JP2006299724A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2006299724A5 JP2006299724A5 JP2005125903A JP2005125903A JP2006299724A5 JP 2006299724 A5 JP2006299724 A5 JP 2006299724A5 JP 2005125903 A JP2005125903 A JP 2005125903A JP 2005125903 A JP2005125903 A JP 2005125903A JP 2006299724 A5 JP2006299724 A5 JP 2006299724A5
- Authority
- JP
- Japan
- Prior art keywords
- pier
- excavation
- pile material
- shear
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Claims (4)
上部構造の橋面まで到達する長さの孔壁保護用ケーシングを用いて掘削装置で地盤を掘削し、前記ケーシングの内空部を排土経路として掘削ずりを排出し、前記排土経路を介して排出された前記掘削ずりを回収することを特徴とする掘削方法。 It is a method of excavation performed to build a pier in the pier construction work,
Excavation ground is excavated with a drilling device using a hole wall protective casing that reaches the bridge surface of the superstructure, and excavation shear is discharged using the inner space of the casing as a soil discharge route, and through the soil discharge route. The excavation method is characterized in that the excavated slab discharged is recovered.
前記杭材の打設に伴って排出される掘削ずりを収容するとともに送出可能に構成された掘削ずり回収器と、
前記掘削ずり回収器から送出される掘削ずりを搬送するためのコンベアと、
を有することを特徴とする排土処理装置。 It is a soil removal processing device used for pier construction to construct a pier by repeating the extension of a unit-like pier panel that forms one unit of the superstructure of the pier and the placement of a tubular pile material that forms a pier. ,
An excavation waste collecting device configured to accommodate excavation waste discharged along with the pile material placement and to be sent out,
A conveyor for transporting the excavation shear sent from the excavation scrap collector;
A soil disposal apparatus characterized by comprising:
地盤を掘削しつつ同時に前記杭材の打設を行うための掘削装置と、請求項2記載の排土処理装置とから構成されており、
前記掘削装置は、掘削のための駆動力を与える駆動装置と;掘削時において前記杭材の内空部に挿入されるようになっており、前記駆動装置に連結された掘削軸部材と;掘削の際に前記杭材の上部から排出される掘削ずりの飛散を防止するための飛散防止カバーと;を有しており、
地盤掘削の際、前記杭材の内空部に挿入した掘削軸部材の先端で地盤を掘削し、同時に該杭材の内空部を排土経路として掘削ずりを送出し、杭材上部から排出される掘削ずりを飛散防止カバーで飛散防止しながら下方へ落下させ、落下してきた前記掘削ずりを前記排土処理装置の掘削ずり回収器内に落とし込んで排土処理するように構成されている
ことを特徴とする掘削・排土処理システム。 It is an excavation and earth removal treatment system used in the construction of a pier that builds a pier by repeating the extension of a unit-like pier panel that forms a unit of the superstructure of the pier and the placement of a tubular pile material that forms a pier. There,
It is comprised from the excavation apparatus for performing the placement of the said pile material simultaneously while excavating the ground, and the soil removal processing apparatus of Claim 2 .
The excavator includes a driving device that applies a driving force for excavation; an excavation shaft member that is inserted into the inner space of the pile material during excavation and is coupled to the driving device; A scattering prevention cover for preventing scattering of excavated shear discharged from the upper part of the pile material at the time of
When excavating the ground, excavate the ground at the tip of the excavation shaft member inserted into the inner space of the pile material, and simultaneously send out the excavation shear using the inner space of the pile material as a soil removal route and discharge from the upper portion of the pile material It is configured to drop the excavated shear to be lowered while preventing scattering by the anti-scattering cover, and drop the excavated shear that has fallen into the excavated waste collecting device of the soil removal processing apparatus to perform the soil removal treatment. Excavation and soil removal treatment system.
桟橋完成部分の既設桟橋パネルに対して新たな桟橋パネルを連結して、前記桟橋完成部分から張り出すように該新たな桟橋パネルを延設する工程と、
延設済み若しくは延設予定の桟橋パネル又は前記桟橋完成部分に請求項2記載の排土処理装置を取り付ける工程と、
橋脚を成す管状の杭材を、延設した前記桟橋パネルのガイド部材を介して、杭打設予定位置の地盤上に建て込む工程と、
掘削装置の掘削軸部材を前記杭材の内空部に挿入する工程と、
挿入した前記掘削軸部材の先端で地盤を掘削しつつ同時に前記杭材の打設を行う工程と、
打設した前記杭材と延設した前記桟橋パネルとを連結する工程と、を含んでおり、
前記掘削・打設工程において、
地盤掘削の間、前記杭材の内空部を排土経路として掘削ずりを送出し、
前記排土経路を介して杭材上部から排出される掘削ずりを、前記排土処理装置の掘削ずり回収器内に落とし込み、
該掘削ずり回収器から送出される掘削ずりをコンベアを利用して搬送することにより、該掘削ずりを予め決められた箇所に集積するようになっており、
上記工程を繰り返すことによって桟橋を架設することを特徴とする桟橋架設方法。
A pier construction method in which a pier is constructed by repeating the extension of a unit-like pier panel that forms one unit of the superstructure of the pier and the placement of a tubular pile material that forms a pier,
Connecting a new jetty panel to the existing jetty panel of the jetty completed part, and extending the new jetty panel so as to protrude from the jetty completed part;
A step of attaching the soil removal treatment apparatus according to claim 2 to an already-extended or planned extension pier panel or the pier completion part;
The step of building the tubular pile material forming the pier on the ground at the planned pile placement position through the extended guide member of the pier panel;
Inserting a drilling shaft member of a drilling device into the inner space of the pile material;
The step of driving the pile material at the same time while excavating the ground at the tip of the inserted excavation shaft member;
Connecting the pile material that has been laid and the pier panel that has been extended, and
In the excavation and placing process,
During the ground excavation, the excavation shear is sent out using the inner space of the pile material as a soil removal route,
The excavation shear discharged from the upper part of the pile material through the soil removal path is dropped into the excavation shear recovery device of the soil disposal device,
By conveying the excavation shear sent from the excavation shear collector using a conveyor, the excavation shear is accumulated at a predetermined location,
A pier erection method, wherein the pier is erected by repeating the above steps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005125903A JP4648998B2 (en) | 2005-04-25 | 2005-04-25 | Earth disposal equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005125903A JP4648998B2 (en) | 2005-04-25 | 2005-04-25 | Earth disposal equipment |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2006299724A JP2006299724A (en) | 2006-11-02 |
JP2006299724A5 true JP2006299724A5 (en) | 2008-05-29 |
JP4648998B2 JP4648998B2 (en) | 2011-03-09 |
Family
ID=37468345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005125903A Expired - Fee Related JP4648998B2 (en) | 2005-04-25 | 2005-04-25 | Earth disposal equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4648998B2 (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5850421B2 (en) * | 2011-06-11 | 2016-02-03 | 株式会社横山基礎工事 | Drilling and turbid water accumulating device and excavation and turbid water transfer method using the same |
JP5661011B2 (en) * | 2011-09-20 | 2015-01-28 | 株式会社高知丸高 | Manufacturing method of superstructure for bridge, bridge and superstructure for bridge |
JP5850423B2 (en) * | 2011-09-22 | 2016-02-03 | 株式会社横山基礎工事 | Drilling / turbid water recovery device and treatment method |
JP5825644B2 (en) * | 2013-09-05 | 2015-12-02 | 株式会社高知丸高 | Pier construction method |
JP6537778B2 (en) * | 2014-03-27 | 2019-07-03 | 株式会社横山基礎工事 | Environmental load reduction device and construction method |
WO2016001997A1 (en) * | 2014-06-30 | 2016-01-07 | 株式会社高知丸高 | Bridge construction method and bridge structure |
JP6488175B2 (en) * | 2015-04-08 | 2019-03-20 | 株式会社技研製作所 | Earth disposal equipment |
JP6626343B2 (en) * | 2015-12-25 | 2019-12-25 | 株式会社横山基礎工事 | Steel sheet pile driving member, steel pipe sheet driving method |
JP6621671B2 (en) * | 2016-01-20 | 2019-12-18 | 日本基礎技術株式会社 | Soil removal adapter, drilling device and soil recovery system |
JP2020026708A (en) * | 2018-08-17 | 2020-02-20 | 株式会社横山基礎工事 | Steel pipe for inner excavation pile construction method |
CN115305819A (en) * | 2022-07-22 | 2022-11-08 | 四川宏华石油设备有限公司 | Recyclable trestle capable of being automatically erected and construction method thereof |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH075301Y2 (en) * | 1989-10-13 | 1995-02-08 | 日信工業株式会社 | Disc brakes for vehicles |
JPH0657711A (en) * | 1992-08-07 | 1994-03-01 | Taisei Corp | Construction of foundation and pier bridge and movable bench |
JP3211673B2 (en) * | 1996-08-02 | 2001-09-25 | 株式会社横山基礎工事 | Simple temporary bridge temporary pier construction method |
JPH11350529A (en) * | 1998-06-04 | 1999-12-21 | Kajima Corp | Excavated muck receiver/conveying device of excavator |
JP3724784B2 (en) * | 2000-08-28 | 2005-12-07 | 株式会社西部工建 | Drilling rig |
-
2005
- 2005-04-25 JP JP2005125903A patent/JP4648998B2/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2006299724A5 (en) | ||
JP4648998B2 (en) | Earth disposal equipment | |
CN106545007B (en) | The method of pile in the stratum that lower part is hard rock stratum | |
CN104746519A (en) | Obstacle clearing construction method | |
JP6319935B2 (en) | Tubing pile driving method | |
JP2019148070A (en) | Construction method of underground structure | |
JP4374338B2 (en) | Pile removal equipment | |
JP4344762B2 (en) | Drilling method and drilling device | |
JP3594758B2 (en) | Existing structure recovery method and existing structure recovery device using all casing method | |
JP5819736B2 (en) | Steel pipe pile for excavation | |
JP6621671B2 (en) | Soil removal adapter, drilling device and soil recovery system | |
JP5308895B2 (en) | Pile hole wall protection method | |
JP2008274746A (en) | Method of demolishing and removing underground structure | |
US6612377B2 (en) | Scraper tool | |
JP4959747B2 (en) | Obstacle removal casing | |
JP4781195B2 (en) | Driving method for driving material and driving material for preceding excavation | |
JP3196697U (en) | Shaft casing | |
JP2010106462A (en) | Excavation method and method for constructing pile-like object | |
JP2008302273A (en) | Refuse disposal process in waste disposal site, and excavation head for refuse disposal process | |
JP4466878B2 (en) | Excavation method | |
JP4959746B2 (en) | Obstacle removal method casing earth removal device | |
JP6626343B2 (en) | Steel sheet pile driving member, steel pipe sheet driving method | |
JP2000080877A (en) | Anti-pollution, muck receiving device for excavating device | |
KR20090117095A (en) | Excavator and construction method for underground structure using the same | |
JP3169577U (en) | Vertical hole drilling rig |