JP2008045322A - Stage for getting on/off elevator for construction - Google Patents

Stage for getting on/off elevator for construction Download PDF

Info

Publication number
JP2008045322A
JP2008045322A JP2006220878A JP2006220878A JP2008045322A JP 2008045322 A JP2008045322 A JP 2008045322A JP 2006220878 A JP2006220878 A JP 2006220878A JP 2006220878 A JP2006220878 A JP 2006220878A JP 2008045322 A JP2008045322 A JP 2008045322A
Authority
JP
Japan
Prior art keywords
cage
deck
boarding
stage
front position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006220878A
Other languages
Japanese (ja)
Other versions
JP4837488B2 (en
Inventor
Yukihisa Harada
幸久 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP2006220878A priority Critical patent/JP4837488B2/en
Publication of JP2008045322A publication Critical patent/JP2008045322A/en
Application granted granted Critical
Publication of JP4837488B2 publication Critical patent/JP4837488B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a stage for getting on and off an elevator for construction, which is used for making personnel get on/off a cage on an aboveground floor, and which enables a material to be directed loaded by bringing a fork lift closer to the cage in such a manner that a part of the stage for getting on/off the elevator, positioned in the front of the cage, is laterally moved when the material is lifted/lowered. <P>SOLUTION: A movable deck 14 is supported on a base 13 in such a manner as to be reciprocatable between a front position 11 to face a getting-on/off portion 32a of the cage 32 of the elevator 30 for construction, and a first lateral position 12a in a horizontal direction X, adjacent to the front position 11. The movable deck 14 is reciprocated by a driving mechanism portion 18. When a person gets on/off the cage 32, the movable deck 14 moves in the direction of the front position, and the front half of it is utilized in such a manner as to close the front position. When the material is loaded/unloaded, the movable deck moves in the direction of the first lateral position, and the front half of it recedes from the front position, so as to open up a space large enough to make a material delivery vehicle get into the front position. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、工事用エレベータの乗降用ステージに関し、更に詳細には、高さのある建造物を建設する際に上方階に人員および資材などを揚げる工事用エレベータのために地上階に設置される乗降用ステージに関する。   The present invention relates to a stage for getting on and off a construction elevator. More specifically, the present invention is installed on a ground floor for a construction elevator that lifts personnel and materials to an upper floor when building a tall building. Related to boarding / exiting stage.

例えば、高層の建設物を建築する際などには、上方階に作業者などの人員や資材を運び揚げる工事用のエレベータが仮設されることはよく知られている。一般的な工事用エレベータは、建設物の外壁に支持をとりながら立設されたエレベータポストにガイドされて昇降するケージを備え、このケージに人員を乗せ、或いは資材を積み込んで揚げ降ろしをする。さらに、このような工事用エレベータにおけるケージの昇降機構は、一般的に、ケージの床下面に設置された電動モータと、この電動モータの回転軸に取り付けられた歯車をエレベータポストに取り付けたラックとから構成され、ラックに噛み合わされた歯車を電動モータにより回転することによりケージを昇降させるようにされている。   For example, when building a high-rise building, it is well known that an elevator for construction is provided on the upper floor to carry personnel and materials such as workers. A general construction elevator includes a cage that is guided by an elevator post that is erected while supporting an outer wall of a building, and a person is loaded on the cage or is loaded and unloaded with materials. Further, the cage lifting mechanism in such a construction elevator generally includes an electric motor installed on the lower surface of the floor of the cage, and a rack in which a gear attached to the rotating shaft of the electric motor is attached to the elevator post. The cage is raised and lowered by rotating a gear engaged with the rack by an electric motor.

そのため、工事用エレベータのケージ床下面には、電動モータやその回転軸により回転される歯車や、また電動モータの回転を減速させて歯車に伝達する減速ギヤボックスなどの駆動機構が設置されているので、地上階でのケージの停止位置は、ケージの床面が地面から約1000〜1500mmの高さに位置するように設定されていることが多い。従って、このような工事用エレベータでは、地上階で人員がケージに乗降できるように乗降用ステージ、即ちプラットホーム状のデッキが、ケージの地上階停止位置におけるケージ乗降部の正面に仮設されている。   Therefore, on the lower surface of the cage floor of the construction elevator, there are installed drive mechanisms such as an electric motor and a gear that is rotated by its rotating shaft, and a reduction gear box that decelerates the rotation of the electric motor and transmits it to the gear. Therefore, the stop position of the cage on the ground floor is often set such that the floor surface of the cage is located at a height of about 1000 to 1500 mm from the ground. Therefore, in such a construction elevator, a boarding stage, that is, a platform-like deck is temporarily installed in front of the cage boarding / alighting section at the ground floor stop position so that personnel can get on and off the cage on the ground floor.

地上階で工事用エレベータのケージに乗り込む作業員は、乗降用のステージに設置された4〜7段の階段を使って乗降用ステージ上に昇り、この乗降用ステージからケージに乗り込み、或いは上方階からケージに乗って地上階に降りてくる人員は、ケージが地上階で停止したときその乗降部から乗降用ステージに降りてそこから地面にさらに降りることになる。   Workers who enter the cage of the construction elevator on the ground floor use the 4-7 steps installed on the boarding stage to climb onto the boarding stage, board the cage from this boarding stage, or A person who gets on the cage and descends to the ground floor from when the cage stops on the ground floor, descends from the boarding area to the boarding stage and further descends to the ground.

かかる工事用エレベータでは、人員がケージに乗降する場合には何の問題もないが、ケージに資材を載せて上方階へ運ぶ場合には、乗降用ステージの近傍に資材搬送車両を止め、その荷台から作業者が乗降用ステージに手作業で運び上げ、さらにそれらをケージに載せ替える作業が必要であった。また、上方階から資材などを降ろす場合も手順が逆になるだけでケージから乗降用ステージへの荷下ろしやさらにそこから車両への積み込みなどに人的作業を必要とした。そこで、このような資材のケージへの積み込みや積み卸し作業を容易にするため特許文献1に開示されているような建設工事用エレベータも開発された。特許文献1に開示された建設工事用エレベータは、ケージに小型のクレーンを設置して、ケージと共にクレーンが揚がり下がりするようにしたものである。この建設工事用エレベータによれば、地上階で停止しているケージに、該ケージに設置されているクレーンで資材搬送車両の荷台から資材を吊り上げてケージに載せ替えたり、逆にケージから資材搬送車両の荷台に資材を載せ替えることが容易にできる。
特開平08−208155号公報
In such an elevator for construction, there is no problem when personnel get on and off the cage, but when carrying materials to the cage and transporting it to the upper floor, the material transport vehicle is stopped near the boarding stage, and its loading platform Therefore, it was necessary for the workers to manually carry them to the boarding stage and transfer them to the cage. In addition, when unloading materials from the upper floor, the procedure was reversed, requiring manual work to unload the cage from the loading / unloading stage and then load it onto the vehicle. Accordingly, an elevator for construction work as disclosed in Patent Document 1 has been developed in order to facilitate loading and unloading of such materials into a cage. In the elevator for construction work disclosed in Patent Literature 1, a small crane is installed in a cage, and the crane is lifted and lowered together with the cage. According to this elevator for construction work, materials are lifted from a loading platform of a material transport vehicle by a crane installed in the cage to a cage stopped on the ground floor and transferred to the cage or vice versa. It is possible to easily transfer materials to the loading platform of the vehicle.
Japanese Patent Laid-Open No. 08-208155

しかしながら、特許文献1に開示された建設工事用エレベータでは、クレーンがケージに一体的に設置されているためケージ自体の重量が重くなり、そのため駆動トルクの大きな電動モータや、耐久性の大きな歯車およびラックなどが必要となるばかりではなく、ケージの構造も複雑となる。そのため、建設工事用エレベータの仮設に多大な費用が掛かり、また仮設後の維持費用、即ち電力使用量が大きく、これらの費用などが建造物の建築コストを高めると、いう経済的な問題があった。   However, in the elevator for construction work disclosed in Patent Document 1, since the crane is integrally installed in the cage, the weight of the cage itself becomes heavy. Therefore, an electric motor having a large driving torque, a highly durable gear, Not only is a rack required, but the cage structure is also complicated. For this reason, there is an economic problem that temporary construction of an elevator for construction work is very expensive, and maintenance costs after temporary construction, that is, power consumption is large, and these costs increase the construction cost of the building. It was.

本発明の目的は、かかる従来の問題点を解決するためになされたもので、地上階でケージに人員が乗降する際には従来通りに乗降用ステージを使用し、ケージに資材を載せて揚げ降ろしする際にはケージの乗降部正面に位置している乗降用ステージの一部が側方に動いて、例えばフォークリストなど資材運搬車両が直接にケージに接近して乗せることが出来るようにした工事用エレベータの乗降用ステージを提供することにある。   An object of the present invention is to solve such a conventional problem. When personnel get on and off the cage on the ground floor, the boarding stage is used as usual, and the material is placed on the cage and fried. When unloading, a part of the boarding stage located in front of the boarding / alighting part of the cage moved to the side so that a material transport vehicle such as a fork wrist can directly get close to the cage. It is to provide a stage for getting on and off the elevator for construction.

本発明は、昇降可能なケージの地上階停止位置が地上面より所定高さに設定されている工事用エレベータの前記ケージの乗降部に対峙する正面位置と該正面位置から前記ケージへ乗り込む方向にほぼ直交する横方向で、かつ前記正面位置に隣接する第1の側方位置との間に設置された乗降用ステージであって、その特徴とするところは、該乗降用ステージが、前記正面位置と前記第1の側方位置との間を往復動可能な可動デッキを備え、前記工事用エレベータの前記ケージに前記地上階で人員が乗降する際には、前記可動デッキが、前記第1の側方位置から前記正面位置に移動して前記人員の前記ケージへの乗降に利用され、前記ケージに前記地上階で資材を積み卸しする際には、前記可動デッキが前記第1の側方位置に移動して資材運搬車両が前記ケージの前記乗降部に接近可能としたことにある。   The present invention is directed to a front position facing a boarding / alighting portion of the cage of a construction elevator in which the ground floor stop position of the elevator that can be raised and lowered is set to a predetermined height from the ground surface, and in a direction of getting into the cage from the front position. A boarding / alighting stage installed in a substantially orthogonal lateral direction and between a first lateral position adjacent to the front position, characterized in that the boarding stage is located at the front position And a movable deck that can reciprocate between the first side position, and when a person gets in and out of the cage of the construction elevator on the ground floor, the movable deck is The movable deck moves from the lateral position to the front position and is used for getting on and off the cage to and from the cage. When loading and unloading materials on the ground floor from the cage, the movable deck is moved to the first lateral position. Move to material truck There is that was accessible to the landing portion of the cage.

本発明の工事用エレベータの乗降用ステージにおける実施形態の一例では、前記可動デッキを前記正面位置と前記第1の側方位置との間を往復動可能に支持するガイド部材が、前記地上階の停止位置ある前記ケージに近接して前記正面位置と前記第1の側方位置との間に延びている。   In one example of the embodiment of the construction elevator boarding / exiting stage according to the present invention, a guide member that supports the movable deck so as to reciprocate between the front position and the first side position is provided on the ground floor. A stop position extends proximate to the cage and between the front position and the first lateral position.

本発明の工事用エレベータの乗降用ステージにおける実施形態の他の例では、前記乗降用ステージが、前記可動デッキを前記ケージの床とほぼ同じ平面内で、かつ前記正面位置と前記第1の側方位置との間を往復移動可能に支持する架台と、該架台に可動に支持された前記可動デッキを前記正面位置と前記第1の側方位置との間で往復移動させる駆動機構部とを含み、前記ガイド部材が、前記架台の構成要素の一部であるガイドレールとされている。   In another example of the embodiment of the boarding / alighting stage of the construction elevator according to the present invention, the boarding / alighting stage has the movable deck in a plane substantially the same as the floor of the cage, and the front position and the first side. And a drive mechanism that reciprocally moves the movable deck movably supported by the mount between the front position and the first side position. In addition, the guide member is a guide rail that is a part of a component of the gantry.

本発明の工事用エレベータの乗降用ステージにおける実施形態の他の例では、前記乗降用ステージが、前記正面位置を挟んで前記第1の側方位置とは反対側の第2の側方位置に設置された人員乗降待機用デッキを備え、前記架台に支持された前記可動デッキが、前記第1の側方位置から前記正面位置に移動したとき、前記可動デッキの端部が前記人員乗降待機用デッキの端部により支持されている。     In another example of the embodiment of the boarding / alighting stage of the construction elevator according to the present invention, the boarding / alighting stage is at a second side position opposite to the first side position across the front position. When the movable deck supported by the pedestal is moved from the first lateral position to the front position, the end of the movable deck is for waiting for the passenger boarding / exiting. Supported by the edge of the deck.

本発明の工事用エレベータの乗降用ステージにおける実施形態の他の例では、前記第2の側方位置に設置された前記人員乗降待機デッキには、前記正面位置に対峙する前記横方向を横断する保護柵が設置され、該保護柵は、前記人員乗降待機デッキに形成されたスリットを介して、前記人員乗降待機デッキの内側の格納位置と前記人員乗降待機デッキの表面から立ち上がる立設位置との間で昇降する。   In another example of the embodiment in the boarding / alighting stage of the construction elevator according to the present invention, the crew boarding / standby deck installed at the second lateral position crosses the lateral direction facing the front position. A protective fence is installed, and the protective fence is provided between a retracted position inside the personnel boarding / waiting deck and a standing position rising from the surface of the staff boarding / waiting deck through a slit formed in the staff boarding / waiting deck. Go up and down between.

本発明の工事用エレベータの乗降用ステージにおける実施形態の他の例では、前記駆動機構部が、前記可動デッキに取り付けられたラックと、前記架台に設置されたモータと、該モータの出力軸により回転力を受けると共に前記ラックに噛み合う歯車とを備えている。   In another example of the embodiment of the construction elevator boarding / exiting stage according to the present invention, the drive mechanism unit includes a rack attached to the movable deck, a motor installed on the gantry, and an output shaft of the motor. A gear that receives rotational force and meshes with the rack.

本発明の工事用エレベータの乗降用ステージによると、人員がケージに乗り降りするときには可動デッキをケージの乗降部に対峙する正面位置に移動し、また、資材をケージに載せたり降ろしたりするときには可動デッキを第1の側方位置に移動してケージの正面位置にフォークリフトを進入させることのできるスペースを作ることができる。そのため、資材をフォークリフトで直接ケージに載せたり降ろしたりすることができ、資材などの荷物をケージに乗せたり降ろしたりする作業時間の短縮やその作業労力の軽減を図ることができる。しかも、このような効果を得るために、ケージには何等かの装置(例えば、クレーン等)を追加設置したりする必要がないので、工事用エレベータは従来のものを使用することができる。その結果、工事用エレベータ仮設費用及び仮設後の維持費用などの抑制を図ることができる。   According to the stage for getting on and off the construction elevator according to the present invention, when a person gets on and off the cage, the movable deck is moved to a front position facing the boarding and getting off part of the cage, and when the material is put on and off the cage, the movable deck is moved. Can be moved to the first lateral position to create a space in which the forklift can enter the front position of the cage. Therefore, the material can be directly placed on or lowered from the cage with a forklift, and the work time for loading or unloading the load such as the material on the cage can be shortened or the labor can be reduced. Moreover, since it is not necessary to additionally install any device (for example, a crane or the like) in the cage in order to obtain such an effect, a conventional construction elevator can be used. As a result, it is possible to suppress the construction elevator temporary cost and the maintenance cost after the temporary construction.

また、本発明の工事用エレベータの乗降用ステージによると、地上階の停止位置あるケージに近接して正面位置と第1の側方位置との間にガイド部材、例えばガイドレールを設置し、このガイド部材により可動デッキを正面位置と第1の側方位置との間を往復動可能に支持するようにしているので、このガイド部材が停止バーとなってフォークリフトなどの資材運搬車両が空間状態となった正面位置に入り込んでケージに接近するとき、誤ってケージに衝突するのを防止することができる。   Further, according to the stage for getting on and off the construction elevator according to the present invention, a guide member, for example, a guide rail, is installed between the front position and the first side position in the vicinity of the cage which is the stop position on the ground floor. Since the movable deck is supported by the guide member so as to be able to reciprocate between the front position and the first lateral position, the guide member serves as a stop bar so that the material transport vehicle such as a forklift is in a space state. It is possible to prevent the cage from accidentally colliding with the cage when entering the front position and approaching the cage.

さらに、本発明の工事用エレベータの乗降用ステージによると、ケージの乗降部に対峙する正面位置に隣接する横方向の第1の側方位置に可動デッキを支持する架台を設置し、前記正面位置を挟んで第1の側方位置とは反対側の第2の側方位置に人員乗降待機用デッキを設置し、可動デッキが正面位置に移動してきたときにその先端部が人員乗降待機用デッキの端部により支持されるようにしたので、可動デッキを正面位置で安全に支えることができる。   Furthermore, according to the stage for boarding / alighting of the construction elevator according to the present invention, the gantry for supporting the movable deck is installed at the first lateral position in the lateral direction adjacent to the front position facing the boarding / alighting portion of the cage, and the front position A deck for boarding / exiting personnel is installed at the second side position opposite to the first side position with the front of the movable deck being moved to the front position. Since it is supported by the end of the movable deck, the movable deck can be safely supported at the front position.

さらにまた、本発明の工事用エレベータの乗降用ステージによると、人員乗降待機用デッキには、該人員乗降用待機デッキの上面から立ち上がった立設位置と人員乗降用待機デッキの下側における格納位置との間を昇降する保護柵が第2の側方位置から正面位置に対峙する横方向を横断して設置されていることから、可動デッキが第1の側方位置に移動しているときやケージが地上階から離れているときの人員の正面位置への進入を防止し、人員への安全を図ることができる。また、本発明の工事用エレベータへの乗降用ステージによると、可動デッキを移動させる駆動機構部が、ラックとモータとから構成されているので、構造が簡単であることから乗降用ステージを容易に仮設又は解体することができる。   Furthermore, according to the boarding / alighting stage of the construction elevator according to the present invention, the personnel boarding / awaiting deck includes a standing position rising from the upper surface of the boarding / alighting deck and a storage position below the boarding deck for personnel boarding / alighting. When the movable deck is moved to the first side position, the protective fence that moves up and down is installed across the lateral direction facing the front position from the second side position. It is possible to prevent personnel from entering the front position when the cage is away from the ground floor and to ensure safety to the personnel. Further, according to the stage for getting on and off the construction elevator according to the present invention, the drive mechanism for moving the movable deck is composed of a rack and a motor. Temporary or dismantled.

以下、本発明の工事用エレベータの乗降用ステージを図に示される好適な実施の形態について更に詳細に説明する。図1ないし図3には、本発明の一実施形態に係る工事用エレベータの乗降用ステージ(以下、乗降用ステージという)10が示されている。図1〜3は、それぞれ同じ実施形態に係る乗降用ステージ10の平面図、正面図、及び側面図である。図1〜3に示される工事用エレベータ30は、周知のものであるので詳細な構造を省略しているが、基本的に、エレベータポスト31が間隔をあけて立設され、それらの間にケージ32が昇降可能に支持されている。また、通常、両エレベータポスト31には、その高さ方向に延びるラック(図示せず)が取り付けられ、ケージ32の床下面に設置した歯車(図示せず)をラックに噛み合わせ、この歯車を電動モータの回転軸で直接回転させるか、減速装置を介して回転することによりケージ32をエレベータポスト31に沿って昇降させるように構成されている。   DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a preferred embodiment shown in the drawings of a construction elevator boarding / exiting stage according to the present invention will be described in more detail. 1 to 3 show a boarding stage (hereinafter referred to as boarding stage) 10 for a construction elevator according to an embodiment of the present invention. 1 to 3 are a plan view, a front view, and a side view, respectively, of a boarding / alighting stage 10 according to the same embodiment. The construction elevator 30 shown in FIGS. 1 to 3 is well-known, and its detailed structure is omitted. Basically, elevator posts 31 are erected at intervals, and a cage is provided between them. 32 is supported so that raising / lowering is possible. Also, normally, racks (not shown) extending in the height direction are attached to both elevator posts 31, and gears (not shown) installed on the lower surface of the cage 32 are meshed with the racks. The cage 32 is configured to move up and down along the elevator post 31 by being directly rotated by the rotating shaft of the electric motor or by being rotated through a speed reducer.

このような工事用エレベータ30では、前述したように、ケージ32の床下面に昇降用の電動モータや減速機構などが取り付けられているため、地上階でのケージ32の停止位置では、ケージ32の床面が地上面G.L.から所定の高さとなる。従って、このような工事用エレベータ30では、地上階で人員がケージ32に乗降できるように乗降用ステージ10が、ケージ32の乗降部32aに対峙する正面位置11と、この正面位置11を挟んで2つのエレベータポスト31の並び方向両側方位置とに渡って仮設されている。便宜的に、2つのエレベータポスト31の並び方向を「横方向」として図1及び図2に矢印Xで示し、正面位置11を挟んで横方向Xにおける両側方位置をそれぞれ第1の側方位置12a及び第2の側方位置12bとする。図1及び図2で見て正面位置11の右側に位置する第1の側方位置12aには、鋼材で組み立てられた架台13が設置されている。   In such a construction elevator 30, as described above, since an electric motor for raising and lowering, a speed reduction mechanism, and the like are attached to the lower surface of the cage 32, the cage 32 is stopped at the stop position of the cage 32 on the ground floor. The floor is G. L. To a predetermined height. Therefore, in such a construction elevator 30, the boarding stage 10 faces the boarding / alighting portion 32 a of the cage 32 so that personnel can get on and off the cage 32 on the ground floor, and the front position 11 is sandwiched between The two elevator posts 31 are temporarily installed over both side positions. For convenience, the arrangement direction of the two elevator posts 31 is indicated as “lateral direction” by arrows X in FIGS. 1 and 2, and both lateral positions in the lateral direction X across the front position 11 are first lateral positions. 12a and the second lateral position 12b. A pedestal 13 made of a steel material is installed at a first side position 12a located on the right side of the front position 11 when viewed in FIGS.

架台13は、ケージ32への進入方向に間隔をあけて配置された2本のガイドレール13a,13bと、これらのガイドレール13a,13bを支える複数の支柱13cとから構成されている。ここで、「ケージ32への進入方向」とは、図1及び図3で見て横方向Xにほぼ直交しかつ正面位置11からケージ32に向かって乗降する方向であり、図1、図3及び図4において矢印Yで示されている。各ガイドレール13a,13bは、端面がコ字形をした溝型鋼材で構成され、これら鋼材の溝側を対向させると共に、各鋼材の上面をケージ32の床面とほぼ同じ平面内に位置させるように設置されている。この実施形態では、各ガイドレール13a,13bが端面コ字形の溝型鋼材で構成されているが、この発明ではこの形の鋼材に限定されるものではなく、例えば端面がH型をしたH鋼を用いることもできる。2本のガイドレール13a,13bのうち、ケージ32に近接して配置されたガイドレール13aは、正面位置11と第1の側方位置12aとの間を延び、他のガイドレール13bは、第1の側方位置12aにのみ配置されている。図1に示されるように、第1の側方位置12aにおける横方向Xの幅寸法は、正面位置11における横方向Xの幅寸法Lのほぼ2倍である。   The gantry 13 includes two guide rails 13a and 13b arranged at intervals in the direction of entry into the cage 32, and a plurality of columns 13c that support the guide rails 13a and 13b. Here, the “entry direction to the cage 32” is a direction that is substantially orthogonal to the lateral direction X as seen in FIGS. 1 and 3 and gets on and off from the front position 11 toward the cage 32, as shown in FIGS. 4 and indicated by an arrow Y in FIG. Each of the guide rails 13a and 13b is made of a groove-type steel material whose end surface is U-shaped. The groove sides of these steel materials are opposed to each other, and the upper surface of each steel material is positioned in substantially the same plane as the floor surface of the cage 32. Is installed. In this embodiment, each of the guide rails 13a and 13b is made of a U-shaped groove-type steel material. However, the present invention is not limited to this type of steel material. For example, the H steel whose end surface is H-shaped. Can also be used. Of the two guide rails 13a and 13b, the guide rail 13a arranged close to the cage 32 extends between the front position 11 and the first side position 12a, and the other guide rails 13b 1 is disposed only at one side position 12a. As shown in FIG. 1, the width dimension in the lateral direction X at the first lateral position 12 a is approximately twice the width dimension L in the lateral direction X at the front position 11.

架台13を構成する2つのガイドレール13a,13b間には、可動デッキ14が配置されている。可動デッキ14は、図4に示されるようにデッキ部15aと、該デッキ部15aにおけるY方向側の両側縁から垂れ下がるように設けられた側壁部15bとから構成されたデッキ本体15を備え、デッキ本体15の各側壁部15bには、その外方に突出するように3つの支持軸16が横方向Xに所定の間隔をあけて取り付けられ、これら各支持軸16にはそれぞれローラ17が回転可能に支持されている。各側壁部15bに支持されたローラ17は、ガイドレール13a,13bを構成している溝型鋼材の溝内に配置され、これにより可動デッキ14は、ガイドレール13a,13bに沿った横方向Xへ移動することができる。この可動デッキ14では、側壁部15bに対する支持軸16の取付け位置を調整することで、デッキ部15aの表面がガイドレール13a,13bの上面と同一平面に位置決めされているので、デッキ部15aの表面は、地上階所定位置に停止している工事用エレベータ30のケージ32における床面とも同じ平面に位置する。デッキ本体15の横方向Xの寸法は、第1の側方位置12aの横方向寸法と同じ2Lである。従って、可動デッキ14が、第1の側方位置12aに移動しているときには、その第1の側方位置12aに完全に納まることになる。   A movable deck 14 is disposed between the two guide rails 13 a and 13 b constituting the gantry 13. As shown in FIG. 4, the movable deck 14 includes a deck body 15 including a deck portion 15a and side wall portions 15b provided so as to hang down from both side edges on the Y direction side of the deck portion 15a. Three support shafts 16 are attached to the respective side wall portions 15b of the main body 15 so as to protrude outwardly at predetermined intervals in the lateral direction X, and rollers 17 are rotatable on the respective support shafts 16 respectively. It is supported by. The rollers 17 supported by the respective side wall portions 15b are arranged in the grooves of the grooved steel material constituting the guide rails 13a and 13b, so that the movable deck 14 can move in the lateral direction X along the guide rails 13a and 13b. Can be moved to. In this movable deck 14, the surface of the deck portion 15a is positioned in the same plane as the upper surfaces of the guide rails 13a and 13b by adjusting the mounting position of the support shaft 16 with respect to the side wall portion 15b. Is located on the same plane as the floor surface of the cage 32 of the construction elevator 30 stopped at a predetermined position on the ground floor. The dimension of the deck body 15 in the lateral direction X is 2L, which is the same as the lateral dimension of the first side position 12a. Accordingly, when the movable deck 14 is moved to the first side position 12a, the movable deck 14 is completely accommodated in the first side position 12a.

ここで、デッキ本体15の各側壁部15bにそれぞれ3つ支持されている合計6つのローラ17の取付け位置について説明する。デッキ本体15の幅寸法は、正面位置11の幅寸法Lの2倍あるので、可動デッキ14が正面位置11に移動されたとき、デッキ本体15は幅方向Xの前半分(正面位置側の前端部から幅寸法L)だけが第1の側方位置12aから張り出して正面位置11にあり、デッキ本体15の後半分(幅寸法は同様にL)は第1の側方位置12aに残っている。このデッキ本体15の前半分における前端側の各側壁部15bにはそれぞれ1つのローラ17が取り付けられ、後半分の各側壁部15bには横方向Xに間隔をあけて2つのローラ17が取り付けられている。従って、可動デッキ14が動いて、デッキ本体15の前半分が正面位置11に移動したとき、デッキ本体15の前半分の前端部に取り付けられている片側の1つのローラ17のみが1つのガイドレール13bから外れるだけで、他のローラ17は、ガイドレール13a,13bの走行溝内にあってデッキ本体15を支持している。その結果、正面位置11では、1つのガイドレール13aのみでもデッキ本体15の前半分を支持することができる。しかし、このデッキ本体15の前半分に人員が乗るなどしてさらに大きな荷重が掛かった場合のために、デッキ本体15の前半分が正面位置11に移動しているときその前端部が後述する人員乗降待機デッキに連結して支えられる。この支持構造については後述する。   Here, the attachment positions of a total of six rollers 17 that are respectively supported by three side walls 15b of the deck body 15 will be described. Since the width dimension of the deck body 15 is twice the width dimension L of the front position 11, when the movable deck 14 is moved to the front position 11, the deck body 15 has a front half in the width direction X (front end on the front position side). Only the width dimension L) extends from the first lateral position 12a to the front position 11, and the rear half of the deck body 15 (the width dimension is also L) remains at the first lateral position 12a. . One roller 17 is attached to each side wall portion 15b on the front end side in the front half of the deck main body 15, and two rollers 17 are attached to each side wall portion 15b of the latter half portion with an interval in the lateral direction X. ing. Therefore, when the movable deck 14 moves and the front half of the deck main body 15 moves to the front position 11, only one roller 17 attached to the front end of the front half of the deck main body 15 has one guide rail. The other rollers 17 are only in the running grooves of the guide rails 13a and 13b and support the deck main body 15 only by coming off from 13b. As a result, at the front position 11, the front half of the deck body 15 can be supported by only one guide rail 13a. However, when the front half of the deck main body 15 is moved to the front position 11 due to a case where a larger load is applied due to a person getting on the front half of the deck main body 15, the front end of the deck main body 15 is the personnel described later. It is supported by connecting to the boarding / alighting deck. This support structure will be described later.

このデッキ本体15では、デッキ部15aの裏面に補強リブ15cが横方向Xに所定の間隔をあけて設けられており、各補強リブ15cの端部は各側壁部15bに結合されている。可動デッキ14には、駆動機構部18により正面位置11と第1の側方位置12aとの間を往復移動する駆動力が付与される。駆動機構部18は、可動デッキ14のデッキ本体15に取り付けられたラック18aと、このラック18aに噛み合う歯車18bと、該歯車18bを回転させる電動モータ18cとから構成されている。ラック18aは、デッキ本体15の補強リブ15cに取り付けられ、かつ横方向Xに延びる帯状を呈している。電動モータ18cは、架台13を構成する支柱13aに支持された横梁13dに載置され、その出力軸に歯車18bがラック18aに噛み合うように取り付けられている。これにより電動モータ18cが駆動されると、回転する歯車18bが、噛み合っているラック18aに移動力を付与するので可動デッキ14が横方向Xに動く。   In the deck main body 15, reinforcing ribs 15c are provided on the back surface of the deck portion 15a at a predetermined interval in the lateral direction X, and the end portions of the reinforcing ribs 15c are coupled to the side wall portions 15b. A driving force that reciprocates between the front position 11 and the first side position 12a is applied to the movable deck 14 by the drive mechanism section 18. The drive mechanism unit 18 includes a rack 18a attached to the deck body 15 of the movable deck 14, a gear 18b that meshes with the rack 18a, and an electric motor 18c that rotates the gear 18b. The rack 18 a is attached to the reinforcing rib 15 c of the deck body 15 and has a strip shape extending in the lateral direction X. The electric motor 18c is mounted on a horizontal beam 13d supported by a column 13a constituting the gantry 13, and a gear 18b is attached to an output shaft thereof so as to mesh with the rack 18a. Thus, when the electric motor 18c is driven, the rotating gear 18b applies a moving force to the meshed rack 18a, so that the movable deck 14 moves in the lateral direction X.

前述したように可動デッキ14が第1の側方位置12aから動いてその前半分が正面位置11に移動されると、デッキ本体15の前端側に取り付けられ、かつガイドレール13bの溝内を動く1つのローラ17は、ガイドレール13bから外れることになる。その際、デッキ本体15の前端部を人員乗降待機デッキと共同して支える構造について説明する。人員乗降待機デッキ19は、正面位置11を挟んで第1の側方位置12aとは反対側の第2の側方位置12bに設置されている。この人員乗降待機デッキ19は、正面位置11に移動してきた可動デッキ15に人員を乗り移らせて工事用エレベータ30のケージ32に乗り込ませるためのもので、該人員乗降待機デッキ19は、図1,図2及び図5に示されるように横方向Xに延びる2つの溝型鋼材19aをY方向に並べて配置し、これらの溝型鋼材19aを複数の支柱19bで支持し、鉄板19cを溝型鋼材19aに架け渡すように載せて構成されている。この人員乗降待機デッキ19の正面位置11に対向する端部には、図5に示されるように段部20が形成されている。すなわち、段部20は、各溝型鋼材19aの先端部における上部をL型に切り欠き、切り欠いた下側部分に荷重受け棒20aが溝型鋼材19a間に橋渡しされて構成されている。   As described above, when the movable deck 14 is moved from the first side position 12a and the front half thereof is moved to the front position 11, it is attached to the front end side of the deck body 15 and moves in the groove of the guide rail 13b. One roller 17 comes off the guide rail 13b. At that time, a structure for supporting the front end portion of the deck main body 15 together with the personnel boarding / alighting deck will be described. Personnel boarding / alighting deck 19 is installed at second side position 12b opposite to first side position 12a with front position 11 interposed therebetween. This personnel getting on / off waiting deck 19 is for transferring personnel to the movable deck 15 that has moved to the front position 11 and getting on the cage 32 of the construction elevator 30. 2 and 5, two groove steel members 19a extending in the transverse direction X are arranged side by side in the Y direction, these groove steel members 19a are supported by a plurality of columns 19b, and the iron plate 19c is grooved. It is mounted so as to span the steel material 19a. As shown in FIG. 5, a step portion 20 is formed at an end portion of the personnel boarding / awaiting deck 19 facing the front position 11. That is, the stepped portion 20 is configured by notching the upper part of the tip of each grooved steel material 19a into an L shape and bridging the load receiving rod 20a between the grooved steel materials 19a at the notched lower part.

他方、デッキ本体15の正面位置11に向いた前端部にも段部21が形成されている。具体的には、図6にデッキ本体15の前端部が拡大して示されているようにその前端部下側が逆L字形に切り欠かれ、切り欠かれた上側部分における両側壁部15b間に荷重受け棒21aが固定されて段部21が構成されている。これら両デッキ14,19における各段部20,21の大きさと形状は、デッキ本体15の前端部が人員乗降待機デッキ19の端部に当接したとき、各段部20,21どうしがぴったり噛み合った状態で重なり合うように設計されている。したがって、この時にはデッキ本体15における前端部の段部21が人員乗降待機デッキ19における端部の段部20に乗った状態となるので、正面位置11に移動したデッキ本体15の前半分についてはその前端部とケージ32に沿う縁部がそれぞれ人員乗降待機デッキ19の端部とガイドレール13aとで支持されるので、正面位置11に移動した可動デッキ14の前半分に人員が乗っても強度的に問題を生じることがない。   On the other hand, a stepped portion 21 is also formed at the front end portion of the deck body 15 facing the front position 11. Specifically, as shown in FIG. 6 in which the front end portion of the deck body 15 is enlarged, the lower side of the front end portion is notched into an inverted L shape, and the load between the side wall portions 15b in the upper portion of the notched portion is cut. The receiving bar 21a is fixed to form the stepped portion 21. The sizes and shapes of the step portions 20 and 21 in both decks 14 and 19 are such that the step portions 20 and 21 are closely meshed with each other when the front end portion of the deck body 15 abuts against the end portion of the passenger boarding / awaiting deck 19. Designed to overlap in a stacked state. Accordingly, at this time, the step portion 21 at the front end portion of the deck main body 15 is in a state of riding on the step portion 20 at the end portion of the personnel getting on / off waiting deck 19, so the front half of the deck main body 15 moved to the front position 11 is Since the front end portion and the edge portion along the cage 32 are supported by the end portion of the person getting on / off waiting deck 19 and the guide rail 13a, respectively, even if a person gets on the front half of the movable deck 14 moved to the front position 11, it is strong. Will not cause any problems.

人員乗降待機デッキ19には、該デッキ19に地上から上がり降りするための階段22が正面位置11とは反対側の横方向端部に取り付けられている。また、人員乗降待機デッキ19の表面を形成している鉄板19cには、Y方向に延びるスリット23が形成されていて、このスリット23の直下の格納位置には昇降式の保護柵24が設置され、所定の操作によりこの保護柵24がスリット23から出たり入ったりして、階段22から人員乗降待機デッキ19に昇った人員に対して正面位置11への進入を可能としたり阻止したりして安全が図られている。なお、図1、図2及び図4において、参照符号25は、デッキ本体15の上面においてY方向の片側(工事用エレベータ30とは反対側)に設置された保護柵を示し、また参照符号26は、架台13において第1の側方位置12aに位置する一方のガイドレール13bの上面に設置された保護柵を示している。これらの保護柵25,26は、図1及び図2に示されるように可動デッキ14が正面位置11の方向へ移動したときに図2に示されるように正面側からみて横方向Xにほぼ一列に並ぶように設置されている。さらに、人員乗降待機デッキ19の鉄板19cにもその上面のY方向一側部(工事用エレベータ30とは反対側)に保護柵27が固定的に立てられている。   A stairway 22 for ascending / descending the deck 19 from the ground is attached to the personnel boarding / awaiting deck 19 at a lateral end opposite to the front position 11. In addition, a slit 23 extending in the Y direction is formed in the iron plate 19c forming the surface of the passenger boarding / awaiting deck 19, and an elevating type protective fence 24 is installed at a storage position immediately below the slit 23. The protective fence 24 enters and exits from the slit 23 by a predetermined operation, and enables or prevents entry of the person who has risen from the stairs 22 to the personnel entry / exit standby deck 19 to the front position 11. Safety is achieved. 1, 2, and 4, reference numeral 25 indicates a protective fence installed on one side in the Y direction (opposite to the construction elevator 30) on the upper surface of the deck main body 15. These show the protection fence installed in the upper surface of one guide rail 13b located in the 1st side position 12a in the mount frame 13. FIG. These protective fences 25 and 26 are arranged in a row in the lateral direction X as seen from the front side as shown in FIG. 2 when the movable deck 14 moves in the direction of the front position 11 as shown in FIGS. It is installed to line up. Further, a protective fence 27 is fixedly erected on one side of the upper surface of the iron board 19c of the passenger boarding / alighting deck 19 in the Y direction (the side opposite to the construction elevator 30).

さらにまた、図1〜図3において、参照符号28は、工事用エレベータ30のエレベータポスト31に固定された支え部28a,28bにより支持されたアコーデオン式のシャッター28cを備える開閉扉28を示している。この開閉扉28は、工事用エレベータ30のケージ32が地上階から離れているときに、シャッター28cを図1に仮想線で示されているように広げて工事用エレベータ30を覆い、乗降用ステージ10から人員が誤ってケージ昇降経路に入らないようにする。ケージ32が地上階まで降りてきて停止し、ケージ32から人員が乗降デッキ10に乗り降りする際には図1に実線で示すように一方側にシャッター28cを折り畳んでケージ32の乗降部32aを開放する。   1 to 3, reference numeral 28 indicates an opening / closing door 28 including an accordion-type shutter 28 c supported by support portions 28 a and 28 b fixed to the elevator post 31 of the construction elevator 30. . When the cage 32 of the construction elevator 30 is away from the ground floor, the open / close door 28 covers the construction elevator 30 by spreading the shutter 28c as shown by phantom lines in FIG. 10 to prevent personnel from accidentally entering the cage lift path. When the cage 32 descends to the ground floor and stops, and when a person gets on or off the boarding deck 10, the shutter 28c is folded to one side to open the boarding / unloading portion 32a of the cage 32 as shown by a solid line in FIG. To do.

次に、この実施形態に係る乗降デッキ10の動作について説明する。図1〜図3は、工事用エレベータ30のケージ32が地上階から離れているときの乗降用ステージ10の状態を示している。通常は、工事用エレベータ30を人員の搬送に使用する場合が多いので、可動デッキ14は、正面位置11の方向に移動しており、従って、可動デッキ14におけるデッキ本体15の前半分は正面位置11にある。そして、工事用エレベータ30のケージ32は地上階から離れているので、開閉扉28のシャッター28cは閉まった状態にあり、また人員乗降待機デッキ19の昇降式保護柵24はスリット23から鉄板19cの上方に立ち上がっており、正面位置11に来ている可動デッキ14へ人員乗降待機デッキ19からの人員が進入するのを阻止している。工事用エレベータ30のケージ32が、上層階から降りてきて地上階の所定位置に停止すると、人員乗降待機デッキ19上に居る保安員が開閉扉28のシャッター28cをあけて、ケージ32の乗降部32aを開放する。シャッター28cが一方側に折り畳まれてケージ32の乗降部32aが開けられると、シャッター28cの折り畳みがセンサー(図示せず)で検知され、人員乗降待機デッキ19に設けられている昇降式保護柵24がその検知信号に基づいてスリット23を介してその下方の格納位置に下降する。これにより、ケージ32に乗っていた人員は、その乗降部32aから可動デッキ14に降り、さらに人員乗降愛機デッキ19を経由して階段22から地上に降りる。また、保護柵24の手前で待機していた乗降待ちの人員は、可動デッキ14へ進入してケージ32に乗り移る。人員を乗せた工事用エレベータ30のケージ32が上昇すると、保安員が開閉扉28のシャッター28cを閉める。シャッター28cが閉められると、これをセンサー(図示せず)が検知し、その検知信号に基づいて人員乗降待機デッキ19の昇降式保護柵24が上昇し、人員乗降待機デッキ19から可動デッキ14への人員の進入が阻止される。   Next, the operation of the boarding / alighting deck 10 according to this embodiment will be described. 1 to 3 show a state of the boarding / alighting stage 10 when the cage 32 of the construction elevator 30 is away from the ground floor. Usually, since the construction elevator 30 is often used for transporting personnel, the movable deck 14 is moved in the direction of the front position 11, and therefore the front half of the deck body 15 in the movable deck 14 is located at the front position. 11 is. Since the cage 32 of the construction elevator 30 is away from the ground floor, the shutter 28c of the open / close door 28 is in a closed state, and the lifting protection fence 24 of the passenger entry / exit standby deck 19 extends from the slit 23 to the iron plate 19c. It stands up and prevents a person from the boarding / leaving deck 19 from entering the movable deck 14 at the front position 11. When the cage 32 of the construction elevator 30 descends from the upper floor and stops at a predetermined position on the ground floor, a security worker on the passenger boarding / departure waiting deck 19 opens the shutter 28c of the door 28 and gets on and off the cage 32. Open 32a. When the shutter 28c is folded to one side and the boarding / alighting part 32a of the cage 32 is opened, folding of the shutter 28c is detected by a sensor (not shown), and the elevating type protective fence 24 provided in the personnel boarding / receiving standby deck 19 is provided. Is lowered to the lower storage position via the slit 23 based on the detection signal. As a result, the personnel riding on the cage 32 descend from the boarding / alighting part 32 a to the movable deck 14 and further descend from the stairs 22 via the personnel boarding / alighting machine deck 19 to the ground. In addition, the person waiting for getting on and off waiting in front of the protective fence 24 enters the movable deck 14 and transfers to the cage 32. When the cage 32 of the construction elevator 30 on which a person is placed rises, the security worker closes the shutter 28c of the door 28. When the shutter 28c is closed, a sensor (not shown) detects this, and based on the detection signal, the lifting / lowering protection fence 24 of the passenger boarding / awaiting deck 19 is raised, and from the personnel boarding / alighting deck 19 to the movable deck 14. The entry of other personnel is prevented.

次に、工事用エレベータ30のケージ32に資材を載せて上層階へ揚げる場合について説明する。ケージ32が地上階の所定位置に停止すると、保安員は、開閉扉検知用のセンサーのスイッチを切ってからシャッター28cを開ける。そして、可動デッキ14の駆動機構部18を構成している電動モータ18cの駆動スイッチを押してこれを駆動し、可動デッキ14を横方向Xにおける第1の側方位置12aへ向かって移動させる。可動デッキ14は、その後端部が架台13の正面側とは反対側の端部に設置されているセンサー(図示せず)により検知されるか又はリミットスイッチ(図示せず)に当接すると、電動モータ18cの駆動が停止され、可動デッキ14の移動が停止する。これにより可動デッキ14の前半分が正面位置11から退去して第1の側方位置12aに移り、正面位置11にはフォークリフト35などが地上を走行してケージ32に接近することができるスペースができる。   Next, the case where a material is placed on the cage 32 of the construction elevator 30 and raised to the upper floor will be described. When the cage 32 stops at a predetermined position on the ground floor, the security guard switches off the open / close door detection sensor and then opens the shutter 28c. And the drive switch of the electric motor 18c which comprises the drive mechanism part 18 of the movable deck 14 is pushed, this is driven, and the movable deck 14 is moved toward the 1st side position 12a in the horizontal direction X. When the movable deck 14 is detected by a sensor (not shown) installed at its rear end opposite to the front side of the gantry 13 or comes into contact with a limit switch (not shown), The drive of the electric motor 18c is stopped, and the movement of the movable deck 14 is stopped. As a result, the front half of the movable deck 14 retreats from the front position 11 and moves to the first side position 12a, and the front position 11 has a space where the forklift 35 and the like can travel on the ground and approach the cage 32. it can.

これにより、資材36をフォークに乗せたフォークリフト35が、空間状態となった正面位置11に入り込んでケージ32に接近し、そのフォークをケージ32内に直接差し入れて資材36をケージ32の床面に降ろす。なお、架台13を構成しているガイドレール13a,13bのうちの1つは、ケージ32側に位置しているが、フォークリフト35は、このガイドレール13aの手前で停止してフォークを上に上げることでケージ32への資材の積み卸しをすれば、このガイドレール13aが作業の邪魔になることはない。また、このガイドレール13aは、その上面がケージ32の床面とほぼ同じ高さにあるので、フォークリフト35のフォークをそれ以下に下げることはできないので、予めケージ32の床面には、資材36を受けるための適当な受け台(図示せず)が置かれており、フォークをガイドレール13aより下方に下げることなくケージ32に積載できるようにされている。なお、架台13のガイドレール13b上、可動デッキ14の上面、及び人員乗降待機デッキ19の上面に立設された保護保護柵26,25,27は、その位置にかならずなければならないものではなく、ケージ32に積み卸しする資材の大きさによっては、その数を減らし、或いは取り外し可能にできるようにしておくことも好ましい。   As a result, the forklift 35 on which the material 36 is placed on the fork enters the frontal position 11 in the space state and approaches the cage 32, and the fork is directly inserted into the cage 32 to place the material 36 on the floor surface of the cage 32. take down. One of the guide rails 13a and 13b constituting the gantry 13 is located on the cage 32 side, but the forklift 35 stops in front of the guide rail 13a and raises the fork. Thus, if the material is loaded and unloaded from the cage 32, the guide rail 13a does not interfere with the work. Further, since the upper surface of the guide rail 13a is substantially the same as the floor surface of the cage 32, the fork of the forklift 35 cannot be lowered below that. A suitable cradle (not shown) for receiving is placed so that the fork can be loaded on the cage 32 without being lowered below the guide rail 13a. The protective protection fences 26, 25, and 27 erected on the guide rail 13 b of the pedestal 13, the upper surface of the movable deck 14, and the upper surface of the passenger boarding / alighting deck 19 do not have to be in their positions, Depending on the size of the material to be loaded and unloaded in the cage 32, it is also preferable to reduce the number or make it removable.

さらに、1つのガイドレール13aを正面位置11のY方向におけるケージ32側に位置させた効果として、フォークリフト35が空間状態となった正面位置11に入り込んでケージ32に接近するとき、誤ってケージ32に衝突するのを防止する停止バーとして機能していることである。単に、正面位置11にある乗降用ステージ10全体を側方へ移動させて正面位置11を空間状態にした場合、フォークリフト35が工事用エレベータ30のケージ32に接近し過ぎてケージ32に衝突し、その昇降機能に支障を来すとその修復に多大な時間と費用が掛かり工事の遅れを招くことになる。しかし、可動デッキ14をガイドする2つのガイドレール13a,13bのうちのケージ32に近接する側の1つを第1の側方位置12aから正面位置11まで延ばすことより、このガイドレール13aは、可動デッキ14を支持するだけではなく、フォークリフト35が誤ってケージ32に衝突するのを防止する停止バーともなっている。この実施形態では、図3、図7及び図8に示されるように資材36のケージ32への載せ替えにフォークリフト35が使用されているが、この発明ではフォークリフトに限定されるものではなく、例えばトラックなどの貨物車両をバックさせてその荷台をケージ32に接近させ、その荷台からケージ32に荷物や資材を載せ替えることもできる。   Further, as a result of positioning one guide rail 13a on the side of the cage 32 in the Y direction of the front position 11, when the forklift 35 enters the front position 11 in the space state and approaches the cage 32, the cage 32 is mistaken. It functions as a stop bar that prevents it from colliding with. Simply, when the entire boarding stage 10 at the front position 11 is moved to the side to bring the front position 11 into a space state, the forklift 35 approaches the cage 32 of the construction elevator 30 and collides with the cage 32. If the lifting / lowering function is hindered, it will take a lot of time and money to repair it, resulting in construction delays. However, by extending one of the two guide rails 13a and 13b for guiding the movable deck 14 on the side close to the cage 32 from the first side position 12a to the front position 11, the guide rail 13a In addition to supporting the movable deck 14, it also serves as a stop bar that prevents the forklift 35 from accidentally colliding with the cage 32. In this embodiment, the forklift 35 is used to transfer the material 36 to the cage 32 as shown in FIGS. 3, 7, and 8. However, the present invention is not limited to the forklift, for example, A cargo vehicle such as a truck can be moved back to bring the cargo bed closer to the cage 32, and loads and materials can be transferred from the cargo bed to the cage 32.

このようにして工事用エレベータ30のケージ32に資材などを載せた後、重量的に余裕があれば、保安員が可動デッキ14を正面位置11側へ移動させてその前半分で正面位置11を閉めきり、人員乗降待機デッキ19で待機している人員をそのケージ32に同乗させることもできる。   In this way, after placing materials or the like on the cage 32 of the construction elevator 30, if there is a margin in weight, the security staff moves the movable deck 14 to the front position 11 side and sets the front position 11 in the front half. It is also possible to bring a person who is fully closed and waiting on the personnel boarding / awaiting deck 19 into the cage 32.

上述した実施形態に係る工事用エレベータの乗降用ステージ10によれば、人員がケージ32に乗り降りするときには可動デッキ14をケージ32の乗降部32aに対峙した正面位置11に移動し、また、資材36をケージ32に載せたり降ろしたりするときには可動デッキ14を第1の側方位置12aに移動してケージ32の正面位置11にフォークリフトなどを進入させることのできるスペースを作ることができるので、資材36をフォークリフト35などで直接ケージ32に載せたり降ろしたりすることができる。その結果、資材などの荷物をケージ32に乗せたり降ろしたりする作業時間の短縮やその作業労力の軽減を図ることができる。しかも、このような効果を得るために、ケージ32には何等かの装置(例えば、クレーン等)を追加設置したりする必要がないので、工事用エレベータは従来のものを使用することができ、工事用エレベータ仮設費用及び仮設後の維持費用などの抑制を図ることができる。   According to the stage 10 for getting on and off the construction elevator according to the above-described embodiment, when a person gets on or off the cage 32, the movable deck 14 is moved to the front position 11 facing the boarding / alighting portion 32a of the cage 32, and the material 36 Since the movable deck 14 can be moved to the first side position 12a and a forklift or the like can be made to enter the front position 11 of the cage 32 when the load is placed on or lowered from the cage 32, the material 36 can be made. Can be directly mounted on or lowered from the cage 32 by a forklift 35 or the like. As a result, it is possible to shorten the work time for loading and unloading loads such as materials on the cage 32 and to reduce the work effort. In addition, in order to obtain such an effect, it is not necessary to additionally install any device (for example, a crane or the like) in the cage 32. Therefore, a conventional construction elevator can be used. It is possible to reduce the temporary construction elevator costs and the maintenance costs after the temporary construction.

また、この工事用エレベータへの乗降用ステージ10によると、地上階の停止位置あるケージ32に近接して正面位置11と第1の側方位置12aとの間にガイド部材となるガイドレール13aを設置し、このガイドレール13aにより可動デッキ14を正面位置11と第1の側方位置12aとの間を往復動可能に支持するようにしているので、このガイドレール13aが停止バーとなってフォークリフト35が空間状態となった正面位置11に入り込んでケージ32に接近するとき、誤ってケージ32に衝突するのを防止することができる。   Further, according to the stage 10 for getting on and off the construction elevator, the guide rail 13a serving as a guide member is provided between the front position 11 and the first side position 12a in the vicinity of the cage 32 which is a stop position on the ground floor. Since the movable deck 14 is supported by the guide rail 13a so as to be able to reciprocate between the front position 11 and the first side position 12a, the guide rail 13a serves as a stop bar and is used as a forklift. When 35 enters the front position 11 in the space state and approaches the cage 32, it can be prevented from accidentally colliding with the cage 32.

さらに、この工事用エレベータへの乗降用ステージ10によると、ケージ32の乗降部32aに対峙する正面位置11に隣接する横方向Xの第1の側方位置12aに可動デッキ14を支持する架台13を設置し、正面位置12aを挟んで第1の側方位置12aとは反対側の第2の側方位置12bに人員乗降待機用デッキ19を設置し、可動デッキ14が正面位置11に移動してきたときにその先端部が人員乗降待機用デッキ19の端部により支持されるようにしたので、可動デッキ14を正面位置11で安全に支えることができる。なお、前述した実施形態では、可動デッキ14が正面位置11に移動してきたときにその先端部を人員乗降待機用デッキ19の端部により支持する構造として、可動デッキ14の先端部に形成した段部21が人員乗降待機用デッキ19の端部に形成した段部20に乗る係合構造としたが、この発明では、このような段部どうしの係合構造に限定されるものではなく、人員乗降待機用デッキ19の端面に凹部を形成しておき、可動デッキ14の先端部を人員乗降待機用デッキ19の端面凹部に嵌合するようにしてもよい。   Furthermore, according to the boarding / alighting stage 10 for the construction elevator, the gantry 13 that supports the movable deck 14 at the first lateral position 12a in the lateral direction X adjacent to the front position 11 facing the boarding / alighting portion 32a of the cage 32. And a deck 19 for getting on and off the person is installed at the second side position 12b opposite to the first side position 12a across the front position 12a, and the movable deck 14 moves to the front position 11. Since the front end of the movable deck 14 is supported by the end of the passenger boarding / alighting deck 19, the movable deck 14 can be safely supported at the front position 11. In the above-described embodiment, when the movable deck 14 has moved to the front position 11, the front end thereof is supported by the end of the passenger boarding / awaiting deck 19. Although the engagement structure that the portion 21 rides on the stepped portion 20 formed at the end of the personnel boarding / awaiting deck 19 is adopted, the present invention is not limited to such an engagement structure between the stepped portions. A recess may be formed on the end surface of the boarding / awaiting deck 19, and the leading end of the movable deck 14 may be fitted into the end surface recess of the person boarding / awaiting deck 19.

さらに、この工事用エレベータへの乗降用ステージ10によると、人員乗降待機用デッキ19には、該人員乗降用待機デッキ19の上面から立ち上がった立設位置と人員乗降用待機デッキ19の下側における格納位置との間を昇降する保護柵24が第2の側方位置12bから正面位置に向かう横方向Xを横断して設置されていることから、可動デッキ14が第1の側方位置12aに移動しているときの人員の正面位置11への進入を防止し、人員への安全を図ることができる。また、この工事用エレベータへの乗降用ステージ10によると、可動デッキ14を移動させる駆動機構部18が、ラック18aと電動モータ18cとから構成されているので、構造が簡単であることから乗降用ステージ10を容易に仮設しかつ解体することができる。   Furthermore, according to the boarding / alighting stage 10 for the construction elevator, the crew boarding / standby deck 19 includes a standing position rising from the upper surface of the boarding / alighting deck 19 and a lower side of the boarding deck 19 for boarding / exiting the crew. Since the protective fence 24 that moves up and down between the storage position and the lateral position X from the second lateral position 12b to the front position is installed, the movable deck 14 is moved to the first lateral position 12a. It is possible to prevent the personnel from entering the front position 11 when moving and to ensure safety to the personnel. Moreover, according to the stage 10 for boarding / exiting to this construction elevator, since the drive mechanism unit 18 for moving the movable deck 14 is composed of the rack 18a and the electric motor 18c, the structure is simple, so The stage 10 can be easily temporarily set up and dismantled.

本発明の一実施形態に係る工事用エレベータの乗降用ステージを示す平面図である。It is a top view which shows the stage for boarding / alighting of the elevator for construction which concerns on one Embodiment of this invention. 図1に示される乗降用ステージの正面図である。It is a front view of the boarding stage shown in FIG. 図1に示される乗降用ステージの側面図である。It is a side view of the boarding / alighting stage shown by FIG. 図1及び図2の4−4線で切断し、架台とこれに支持された可動デッキとを示す断面図である。It is sectional drawing which cut | disconnects by 4-4 lines of FIG.1 and FIG.2, and shows a mount frame and the movable deck supported by this. 人員乗降待機デッキの正面位置側の一部を示す斜視図である。It is a perspective view which shows a part of front position side of a personnel boarding / alighting deck. 可動デッキの正面位置側の先端部を拡大して示す部分的な斜視図である。It is a partial perspective view which expands and shows the front-end | tip part of the front position side of a movable deck. 可動デッキが第1の側方位置に移動して、正面位置にフォークリフトが進入して資材を直接工事用エレベータのケージに積み込んでいる状態を示す図1と同様な平面図である。FIG. 2 is a plan view similar to FIG. 1 showing a state in which the movable deck moves to the first side position, the forklift enters the front position, and the material is directly loaded in the cage of the construction elevator. 図7に示される工事用エレベータの乗降用ステージの正面図である。It is a front view of the stage for boarding / alighting of the construction elevator shown in FIG.

符号の説明Explanation of symbols

10 乗降用ステージ
11 正面位置
12a 第1の側方位置
12b 第2の側方位置
13 架台
13a,13b ガイドレール
14 可動デッキ
15 デッキ本体
15a デッキ部
15b 側壁部
17 ローラ
18 駆動機構部
18a ラック
18c 電動モータ
19 人員乗降待機デッキ
20 人員乗降待機デッキの先端段部
21 デッキ本体の先端段部
30 工事用エレベータ
31 エレベータポスト
32 ケージ
32a ケージの乗降部
35 フォークリフト
36 資材
DESCRIPTION OF SYMBOLS 10 Boarding / alighting stage 11 Front position 12a 1st side position 12b 2nd side position 13 Base 13a, 13b Guide rail 14 Movable deck 15 Deck main body 15a Deck part 15b Side wall part 17 Roller 18 Drive mechanism part 18a Rack 18c Electric Motor 19 Entry / exit stand-by deck 20 Front end step of pedestrian entrance / exit stand-by 21 End step of deck main body 30 Elevator for construction 31 Elevator post 32 Cage 32a Get-on / off part of cage 35 Forklift 36 Materials

Claims (6)

昇降可能なケージの地上階停止位置が地上面より所定高さに設定されている工事用エレベータの前記ケージの乗降部に対峙する正面位置と該正面位置から前記ケージへ乗り込む方向にほぼ直交する横方向で、かつ前記正面位置に隣接する第1の側方位置との間に設置された乗降用ステージであって、
該乗降用ステージが、前記正面位置と前記第1の側方位置との間を往復動可能な可動デッキを備え、
前記工事用エレベータの前記ケージに前記地上階で人員が乗降する際には、前記可動デッキが、前記第1の側方位置から前記正面位置に移動して前記人員の前記ケージへの乗降に利用され、前記ケージに前記地上階で資材を積み卸しする際には、前記可動デッキが前記第1の側方位置に移動して資材運搬車両が前記ケージの前記乗降部に接近可能としたことを特徴とする工事用エレベータの乗降用ステージ。
The front position of the construction elevator in which the ground floor stop position of the elevator that can be raised and lowered is set to a predetermined height from the ground surface, and the side that is substantially orthogonal to the direction of getting into the cage from the front position. A boarding stage installed in a direction and between a first lateral position adjacent to the front position,
The stage for getting on and off includes a movable deck capable of reciprocating between the front position and the first side position,
When a person gets on and off the cage of the construction elevator on the ground floor, the movable deck moves from the first side position to the front position and is used for getting on and off the person to the cage. When loading and unloading materials from the ground floor to the cage, the movable deck is moved to the first lateral position so that the material transporting vehicle can approach the boarding / exiting portion of the cage. A special stage for getting on and off a construction elevator.
前記可動デッキを前記正面位置と前記第1の側方位置との間を往復動可能に支持するガイド部材が、前記地上階の停止位置ある前記ケージに近接して前記正面位置と前記第1の側方位置との間に延びている請求項1に記載の工事用エレベータの乗降用ステージ。   A guide member that supports the movable deck so as to be able to reciprocate between the front position and the first side position is close to the cage that is a stop position on the ground floor and the front position and the first position. The stage for boarding / exiting a construction elevator according to claim 1, which extends between the side position and the side position. 前記乗降用ステージが、前記可動デッキを前記ケージの床とほぼ同じ平面内で、かつ前記正面位置と前記第1の側方位置との間を往復移動可能に支持する架台と、該架台に可動に支持された前記可動デッキを前記正面位置と前記第1の側方位置との間で往復移動させる駆動機構部とを含み、
前記ガイド部材が、前記架台の構成要素の一部であるガイドレールである請求項2に記載の工事用エレベータの乗降用ステージ。
The boarding stage supports the movable deck in a plane substantially the same as the floor of the cage and reciprocally moves between the front position and the first side position, and is movable on the base. A drive mechanism that reciprocates the movable deck supported by the front position and the first lateral position;
The stage for boarding / exiting a construction elevator according to claim 2, wherein the guide member is a guide rail which is a part of a component of the gantry.
前記乗降用ステージが、前記正面位置を挟んで前記第1の側方位置とは反対側の第2の側方位置に設置された人員乗降待機用デッキを備え、前記架台に支持された前記可動デッキが、前記第1の側方位置から前記正面位置に移動したとき、前記可動デッキの端部が前記人員乗降待機用デッキの端部により支持される請求項1〜3のいずれかに記載の工事用エレベータの乗降用ステージ。   The movable stage supported by the gantry, wherein the boarding / alighting stage includes a crew boarding / waiting deck installed at a second side position opposite to the first side position across the front position. The end of the movable deck is supported by the end of the deck for waiting for getting on and off of a person when the deck moves from the first lateral position to the front position. Stage for getting on and off the elevator for construction. 前記第2の側方位置に設置された前記人員乗降待機デッキには、前記正面位置に向かう前記横方向を横断する保護柵が設置され、該保護柵は、前記人員乗降待機デッキに形成されたスリットを介して、前記人員乗降待機デッキの内側の格納位置と前記人員乗降待機デッキの表面から立ち上がる立設位置との間で昇降する請求項4に記載の工事用エレベータの乗降用ステージ。   The personnel boarding / alighting deck installed at the second lateral position is provided with a protective fence that crosses the lateral direction toward the front position, and the protective fence is formed on the personnel boarding / awaiting deck. The stage for boarding / exiting a construction elevator according to claim 4, wherein the stage is lifted and lowered between a storage position inside the crew boarding / standby deck and a standing position rising from the surface of the boarding board. 前記駆動機構部が、前記可動デッキに取り付けられたラックと、前記架台に設置されたモータと、該モータの出力軸により回転力を受けると共に前記ラックに噛み合う歯車とを備えている請求項3〜5のいずれかに記載の工事用エレベータの乗降用ステージ。
The said drive mechanism part is provided with the rack attached to the said movable deck, the motor installed in the said mount, and the gearwheel which meshes with the said rack while receiving rotational force with the output shaft of this motor. The stage for getting on and off the construction elevator according to any one of 5.
JP2006220878A 2006-08-14 2006-08-14 Elevator stage for construction elevators Active JP4837488B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006220878A JP4837488B2 (en) 2006-08-14 2006-08-14 Elevator stage for construction elevators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006220878A JP4837488B2 (en) 2006-08-14 2006-08-14 Elevator stage for construction elevators

Publications (2)

Publication Number Publication Date
JP2008045322A true JP2008045322A (en) 2008-02-28
JP4837488B2 JP4837488B2 (en) 2011-12-14

Family

ID=39179323

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006220878A Active JP4837488B2 (en) 2006-08-14 2006-08-14 Elevator stage for construction elevators

Country Status (1)

Country Link
JP (1) JP4837488B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012167371A2 (en) * 2011-04-28 2012-12-13 Dc Solutions Inc. Maintenance and retrieval cart
KR101899900B1 (en) * 2016-05-25 2018-09-18 두산중공업 주식회사 Scaffold For Casting Ingot Having Position Switching Scaffold
EP4296200A1 (en) * 2022-06-23 2023-12-27 Daifuku Co., Ltd. Article storage facility

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08208155A (en) * 1995-02-02 1996-08-13 Ando Corp Elevator for construction work
JPH10140820A (en) * 1996-11-12 1998-05-26 Shuji Takase Sliding door installed in opening in temporary scaffold
JP3136578B2 (en) * 1992-12-07 2001-02-19 日本軽金属株式会社 Work corridor
JP3477256B2 (en) * 1994-09-06 2003-12-10 安藤建設株式会社 Crossing scaffold structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3136578B2 (en) * 1992-12-07 2001-02-19 日本軽金属株式会社 Work corridor
JP3477256B2 (en) * 1994-09-06 2003-12-10 安藤建設株式会社 Crossing scaffold structure
JPH08208155A (en) * 1995-02-02 1996-08-13 Ando Corp Elevator for construction work
JPH10140820A (en) * 1996-11-12 1998-05-26 Shuji Takase Sliding door installed in opening in temporary scaffold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012167371A2 (en) * 2011-04-28 2012-12-13 Dc Solutions Inc. Maintenance and retrieval cart
WO2012167371A3 (en) * 2011-04-28 2013-03-28 Dc Solutions Inc. Maintenance and retrieval cart
US9150231B2 (en) 2011-04-28 2015-10-06 Ideal Warehouse Innovations, Inc. Maintenance and retrieval cart
KR101899900B1 (en) * 2016-05-25 2018-09-18 두산중공업 주식회사 Scaffold For Casting Ingot Having Position Switching Scaffold
EP4296200A1 (en) * 2022-06-23 2023-12-27 Daifuku Co., Ltd. Article storage facility

Also Published As

Publication number Publication date
JP4837488B2 (en) 2011-12-14

Similar Documents

Publication Publication Date Title
JP2004322823A (en) Simple movable fence of platform
JP5049682B2 (en) Elevator parking system
KR0128483B1 (en) Automatically high-raised parking system
JP4837488B2 (en) Elevator stage for construction elevators
JP4979292B2 (en) Three-dimensional parking device
JP6342238B2 (en) Elevator-type parking facility entrance / exit deck device, elevator-type parking facility equipped with the same
JP4570482B2 (en) Elevator equipment for automobiles
CN100595124C (en) Vertical elevator
JP6161383B2 (en) Mechanical parking equipment
JP2006207327A (en) Apparatus for working at mechanical parking device and its working method
KR101342098B1 (en) Auxiliary parking system and parking system having the same
KR102471610B1 (en) Cargo carrying aids in elevators
JP3545539B2 (en) Pallet fall prevention device for mechanical multi-story parking facilities
CN111137802A (en) Vertical conveyer of small-size material that construction used
JPH04140298A (en) Hatchway cover device for passenger conveyer
JPH07237857A (en) Carrier in elevator for construction
CN211998305U (en) Automatic loading and unloading goods lift
JP4497403B2 (en) Elevator type parking device movable deck device
JP2578010Y2 (en) Elevator parking device with transfer device
JP2932879B2 (en) In / out device with cab
RU213311U1 (en) Passenger lift for persons with disabilities
JP2730438B2 (en) Second floor elevator system
JP2006248630A (en) Elevator car device
NL2015870B1 (en) Transportable elevator device, method for preparing a mobile elevator device for use and method for preparing a mobile elevator device for transport.
JP3687437B2 (en) Parallel parking system safety device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090512

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110913

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110928

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141007

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4837488

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250