JP2005330508A - Apparatus and method for controlling delivering plan, and program thereof - Google Patents

Apparatus and method for controlling delivering plan, and program thereof Download PDF

Info

Publication number
JP2005330508A
JP2005330508A JP2004147556A JP2004147556A JP2005330508A JP 2005330508 A JP2005330508 A JP 2005330508A JP 2004147556 A JP2004147556 A JP 2004147556A JP 2004147556 A JP2004147556 A JP 2004147556A JP 2005330508 A JP2005330508 A JP 2005330508A
Authority
JP
Japan
Prior art keywords
payout
plan
torpedo
guidance
arrival
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004147556A
Other languages
Japanese (ja)
Other versions
JP4373275B2 (en
Inventor
Kiyoe Koura
潔恵 小浦
Masatoshi Hida
正俊 飛田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP2004147556A priority Critical patent/JP4373275B2/en
Publication of JP2005330508A publication Critical patent/JP2005330508A/en
Application granted granted Critical
Publication of JP4373275B2 publication Critical patent/JP4373275B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide an apparatus and method for controlling a delivering plan, and a program thereof, by which the delivering plan can be controlled while considering the relation with a molten iron transporting vessel (torpedo) at the delivering time. <P>SOLUTION: The molten iron transporting vessel information, equipment information, molten iron tapping quantity predicting information and delivering plan information, guidance index and process-changing pattern information are recorded (S1, S2). Then, regarding to a job planned based on the molten iron transporting vessel information, the equipment information and the molten iron tapping predicting information, a schedule is prepared and a simulation for achieving expecting time to the delivering place in each molten iron transporting vessel, is performed (S3-S5). Calculation of the guidance is performed by comparing the simulation result with the delivering plan information, the guidance index and the process changing pattern information, and the calculation of the guidance is performed, and the indication of the delay of achieving time of the molten iron transporting vessel and process changing plan satisfying the guidance reference value is performed (S6, S7). Further, if necessary, the input of the process-changing plan is performed (S8, S9). <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、高炉から出銑される溶銑を複数の工程を通過しながら運搬して払出場で払出す1または2以上のトピードと、払出開始時刻と、がチャージとして関連付けされている払出計画の管理を行う払出計画管理装置及び払出計画管理方法、並びにプログラムに関する。   The present invention relates to a payout plan in which one or more torpedos that transport hot metal discharged from a blast furnace while passing through a plurality of steps and pay out at a payout place, and a payout start time are associated as charges. The present invention relates to a payout plan management apparatus, a payout plan management method, and a program.

従来から、複数の高炉及び製鋼工場を持つ一貫製鉄所等の工場において、高炉から出銑される溶銑の搬送はトピードカー(以下、「トピード」と略する。)と呼ばれる台車が巡回する形で行われる。ここで、工場における高炉から製鋼工場間の物流の流れを説明する。まず、トピードは、高炉からの出銑をトピードで受け(受銑)、それを機関車が牽引して各処理設備へ運び、最終的に払出し場に到着する。ここで、各トピードは、高炉から払出し場に到着するまでの間、操業条件(例えば、溶銑を後述するチャージで要求される成分値にするための予備処理)に基づき、それぞれ1つまたは複数の工程(即ち、当該工程を処理する処理設備)を通過する。次に、払出し場では、溶銑をトピードから鍋に移すという操作を行う。そして、払い出しによって空になったトピードは再び高炉下に搬送され、受銑を待つ。一方、溶銑を移された鍋では、鍋を転炉(次工程)まで搬送し、そこで溶銑を転炉に移す。ここで、鍋1杯を1チャージ(=1ロット)と数える。そして、空いた鍋は次のチャージの払い出しを待つ。尚、鍋もトピードと同様に、数個を廻しながら操業する。   Conventionally, in factories such as integrated steelworks that have multiple blast furnaces and steel mills, the hot metal transported from the blast furnaces is transported in a form of a trolley called a topped car (hereinafter abbreviated as “toped”). Is called. Here, the flow of logistics between the blast furnace and the steelmaking factory in the factory will be described. First, the torpedo receives the output from the blast furnace (to receive), and the locomotive pulls it to each processing facility, and finally arrives at the dispensing place. Here, each torpedo is one or more each based on operating conditions (for example, preliminary processing for making hot metal into a component value required by a charge described later) until it arrives at the discharge station from the blast furnace. It passes through a process (that is, a processing facility that processes the process). Next, at the dispensing place, the hot metal is transferred from the topy to the pan. Then, the torpedo emptied by the payout is transported again under the blast furnace and waits for acceptance. On the other hand, in the pan where the hot metal has been transferred, the pan is transported to the converter (next step), where the hot metal is transferred to the converter. Here, one pot is counted as 1 charge (= 1 lot). The empty pot then waits for the next charge. In addition, the pot is operated while rotating several pieces, like Topid.

近年では、コンピュータ化が進み、高炉から製鋼工場間の物流について、各トピードが通過する工程(以下、「通過工程」と略する。)に基づいて、コンピュータによりシミュレーションを行うことにより、高炉の出銑に伴う溶銑の払出計画の管理を行う技術が開発されている。   In recent years, computerization has progressed, and the distribution of blast furnaces from the blast furnace to the steelmaking factory is carried out by computer simulations based on the process through which each toppe passes (hereinafter referred to as “passing process”). Technology has been developed to manage the hot metal discharge plan associated with dredging.

例えば、特許文献1では、溶銑の転炉への供給を予測する方法が開示されている。特許文献1の技術においては、まず、高炉の出銑予測と転炉への払出量予測、通過工程及び使用設備の処理能力を入力する。そして、設備の能力から出銑した溶鋼の単位時間当たりの通過量を予測し、貯銑量(高炉から製鋼工場間に滞留する溶銑の貯銑量)及びそのバランス(転炉前の供給量)を予測する。   For example, Patent Document 1 discloses a method for predicting supply of hot metal to a converter. In the technique of Patent Document 1, first, the prediction of the output of the blast furnace, the prediction of the amount discharged to the converter, the passage process, and the processing capacity of the equipment used are input. Then, the amount of molten steel produced per unit time estimated from the capacity of the equipment is predicted, and the amount of storage (the amount of molten iron retained between the blast furnace and the steelmaking plant) and its balance (the amount supplied before the converter) Predict.

特開2003−82407号公報JP 2003-82407 A

しかしながら、実際は、操業条件としてチャージとトピードとの紐付けが行われた上で、トピードの予備処理が行われることが多い。また、払いだされた溶鋼の成分を調整するため、複数のトピードから1つのチャージへの払い出しを行うことも多い。従って、特定のトピードが到着していないために払い出しが遅れるという現象が発生する問題がある。払い出しが遅れることにより、一旦連鋳切れが発生すると、30〜60分間程度設備を停止することとなり、約1チャージ分の機会損失となる。また、連鋳への供給が計画通りに行われないと、連鋳以下の工程において、効率的な操業が行うことが困難になる。   In practice, however, the charge and the topies are linked as the operating conditions, and the predecessor of the topies is often performed. Moreover, in order to adjust the components of the molten steel that has been paid out, it is often the case that payouts are made from a plurality of topologies to one charge. Therefore, there is a problem that a phenomenon in which payout is delayed because a specific toppe has not arrived occurs. Due to delay in payout, once continuous casting occurs, the equipment is stopped for about 30 to 60 minutes, resulting in an opportunity loss for about one charge. Moreover, if the supply to continuous casting is not performed as planned, it will be difficult to perform efficient operations in the processes following continuous casting.

特許文献1の技術では、高炉から製鋼工場間のシミュレーションを行うことにより転炉前の貯銑量バランスを確認することを目的としており、払い出しの可否判断は予備処理済貯銑量のみをみて判断することになる。つまり、特許文献1の技術では、必要な成分に調整されたトピードが払出場前に到着しているかが確認できないため、特定のトピードが到着していないために払い出しが遅れるという問題に対応することができない。   The technique of Patent Document 1 aims to confirm the balance of storage amount before converter by performing simulation between the blast furnace and the steelmaking factory. Judgment of whether or not to pay out is based on only the pre-processed storage amount. Will do. In other words, in the technique of Patent Document 1, since it is impossible to confirm whether the torpedo adjusted to the necessary component has arrived before the payout place, it corresponds to the problem that the payout is delayed because the specific toppe has not arrived. I can't.

本発明は、上記問題点に鑑みてなされたものであり、払出時にトピードとの関連付けを考慮して払出計画を管理することができる払出計画管理装置及び払出計画管理方法、並びにプログラムを提供するものである。   The present invention has been made in view of the above-described problems, and provides a payout plan management apparatus, a payout plan management method, and a program capable of managing a payout plan in consideration of association with topies at the time of payout. It is.

課題を解決するための手段及び効果Means and effects for solving the problems

上記課題を解決するために、本発明に係る払出計画管理装置は、高炉から出銑される溶銑を運搬する複数のトピードのそれぞれについて、溶銑を高炉で受銑してから払出場で払出すまでの工程の中から処理で通過する通過工程を登録するトピード情報記憶手段と、前記トピードと前記通過工程との組み合わせをジョブとして登録するジョブ情報記憶手段と、前記工程を処理することが可能な処理設備と当該処理設備の能力とを登録する設備情報記憶手段と、前記ジョブの中から予め設定した優先度に基づいて選択したジョブについて、前記処理設備の中から処理する処理設備を選択して割り付けて、前記トピード毎に、払出場に到着する払出場到着予想時刻を予測する払出場到着時刻予測手段と、を備えることを特徴とする。   In order to solve the above-mentioned problem, the dispensing plan management device according to the present invention is configured to receive a hot metal from a blast furnace and pay it out at a dispensing place after receiving the molten iron in the blast furnace. A torpedo information storing means for registering a passing process that passes through the process, a job information storing means for registering a combination of the topped and the passing process as a job, and a process capable of processing the process The facility information storage means for registering the facility and the capacity of the processing facility, and the job selected based on the priority set in advance from the job, the processing facility to be processed is selected from the processing facility and assigned. And a payout place arrival time predicting means for predicting an expected payout place arrival time arriving at the payout place for each topid.

本発明に係る払出計画管理方法は、高炉から出銑される溶銑を運搬する複数のトピードのそれぞれについて、溶銑を高炉で受銑してから払出場で払出すまでの工程の中から処理で通過する通過工程を登録するトピード情報記憶ステップと、前記トピードと前記通過工程との組み合わせをジョブとして登録するジョブ情報記憶ステップと、前記工程を処理することが可能な処理設備と当該処理設備の能力とを登録する設備情報記憶ステップと、前記ジョブの中から予め設定した優先度に基づいて選択したジョブについて、前記処理設備の中から処理する処理設備を選択して割り付けて、前記トピード毎に、払出場に到着する払出場到着予想時刻を予測する払出場到着時刻予測ステップと、を備えることを特徴とする。   The delivery plan management method according to the present invention passes through processing from the process of receiving hot metal from the blast furnace to delivering it at the delivery site for each of a plurality of torpedos that transport the hot metal discharged from the blast furnace. A torpedo information storing step for registering a passing process to be performed, a job information storing step for registering a combination of the torpedo and the passing process as a job, a processing facility capable of processing the process, and the capacity of the processing facility A facility information storage step for registering and a job selected based on a priority set in advance from among the jobs, a processing facility to be processed is selected and allocated from the processing facilities, and a payment is made for each of the topologies. A payout arrival time predicting step of predicting a payout arrival arrival prediction time arriving at the appearance.

本発明に係るプログラムは、高炉から出銑される溶銑を運搬する複数のトピードのそれぞれについて、溶銑を高炉で受銑してから払出場で払出すまでの工程の中から処理で通過する通過工程を登録するトピード情報記憶ステップ、前記トピードと前記通過工程との組み合わせをジョブとして登録するジョブ情報記憶ステップ、前記工程を処理することが可能な処理設備と当該処理設備の能力とを登録する設備情報記憶ステップ、前記ジョブの中から予め設定した優先度に基づいて選択したジョブについて、前記処理設備の中から処理する処理設備を選択して割り付けて、前記トピード毎に、払出場に到着する払出場到着予想時刻を予測する払出場到着時刻予測ステップ、をコンピュータに実行させることを特徴とする。   The program according to the present invention is a passing process in which a plurality of torpedos for transporting hot metal discharged from a blast furnace are passed through the process from receiving the hot metal in the blast furnace to paying out the hot metal in the discharge area. Information storing step, a job information storing step for registering a combination of the toppe and the passing step as a job, a processing facility capable of processing the step, and facility information for registering the capability of the processing facility A storage step, for a job selected based on a priority set in advance from among the jobs, selecting and assigning a processing facility to be processed from the processing facilities, and a payout location arriving at a payout location for each of the topologies A computer is caused to execute a payout place arrival time predicting step for predicting an expected arrival time.

これによると、処理設備の能力を考慮し、トピード毎の通過工程を展開したジョブ単位でシミュレーションを行うことにより、各トピードの払出場への到着時刻を精度よく予測することが可能になる。そして、予め立案された払出計画に基づいて、チャージの払出開始予定時刻と当該チャージに紐付けされているトピードの払出場到着予想時刻とを比較することにより、溶銑在庫量だけでは判断できないトピードの到着遅れがあるか否かを事前に把握することができる。   According to this, it is possible to accurately predict the arrival time of each toppe at the payout place by performing simulation in units of jobs in which the passing process for each toppe is developed in consideration of the capacity of the processing facility. Then, based on a pre-planned payout plan, by comparing the scheduled payout start time and the expected arrival time of the torpedo associated with the charge, it is It is possible to know in advance whether there is an arrival delay.

ここで、本発明に係る払出計画管理装置は、溶銑を払出す1または2以上のトピードと払出開始予定時刻との組み合わせであるチャージを登録する払出計画登録手段と、前記トピード毎に、前記払出場到着予想時刻と、前記払出開始予定時刻から求まる各トピードの払出場到着目標時刻と、を比較して、予め設定した基準値を満たさないトピードを検知する払出し遅れ検知手段と、を更に備えることが好ましい。   Here, the payout plan management apparatus according to the present invention includes a payout plan registration means for registering a charge, which is a combination of one or more torpedo paying out hot metal and a payout start scheduled time, and the payout for each torpedo. A payout delay detecting means for comparing a predicted arrival arrival time with a payout arrival target time of each torpedo determined from the scheduled start time of payout, and detecting a torpedo that does not satisfy a preset reference value; Is preferred.

同様に、本発明に係る払出計画管理方法は、溶銑を払出す1または2以上のトピードと払出開始予定時刻との組み合わせであるチャージを登録する払出計画登録ステップと、前記トピード毎に、前記払出場到着予想時刻と、前記払出開始予定時刻から求まる各トピードの払出場到着目標時刻と、を比較して、予め設定した基準値を満たさないトピードを検知する払出し遅れ検知ステップと、を更に備えることが好ましい。   Similarly, the payout plan management method according to the present invention includes a payout plan registration step of registering a charge, which is a combination of one or more topologies for paying hot metal, and a payout start scheduled time, and the payout plan for each torpedo. A payout delay detecting step of comparing a predicted arrival arrival time with a payout arrival target time of each toppe obtained from the scheduled start time of payout, and detecting a torpedo that does not satisfy a preset reference value; Is preferred.

同様に、本発明に係るプログラムは、溶銑を払出す1または2以上のトピードと払出開始予定時刻との組み合わせであるチャージを登録する払出計画登録ステップ、前記トピード毎に、前記払出場到着予想時刻と、前記払出開始予定時刻から求まる各トピードの払出場到着目標時刻と、を比較して、予め設定した基準値を満たさないトピードを検知する払出し遅れ検知ステップ、を更にコンピュータに実行させることが好ましい。   Similarly, the program according to the present invention includes a payout plan registration step of registering a charge that is a combination of one or more torpedo to pay out hot metal and a payout start time, and for each torpedo, the payout arrival expected time It is preferable to further cause the computer to execute a payout delay detection step of detecting a torpedo that does not satisfy a preset reference value by comparing the payout start arrival time of each toppe obtained from the payout start scheduled time. .

これによると、予め登録された払出計画に基づいて、チャージの払出開始予定時刻から求まる当該チャージに紐付けされている各トピードの払出場到着目標時刻と、各トピードの払出場到着予想時刻と、を比較することにより、予め設定した基準値を満たさないトピードの到着遅れがあるか否かを事前に検知することができる。   According to this, based on a pre-registered payout plan, the payout arrival arrival time of each tope linked to the charge obtained from the charge payout start scheduled time, the expected payout arrival time of each tope, By comparing these, it is possible to detect in advance whether or not there is a delay in arrival of topies that do not satisfy a preset reference value.

更に、本発明に係る払出計画管理装置は、前記払出し遅れ検知手段で表示されたトピードに対して予め設定した工程変更案の中から予め設定した優先度に基づいて選択した工程変更案をガイダンスとして表示するガイダンス表示手段と、を更に備えることが好ましい。   Furthermore, the payout plan management apparatus according to the present invention provides, as guidance, a process change plan selected based on a preset priority from among the process change plans set in advance with respect to the toppe displayed by the payout delay detection means. It is preferable to further include guidance display means for displaying.

同様に、本発明に係る払出計画管理方法は、前記払出し遅れ検知ステップで表示されたトピードに対して予め設定した工程変更案の中から予め設定した優先度に基づいて選択した工程変更案をガイダンスとして表示するガイダンス表示ステップと、を更に備えることが好ましい。   Similarly, the payout plan management method according to the present invention provides guidance on a process change plan selected based on a preset priority among the process change plans set in advance for the toppe displayed in the payout delay detection step. It is preferable to further include a guidance display step of displaying as

同様に、本発明に係るプログラムは、前記払出し遅れ検知ステップで表示されたトピードに対して予め設定した工程変更案の中から予め設定した優先度に基づいて選択した工程変更案をガイダンスとして表示するガイダンス表示ステップ、を更にコンピュータに実行させることが好ましい。   Similarly, the program according to the present invention displays, as guidance, a process change plan selected based on a preset priority among the process change plans set in advance with respect to the toppe displayed in the payout delay detection step. Preferably, the guidance display step is further executed by the computer.

これによると、予め登録された払出計画に基づいて、チャージの払出開始予定時刻と当該チャージに紐付けされているトピードの払出場到着時刻とを比較することにより、予め設定した基準値を満たさないトピードの到着遅れがあるか否かを事前に検知することができる。   According to this, based on a pre-registered payout plan, the preset reference value is not satisfied by comparing the scheduled payout start time with the torpedo payout arrival time linked to the charge. It is possible to detect in advance whether or not there is a delay in the arrival of the topic.

更に、本発明に係る払出計画管理装置は、前記払出し遅れ検知手段で表示されたトピードに対して通過工程の工程変更案を入力する工程変更案入力手段、を更に備えることが好ましい。   Furthermore, it is preferable that the payout plan management apparatus according to the present invention further includes process change plan input means for inputting a process change plan of the passing process with respect to the toppe displayed by the payout delay detection means.

同様に、本発明に係る払出計画管理方法は、前記払出し遅れ検知ステップで表示されたトピードに対して通過工程の工程変更案を入力する工程変更案入力ステップ、を更に備えることが好ましい。   Similarly, it is preferable that the payout plan management method according to the present invention further includes a process change plan input step for inputting a process change plan of the passing process for the toppe displayed in the payout delay detection step.

同様に、本発明に係るプログラムは、前記払出し遅れ検知ステップで表示されたトピードに対して通過工程の工程変更案を入力する工程変更案入力ステップ、を更にコンピュータに実行させることが好ましい。   Similarly, it is preferable that the program according to the present invention further causes the computer to execute a process change plan input step for inputting a process change plan for the passage process for the toppe displayed in the payout delay detection step.

これによると、ガイダンスで表示された工程変更案あるいは操作者が独自に考えた工程変更案に基づいて通過工程の工程変更を行うことにより、事前にトピードの払出遅れを防止することが可能になる。   According to this, it becomes possible to prevent a delay in paying out torpedo in advance by changing the process of the passing process based on the process change proposal displayed in the guidance or the process change proposal uniquely thought by the operator. .

尚、本発明に係るプログラムは、CD−ROM(Compact Disc Read Only Memory)、FD(Floppy(登録商標) Disk)、MO(Magneto-Optic)などのリムーバブル型記録媒体やハードディスクなどの固定型記録媒体に記録して配布可能である他、有線又は無線の電気通信手段によってインターネットなどの通信ネットワークを介して配布可能である。   The program according to the present invention is a removable recording medium such as a CD-ROM (Compact Disc Read Only Memory), FD (Floppy (registered trademark) Disk), or MO (Magneto-Optic), or a fixed recording medium such as a hard disk. In addition to being able to be recorded and distributed, it can be distributed via a communication network such as the Internet by wired or wireless telecommunication means.

以下、図面を参照しつつ、本発明である払出計画管理装置及び払出計画管理方法、並びにプログラムを実施するための最良の形態について、具体的な一例に即して説明する。   Hereinafter, the best mode for carrying out the payout plan management apparatus, the payout plan management method, and the program according to the present invention will be described with reference to a specific example with reference to the drawings.

本実施の形態で対象とする高炉から製鋼工場間のトピードによる物流工程について図2に基づいて説明する。
図2に示すように、本実施の形態では、高炉が高炉A及び高炉Bの2基、処理棟1が処理棟1−A及び処理棟1−Bの2箇所、処理棟2が処理棟2−A及び処理棟2−B及び処理棟2−Cの3箇所、処理棟3が処理棟3−Aの1箇所、払出場が払出場A及び払出場Bの2箇所、鋳銑機が1箇所あるものとする。尚、図中の矢印はトピードが通過可能な処理の順路を示している。
The physical distribution process by the torpedo between the blast furnace and the steelmaking factory as an object in the present embodiment will be described based on FIG.
As shown in FIG. 2, in the present embodiment, the blast furnace is two units of blast furnace A and blast furnace B, the processing building 1 is two places of processing building 1-A and processing building 1-B, and the processing building 2 is processing building 2 -A, processing building 2-B, and processing building 2-C, three places, processing building 3 is one place in processing building 3-A, a payout place is two places, payout place A and payout place B, and a casting machine is 1 There shall be places. In addition, the arrow in a figure has shown the route of the process through which a toppe can pass.

まず、本実施の形態に係る払出計画管理装置について、図1に基づいて説明する。図1は、本実施の形態に係る払出計画管理装置を示すブロック図である。
図1に示すように、本実施の形態に係る払出計画管理装置1は、ジョブ情報生成部(ジョブ情報記憶手段)10と、トピード情報記憶部(トピード情報記憶手段)11と、設備情報記憶部(設備情報記憶手段)12と、出銑量予測情報記憶部13と、シミュレーション計算部(払出場到着時刻予測手段)20と、ガイダンス計算部(払出し遅れ検知手段)30と、払出計画情報記憶部(払出計画登録手段)31と、ガイダンス指標記憶部32と、工程変更パターン情報記憶部33と、ガイダンス出力部(ガイダンス表示手段)40と、工程変更案入力部(工程変更案入力手段)50と、結果出力部60と、から構成される。
First, the payout plan management apparatus according to the present embodiment will be described with reference to FIG. FIG. 1 is a block diagram showing a payout plan management apparatus according to the present embodiment.
As shown in FIG. 1, a payout plan management apparatus 1 according to the present embodiment includes a job information generation unit (job information storage unit) 10, a torpedo information storage unit (tope information storage unit) 11, and an equipment information storage unit. (Facility information storage means) 12, output amount prediction information storage section 13, simulation calculation section (payout arrival time prediction means) 20, guidance calculation section (payout delay detection means) 30, and payout plan information storage section (Payout plan registration unit) 31, guidance index storage unit 32, process change pattern information storage unit 33, guidance output unit (guidance display unit) 40, process change plan input unit (process change plan input unit) 50, And a result output unit 60.

トピード情報記憶部11は、溶銑を運搬するトピードの情報をトピード情報として記憶するためのものである。トピード情報としては、溶銑情報として、トピード番号、位置、受銑量(初期積載量を意味する。)、積載量の情報が与えられ、工程計画情報として、通過予定工程、処理設備、標準処理時間、処理実績の情報が与えられるものとする。本実施の形態では、トピードが20存在するものとし、トピード番号1〜20に対して、表1に示す溶銑情報と、表2に示す工程計画が与えられるものとする。   The torpedo information storage unit 11 is for storing the information on the torpedo that transports the molten iron as topped information. As the torpedo information, the hote information is given with information on the tope number, position, received amount (meaning the initial loading amount), and loading amount, and the process plan information is the scheduled passage process, processing equipment, standard processing time. Suppose that information on processing results is given. In this embodiment, it is assumed that there are 20 topies, and the hot metal information shown in Table 1 and the process plan shown in Table 2 are given to the topid numbers 1 to 20.

Figure 2005330508
Figure 2005330508

Figure 2005330508
Figure 2005330508

尚、表2の工程計画情報では、処理が完了している工程に関しては処理設備及び開始・終了時刻の情報が与えられ、未処理の工程に関しては候補となる処理設備及び標準処理時間の情報が登録されるものとする。   In the process plan information in Table 2, information on processing facilities and start / end times is given for processes that have been processed, and information on candidate processing facilities and standard processing times is provided for unprocessed processes. Shall be registered.

設備情報記憶部12は、高炉から製鋼工場間のトピードによる物流工程の各工程を処理することが可能な処理設備と各処理設備の能力とを設備情報として記憶するためのものである。ここで、処理設備の一部は代替関係にあり、同じ工程を処理することが可能であるものとする。本実施の形態では、表3に示す設備情報が与えられる。   The equipment information storage unit 12 is for storing, as equipment information, processing equipment capable of processing each process of a physical distribution process using a torpedo between a blast furnace and a steelmaking factory and the capacity of each processing equipment. Here, it is assumed that a part of the processing equipment has an alternative relationship and can process the same process. In the present embodiment, the facility information shown in Table 3 is given.

Figure 2005330508
Figure 2005330508

表3に示すとおり、本実施の形態では、各工程における各処理設備の処理能力は等しいものとする。尚、工程によっては成分調整の大きさによって処理に要する時間が異なるため、当該工程における処理設備の処理能力が異なっても良い。かかる場合は、処理能力算定に必要な情報を設備情報に設けてもよい。   As shown in Table 3, in this embodiment, it is assumed that the processing capacity of each processing facility in each step is equal. In addition, since the time required for processing differs depending on the magnitude of component adjustment depending on the process, the processing capacity of the processing equipment in the process may be different. In such a case, information necessary for calculating the processing capacity may be provided in the facility information.

出銑量予測情報記憶部13は、高炉の出銑ピッチ(予測値)を記憶するためのものである。本実施の形態では、高炉A及び高炉Bともに、出銑ピッチを30分とする。   The output amount prediction information storage unit 13 is for storing the output pitch (predicted value) of the blast furnace. In the present embodiment, both the blast furnace A and the blast furnace B have an output pitch of 30 minutes.

ジョブ情報生成部10は、トピード情報記憶部11で記憶したトピード情報と、設備情報記憶部12で記憶した設備情報と、出銑量予測情報記憶部13で記憶した出銑ピッチの情報に基づいて、ジョブ情報を生成するためのものである。本実施の形態において、トピード1〜20に対して与えられた工程計画(表2に示す工程計画情報参照。)に基づいて生成したジョブの一覧を表4に示す。   The job information generation unit 10 is based on the topic information stored in the topic information storage unit 11, the facility information stored in the facility information storage unit 12, and the output pitch information stored in the output amount prediction information storage unit 13. , For generating job information. Table 4 shows a list of jobs generated based on the process plan (see process plan information shown in Table 2) given to the topologies 1 to 20 in the present embodiment.

Figure 2005330508
Figure 2005330508

表4に示すように、既に処理が完了しているジョブに関しては、登録されている処理設備及び開始・終了時刻の情報を設定する。一方、処理がまだ開始されていないジョブに関しては、候補となる処理設備及び工程時間(即ち、当該処理設備の標準処理時間)の情報を設定する。また、受銑工程(工程1)については、それぞれの高炉の出銑ピッチ(本実施の形態においては30分)に基づいて、各トピードの受銑工程に該当するジョブ(表5に示すジョブTP1−01、TP2−01、TP3−01、TP4−01、TP5−01、TP6−01、TP7−01、TP8−01、TP9−01、TP10−01、TP11−01、TP12−01、TP13−01、TP14−01、TP15−01、TP16−01、TP17−01、TP18−01、TP19−01、TP20−01)の開始・終了時刻の情報を設定する。   As shown in Table 4, for a job that has already been processed, information about registered processing facilities and start / end times is set. On the other hand, for a job for which processing has not yet started, information on candidate processing equipment and process time (that is, standard processing time of the processing equipment) is set. As for the receiving process (process 1), a job corresponding to the receiving process of each toped (job TP1 shown in Table 5) based on the output pitch of each blast furnace (30 minutes in the present embodiment). -01, TP2-01, TP3-01, TP4-01, TP5-01, TP6-01, TP7-01, TP8-01, TP9-01, TP10-01, TP11-01, TP12-01, TP13-01 TP14-01, TP15-01, TP16-01, TP17-01, TP18-01, TP19-01, TP20-01).

シミュレーション計算部20は、予め設定された割付優先度に基づいて選択したジョブについて処理設備に割り付けてスケジュールを作成し、各トピードの払出場到着予想時刻を求めるためのものである。本実施の形態においては、割付優先度を設備到着順として、スケジュール作成を行った。作成したスケジュールを図3に示す。また、スケジュールの作成に当たっては、工程間の搬送時間を5分とし、トピード数の制約から、同時刻に搬送可能なトピード数の上限を10台とした。尚、本実施の形態においては、割付優先度を設備到着順としているが、それに限らず、出鋼順、払出納期順等が考えられる。そして、作成したスケジュールから、各トピードの払出場到着予想時刻が表6のように計算される。尚、作成したスケジュール(図3参照)は、図示しない出力用インタフェースを介して、ディスプレイ、ハードディスク、プリンタ等の結果出力部60に出力する。   The simulation calculation unit 20 is for allocating a job selected on the basis of a preset allocation priority to a processing facility and creating a schedule, and obtaining a predicted payout arrival arrival time for each topic. In the present embodiment, the schedule is created with the allocation priority as the equipment arrival order. The created schedule is shown in FIG. In creating the schedule, the transfer time between the processes was set to 5 minutes, and the upper limit of the number of torpedos that can be transferred at the same time was set to 10 due to the limitation of the number of topologies. In the present embodiment, the allocation priority is set to the equipment arrival order, but not limited to this, the order of steel output, the order of delivery date, etc. can be considered. Then, from the created schedule, the expected arrival time for each torpedo is calculated as shown in Table 6. The created schedule (see FIG. 3) is output to a result output unit 60 such as a display, a hard disk, or a printer via an output interface (not shown).

Figure 2005330508
Figure 2005330508

払出計画情報記憶部31は、払出計画を記憶するためのものである。ここで、払出計画は、予め別のシステムもしくは人によって立案され、下記のルールを満たす範囲において作成される。
・1チャージに対する払出し量の合計が鍋の容量を越えない。
・溶銑の成分値がチャージの成分目標値の範囲内に収まるようなトピードの組合せを選ぶ。
本実施の形態においては、トピードの容量が払出工程(表3の工程6)において溶銑を受ける鍋(チャージ)より大きいものとする。即ち、トピードの容量に差がある場合に溶銑無駄無く処理しようとすると、1つのチャージに複数のトピードから払い出しを行うという状態が発生する。従って、本実施の形態においては、1つのチャージに対して、1台もしくは2台のトピードから払い出しが行われるものとしている。また、払出場では複数台のトピードの並列処理が可能であるものとしている(他の設備は同時に処理できるトピード数は1台)。本実施の形態においての払出計画を表5に示す。
The payout plan information storage unit 31 is for storing a payout plan. Here, the payout plan is prepared in advance by another system or person, and is created within a range that satisfies the following rules.
・ The total amount paid out per charge does not exceed the pot capacity.
・ Select a combination of topologies that keeps the hot metal component value within the target charge value range.
In the present embodiment, it is assumed that the topped capacity is larger than the pan (charge) that receives hot metal in the dispensing step (step 6 in Table 3). In other words, if there is a difference in the capacity of the torpedo and if it is attempted to process without waste of hot metal, a state occurs in which a single charge is paid out from a plurality of topies. Therefore, in the present embodiment, it is assumed that payout is performed from one or two topies for one charge. In addition, it is assumed that a plurality of topies can be processed in parallel at the payout place (the number of topologies that can be processed simultaneously by other equipment is one). The payout plan in the present embodiment is shown in Table 5.

Figure 2005330508
Figure 2005330508

ガイダンス指標記憶部32は、ガイダンスを出力する場合のガイダンス基準値を、ガイダンス指標として予め記憶するためのものである。本実施の形態においては、ガイダンス基準値を以下のように定める。
・到着遅れトピードのガイダンス基準値
払出場への到着が一定時間(本実施の形態では15分)以上遅れたトピードを指定する。
・溶銑積載トピード数超のガイダンス基準値
一定時間後(本実施の形態では20分後)の溶銑積載トピード数が一定数(本実施の形態では10台)を超えた場合、払出場に到着している未払出トピードのうち最も早い時刻に到着したトピードを指定する。但し、払出場に到着している未払出トピードがない場合は、対象トピードが無となる。
The guidance index storage unit 32 is for storing in advance a guidance reference value for outputting guidance as a guidance index. In the present embodiment, the guidance reference value is determined as follows.
-Guidance reference value of arrival delay torpedo A torpedo that arrives at the payout place is delayed by a certain time (15 minutes in this embodiment) or more.
-Guidance reference value exceeding the number of hot metal loaded toppeds When the number of hot metal loaded torpedo exceeds a certain number (10 in this embodiment) after a certain time (20 minutes in this embodiment), it arrives at the payout place. Specify the topped item that arrived at the earliest time among the unpaid topped items. However, if there is no unpaid toppedy that has arrived at the payout place, there is no target topped.

工程変更パターン情報記憶部33は、ガイダンスを出力する場合の工程変更案とその優先度を、工程変更パターン情報として予め記憶するためのものである。本実施の形態においては、上述のガイダンスし表記億部32で記憶したガイダンス基準値、即ち、到着遅れトピードのガイダンス基準値と溶銑積載トピード数のガイダンス基準値のそれぞれに対する工程変更案とその優先度を以下のように定める。
・到着遅れトピードの工程変更案
到着遅れトピードの工程計画に省略可能工程(本実施の形態では、工程4のみ)が含まれている場合は、省略可能工程をスキップする。尚、本実施の形態では、省略可能工程として工程4のみを指定しているが、複数の省略可能工程を設定する場合は、各工程の優先度も設定する。
・溶銑積載トピード数超の工程変更案
通常の払出場以外の払出設備で払い出しを行い、溶銑積載トピード数を減らすべく、トピードを鋳銑場に回す。
The process change pattern information storage unit 33 is for storing in advance, as process change pattern information, a process change proposal and its priority when outputting guidance. In the present embodiment, the above-mentioned guidance reference values stored in the guidance and notation part 32, that is, the guidance reference value for the arrival delay torpedo and the guidance reference value for the number of hot metal loaded topologies, and the priority thereof Is defined as follows.
-Process change plan of arrival delay topy If the process plan of arrival delay topy includes an omissible process (in this embodiment, only process 4), the omissible process is skipped. In the present embodiment, only the process 4 is specified as an omissible process, but when a plurality of omissible processes are set, the priority of each process is also set.
-Process change plan exceeding the number of hot metal loaded toppedes Disbursement is performed at a dispensing facility other than the normal dispensing site, and the torpedo is sent to the foundry to reduce the number of hot metal loaded torpedoes.

ガイダンス計算部30は、シミュレーション計算部20で作成したスケジュール(各トピードの払出場到着予想時刻を含む。)と払出計画情報記憶部31とを比較し、ガイダンス指標記憶部32及び工程変更パターン情報記憶部33から出力するガイダンスを計算するためのものである。本実施の形態においては、到着遅れトピードについては、シミュレーション計算部20で作成したスケジュールから得た各トピードの払出場到着予想時刻と払出計画情報記憶部31から得た払出場到着目標時刻とを比較し、ガイダンス指標記憶部32で記憶された到着遅れトピードのガイダンス基準値に基づいて指定されたトピードについて、工程変更パターン情報記憶部33で記憶された優先度に基づいて選択された工程変更案を、ガイダンスとして出力する。そして、溶銑積載トピード数超については、シミュレーション計算部20で作成したスケジュールについて一定時間後(本実施の形態では20分後)の溶銑積載トピード数を算出し、ガイダンス指標記憶部32で記憶された溶銑積載トピード数超のガイダンス基準値に基づいて指定されたトピードについて、工程変更パターン情報記憶部33で記憶された優先度に基づいて選択された工程変更案を、ガイダンスとして出力する。尚、払出場到着目標時刻は、払出計画情報記憶部31から算出する。即ち、各トピードに対して、そのトピードが払い出す最も早いチャージの開始予定時刻を払出場到着目標時刻とする。但し、そのチャージに対して複数台のトピードが払い出す場合は、その台数に応じて払出場到着目標時刻を繰り下げる。繰り下げる時間は、払い出すトピード数をnとすると、チャージの処理予定時刻×(n−1)/nとする。例えば、払い出すトピード数を3とすると、払出場到着目標時刻=チャージの開始予定時刻+(チャージの終了予定時刻−チャージの開始予定時刻)×2/3となる。   The guidance calculation unit 30 compares the schedule created by the simulation calculation unit 20 (including the expected arrival time at each torpedo) with the payout plan information storage unit 31, and stores a guidance index storage unit 32 and process change pattern information storage. This is for calculating the guidance output from the unit 33. In the present embodiment, for the arrival delay tope, the expected payout arrival arrival time of each topic obtained from the schedule created by the simulation calculation unit 20 and the payout arrival target time obtained from the payout plan information storage unit 31 are compared. Then, the process change plan selected based on the priority stored in the process change pattern information storage unit 33 for the toppe designated based on the guidance reference value of the arrival delay topped stored in the guidance index storage unit 32. And output as guidance. For the hot metal loaded topped number, the hot metal loaded topped number after a certain time (20 minutes in the present embodiment) is calculated and stored in the guidance index storage unit 32 for the schedule created by the simulation calculation unit 20. The process change plan selected based on the priority stored in the process change pattern information storage unit 33 is output as guidance for the toppe designated based on the guidance reference value exceeding the hot metal loaded topped number. The payout place arrival target time is calculated from the payout plan information storage unit 31. That is, for each topic, the scheduled start time of the earliest charge paid out by that toppe is set as the payout arrival target time. However, when a plurality of topies pays out for the charge, the payout arrival target time is decremented according to the number. The carry-down time is assumed to be the charge processing scheduled time × (n−1) / n, where n is the number of topies to be paid out. For example, if the number of toppedies to be paid out is 3, payout place arrival target time = scheduled start time of charge + (scheduled end time of charge−scheduled start time of charge) × 2/3.

ガイダンス出力部40は、ガイダンス計算部30で計算されたガイダンスを出力するためのものである。本実施の形態においては、図3に示すように、払出場Aではほぼ計画どおりに払出が行われるが、払出場Bにおいては、トピード5やトピード9の到着が15分以上遅れ、払出遅れが発生していることがわかる。ここで、図3に示す各払出場下の△印は、払出場到着目標時刻を示すものである。また、図中の矢印(←→の印)は、払出し場到着目標時刻と払出し場到着予想時刻の差の払出遅れ時間を示すものである(ガイダンス基準値である15分を越えているものは太線の矢印で表示)。即ち、本実施の形態においては、表7のようなガイダンスを出力する。   The guidance output unit 40 is for outputting the guidance calculated by the guidance calculation unit 30. In the present embodiment, as shown in FIG. 3, the payout place A pays out almost as planned, but at the payout place B, the arrival of the topies 5 and 9 is delayed by 15 minutes or more, and the payout delay is delayed. You can see that it has occurred. Here, the Δ mark under each payout place shown in FIG. 3 indicates the payout place arrival target time. In addition, the arrow in the figure (marked with ← →) indicates the payout delay time of the difference between the payout arrival target time and the expected payout arrival time (those that exceed the guidance reference value of 15 minutes) (Shown with a thick arrow). That is, in this embodiment, guidance as shown in Table 7 is output.

Figure 2005330508
Figure 2005330508

表7のガイダンスでは、アラームの種類(到着遅れトピードあるいは溶銑積載トピード数超のいずれか)と、その警告内容(払出遅れ時間あるいは溶銑積載トピード数)と、ガイダンス計算部30で指定されたトピードと、選択された計画変更案が表示されている。尚、アラームが到着遅れトピードの場合は、ガイダンス中に払い出し遅れが生じるチャージを表示しても良い。   In the guidance of Table 7, the type of alarm (either the arrival delay toppe or the number of hot metal loaded topologies), the warning content (payout delay time or the number of hot metal loaded topologies), and the toppe specified by the guidance calculation unit 30 The selected plan change plan is displayed. If the alarm is an arrival delay topic, a charge causing a payout delay may be displayed during the guidance.

工程変更案入力部50は、ガイダンス出力部40で出力されたガイダンスに表示されたトピードに対して通過工程の工程変更案を入力するためのものである。ここで、入力する工程変更案は、ガイダンス出力部40で出力されたガイダンスに表示された工程変更案であっても良いし、独自に考えた工程変更案であっても良い。入力された工程変更案は、トピード情報記憶部11のトピード情報(より詳細には、工程計画情報)として記憶される。そして、新たな工程計画としてジョブ情報生成部10で生成されたジョブに基づいて、シミュレーション計算部20に基づいてシミュレーションが行われ、ガイダンス計算部30において算出されたガイダンスが再びガイダンス出力部40により出力される。本実施の形態においては、表7に示すガイダンスに基づいて、トピード5とトピード9の工程計画を変更した場合(工程4省略)のシミュレーション結果を図4に示す。図4に示すように、トピード5とトピード9の払出遅れが解消される。   The process change plan input unit 50 is for inputting a process change plan for the passing process with respect to the toppe displayed in the guidance output by the guidance output unit 40. Here, the input process change plan may be the process change plan displayed in the guidance output by the guidance output unit 40 or may be a process change plan that is uniquely considered. The input process change plan is stored as topped information (more specifically, process plan information) in the topped information storage unit 11. Then, based on the job generated by the job information generation unit 10 as a new process plan, a simulation is performed based on the simulation calculation unit 20, and the guidance calculated by the guidance calculation unit 30 is output again by the guidance output unit 40. Is done. In the present embodiment, based on the guidance shown in Table 7, FIG. 4 shows a simulation result when the process plans for topped 5 and topped 9 are changed (process 4 is omitted). As shown in FIG. 4, the payout delay of the topped 5 and the topped 9 is eliminated.

次に、本実施の形態に係る払出計画管理装置1を用いた払出計画管理方法の処理の手順について、図5に基づいて、説明する。図5は、本実施の形態に係る払出計画管理方法の処理の手順について説明したフローチャートである。
尚、以下で説明する本実施の形態に係る払出計画管理方法の処理は、コンピュータにおいても同様に、プログラムとしてCPUにより読み出して実行することができる。また、このプログラムは、CD−ROMやFD、MOなどのリムーバブルな記憶媒体に記録しておくことにより、様々なコンピュータの記憶装置にインストールすることが可能である。
Next, the processing procedure of the payout plan management method using the payout plan management apparatus 1 according to the present embodiment will be described with reference to FIG. FIG. 5 is a flowchart illustrating the processing procedure of the payout plan management method according to the present embodiment.
Note that the processing of the payout plan management method according to the present embodiment described below can be read and executed by the CPU as a program in the computer as well. In addition, this program can be installed in various computer storage devices by recording it in a removable storage medium such as a CD-ROM, FD, or MO.

図5に示すように、まず、トピード情報、設備情報、出銑量予測情報を、それぞれ、トピード情報記憶部11、設備情報記憶部12、出銑量予測情報記憶部13に登録する(ステップS1:トピード情報記憶ステップ、設備情報記憶ステップ)。また、払出計画情報、ガイダンス指標、工程変更パターン情報を、それぞれ、払出計画情報記憶部31、ガイダンス指標記憶部32、工程変更パターン情報記憶部33に登録する(ステップS2:払出計画登録ステップ)   As shown in FIG. 5, first, the torpedo information, the facility information, and the output amount prediction information are registered in the torpedo information storage unit 11, the facility information storage unit 12, and the output amount prediction information storage unit 13, respectively (step S1). : Topic information storage step, facility information storage step). Also, the payout plan information, the guidance index, and the process change pattern information are registered in the payout plan information storage unit 31, the guidance index storage unit 32, and the process change pattern information storage unit 33, respectively (step S2: payout plan registration step).

次に、トピード情報記憶部11、設備情報記憶部12、出銑量予測情報記憶部13に登録されたトピード情報、設備情報、出銑量予測情報を元に、ジョブ情報生成部10においてジョブ情報を生成する(ステップS3:ジョブ情報記憶ステップ)。   Next, in the job information generating unit 10, job information is generated based on the topped information, facility information, and output amount prediction information registered in the topped information storage unit 11, the facility information storage unit 12, and the output amount prediction information storage unit 13. Is generated (step S3: job information storage step).

そして、ジョブ情報生成部10で生成されたジョブを元に、シミュレーション計算部20において、スケジュールを作成し、各トピードが払出場に到着する払出場到着予想時刻を算出する(ステップS4:払出場到着時刻予測ステップ)。尚、シミュレーション計算部20において作成したスケジュールは結果出力部60においてディスプレイ等に出力する(ステップS5)。   Then, based on the job generated by the job information generation unit 10, the simulation calculation unit 20 creates a schedule, and calculates the expected payout arrival time at which each topic arrives at the payout point (step S4: arrival at the payout point). Time prediction step). The schedule created in the simulation calculation unit 20 is output to a display or the like in the result output unit 60 (step S5).

次に、払出計画情報記憶部31、ガイダンス指標記憶部32と、工程変更パターン情報記憶部33に登録された払出計画情報、ガイダンス指標、工程変更パターン情報、及び、シミュレーション計算部20において作成されたスケジュールと算出された各トピードの払出場到着予想時刻を元に、ガイダンス計算部30において、出力するガイダンスを算出する(ステップS6:払出し遅れ検知ステップ)。   Next, the payout plan information storage unit 31, the guidance index storage unit 32, and the payout plan information registered in the process change pattern information storage unit 33, the guidance index, the process change pattern information, and the simulation calculation unit 20 create Based on the schedule and the estimated payout arrival arrival time of each toppe, the guidance calculation unit 30 calculates the guidance to be output (step S6: payout delay detection step).

ガイダンス計算部30において算出したガイダンスは、ガイダンス出力部40において出力する(ステップS7:ガイダンス表示ステップ)。   The guidance calculated by the guidance calculation unit 30 is output by the guidance output unit 40 (step S7: guidance display step).

そして、ガイダンス出力部40で出力されたガイダンスで指定されたトピードについて工程変更を行う場合は(ステップS8:YES)、ガイダンス表示部40で表示されたガイダンスに従った工程変更案、または、独自に考えた工程変更案を、工程変更案入力部50において入力して登録して(ステップS9:工程変更案入力ステップ)、ステップS3に戻る。尚、ガイダンス出力部40で出力されたガイダンスで指定されたトピードについて工程変更を行わない場合、あるいは、ガイダンス出力部40で出力されたガイダンスでトピードが指定されていない場合は(ステップS8:NO)、処理を終了する。   And when changing a process about the toppe designated by the guidance output by the guidance output part 40 (step S8: YES), the process change proposal according to the guidance displayed on the guidance display part 40, or uniquely The considered process change plan is input and registered in the process change plan input unit 50 (step S9: process change plan input step), and the process returns to step S3. In addition, when a process change is not performed about the toppe designated by the guidance output by the guidance output part 40, or when a tope is not designated by the guidance output by the guidance output part 40 (step S8: NO) The process is terminated.

このように、本実施形態に係る払出計画管理装置及び払出計画管理方法、並びにプログラムによれば、設備情報記憶部12で記憶した処理設備の能力を考慮し、トピード情報記憶部11のトピード情報として記憶されたトピード毎の通過工程をジョブ情報生成部10で展開したジョブ単位で、シミュレーション計算部20においてシミュレーションを行うことにより、各トピードの払出場への到着時刻を精度よく予測することが可能になる。そして、予め立案された払出計画に基づいて、チャージの払出開始予定時刻と当該チャージに紐付けされているトピードの払出場到着予想時刻とを比較することにより、溶銑在庫量だけでは判断できないトピードの到着遅れがあるか否かを事前に把握することができる。   As described above, according to the payout plan management apparatus, the payout plan management method, and the program according to the present embodiment, the capacity of the processing equipment stored in the equipment information storage unit 12 is taken into consideration, and the topped information in the topped information storage unit 11 is used. It is possible to accurately predict the arrival time of each torpedo at the payout place by performing a simulation in the simulation calculation unit 20 in units of jobs in which the stored passage processes for each torpedo are developed by the job information generation unit 10. Become. Then, based on a pre-planned payout plan, by comparing the scheduled payout start time with the expected torpedo arrival time of the torpedo linked to the charge, It is possible to know in advance whether there is an arrival delay.

また、払出計画情報記憶部31で予め登録された払出計画に基づいて、チャージの払出開始予定時刻から求まる当該チャージに紐付けされている各トピードの払出場到着目標時刻と、各トピードの払出場到着予想時刻と、をガイダンス計算部30において比較することにより、ガイダンス指標記億部32で予め設定した基準値を満たさないトピードの到着遅れがあるか否かを事前に検知することができる。   In addition, based on the payout plan registered in advance in the payout plan information storage unit 31, the payout arrival target time of each torpedo linked to the charge obtained from the scheduled payout start time of the charge, and the payout place of each torpedo By comparing the estimated arrival time with the guidance calculation unit 30, it is possible to detect in advance whether there is an arrival delay of a topeido that does not satisfy the reference value preset in the guidance index storage unit 32.

また、工程変更パターン情報記憶部33で予め設定した工程変更案をガイダンスとして表示することにより、事前にトピードの払出遅れを防ぐための対策を立てることができる。   In addition, by displaying the process change plan set in advance in the process change pattern information storage unit 33 as guidance, it is possible to take measures to prevent a delay in paying out the torpedo in advance.

また、ガイダンス出力部40でガイダンスとして表示された工程変更案あるいは操作者が独自に考えた工程変更案に基づいて、工程変更案入力部50で通過工程の工程変更を行うことにより、事前にトピードの払出遅れを防止することが可能になる。   Further, based on the process change plan displayed as guidance in the guidance output unit 40 or the process change plan uniquely thought by the operator, the process change plan input unit 50 performs the process change of the passing process, so that This makes it possible to prevent the payout delay.

以上、本発明の好適な実施の形態について説明したが、本発明は、前記実施の形態に限定されるものではなく、特許請求の範囲に記載した限りにおいてさまざまな変更が可能なものである。   The preferred embodiments of the present invention have been described above. However, the present invention is not limited to the above-described embodiments, and various modifications can be made as long as they are described in the claims.

上述の実施の形態では、到着遅れトピードと溶銑積載トピード数超のガイダンス基準値及び工程変更案を設定しているが、それに限らず、到着遅れトピードのみのガイダンス基準値及び工程変更案を設定した場合であっても適用することができる。   In the above-described embodiment, the guidance reference value and the process change proposal for the arrival delay toppe and the number of hot metal loaded topologies are set, but not limited thereto, the guidance reference value and the process change proposal for only the arrival delay toppe are set. Even in cases it can be applied.

また、上述の実施の形態では、シミュレーション計算部20においては、予め設定された割付優先度に基づいて選択したジョブについて処理設備に割り付けてスケジュールを作成しているが、更に、機関車能力を考慮した上で予め設定された割付優先度に基づいて選択したジョブについて処理設備に割り付けてスケジュールを作成することが好ましい。即ち、高炉から製鋼工場間のトピードによる物流では、機関車がトピードを牽引しているため、機関車数を超えるトピードを同時に移動させることができない。そこで、この機関車能力の制約をシミュレーション計算部20に反映するために、機関車とその能力(台数)を設備として設備情報記憶部12に登録するとともに、ジョブ情報生成部11において設備間の搬送を1つの工程としてジョブに追加する。そして、シミュレーション計算部20におけるスケジュールの作成において、同時刻に搬送されるトピード数が機関車数を超えそうな場合、優先度の高い搬送命令(トピード)を優先し、優先度の低い搬送命令を待機させるようにする。尚、優先度の設定は、例えば、搬送効率を上げるために搬出を優先し、それぞれの搬送分類(搬入及び搬出)の中では待ち時間の長いものを優先するように設定する等、工程に合わせて様々な方法が考えられる。そして、機関車能力の足りない場合は、設定した優先度に基づいて、搬送を先送りしながらジョブの資源への割付を行うと、機関車能力の制約を満たしたスケジュールが得られる。従って、シミュレーション計算部20において、機関車の台数を上回る搬送が同時に割り付けられることを回避することができる。   Further, in the above-described embodiment, the simulation calculation unit 20 creates a schedule by allocating the job selected based on the preset allocation priority to the processing equipment, but further considers the locomotive capability. In addition, it is preferable to create a schedule by allocating a job selected based on a preset allocation priority to a processing facility. That is, in the logistics by the toppe between the blast furnace and the steelmaking factory, the locomotive is pulling the toppe, and therefore, the topped exceeding the number of locomotives cannot be moved simultaneously. Therefore, in order to reflect the restriction on the locomotive capability in the simulation calculation unit 20, the locomotive and its capability (number) are registered in the facility information storage unit 12 as facilities, and the job information generation unit 11 carries them between the facilities. Is added to the job as one process. In the creation of the schedule in the simulation calculation unit 20, when the number of torpedo transported at the same time is likely to exceed the number of locomotives, priority is given to a transport command with high priority (topes), and a transport command with low priority is given. Try to wait. In addition, priority is set according to the process, for example, priority is given to unloading in order to increase transfer efficiency, and priority is given to items with a long waiting time in each transfer classification (loading and unloading). Various methods are possible. If the locomotive capacity is insufficient, a schedule satisfying the restrictions on the locomotive capacity can be obtained by assigning jobs to resources while deferring conveyance based on the set priority. Therefore, in the simulation calculation unit 20, it is possible to avoid simultaneous assignment of conveyances exceeding the number of locomotives.

本実施の形態に係る払出計画管理装置を示すブロック図である。It is a block diagram which shows the payout plan management apparatus which concerns on this Embodiment. 本実施の形態で対象とする高炉から製鋼工場間のトピードによる物流工程を示す図である。It is a figure which shows the physical distribution process by the toppe between the blast furnace made into object in this Embodiment, and a steelmaking factory. シミュレーション計算部において作成されたシミュレーション結果である。It is the simulation result produced in the simulation calculation part. 図3のシミュレーション結果に対して、トピード5とトピード9の工程計画を変更した場合のシミュレーション結果を示す図である。It is a figure which shows the simulation result at the time of changing the process plan of Tope 5 and Tope 9 with respect to the simulation result of FIG. 本実施の形態に係る払出計画管理方法の処理の手順について説明したフローチャートである。It is the flowchart explaining the procedure of the process of the payment plan management method which concerns on this Embodiment.

符号の説明Explanation of symbols

1 払出計画管理装置
10 ジョブ情報生成部(ジョブ情報記憶手段)
11 トピード情報記憶部(トピード情報記憶手段)
12 設備情報記憶部(設備情報記憶手段)
13 出銑量予測情報記憶部
20 シミュレーション計算部(払出場到着時刻予測手段)
30 ガイダンス計算部(払出し遅れ検知手段)
31 払出計画情報記憶部(払出計画登録手段)
32 ガイダンス指標記憶部
33 工程変更パターン情報記憶部
40 ガイダンス出力部(ガイダンス表示手段)
50 工程変更案入力部(工程変更案入力手段)
60 結果出力部
1 Disbursement plan management device 10 Job information generation unit (job information storage means)
11 Topic information storage unit (Topic information storage means)
12 Equipment information storage unit (equipment information storage means)
13 Output amount prediction information storage unit 20 Simulation calculation unit (payout arrival time prediction means)
30 Guidance calculation section (payment delay detection means)
31 payout plan information storage unit (payout plan registration means)
32 Guidance index storage unit 33 Process change pattern information storage unit 40 Guidance output unit (guidance display means)
50 Process change plan input part (process change plan input means)
60 Result output part

Claims (12)

高炉から出銑される溶銑を運搬する複数のトピードのそれぞれについて、溶銑を高炉で受銑してから払出場で払出すまでの工程の中から処理で通過する通過工程を登録するトピード情報記憶手段と、
前記トピードと前記通過工程との組み合わせをジョブとして登録するジョブ情報記憶手段と、
前記工程を処理することが可能な処理設備と当該処理設備の能力とを登録する設備情報記憶手段と、
前記ジョブの中から予め設定した優先度に基づいて選択したジョブについて、前記処理設備の中から処理する処理設備を選択して割り付けて、前記トピード毎に、払出場に到着する払出場到着予想時刻を予測する払出場到着時刻予測手段と、
を備えることを特徴とする払出計画管理装置。
For each of a plurality of torpedos that transport the hot metal discharged from the blast furnace, a torpedo information storage means for registering a passing process that passes through the process from when the hot metal is received at the blast furnace to when the hot metal is discharged at the discharge station. When,
Job information storage means for registering a combination of the toppe and the passing step as a job;
Facility information storage means for registering the processing facility capable of processing the process and the capacity of the processing facility;
For a job selected based on a priority set in advance from among the jobs, a processing facility to be processed is selected and allocated from the processing facilities, and an expected arrival time of arrival at the payout location for each torpedo A means for predicting the arrival time of the place for predicting,
A payout plan management apparatus comprising:
溶銑を払出す1または2以上のトピードと払出開始予定時刻との組み合わせであるチャージを登録する払出計画登録手段と、
前記トピード毎に、前記払出場到着予想時刻と、前記払出開始予定時刻から求まる各トピードの払出場到着目標時刻と、を比較して、予め設定した基準値を満たさないトピードを検知する払出し遅れ検知手段と、
を更に備えることを特徴とする請求項1に記載の払出計画管理装置。
A payout plan registration means for registering a charge which is a combination of one or more torpedoes for paying out hot metal and a payout start scheduled time;
A payout delay detection that compares the expected payout arrival time and the payout arrival target time of each torpedo determined from the payout scheduled start time for each torpedo and detects a torpedo that does not satisfy a preset reference value. Means,
The payout plan management apparatus according to claim 1, further comprising:
前記払出し遅れ検知手段で表示されたトピードに対して予め設定した工程変更案の中から予め設定した優先度に基づいて選択した工程変更案をガイダンスとして表示するガイダンス表示手段と、
を更に備えることを特徴とする請求項2に記載の払出計画管理装置。
Guidance display means for displaying, as guidance, a process change proposal selected based on a priority set in advance from among process change proposals set in advance with respect to the toppe displayed by the payout delay detection means;
The payout plan management apparatus according to claim 2, further comprising:
前記払出し遅れ検知手段で表示されたトピードに対して通過工程の工程変更案を入力する工程変更案入力手段、
を更に備えることを特徴とする請求項2または3に記載の払出計画管理装置。
A process change proposal input means for inputting a process change proposal of a passing process for the toppe displayed by the payout delay detection means;
The payout plan management apparatus according to claim 2, further comprising:
高炉から出銑される溶銑を運搬する複数のトピードのそれぞれについて、溶銑を高炉で受銑してから払出場で払出すまでの工程の中から処理で通過する通過工程を登録するトピード情報記憶ステップと、
前記トピードと前記通過工程との組み合わせをジョブとして登録するジョブ情報記憶ステップと、
前記工程を処理することが可能な処理設備と当該処理設備の能力とを登録する設備情報記憶ステップと、
前記ジョブの中から予め設定した優先度に基づいて選択したジョブについて、前記処理設備の中から処理する処理設備を選択して割り付けて、前記トピード毎に、払出場に到着する払出場到着予想時刻を予測する払出場到着時刻予測ステップと、
を備えることを特徴とする払出計画管理方法。
A torpedo information storage step for registering the passing process through the process from receiving the hot metal from the blast furnace to discharging it at the discharge station for each of a plurality of torpedos that transport the hot metal discharged from the blast furnace When,
A job information storage step for registering a combination of the topped and the passing step as a job;
A facility information storage step for registering a processing facility capable of processing the process and the capacity of the processing facility;
For a job selected based on a priority set in advance from among the jobs, a processing facility to be processed is selected and allocated from the processing facilities, and an expected arrival time of arrival at the payout location for each torpedo A payout arrival time prediction step for predicting,
A payout plan management method characterized by comprising:
溶銑を払出す1または2以上のトピードと払出開始予定時刻との組み合わせであるチャージを登録する払出計画登録ステップと、
前記トピード毎に、前記払出場到着予想時刻と、前記払出開始予定時刻から求まる各トピードの払出場到着目標時刻と、を比較して、予め設定した基準値を満たさないトピードを検知する払出し遅れ検知ステップと、
を更に備えることを特徴とする請求項5に記載の払出計画管理方法。
A payout plan registration step for registering a charge that is a combination of one or more topologies for paying out hot metal and a payout start scheduled time;
A payout delay detection that compares the expected payout arrival time and the payout arrival target time of each torpedo determined from the payout scheduled start time for each torpedo and detects a torpedo that does not satisfy a preset reference value. Steps,
The payout plan management method according to claim 5, further comprising:
前記払出し遅れ検知ステップで表示されたトピードに対して予め設定した工程変更案の中から予め設定した優先度に基づいて選択した工程変更案をガイダンスとして表示するガイダンス表示ステップと、
を更に備えることを特徴とする請求項6に記載の払出計画管理方法。
A guidance display step for displaying, as guidance, a process change plan selected based on a priority set in advance from among the process change plans set in advance for the toppe displayed in the payout delay detection step;
The payout plan management method according to claim 6, further comprising:
前記払出し遅れ検知ステップで表示されたトピードに対して通過工程の工程変更案を入力する工程変更案入力ステップ、
を更に備えることを特徴とする請求項6または7に記載の払出計画管理方法。
A process change plan input step for inputting a process change plan for the passage process for the toppe displayed in the payout delay detection step,
The payout plan management method according to claim 6 or 7, further comprising:
高炉から出銑される溶銑を運搬する複数のトピードのそれぞれについて、溶銑を高炉で受銑してから払出場で払出すまでの工程の中から処理で通過する通過工程を登録するトピード情報記憶ステップ、
前記トピードと前記通過工程との組み合わせをジョブとして登録するジョブ情報記憶ステップ、
前記工程を処理することが可能な処理設備と当該処理設備の能力とを登録する設備情報記憶ステップ、
前記ジョブの中から予め設定した優先度に基づいて選択したジョブについて、前記処理設備の中から処理する処理設備を選択して割り付けて、前記トピード毎に、払出場に到着する払出場到着予想時刻を予測する払出場到着時刻予測ステップ、
をコンピュータに実行させるためのプログラム。
A torpedo information storage step for registering the passing process through the process from receiving the hot metal from the blast furnace to discharging it at the discharge station for each of a plurality of torpedos that transport the hot metal discharged from the blast furnace ,
A job information storage step for registering a combination of the toppe and the passing step as a job;
A facility information storage step for registering a processing facility capable of processing the process and the capacity of the processing facility;
For a job selected based on a priority set in advance from among the jobs, a processing facility to be processed is selected and allocated from the processing facilities, and an expected arrival time of arrival at the payout location for each torpedo A payout arrival time prediction step for predicting,
A program that causes a computer to execute.
溶銑を払出す1または2以上のトピードと払出開始予定時刻との組み合わせであるチャージを登録する払出計画登録ステップ、
前記トピード毎に、前記払出場到着予想時刻と、前記払出開始予定時刻から求まる各トピードの払出場到着目標時刻と、を比較して、予め設定した基準値を満たさないトピードを検知する払出し遅れ検知ステップ、
を更にコンピュータに実行させることを特徴とする請求項9に記載のプログラム。
A payout plan registration step for registering a charge that is a combination of one or more torpedo for paying out hot metal and a payout start scheduled time;
A payout delay detection that compares the expected payout arrival time and the payout arrival target time of each torpedo determined from the payout scheduled start time for each torpedo and detects a torpedo that does not satisfy a preset reference value. Step,
The program according to claim 9, further causing a computer to execute.
前記払出し遅れ検知ステップで表示されたトピードに対して予め設定した工程変更案の中から予め設定した優先度に基づいて選択した工程変更案をガイダンスとして表示するガイダンス表示ステップ、
を更にコンピュータに実行させることを特徴とする請求項10に記載のプログラム。
A guidance display step for displaying, as guidance, a process change plan selected based on a priority set in advance from among the process change plans set in advance for the toppe displayed in the payout delay detection step;
The program according to claim 10, further causing a computer to execute.
前記払出し遅れ検知ステップで表示されたトピードに対して通過工程の工程変更案を入力する工程変更案入力ステップ、
を更にコンピュータに実行させることを特徴とする請求項10または11に記載のプログラム。
A process change plan input step for inputting a process change plan for the passage process for the toppe displayed in the payout delay detection step,
The program according to claim 10 or 11, further causing the computer to execute.
JP2004147556A 2004-05-18 2004-05-18 Discharge plan management apparatus, payout plan management method, and program Expired - Fee Related JP4373275B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004147556A JP4373275B2 (en) 2004-05-18 2004-05-18 Discharge plan management apparatus, payout plan management method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004147556A JP4373275B2 (en) 2004-05-18 2004-05-18 Discharge plan management apparatus, payout plan management method, and program

Publications (2)

Publication Number Publication Date
JP2005330508A true JP2005330508A (en) 2005-12-02
JP4373275B2 JP4373275B2 (en) 2009-11-25

Family

ID=35485376

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004147556A Expired - Fee Related JP4373275B2 (en) 2004-05-18 2004-05-18 Discharge plan management apparatus, payout plan management method, and program

Country Status (1)

Country Link
JP (1) JP4373275B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007105298A1 (en) * 2006-03-13 2007-09-20 Mitsubishi Denki Kabushiki Kaisha Manufacture system development supporting apparatus and manufacture executing system
JP2007254864A (en) * 2006-03-24 2007-10-04 Jfe Steel Kk Method for keeping heat of molten pig iron in torpedo car, and heat-keeping apparatus
CN104298214A (en) * 2014-11-03 2015-01-21 天津理工大学 Comprehensive optimization and control method for blast furnace molten iron productive process
JP2016186743A (en) * 2015-03-27 2016-10-27 三菱重工業株式会社 Work planning device and work planning method
JP2016191974A (en) * 2015-03-30 2016-11-10 Jfeスチール株式会社 Transportation plan creation device and transportation plan creation method
WO2024016409A1 (en) * 2022-07-21 2024-01-25 中冶南方工程技术有限公司 Automatic control system for molten iron pretreatment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52150310A (en) * 1976-06-09 1977-12-14 Kobe Steel Ltd Treatment for control of transporting molten pig iron
JP2002062924A (en) * 2000-08-23 2002-02-28 Kobe Steel Ltd Physical distribution simulation method for manufacturing line
JP2002332510A (en) * 2001-05-07 2002-11-22 Nkk Corp Method for preparing physical distribution plan, and program therefor
JP2003055705A (en) * 2001-08-10 2003-02-26 Nkk Corp Physical distribution plan preparing method, and program thereof
JP2003082407A (en) * 2001-09-11 2003-03-19 Kawasaki Steel Corp Method and device for verifying balance in hot metal storage between blast furnace and steel-making shop

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52150310A (en) * 1976-06-09 1977-12-14 Kobe Steel Ltd Treatment for control of transporting molten pig iron
JP2002062924A (en) * 2000-08-23 2002-02-28 Kobe Steel Ltd Physical distribution simulation method for manufacturing line
JP2002332510A (en) * 2001-05-07 2002-11-22 Nkk Corp Method for preparing physical distribution plan, and program therefor
JP2003055705A (en) * 2001-08-10 2003-02-26 Nkk Corp Physical distribution plan preparing method, and program thereof
JP2003082407A (en) * 2001-09-11 2003-03-19 Kawasaki Steel Corp Method and device for verifying balance in hot metal storage between blast furnace and steel-making shop

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007105298A1 (en) * 2006-03-13 2007-09-20 Mitsubishi Denki Kabushiki Kaisha Manufacture system development supporting apparatus and manufacture executing system
JPWO2007105298A1 (en) * 2006-03-13 2009-07-23 三菱電機株式会社 Manufacturing system development support equipment
JP4629771B2 (en) * 2006-03-13 2011-02-09 三菱電機株式会社 Manufacturing system development support equipment
JP2007254864A (en) * 2006-03-24 2007-10-04 Jfe Steel Kk Method for keeping heat of molten pig iron in torpedo car, and heat-keeping apparatus
CN104298214A (en) * 2014-11-03 2015-01-21 天津理工大学 Comprehensive optimization and control method for blast furnace molten iron productive process
JP2016186743A (en) * 2015-03-27 2016-10-27 三菱重工業株式会社 Work planning device and work planning method
JP2016191974A (en) * 2015-03-30 2016-11-10 Jfeスチール株式会社 Transportation plan creation device and transportation plan creation method
WO2024016409A1 (en) * 2022-07-21 2024-01-25 中冶南方工程技术有限公司 Automatic control system for molten iron pretreatment

Also Published As

Publication number Publication date
JP4373275B2 (en) 2009-11-25

Similar Documents

Publication Publication Date Title
JP4987602B2 (en) Yard operation planning method, apparatus, and program
JP6428435B2 (en) Transportation plan creation device and transportation plan creation method
JP4373275B2 (en) Discharge plan management apparatus, payout plan management method, and program
JP5258673B2 (en) Dispensing planning method and dispensing planning apparatus for sample processing system
JP2013237878A (en) Feedstock transportation control apparatus and feedstock transportation control method
JP2018012559A (en) Yard management apparatus, yard management method, and program
JP6724858B2 (en) Transportation container allocation plan creation method, transportation container allocation plan creation device, and steel mill operation method
JP2006260294A (en) Operation schedule creating system and method of steel manufacturing process, and computer program
JP4308303B1 (en) Method, apparatus and program for creating a plan for entering a raw material storage tank
JP4557473B2 (en) Method and apparatus for adjusting steelmaking schedule based on the amount of storage between blast furnace and steelmaking factory
JP6648365B2 (en) How to determine the start time of continuous casting
JP2017134739A (en) Physical distribution system, control method, and program
JP2019067293A (en) Arrangement adjustment system of engine for traction of mixer car in steel-making process
JP2003076821A (en) Worker assignment system
JP4959125B2 (en) Processing plan creation device, operation control device, processing plan creation method, operation control method, computer program, and recording medium
JP2018150135A (en) Yard management device, yard management method, and program
JP4638824B2 (en) Production / distribution plan creation apparatus, production / distribution plan creation method, distribution control apparatus, distribution control method, program, and computer-readable recording medium
JP2007009243A (en) Unit for allotting molten iron
JP2019206732A (en) Torpedo information output device, torpedo information output method and program
JP2007009244A (en) Unit for allotting molten iron
JP4157090B2 (en) Hot metal supply method to converter
JP2626201B2 (en) Optimal transfer control device for raw material yard
JP4498878B2 (en) Raw material ship allocation planning apparatus, raw material ship allocation planning method, and program
JP2005301813A (en) Method and device for generating put-out work plan, and program
JP2005029865A (en) Operation method for steelmaking furnace

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060925

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090526

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090623

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090818

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090901

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090903

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120911

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4373275

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120911

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130911

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees