も、画像処理装置12に応答することに代えて、ユーザが指定する場合には端末10に通知してもよい。 If NO in S205, that is, if the expected end date and time calculated in S201 is not within the deadline, the deadline is tentatively accepted and registered in the schedule (S207), and the image processing apparatus 12 is processed within the deadline. It responds that adjustment is necessary because it will not end, and the expected end date and time calculated in S201 as the current shortest end time (S208). Also in this case, instead of responding to the image processing device 12, the terminal 10 may be notified if the user specifies.

次に、図3において、サーバ14からの応答を受信した画像処理装置12は、ユーザからの入力を受け付ける画面を表示部に表示し、同意や変更、修正を受け付ける(S103)。そして、受け付けた同意や変更、修正をサーバ14に送信する(S104)。サーバ14からの応答が、最短で受け付けた旨の応答である場合には、ユーザは通常、同意を入力する。サーバ14からの応答が、デッドラインで受け付けた旨の応答である場合にも、ユーザは通常、同意を入力する。他方で、サーバ14からの応答が、要調整の旨と最短終了時間の応答である場合には、ユーザは通常、処理の指示あるいはデッドラインを変更あるいは修正して入力する。例えば、処理の取消を入力する、デッドラインを維持したまま他サーバへ処理を変更する、サーバ14への処理を維持しつつデッドラインを変更(遅延)する等である。なお、画像処理装置12から端末10に通知した場合には、端末10において変更画面を表示し、同意や変更、修正を受け付けてサーバ14に送信する。 Next, in FIG. 3, the image processing apparatus 12 that has received the response from the server 14 displays a screen for receiving input from the user on the display unit, and receives consent, change, and correction (S103). Then, the accepted consent, change, or correction is transmitted to the server 14 (S104). If the response from the server 14 is the shortest acceptable response, the user typically enters consent. Even if the response from the server 14 is a deadline acceptance response, the user will normally enter consent. On the other hand, if the response from the server 14 is a response to the effect that adjustment is required and the shortest completion time, the user normally changes or modifies the processing instruction or deadline and inputs it. For example, inputting cancellation of processing, changing processing to another server while maintaining the deadline, changing (delaying) the deadline while maintaining processing to the server 14, and the like. When the terminal 10 is notified from the image processing device 12 , the terminal 10 displays a change screen, accepts consent, changes, and corrections, and transmits them to the server 14 .

サーバ14は、画像処理装置12からの指示を受け付けると、当該指示が変更なしを意味するか否かを判定する(S209)。「同意」の場合には変更なしであるので(S209でYES)、図2のS207の仮受け付けを正式受け付けに変更し(S210)、スケジュールに正式に登録して受け付けた旨を画像処理装置12に応答する(S211)。なお、S203あるいはS206で既に正式に受け付けている場合には、S210の処理は不要である。 When receiving the instruction from the image processing apparatus 12, the server 14 determines whether or not the instruction means no change (S209). In the case of "agree", there is no change (YES in S209), so the provisional acceptance in S207 of FIG. (S211). It should be noted that the processing of S210 is not necessary if the request has already been formally accepted in S203 or S206.

他方で、画像処理装置12からの指示が「変更」あるいは「修正」の場合には変更ありとなり(S209でNO)、次にデッドラインの修正であるか否かを判定する(S212)。デッドラインの修正である場合(S212でYES)、図2のS207の仮受け付けを破棄し(S213)、指示されたデッドラインにて受け付け、スケジュールに登録する(S214)。そして、受け付けた旨を画像処理装置12に応答する(S211)。また、デッドラインの修正でない場合(S212)、例えば、処理の取消や他サーバへの処理変更等の指示の場合には、同様に図2のS207の仮受け付けを破棄し(S215)、破棄した旨を画像処理装置12に応答する(S216)。 On the other hand, if the instruction from the image processing apparatus 12 is "change" or "correction", it means that there is a change (NO in S209), and then it is determined whether or not the deadline is to be corrected (S212). If it is a correction of the deadline (YES in S212), the provisional acceptance of S207 in FIG. 2 is discarded (S213), acceptance by the indicated deadline is registered in the schedule (S214). Then, it responds to the image processing apparatus 12 to the effect that it has been accepted (S211). If the deadline is not corrected (S212), for example, if the instruction is to cancel the process or change the process to another server, the provisional acceptance of S207 in FIG. 2 is similarly discarded (S215). A response to that effect is sent to the image processing device 12 (S216).

図4は、処理実行時のサーバ14のフローチャートである。 FIG. 4 is a flowchart of the server 14 when executing processing.

サーバ14は、画像処理装置12から指示された処理をスケジュールに従って実行する(S217)。そして、一定の制御周期で処理完了日時を逐次算出し、算出された処理完了日時がスケジュールとして登録されているデッドライン以内であるか否かを判定する(S218)。なお、S218で算出される処理完了日時は、基本的には図2のS201で算出される予想終了日時と一致するが、サーバ14側の負荷状況の変動により一致しない場合もあり得る。例えば、サーバ14側の負荷状況が増大し、処理完了日時が予想終了日時よりも後になる場合もあり得る。判定の結果、処理完了日時がデッドライン内であれば問題ないので、特段の通知を行わない。 The server 14 executes the processing instructed by the image processing device 12 according to the schedule (S217). Then, the processing completion date and time are sequentially calculated at a constant control cycle, and it is determined whether or not the calculated processing completion date and time are within the deadline registered as the schedule (S218). The processing completion date and time calculated in S218 basically match the expected end date and time calculated in S201 of FIG. For example, the load status on the server 14 side may increase, and the processing completion date and time may be later than the expected end date and time. As a result of the determination, if the processing completion date and time are within the deadline, there is no problem, so no particular notification is made.

他方で、負荷状況の変動等により処理完了日時がスケジュールに登録されたデッドラインを超えると判定された場合(S218でNO)、次に、最短の指定がされているか否かを判定する(S219)。画像処理装置12から「最短」の指示を受け付けている場合(S219でYES)、処理を完了した時点で速やかに端末10に対して処理完了した旨を通知する(S220)。最短日時の指定がされていない場合(S219でNO)、処理を完了した時点ではなく処理完了日時がデッドラインを超えると判定された時点で端末10にそのときの処理完了日時を通知する(S221)。S220及びS221では、画像処理装置12を介して端末10に通知してもよい。 On the other hand, if it is determined that the processing completion date and time will exceed the deadline registered in the schedule due to changes in the load status (NO in S218), then it is determined whether or not the shortest time is designated (S219). ). If the "shortest" instruction has been received from the image processing device 12 (YES in S219), the terminal 10 is promptly notified of the completion of the processing upon completion of the processing (S220). If the shortest date and time is not specified (NO in S219), the terminal 10 is notified of the processing completion date and time when it is determined that the processing completion date and time exceeds the deadline, not when the processing is completed (S221). ). In S<b>220 and S<b>221 , the terminal 10 may be notified via the image processing device 12 .

本実施形態の処理を具体的に説明する。
ユーザは、画像処理装置12を操作して、一連の処理フローとして、
画像処理装置12での原文書のスキャン処理
→当該文書を用いたサーバ14での翻訳処理
→翻訳文書のサーバ14の記憶装置への格納
→翻訳文書の画像処理装置12への転送
→翻訳文書の画像処理装置12での印刷
を実行するものとする。
The processing of this embodiment will be specifically described.
A user operates the image processing device 12 to perform the following as a series of processing flows:
Scan processing of the original document by the image processing device 12→translation processing by the server 14 using the document→storage of the translated document in the storage device of the server 14→transmission of the translated document to the image processing device 12→translation of the translated document It is assumed that the image processing device 12 executes printing.

ユーザは、画像処理装置12の操作部を操作して、原文書をADF(オートドキュメントフィーダ)等にセットするとともに、最終出力文書名や翻訳言語、処理終了日時等を入力して処理の実行を指示する。 The user operates the operation unit of the image processing apparatus 12 to set the original document in an ADF (automatic document feeder) or the like, and inputs the final output document name, translation language, processing end date and time, etc. to execute processing. instruct.

図5Aは、画像処理装置12の表示部12aに表示される入力画面の一例を示す。入力フィールドとして、
出力文書名:
翻訳言語:
処理終了日時:
が表示され、ユーザはこれらの入力フィールドに入力する。例えば、
出力文書名:報告書
翻訳言語:英語
処理終了日時:2018/8/31 15:00
等である。この入力フィールドにおける処理終了日時はデッドラインに相当する。そして、スタートボタンを操作することで、画像処理装置12及びサーバ14に対して実行を指示する。なお、サーバ14は、予め設定されたデフォルトのサーバとしてもよく、ユーザが通信ネットワーク16上に存在する複数のサーバから選択してもよい。
5A shows an example of an input screen displayed on the display unit 12a of the image processing device 12. FIG. as an input field
Output document name:
Translation language:
Processing end date and time:
is displayed and the user fills in these input fields. for example,
Output document name: Report Translation language: English Processing end date: 2018/8/31 15:00
etc. The processing end date and time in this input field corresponds to the deadline. By operating the start button, the image processing apparatus 12 and the server 14 are instructed to execute. Note that the server 14 may be a preset default server, or may be selected by the user from a plurality of servers existing on the communication network 16 .

処理の実行が指示されると、画像処理装置12は、セットされた原文書のスキャン処理を実行して電子化データを生成し、当該電子化データと、スキャンに用いたパラメータ(色情報、データサイズ情報、フォーマット)、及びユーザが入力した情報(出力文書名、翻訳言語、処理終了日時)と、処理依頼をサーバ14に送信する。 When the execution of processing is instructed, the image processing apparatus 12 executes scanning processing of the set original document to generate digitized data, and stores the digitized data and the parameters (color information, data size information, format), information input by the user (output document name, translation language, processing end date and time), and a processing request are transmitted to the server 14 .

サーバ14は、これらの情報を受け付けると、スキャンに用いたパラメータを用いて処理に要する時間及びこれに基づく予想終了日時を算出する。サーバ14における処理開始時間及び所要時間に応じ、算出された予想終了日時と指示されたデッドラインとの関係で以下の2つのパターンがあり得る。
(1)算出された予想終了日時が14:40であり、指示されたデッドライン以前であるため、サーバ14側の処理をスケジュールに登録するとともに、15:00までの処理完了で受け付けた旨を画像処理装置12に応答する。
(2)算出された予想終了日時が15:30であり、指示されたデッドラインの後であるため、サーバ14側の処理をスケジュールに仮登録するとともに、15:00までの処理完了できない旨、及び15:30までなら処理完了できる旨を画像処理装置12に応答する。
When receiving these pieces of information, the server 14 uses the parameters used for scanning to calculate the time required for processing and the expected end date and time based on this. Depending on the processing start time and required time in the server 14, the following two patterns are possible for the relationship between the calculated expected end date and time and the designated deadline.
(1) Since the calculated expected end date and time is 14:40, which is before the designated deadline, the processing on the server 14 side is registered in the schedule, and the completion of processing by 15:00 is accepted. Respond to the image processing device 12 .
(2) Since the calculated expected end date and time is 15:30, which is after the designated deadline, the processing on the server 14 side is provisionally registered in the schedule, and the processing cannot be completed by 15:00. And it responds to the image processing device 12 that the processing can be completed by 15:30.

図5Bは、(1)のパターンにおける画像処理装置12の表示部12aに表示される応答の一例を示す。「2018/8/31 15:00までの処理終了で受け付けました。」とのメッセージを表示するとともに、「OK」、「変更」、「取消」の操作ボタンが表示される。
なお、処理を受け付けた場合に、当該処理を特定するための受付番号を割り当てて画像処理装置12に応答してもよい。「2018/8/31 15:00までの処理終了で受け付けました。受付番号0123」等である。ユーザは、サーバ14からの応答に同意する場合には「OK」のボタンを操作してサーバ14に指示する。
FIG. 5B shows an example of a response displayed on the display unit 12a of the image processing device 12 in pattern (1). A message "Processing completed by 15:00 on August 31, 2018 has been accepted" is displayed, and operation buttons "OK", "Change", and "Cancel" are displayed.
It should be noted that when a process is accepted, a receipt number for specifying the process may be assigned and sent back to the image processing apparatus 12 . For example, "Processing completed by 15:00 on August 31, 2018. Receipt number 0123". If the user agrees with the response from the server 14 , the user operates the “OK” button to instruct the server 14 .

サーバ14は、登録された当該処理のスケジュールに従って処理を実行し、電子化データを英語に翻訳する。スケジュールでは14:40に処理が終了する予定であるが、仮に14:40を過ぎても処理が完了しない場合でも、デッドラインである15:00を超えなければ画像処理装置12あるいは端末10に通知しない。他方で、14:40を過ぎても処理が完了せず、かつデッドラインである15:00以前に処理が完了しないと判定した場合には、画像処理装置12あるいは端末10にその旨を通知する。翻訳が完了すると、原文書及び翻訳文書は記憶装置に格納される。そして、記憶装置から原文書及び翻訳文書を読み出して画像処理装置12に送信する。画像処理装置12への送信は、サーバ14がスケジュールに従って自動実行してもよく、あるいは画像処理装置12からの要求に応じて送信してもよい。画像処理装置12は、原文書及び翻訳文書を受信すると、必要に応じてユーザ所望のレイアウトに編集した上で印刷出力する。 The server 14 executes processing according to the registered processing schedule, and translates the digitized data into English. According to the schedule, the processing is scheduled to end at 14:40, but even if the processing is not completed by 14:40, the image processing apparatus 12 or the terminal 10 is notified if the deadline of 15:00 is not exceeded. do not. On the other hand, if it is determined that the processing will not be completed even after 14:40 and that the processing will not be completed before 15:00, which is the deadline, the image processing device 12 or the terminal 10 is notified to that effect. . Once the translation is complete, the original document and the translated document are stored in storage. Then, the original document and the translation document are read out from the storage device and transmitted to the image processing device 12 . The transmission to the image processing device 12 may be automatically executed by the server 14 according to a schedule, or may be transmitted in response to a request from the image processing device 12 . Upon receiving the original document and the translated document, the image processing apparatus 12 edits them into a layout desired by the user as necessary, and prints them out.

図5Cは、(2)のパターンにおける画像処理装置12の表示部12aに表示される応答の一例を示す。「2018/8/31 15:00までの処理を終了できません。15:30までに処理終了できます。」とのメッセージを表示するとともに、「OK」、「変更」、「取消」の操作ボタンが表示される。ユーザは、いずれかのボタンを操作してサーバ14に指示する。ユーザが「OK」ボタンを操作した場合、サーバ14は、処理を15:30に終了する仮スケジュールを本登録する。ユーザが「変更」ボタンを操作した場合、画像処理装置12は、再び図5Aの画面を表示部12aに表示して処理終了日時の変更を促す。サーバ14は、ユーザが再入力した変更後の処理終了日時を受け付け、仮登録されたスケジュールを破棄して新たに受け付けた変更後の終了日時でスケジュールを登録する。 FIG. 5C shows an example of a response displayed on the display unit 12a of the image processing device 12 in pattern (2). The message "The process cannot be completed by 15:00 on August 31, 2018. The process can be completed by 15:30." Is displayed. The user instructs the server 14 by operating any button. When the user operates the "OK" button, the server 14 officially registers a provisional schedule that ends processing at 15:30. When the user operates the "change" button, the image processing apparatus 12 again displays the screen of FIG. 5A on the display unit 12a to prompt the user to change the processing end date and time. The server 14 accepts the changed processing end date and time re-input by the user, discards the provisionally registered schedule, and registers the schedule with the newly accepted changed end date and time.

そして、サーバ14は、登録された当該処理のスケジュールに従って処理を実行し、電子化データを英語に翻訳する。スケジュールでは15:30に処理が終了する予定であるが、仮に15:30を過ぎても処理が完了しない場合には、画像処理装置12あるいは端末10にその旨を通知する。翻訳が完了すると、原文書及び翻訳文書は記憶装置に格納される。そして、記憶装置から原文書及び翻訳文書を読み出して画像処理装置12に送信する。画像処理装置12への送信は、サーバ14がスケジュールに従って自動実行してもよく、あるいは画像処理装置12からの要求に応じて送信してもよい。画像処理装置12は、原文書及び翻訳文書を受信すると、必要に応じてユーザ所望のレイアウトに編集した上で印刷出力する。 Then, the server 14 executes the process according to the registered schedule of the process, and translates the digitized data into English. According to the schedule, the processing is scheduled to end at 15:30, but if the processing is not completed even after 15:30, the image processing apparatus 12 or the terminal 10 is notified to that effect. Once the translation is complete, the original document and the translated document are stored in storage. Then, the original document and the translation document are read out from the storage device and transmitted to the image processing device 12 . The transmission to the image processing device 12 may be automatically executed by the server 14 according to a schedule, or may be transmitted in response to a request from the image processing device 12 . Upon receiving the original document and the translated document, the image processing apparatus 12 edits them into a layout desired by the user as necessary, and prints them out.

ユーザが「取消」ボタンを操作した場合、サーバ14は仮登録したスケジュールを破棄する。この場合、サーバ14での翻訳処理は実行されない。 When the user operates the "cancel" button, the server 14 discards the provisionally registered schedule. In this case, no translation processing is performed by the server 14 .

図5Dは、画像処理装置12の表示部12aに表示される入力画面の他の例を示す。入力フィールドとして、
出力文書名:
翻訳言語:
処理終了日時:
が表示されるとともに、最短で処理することを指示するチェックボックスが表示される。ユーザはこれらの入力フィールドに入力するとともに、必要に応じてチェックボックスにチェックを入れる。例えば、
出力文書名:報告書
翻訳言語:英語
処理終了日時:2018/8/31 15:00
「最短で処理する」のチェックあり
等である。
FIG. 5D shows another example of the input screen displayed on the display section 12a of the image processing device 12. As shown in FIG. as an input field
Output document name:
Translation language:
Processing end date and time:
is displayed, along with a check box for instructing the shortest processing. The user fills in these input fields and checks checkboxes as required. for example,
Output document name: Report Translation language: English Processing end date and time: 2018/8/31 15:00
For example, there is a check for "process in the shortest possible time".

この場合、サーバ14は、たとえ算出された予想終了日時が指示されたデッドラインを超えたとしても、算出された予想終了日時でスケジュールを登録し、画像処理装置12に応答する。 In this case, even if the calculated expected end date and time exceeds the specified deadline, the server 14 registers the schedule with the calculated expected end date and time and responds to the image processing apparatus 12 .

図5Eは、この場合の画像処理装置12の表示部12aに表示される応答の一例を示す。「2018/8/31 15:00までの処理を終了できません。最短の15:30までに処理終了できます。」とのメッセージを表示するとともに、「OK」、「変更」、「取消」の操作ボタンが表示される。ユーザは、いずれかのボタンを操作してサーバ14に指示する。ユーザが「OK」ボタンを操作した場合、サーバ14は、処理を15:30に終了するスケジュールに従って処理を実行する。ユーザが「変更」ボタンを操作した場合、画像処理装置12は、再び図5Aの画面を表示部12aに表示して処理終了日時の変更を促す。サーバ14は、ユーザが再入力した変更後の処理終了日時を受け付け、スケジュールを破棄して新たに受け付けた変更後の終了日時でスケジュールを登録する。 FIG. 5E shows an example of a response displayed on the display unit 12a of the image processing device 12 in this case. The message "The process cannot be completed by 15:00 on August 31, 2018. The process can be completed by 15:30 at the earliest." A button appears. The user instructs the server 14 by operating any button. When the user operates the "OK" button, the server 14 executes the process according to the schedule to end the process at 15:30. When the user operates the "change" button, the image processing apparatus 12 again displays the screen of FIG. 5A on the display unit 12a to prompt the user to change the processing end date and time. The server 14 accepts the changed processing end date and time re-input by the user, discards the schedule, and registers the schedule with the newly accepted changed end date and time.

サーバ14は、登録された当該処理のスケジュールに従って処理を実行し、電子化データを英語に翻訳する。スケジュールでは15:30に処理が終了する予定であるが、仮に15:30を過ぎても処理が完了しない場合でも、最短で処理を実行しているので、処理が完了した時点で画像処理装置12あるいは端末10に通知する。但し、15:30を過ぎても処理が完了しないと判定された時点で画像処理装置12あるいは端末にその旨を通知してもよい。翻訳が完了すると、原文書及び翻訳文書は記憶装置に格納される。そして、記憶装置から原文書及び翻訳文書を読み出して画像処理装置12に送信する。画像処理装置12は、原文書及び翻訳文書を受信すると、必要に応じてユーザ所望のレイアウトに編集した上で印刷出力する。 The server 14 executes processing according to the registered processing schedule, and translates the digitized data into English. According to the schedule, the processing is scheduled to end at 15:30. Alternatively, the terminal 10 is notified. However, when it is determined that the processing will not be completed even after 15:30, the image processing apparatus 12 or the terminal may be notified to that effect. Once the translation is complete, the original document and the translated document are stored in storage. Then, the original document and the translation document are read out from the storage device and transmitted to the image processing device 12 . Upon receiving the original document and the translated document, the image processing apparatus 12 edits them into a layout desired by the user as necessary, and prints them out.

図5Fは、処理が完了した場合にサーバ14から端末10に通知をする場合に端末10に表示される通知例を示す。処理の内容、文書名、文書の格納場所が通知される。例えば、
「翻訳処理が完了しました。文書名:報告書 格納場所:xyz」
等である。このメッセージとともに、
「画像処理装置12からアクセスして出力して下さい。」
とのメッセージも通知される。ユーザは、たとえ画像処理装置12から離間した位置に存在していても、自己が携帯する端末10を視認することで、処理が完了したこと、及び画像処理装置12からどこにアクセスすればよいかを把握できる。
FIG. 5F shows an example notification displayed on the terminal 10 when the server 14 notifies the terminal 10 when the process is complete. Details of processing, document name, and document storage location are notified. for example,
"Translation process completed. Document name: Report Storage location: xyz"
etc. With this message
"Please access from the image processing device 12 and output."
A message will also be sent. Even if the user is located at a distance from the image processing apparatus 12, the user can visually recognize the terminal 10 carried by the user to know that the processing has been completed and where to access from the image processing apparatus 12. I can grasp it.

本実施形態において、サーバ14のスケジュール管理部144は、処理すべきデータ量とプロセッサの処理能力、負荷状況に応じて処理の所要時間を算出し、当該処理の処理開始日時、予想終了日時、及び指示されたデッドラインをスケジュールテーブルに登録することで管理するが、予想終了日時とデッドラインとの間に一定の余裕期間(あるいは猶予期間)が存在する場合には、必要に応じてこの猶予期間内においてリスケジューリングして再登録してもよい。 In this embodiment, the schedule management unit 144 of the server 14 calculates the required processing time according to the amount of data to be processed, the processing capacity of the processor, and the load status, and calculates the processing start date and time, the expected end date and time, and The designated deadline is managed by registering it in the schedule table, but if there is a certain leeway (or grace period) between the expected end date and time and the deadline, this grace period is added as necessary may be rescheduled and re-registered within.

図6A及び図6Bに、スケジュール管理部144におけるリスケジューリングの一例を示す。ユーザAから処理1を指示され、ユーザBから処理2を指示されたものとし、処理1の処理開始日時、処理終了日時(予想終了日時)、及びデッドラインがスケジュールテーブルに登録され、処理2の処理開始日時、処理終了日時(予想終了日時)、及びデッドラインがスケジュールテーブルに登録されている。スケジュール管理部144は、何からの理由により他の処理を処理1に先だって実行する必要が生じたものとする。このままでは他の処理を優先的に処理できない場合、スケジュール管理部144は、処理1の処理終了日時とデッドラインとを比較し、一定の猶予期間が存在する場合に、処理1の処理開始日時と処理終了日時を一定時間だけ遅延させる。 6A and 6B show an example of rescheduling in the schedule management unit 144. FIG. Assuming that user A instructs process 1 and user B instructs process 2, the process start date and time, the process end date and time (estimated end date and time), and the deadline of process 1 are registered in the schedule table, and the process 2 is performed. A processing start date and time, a processing end date and time (expected end date and time), and a deadline are registered in the schedule table. It is assumed that the schedule management unit 144 needs to execute another process prior to process 1 for some reason. If other processes cannot be processed preferentially in this state, the schedule management unit 144 compares the processing end date and time of process 1 with the deadline, and if there is a certain grace period, determines the processing start time and date of process 1. Delay the processing end date and time by a certain amount of time.

図6Bは、遅延後の処理1のスケジュールを示す。処理1の猶予期間内において処理1の処理開始日時と処理終了日時を遅延させる。なお、処理1は既に登録されて画像処理装置12に受け付けた旨を応答しているので、デッドラインを維持できる範囲内で遅延させる。また、処理1をリスケジューリングしたとしても、デッドラインは維持されているので、リスケジューリングした旨を画像処理装置12あるいは端末10に通知する必要はないが、ユーザが所望する場合には通知してもよい。 FIG. 6B shows the schedule for process 1 after delay. The processing start date and time and the processing end date and time of the processing 1 are delayed within the grace period of the processing 1. Note that processing 1 has already been registered and has responded to the image processing apparatus 12 that it has been received, so the processing is delayed within a range in which the deadline can be maintained. Also, even if process 1 is rescheduled, the deadline is maintained, so there is no need to notify the image processing apparatus 12 or the terminal 10 of the rescheduling. good too.

また、サーバ14のスケジュール管理部144は、処理すべきデータ量とプロセッサの処理能力、負荷状況に応じて指示された処理の所要時間を算出し、当該処理の処理開始日時、予想終了日時、及び指示されたデッドラインをスケジュールテーブルに登録することで管理するが、いずれかの処理が登録後に取り消された場合に、最短の指示がある処理を前倒しで実行するようにリスケジューリングして再登録してもよい。 In addition, the schedule management unit 144 of the server 14 calculates the required time for the instructed process according to the amount of data to be processed, the processing capacity of the processor, and the load status, and calculates the processing start date and time, the expected end date and time, and The designated deadline is managed by registering it in the schedule table, but if any process is canceled after being registered, it is rescheduled and re-registered so that the process with the shortest instruction is executed ahead of schedule. may

図7A及び図7Bに、スケジュール管理部144におけるリスケジューリングの他の例を示す。ユーザAから処理1を指示され、ユーザBから処理2を指示され、ユーザCから処理3を指示され、ユーザDから処理4を指示されたものとする。処理1、処理2、処理3、処理4の順に指示され、処理1~処理3は最短指示がなく、処理4は最短指示されたものとする。 7A and 7B show another example of rescheduling in the schedule management unit 144. FIG. Assume that user A instructs process 1, user B instructs process 2, user C instructs process 3, and user D instructs process 4. FIG. It is assumed that processing 1, processing 2, processing 3, and processing 4 are instructed in that order, processing 1 to processing 3 are not instructed at the shortest time, and processing 4 is instructed at the shortest time.

図7Aに示されるように、処理1~処理4について処理開始日時、処理終了日時、及びデッドラインが登録された後に、ユーザBからの指示により処理2が実行前に取り消されたものとする。この場合、スケジュール管理部144は、処理2の登録を破棄するとともに、最短指示された処理4に着目し、処理2に続く処理3ではなく、最短指示された処理4の前倒し処理をリスケジューリングする。 As shown in FIG. 7A, after the processing start date and time, the processing end date and time, and the deadline for processing 1 to processing 4 are registered, it is assumed that processing 2 is canceled before execution by an instruction from user B. In this case, the schedule management unit 144 cancels the registration of the process 2, focuses on the process 4 that was instructed to be the shortest, and reschedules the process 4 that was instructed to be the shortest instead of the process 3 that follows the process 2. .

図7Bには、処理2が取り消され、処理2に代えて処理4の処理開始日時、処理終了日時、及びデッドラインを新たにリスケジューリングして登録する場合を示す。なお、処理2に代えて処理4を実行する結果、処理3の処理開始日時及び処理終了日時が遅延する場合には、処理3の遅延後の処理終了日時がデッドライン以前であることを確認する。サーバ14は、処理4をリスケジューリングして処理終了日時が前倒しされた場合には、その旨をユーザDの端末10に通知する。処理3に関しては、リスケジューリングしたとしても、デッドラインは維持されているので、リスケジューリングした旨をユーザCの端末10に通知する必要はないが、ユーザCが所望する場合には通知してもよい。 FIG. 7B shows a case where the process 2 is canceled and the process start date and time, the process end date and time, and the deadline of the process 4 are rescheduled and registered instead of the process 2 . If the processing start date and time and the processing end date and time of the processing 3 are delayed as a result of executing the processing 4 instead of the processing 2, it is confirmed that the processing end date and time after the delay of the processing 3 is before the deadline. . When the server 14 reschedules the processing 4 and the processing end date and time is brought forward, the server 14 notifies the terminal 10 of the user D to that effect. Regarding process 3, even if rescheduling is performed, the deadline is maintained, so there is no need to notify the terminal 10 of user C that rescheduling has been performed. good.

以上、本発明の実施形態について説明したが、本発明はこれに限定されるものではなく、種々の変形が可能である。以下、変形例について説明する。 Although the embodiment of the present invention has been described above, the present invention is not limited to this, and various modifications are possible. Modifications will be described below.

<変形例>
実施形態では、ユーザが画像処理装置12の表示部12aに表示された入力フィールドに処理のデッドラインを入力してサーバ14に送信する構成であるが、デッドラインとして具体的な日付ではなく、「最短」をデッドラインとして入力してもよい。
<Modification>
In the embodiment, the user inputs the processing deadline into the input field displayed on the display unit 12a of the image processing device 12 and transmits the processing deadline to the server 14. Shortest” may be entered as a deadline.

図8は、この場合における画像処理装置12の表示部12aに表示される画面例を示す。図5Dと同様に、入力フィールドとして出力文書名、翻訳言語、処理終了日時、「最短で処理する」のチェックボックスが表示されるが、図5Dと異なり、処理終了日時には具体的な日時を入力せず、「最短で処理する」のチェックボックスにチェックを入れる。 FIG. 8 shows an example of a screen displayed on the display unit 12a of the image processing device 12 in this case. As in FIG. 5D, the output document name, translation language, processing end date and time, and a check box for "process as soon as possible" are displayed as input fields. check the checkbox of "process as soon as possible".

このとき、サーバ14ではデッドラインを最短日時とみなして処理する。具体的には、図2の処理において、処理のデータ量を用いて所要時間を算出し(S201)、最短指示があるので(S202でYES)、算出された所要時間に基づく終了日時で処理を受け付け(S203)、画像処理装置12に応答する(S204)。 At this time, the server 14 treats the deadline as the shortest date and time. Specifically, in the process of FIG. 2, the required time is calculated using the data amount of the process (S201), and since there is a shortest instruction (YES in S202), the process is started with the end date and time based on the calculated required time. Accept (S203), and respond to the image processing device 12 (S204).

本変形例では、デッドラインとして、具体的な日時(タイミング)と、「最短」の少なくともいずれかを指定し得るといえる。 In this modification, it can be said that at least one of a specific date and time (timing) and "shortest" can be designated as the deadline.

10 端末、12 画像処理装置、14 サーバ、16 通信ネットワーク。
10 terminal, 12 image processing device, 14 server, 16 communication network.

Claims (6)

画像処理装置から処理の指示及びデッドラインを受信する受信手段と、
前記処理の予想終了日時を算出する算出手段と、
算出された前記予想終了日時が前記デッドライン以前である場合は前記画像処理装置に前記処理を受け付けた旨を通知し、算出された前記予想終了日時が前記デッドラインより後である場合は前記画像処理装置に前記デッドラインの調整の必要性及び算出された前記予想終了日時を通知する通知手段と、
算出された前記予想終了日時及び前記デッドラインをスケジュールとして登録する登録手段と、
を備え、
前記登録手段は、複数の処理のそれぞれの予想終了日時とそれぞれのデッドラインを登録し、前記複数の処理のいずれかが取り消された場合に、取り消された処理よりも時間的に後に登録された処理のうち最短で処理すべき処理の予想終了日時を、他の処理のデッドラインを維持しつつ調整して再登録する
情報処理装置。
receiving means for receiving processing instructions and deadlines from the image processing apparatus;
Calculation means for calculating the expected end date and time of the processing;
If the calculated expected end date and time is before the deadline, the image processing apparatus is notified that the processing has been accepted, and if the calculated expected end date and time is after the deadline, the image is displayed. notification means for notifying the processing device of the necessity of adjusting the deadline and the calculated expected end date;
registration means for registering the calculated expected end date and time and the deadline as a schedule;
with
The registration means registers the expected end date and time of each of the plurality of processes and the respective deadlines, and if any of the plurality of processes is canceled, the registered process is registered temporally later than the canceled process. Adjust and re-register the expected end date and time of the process that should be processed in the shortest time while maintaining the deadline of other processes.
Information processing equipment.
前記算出手段は、前記予想終了日時として最短日時を算出する
請求項1に記載の情報処理装置。
The information processing apparatus according to claim 1, wherein said calculation means calculates the shortest date and time as said expected end date and time.
前記受信手段は、さらに、前記画像処理装置から調整後のデッドラインを受信する
請求項1,2のいずれかに記載の情報処理装置。
3. The information processing apparatus according to claim 1, wherein said receiving means further receives the adjusted deadline from said image processing apparatus.
前記登録手段は、前記予想終了日時と前記デッドラインとの間に猶予がある場合に、前記デッドラインを維持しつつ前記予想終了日時を調整して再登録する
請求項に記載の情報処理装置。
2. The information processing apparatus according to claim 1 , wherein said registration means adjusts and re-registers said expected end date and time while maintaining said deadline when there is a grace period between said expected end date and time and said deadline. .
画像処理装置と、
前記画像処理装置と通信手段を介して接続された情報処理装置と、
を備え、前記画像処理装置は、
処理の指示及びデッドラインを前記情報処理装置に送信する送信手段と、
前記情報処理装置からの、処理を受け付けた旨、あるいは前記デッドラインの調整の必要性及び算出された予想終了日時の通知を受信する受信手段と、
前記デッドラインの調整の必要性及び算出された前記予想終了日時の通知を受信した場合に、前記処理の取消、あるいは調整後のデッドラインを前記情報処理装置に再送信する再送信手段と、
を備え、前記情報処理装置は、
前記画像処理装置から処理の指示及びデッドラインを受信する受信手段と、
前記処理の前記予想終了日時を算出する算出手段と、
算出された前記予想終了日時が前記デッドライン以前である場合は前記画像処理装置に前記処理を受け付けた旨を通知し、算出された前記予想終了日時が前記デッドラインより後である場合は前記画像処理装置に前記デッドラインの調整の必要性及び算出された前記予想終了日時を通知する通知手段と、
算出された前記予想終了日時と、前記デッドラインあるいは調整後のデッドラインをスケジュールとして登録する登録手段と、
前記登録手段に登録された前記スケジュールに従って前記処理を実行する処理手段と、
を備え、
前記登録手段は、複数の処理のそれぞれの予想終了日時とそれぞれのデッドラインを登録し、前記複数の処理のいずれかが取り消された場合に、取り消された処理よりも時間的に後に登録された処理のうち最短で処理すべき処理の予想終了日時を、他の処理のデッドラインを維持しつつ調整して再登録する情報処理システム。
an image processing device;
an information processing device connected to the image processing device via communication means;
wherein the image processing device comprises
a transmitting means for transmitting a processing instruction and a deadline to the information processing apparatus;
Receiving means for receiving from the information processing apparatus a notification indicating that the process has been accepted, or a notification of the necessity of adjusting the deadline and the calculated expected end date and time;
retransmitting means for retransmitting the cancellation of the process or the adjusted deadline to the information processing apparatus when receiving notification of the necessity of adjusting the deadline and the calculated expected end date and time;
wherein the information processing device comprises
receiving means for receiving processing instructions and deadlines from the image processing apparatus;
calculation means for calculating the expected end date and time of the processing;
If the calculated expected end date and time is before the deadline, the image processing apparatus is notified that the processing has been accepted, and if the calculated expected end date and time is after the deadline, the image is displayed. notification means for notifying the processing device of the necessity of adjusting the deadline and the calculated expected end date;
registration means for registering the calculated expected end date and time and the deadline or the adjusted deadline as a schedule;
processing means for executing the processing according to the schedule registered in the registration means;
with
The registration means registers the expected end date and time of each of the plurality of processes and the respective deadlines, and if any of the plurality of processes is canceled, the registered process is registered temporally later than the canceled process. An information processing system that adjusts and re-registers the expected end date and time of a process that should be processed in the shortest time while maintaining deadlines for other processes .
コンピュータを、
画像処理装置から処理の指示及びデッドラインを受信する受信手段と、
前記処理の予想終了日時を算出する算出手段と、
算出された前記予想終了日時が前記デッドライン以前である場合は前記画像処理装置に前記処理を受け付けた旨を通知し、算出された前記予想終了日時が前記デッドラインより後である場合は前記画像処理装置に前記デッドラインの調整の必要性及び算出された前記予想終了日時を通知する通知手段と、
算出された前記予想終了日時及び前記デッドラインをスケジュールとして登録する登録手段
として機能させ、
前記登録手段は、複数の処理のそれぞれの予想終了日時とそれぞれのデッドラインを登録し、前記複数の処理のいずれかが取り消された場合に、取り消された処理よりも時間的に後に登録された処理のうち最短で処理すべき処理の予想終了日時を、他の処理のデッドラインを維持しつつ調整して再登録するように機能させるためのプログラム。
the computer,
receiving means for receiving processing instructions and deadlines from the image processing apparatus;
Calculation means for calculating the expected end date and time of the processing;
If the calculated expected end date and time is before the deadline, the image processing apparatus is notified that the processing has been accepted, and if the calculated expected end date and time is after the deadline, the image is displayed. notification means for notifying the processing device of the necessity of adjusting the deadline and the calculated expected end date ;
registration means for registering the calculated expected end date and time and the deadline as a schedule
function as
The registration means registers the expected end date and time of each of the plurality of processes and the respective deadlines, and if any of the plurality of processes is canceled, the registered process is registered temporally later than the canceled process. A program that adjusts and re-registers the expected end date and time of a process that should be processed in the shortest time while maintaining the deadlines of other processes .
JP2018156124A 2018-08-23 2018-08-23 Information processing device, image processing device, information processing system and program Active JP7192306B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018156124A JP7192306B2 (en) 2018-08-23 2018-08-23 Information processing device, image processing device, information processing system and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018156124A JP7192306B2 (en) 2018-08-23 2018-08-23 Information processing device, image processing device, information processing system and program

Publications (2)

Publication Number Publication Date
JP2020030637A JP2020030637A (en) 2020-02-27
JP7192306B2 true JP7192306B2 (en) 2022-12-20

Family

ID=69622536

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018156124A Active JP7192306B2 (en) 2018-08-23 2018-08-23 Information processing device, image processing device, information processing system and program

Country Status (1)

Country Link
JP (1) JP7192306B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005174083A (en) 2003-12-12 2005-06-30 Fuji Xerox Co Ltd Instruction description correction device and method, instruction description instruction program, job execution device, job execution instruction program, and jog execution method
JP2006011663A (en) 2004-06-23 2006-01-12 Canon Inc Information processor and information processing method
JP2007102076A (en) 2005-10-07 2007-04-19 Noritsu Koki Co Ltd Printing processing system
JP2008221639A (en) 2007-03-13 2008-09-25 Seiko Epson Corp Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client
JP2008254228A (en) 2007-04-02 2008-10-23 Murata Mach Ltd Image recorder
JP2010277343A (en) 2009-05-28 2010-12-09 Brother Ind Ltd Printing system and printer
JP2014150414A (en) 2013-02-01 2014-08-21 Konica Minolta Inc Image processing device, information processing terminal, and program

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005174083A (en) 2003-12-12 2005-06-30 Fuji Xerox Co Ltd Instruction description correction device and method, instruction description instruction program, job execution device, job execution instruction program, and jog execution method
JP2006011663A (en) 2004-06-23 2006-01-12 Canon Inc Information processor and information processing method
JP2007102076A (en) 2005-10-07 2007-04-19 Noritsu Koki Co Ltd Printing processing system
JP2008221639A (en) 2007-03-13 2008-09-25 Seiko Epson Corp Job processor capable of providing client with notification associated with job execution time, and system having the job processor and its client
JP2008254228A (en) 2007-04-02 2008-10-23 Murata Mach Ltd Image recorder
JP2010277343A (en) 2009-05-28 2010-12-09 Brother Ind Ltd Printing system and printer
JP2014150414A (en) 2013-02-01 2014-08-21 Konica Minolta Inc Image processing device, information processing terminal, and program

Also Published As

Publication number Publication date
JP2020030637A (en) 2020-02-27

Similar Documents

Publication Publication Date Title
US9176776B2 (en) Apparatus, method, and computer-readable recording medium for processing data
US10171685B2 (en) Service providing system, information processing method, and non-transitory recording medium
US9319549B2 (en) Information processing system, information processing apparatus, and information processing method
US20140253947A1 (en) Transmission control system, transmission control method, and information processing device
US9813581B2 (en) Improving workflow processing efficiency of information processing system, information processing method, and device via workload distribution
JP2019089287A (en) Image formation device, method for control of image formation device, and program
JP2012096384A (en) Image forming apparatus and image forming system using the same
US11113011B2 (en) Information processing system, information processing method, and recording medium
US9992360B2 (en) Image processing apparatus, image processing system, information processing method, and storage medium, for supporting document workflows
JP4987770B2 (en) Event notification device, event notification method, and event notification program
JP5725751B2 (en) Job processing apparatus, control method thereof, control program, and recording medium
US9172689B2 (en) Image processing apparatus, method of controlling the same and storage medium thereof
JP7192306B2 (en) Information processing device, image processing device, information processing system and program
JP2011008407A (en) System and device for controlling print
JP2014176026A (en) Relay device and fax transmission/reception program
JP2007072565A (en) Network image processing system, network image processor, and network image processing method
JP2015153117A (en) document generation system
JP2007241569A (en) Print server device
JP2004062859A (en) Information input system and information input control program
JP2005275544A (en) Printing processing method and printing processing apparatus
JP2011108047A (en) Image processing apparatus, and method for controlling the same
JP6273987B2 (en) Image forming system
JP2014182412A (en) Information processor, information processing method and program
US9667813B2 (en) Facsimile apparatus that can store fax image data as transmission history information without storing cover sheet image, control method for facsimile apparatus, and storage medium
JP2009064351A (en) Printing processing system and print processing execution program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210721

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220526

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220607

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220804

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221108

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221121

R150 Certificate of patent or registration of utility model

Ref document number: 7192306

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150