JP2006040194A - Field work management system - Google Patents

Field work management system Download PDF

Info

Publication number
JP2006040194A
JP2006040194A JP2004222808A JP2004222808A JP2006040194A JP 2006040194 A JP2006040194 A JP 2006040194A JP 2004222808 A JP2004222808 A JP 2004222808A JP 2004222808 A JP2004222808 A JP 2004222808A JP 2006040194 A JP2006040194 A JP 2006040194A
Authority
JP
Japan
Prior art keywords
work
information
site
management
database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004222808A
Other languages
Japanese (ja)
Inventor
Hiroki Yamamoto
博樹 山本
Masahiko Sasaki
雅彦 佐々木
Yuichi Makise
祐一 牧瀬
Koji Hikuma
幸治 日隈
Masatake Sakuma
正剛 佐久間
Kenji Ozaki
健司 尾崎
Shunichi Shimizu
俊一 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2004222808A priority Critical patent/JP2006040194A/en
Publication of JP2006040194A publication Critical patent/JP2006040194A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a field work management system capable of adequately selecting field work of disassembly, inspection and maintenance work relating to equipment conducted in a regular inspection of a plant, and enabling to analyze and reevaluate after completion of the work. <P>SOLUTION: A work plan management means 13 creates and issues an authentication key for the field work on the basis of work implementation information obtained from a process managing means 12, and work guideline information obtained from a work guideline database 11. A work implementation management means 15 determines and monitors work completion on every implementation procedure of the work from field information from a field information collecting means 14 and the work guideline information stored in the work guideline database 11, creates as an evidence on the implemented work, notifies to the process management means 12, and stores the evidence on the implemented work in a work history database 16 by corresponding to each procedure. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、プラントの定期検査等に実施する設備機器に関わる分解点検保守工事の作業の完了確認や実施作業内容を閲覧可能とする現場作業管理システムに関する。   The present invention relates to an on-site work management system that makes it possible to confirm completion of work of disassembly inspection maintenance work related to equipment and equipment to be carried out for periodic inspection of a plant and to view the contents of work performed.

例えば、原子力発電プラントのような大規模プラントにおける設備機器の保守工事では、予めプラント運用会社はプラントメーカ等の請負会社と協議の上で、工事件名や工事対象機器さらには工事内容を決定し、予め定めた作業要領書や手順書等に従って請負業者が作業を実施している。この場合、作業中の重要なポイントをプラント運用会社に所属する監理員の立会い個所として定め、作業要領書の品質記録等に点検等の作業結果を人間系により、良否等の文字情報やスケッチ等の定性的な記録にまとめて、監理員の承認を受けることにより作業完了としている。   For example, in maintenance work for equipment in a large-scale plant such as a nuclear power plant, the plant operating company in advance discusses with a contractor such as a plant maker, etc. The contractor carries out the work in accordance with predetermined work procedures and procedures. In this case, the important points during the work are defined as the presence of supervisors belonging to the plant operation company, and the work results such as inspections are recorded in the quality records of the work manual, etc. The work is completed by obtaining a qualitative record and receiving approval from the supervisor.

このような作業実施の記録は紙の形式で作成され、予め決められた年月保管される。そして、次回以降の対象機器部品に関わる分解点検計画や不適合発生時の履歴確認として利用されている。   Such work execution records are created in paper format and stored for a predetermined year and month. And it is used as an overhaul inspection plan related to the target device parts from the next time and a history check when nonconformity occurs.

このような作業完了確認方式では、実施作業に対するエビデンスが定性的な情報しか記録されないので詳細な内容確認が困難である。例えば、ポンプ組立時のボルト締め付けを手順に従ってバランス良く締めたか否かの確認を行う場合には、良否あるいは締め付けたトルク値等の定性的な情報しか記録されないので、作業が完了した後に、再度その詳細な内容確認を行おうとした場合にその確認が困難である。   In such a work completion confirmation method, only qualitative information is recorded on the evidence for the work performed, so that it is difficult to confirm the detailed contents. For example, when confirming whether or not bolt tightening during pump assembly is performed in a well-balanced manner according to the procedure, only qualitative information such as pass / fail or tightened torque value is recorded. It is difficult to confirm details when attempting to confirm the details.

また、請負業者や監理員の信頼関係や暗黙の了解に基づいて作業が実施されているため個人的な経験値や技術レベル差により、作業完了とする基準があいまいになる可能性が残されている。さらに、紙で保管している実施記録が定性的な情報でしかないため、工事完了や組み立て等の事後に定量的に分析や再評価する方法が提供されていない。   In addition, because work is carried out based on the contractor's and supervisor's trust relationships and tacit understanding, there is still a possibility that the criteria for completion of work may be ambiguous due to personal experience and technical level differences. Yes. Furthermore, since the implementation records stored in paper are only qualitative information, no method for quantitative analysis or re-evaluation after completion of construction or assembly is not provided.

また、立会い個所以外が請負業者の判断に任されており、計画された作業が計画された手順に従って、計画された場所で実施できたか否かの確認が非常に困難であり、見過ごしや誤判断等のヒューマンエラーの可能性が残されている。これらに対応すべく立会いの個所を増やすという案も考えられるが、限られた監理員及び工事期間の観点から実現的でなく、実現できたとしても複数の立会い場所に移動する時間も必要となることから、効率的な作業の障害となっていた。   In addition, it is left to the contractor's judgment except for the witnesses, and it is very difficult to confirm whether the planned work has been carried out at the planned location according to the planned procedure. The possibility of human error such as is left. There may be a plan to increase the number of witnesses to cope with these, but it is not practical from the viewpoint of limited supervisors and construction period, and even if it can be realized, it takes time to move to multiple witnessing places. Therefore, it was an obstacle to efficient work.

そこで、プラント内で作業現場と制御室との双方向通信の実施により、作業効率化や作業員の負担軽減を図るようにしたプラント内情報通信システム(特許文献1参照)や、点検保守作業に必要な情報を現場と事務所間で共有できるプラント保守作業支援システム(例えば特許文献2参照)がある。
特許第3106107号公報 特開平11−202904号公報
Therefore, in-plant information communication system (see Patent Document 1) designed to improve work efficiency and reduce the burden on workers by implementing two-way communication between the work site and the control room in the plant, and inspection and maintenance work. There is a plant maintenance work support system (see, for example, Patent Document 2) that can share necessary information between a site and an office.
Japanese Patent No. 3106107 JP-A-11-202904

しかし、現場作業の状況を紙形式に代わって、電子化して事務所間で共有する方式を採用した場合でも、抜けや漏れなく該当の設備機器に関わる分解点検保守工事を選定し、予め決められた工事中の実施作業手順と対応付けて確認する手段が提供されていない。通常、日々、十数件オーダーの工事が並行して実施されているので、例えば、事務所で共有している現場作業が間違いなく対象としている工事であるか否かを直ちに確認できない可能性がある。また、一貫した工事や作業履歴が困難となりエビデンスとしての透明性に欠ける。さらに、原子力発電プラントのような大規模プラントでは、類似/同型構造の弁や計装品を同時に多数作業する場合があり、誤判断等の可能性が残されている。   However, even if a method of digitizing and sharing the status of on-site work between offices instead of paper is adopted, the overhaul and maintenance work related to the relevant equipment is selected without any omissions or omissions. There is no means to check in correspondence with the work procedure under construction. Normally, more than a dozen orders of work are carried out in parallel every day. For example, there is a possibility that it is not possible to immediately confirm whether or not the site work shared in the office is the target work. is there. In addition, consistent construction and work history become difficult, and lack of transparency as evidence. Furthermore, in a large-scale plant such as a nuclear power plant, there are cases where a large number of valves / instruments having similar / same structures are simultaneously operated, and the possibility of misjudgment remains.

また、現場における設備機器の分解点検保守作業に関わる映像、音声、振動、音響、機器状態、点検計測の各データ(以下、現場情報という)が得られたとしても、作業手順通りに正しく確認が行われているか否かを確認する手段が提供されていない。   Even if video, audio, vibration, sound, equipment status, and inspection / measurement data (hereinafter referred to as on-site information) related to overhaul and maintenance of equipment at the site are obtained, it can be confirmed correctly according to the work procedure. There is no provision for checking whether this is done.

さらに、得られた設備機器の分解点検作業に関わる現場情報を事後にて定量的に分析や評価するための手段が提供されていない。例えば、各データの採取した時間等を比較し各データ間のつながりを個別に連携するという方法も考えられるが、非常に膨大な労力がかかること、また仮に個別に人間系で連携したとしても誤判断の可能性が残されていた。なお、従来においては、音声データ及び映像データを送受信する多地点テレビ会議システムを利用した同様のシステムが提供されているが、実際に送受信されたデータを記録することは可能であるものの、送受信されたプラントの現場作業に関わる保守・監視上重要な現場情報データを自動的に抽出、記録、整理し、予め定めた作業手順通りに実施できているか否かを確認する仕組みは確立されていない。   Furthermore, no means for quantitatively analyzing and evaluating the field information related to the overhaul work of the obtained equipment is provided after the fact. For example, it is possible to compare the collection time of each data and link the connection between each data individually, but it takes a huge amount of labor, and even if it is individually linked in the human system, it is erroneous. The possibility of judgment remained. Conventionally, a similar system using a multipoint video conference system that transmits and receives audio data and video data has been provided. However, although it is possible to record actually transmitted and received data, it is transmitted and received. There is no established mechanism for automatically extracting, recording and organizing on-site information data important for maintenance and monitoring related to on-site work at a plant and confirming whether or not it can be carried out according to a predetermined work procedure.

また、現場における設備機器の分解点検保守作業の完了状況を、当該工事に関連する他の工事を担当するプラント運用会社のユーザや工事請負会社のユーザに公開して関連工事に役立たせる手段が提供されていないこと、及びプラントが立地する自治体や公共機関等を含めた一般のユーザに対してタイムリーに抜けなく漏れなく公開し、プラントの健全性や定期検査等の保守作業の透明性を示す手段が提供されていないことである。   In addition, it provides a means to disclose the status of completion of overhaul and maintenance work of facility equipment on site to users of plant management companies and construction contractors who are responsible for other work related to the work concerned, and to make it useful for related work. It is not disclosed, and it is disclosed to the general users including local governments and public institutions where the plant is located, in a timely and complete manner, and shows the soundness of the plant and the transparency of maintenance work such as periodic inspections. No means are provided.

本発明の目的は、プラントの定期検査に実施する設備機器に関わる分解点検保守工事の現場作業を適切に選定できると共に工事完了後に分析や再評価が行え、これら工事の完了状況を公開できる現場作業管理システムを提供することである。   The purpose of the present invention is to be able to appropriately select the field work of the overhaul and maintenance work related to the equipment and equipment to be carried out for the periodic inspection of the plant, perform the analysis and re-evaluation after the work is completed, and can disclose the completion status of these works It is to provide a management system.

本発明の現場作業管理システムは、プラントの定期検査に実施する設備機器に関わる分解点検保守工事の工事要領情報を記憶した工事要領データベースと、今回の定期検査において実施対象としている工事に関わる工事実施情報を含めて前記分解点検保守工事の計画/実績工程情報と共に管理する工程管理手段と、前記工程管理手段から得られる前記工事実施情報及び前記工事要領データベースから得られる前記工事要領情報を基に現場作業用の認証キーを作成し発行する作業計画管理手段と、前記分解点検保守工事の実施場所にてネットワーク回線を用いて前記認証キーの情報と共に現場の設備機器の分解点検保守作業に関わる現場情報を現場端末にて収集し送信する現場情報収集手段と、前記現場情報収集手段から送信された現場情報と前記工事要領データベースに記憶されている工事要領情報とから工事の実施手順毎の作業完了を判断監査し実施作業に対するエビデンスとして作成すると共に前記工程管理手段に通知する作業実施管理手段と、前記作業実施管理手段で作成された実施作業に対するエビデンスを手順毎に対応付けて登録管理する作業履歴データベースと、システムの管理ユーザからの要求に応じて前記工程管理手段や前記作業計画管理手段及び前記作業実施管理手段に関わる情報の管理を実施する情報入出力手段とを備えたことを特徴とする。   The field work management system of the present invention includes a construction procedure database that stores construction procedure information on overhaul inspection and maintenance work related to equipment that is carried out for periodic inspection of the plant, and construction work related to the work that is to be carried out in this periodic inspection. On-site management based on the construction management information that is managed together with the plan / actual process information of the overhaul inspection maintenance work including information, the construction execution information obtained from the process management means, and the construction schedule information obtained from the construction schedule database Work plan management means for creating and issuing an authentication key for work, and on-site information related to overhaul inspection and maintenance work of on-site equipment together with information on the authentication key using a network line at the location where the overhaul and maintenance work is performed On-site information collecting means for collecting and transmitting the information at the on-site terminal, and the on-site information transmitted from the on-site information collecting means The work execution management means for judging and auditing the completion of work for each work execution procedure from the work outline information stored in the work summary database, creating as evidence for the work performed, and notifying the process management means, and the work execution A work history database that registers and manages the evidence for the work performed by the management means in association with each procedure, and the process management means, the work plan management means, and the work execution management in response to a request from a system management user And an information input / output means for managing information related to the means.

本発明によれば、プラントの定期検査に実施する設備機器に関わる分解点検保守工事の現場作業用の認証キーを作成し発行するので、適切に該当の設備機器に関わる分解点検保守工事を選定でき、また、予め決められた工事中の実施作業手順と対応付けて現場作業の状況を自動的に記録し確認するので、現場作業としてのエビデンスを管理することができる。従って、実施作業のエビデンスに基づき工事完了後に分析や再評価できる。   According to the present invention, since an authentication key for on-site work of overhaul inspection and maintenance work related to equipment and equipment to be carried out for periodic inspection of the plant is created and issued, it is possible to appropriately select the overhaul and maintenance work related to the relevant equipment and equipment. In addition, since the situation of the field work is automatically recorded and confirmed in association with a predetermined work procedure during construction, the evidence as the field work can be managed. Therefore, it can be analyzed and re-evaluated after completion of construction based on the evidence of the work performed.

以下、本発明の実施の形態を説明する。図1は本発明の第1の実施の形態に係わる現場作業管理システムのブロック構成図である。工事要領データベース11は、プラントの定期検査に実施する設備機器に関わる分解点検保守工事の工事要領情報を記憶するものであり、例えば、原子力発電プラントの定期検査等に実施する設備機器に関わる分解点検保守工事において、これらの分解点検保守工事に関わる件名、対象機器、実施内容/手順、これら手順毎の確認項目、確認項目に対応する確認方法を工事要領情報として記憶する。工程管理手段12は、今回の定期検査において実施対象としている工事に関わる工事実施情報を含めて分解点検保守工事の計画/実績工程情報と共に管理するものであり、今回の定期検査等において実施対象としている工事に関わる件名、請負会社、期間、対象機器、実施内容/手順、実施場所を工事実施情報として監視すると共に、分解点検保守工事の計画/実績工程情報を管理する。   Embodiments of the present invention will be described below. FIG. 1 is a block diagram of a field work management system according to the first embodiment of the present invention. The construction guideline database 11 stores construction guideline information for overhaul inspection and maintenance work related to equipment and equipment to be carried out for periodic inspection of the plant. For example, overhaul inspection related to equipment and equipment to be carried out for periodic inspection of a nuclear power plant, etc. In maintenance work, the title, target equipment, implementation contents / procedures, confirmation items for each of these procedures, and confirmation methods corresponding to the confirmation items are stored as construction procedure information. The process management means 12 is to manage together with the plan / actual process information of the overhaul inspection maintenance work including the work execution information related to the work to be carried out in the periodic inspection this time. Monitors the subject, contractor, period, target equipment, implementation contents / procedures, and implementation location related to existing construction as construction execution information, and manages the plan / actual process information of overhaul and maintenance work.

作業計画管理手段13は、工程管理手段12から得られる工事実施情報及び工事要領データベース11から得られる工事要領情報を基に現場作業用の認証キーを作成し発行するものである。すなわち、工程管理手段12から得られる計画工事に関わる件名、請負会社、期間、対象機器、実施内容/手順、実施場所と、工事要領データベース11から得られる当該工事の実施内容/手順と手順毎の確認項目と確認方法を基に、現場作業用の認証キーを作成し発行する。   The work plan management means 13 creates and issues an authentication key for field work based on the construction execution information obtained from the process management means 12 and the construction outline information obtained from the construction outline database 11. That is, the subject, contractor company, period, target equipment, execution contents / procedure, execution place, and execution contents / procedure of the work obtained from the construction procedure database 11 are obtained from the process management means 12 for each work. Create and issue an authentication key for field work based on the confirmation items and confirmation method.

現場情報収集手段14は、分解点検保守工事の実施場所にてネットワーク回線を用いて認証キーの情報と共に現場の設備機器の分解点検保守作業に関わる現場情報を現場端末にて収集し送信するものである。すなわち、現場情報収集手段14は、当該工事の実施場所にて予めプラント建屋内に設置された構内PHS回線網やLAN等のデータ通信が可能なネットワーク回線を用いて、認証キーの情報と共に現場設備機器の分解点検保守作業に関わる映像(動画、静止画)データや音声データ、回転機等の機器運転時に得られる振動データや軸受音等の音響データ、現場に設置または仮設された温度計、流量計、圧力計、湿度計等の指示値から得られる機器プロセス情報や機器ON/OFF状態、回転数、開度等の機器状態データ、締め付けトルク値や隙間ゲージ等の点検計測データを携帯型装置等の現場端末にて収集し作業実施管理手段15に送信する。   The on-site information collecting means 14 collects and transmits on-site terminals on-site information related to overhaul inspection and maintenance work of on-site equipment along with authentication key information using a network line at the location where the overhaul and maintenance work is performed. is there. That is, the field information collecting means 14 uses the local PHS line network installed in advance in the plant building at the construction site and a network line capable of data communication, such as a LAN, together with the authentication key information and the field facility. Video (video, still image) data and audio data related to equipment overhaul and maintenance work, acoustic data such as vibration data and bearing sound obtained during operation of equipment such as rotating machines, thermometers installed or temporarily installed on site, flow rate Portable device with device process information, device ON / OFF status, device status data such as rotation speed, opening, etc., inspection torque data such as tightening torque values and clearance gauges obtained from indicated values such as gauges, pressure gauges and hygrometers The data is collected at the field terminal such as and transmitted to the work execution management means 15.

作業実施管理手段15は、現場情報収集手段14から送信された現場情報と工事要領データベース11に記憶されている工事要領情報とから工事の実施手順毎の作業完了を判断監査し、実施作業に対するエビデンスとして作成すると共に工程管理手段に通知するものである。すなわち、作業実施管理手段15は、現場情報収集手段14から送信された現場情報と工事要領データベース11に記載されている手順毎の確認項目/方法とから工事の実施手順毎の作業完了を判断監査し工程管理手段12に通知すると共に、実施作業に対するエビデンスとしてこれらのデータを作業履歴データベース16に登録する。   The work execution managing means 15 judges and audits the completion of work for each work execution procedure from the work site information transmitted from the work site information collecting means 14 and the work work information stored in the work work procedure database 11, and provides evidence for the work performed. As well as notifying the process management means. In other words, the work execution management means 15 judges and audits the completion of work for each work execution procedure based on the site information transmitted from the work site information collection means 14 and the confirmation items / methods for each procedure described in the work procedure database 11. The process management means 12 is notified, and these data are registered in the work history database 16 as evidence for the work performed.

作業履歴データベース16は、作業実施管理手段15で作成された実施作業に対するエビデンスを手順毎に対応付けて登録管理する。また、情報入出力手段17は、システムの管理ユーザからの要求に応じて工程管理手段12や作業計画管理手段13及び作業実施管理手段15に関わる情報の管理を実施するものである。   The work history database 16 registers and manages the evidence for the work performed by the work execution management means 15 in association with each procedure. The information input / output unit 17 manages information related to the process management unit 12, the work plan management unit 13, and the work execution management unit 15 in response to a request from a system management user.

次に、対象工事及び工事に関わる作業手順の選定方法について説明する。工事要領データベース11には、プラントの定期検査に実施する設備機器に関わる分解点検保守工事に関わる件名、対象機器、実施内容/手順、手順毎の確認項目、確認項目に対応する確認方法が記載されている。   Next, the method of selecting the target construction and the work procedure related to the construction will be described. In the construction procedure database 11, the subject, the target equipment, the contents / procedures to be implemented, the confirmation items for each procedure, and the confirmation method corresponding to the confirmation items are described in relation to the overhaul inspection and maintenance work related to the equipment to be performed for the periodic inspection of the plant. ing.

工程管理手段12では、プラント運用会社と工事請負会社と協議の上、今回の定期検査等において実施対象として調整した工事に関わる件名、請負会社、期間、対象機器、実施内容/手順、実施場所を含めて、分解点検保守工事の計画/実績工程情報と共に管理する。この工程管理手段12は、定期検査における日々の計画工程あるいは実績工程を登録管理しても良いし、他のシステムからの情報として、工事に関わる件名、請負会社、期間、対象機器、実施内容/手順、実施場所、計画/実績工程情報を連携する方法でも良い。   In the process management means 12, in consultation with the plant management company and the construction contractor, the subject, contractor, period, target equipment, implementation contents / procedures and implementation location related to the construction adjusted as the implementation target in this periodic inspection, etc. Including overhaul inspection maintenance plan / actual process information. This process management means 12 may register and manage the daily planned process or the actual process in the periodic inspection, and as information from other systems, the subject, contractor, period, target equipment, execution contents / A method of linking procedure, execution place, plan / actual process information may be used.

そこで、本発明のデータを管理するユーザからの要求により、計画工程情報と工事要領データベース11の工事要領情報を用いて、件名、請負会社、期間、対象機器、実施場所、実施内容/手順、手順毎の確認項目と確認方法に関わる情報を得る。これらの情報を基に、作業計画管理手段13は現場作業用の認証キーを作成し発行する。このような方法と構成により、計画/実績工程に基づいて、対象とする工事件名や期間、場所、実施内容/手順、手順毎の確認項目/方法を抜けなく漏れなく正確に選出することができる。   Therefore, in response to a request from the user who manages the data of the present invention, using the planned process information and the construction procedure information in the construction procedure database 11, the subject name, the contracting company, the period, the target equipment, the implementation location, the implementation content / procedure, and the procedure Get information on each confirmation item and confirmation method. Based on these pieces of information, the work plan management means 13 creates and issues an authentication key for field work. With such a method and configuration, it is possible to select the target construction subject, period, location, implementation contents / procedure, and confirmation items / methods for each procedure accurately and without omission based on the plan / actual process. .

次に、分解点検保守作業に関わる現場情報データの収集方法について説明する。作業用の認証キーが発行されると、現場情報収集手段14では携帯型装置等の現場端末にこれらをネットワーク回線を経由して組み込み、対象工事の実施場所まで持ち込む。この現場端末は、請負会社担当者あるいはプラント運用会社から委託業務等にて依頼を受けた会社の担当者、あるいはこのような業務を専門に請負うサービス会社の担当者が工事の実施場所まで持ち込んで、現場における作業状況等を収集して作業実施管理手段15に送信する。   Next, a method for collecting field information data related to overhaul inspection and maintenance work will be described. When the work authentication key is issued, the on-site information collecting means 14 incorporates them into the on-site terminal such as a portable device via the network line and brings them to the target construction site. This on-site terminal is brought to the place of construction by the person in charge of the contractor, the person in charge of the company that has received a request from the plant management company, or the person in charge of the service company that specializes in such work. The work situation at the site is collected and transmitted to the work execution management means 15.

この現場端末は、プラント運用会社が、例えば原子力プラントの場合では、プラント運用会社にて設置された防護区域あるいは管理区域の入出エリアに設置して、入域確認時に受け渡し、退域時に返却する方法でも良いし、プラント運用会社から定期検査の間、貸与する方法でも良いし、サービス会社が委託業務の一環として現場端末を準備し、サービスを提供する方法でも良い。   For example, in the case of a nuclear power plant, this on-site terminal is installed in the entry / exit area of the protection area or management area installed by the plant operation company, delivered when confirming entry, and returned when leaving However, it may be a method of lending from a plant operating company during a periodic inspection, or a service company may prepare a field terminal as part of the commissioned work and provide a service.

現場における分解点検保守作業が開始されると同時に、プラント建屋内に設置された構内PHS回線網やLAN等のデータ通信が可能なネットワーク回線を用いて現場端末から現場情報データを送信する。   At the same time as the overhaul and maintenance work at the site is started, the site information data is transmitted from the site terminal using a network line capable of data communication such as a local PHS network installed in the plant building or a LAN.

次に、現場作業手順や手順毎の確認方法及び作業完了についての管理方法について説明する。認証キーに含まれる作業手順と手順毎の確認方法等を予め定められた手順に従って現場端末使用ユーザに提示し、予定された手順に従って実施し確認しているか否かの結果入力を得る。ここでは、認証キーにより、映像、音声、振動、音響、機器状態、点検計測の現場情報データを連携したまま提示されるため、データ間の因果関係に基づく分析や評価が可能となり、誤判断等の可能性が低減される。現場端末使用ユーザからの結果入力に基づき、実施作業が正しく行われているか、作業がすべて完了したか否かを判断監査し、その結果をシステム管理ユーザに提示する。   Next, an on-site work procedure, a confirmation method for each procedure, and a management method for work completion will be described. The work procedure included in the authentication key, the confirmation method for each procedure, etc. are presented to the user using the field terminal in accordance with a predetermined procedure, and the result input as to whether or not it has been carried out and confirmed in accordance with the scheduled procedure is obtained. Here, the authentication key presents video, audio, vibration, sound, equipment status, and inspection / measurement site information data in a coordinated manner, enabling analysis and evaluation based on the causal relationship between the data, and making misjudgments, etc. The possibility of is reduced. Based on the result input from the on-site terminal user, it is judged and audited whether the work is correctly performed or whether all the work is completed, and the result is presented to the system management user.

これにより、対象としている作業が計画された手順通りに、計画された確認方法で実施し、完了できているか否かを現場情報データを送信しながら、オンライン・リアルタイムで判断し監査することが可能となる。   This allows the target work to be carried out according to the planned procedure using the planned confirmation method, and whether or not it is completed can be judged and audited in real time while sending on-site information data. It becomes.

次に、現場作業に関わる作業履歴の管理方法について説明する。作業実施管理手段15では、判断監査された工事の実施手順毎の作業完了に関わる情報を工程管理手段12に通知すると共に、実施作業のエビデンスとして、作業履歴データベースに自動的に登録管理する。これにより、別途、人間系での対応を行うことなく、自動的に作業履歴データがデータベース化することができ、さらに実績工程情報を工程管理手段12にて反映することができるため、工事や作業の進捗状況が明確となり、管理精度が増し信頼性の向上が図られる。   Next, a work history management method related to field work will be described. The work execution management means 15 notifies the process management means 12 of information related to the completion of work for each execution procedure of the construction that has been judged and audited, and automatically registers and manages it in the work history database as evidence of the execution work. Thereby, the work history data can be automatically made into a database without separately dealing with human systems, and the actual process information can be reflected in the process management means 12, so that construction and work can be performed. As a result, the management accuracy is improved and the reliability is improved.

また、作業実施管理手段15は、現場情報収集手段14から送信された現場設備機器の分解点検保守作業に関わる現場情報を作業履歴データベース16に登録管理する際には、現場作業用の認証キー情報を現場情報に関わる管理用情報として用い、システム管理ユーザからの検索情報やシステム管理ユーザへの閲覧情報として使用する。   Further, the work execution management means 15, when registering and managing the field information related to the overhaul and maintenance work of the field equipment transmitted from the field information collecting means 14 in the work history database 16, is the authentication key information for the field work. Is used as management information related to site information, and is used as search information from the system management user and browsing information to the system management user.

すなわち、作業実施管理手段15では、現場情報収集手段14から送信された現場設備機器の分解点検保守作業に関わる映像(動画、静止画)データや音声データ、回転機等の機器運転時に得られる振動データや軸受音等の音響データ、現場に設置または仮設された温度計、流量計、圧力計、湿度計等の指示値から得られる機器プロセス情報や機器ON/OFF状態、回転数、開度等の機器状態データ、締め付けトルク値や隙間ゲージ等の点検計測データを作業履歴データベース16に登録管理する際には、作業用の認証キー情報をこれらのデータに関わる管理用情報として用いシステム管理ユーザからの検索情報やシステム管理ユーザへの閲覧情報として使用する。これにより、得られた設備機器の分解点検作業に関わる現場情報(映像、音声、振動、音響、機器状態、点検計測の各データ)を、事後にて定量的に分析や評価するために、人間系で個別に連携する等の労力を必要とすることなく、関連付けて登録管理することができる。   In other words, the work execution management means 15 is the vibrations obtained during operation of equipment such as video (moving picture, still picture) data, audio data, rotating machines, etc. related to the overhaul inspection and maintenance work of the on-site equipment transmitted from the on-site information collecting means 14. Instrument data such as data and bearing sound, instrument process information and instrument ON / OFF status, rotation speed, opening, etc. obtained from the indicated values of thermometers, flow meters, pressure gauges, hygrometers, etc. installed or temporarily installed on site When registering and managing device status data, inspection torque data such as tightening torque values and clearance gauges in the work history database 16, authentication key information for work is used as management information related to these data from the system management user. Used as search information and browsing information for system management users. In order to analyze and evaluate the site information (video, sound, vibration, sound, equipment state, inspection and measurement data) related to the overhaul work of equipment and equipment quantitatively after this, Registration and management can be performed in association with each other without the need for individual cooperation in the system.

第1の実施の形態によれば、プラントの定期検査等に実施する設備機器に関わる分解点検保守工事に関わる現場作業を適切に抜け無く漏れなく該当の設備機器に関わる分解点検保守工事を選定し、予め決められた工事中の実施作業手順と対応付けて現場作業の状況を自動的に記録し確認することが可能となり、極めて簡易な手続きによって、現場作業としてのエビデンスを管理することができる。   According to the first embodiment, the overhaul inspection maintenance work related to the relevant equipment is selected without omissions properly and without oversight work related to the overhaul inspection maintenance work related to the equipment performed for the periodic inspection of the plant. In addition, it is possible to automatically record and check the status of the field work in association with a predetermined work procedure during the construction, and it is possible to manage the evidence as the field work by a very simple procedure.

また、得られた設備機器の分解点検作業に関わる映像、音声、振動、音響、機器状態、点検計測の現場情報を事後にて定量的に分析し評価するための情報を自動的に付加し検索や閲覧時に活用できる。   In addition, video, audio, vibration, sound, equipment status, and on-site information on inspection and measurement related to the overhaul of the equipment and equipment obtained are automatically added and searched for quantitative analysis and evaluation after the fact. And can be used when browsing.

次に、本発明の第2の実施の形態を説明する。図2は本発明の第2の実施の形態に係わる現場作業管理システムのブロック構成図である。この第2の実施の形態は、図1に示した第1の実施の形態に対し、現場情報収集手段14から送信される現場情報の送信場所を管理するデータ送信場所管理手段18を追加して設け、作業実施管理手段15は、現場情報の送信場所情報を基に現場情報収集手段14から送信された現場作業用の認証キーと工事の実施場所での実施作業内容とを比較しその結果をシステム管理ユーザに提示するようにしたものである。図1と同一要素には同一符号を付し重複する説明は省略する。   Next, a second embodiment of the present invention will be described. FIG. 2 is a block diagram of a field work management system according to the second embodiment of the present invention. In the second embodiment, a data transmission location management means 18 for managing the transmission location of the site information transmitted from the site information collection means 14 is added to the first embodiment shown in FIG. The work execution management means 15 compares the authentication key for the field work transmitted from the field information collection means 14 with the contents of the work performed at the construction place based on the transmission place information of the field information, and compares the result. This is presented to the system management user. The same elements as those in FIG.

データ送信場所管理手段18は、プラント建屋内に設置された構内PHS回線網やLAN等のネットワーク回線を用いて、現場情報収集手段14から送信されるデータの送信場所を管理するものである。   The data transmission location management means 18 manages the transmission location of data transmitted from the field information collection means 14 using a network line such as a local PHS network or a LAN installed in the plant building.

作業実施管理手段15では、これらのデータ送信場所情報を基に現場情報収集手段14から送信された作業用の認証キーと、工事の実施作業の内容、手順、実施場所を判断し、その判断結果をシステム管理ユーザに提示する。これにより、現場における設備機器の分解点検保守作業に関わる現場情報データ(映像、音声、振動、音響、機器状態、点検計測の各データ)が当該工事の作業に関わるデータであり、作業手順に従って正しく実施確認が行われているか否かを判断することができる。   The work execution management means 15 determines the work authentication key transmitted from the work site information collection means 14 based on these data transmission location information, the content, procedure, and execution location of the work to be performed, and the determination result. Is presented to the system management user. As a result, the on-site information data (video, audio, vibration, sound, equipment status, and inspection / measurement data) related to the overhaul and maintenance work of the equipment at the site is the data related to the work of the construction, and is correct according to the work procedure. It can be determined whether or not implementation confirmation has been performed.

第2の実施の形態によれば、第1の実施の形態に効果に加え、現場における設備機器の分解点検保守作業に関わる映像、音声、振動、音響、機器状態、点検計測の各データが当該工事の作業として予定された場所で実施しているか否かをオンライン・リアルタイムで確認するできる。従って、対象としている作業が計画した通りの場所で実施しているか否かを現場情報データを送信しながら、オンライン・リアルタイムで判断することが可能となる。   According to the second embodiment, in addition to the effects of the first embodiment, the video, sound, vibration, sound, equipment state, and inspection / measurement data related to the overhaul / inspection work of the equipment on site are It is possible to check in real time on-line whether or not it is being carried out at a place planned for construction work. Therefore, it is possible to determine on-line and in real time while transmitting on-site information data whether or not the target work is being performed at a planned location.

次に、本発明の第3の実施の形態を説明する。図3は本発明の第3の実施の形態に係わる現場作業管理システムのブロック構成図である。この第3の実施の形態は、図2に示した第2の実施の形態に対し、公開用実績工程データベース19とCAD図面データベース20と作業閲覧管理手段21とを追加して設けたものである。図2と同一要素には同一符号を付し重複する説明は省略する。   Next, a third embodiment of the present invention will be described. FIG. 3 is a block diagram of a field work management system according to the third embodiment of the present invention. In the third embodiment, a public performance process database 19, a CAD drawing database 20, and work browsing management means 21 are added to the second embodiment shown in FIG. . The same elements as those in FIG.

公開用実績工程データベース19は、システム管理ユーザの要求に基づき工程管理手段12にて管理している完了作業のみに関わる実績工程情報を記憶するものであり、CAD図面データベース20は、プラントの機器配置図や系統構成に関わるCAD図面情報を登録するものである。CAD図面データベース20には、プラントの機器配置図や配管、計装品、電気品等の系統構成等に関わるCAD図面情報が登録される。   The actual performance process database 19 stores actual process information related only to the completed work managed by the process management means 12 based on the request of the system management user, and the CAD drawing database 20 stores the equipment arrangement of the plant. It registers CAD drawing information related to diagrams and system configurations. Registered in the CAD drawing database 20 is CAD drawing information relating to the system layout of the plant, piping, instrumentation, electrical equipment, and the like.

作業閲覧管理手段21は、システム管理ユーザからの要求に基づき作業履歴データベース16に登録された実施作業に対するエビデンスとしての現場情報をCAD図面データベース20上の図面情報や、公開用実績工程データベース19の実績工程情報から得られる機器の配置や系統構成情報に関わるCAD図面上のシンボルデータ及び属性データと相互に関連付けてネットワーク回線を通じて検索や閲覧を許可する際の管理を行うものである。   The work browsing management means 21 uses the site information as evidence for the work performed registered in the work history database 16 based on the request from the system management user as the drawing information on the CAD drawing database 20 and the results in the publication result process database 19. Management is performed when searching and browsing are permitted through a network line in association with symbol data and attribute data on a CAD drawing related to device arrangement and system configuration information obtained from process information.

すなわち、作業閲覧管理手段21は、システム管理ユーザからの要求に基づき、実績作業履歴データベースに登録された実施作業に対するエビデンスとしての現場情報データ(映像データや音声データ、振動データ、音響データ、機器状態データ、点検計測データ)を、プラント運用会社における閲覧許可に基づき、予め設定した上記運用会社のユーザや機器分解点検保守工事を請け負う会社のユーザ、プラントが立地する自治体や公共機関等を含めた一般のユーザに対して、イントラネット/インターネット等のネットワーク回線を通じて、CAD図面データベース20上の図面情報や公開用実績工程データベース19の実績工程情報から得られる機器の配置や系統構成情報に関わるCAD図面上のシンボルデータ及び属性データと相互に関連付けて、予め設定し許可した開示手段や制限の範囲で検索閲覧を可能とする。   That is, the work browsing management means 21 is based on the request from the system management user, and the field information data (video data, audio data, vibration data, acoustic data, equipment state) as evidence for the work performed registered in the actual work history database. Data, inspection / measurement data) based on the permission to view the plant operation company, including the users of the operation company set in advance, users of the company that undertakes equipment overhaul inspection maintenance work, and general public, including local governments and public institutions where the plant is located On the CAD drawing related to the arrangement of equipment and the system configuration information obtained from the drawing information on the CAD drawing database 20 and the actual process information in the actual result process database 19 through a network line such as Intranet / Internet. Mutually with symbol data and attribute data Put communication, to allow retrieval and browsing in a predetermined range of allowed the disclosed means and limitations.

これにより、現場における設備機器の分解点検保守作業の完了状況を、当該工事に関連する他の工事を担当するプラント運用会社のユーザや工事請負会社のユーザ及びプラントが立地する自治体や公共機関等を含めた一般のユーザに対してタイムリーに抜けなく漏れなく公開することができる。   As a result, the completion status of the overhaul inspection and maintenance work of the equipment on site can be confirmed by the user of the plant operation company in charge of other work related to the work concerned, the user of the construction contractor, the local government or public institution where the plant is located, etc. It is possible to publish without omissions in a timely manner to the general users included.

ここで、現場作業状況の閲覧や公開方法について説明する。作業閲覧管理手段21では、システム管理ユーザからの要求に基づき、作業履歴データベース16に登録された実施作業に対する現場情報データを、当該工事に関連する他の工事を担当するプラント運用会社のユーザや工事請負会社のユーザに対して、予め定めた開示手段やアクセスID/パスワード等の制限により公開する。さらに、プラントが立地する自治体や公共機関等を含めた一般のユーザに対しても、同様に予め定めた開示手段やアクセスID/パスワード等の制限により、タイムリーに抜けなく漏れなく公開する。   Here, a method for browsing and publishing the on-site work status will be described. In the work browsing management means 21, based on the request from the system management user, the field information data for the work performed registered in the work history database 16 is used as the user of the plant operating company in charge of other work related to the work or the work. It is disclosed to the contractor user by restriction of predetermined disclosure means and access ID / password. Furthermore, for general users including local governments, public institutions, etc. where the plant is located, it is also disclosed in a timely and complete manner by the restriction of predetermined disclosure means and access ID / password.

この公開にあたっては、工程管理手段12にて管理している完了作業のみに関わる実績工程情報を選出した公開用実績工程データベース12と、プラントの機器配置図や配管、計装品、電気品等の系統構成等に関わるCAD図面情報を登録したCAD図面データベース20とを用いて、実績工程情報やCAD図面上のシンボルデータ及び属性データと相互に関連付けて行う。特に、現場情報データについては、認証キーに関わる情報をインデックス情報として活用することで、実績工程と映像データや音声データ、振動データ、音響データの検索も可能となっている。   In this disclosure, the actual process database 12 for public that selects the actual process information related only to the completed work managed by the process management means 12, and the equipment layout drawing of the plant, piping, instrumentation, electrical products, etc. Using the CAD drawing database 20 in which CAD drawing information related to the system configuration and the like is registered, it is correlated with the actual process information and the symbol data and attribute data on the CAD drawing. In particular, for field information data, information related to an authentication key can be used as index information, so that it is possible to search performance processes and video data, audio data, vibration data, and acoustic data.

第3の実施の形態によれば、現場における設備機器の分解点検保守作業の完了状況を当該工事に関連する他の工事を担当するプラント運用会社のユーザや工事請負会社のユーザに公開して関連工事に役立たせると共に、プラントが立地する自治体や公共機関等を含めた一般のユーザに対してタイムリーに抜けなく漏れなく公開し、プラント定期検査等の保守作業の透明性を示すことができる。   According to the third embodiment, the completion status of the overhaul inspection and maintenance work of the equipment on the site is disclosed to the users of the plant operation company and the construction contractor in charge of other construction related to the construction concerned. In addition to being useful for the construction, it can be disclosed in a timely and complete manner to general users including local governments and public institutions where the plant is located, and the transparency of maintenance work such as periodic inspection of the plant can be shown.

本発明の第1の実施の形態に係わる現場作業管理システムのブロック構成図。1 is a block configuration diagram of an on-site work management system according to a first embodiment of the present invention. 本発明の第2の実施の形態に係わる現場作業管理システムのブロック構成図。The block block diagram of the field work management system concerning the 2nd Embodiment of this invention. 本発明の第3の実施の形態に係わる現場作業管理システムのブロック構成図。The block block diagram of the field work management system concerning the 3rd Embodiment of this invention.

符号の説明Explanation of symbols

11…工事要領データベース、12…工程管理手段、13…作業計画管理手段、14…現場情報収集手段、15…作業実施管理手段、16…作業履歴データベース、17…情報入出力手段、18…データ送信場所管理手段、19…公開用実績工程データベース、20…CAD図面データベース、21…作業閲覧管理手段 DESCRIPTION OF SYMBOLS 11 ... Construction procedure database, 12 ... Process management means, 13 ... Work plan management means, 14 ... Site information collection means, 15 ... Work execution management means, 16 ... Work history database, 17 ... Information input / output means, 18 ... Data transmission Location management means, 19 ... database for public performance process, 20 ... CAD drawing database, 21 ... work browsing management means

Claims (4)

プラントの定期検査に実施する設備機器に関わる分解点検保守工事の工事要領情報を記憶した工事要領データベースと、今回の定期検査において実施対象としている工事に関わる工事実施情報を含めて前記分解点検保守工事の計画/実績工程情報と共に管理する工程管理手段と、前記工程管理手段から得られる前記工事実施情報及び前記工事要領データベースから得られる前記工事要領情報を基に現場作業用の認証キーを作成し発行する作業計画管理手段と、前記分解点検保守工事の実施場所にてネットワーク回線を用いて前記認証キーの情報と共に現場の設備機器の分解点検保守作業に関わる現場情報を現場端末にて収集し送信する現場情報収集手段と、前記現場情報収集手段から送信された現場情報と前記工事要領データベースに記憶されている工事要領情報とから工事の実施手順毎の作業完了を判断監査し実施作業に対するエビデンスとして作成すると共に前記工程管理手段に通知する作業実施管理手段と、前記作業実施管理手段で作成された実施作業に対するエビデンスを手順毎に対応付けて登録管理する作業履歴データベースと、システムの管理ユーザからの要求に応じて前記工程管理手段や前記作業計画管理手段及び前記作業実施管理手段に関わる情報の管理を実施する情報入出力手段とを備えたことを特徴とする現場作業管理システム。 The above-mentioned overhaul inspection and maintenance work including the work outline database storing the work outline information of the overhaul inspection and maintenance work related to the equipment and equipment to be carried out for the periodic inspection of the plant, and the work execution information related to the work to be carried out in this periodic inspection Creates and issues an authentication key for on-site work based on the process management means that is managed together with the plan / actual process information and the construction execution information obtained from the process management means and the construction procedure information obtained from the construction procedure database. Collecting and transmitting on-site terminal information related to overhaul inspection and maintenance work of on-site equipment along with information on the authentication key using a network line at the location where the overhaul inspection and maintenance work is performed On-site information collecting means, on-site information transmitted from the on-site information collecting means and stored in the construction procedure database The work execution management means for judging and auditing the completion of work for each work execution procedure from the construction outline information being prepared and preparing it as evidence for the work, and notifying the process management means, and the work created by the work execution management means Management of information related to the process management means, the work plan management means, and the work execution management means in response to a request from a system management user, and a work history database that registers and manages evidence for work for each procedure. An on-site work management system characterized by comprising information input / output means for carrying out. 前記現場情報収集手段から送信される現場情報の送信場所を管理するデータ送信場所管理手段を備え、前記作業実施管理手段は、前記現場情報の送信場所情報を基に前記現場情報収集手段から送信された現場作業用の認証キーと、工事の実施場所での実施作業内容とを比較しその結果をシステム管理ユーザに提示することを特徴とする請求項1記載の現場作業管理システム Data transmission location management means for managing the transmission location of the site information transmitted from the site information collection means is provided, and the work execution management means is transmitted from the site information collection means based on the transmission location information of the site information. 2. The field work management system according to claim 1, wherein the field work authentication key is compared with the contents of the work performed at the construction site and the result is presented to the system management user. 前記作業実施管理手段は、前記現場情報収集手段から送信された現場設備機器の分解点検保守作業に関わる現場情報を前記作業履歴データベースに登録管理する際には、現場作業用の認証キー情報を前記現場情報に関わる管理用情報として用い、システム管理ユーザからの検索情報や前記システム管理ユーザへの閲覧情報として使用することを特徴とする請求項1または請求項2に記載の現場作業管理システム。 The work execution management means, when registering and managing on-site information related to the overhaul and maintenance work of the on-site equipment transmitted from the on-site information collecting means in the work history database, the authentication key information for the on-site work is The field work management system according to claim 1 or 2, wherein the field work management system is used as management information related to field information and used as search information from a system management user or browsing information to the system management user. システム管理ユーザの要求に基づき前記工程管理手段にて管理している完了作業のみに関わる実績工程情報を記憶した公開用実績工程データベースと、プラントの機器配置図や系統構成に関わるCAD図面情報を登録したCAD図面データベースと、前記システム管理ユーザからの要求に基づき前記作業履歴データベースに登録された実施作業に対するエビデンスとしての現場情報を前記CAD図面データベース上の図面情報や前記公開用実績工程データベースの実績工程情報から得られる機器の配置や系統構成情報に関わるCAD図面上のシンボルデータ及び属性データと相互に関連付けてネットワーク回線を通じて検索や閲覧を許可する際の管理を行う作業閲覧管理手段とを備えたことを特徴とする請求項2記載の現場作業管理システム。
Based on the request of the system management user, register the actual process database for disclosure storing the actual process information related only to the completed work managed by the process management means, and the CAD drawing information related to the equipment layout and system configuration of the plant. The CAD drawing database and the field information as evidence for the work performed registered in the work history database based on the request from the system management user, the drawing information on the CAD drawing database and the actual process of the actual process database for publication Work browsing management means for performing management when permitting searching and browsing through a network line in association with symbol data and attribute data on CAD drawings related to equipment arrangement and system configuration information obtained from information The field work management system according to claim 2, wherein
JP2004222808A 2004-07-30 2004-07-30 Field work management system Pending JP2006040194A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004222808A JP2006040194A (en) 2004-07-30 2004-07-30 Field work management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004222808A JP2006040194A (en) 2004-07-30 2004-07-30 Field work management system

Publications (1)

Publication Number Publication Date
JP2006040194A true JP2006040194A (en) 2006-02-09

Family

ID=35905076

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004222808A Pending JP2006040194A (en) 2004-07-30 2004-07-30 Field work management system

Country Status (1)

Country Link
JP (1) JP2006040194A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008027272A (en) * 2006-07-24 2008-02-07 Toshiba Corp Site information management system
JP2008040569A (en) * 2006-08-02 2008-02-21 Hitachi Ltd Management device of facility and management method of facility
JP2011076471A (en) * 2009-09-30 2011-04-14 Ntt Communications Kk Device, method and program for managing work
JP2014157503A (en) * 2013-02-15 2014-08-28 Hitachi Systems Ltd Productivity improvement system
EP2975543A1 (en) 2014-07-15 2016-01-20 Kabushiki Kaisha Toshiba Working process processing system and working process processing method
WO2019167340A1 (en) * 2018-03-02 2019-09-06 三菱電機株式会社 Report generating system and program
US11395102B2 (en) 2019-07-23 2022-07-19 Kabushiki Kaisha Toshiba Field cooperation system and management device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008027272A (en) * 2006-07-24 2008-02-07 Toshiba Corp Site information management system
JP2008040569A (en) * 2006-08-02 2008-02-21 Hitachi Ltd Management device of facility and management method of facility
JP2011076471A (en) * 2009-09-30 2011-04-14 Ntt Communications Kk Device, method and program for managing work
JP2014157503A (en) * 2013-02-15 2014-08-28 Hitachi Systems Ltd Productivity improvement system
EP2975543A1 (en) 2014-07-15 2016-01-20 Kabushiki Kaisha Toshiba Working process processing system and working process processing method
US10082929B2 (en) 2014-07-15 2018-09-25 Kabushiki Kaisha Toshiba Working process processing system and working process processing method
WO2019167340A1 (en) * 2018-03-02 2019-09-06 三菱電機株式会社 Report generating system and program
JP2019153054A (en) * 2018-03-02 2019-09-12 三菱電機ビルテクノサービス株式会社 Report creating system and program
US11395102B2 (en) 2019-07-23 2022-07-19 Kabushiki Kaisha Toshiba Field cooperation system and management device

Similar Documents

Publication Publication Date Title
Ciardhuáin An extended model of cybercrime investigations
Dunston et al. Incorporating maintainability in constructability review process
CN106056347A (en) Engineering project management cloud platform system based on video monitoring
US8521676B1 (en) System to build, analyze and manage a real world model in software of a safety instrumented system architecture for safety instrumented systems in a facility
CN109801416A (en) A kind of total dimension computer lab management method of building together based on big data analysis
Piechnicki et al. Data fusion framework for decision-making support in reliability-centered maintenance
Al Rashdan et al. Methods of data collection in nuclear power plants
CN114175599A (en) Alarm problem management for building management environments
JP2006040194A (en) Field work management system
Görsch et al. Uncovering and visualizing work process interruptions through quantitative workflow analysis
CN117541195A (en) Intelligent management method and system for audit project
Akhmedjanov Reliability databases: State-of-the-art and perspectives
Naticchia et al. Mixed reality approach for the management of building maintenance and operation
US8954369B1 (en) Method to build, analyze and manage a safety instrumented model in software of a safety instrumented system architecture for safety instrumented systems in a facility
CN115641003A (en) Method for hierarchical management and control of associated risks and troubleshooting and treatment of hidden dangers
CN116362535A (en) Dual pre-control method and device for risk classification management and control and hidden trouble investigation
Singh et al. Conceptual Model of Quality Management Based on Blockchain in Construction Industry
KR20090038981A (en) Method and apparatus for managing fault
JP2009104588A (en) System organizing guide system
Mashio et al. Development of Emergency Information System to Support Nuclear Power Plant Management in Severe Accident
Görsch et al. Unlocking Productivity: Revealing Waste and Hidden Disturbances Impacting MEP Workers
CN112907415A (en) Laboratory safety inspection system and method for multi-person patrol
Mustard et al. The Role of the Digital Twin in Oil and Gas Projects and Operations
Camera et al. Service Data Quality Management Framework to Enable Through-life Engineering Services
Bilgin et al. A relational database for construction delay

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090529

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090609

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20091020