JP2006228000A - Apparatus, program and method for allocating crew - Google Patents

Apparatus, program and method for allocating crew Download PDF

Info

Publication number
JP2006228000A
JP2006228000A JP2005042334A JP2005042334A JP2006228000A JP 2006228000 A JP2006228000 A JP 2006228000A JP 2005042334 A JP2005042334 A JP 2005042334A JP 2005042334 A JP2005042334 A JP 2005042334A JP 2006228000 A JP2006228000 A JP 2006228000A
Authority
JP
Japan
Prior art keywords
crew
data
assignment
train
plan data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005042334A
Other languages
Japanese (ja)
Inventor
Katsumi Ikeda
克己 池田
Taro Okuda
太郎 奥田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Digital Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Solutions Corp filed Critical Toshiba Corp
Priority to JP2005042334A priority Critical patent/JP2006228000A/en
Publication of JP2006228000A publication Critical patent/JP2006228000A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To support the preparation of a crew operation arrangement plan which is a result of allocating crews to a vehicle arrangement plan. <P>SOLUTION: The crew allocation apparatus 2 is provided with: means 3a, 3b for acquiring rule data 13 expressing a rule for allocating crews to the operation of an unallocated train, arrangement plan data 19 expressing train operation for restoring trouble and item data 14 expressing check items of results of allocating the crews to the train operation; a means 4 for preparing operation arrangement plan data 15 expressing results of allocating the crews to the operation of the unallocated train in the arrangement plan data 19 in accordance with the contents of the rule data 13; a means 6 for acquiring changed content data 35 for instructing the allocation of other crews in train operation in the operation arrangement plan data 15; a means 7 for preparing the changed operation arrangement plan data 20; and a means 5 for preparing checked result data 21 expressing a result of determination whether the allocated result satisfies the check items of the item data 14 or not in the operation arrangement plan data 15 or the changed operation arrangement data 20. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、列車の運行スケジュール(ダイヤグラム)の乱れの復旧を支援する技術に関する。   The present invention relates to a technology that supports recovery of disturbance in a train operation schedule (diagram).

列車の運行スケジュールに乱れが生じると、正常な運行スケジュールに復旧するための計画(以下、「車両整理案」という)が作成される。   When the train operation schedule is disturbed, a plan for restoring the normal operation schedule (hereinafter referred to as “vehicle arrangement plan”) is created.

車両整理案が作成された場合、個々の列車の発着時間と位置が正常な運行スケジュールから変化しているため、車両整理案における各列車の運用に対して乗務員の割り当ても新たに決定する必要がある。   When a vehicle arrangement plan is created, since the departure and arrival times and positions of individual trains have changed from the normal operation schedule, it is necessary to newly determine the assignment of crew members for the operation of each train in the vehicle arrangement plan. is there.

特許文献1(特開平9−282372号公報)には、乗務員の割り当て結果(以下、「乗務員の運用整理案」という)の作成に必要なデータを検索し、可能な限り自動的に乗務員の運用整理案を作成し、必要なデータを分かり易く表示することで、乗務員の運用整理案の作成を支援する乗務員運用計画支援装置が記載されている。   In Patent Document 1 (Japanese Patent Laid-Open No. 9-282372), data necessary for creating a crew assignment result (hereinafter referred to as “crew crew operation arrangement plan”) is searched, and crew crew operations are automatically performed as much as possible. There is described a crew member operation plan support device that supports the creation of a crew member's operation rearrangement plan by creating a rearrangement plan and displaying necessary data in an easy-to-understand manner.

この乗務員運用計画支援装置は、対話形式により乗務員の運用整理案を作成する。より具体的に説明すると、特許文献1では、乗務員が未割り当ての列車の到着駅とこの到着駅の到着時刻とを取得し、この到着時刻に乗継準備時間を加算し、乗継可能時刻を算出する。そして、乗継可能時刻以降に到着駅を出発可能な乗務員が、乗務員未割り当ての列車の割り当て候補となる。そして、割り当て候補の乗務員が、評価点順に一覧表示される。   This crew member operation plan support device creates a crew member's operation arrangement plan in an interactive format. More specifically, in Patent Document 1, the crew member acquires the arrival station of an unassigned train and the arrival time of this arrival station, adds the transit preparation time to this arrival time, and determines the transitable time. calculate. A crew member who can depart from the arrival station after the transit time becomes an assignment candidate for a train that is not assigned to a crew member. Then, the assignment candidate crew members are displayed in a list in the order of evaluation points.

特許文献1において、乗務員の運用整理案の作成者は、一覧表示された乗務スケジュールの候補の中から最も適していると判断される候補を選択し、この乗務スケジュールの乗務員に対して、乗務員未割り当ての列車を割り当てる。評価点の算出には、乗り継ぎ時間の長さを用いる。   In Patent Document 1, the creator of the crew operation management plan selects a candidate judged to be the most suitable from the list of crew schedule candidates displayed on the list, and the crew member of this crew schedule is assigned a crew member not yet selected. Assign the assigned train. The length of the connection time is used to calculate the evaluation score.

特許文献2(特開平6−72333号公報)には、列車などの計画立案システムにおける計画修正方法について記載されており、指令員の判断を支援する情報を豊富に提供可能で操作性の良い計画修正システムについて記載されている。より具体的に説明すると、特許文献2では、オペレータから乗務員の運用整理案を立案するための情報が提供され、立案されたときに不具合が発生するか否かチェックし、チェック結果が分かり易く表示され、乗務員の運用整理案が自動提供される。
特開平9−282372号公報 特開平6−72333号公報
Patent Document 2 (Japanese Patent Application Laid-Open No. 6-72333) describes a plan correction method in a planning system such as a train, and can provide abundant information that supports the judgment of the commander and is a plan with good operability. A correction system is described. More specifically, in Patent Document 2, information is provided from the operator for planning the operation arrangement plan for the crew, and it is checked whether a problem occurs when the plan is formulated, and the check result is displayed in an easy-to-understand manner. The crew's operation arrangement plan is automatically provided.
JP-A-9-282372 Japanese Patent Laid-Open No. 6-72333

特許文献1では、まず乗務員未割り当ての列車を検索し、この検索された乗務員未割り当ての列車に対して乗務員を割り当てる。   In Patent Document 1, first, a train that is not assigned to a crew member is searched, and a crew member is assigned to the searched train that is not assigned to a crew member.

したがって、既に乗務員が割り当てられている列車の運行スケジュールの一部を変更した場合に、この変更部分について乗務員を割り当てる目的で特許文献1の乗務員運用計画支援装置は使用されない。また、特許文献1では、乗務員の運用整理案を効率よく関連部署に通知するための方法に関しては何ら述べられていない。   Therefore, when a part of the operation schedule of a train to which a crew member has already been assigned is changed, the crew member operation plan support device of Patent Document 1 is not used for the purpose of assigning the crew member to this changed part. Further, Patent Document 1 does not describe anything about a method for efficiently notifying related departments of an operation arrangement plan for crew members.

特許文献2においては、車両の乱れの修復までは支援されるが、乗務員の変更までは検討されていない。   In patent document 2, although it supports up to repair of the disturbance of a vehicle, it has not been examined until the change of a crew member.

車両整理案を実行する場合には、この車両整理案を実現するための乗務員の再割り当てが必要となる。   When the vehicle arrangement plan is executed, it is necessary to reassign crew members to realize the vehicle arrangement plan.

本発明は、以上のような実情に鑑みてなされたもので、車両整理案に対して乗務員を割り当てた結果である乗務員運用整理案の作成を支援する乗務員割当装置及びプログラム並びに方法を提供することを目的とする。   The present invention has been made in view of the above circumstances, and provides a crew member assignment apparatus, program, and method for supporting creation of a crew member operation rearrangement plan that is a result of assigning a crew member to a vehicle rearrangement plan. With the goal.

本発明を実現するにあたって講じた具体的手段について以下に説明する。   Specific means taken for realizing the present invention will be described below.

上記課題は、未割り当ての列車の運用に対して乗務員を割り当てる規則を表す乗務員割当規則データと、乱れから復旧させるための列車の運用を表す車両整理案データと、列車の運用に対して乗務員を割り当てた結果のチェック項目を表すチェック項目データとを取得する取得手段と、乗務員割当規則データの内容にしたがって、車両整理案データのうちの未割り当ての列車の運用に対して乗務員の割り当て処理を実行し、車両整理案データの列車の運用に対する乗務員の割り当て結果を表す乗務員運用整理案データを作成する割当手段と、乗務員運用整理案データで表される列車の運用のうちの少なくとも一つの列車の運用について他の乗務員の割り当てを指示する変更内容データを取得する変更内容取得手段と、変更内容データに基づいて乗務員運用整理案データを変更し、変更後の乗務員運用整理案データを作成する変更手段と、乗務員運用整理案データと変更後の乗務員運用整理案データとのうちの少なくとも一方について、割当結果がチェック項目データで表されているチェック項目を満たすか否か判断し、チェック結果を表すチェック結果データを作成するチェック手段とを具備することを特徴とする乗務員割当装置により、解決される。   The above-mentioned issues include crew assignment rule data representing rules for assigning crew members to unassigned train operations, vehicle arrangement plan data representing train operations for recovery from disturbance, and crew members for train operations. According to the content of the check item data representing the check items of the assigned result and the crew assignment rule data, the crew assignment process is executed for the operation of unassigned trains in the vehicle arrangement plan data. And assigning means for creating crew member operation rearrangement data representing a result of assignment of crew members to train operation of vehicle rearrangement plan data, and operation of at least one of the train operations represented by the crew member operation rearrangement plan data Based on the change content acquisition means and the change content acquisition means for acquiring the change content data instructing the assignment of other crew members Allocation results are checked for at least one of the means for changing the crew management organization plan data and creating the revised crew management organization plan data, and the crew management organization plan data and the changed crew management organization plan data This is solved by a crew member assigning device characterized by comprising check means for judging whether or not a check item represented by item data is satisfied and creating check result data representing the check result.

なお、上記の態様は、装置として表現されている。しかしながら、これに限らず、上記の態様は、プログラム、方法、コンピュータ読み取り可能な記憶媒体などで表現されるとしてもよい。   In addition, said aspect is expressed as an apparatus. However, the present invention is not limited to this, and the above aspect may be expressed by a program, a method, a computer-readable storage medium, and the like.

本発明により、車両整理案に対して乗務員を割り当てた結果である乗務員運用整理案の作成を支援する乗務員割当装置及びプログラム並びに方法を提供することができる。   According to the present invention, it is possible to provide a crew member assignment apparatus, program, and method for supporting creation of a crew member operation rearrangement plan that is a result of assigning a crew member to a vehicle rearrangement plan.

以下、図面を参照しながら本発明の実施の形態について説明する。なお、以下の各図において同一の部分については同一の符号を付して説明を省略する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In addition, the same code | symbol is attached | subjected about the same part in each following figure, and description is abbreviate | omitted.

(第1の実施の形態)
図1は、本実施の形態に係る乗務員割当装置の一例を示すブロック図である。
(First embodiment)
FIG. 1 is a block diagram showing an example of a crew member assignment apparatus according to the present embodiment.

記録媒体1に記録されている乗務員割当プログラム1aは、コンピュータ2によって読み込まれ、実行される。これにより、コンピュータ2は、乗務員割当装置としての機能を実現する。   The crew member assignment program 1a recorded on the recording medium 1 is read and executed by the computer 2. Thereby, the computer 2 implement | achieves the function as a crew member assignment apparatus.

具体的には、コンピュータ2は、乗務員割当プログラム1aにしたがって、第1取得機能3a、第2取得機能3b、割当機能4、チェック機能5、変更内容取得機能6、変更機能7、提供機能8を実現する。また、コンピュータ2は、記憶部(第1記憶手段に相当)9を参照可能であり、内部記憶部(第2記憶手段に相当)10を備えている。   Specifically, the computer 2 has a first acquisition function 3a, a second acquisition function 3b, an assignment function 4, a check function 5, a change content acquisition function 6, a change function 7, and a provision function 8 in accordance with the crew assignment program 1a. Realize. The computer 2 can refer to a storage unit (corresponding to the first storage unit) 9 and includes an internal storage unit (corresponding to the second storage unit) 10.

記憶部9は、乗務員運用計画データ11、運用実績データ12、乗務員割当規則データ13、割り当てに関する制限条件や労働条件などを含むチェック項目データ14を記憶する。   The storage unit 9 stores crew item operation plan data 11, operation result data 12, crew member assignment rule data 13, check item data 14 including restriction conditions and working conditions related to assignment.

乗務員運用計画データ11は、乱れの発生していない場合の列車の運行スケジュール(通常のダイヤ)とこの運行スケジュールにおける各列車の運用に対して割り当てられている乗務員とを表す原計画データである。   The crew member operation plan data 11 is original plan data representing a train operation schedule (ordinary timetable) when no disturbance occurs and crew members assigned to the operation of each train in this operation schedule.

運用実績データ12は、実際の列車の運用及び実際の列車の運用を担当した乗務員を記録したデータである。   The operation result data 12 is data in which crew members who are in charge of actual train operation and actual train operation are recorded.

乗務員割当規則データ13は、列車の運用に対する乗務員の割り当て規則(割り当てパターン)を表すデータである。   The crew assignment rule data 13 is data representing crew assignment rules (assignment patterns) for train operation.

本実施の形態では、乗務員割当規則データ13は、運行スケジュールに乱れが発生した場合に、乱れの発生した後の運行スケジュールに対して乗務員運用計画データ11にしたがった(例えば原計画通りの)乗務員の割り当てを行う旨の内容が定義されているとする。なお、乗務員割当規則データ13に代えて、乗務員割当アルゴリズムが作成されており、この乗務員割当アルゴリズムを用いて運行に対する乗務員の割り当て処理が実行されるとしてもよい。   In the present embodiment, the crew assignment rule data 13 is in accordance with the crew operation plan data 11 (for example, as in the original plan) with respect to the schedule after the disorder occurs when the schedule is disturbed. Suppose that the content of assigning is defined. In addition, it replaces with the crew member assignment rule data 13, and the crew member assignment algorithm is produced, and the crew member assignment process with respect to operation may be performed using this crew member assignment algorithm.

チェック項目データ14では、例えば、乗務員が列車に乗車する前または乗車した後に必要な休憩時間、継続して乗車可能な距離、継続して業務可能な時間、乱れ発生時刻において乗務員運用計画データ11または運用実績データ12と作成された乗務員運用整理案データ15とが一致しているか、乱れ復旧時刻において乗務員運用計画データ11と作成された乗務員運用整理案データ15とが一致しているか、などのチェック項目が定義されている。   In the check item data 14, for example, the crew operation plan data 11 before or after the crew rides on the train, the required rest time, the distance that can be taken continuously, the time that the crew can continue working, Check whether the operation result data 12 and the created crew member operation arrangement plan data 15 match, or whether the crew member operation plan data 11 and the created crew member operation arrangement plan data 15 coincide with each other at the recovery time The item is defined.

第1取得機能3aは、列車の運行スケジュールが正常でなくなった場合に、他システム16またはオペレータ17の操作する端末18から、ネットワーク22経由で、車両整理案データ(復旧ダイヤ)19、乗務員割当要求、チェック要求、データ取得要求を取得する。   When the train operation schedule becomes abnormal, the first acquisition function 3a receives the vehicle arrangement plan data (recovery diagram) 19 and the crew assignment request from the other system 16 or the terminal 18 operated by the operator 17 via the network 22. , Get check request, get data request.

そして、第1取得機能3aは、車両整理案データ19と乗務員割当要求とを取得した場合、車両整理案データ19と乗務員割当要求とを割当機能4に提供する。   When the first acquisition function 3 a acquires the vehicle arrangement plan data 19 and the crew assignment request, the first acquisition function 3 a provides the vehicle arrangement plan data 19 and the crew assignment request to the assignment function 4.

また、第1取得機能3aは、チェック要求を取得した場合に、チェック要求をチェック機能5に提供する。   The first acquisition function 3 a provides the check request to the check function 5 when the check request is acquired.

さらに、第1取得機能3aは、乗務員割当要求、チェック要求、データ取得要求を取得した場合に、この要求を提供機能8に通知する。   Further, when the first acquisition function 3a acquires the crew assignment request, the check request, and the data acquisition request, the first acquisition function 3a notifies the providing function 8 of the request.

第2取得機能3bは、記憶部9から乗務員運用計画データ11、運用実績データ12、乗務員割当規則データ13、チェック項目データ14を取得する。   The second acquisition function 3 b acquires crew member operation plan data 11, operation result data 12, crew member assignment rule data 13, and check item data 14 from the storage unit 9.

そして、第2取得機能3bは、取得した乗務員運用計画データ11と乗務員割当規則データ13とを割当機能4に提供し、乗務員運用計画データ11、運用実績データ12、チェック項目データ14をチェック機能5に提供する。   Then, the second acquisition function 3b provides the acquired crew member operation plan data 11 and the crew member assignment rule data 13 to the assignment function 4, and checks the crew member operation plan data 11, the operation result data 12, and the check item data 14 as the check function 5. To provide.

なお、記憶部9として例えばデータベースを用い、第2取得機能3bとしてこのデータベースに対する検索機能を用いてもよい。   For example, a database may be used as the storage unit 9, and a search function for this database may be used as the second acquisition function 3b.

割当機能4は、乗務員割当要求を第1取得機能3aから受け付けた場合、乗務員運用計画データ11に基づいて、乗務員割当規則データ13にしたがって、車両整理案データ19の各列車の運用に対して乗務員の割り当てを行い、割り当てた結果を示す乗務員運用整理案データ15を作成する。   When the assignment function 4 receives the crew assignment request from the first acquisition function 3a, the crew function 4 performs the operation of each train of the vehicle arrangement plan data 19 according to the crew assignment rule data 13 based on the crew operation plan data 11. The crew member operation rearrangement plan data 15 indicating the assigned result is created.

例えば、割当機能4は、乗務員運用計画データ11と車両整理案データ19とにおいて、出発駅と到着駅とが同じ列車の運用があり、この両列車の運用の出発時刻と到着時刻との差が一定のレベル以下である場合に、乗務員運用計画データ11における列車の運用の乗務員を車両整理案データ19の列車の運用に対して割り当てる処理を実行する。   For example, in the assignment function 4, in the crew operation plan data 11 and the vehicle arrangement plan data 19, the departure station and the arrival station have the same train operation, and the difference between the departure time and arrival time of the operation of both trains is When the level is below a certain level, a process of allocating the crew of the train operation in the crew operation plan data 11 to the train operation of the vehicle arrangement plan data 19 is executed.

そして、割当機能4は、乗務員運用整理案データ15を内部記憶部10に記憶する。   Then, the assignment function 4 stores the crew member operation arrangement plan data 15 in the internal storage unit 10.

チェック機能5は、第2取得機能3bから乗務員運用計画データ11、運用実績データ12、チェック項目データ14を受け付ける。   The check function 5 receives crew member operation plan data 11, operation result data 12, and check item data 14 from the second acquisition function 3b.

また、チェック機能5は、チェック要求を第1取得機能3aから受け付けた場合、記憶部15に記憶されている乗務員運用整理案データ15または変更後の乗務員運用整理案データ20を取得する。   When the check function 5 receives a check request from the first acquisition function 3a, the check function 5 acquires the crew member operation rearrangement plan data 15 stored in the storage unit 15 or the crew member rearrangement plan data 20 after the change.

そして、チェック機能5は、乗務員運用計画データ11、運用実績データ12、チェック項目データ14に基づいて、乗務員運用整理案データ15または変更後の乗務員運用整理案データ20における各列車の運用への乗務員の割り当てがチェック項目を満たすか否か判断する。   The check function 5 is based on the crew operation plan data 11, the operation result data 12, and the check item data 14, and the crew members to operate each train in the crew operation arrangement plan data 15 or the changed crew operation arrangement plan data 20. It is determined whether the allocation of the item satisfies the check item.

例えば、乗務員の労働時間が許容範囲か、乗務員の休憩時間が所定値以上か、復旧後において各乗務員の存在する駅が乗務員運用計画データ11の内容と一致するかなどの項目がチェックされる。   For example, items such as whether the crew's working hours are within an allowable range, whether the crew's break time is greater than or equal to a predetermined value, and whether the station where each crew member is present match the contents of the crew operation plan data 11 are checked.

チェック機能5は、乗務員運用整理案データ15または変更後の乗務員運用整理案データ20について乗務員の割り当て結果がチェック項目を満たさない列車の運用を検出した結果を表すチェック結果データ21または変更後のチェック結果データ21aを作成し、チェック結果データ21または変更後のチェック結果データ21aを内部記憶部10に記憶する。   The check function 5 is the check result data 21 representing the result of detecting the operation of a train whose crew assignment result does not satisfy the check items in the crew operation rearrangement plan data 15 or the changed crew operation rearrangement plan data 20 or the check after the change. Result data 21 a is created, and check result data 21 or changed check result data 21 a is stored in internal storage unit 10.

さらに、本実施の形態において、チェック機能5は、乗務員候補選択機能を持つ。乗務員候補選択機能は、乗務員の割り当て結果がチェック項目を満たさない列車の運用が検出された場合に、この列車に対して割り当て可能でありチェック項目を満たす乗務員の候補を選択する機能である。   Further, in the present embodiment, the check function 5 has a crew member candidate selection function. The crew member selection function is a function for selecting a crew member candidate that can be assigned to this train and satisfies the check item when the operation of the train whose crew assignment result does not satisfy the check item is detected.

チェック機能5は、乗務員候補選択機能によって選択された乗務員の候補を含むチェック結果データ21または変更後のチェック結果データ21aを作成する。   The check function 5 creates the check result data 21 including the crew candidate selected by the crew candidate selection function or the check result data 21a after the change.

変更内容取得機能6は、変更要求、例えば乗務員の割り当てを変更する列車の運用の指定と変更後の乗務員の指定などのような変更内容を表す変更内容データ35を取得し、変更内容データ35を変更機能7に提供する。   The change content acquisition function 6 acquires change content data 35 representing change content such as a change request, for example, designation of operation of a train to change the crew assignment, and designation of a crew member after the change. Provide to change function 7.

また、変更内容取得機能6は、変更要求を取得した場合に、この変更要求を提供機能8に通知する。   Further, when the change content acquisition function 6 acquires the change request, the change content acquisition function 6 notifies the providing function 8 of the change request.

変更機能7は、変更内容取得機能6から変更内容データ35を受け付けた場合に、内部記憶部10に記憶されている乗務員運用整理案データ15を読み出す。   When the change content data 35 is received from the change content acquisition function 6, the change function 7 reads the crew member operation arrangement plan data 15 stored in the internal storage unit 10.

また、変更機能7は、乗務員運用整理案データ15のうち変更内容データ35で指定されている列車の運用を変更内容データ35の示す乗務員により変更し、変更後の乗務員運用整理案データ20を作成する。   Also, the change function 7 changes the operation of the train specified in the change content data 35 in the crew operation rearrangement plan data 15 by the crew indicated by the change content data 35, and creates the crew operation rearrangement plan data 20 after the change. To do.

そして、変更機能7は、変更後の乗務員運用整理案データ20を内部記憶部10に記憶する。なお、変更後の乗務員運用整理案データ20に対する変更も、同様に実行可能である。   Then, the change function 7 stores the changed crewmember operation rearrangement plan data 20 in the internal storage unit 10. Note that the change to the crew management organization plan data 20 after the change can be executed in the same manner.

提供機能8は、第1取得機能3aまたは変更内容取得機能6から通知された要求にしたがって、内部記憶部10に記憶されているデータを、ネットワーク22経由で他システム16または端末18に対して提供する。   The providing function 8 provides the data stored in the internal storage unit 10 to the other system 16 or the terminal 18 via the network 22 in accordance with the request notified from the first acquisition function 3a or the change content acquisition function 6. To do.

本実施の形態では、第1取得機能3a、第2取得機能3b、変更内容取得機能6、提供機能8により、コンピュータ2と他の装置(例えば、記憶部9、他システム16、端末18)との間の入出力インタフェース機能が実現される。この入出力インタフェース機能により、他システム16または端末18から指示された内容の画面表示を行うことが可能となる。   In the present embodiment, the first acquisition function 3a, the second acquisition function 3b, the change content acquisition function 6, and the provision function 8 allow the computer 2 and other devices (for example, the storage unit 9, the other system 16, and the terminal 18) to The input / output interface function between the two is realized. With this input / output interface function, it is possible to display a screen instructed by the other system 16 or the terminal 18.

なお、各機能間でのデータのやり取りについては、コンピュータ2内の内部記憶装置10などの記憶手段を経由して行われるとしてもよい。   Note that data exchange between the functions may be performed via a storage unit such as the internal storage device 10 in the computer 2.

図2は、車両整理案データ19の例を示す図である。   FIG. 2 is a diagram illustrating an example of the vehicle arrangement plan data 19.

この図2では、乱れ発生時刻t1から乱れ復旧時刻t2までの車両整理案、すなわち列車の運行スケジュールが定められている。   In FIG. 2, a vehicle arrangement plan from the disturbance occurrence time t1 to the disturbance recovery time t2, that is, a train operation schedule is defined.

縦軸は駅SA〜SCを表し、この図2では駅SA〜SC間での運行スケジュールが表されている。横軸は時間を表す。   The vertical axis represents the stations SA to SC. In FIG. 2, the operation schedule between the stations SA to SC is represented. The horizontal axis represents time.

縦軸および横軸を除く他の線は、駅SA〜SC間を移動する列車の運用(走行状態)を表す。すなわち、各線は、各列車が担当する一連の運用の流れを表す。運用を表す線のうち斜線は駅間の列車の移動を表し、線のうち横軸に平行な線は駅での列車の停車を表す。   The other lines excluding the vertical axis and the horizontal axis represent the operation (running state) of the train moving between the stations SA to SC. That is, each line represents a series of operational flows that each train is in charge of. Of the lines representing operation, diagonal lines represent movement of trains between stations, and among the lines, lines parallel to the horizontal axis represent train stops at stations.

例えば、運用RAの列車は、乱れの発生時刻t1において駅SAに向かっている。そして、運用RAの列車は、駅SAに到着後しばらく停車し、その後駅SCへ向かう。   For example, the operating RA train is heading for the station SA at the time t1 when the disturbance occurs. And the train of operation RA stops for a while after arriving at station SA, and heads for station SC after that.

なお、第1取得機能3aによって取得された車両整理案データ19は、この図2に示すようなある時間帯の全ての列車の運行スケジュールを表すとしてもよいし、ある特定の列車の運用の一部の区間の変更を表す情報でもよい。後者の場合は、必要に応じて第2取得機能3bにより他の列車の運用に関する情報を取得し、乗務員の割り当て及びチェックが行われる。   The vehicle arrangement plan data 19 acquired by the first acquisition function 3a may represent the operation schedules of all trains in a certain time zone as shown in FIG. Information indicating a change in the section of the section may be used. In the latter case, information on the operation of other trains is acquired by the second acquisition function 3b as necessary, and crew members are assigned and checked.

図3は、本実施の形態に係る乗務員割当装置によって表示されるチェック結果データ21の表示例を示す図である。   FIG. 3 is a diagram showing a display example of the check result data 21 displayed by the crew assignment device according to the present embodiment.

この図3においては、上記図2の記述方法による車両整理案データ19の内容に加えて、チェック項目を満たさない矛盾部分の列車の運用RB,RCが2重線で表されている。   In FIG. 3, in addition to the contents of the vehicle arrangement plan data 19 by the description method of FIG. 2, the operation RB, RC of the contradictory portion that does not satisfy the check items is represented by a double line.

なお、チェック項目を満たさない矛盾部分の列車の運用RB,RCは、乗務員が担当可能な運用と区別可能であれば他の手法により表示されるとしてもよい。例えば、点滅、色彩の変更、太線などを用いるとしてもよい。   Note that the operation RB, RC of the contradictory portion that does not satisfy the check items may be displayed by another method as long as it can be distinguished from the operation that can be handled by the crew. For example, blinking, color change, thick lines, etc. may be used.

運行スケジュール形式のチェック結果の表示内容に対して、ポインティングデバイスなどによりある線が選択されると、この選択された列車の運用RBについての詳細情報23が表示される。   When a certain line is selected by the pointing device or the like for the display contents of the check result in the operation schedule format, detailed information 23 about the operation RB of the selected train is displayed.

この図3の例では、詳細情報23として、行路No、運用No、担当乗務員、状態、理由などが表示されている。詳細情報23の「状態」には、チェック項目を満足しない場合に「担当不可」が表示される。そして、詳細情報23の「理由」には、満足しないチェック項目の内容が表示される。   In the example of FIG. 3, as the detailed information 23, a route number, an operation number, a crew member in charge, a state, a reason, and the like are displayed. In the “status” of the detailed information 23, “not in charge” is displayed when the check items are not satisfied. Then, in the “reason” of the detailed information 23, the content of the check item that is not satisfied is displayed.

図4は、本実施の形態に係る乗務員割当装置の処理の例を示すフローチャートである。   FIG. 4 is a flowchart showing an example of processing of the crew member assignment apparatus according to the present embodiment.

ステップS1において、第1取得機能3aは、他システム16または端末18から、車両整理案データ19、乗務員割当要求、チェック要求を取得する。   In step S <b> 1, the first acquisition function 3 a acquires the vehicle arrangement plan data 19, the crew assignment request, and the check request from the other system 16 or the terminal 18.

ステップS2において、第2取得機能3bは、記憶部9から乗務員運用計画データ11、運用実績データ12、乗務員割当規則データ13、チェック項目データ14を取得する。   In step S <b> 2, the second acquisition function 3 b acquires crew member operation plan data 11, operation result data 12, crew member assignment rule data 13, and check item data 14 from the storage unit 9.

ステップS3において、割当機能4は、乗務員運用計画データ11および運用実績データ12に基づいて、乗務員割当規則データ13にしたがって、車両整理案データ19の各列車の運用に対して乗務員の割り当てを行い、割り当てた結果を示す乗務員運用整理案データ15を作成する。   In step S3, the assignment function 4 assigns crew members to the operation of each train in the vehicle arrangement plan data 19 according to the crew assignment rule data 13 based on the crew crew operation plan data 11 and the operation result data 12, The crew operation rearrangement plan data 15 indicating the assigned result is created.

ステップS4において、チェック機能5は、乗務員運用計画データ11、運用実績データ12、チェック項目データ13、乗務員運用整理案データ15に基づいて、乗務員運用整理案データ15における各列車の運用への乗務員の割り当てがチェック項目を満たすか否か判断し、チェック項目を満たさない列車の運用に対しては乗務員の候補を選択し、チェック結果データ21を作成する。   In step S4, the check function 5 is based on the crew member operation plan data 11, the operation result data 12, the check item data 13, and the crew member operation rearrangement plan data 15. Judgment is made as to whether or not the assignment satisfies the check item, and for the operation of the train that does not satisfy the check item, a crew member candidate is selected and check result data 21 is created.

ステップS5において、提供機能8は、乗務員運用整理案データ15とチェック結果データ21とを他システム16または端末18に提供する。この結果、乗務員運用整理案データ15とチェック結果データ21が画面上に表示され、オペレータ17に参照される。   In step S <b> 5, the providing function 8 provides the crew member operation arrangement plan data 15 and the check result data 21 to the other system 16 or the terminal 18. As a result, the crew member operation arrangement plan data 15 and the check result data 21 are displayed on the screen and referred to by the operator 17.

ステップS6において、変更内容取得機能6は、変更要求、変更内容データ35、チェック要求を取得したか否か判断する。変更要求等を取得していない場合、処理は終了する。   In step S6, the change content acquisition function 6 determines whether or not a change request, change content data 35, and a check request have been acquired. If a change request or the like has not been acquired, the process ends.

変更要求等を取得した場合、ステップS7において、変更機能7は、乗務員運用整理案データ15のうち変更内容データ35が変更する部分として指定する運用に対して変更内容データ35の示す乗務員を割り当て、変更後の乗務員運用整理案データ20を作成する。   When the change request or the like is acquired, in step S7, the change function 7 assigns the crew indicated by the change content data 35 to the operation designated as the portion to be changed by the change content data 35 in the crew operation organization plan data 15, The crew management rearrangement plan data 20 after the change is created.

ステップS8において、チェック機能5は、乗務員運用計画データ11、運用実績データ12、チェック項目データ14、変更後の乗務員運用整理案データ20に基づいて、変更後の乗務員運用整理案データ20における各列車の運用への乗務員の割り当てがチェック項目を満たすか否か判断し、チェック項目を満たさない列車の運用に対しては乗務員の候補を選択し、変更後のチェック結果データ21aを作成する。   In step S8, the check function 5 determines each train in the changed crewmember operation plan data 20 based on the crew member operation plan data 11, the operation result data 12, the check item data 14, and the changed crew member operation plan data 20. It is determined whether or not the assignment of the crew to the operation satisfies the check item, and for the operation of the train not satisfying the check item, a crew member candidate is selected, and the check result data 21a after the change is created.

ステップS9において、提供機能8は、変更後の乗務員運用整理案データ20と変更後のチェック結果データ21aを他システム16または端末18に提供する。この結果、変更後の乗務員運用整理案データ20と変更後のチェック結果データ21aが画面上に表示され、オペレータ17に参照される。その後、処理は上記ステップS6に戻る。   In step S <b> 9, the providing function 8 provides the changed crew member operation organization plan data 20 and the changed check result data 21 a to the other system 16 or the terminal 18. As a result, the changed crew management arrangement plan data 20 and the changed check result data 21a are displayed on the screen and referred to by the operator 17. Thereafter, the process returns to step S6.

図5は、チェック機能5の処理の例を示すフローチャートである。   FIG. 5 is a flowchart illustrating an example of processing of the check function 5.

本実施の形態において、チェック機能5は、車両整理案に対する原計画にそった乗務員の割り当てによって、原計画通りの駅に列車が到達できるかどうかをチェックするとする。また、チェック機能5は、車両整理案における運用のうち乗務員が未割り当ての運用がないかどうかをチェックするとする。   In the present embodiment, it is assumed that the check function 5 checks whether the train can reach the station according to the original plan by assigning the crew members along the original plan to the vehicle arrangement plan. Further, it is assumed that the check function 5 checks whether there is any operation that is not assigned by the crew among the operations in the vehicle arrangement plan.

ステップT1において、チェック機能5は、車両整理案データ19における列車の全運用を配列MAに格納する。   In step T1, the check function 5 stores all train operations in the vehicle arrangement plan data 19 in the array MA.

ステップT2において、チェック機能5は、割り当てを行う乗務員のソートを行う。ソートする順番としては、例えば、割り当て可能な時刻が早い順が考えられるが、他の順番でソートしてもかまわない。   In step T2, the check function 5 sorts crew members to be assigned. As an order for sorting, for example, the order in which the assignable time is earlier can be considered, but the order may be sorted in another order.

ステップT3おいて、チェック機能5は、ソート後の全ての乗務員について、ステップT4からステップT7までの処理を繰り返す。   In step T3, the check function 5 repeats the processing from step T4 to step T7 for all the crew members after sorting.

ステップT4において、チェック機能5は、ある乗務員について計画通りの割り当てが可能かどうかをチェックする。   In step T4, the check function 5 checks whether a certain crew member can be assigned as planned.

このある乗務員について割り当て可能か否かの判断のために、いくつかのチェック項目が定義されている。このチェック項目は、予め記憶されている。また、必要に応じて追加・変更・削除可能である。   In order to determine whether or not an assignment can be made for a certain crew member, several check items are defined. This check item is stored in advance. Moreover, it can be added / changed / deleted as necessary.

例えば、チェック項目として、ある乗務員が原計画で担当予定であった運用は復旧計画で存在するか(運休に変更された場合、存在しない)、乗り継ぎに時間的な余裕はあるか、乱れの復旧時刻において計画通りの駅にいるか、が定義されているとする。   For example, as a check item, the operation that a certain crew member was scheduled to be in charge of in the original plan exists in the recovery plan (does not exist if changed to suspension), whether there is time for the connection, or recovery of disturbance Assume that it is defined whether the station is as planned at the time.

ステップT5において、チェック機能5は、ステップT4でのチェック結果に基づいて、ある乗務員を計画通りに割り当て可能な運用を配列OKに格納する。   In step T5, the check function 5 stores, in the array OK, operations that can assign a certain crew member as planned based on the check result in step T4.

ステップT6において、チェック機能5は、ステップT4でのチェック結果に基づいて、ある乗務員を計画通りに割り当て可能か判定する。ある乗務員が計画通りに割り当て可能であれば処理は、ステップT8に移る。   In step T6, the check function 5 determines whether a certain crew member can be assigned as planned based on the check result in step T4. If a crew member can be assigned as planned, the process proceeds to step T8.

乗務員が計画通りに割り当て可能でない場合、ステップT7において、乗務員ID、担当不可能な復旧計画における運用、その理由(チェック項目)を、それぞれ配列ID,U,Rに格納し、ステップT8に移る。   If the crew member cannot be assigned as planned, in step T7, the crew member ID, the operation in the recovery plan that cannot be assigned, and the reason (check item) are stored in the array IDs, U, and R, respectively, and the process moves to step T8.

ステップT8において、チェック機能5は、全ての乗務員についてのチェックが終了したか否か判断し、終了したならば処理はステップT9に移る。終了していない場合には、処理は、ステップT3に戻る。   In step T8, the check function 5 determines whether or not all the crew members have been checked. If completed, the process proceeds to step T9. If not, the process returns to step T3.

ステップT9において、チェック機能5は、配列MA,OKに基づいて、乗務員が未割り当ての運用を検索し、配列Sに格納する。   In step T9, the check function 5 searches for operations that are not assigned by the crew based on the arrays MA and OK, and stores them in the array S.

ステップT10において、チェック機能5は、配列ID,U,R,Sを含むチェック結果データ21を作成する。   In step T10, the check function 5 creates check result data 21 including the array IDs, U, R, and S.

図6は、本実施の形態に係る乗務員割当装置によって表示される乗務員候補選択結果を含むチェック結果データ21の表示例を示す図である。   FIG. 6 is a diagram illustrating a display example of the check result data 21 including the crew candidate selection result displayed by the crew assignment device according to the present embodiment.

この図6においては、上記図3と同様の内容が表示されている。さらに、この図6においては、詳細情報24として、その列車の運用について担当可能な乗務員候補のリストが表示されている。このリストは、乗務員候補選択機能によって作成される。   In FIG. 6, the same contents as in FIG. 3 are displayed. Further, in FIG. 6, as the detailed information 24, a list of crew members who can be in charge of operation of the train is displayed. This list is created by the crew member selection function.

乗務員候補選択機能は、例えば、乗務員運用計画データ11、運用実績データ12、チェック項目データ14、乗務員運用整理案データ15または変更後の乗務員運用整理案データ20に基づいて、割り当て対象の運用の出発時刻からある程度前(あらかじめ定められている余裕時間)に、出発駅にいる乗務員であること、割り当て対象の運用の出発駅で待機している予備の乗務員であること、を条件に乗務員の選択を行う。   The crew candidate selection function is, for example, based on the crew operation plan data 11, the operation result data 12, the check item data 14, the crew operation rearrangement plan data 15 or the changed crew operation rearrangement plan data 20, and the start of the operation to be assigned. Select a crew member on the condition that it is a crew member at the departure station and a spare crew member waiting at the departure station of the operation subject to allocation at some time before the time (predetermined margin time) Do.

各乗務員候補の横には、択一選択用ボタン25が割り当てられている。この択一選択用ボタン25によって乗務員が選択され、変更ボタン26が押されると、選択されている運用と乗務員との関係に基づいて変更機能7による変更処理が実行される。   An alternative selection button 25 is assigned beside each crew member candidate. When the crew member is selected by the selection selection button 25 and the change button 26 is pressed, the changing process by the changing function 7 is executed based on the relationship between the selected operation and the crew member.

図7は、本実施の形態に係る乗務員割当装置によって表示される変更後のチェック結果データ21aの表示例を示す図である。   FIG. 7 is a diagram showing a display example of the check result data 21a after the change displayed by the crew assignment device according to the present embodiment.

画面27のうち表示領域27aには、変更された運用の内容が図示される。行路変更の日時、行路No、行路の詳細情報も、この表示領域27aに表示される。なお、行路とは、ある乗務員が担当する一連の運用の集合を意味するとする。   The contents of the changed operation are shown in the display area 27a of the screen 27. The date / time of the route change, the route number, and the detailed information of the route are also displayed in the display area 27a. Here, the route means a set of a series of operations that a crew member is in charge of.

表示領域27aに表示される変更内容のうち、変更箇所は、例えば強調文字などにより、変更のない箇所と表示方法が区別され、変更の有無が把握容易とされる。   Of the changed contents displayed in the display area 27a, the changed part is distinguished from the part without change by the highlighted character, for example, and the display method, so that it is easy to grasp the presence or absence of the change.

表示領域27bには、変更内容の説明が表示される。   In the display area 27b, an explanation of the change contents is displayed.

ボタン27cは、全ての運用を表示する場合に押される。このボタン27cを押下することにより、上記図6に示す形式で全ての運用の一覧が表示される。   The button 27c is pressed when displaying all operations. By pressing this button 27c, a list of all operations is displayed in the format shown in FIG.

ボタン27dは、特定の検索条件を満たす変更のみを表示させるために用いられる。検索条件としては、例えば、特定の行路、運用、時間帯、発駅と着駅などが用いられる。検索条件を設定してこのボタン27dを押下すると、提供機能8の検索機能によって変更後のチェック結果データ21aから検索条件を満たす内容が検索され、以下で説明する図8に示すような形式で検索結果の一覧が表示される。   The button 27d is used to display only changes that satisfy a specific search condition. As a search condition, for example, a specific route, operation, time zone, departure station and arrival station are used. When the search condition is set and this button 27d is pressed, the search function of the provision function 8 searches the check result data 21a after the change for the contents satisfying the search condition, and searches in the format shown in FIG. 8 described below. A list of results is displayed.

ボタン27eは、複数の変更が行われた場合において、次の変更内容を表示する場合に押される。ボタン27fは、複数の変更が行われた場合において、前の変更内容を表示する場合に押される。なお、変更箇所は表示領域27a,27bに示す情報を一まとまりの情報として、その単位で配列やリストの形式で記憶されているとしてもよい。このように表示領域27a,27bに示す情報を一まとまりの情報として配列やリストの形式で記憶することにより、変更された内容について順番にアクセス可能である。   The button 27e is pressed when the next change content is displayed when a plurality of changes are made. The button 27f is pressed when displaying the previous change contents when a plurality of changes are made. The changed portions may be stored in the form of an array or a list in units of information shown in the display areas 27a and 27b as a set of information. Thus, by storing the information shown in the display areas 27a and 27b as a set of information in the form of an array or list, the changed contents can be accessed in order.

図8は、変更箇所の一覧表示の例を示す図である。一覧表示28には、行路No、乗務員、変更した運用などが表示される。この一覧表示28から一つの行を選択することにより、上記図7に示すような変更箇所の詳細画面が表示される。   FIG. 8 is a diagram illustrating an example of a list display of changed locations. The list display 28 displays a route number, a crew member, a changed operation, and the like. By selecting one row from the list display 28, a detailed screen of the changed part as shown in FIG. 7 is displayed.

以上説明した本実施の形態においては、列車の運行スケジュールに乱れが発生した場合に、乗務員運用整理案データ15の作成に必要な情報を取得し、可能な限り自動的に乗務員運用整理案データ15を作成することができ、必要な情報をわかりやすく表示することができる。   In the present embodiment described above, when the train operation schedule is disturbed, information necessary for creating the crew operation arrangement plan data 15 is acquired, and the crew operation arrangement plan data 15 is automatically acquired as much as possible. The necessary information can be displayed in an easy-to-understand manner.

また、車両整理案における各運用について、各乗務員が担当することに矛盾がないかを自動的にチェックすることができる。オペレータ17は、迅速かつ容易に、車両整理案に対して乗務員を確保できるか否かの判断結果を得ることができる。   In addition, it is possible to automatically check whether each crew member is responsible for each operation in the vehicle arrangement plan. The operator 17 can quickly and easily obtain a determination result as to whether a crew member can be secured for the vehicle arrangement plan.

さらに、本実施の形態においては、作成された乗務員運用整理案データ15について変更を行うことができ、変更された運用計画に矛盾がないかどうかを自動的にチェックすることができ、運行と乗務員の調整を容易に行うことができる。   Furthermore, in the present embodiment, it is possible to make changes to the crew management arrangement plan data 15 that has been created, and it is possible to automatically check whether there is any contradiction in the changed operation plan. Can be easily adjusted.

また、変更された運用計画と原計画または前の変更整理案とを比較することができ、変更された運用計画と原計画または前の変更整理案との違いを分かりやすく表示することができる。オペレータ17は、運行スケジュールに乱れが発生した場合に各部署へ伝達する事項を容易に確認することができる。   Further, the changed operation plan can be compared with the original plan or the previous change arrangement plan, and the difference between the changed operation plan and the original plan or the previous change arrangement plan can be displayed in an easily understandable manner. The operator 17 can easily confirm matters to be transmitted to each department when the operation schedule is disturbed.

(第2の実施の形態)
本実施の形態は、上記第1の実施の形態に係る乗務員割当装置の変形例である。本実施の形態に係る乗務員割当装置は、乗務員運用整理案データ15に対する変更要求を取得するとともに、この変更により発生する影響を調査する旨の影響調査要求を取得し、この影響調査結果を含むチェック結果データを作成する。
(Second Embodiment)
The present embodiment is a modification of the crew assignment device according to the first embodiment. The crew assignment device according to the present embodiment obtains a change request for the crew management organization plan data 15, obtains an influence investigation request for investigating an influence caused by the change, and includes a check including the result of the influence investigation. Create result data.

図9は、本実施の形態に係る乗務員割当装置の一例を示すブロック図である。   FIG. 9 is a block diagram showing an example of a crew member assignment apparatus according to the present embodiment.

コンピュータ29は、記録媒体30に記録されている乗務員割当プログラム30aにしたがって、第1取得機能31、第2取得機能3b、割当機能4、チェック機能32、変更内容取得機能6、変更機能7、提供機能8を実現する。   The computer 29 provides a first acquisition function 31, a second acquisition function 3b, an assignment function 4, a check function 32, a change content acquisition function 6, a change function 7, according to the crew assignment program 30a recorded in the recording medium 30. Function 8 is realized.

第1取得機能31は、上記第1の実施の形態に係る第1取得機能3aと同様の機能を持ち、さらに運用に対する乗務員の割り当てが変更される場合に、この変更により発生する影響を調査する旨を示す影響調査要求を取得する。   The first acquisition function 31 has the same function as the first acquisition function 3a according to the first embodiment, and further investigates the effect caused by the change when the crew assignment to the operation is changed. Acquire an impact investigation request to the effect.

チェック機能32は、上記第2の実施の形態に係るチェック機能5と同様の機能を持ち、加えて、影響調査機能32aを持つ。   The check function 32 has the same function as the check function 5 according to the second embodiment, and additionally has an influence investigation function 32a.

影響調査機能32aを持つチェック機能32は、影響調査要求を受け付けた場合に、乗務員運用整理案データ15と変更後の乗務員運用整理案データ20とに基づいて、変更機能7によって変更された運用と関連する運用を影響部として抽出し、影響部の抽出結果を示す影響調査データ33を含むチェック結果データ34を作成し、内部記憶部10に記憶する。   When the check function 32 having the influence investigation function 32a accepts the influence investigation request, the check function 32 has the operation changed by the change function 7 based on the crew operation rearrangement plan data 15 and the changed crew operation rearrangement plan data 20. A related operation is extracted as an influence part, check result data 34 including influence investigation data 33 indicating the extraction result of the influence part is created, and stored in the internal storage part 10.

例えば、影響調査機能32aは、変更された運用における乗務員と同一の乗務員が割り当てられている運用を抽出する。   For example, the impact investigation function 32a extracts an operation to which the same crew member is assigned as the crew member in the changed operation.

図10は、変更された運用と影響部との関係の例を示す図である。   FIG. 10 is a diagram illustrating an example of the relationship between the changed operation and the affected part.

運用101と運用103には同一の乗務員Z1が割り当てられているとする。一方、運用102には別の乗務員Z2が割り当てられているとする。   It is assumed that the same crew member Z1 is assigned to the operations 101 and 103. On the other hand, it is assumed that another crew member Z2 is assigned to the operation 102.

ここで、オペレータ17が乗務員Z1に対して、運用101の割り当てを解消し、運用102を割り当てるように変更した場合、影響調査機能32aは、影響部を求め、影響調査データ33を含むチェック結果データ34を作成する。   Here, when the operator 17 cancels the assignment of the operation 101 to the crew member Z1 and changes the assignment so that the operation 102 is assigned, the influence investigation function 32a obtains an influence part and checks result data including the influence investigation data 33. 34 is created.

提供機能7は、影響部を警告表示するためにチェック結果データ34を提供する。   The providing function 7 provides the check result data 34 for displaying the affected part as a warning.

この図10の例では、上記の変更により運用103に影響がおよぶと判断され、この運用103が影響部として抽出される。変更の影響を受ける運用102,103は、例えば2重線などで表示され、容易に確認できる。   In the example of FIG. 10, it is determined that the operation 103 is affected by the above change, and the operation 103 is extracted as an influence unit. The operations 102 and 103 affected by the change are displayed by, for example, a double line and can be easily confirmed.

また、影響調査機能32aは、チェック項目データ14に基づいて、運用101の変更によって発生する影響部がチェック項目を満たすか否かを判断し、チェック項目を満たさない場合にこの影響部を矛盾部と判断し、矛盾部についてのチェック項目の内容を示す警告情報104を含む影響調査データ33を作成する。   Further, the influence investigation function 32a determines whether or not the influence part generated by the change of the operation 101 satisfies the check item based on the check item data 14, and if this check part does not satisfy the check item, the influence investigation part The impact investigation data 33 including the warning information 104 indicating the content of the check item for the contradiction portion is created.

提供機能8は、チェック結果データ34を提供する。これにより、例えば、「運用103の担当を変更する必要あり」「乗務員Z1は運用102担当後に駅SCに向かう必要あり」などの内容が表示される。   The providing function 8 provides check result data 34. As a result, for example, “the person in charge of operation 103 needs to be changed” and “the crew Z1 needs to go to the station SC after being in charge of operation 102” are displayed.

図11は、本実施の形態に係る乗務員割当装置の処理の例を示すフローチャートである。   FIG. 11 is a flowchart showing an example of processing of the crew member assignment apparatus according to the present embodiment.

ステップU1〜U7は、上記第1の実施の形態に係る図7のステップS1〜S7と同様である。   Steps U1 to U7 are the same as steps S1 to S7 in FIG. 7 according to the first embodiment.

ステップU8において、チェック機能32は、影響調査要求を取得したか否か判断する。影響調査要求を取得していない場合、処理はステップU6に戻る。   In step U8, the check function 32 determines whether an impact investigation request has been acquired. If an influence investigation request has not been acquired, the process returns to step U6.

影響調査要求を取得した場合、ステップU9において、チェック機能32は、乗務員運用整理案データ15、変更後の乗務員運用整理案データ20、乗務員運用計画データ11、運用実績データ12、チェック項目データ14に基づいて、変更後の乗務員運用整理案データ20において変更された運用によって影響を受ける影響部を求め、影響調査データ33を含むチェック結果データ34を作成する。   When the influence investigation request is acquired, in step U9, the check function 32 converts the crew member operation arrangement plan data 15, the crew member operation arrangement plan data 20 after the change, the crew member operation plan data 11, the operation result data 12, and the check item data 14 into the check item data 14. Based on the changed crew member operation rearrangement plan data 20, the affected part affected by the changed operation is obtained, and check result data 34 including the influence investigation data 33 is created.

ステップU10において、提供機能8は、影響調査データ33を含むチェック結果データを他システム16または端末18に提供する。この結果、影響調査結果が画面上に表示され、オペレータ17に参照される。その後、処理は上記ステップU6に戻る。   In step U <b> 10, the providing function 8 provides check result data including the impact investigation data 33 to the other system 16 or the terminal 18. As a result, the impact investigation result is displayed on the screen and is referred to by the operator 17. Thereafter, the process returns to step U6.

これにより、上記図10のようなチェック結果の表示形式が実現可能である。   Thereby, the display format of the check result as shown in FIG. 10 can be realized.

以上説明した本実施の形態においては、上記第1の実施の形態と同様の効果を得ることができ、運用に対する乗務員の割り当てを変更した場合、変更の影響を受ける影響部などが表示される。これにより、オペレータ17は、運用に対する乗務員の割り当てを容易に確認、決定できる。   In the present embodiment described above, the same effect as in the first embodiment can be obtained, and when the crew assignment to the operation is changed, an affected part or the like affected by the change is displayed. As a result, the operator 17 can easily confirm and determine the assignment of the crew to the operation.

(第3の実施の形態)
本実施の形態は、上記第1および第2の実施の形態に係る乗務員割当装置の割当機能4の変形例について説明する。本実施の形態に係る割当機能4は、乗務員運用整理案データ15を自動的に作成する。
(Third embodiment)
In the present embodiment, a modified example of the assignment function 4 of the crew member assignment device according to the first and second embodiments will be described. The assignment function 4 according to the present embodiment automatically creates crew member operation arrangement plan data 15.

図12は、本実施の形態に係る乗務員割当装置の処理の例を示すフローチャートである。   FIG. 12 is a flowchart showing an example of processing of the crew member assignment apparatus according to the present embodiment.

ステップV1〜V5は、上記第1の実施の形態に係る図4のステップS1〜S5と同様である。   Steps V1 to V5 are the same as steps S1 to S5 in FIG. 4 according to the first embodiment.

ステップV6において、変更内容取得機能6と第1取得機能3aとのうちの少なくとも一方は、変更要求と乗務員割当要求とのうちの少なくとも一方を取得したか否か判断する。変更要求または乗務員割当要求を取得していない場合、処理は終了する。   In step V6, at least one of the change content acquisition function 6 and the first acquisition function 3a determines whether or not at least one of the change request and the crew assignment request has been acquired. If no change request or crew assignment request has been acquired, the process ends.

変更要求と乗務員割当要求とのうちの少なくとも一方を取得した場合、ステップV7において、割当機能4と変更機能7とは、変更要求においてオペレータ17の手動による変更が要求されているか、乗務員割当要求において乗務員割当装置の自動による割当が要求されているか判断する。   When at least one of the change request and the crew assignment request is acquired, in step V7, the assignment function 4 and the change function 7 determine whether the change request is manually changed by the operator 17 or in the crew assignment request. It is determined whether the automatic assignment of the crew assignment device is required.

オペレータ17の手動による変更が要求されている場合、ステップV8aにおいて、変更機能7は、オペレータ17の指示に基づく変更後の乗務員運用整理案データ20を作成する。   When the manual change of the operator 17 is requested | required, the change function 7 produces the crew member operation | organization arrangement plan data 20 after the change based on the instruction | indication of the operator 17 in step V8a.

乗務員割当装置の自動による変更が要求されている場合、ステップV8bにおいて、割当機能4は、自動で運用に対する割当処理を実行し、自動で変更後の乗務員運用整理案データ20を作成する。   When an automatic change of the crew member assignment device is requested, in step V8b, the assignment function 4 automatically executes the assignment process for the operation, and automatically creates the crew member operation rearrangement plan data 20 after the change.

ステップV9,V10は、上記第1の実施の形態に係る図4のステップS8,S9と同様である。   Steps V9 and V10 are the same as steps S8 and S9 of FIG. 4 according to the first embodiment.

以下に、本実施の形態で用いられる未割り当ての運用への乗務員の割り当て方法の具体例について説明する。   Hereinafter, a specific example of a method for assigning crew members to unassigned operations used in the present embodiment will be described.

図13は、本実施の形態で用いられる未割り当ての運用に対する乗務員の割り当て方法の例を示す図である。   FIG. 13 is a diagram illustrating an example of a crew assignment method for an unassigned operation used in the present embodiment.

行路1301は、ある乗務員に実際に担当される。この図13において、現在時刻tRまでは実績が表されており、時刻tR以降は予測が表されている。   The route 1301 is actually assigned to a certain crew member. In FIG. 13, the actual results are shown up to the current time tR, and the predictions are shown after the time tR.

行路1302は、行路1301を担当する乗務員の計画上の行路を表す。計画では、乗務員は現在時刻tR以降に駅SBから駅SAに戻ることになっている。   A route 1302 represents a planned route of a crew member in charge of the route 1301. According to the plan, the crew is to return from the station SB to the station SA after the current time tR.

しかし、実際の列車は現在時刻tRの時点で駅SBに到着していないため、計画の行路のうち、乗務員は駅SB発、駅SA着の運用を担当できない。そのため、このままでは乗務員は駅SAに戻れない。   However, since the actual train has not arrived at the station SB at the current time tR, the crew cannot take charge of operation from the station SB to the station SA on the planned route. For this reason, the crew cannot return to the station SA.

運用1303は、現在時刻tR後であり乗務員が駅SBに到着した後に駅SBから駅SAに向かう臨時列車の運用を表す。   Operation 1303 represents the operation of a temporary train from the station SB to the station SA after the current time tR and the crew arrives at the station SB.

そこで、割当機能4は、この運用1303に対して乗務員を割り当て、この乗務員を駅SBから駅SAに戻す。   Therefore, the assignment function 4 assigns a crew member to this operation 1303, and returns this crew member from the station SB to the station SA.

図14は、本実施の形態で用いられる運用間での乗務員の交換による割り当て方法の例を示す図である。   FIG. 14 is a diagram illustrating an example of an assignment method by exchanging crew members between operations used in the present embodiment.

行路1401は、ある乗務員の担当する実際の行路を表す。また、行路1402は、行路1401と同じ乗務員の担当する計画行路を表す。現在時刻tRの時点で遅れが発生し、この乗務員は運用1402aを担当することができない状態にある。また、この乗務員は現在時刻tR後に駅SBから駅SAに戻る必要があるが、このままでは駅SBから駅SAに戻れなくなる。   A route 1401 represents an actual route that a crew member is in charge of. A route 1402 represents a planned route that is handled by the same crew as the route 1401. There is a delay at the current time tR, and this crew member is not in charge of the operation 1402a. In addition, this crew member needs to return from the station SB to the station SA after the current time tR, but in this state, the crew member cannot return from the station SB to the station SA.

一方で、行路1403は、別の乗務員の担当する行路を表す。運用1403aは行路1403の運用である。この行路1403の運用1403aでは、行路1401を担当する乗務員が駅SBに到着した後に出発する予定となっている。   On the other hand, the route 1403 represents a route in charge of another crew member. Operation 1403 a is operation of the route 1403. In operation 1403a of this route 1403, it is scheduled that a crew member in charge of the route 1401 will depart after arriving at the station SB.

この場合、乗務員と別の乗務員との間で、行路1402の運用1402aと行路1403の運用1403aとを交換する。この結果、現在時刻tRの後、乗務員は行路1402の運用1402aに代えて行路1403の運用1403aを担当し、この乗務員は、駅SBから駅SAに戻ることが可能である。また、別の乗務員は行路1403の運用1403aに代えて行路1401の運用1401aを担当する。   In this case, the operation 1402a of the route 1402 and the operation 1403a of the route 1403 are exchanged between the crew member and another crew member. As a result, after the current time tR, the crew member takes charge of the operation 1403a of the route 1403 instead of the operation 1402a of the route 1402, and this crew member can return from the station SB to the station SA. Another crew member takes charge of the operation 1401a of the route 1401 instead of the operation 1403a of the route 1403.

なお、この図14では、2つの運用間で乗務員を交換する場合を例に説明しているが、3つ以上の運用間で複数の乗務員を交換するとしてもよい。このような運用を交換する数の上限は、オペレータ17が条件入力で与えるものとする。   Note that FIG. 14 illustrates an example in which a crew member is exchanged between two operations, but a plurality of crew members may be exchanged between three or more operations. It is assumed that the upper limit of the number of such operation exchanges is given by the operator 17 as a condition input.

図15は、本実施の形態で用いられる運用間での乗務員の順送りおよび便乗による割り当て方法の例を示す図である。   FIG. 15 is a diagram illustrating an example of an assignment method by forward and crewmembers between operations used in the present embodiment.

リスト1501では、駅SA発、駅SB着の計画上の運用を担当する乗務員が一覧で表される。乗務員J1は駅SAに到着するのが遅れており、駅SAを11:20に出発する運用が担当できないとする。   The list 1501 displays a list of crew members who are in charge of the planned operation from the station SA to the station SB. It is assumed that the crew member J1 is late in arriving at the station SA, and cannot take charge of the operation of leaving the station SA at 11:20.

リスト1502は、順送りと便乗とを適用した後の駅SA発、駅SB着の計画上の運用を担当する乗務員の一覧である。   A list 1502 is a list of crew members in charge of the planned operation of departure from the station SA and arrival at the station SB after applying forward feeding and piggybacking.

乗務員J1に割り当て予定だった駅SAを11:20に出発する運用については、運休にするか、または予備人員を割り当てるなどのような他の割り当て規則を適用して乗務員を割り当て直す。   For the operation of leaving the station SA scheduled to be assigned to the crew member J1 at 11:20, the crew member is reassigned by applying other assignment rules such as suspension of service or assignment of spare personnel.

乗務員J1は、駅SAを11:30に出発する運用であれば担当可能と見込まれるため、この駅SAを11:30に出発する運用に割り当てる(順送り)。   The crew member J1 assigns the station SA to the operation departing at 11:30 because the operation is expected to be possible if the operation departs from the station SA at 11:30 (forward feeding).

順送りにより乗務員J1が割り当てられた駅SAを11:30に出発する運用は、計画上は乗務員J2が担当する予定であった。乗務員J2についても、駅SAから駅SBに移動させる必要があるため、乗務員J2は乗務員J3が担当する駅SAを12:00に出発する運用に同乗させる(便乗)。なお、順送りの回数は、あらかじめオペレータ17が条件入力した上限値までとする。   The operation of leaving the station SA, to which the crew member J1 was assigned in order, at 11:30, was planned to be handled by the crew member J2. Since the crew member J2 also needs to be moved from the station SA to the station SB, the crew member J2 takes the station SA for which the crew member J3 is in charge of the operation starting at 12:00 (piping). It should be noted that the number of forward feeds is up to an upper limit value that the operator 17 inputs in advance.

図16は、本実施の形態で用いられる運用間での予備人員の割り当て方法の例を示す図である。   FIG. 16 is a diagram illustrating an example of a method for assigning spare personnel between operations used in the present embodiment.

行路1601は、ある乗務員の担当する実際の行路を表す。行路1602は行路1601と同じ乗務員が担当する計画上の行路を表す。現在時刻tRの時点で遅れが発生しており、この乗務員は駅SBに計画通りの時間に到着できず、計画上の運用が実施できない。   A route 1601 represents an actual route in charge of a certain crew member. A route 1602 represents a planned route that is handled by the same crew as the route 1601. There is a delay at the current time tR, and this crew member cannot arrive at the station SB at the planned time and cannot perform the planned operation.

この状況で、現在時刻tRにおいて駅SAに待機している予備人員がいれば、この乗務員の実施できない行路1602の運用にその予備人員を割り当てる。行路1603は、予備人員を割り当てた結果の行路を表す。   In this situation, if there is a spare person standing by at the station SA at the current time tR, the spare person is assigned to the operation of the route 1602 where the crew cannot perform. A route 1603 represents a route as a result of assigning a spare person.

図17は、本実施の形態に係る割当機能4の処理の一例を示すフローチャートである。   FIG. 17 is a flowchart showing an example of processing of the assignment function 4 according to the present embodiment.

ステップW1において、割当機能4は、割り当てパターン(割り当て条件)を含む乗務員割当規則データ13を第2取得機能3b経由で取得する。なお、乗務員割当規則データ13は、オペレータ17から入力されるとしてもよい。   In step W1, the assignment function 4 acquires the crew assignment rule data 13 including the assignment pattern (assignment condition) via the second acquisition function 3b. The crew member assignment rule data 13 may be input from the operator 17.

乗務員割当規則データ13に定義されている割り当てパターンとしては、例えば「乗務員主体」「運用主体」「割り当てパターンの優先順位」「割り当て結果の評価指標」などが定義されている。   As the assignment pattern defined in the crew assignment rule data 13, for example, “crew principal”, “operation subject”, “priority of assignment pattern”, “evaluation index of assignment result”, and the like are defined.

乗務員主体とは、一人の乗務員が担当可能な一連の運用を検索して割り当てを行う旨を定めた規則である。   The crew subject is a rule that specifies that a series of operations that can be handled by one crew member is searched and assigned.

運用主体とは、一つの車両が担当する一連の運用に対して、割り当て可能な乗務員を検索して割り当てを行う旨を定めた規則である。   The operation subject is a rule that specifies that a crew member who can be assigned is searched for and assigned to a series of operations that one vehicle is in charge of.

割り当てパターンの優先順位とは、上記図13〜図16で説明した未割り当ての運用に対する乗務員の割り当て、運用間での乗務員の交換、運用間での乗務員の順送りおよび便乗、運用間での予備人員の割り当てなどの割り当てパターンの優先順位である。各割り当てパターンに対してあらかじめ優先順位を定めておき、この順番にしたがって各割り当てパターンが適用され、運用に対して割り当て可能な乗務員が検索される。   Allocation pattern priority refers to crew assignment to unallocated operations described in FIGS. 13 to 16 above, replacement of crew between operations, forward and flight of crew between operations, and reserve personnel between operations. This is the priority of the allocation pattern such as allocation. Priorities are determined in advance for each assignment pattern, and each assignment pattern is applied according to this order, and crew members who can be assigned to the operation are searched.

割り当て結果の評価指標とは、割り当て結果として複数の組み合わせが存在する場合に、この複数の組み合わせの中から最適な組み合わせを選択するための評価指標である。なお、組み合わせとは、乗務員主体で割り当てを行った場合の一連の運用の組み合わせ、または、運用主体で割り当てを行った場合の一連の乗務員の組み合わせとする。   The evaluation index of the allocation result is an evaluation index for selecting an optimum combination from the plurality of combinations when there are a plurality of combinations as the allocation result. The combination is a combination of a series of operations when assignment is performed by a crew member or a combination of crew members when assignment is performed by a management subject.

この割り当て結果の評価指標として、例えば適当な割り当てを選択するための評価値の算出方法が定義される。具体例としては、評価指標として総勤務時間の長さ、休憩時間の適切さなどが用いられる。   As an evaluation index of the assignment result, for example, an evaluation value calculation method for selecting an appropriate assignment is defined. As a specific example, the length of the total working time, the appropriateness of the break time, etc. are used as the evaluation index.

ステップW2において、割当機能4は、各乗務員または運用について、ステップW3〜W8を繰り返す。   In step W2, the assignment function 4 repeats steps W3 to W8 for each crew member or operation.

ステップW3において、割当機能4は、割り当てパターンの優先順位にしたがって、各割り当てパターンを適用し、運用に割り当てる乗務員の候補を検索する。   In step W3, the allocation function 4 applies each allocation pattern according to the priority order of the allocation pattern, and searches for crew members to be allocated to operation.

ステップW4において、割当機能4は、割り当て可能な運用と乗務員との組み合わせがあるか否かを判断する。   In step W4, the assignment function 4 determines whether there is a combination of operation and crew that can be assigned.

割り当て可能な組み合わせがない場合、ステップW5において、割当機能4は、割り当て不可能な乗務員または運用を配列NAに格納する。その後、処理は、ステップW9に移る。   If there is no assignable combination, in step W5, the assignment function 4 stores the crew members or operations that cannot be assigned in the array NA. Thereafter, the process proceeds to step W9.

一方、割り当て可能な組み合わせがある場合、ステップW6において、割当機能4は、割り当て可能な組み合わせが複数か否か判断する。   On the other hand, when there are combinations that can be allocated, in step W6, the allocation function 4 determines whether or not there are a plurality of combinations that can be allocated.

割り当て可能な組み合わせが単数の場合、ステップW7において、割当機能4は、この組み合わせによる割り当てを行い、組み合わせを配列Pに格納する。その後、処理はステップW9に移る。   If the number of combinations that can be allocated is singular, the allocation function 4 performs allocation by this combination and stores the combinations in the array P in step W7. Thereafter, the process proceeds to step W9.

一方、割り当て可能な組み合わせが複数の場合、ステップW8において、割当機能4は、複数の割り当ての組み合わせについて、あらかじめ定義されている評価指標に基づいて評価値を算出し、この評価値が最も高い組み合わせを選択し、配列Pに格納する。その後、処理はステップW9に移る。   On the other hand, when there are a plurality of assignable combinations, in Step W8, the assignment function 4 calculates an evaluation value based on a predefined evaluation index for the plurality of assignment combinations, and the combination having the highest evaluation value is obtained. Is stored in the array P. Thereafter, the process proceeds to step W9.

ステップW9において、割当機能4は、全ての乗務員または運用について、処理が終了したかどうかを判断する。   In step W9, the allocation function 4 determines whether or not the processing has been completed for all crew members or operations.

終了していない場合、処理はステップW2に戻る。   If not completed, the process returns to step W2.

一方、終了している場合、ステップW10において、割当機能4は、割り当て結果である乗務員運用整理案データ15(例えば、配列P,NA)または変更後の乗務員運用整理案データ20を内部記憶部10に記憶する。   On the other hand, if it has been completed, in step W10, the allocation function 4 stores the crew operation rearrangement plan data 15 (for example, the array P, NA) or the crew member rearrangement plan data 20 after the change as the allocation result. To remember.

以上説明した本実施の形態では、割当機能4により乗務員運用整理案データ15または変更後の乗務員運用整理案データ20を自動的に作成することができる。これにより、オペレータ17の作業労力を軽減させることができる。   In the present embodiment described above, it is possible to automatically create the crew member operation rearrangement plan data 15 or the changed crew member operation rearrangement plan data 20 by the assignment function 4. Thereby, the work effort of the operator 17 can be reduced.

なお、自動的な割り当ての手法として、例えば、割当機能4は、車両整理案における個々の列車の運用に対して試験的に乗務員の割り当てを行い、この乗務員の割り当てが乗務員割当規則データ13またはチェック項目データ14の内容に矛盾するか否かをチェックし、矛盾しない場合その列車の運用への乗務員の割り当てが適切であるとして採用し、矛盾する場合この矛盾のある列車の運用に対して他の乗務員の割り当てを行い、この他の乗務員の割り当てが乗務員割当規則データ13またはチェック項目データ14の内容に矛盾するか否かをチェックし、同様の処理を繰り返すとしてもよい。   As an automatic assignment method, for example, the assignment function 4 assigns crew members on a trial basis to the operation of individual trains in the vehicle arrangement plan, and the assignment of the crew members is the crew assignment rule data 13 or check. Check whether the contents of the item data 14 are inconsistent. If there is no contradiction, the assignment of the crew to the operation of the train is adopted as appropriate. It is also possible to assign a crew member, check whether the assignments of other crew members contradict the contents of the crew member assignment rule data 13 or the check item data 14, and repeat the same processing.

上記各実施の形態において、各構成要素は同様の動作を実現可能であれば配置を変更させてもよく、また各構成要素を自由に組み合わせてもよく、各構成要素を自由に分割してもよく、いくつかの構成要素を削除してもよい。すなわち、上記各実施の形態については、上記の構成そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化できる。   In each of the above embodiments, each component may be rearranged as long as the same operation can be realized, each component may be freely combined, and each component may be freely divided. Well, some components may be deleted. In other words, each of the above embodiments is not limited to the above-described configuration as it is, and can be embodied by modifying the components without departing from the scope of the invention in the implementation stage.

例えば、内部記憶部10に代えてコンピュータ2,29に対して備えられる外付けのハードディスクなどを用いるとしてもよい。   For example, an external hard disk provided for the computers 2 and 29 may be used instead of the internal storage unit 10.

また、例えば、チェック機能32と影響調査機能32aとは、別構造としてもよい。また、チェック結果データ34と影響調査データ33とは、別構造としてもよい。   For example, the check function 32 and the impact investigation function 32a may have different structures. Further, the check result data 34 and the influence investigation data 33 may have different structures.

上記各実施の形態で説明した乗務員割当プログラム1a,30aは、例えば磁気ディスク(フレキシブルディスク、ハードディスク等)、光ディスク(CD−ROM、DVD等)、半導体メモリなどの記録媒体に書き込んで、コンピュータ2,29に適用可能である。また、上記乗務員割当プログラム1a,30aは、通信媒体により伝送してコンピュータ2,29に適用することも可能である。コンピュータ2,29は、上記乗務員割当プログラム1a,30aを読み込み、上記乗務員割当プログラム1a,30aによって動作が制御されることにより、上記の機能を実現する。   The crew assignment programs 1a and 30a described in the above embodiments are written on a recording medium such as a magnetic disk (flexible disk, hard disk, etc.), optical disk (CD-ROM, DVD, etc.), semiconductor memory, etc. 29 is applicable. The crew assignment programs 1a and 30a can also be transmitted to a computer 2 and applied to the computers 2 and 29 through a communication medium. The computers 2 and 29 read the crew assignment programs 1a and 30a, and the operations are controlled by the crew assignment programs 1a and 30a, thereby realizing the functions described above.

上記各実施の形態において、ソフトウェアにより実現される機能は、ハードウェアによって実現されるとしてもよい。   In each of the above embodiments, the function realized by software may be realized by hardware.

上記各実施の形態において、乗務員割当プログラム1a,30aは、複数のコンピュータに分散して配置され、複数のコンピュータ間で互いに連携しつつ処理が実行されるとしてもよい。   In each of the above embodiments, the crew member assignment programs 1a and 30a may be distributed and arranged in a plurality of computers, and the processing may be executed while cooperating with each other between the plurality of computers.

本発明は、列車の運行スケジュールの乱れを復旧する分野に有効である。   The present invention is effective in the field of recovering disturbances in train operation schedules.

本発明の第1の実施の形態に係る乗務員割当装置の一例を示すブロック図。The block diagram which shows an example of the crew member assignment apparatus which concerns on the 1st Embodiment of this invention. 車両整理案データの例を示す図。The figure which shows the example of vehicle arrangement plan data. 同実施の形態に係る乗務員割当装置によって表示されるチェック結果データの表示例を示す図。The figure which shows the example of a display of the check result data displayed by the crew member assignment apparatus which concerns on the embodiment. 同実施の形態に係る乗務員割当装置の処理の例を示すフローチャート。The flowchart which shows the example of a process of the crew member assignment apparatus which concerns on the embodiment. 同実施の形態に係るチェック機能の処理の例を示すフローチャートA flowchart showing an example of processing of a check function according to the embodiment 同実施の形態に係る乗務員割当装置によって表示される乗務員候補選択結果を含むチェック結果データの表示例を示す図。The figure which shows the example of a display of the check result data containing the crew member candidate selection result displayed by the crew member allocation apparatus which concerns on the embodiment. 同実施の形態に係る乗務員割当装置によって表示される変更後のチェック結果データの表示例を示す図。The figure which shows the example of a display of the check result data after a change displayed by the crew member assignment apparatus which concerns on the embodiment. 変更箇所の一覧表示の例を示す図。The figure which shows the example of a list display of a change location. 本発明の第2の実施の形態に係る乗務員割当装置の一例を示すブロック図。The block diagram which shows an example of the crew member assignment apparatus which concerns on the 2nd Embodiment of this invention. 変更された運用と影響部との関係の例を示す図。The figure which shows the example of the relationship between the changed operation | use and an influence part. 同実施の形態に係る乗務員割当装置の処理の例を示すフローチャート。The flowchart which shows the example of a process of the crew member assignment apparatus which concerns on the embodiment. 本発明の第3の実施の形態に係る乗務員割当装置の処理の例を示すフローチャート。The flowchart which shows the example of a process of the crew member allocation apparatus which concerns on the 3rd Embodiment of this invention. 同実施の形態で用いられる未割り当ての運用に対する乗務員の割り当て方法の例を示す図。The figure which shows the example of the crew member assignment | assigning method with respect to the unassigned operation used in the embodiment. 同実施の形態で用いられる運用間での乗務員の交換による割り当て方法の例を示す図。The figure which shows the example of the allocation method by replacement | exchange of a crew member between the operations used in the embodiment. 同実施の形態で用いられる運用間での乗務員の順送りおよび便乗による割り当て方法の例を示す図。The figure which shows the example of the allocation method by the forward-feeding of a crew member between operation used by the same embodiment, and piggybacking. 同実施の形態で用いられる運用間での予備人員の割り当て方法の例を示す図。The figure which shows the example of the allocation method of the reserve personnel between the operations used in the embodiment. 同実施の形態に係る割当機能の処理の一例を示すフローチャート。The flowchart which shows an example of the process of the allocation function which concerns on the embodiment.

符号の説明Explanation of symbols

1,30…記録媒体、1a,30a…乗務員割当プログラム、2,29…コンピュータ、3a,31…第1取得機能、3b…第2取得機能、4…割当機能、5,32…チェック機能、6…変更内容取得機能、7…変更機能、8…提供機能、9…記憶部、10…内部記憶部、11…乗務員運用計画データ、12…運用実績データ、13…乗務員割当規則データ、14…チェック項目データ、15…乗務員運用整理案データ、16…他システム、17…オペレータ、18…端末、19…車両整理案データ、20…変更後の乗務員運用整理案データ、21,34…チェック結果データ、21a…変更後のチェック結果データ、22…ネットワーク,32a…影響調査機能,33…影響調査データ   DESCRIPTION OF SYMBOLS 1,30 ... Recording medium, 1a, 30a ... Crew assignment program, 2, 29 ... Computer, 3a, 31 ... First acquisition function, 3b ... Second acquisition function, 4 ... Assignment function, 5, 32 ... Check function, 6 ... Change content acquisition function, 7 ... Change function, 8 ... Provided function, 9 ... Storage unit, 10 ... Internal storage unit, 11 ... Crew crew operation plan data, 12 ... Crew performance data, 13 ... Crew assignment rule data, 14 ... Check Item data, 15 ... Crew member operation arrangement plan data, 16 ... Other system, 17 ... Operator, 18 ... Terminal, 19 ... Vehicle arrangement plan data, 20 ... Crew operation arrangement plan data after change, 21, 34 ... Check result data, 21a ... Check result data after change, 22 ... Network, 32a ... Influence investigation function, 33 ... Influence investigation data

Claims (12)

未割り当ての列車の運用に対して乗務員を割り当てる規則を表す乗務員割当規則データと、乱れから復旧させるための列車の運用を表す車両整理案データと、列車の運用に対して乗務員を割り当てた結果のチェック項目を表すチェック項目データとを取得する取得手段と、
前記乗務員割当規則データの内容にしたがって、前記車両整理案データのうちの未割り当ての列車の運用に対して乗務員の割り当て処理を実行し、前記車両整理案データの列車の運用に対する乗務員の割り当て結果を表す乗務員運用整理案データを作成する割当手段と、
前記乗務員運用整理案データで表される列車の運用のうちの少なくとも一つの列車の運用について他の乗務員の割り当てを指示する変更内容データを取得する変更内容取得手段と、
前記変更内容データに基づいて前記乗務員運用整理案データを変更し、変更後の乗務員運用整理案データを作成する変更手段と、
前記乗務員運用整理案データと前記変更後の乗務員運用整理案データとのうちの少なくとも一方について、割当結果が前記チェック項目データで表されている前記チェック項目を満たすか否か判断し、チェック結果を表すチェック結果データを作成するチェック手段と
を具備することを特徴とする乗務員割当装置。
Crew assignment rule data representing rules for assigning crew members to unassigned train operations, vehicle arrangement plan data representing train operations to recover from disturbances, and results of assigning crew members to train operations Acquisition means for acquiring check item data representing a check item;
In accordance with the content of the crew assignment rule data, the crew assignment process is executed for the operation of the unassigned train in the vehicle arrangement plan data, and the crew assignment result for the train operation of the vehicle arrangement plan data is obtained. An assigning means for creating crew management arrangement plan data to be represented;
Change content acquisition means for acquiring change content data for instructing assignment of other crew members for operation of at least one of the train operations represented by the crew operation organization plan data;
Change means for changing the crew operation rearrangement plan data based on the change content data, and creating the crew operation rearrangement plan data after the change,
For at least one of the crew operation rearrangement plan data and the changed crew operation rearrangement plan data, it is determined whether or not an allocation result satisfies the check item represented by the check item data, and the check result is A crew member allocating apparatus comprising check means for generating check result data to be expressed.
請求項1記載の乗務員割当装置において、
前記取得手段は、乱れの発生していない列車の運用に対して乗務員を割り当てた乗務員運用計画データをさらに取得し、
前記チェック項目として、乱れ発生時と乱れ復旧時に、前記乗務員運用計画データにおいて各駅に配置されている乗務員と前記乗務員運用整理案データにおいて各駅に配置されている乗務員とが同じであることが定義されていることを特徴とする乗務員割当装置。
In the crew member assignment device according to claim 1,
The acquisition means further acquires crew member operation plan data in which a crew member is assigned to the operation of a train in which no disturbance occurs,
As the check item, it is defined that the crew arranged at each station in the crew operation plan data and the crew arranged at each station in the crew management organization plan data are the same at the time of occurrence of the disturbance and the recovery from the disturbance. A crew member assigning device characterized by that.
請求項1または請求項2記載の乗務員割当装置において、
前記チェック項目として、乗務員が所定の労働条件を満たすことが定義されていることを特徴とする乗務員割当装置。
In the crew member assignment device according to claim 1 or 2,
As the check item, it is defined that a crew member satisfies a predetermined labor condition.
請求項1ないし請求項3のいずれか1項に記載の乗務員割当装置において、
前記変更後の乗務員運用整理案データのうち前記変更内容データに基づいて変更された部分と関係する影響部を求め、影響部を表す影響調査データを作成する影響調査手段をさらに具備することを特徴とする乗務員割当装置。
In the crew member assignment device according to any one of claims 1 to 3,
It further comprises an influence investigation means for obtaining an influence investigation data representing the influence part by obtaining an influence part related to the changed part based on the change content data in the changed crew operation rearrangement plan data. Crew assignment device.
請求項1ないし請求項4のいずれか1項に記載の乗務員割当装置において、
前記取得手段は、データ取得要求を取得し、
前記データ取得要求に応じて、前記データ取得要求の発信元に、前記データ取得要求で指定されているデータを提供する提供手段をさらに具備することを特徴とする乗務員割当装置。
In the crew member assignment device according to any one of claims 1 to 4,
The acquisition means acquires a data acquisition request,
The crew member allocating apparatus according to claim 1, further comprising providing means for providing the data specified in the data acquisition request to a source of the data acquisition request in response to the data acquisition request.
請求項1ないし請求項5のいずれか1項に記載の乗務員割当装置において、
前記乗務員割当規則データは、前記乗務員運用計画データと前記車両整理案データとにおいて、出発駅と到着駅とが同じであり、出発時間と到着時間との差が一定のレベル以下の列車の運用を抽出し、前記乗務員運用計画データにおいてこの抽出された列車の運用に対応付けされている乗務員を前記車両整理案データの列車の運用に割り当てる旨の定義を含むことを特徴とする乗務員割当装置。
In the crew member assignment device according to any one of claims 1 to 5,
In the crew assignment rule data, in the crew crew operation plan data and the vehicle arrangement plan data, the departure station and the arrival station are the same, and the difference between the departure time and the arrival time is less than a certain level. A crew member assignment device comprising: a definition for extracting and assigning a crew member associated with the train operation extracted in the crew member operation plan data to the train operation of the vehicle arrangement plan data.
請求項1ないし請求項6のいずれか1項に記載の乗務員割当装置において、
前記乗務員割当規則データは、各乗務員が担当可能な列車の運用を検索し、各乗務員に対してこの検索された列車の運用を割り当てる旨の定義を含むことを特徴とする乗務員割当装置。
In the crew member assignment device according to any one of claims 1 to 6,
The crew member assignment rule data includes a definition that searches for a train operation that can be handled by each crew member and assigns the searched train operation to each crew member.
請求項1ないし請求項7のいずれか1項に記載の乗務員割当装置において、
前記乗務員割当規則データは、各列車の運用に対して割り当て可能な乗務員を検索し、各列車の運用に対してこの検索された乗務員を割り当てる旨の定義を含むことを特徴とする乗務員割当装置。
In the crew member assignment device according to any one of claims 1 to 7,
The crew member assignment rule data includes a definition that searches for crew members that can be assigned to the operation of each train and assigns the searched crew members to the operation of each train.
請求項1ないし請求項8のいずれか1項に記載の乗務員割当装置において、
前記乗務員割当規則データは、複数の割り当てパターンを適用する場合の優先順位の定義を含むことを特徴とする乗務員割当装置。
In the crew member allocating device according to any one of claims 1 to 8,
The crew member assignment rule data includes a definition of priority in the case of applying a plurality of assignment patterns.
請求項1ないし請求項9のいずれか1項に記載の乗務員割当装置において、
前記乗務員割当規則データは、同一の列車の運用に対して異なる乗務員の割り当てが行われた場合に、各割り当てに対して評価値を計算し、前記評価値の高い割り当てを選択する旨の定義を含むことを特徴とする乗務員割当装置。
In the crew member assignment device according to any one of claims 1 to 9,
The crew assignment rule data has a definition that, when different crew assignments are made for the operation of the same train, an evaluation value is calculated for each assignment, and an assignment with a high evaluation value is selected. A crew member allocating device characterized by including.
コンピュータを、
第1記憶手段に記憶されており未割り当ての列車の運用に対して乗務員を割り当てる規則を表す乗務員割当規則データと、乱れから復旧させるための列車の運用を表す車両整理案データと、前記第1記憶手段に記憶されており列車の運用に対して乗務員を割り当てた結果のチェック項目を表すチェック項目データとを取得する取得手段、
前記乗務員割当規則データの内容にしたがって、前記車両整理案データのうちの未割り当ての列車の運用に対して乗務員の割り当て処理を実行し、前記車両整理案データの列車の運用に対する乗務員の割り当て結果を表す乗務員運用整理案データを作成し、第2記憶手段に記憶する割当手段、
前記乗務員運用整理案データで表される列車の運用のうちの少なくとも一つの列車の運用について他の乗務員の割り当てを指示する変更内容データを取得する変更内容取得手段、
前記変更内容データに基づいて前記乗務員運用整理案データを変更し、変更後の乗務員運用整理案データを作成し、前記第2記憶手段に記憶する変更手段、
前記乗務員運用整理案データと前記変更後の乗務員運用整理案データとのうちの少なくとも一方について、割当結果が前記チェック項目データで表されている前記チェック項目を満たすか否か判断し、チェック結果を表すチェック結果データを作成し、前記第2記憶手段に記憶するチェック手段
として機能させるためのプログラム。
Computer
Crew assignment rule data representing rules for assigning crew members to operations of unassigned trains stored in the first storage means, vehicle arrangement plan data representing train operations for recovery from disturbance, and the first Acquisition means for acquiring check item data representing a check item as a result of assigning a crew member to the operation of the train stored in the storage means;
In accordance with the content of the crew assignment rule data, the crew assignment process is executed for the operation of the unassigned train in the vehicle arrangement plan data, and the crew assignment result for the train operation of the vehicle arrangement plan data is obtained. Assigning means for creating crew management operation plan data to be represented and storing the data in the second storage means;
Change content acquisition means for acquiring change content data for instructing assignment of other crew members for operation of at least one of the train operations represented by the crew operation organization plan data,
Changing the crew operation rearrangement plan data based on the change content data, creating the changed crew operation rearrangement plan data, and storing the data in the second storage unit;
For at least one of the crew operation rearrangement plan data and the changed crew operation rearrangement plan data, it is determined whether or not an allocation result satisfies the check item represented by the check item data, and the check result is A program for creating check result data to be expressed and functioning as check means for storing in the second storage means.
コンピュータにより列車の運用に対して乗務員を割り当てる方法において、
前記コンピュータは、
第1記憶手段に記憶されており未割り当ての列車の運用に対して乗務員を割り当てる規則を表す乗務員割当規則データと、乱れから復旧させるための列車の運用を表す車両整理案データと、前記第1記憶手段に記憶されており列車の運用に対して乗務員を割り当てた結果のチェック項目を表すチェック項目データとを取得し、
前記乗務員割当規則データの内容にしたがって、前記車両整理案データのうちの未割り当ての列車の運用に対して乗務員の割り当て処理を実行し、前記車両整理案データの列車の運用に対する乗務員の割り当て結果を表す乗務員運用整理案データを作成し、第2記憶手段に記憶し、
前記乗務員運用整理案データで表される列車の運用のうちの少なくとも一つの列車の運用について他の乗務員の割り当てを指示する変更内容データを取得し、
前記変更内容データに基づいて前記乗務員運用整理案データを変更し、変更後の乗務員運用整理案データを作成し、前記第2記憶手段に記憶し、
前記乗務員運用整理案データと前記変更後の乗務員運用整理案データとのうちの少なくとも一方について、割当結果が前記チェック項目データで表されている前記チェック項目を満たすか否か判断し、チェック結果を表すチェック結果データを作成し、前記第2記憶手段に記憶する
ことを特徴とする乗務員割当方法。
In a method of assigning crew members to train operation by computer,
The computer
Crew assignment rule data representing rules for assigning crew members to operations of unassigned trains stored in the first storage means, vehicle arrangement plan data representing train operations for recovery from disturbance, and the first Check item data representing a check item as a result of assigning a crew member to the operation of the train stored in the storage means,
In accordance with the content of the crew assignment rule data, the crew assignment process is executed for the operation of the unassigned train in the vehicle arrangement plan data, and the crew assignment result for the train operation of the vehicle arrangement plan data is obtained. To create a crew management arrangement plan data to be represented and store it in the second storage means,
Obtaining change content data instructing assignment of other crew members for operation of at least one of the train operations represented by the crew operation organization plan data,
Change the crew operation rearrangement plan data based on the change content data, create a crew operation rearrangement plan data after the change, store in the second storage means,
For at least one of the crew operation rearrangement plan data and the changed crew operation rearrangement plan data, it is determined whether or not an allocation result satisfies the check item represented by the check item data, and the check result is A check result data to be expressed is created and stored in the second storage means.
JP2005042334A 2005-02-18 2005-02-18 Apparatus, program and method for allocating crew Pending JP2006228000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005042334A JP2006228000A (en) 2005-02-18 2005-02-18 Apparatus, program and method for allocating crew

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005042334A JP2006228000A (en) 2005-02-18 2005-02-18 Apparatus, program and method for allocating crew

Publications (1)

Publication Number Publication Date
JP2006228000A true JP2006228000A (en) 2006-08-31

Family

ID=36989321

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005042334A Pending JP2006228000A (en) 2005-02-18 2005-02-18 Apparatus, program and method for allocating crew

Country Status (1)

Country Link
JP (1) JP2006228000A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008250502A (en) * 2007-03-29 2008-10-16 Fujitsu Ltd Attending technologist decision program, attending technologist decision apparatus and attending technologist decision method
JP2012113669A (en) * 2010-11-29 2012-06-14 Railway Technical Research Institute Method of displaying evaluation scale for crew operation plan
WO2014016999A1 (en) * 2012-07-24 2014-01-30 日本電気株式会社 Data output device, date output method, and program
JP2017097520A (en) * 2015-11-20 2017-06-01 株式会社日立製作所 Resource management plan supporting device and resource management plan supporting method
JP2018045312A (en) * 2016-09-12 2018-03-22 株式会社東芝 Operation plan creation method and operation plan creation system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0796837A (en) * 1993-09-29 1995-04-11 Toshiba Corp Train act diagram creating device
JPH09282372A (en) * 1996-04-11 1997-10-31 Mitsubishi Electric Corp Crew operation planning support device
JP2004224290A (en) * 2003-01-27 2004-08-12 Toshiba Corp Crew scheduling and arrangement plan preparation support device for recovering train schedule and crew scheduling and arrangement plan preparation support program for recovering train schedule
JP2004230957A (en) * 2003-01-29 2004-08-19 Hitachi Ltd Train service control system
JP2004243857A (en) * 2003-02-13 2004-09-02 Toshiba Solutions Corp Device and method for supporting operation and arrangement of crew

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0796837A (en) * 1993-09-29 1995-04-11 Toshiba Corp Train act diagram creating device
JPH09282372A (en) * 1996-04-11 1997-10-31 Mitsubishi Electric Corp Crew operation planning support device
JP2004224290A (en) * 2003-01-27 2004-08-12 Toshiba Corp Crew scheduling and arrangement plan preparation support device for recovering train schedule and crew scheduling and arrangement plan preparation support program for recovering train schedule
JP2004230957A (en) * 2003-01-29 2004-08-19 Hitachi Ltd Train service control system
JP2004243857A (en) * 2003-02-13 2004-09-02 Toshiba Solutions Corp Device and method for supporting operation and arrangement of crew

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008250502A (en) * 2007-03-29 2008-10-16 Fujitsu Ltd Attending technologist decision program, attending technologist decision apparatus and attending technologist decision method
JP2012113669A (en) * 2010-11-29 2012-06-14 Railway Technical Research Institute Method of displaying evaluation scale for crew operation plan
WO2014016999A1 (en) * 2012-07-24 2014-01-30 日本電気株式会社 Data output device, date output method, and program
JPWO2014016999A1 (en) * 2012-07-24 2016-07-07 日本電気株式会社 Data output device, data output method and program
JP2017097520A (en) * 2015-11-20 2017-06-01 株式会社日立製作所 Resource management plan supporting device and resource management plan supporting method
JP2018045312A (en) * 2016-09-12 2018-03-22 株式会社東芝 Operation plan creation method and operation plan creation system

Similar Documents

Publication Publication Date Title
JP5869276B2 (en) Resource management plan creation device and method, and program
EP3086268A1 (en) Resource operation planning assist apparatus and resource operation planning assist method
JP2009107443A (en) Vehicle operation schedule preparation device and method
WO2012111217A1 (en) Resource management plan creation device and resource management plan creation method
JP2006228000A (en) Apparatus, program and method for allocating crew
US8965605B2 (en) System and method for vehicle movement modeling in a railway network
EP3623257B1 (en) Vehicle allocation support system, method, and program
JP2008049853A (en) Operation arrangement supporting system
WO2017046933A1 (en) Operation rescheduling support apparatus and system
JP5271139B2 (en) Diamond management method, program, and diamond management apparatus
JP5731912B2 (en) Driving arrangement support system
JP6162264B2 (en) Resource management plan creation apparatus and method
JP5096698B2 (en) Schedule correction device
JP4254774B2 (en) Train schedule creation device
JP6603539B2 (en) How to create a vehicle cleaning work plan
JP2018062249A (en) Vehicle operation business assistance system
JP7388915B2 (en) Traffic rescheduling support device and traffic rescheduling support method
JP6988791B2 (en) Information processing equipment and information processing method
JP6781016B2 (en) Crew placement management support system
JP6603541B2 (en) Vehicle operation support system
JP7074708B2 (en) Information processing equipment, information processing methods, programs and storage media
JP6603542B2 (en) Vehicle operation business support device
JP6889130B2 (en) Operation control support system and operation control support method
Van Aken et al. Optimal timetables in case of temporarily unavailable tracks
WO2023286425A1 (en) Device for assisting with changing operation plan, method for assisting with changing operation plan, and train operation management system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070627

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091008

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091020

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091218

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100330