JP2006291453A - 土木工事の盛土施工管理支援システム - Google Patents
土木工事の盛土施工管理支援システム Download PDFInfo
- Publication number
- JP2006291453A JP2006291453A JP2005109174A JP2005109174A JP2006291453A JP 2006291453 A JP2006291453 A JP 2006291453A JP 2005109174 A JP2005109174 A JP 2005109174A JP 2005109174 A JP2005109174 A JP 2005109174A JP 2006291453 A JP2006291453 A JP 2006291453A
- Authority
- JP
- Japan
- Prior art keywords
- block
- information
- management
- embankment
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009430 construction management Methods 0.000 claims abstract description 51
- 239000000463 material Substances 0.000 claims abstract description 47
- 238000010276 construction Methods 0.000 claims description 57
- 239000011159 matrix material Substances 0.000 claims description 6
- 238000012545 processing Methods 0.000 abstract description 47
- 238000007726 management method Methods 0.000 description 148
- 238000000034 method Methods 0.000 description 28
- 239000002689 soil Substances 0.000 description 19
- 238000009412 basement excavation Methods 0.000 description 13
- 238000004891 communication Methods 0.000 description 12
- 238000003860 storage Methods 0.000 description 12
- 238000010586 diagram Methods 0.000 description 11
- 238000005065 mining Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 230000032258 transport Effects 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 238000013500 data storage Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000004040 coloring Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】施工管理サーバ300の管理ブロック設定処理部322及び管理ブロックDB331と現場事務所PC400により、盛土作業の作業対象領域を、横断方向、縦断方向から見て、盛土層、測点毎の情報が識別可能な複数のメッシュブロックに分割し、3次元の管理ブロックを設定し、施工管理サーバ300のデータ受信・格納処理部324と積み込み情報DB332及び荷受け情報DBにより、盛土作業において施工した盛土材料の種類情報と、この盛土材料の配置場所に関する位置情報とを含む盛土情報を取得し、格納し、施工管理サーバ300のデータ出力処理部326及び盛土材料DB334と現場事務所PC400により、盛土情報を管理ブロックに関連付けて出力する。
【選択図】 図3
Description
<全体構成>
図1は、道路工事における施工工程の全体概要と本発明の盛土施工管理支援システムの全体構成を示す図である。
<全体概要>
図14のステップS001において、道路工事の施工管理者は、図1の現場事務所PC400からインターネット網600を経由して、施工管理サーバ300にアクセスする。次にステップS002において、施工管理者は、本施工作業における設計図と施工計画書の基づいて図示しない施工目標画面から、必要事項を入力して図3に示すハードディスク330内の図示しない施工目標データベースに登録する。次にステップS003において、図4の管理ブロック設定画面により、図5〜図9に示す各種設定画面から、管理ブロックの設定処理(詳細は後述)を行い、作業管理ブロックを定義する。次にステップS004において施工作業が開始されたら、ステップS005にけるデータ受信・格納処理(詳細は後述)により、各種施工機械から送信されてくる管理データを、図1及び図3の施工管理サーバ300のハードディスク330内の管理ブロックDB331に蓄積する。次にステップS006において施工作業が終了したら、ステップS007のデータ出力処理(詳細は後述)において、施工管理者は、図1の現場事務所PC400からインターネット網600を経由して施工管理サーバ300にアクセスし、帳票類を出力させ、作業状況の確認を行う。
<管理ブロック設定処理>
図14のステップS003における管理ブロックの設定処理の詳細を図15を用いて説明する。
<データ受信・格納処理>
図14のステップS005におけるデータ受信・格納処理の詳細を図16を用いて説明する。
<データ出力処理>
図14のステップS007におけるデータ出力処理の詳細を図17及び図18を用いて説明する。
<帳票類出力処理>
帳票類出力処理は次のように行われる。
2 盛土工区
10 バックホウ
20 ダンプ
30 ブリードー座
40 振動ローラ
50 バックホウ
100 制御システム
112,114,116 制御ユニット
118 衛星通信端末
120 GPSユニット
122 メールスイッチ
150 小型携帯端末
200 携帯電話
300 施工管理サーバ
310 通信インターフェース
320 CPU
322 管理ブロック設定処理部
324 データ受信・格納処理部
326 データ出力処理部
330 ハードディスク
331 管理ブロックDB
332 積み込み情報DB
333 荷受け情報DB
334 盛土材料DB
400 現場事務所PC
500 GPS衛星
520 通信衛星
600 インターネット網
701 メニュー
702 入力フォーム
703 管理対象サイズの設定
704 管理ブロックサイズの設定
705 測点番号の設定
706 基準点座標の設定
707 ゾーン名称の設定
711 管理対象ブロック
712 高さ入力フイールド
713 幅入力フィールド
714 長さ入力フィールド
715 登録ボタン
721 メッシュブロック
722 高さ入力フィールド
723 幅入力フィールド
724 長さ入力フィールド
725 管理ブロック数入力フィールド
726 登録ボタン
731 測点開始入力フィールド
732 測点終了入力フィールド
733 測点数入力フィールド
734 測点間距離入力フィールド
735 目盛間距離入力フィールド
736 測点番号
737 登録ボタン
741 管理ブロック番号入力フィールド
742 横座標入力フィールド
743 縦座標入力フィールド
745 標高入力フィールド
746 緯度入力フィールド
747 経度入力フィールド
748 登録ボタン
751 ゾーン名称選択プルダウン
752 管理ブロック番号入力フィールド
753 登録ボタン
810 横断方向表示
820 縦断方向表示
830 ゾーン表示
852 測点番号
854 管理対象ブロックの幅番号
856 管理対象ブロックの高さ番号
862 管理対象ブロックの幅番号
864 管理対象ブロックの長さ番号
866 管理対象ブロックの高さ番号
Claims (6)
- 盛土作業の作業対象領域を、横断方向、縦断方向から見て、盛土層、測点毎の情報が識別可能な複数のメッシュブロックに分割し、この複数のメッシュブロックを含む3次元の管理ブロックを設定する第1手段と、
盛土作業において施工した盛土材料の種類情報と、この盛土材料の配置場所の位置情報を含む盛土情報を取得し、格納する第2手段と、
前記盛土情報を前記管理ブロックに関連付けて出力する第3手段とを備えることを特徴とする土木工事の盛土施工管理支援システム。 - 請求項1記載の土木工事の盛土施工管理支援システムにおいて、前記第3手段は、前記盛土情報を任意のアプリケーション処理ソフトのワークシートに割り当て、帳票として出力させることを特徴とする盛土施工管理支援システム。
- 請求項1記載の土木工事の盛土施工管理支援システムにおいて、前記第3手段は、任意の表計算ソフトのワークシートに前記縦断方向及び縦断方向の各断面における前記メッシュブロックのマトリックスを生成し、前記盛土情報をそのマトリックスに割り当て、帳票として出力させることを特徴とする盛土施工管理支援システム。
- 請求項1〜3のいずれか1項記載の土木工事の盛土施工管理支援システムにおいて、前記第1手段は、前記作業対象領域の全域を含む立方体を前記管理対象ブロックとして設定し、この管理対象ブロックを管理したいブロック毎に立方体に分割することで前記メッシュブロックを生成し、前記立方体の寸法が任意に設定可能であることを特徴とする盛土施工管理支援システム。
- 請求項1〜3のいずれか1項記載の土木工事の盛土施工管理支援システムにおいて、前記第1手段は、前記管理ブロックの所定のメッシュブロックに測点番号を付与し、この測点番号によりメッシュブロックの位置を管理することを特徴とする盛土施工管理支援システム。
- 請求項1〜3のいずれか1項記載の土木工事の盛土施工管理支援システムにおいて、前記第1手段は、前記管理ブロックの基準点座標に位置するメッシュブロックに管理ブロック番号を付与し、この管理ブロック番号により前記管理ブロックの位置を管理することを特徴とする盛土施工管理支援システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005109174A JP4589790B2 (ja) | 2005-04-05 | 2005-04-05 | 土木工事の盛土施工管理支援システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005109174A JP4589790B2 (ja) | 2005-04-05 | 2005-04-05 | 土木工事の盛土施工管理支援システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006291453A true JP2006291453A (ja) | 2006-10-26 |
JP4589790B2 JP4589790B2 (ja) | 2010-12-01 |
Family
ID=37412304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005109174A Expired - Fee Related JP4589790B2 (ja) | 2005-04-05 | 2005-04-05 | 土木工事の盛土施工管理支援システム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4589790B2 (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010073031A (ja) * | 2008-09-19 | 2010-04-02 | Hitachi Constr Mach Co Ltd | 施工管理システム |
CN109933380A (zh) * | 2019-03-05 | 2019-06-25 | 天津字节跳动科技有限公司 | 在线表格分块加载方法及装置 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101988352B1 (ko) * | 2018-05-25 | 2019-09-30 | (주)대우건설 | 블록 지반 모델링과 3차원 위치정보를 이용한 토공량 산정 시스템 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000319886A (ja) * | 1999-03-08 | 2000-11-21 | Shimizu Corp | 盛土管理システム |
JP2002297688A (ja) * | 2001-03-30 | 2002-10-11 | Koishi:Kk | 土木工事測量・施工支援システム |
JP2002302965A (ja) * | 2001-04-06 | 2002-10-18 | Kajima Corp | 盛土ゾーニングの自動管理方法及びシステム |
JP2004054716A (ja) * | 2002-07-22 | 2004-02-19 | Hitachi East Japan Solutions Ltd | 作業管理方法および作業の表示方法 |
-
2005
- 2005-04-05 JP JP2005109174A patent/JP4589790B2/ja not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000319886A (ja) * | 1999-03-08 | 2000-11-21 | Shimizu Corp | 盛土管理システム |
JP2002297688A (ja) * | 2001-03-30 | 2002-10-11 | Koishi:Kk | 土木工事測量・施工支援システム |
JP2002302965A (ja) * | 2001-04-06 | 2002-10-18 | Kajima Corp | 盛土ゾーニングの自動管理方法及びシステム |
JP2004054716A (ja) * | 2002-07-22 | 2004-02-19 | Hitachi East Japan Solutions Ltd | 作業管理方法および作業の表示方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010073031A (ja) * | 2008-09-19 | 2010-04-02 | Hitachi Constr Mach Co Ltd | 施工管理システム |
CN109933380A (zh) * | 2019-03-05 | 2019-06-25 | 天津字节跳动科技有限公司 | 在线表格分块加载方法及装置 |
CN109933380B (zh) * | 2019-03-05 | 2023-02-28 | 天津字节跳动科技有限公司 | 在线表格分块加载方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
JP4589790B2 (ja) | 2010-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10364548B2 (en) | Method of optimizing performance of machines at a worksite | |
US7747369B2 (en) | System and method for sharing terrain data among multiple machines | |
US8306836B2 (en) | Management of materials on a construction site | |
JP3787812B2 (ja) | 造成工事における重機の施工ナビゲーションシステム | |
EP3767563B1 (en) | Work order placement/receiving system, server, and work order placement/receiving method | |
US20130035978A1 (en) | Management of materials on a construction site | |
Montaser et al. | Truck+ for earthmoving operations | |
JP4589791B2 (ja) | 盛土施工管理支援システム | |
JPWO2019017173A1 (ja) | 施工現場管理装置、出力装置、および施工現場の管理方法 | |
US20210097458A1 (en) | Determination of a lift count metric | |
US20140006074A1 (en) | System and method for gathering, analyzing, managing and sharing ground modification operation data | |
Navon et al. | A model for automated monitoring of road construction | |
JP4589790B2 (ja) | 土木工事の盛土施工管理支援システム | |
DE112017001970T5 (de) | Management-vorrichtung, baumanagement-system und management-verfahren für positions-informationen | |
CN114514355A (zh) | 统一生产指标的确定 | |
Kim et al. | A case study on BIM object-based earned value and process management in highway construction | |
CN112632657B (zh) | 一种基于bim技术的预应力管桩配桩系统以及配桩方法 | |
KR20090103027A (ko) | 지리정보시스템을 이용한 구조물의 파일 설계 관리 시스템 | |
DE112017001974T5 (de) | Baumanagement-Vorrichtung, Baumanagement-system und Baumanagement-Verfahren. | |
Matsimbe | Optimization of shovel-truck productivity in quarries | |
JP3835736B2 (ja) | 盛土ゾーニングの自動管理方法及びシステム | |
JP7557253B2 (ja) | 盛土施工管理支援システム | |
JP7557254B2 (ja) | 盛土施工管理支援システム | |
JP7568379B2 (ja) | 盛土施工管理支援システム | |
JP7535836B2 (ja) | 盛土施工管理支援システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070702 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20070702 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090428 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100615 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100811 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100907 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100910 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4589790 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130917 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |