JP2005156035A - Device and method for controlling number of operated machines - Google Patents

Device and method for controlling number of operated machines Download PDF

Info

Publication number
JP2005156035A
JP2005156035A JP2003395692A JP2003395692A JP2005156035A JP 2005156035 A JP2005156035 A JP 2005156035A JP 2003395692 A JP2003395692 A JP 2003395692A JP 2003395692 A JP2003395692 A JP 2003395692A JP 2005156035 A JP2005156035 A JP 2005156035A
Authority
JP
Japan
Prior art keywords
heat source
day
load
units
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003395692A
Other languages
Japanese (ja)
Other versions
JP4291116B2 (en
Inventor
Tsuneyoshi Suzuki
恒由 鈴木
Masafumi Takesako
雅史 竹迫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Priority to JP2003395692A priority Critical patent/JP4291116B2/en
Publication of JP2005156035A publication Critical patent/JP2005156035A/en
Application granted granted Critical
Publication of JP4291116B2 publication Critical patent/JP4291116B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To determine the number of operated heat source machines every day at the requested time of the day (the control start time and the time set by fixed time before the end of control) neither more nor less. <P>SOLUTION: If the day is a weekday, the result value of load after the lapse of fixed time from the start of control of the latest weekday (the request load amount after the lapse of fixed time from the start time of control) is read, and the number of operated heat source machines at the control start time of the day is determined based on the result value. Further, the result value of load at the fixed time before the end of control of the latest weekday (the request load amount at the fixed time before the end time of control) is read, and the number of operated heat source machines at the time set by the fixed time before the control end of the day is determined based on the result value. In the same way also when the day is a holiday or a special day, the number of operated heat source machines at the start time of control of the day and at the time set by the fixed time before the end of control is determined. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

この発明は、外部負荷が要求する負荷熱量や負荷流量などの要求負荷量に基づいて熱源機の運転台数を制御する運転台数制御装置および方法に関するものである。   The present invention relates to an operating number control apparatus and method for controlling the number of operating heat source units based on a required load amount such as a load heat amount and a load flow rate required by an external load.

従来より、テナントビルなどにおいては、複数の熱源機とこれら熱源機のそれぞれに補機として設けられたポンプとを主要構成要素とする熱源システムを設け、ポンプより圧送した熱源水を熱源機により冷却あるいは加熱し、往ヘッダにおいて混合し、往水管路を介して空調機やファンコイルなどの外部負荷に供給するようにしている。外部負荷において熱交換された熱源水は、還水管路を介して還ヘッダに戻され、再びポンプによって圧送され、以上の経路を循環する。例えば、熱源機を冷凍機とした場合、熱源水は冷水とされ、上述した経路を循環する。熱源機を加熱機とした場合、熱源水は温水とされ、上述した経路を循環する(例えば、特許文献1参照)。   Conventionally, in tenant buildings, etc., a heat source system that has a plurality of heat source machines and a pump provided as an auxiliary machine for each of these heat source machines is provided as a main component, and the heat source water pumped from the pump is cooled by the heat source machine. Or it heats, mixes in an outward header, and supplies it to external loads, such as an air conditioner and a fan coil, via an outward water pipe line. The heat source water heat-exchanged in the external load is returned to the return header via the return water pipe, and is pumped again by the pump, and circulates through the above path. For example, when the heat source machine is a refrigerator, the heat source water is cold water and circulates through the above-described path. When the heat source machine is a heater, the heat source water is warm water and circulates through the above-described path (for example, see Patent Document 1).

この熱源システムには熱源機の運転台数を制御する運転台数制御装置が設けられる。運転台数制御装置は、往ヘッダから外部負荷への熱源水の温度(往水温度)TS,還ヘッダに戻される熱源水の温度(還水温度)TRおよび還ヘッダに戻される熱源水の流量(負荷流量)Fとから、F×(TR−TS)=Qとして現在の負荷熱量Qを求め、この求めた現在の負荷熱量Q又は負荷流量F(Q,F:要求負荷量)に応じて熱源機の運転台数を制御する。   This heat source system is provided with an operating number control device for controlling the operating number of heat source machines. The operating number control device includes the temperature of the heat source water from the forward header to the external load (forward water temperature) TS, the temperature of the heat source water returned to the return header (return water temperature) TR, and the flow rate of the heat source water returned to the return header ( The current load heat quantity Q is obtained from the load flow rate F and F × (TR−TS) = Q, and the heat source is determined according to the obtained current load heat quantity Q or the load flow quantity F (Q, F: required load quantity). Control the number of operating machines.

例えば、予め定められている運転順序テーブルに従い、負荷流量Fが所定値F1に達するまでは指定順位1番の熱源機を運転し、負荷流量Fが所定値F1を越えれば、指定順位1番の熱源機に加えて指定順位2番の熱源機の運転を開始する。なお、熱源機の運転が開始されれば、その熱源機の補機であるポンプの運転も開始される。   For example, according to a predetermined operation order table, the heat source unit of the designated rank 1 is operated until the load flow rate F reaches the predetermined value F1, and if the load flow rate F exceeds the predetermined value F1, the designated rank No. 1 is operated. In addition to the heat source machine, the operation of the heat source machine of the designated rank 2 is started. When the operation of the heat source machine is started, the operation of the pump that is an auxiliary machine of the heat source machine is also started.

この熱源機の運転台数の制御において、当日の始動時の熱源機の運転台数は、制御開始運転スケジュールとカレンダとに基づいて固定的に定められる。例えば、カレンダで当日が平日であるのか、休日であるのかを判断し、当日が平日であれば、全ての平日に対して季節毎に一律に定められた制御開始運転スケジュールに従って、当日の始動時の運転台数を決定する。同様にして、当日が休日であれば、全ての休日に対して季節毎に一律に定められた制御開始運転スケジュールに従って当日の始動時の運転台数を決定する。   In the control of the number of operating heat source units, the number of operating heat source units at the start of the day is fixedly determined based on the control start operation schedule and the calendar. For example, the calendar determines whether the day is a weekday or a holiday, and if the day is a weekday, the start date of the day is determined according to the control start operation schedule that is uniformly set for each weekday for all weekdays. Determine the number of units to be operated. Similarly, if the current day is a holiday, the number of units to be started at that day is determined in accordance with a control start operation schedule that is uniformly determined for every holiday for each season.

なお、制御開始運転スケジュールは、その制御開始運転スケジュールが適用される種別の日(平日、休日など)の始動時の時刻(制御開始時刻)とその時刻における熱源機の運転台数を規定する。また、制御開始運転スケジュールにおいて、その制御開始運転スケジュールを適用する種別の日の始動時の熱源機の運転台数は、その種別の日に対して季節毎に固定的に定められた1日の予想される熱負荷に基づいて、始動時に快適な環境となるように定められる(例えば、特許文献2、特許文献3参照)。   The control start operation schedule defines the start time (control start time) of the type of day (weekday, holiday, etc.) to which the control start operation schedule is applied and the number of operating heat source units at that time. In addition, in the control start operation schedule, the number of operating heat source units at the start of the day of the type to which the control start operation schedule is applied is the forecast of the day that is fixed for each season with respect to the season. It is determined based on the heat load to be a comfortable environment at the time of starting (see, for example, Patent Document 2 and Patent Document 3).

特開2002−98358号公報JP 2002-98358 A 特開平8−86490号公報JP-A-8-86490 特開2002−22239号公報JP 2002-22239 A

上述したように、従来の熱源機の運転台数制御装置では、平日、休日などの日の種別毎に、また季節毎に、当日の始動時の熱源機の運転台数が定められる。しかしながら、この始動時の熱源機の運転台数は、例えば当日が平日である場合、同一季節では全ての平日で同じとなる。このため、季節の変わり目など、始動時の熱源機の運転台数が多すぎ、始動時に余分なエネルギーを使用して暖め過ぎたり、冷やし過ぎたりするなどの問題が生じていた。また、逆に、始動時の熱源機の運転台数が少なすぎ、始動時に目的の温度まで達せず、居住者に不快感を与えてしまうという問題が生じていた。このことは、始動時だけではなく、例えば残業時など当日の所望の時刻における熱源機の運転台数を定めるような場合でも同じことが言える。   As described above, in the conventional heat source unit operating number control device, the number of operating heat source units at the start of the day is determined for each day type such as weekdays and holidays, and for each season. However, the number of operating heat source machines at the time of starting is the same for all weekdays in the same season, for example, when the day is a weekday. For this reason, the number of operating heat source units at the start is too large, such as at the turn of the season, and problems such as excessive warming and excessive cooling using extra energy at the start have occurred. On the other hand, the number of operating heat source units at the start is too small, the target temperature is not reached at the start, and there is a problem that unpleasantness is given to residents. This is true not only when starting, but also when the number of operating heat source units at a desired time of the day such as overtime is determined.

本発明は、このような課題を解決するためになされたもので、その目的とするところは、毎日、過不足なく、当日の所望の時刻における熱源機の運転台数を決定することができる運転台数制御装置および方法を提供することにある。   The present invention has been made to solve such a problem, and the object of the present invention is to be able to determine the number of operating heat source units at a desired time of the day without excess or deficiency every day. It is to provide a control device and method.

このような目的を達成するために本発明は、少なくとも過去の各日の所定時刻における要求負荷量の実績値を所定時刻負荷として記憶し、当日の日の種別に応じて直近の同一種別の日の所定時刻負荷を読み出し、この読み出した所定時刻負荷に基づいて当日の所望の時刻における熱源機の運転台数を決定するようにしたものである。
例えば、過去の各日の制御開始時刻から一定時間経過後(制御開始一定時間経過後時刻)の要求負荷量の実績値を制御開始一定時間経過後負荷として記憶し、当日の日の種別に応じて直近の同一種別の日の制御開始一定時間経過後負荷を読み出し、この読み出した制御開始一定時間経過後負荷に基づいて当日の制御開始時刻における熱源機の運転台数を決定する。
また、過去の各日の制御終了時刻から一定時間前(制御終了一定時間前時刻)の要求負荷量の実績値を制御終了一定時間前負荷として記憶し、当日の日の種別に応じて直近の同一種別の日の制御終了一定時間前負荷を読み出し、この読み出した制御終了一定時間前負荷に基づいて当日の制御終了一定時間前時刻における熱源機の運転台数を決定する。
本発明では、当日の所望の時刻(制御開始時刻、制御終了一定時間前時刻)における熱源機の運転台数が直近の当日と同一種別の日の所定時刻負荷(制御開始一定時間経過後負荷、制御終了一定時間前負荷)に基づいて決定されるものとなる。すなわち、当日が平日であり、前日も平日であれば、前日の所定時刻負荷に基づいて当日の所望の時刻における熱源機の運転台数が決定される。また、当日が日曜日であれば、前日(土曜日(休日))の所定時刻負荷に基づいて当日の所望の時刻における熱源機の運転台数が決定される。また、当日が例えば創立記念日(特別日)であれば、昨年の創立記念日の所定時刻負荷に基づいて当日の所望の時刻における熱源機の運転台数が決定される。
In order to achieve such an object, the present invention stores at least the actual value of the required load amount at a predetermined time in each past day as a predetermined time load, and the most recent day of the same type according to the type of the current day. The predetermined time load is read out, and the number of operating heat source units at a desired time of the day is determined based on the read predetermined time load.
For example, the actual value of the required load amount after a certain amount of time has elapsed since the control start time of each day in the past (the time after a certain amount of control start has elapsed) is stored as the load after a certain amount of control start has elapsed, depending on the type of the current day Then, the load is read after a certain period of control start time on the same type of the most recent day, and the number of operating heat source devices at the control start time of the day is determined based on the read load after the certain period of control start.
In addition, the actual value of the required load amount for a certain time before the control end time of each past day (the time before the control end time) is stored as the load before the control end constant time, and the most recent load according to the type of the current day A control end fixed time preload for the same type of day is read out, and the number of operating heat source units at the time of the control end fixed time before that day is determined based on the read control end fixed time preload.
In the present invention, the number of operating heat source machines at a desired time of the day (control start time, time before control end time) is a predetermined time load of the same type as the most recent day (load after control start time elapses, control It is determined on the basis of the end load for a predetermined period of time. That is, if the current day is a weekday and the previous day is also a weekday, the number of operating heat source units at a desired time of the day is determined based on the predetermined time load of the previous day. If the current day is Sunday, the number of operating heat source units at a desired time of the day is determined based on a predetermined time load on the previous day (Saturday (holiday)). In addition, if the day is, for example, a founding anniversary (special day), the number of operating heat source machines at a desired time on the day is determined based on a predetermined time load on the founding anniversary last year.

本発明によれば、当日の所望の時刻における熱源機の運転台数を直近の当日と同一種別の日の所定時刻負荷に基づいて決定するようにしたので、毎日、過不足なく、当日の所望の時刻における熱源機の運転台数を決定することができるようになり、省エネルギーの実現と快適な環境を提供することができるようになる。   According to the present invention, the number of operating heat source units at a desired time of the day is determined based on the predetermined time load of the same type of day as the most recent day. It becomes possible to determine the number of operating heat source units at the time, and to realize energy saving and a comfortable environment.

以下、本発明を図面に基づいて詳細に説明する。図1はこの発明に係る運転台数制御装置を含む熱源システムの一実施の形態を示す計装図である。同図において、1−1〜1−Nは熱源水を生成する熱源機、2−1〜2−Nは熱源機1−1〜1−Nが生成する熱源水を搬送するポンプ、3−1〜3−Nはポンプ2−1〜2−Nに付設されたインバータ、4は熱源機1−1〜1−Nからの熱源水を混合する往ヘッダ、5は往水管路、6は往ヘッダ4から往水管路5を介して送られてくる熱源水の供給を受ける外部負荷(地域冷暖房の需要家、または空調機・ファンコイル等の熱負荷)、7は還水管路である。外部負荷6には供給される熱源水の流量を調整するためのバルブ6−1が設けられている。   Hereinafter, the present invention will be described in detail with reference to the drawings. FIG. 1 is an instrumentation diagram showing an embodiment of a heat source system including an operating number control device according to the present invention. In the figure, 1-1 to 1-N are heat source units that generate heat source water, 2-1 to 2-N are pumps that transport the heat source water generated by the heat source units 1-1 to 1-N, 3-1. ˜3-N is an inverter attached to the pumps 2-1 to 2-N, 4 is a forward header for mixing the heat source water from the heat source devices 1-1 to 1-N, 5 is a forward conduit, and 6 is a forward header 4 is an external load that receives the supply of heat source water that is sent from 4 through the outgoing water pipe 5 (a heat load such as a district cooling / heating consumer or an air conditioner / fan coil), and 7 is a return water pipe. The external load 6 is provided with a valve 6-1 for adjusting the flow rate of supplied heat source water.

8は外部負荷6において熱交換され還水管路7を介して送られてくる熱源水が戻される還ヘッダ、9は往ヘッダ4と還ヘッダ8とを連通させるバイパス管路、10はバイパス管路9に設けられたバイパス弁、11は往ヘッダ4と還ヘッダ8との間の熱源水の差圧(ヘッダ間差圧)ΔPを計測する差圧計、12は往ヘッダ4から外部負荷6への熱源水の温度を往水温度TSとして計測する往水温度センサ、13は還ヘッダ8に戻される熱源水の温度を還水温度TRとして計測する還水温度センサ、14は還ヘッダ8に戻される熱源水の流量(外部負荷6に供給される熱源水の流量)を負荷流量Fとして計測する流量計、15は制御装置である。   8 is a return header in which heat source water is exchanged in the external load 6 and returned via the return water pipe 7, 9 is a bypass pipe that connects the forward header 4 and the return header 8, and 10 is a bypass pipe. 9 is a bypass valve, 11 is a differential pressure gauge for measuring the pressure difference ΔP of the heat source water between the forward header 4 and the return header 8 (inter-header differential pressure) ΔP, and 12 is a differential pressure gauge from the forward header 4 to the external load 6 A forward water temperature sensor that measures the temperature of the heat source water as the forward water temperature TS, 13 is a return water temperature sensor that measures the temperature of the heat source water returned to the return header 8 as the return water temperature TR, and 14 is returned to the return header 8. A flow meter 15 for measuring the flow rate of the heat source water (the flow rate of the heat source water supplied to the external load 6) as the load flow rate F, 15 is a control device.

この熱源システムにおいて、ポンプ2−1〜2−Nにより圧送された熱源水は、熱源機1−1〜1−Nにより冷却あるいは加熱され、往ヘッダ4において混合され、往水管路5を介して外部負荷6へ供給される。そして、外部負荷6において熱交換され、還水管路7を介して還ヘッダ8に戻され、再びポンプ2−1〜2−Nによって圧送され、以上の経路を循環する。例えば、熱源機1−1〜1−Nを冷凍機とした場合、熱源水は冷水とされ、上述した経路を循環する。熱源機1−1〜1−Nを加熱機とした場合、熱源水は温水とされ、上述した経路を循環する。   In this heat source system, the heat source water pumped by the pumps 2-1 to 2 -N is cooled or heated by the heat source devices 1-1 to 1 -N, mixed in the forward header 4, and passed through the forward water pipe 5. Supplied to external load 6. And it heat-exchanges in the external load 6, returns to the return header 8 via the return water pipe 7, is pumped again by the pumps 2-1 to 2-N, and circulates the above path. For example, when the heat source devices 1-1 to 1-N are refrigerators, the heat source water is cold water and circulates through the above-described path. When the heat source devices 1-1 to 1-N are heaters, the heat source water is warm water and circulates through the above-described path.

〔ポンプ回転数による圧力一定制御〕
制御装置15は、差圧計11によって計測されるヘッダ間差圧ΔPを監視し、このヘッダ間差圧ΔPを一定とするようにポンプ2−1〜2−Nの回転数を制御する。すなわち、差圧計11によって計測されるヘッダ間差圧ΔPpvと予め設定されている設定差圧ΔPspとを比較し、ΔPpv=ΔPspとなるように、インバータ3−1〜3−Nへインバータ出力(0〜100%)を送って、ポンプ2−1〜2−Nの回転数を制御する。これをポンプ回転数による圧力一定制御と呼ぶ。なお、このポンプ回転数による圧力一定制御では、制御装置15よりバイパス弁10へ0%のバイパス弁開度出力を送って、バイパス弁10を全閉状態とする。
[Constant pressure control by pump speed]
The control device 15 monitors the inter-header differential pressure ΔP measured by the differential pressure gauge 11, and controls the rotational speeds of the pumps 2-1 to 2-N so that the inter-header differential pressure ΔP is constant. That is, the header differential pressure ΔPpv measured by the differential pressure gauge 11 is compared with the preset differential pressure ΔPsp, and the inverter output (0 to 0-3) is set so that ΔPpv = ΔPsp. ~ 100%) to control the rotational speed of the pumps 2-1 to 2-N. This is called constant pressure control based on the pump rotation speed. In this constant pressure control based on the pump speed, a 0% bypass valve opening degree output is sent from the control device 15 to the bypass valve 10 to fully close the bypass valve 10.

〔熱源機運転台数制御〕
制御装置15は、往水温度センサ12からの往水温度TS,還水温度センサ12からの還水温度TRおよび流量計14からの負荷流量Fとから、F×(TR−TS)=Qとして現在の負荷熱量Qを求め、この求めた現在の負荷熱量Q又は流量計14からの負荷流量F(Q,F:要求負荷量)に応じて熱源機1−1〜1−Nの運転台数を制御する。例えば、予め定められている運転順序テーブルに従い、負荷流量Fが所定値F1に達するまでは指定順位1番の熱源機1−1を運転し、負荷流量Fが所定値F1を越えれば、熱源機1−1に加えて指定順位2番の熱源機1−2の運転を開始する。なお、熱源機1−2の運転が開始されれば、この熱源機1−2の補機であるポンプ2−2の運転も開始される。この実施の形態では、負荷流量Fに基づいて熱源機の運転台数の制御を行うものとする。
[Control of the number of operating heat source units]
The control device 15 calculates F × (TR−TS) = Q from the incoming water temperature TS from the incoming water temperature sensor 12, the return water temperature TR from the return water temperature sensor 12, and the load flow rate F from the flow meter 14. The current load heat quantity Q is obtained, and the number of operating heat source devices 1-1 to 1-N is determined according to the obtained current load heat quantity Q or the load flow rate F (Q, F: required load quantity) from the flow meter 14. Control. For example, according to a predetermined operation order table, the heat source unit 1-1 of the designated rank 1 is operated until the load flow rate F reaches a predetermined value F1, and if the load flow rate F exceeds the predetermined value F1, the heat source unit In addition to 1-1, the operation of the heat source machine 1-2 of the designated rank 2 is started. When the operation of the heat source device 1-2 is started, the operation of the pump 2-2 that is an auxiliary device of the heat source device 1-2 is also started. In this embodiment, the number of operating heat source units is controlled based on the load flow rate F.

〔バイパス弁開度による圧力一定制御〕
例えば、熱源機1−1と熱源機1−2との2台運転中、外部負荷6が要求する熱源水の流量が少なくなると、ヘッダ間差圧ΔPpvが大きくなるので、ΔPpv=ΔPspとなるように、制御装置15はポンプ2−2へのインバータ出力を小さくする。ポンプ2−2へのインバータ出力が予め設定されている下限値に達しても、なお外部負荷6が要求する流量の方が少ない場合、制御装置15は、バイパス弁10を開き、ヘッダ間差圧ΔPを一定とするようにバイパス弁10の開度を制御する。これをバイパス弁開度による圧力一定制御と呼ぶ。
[Constant pressure control by bypass valve opening]
For example, when the flow rate of the heat source water required by the external load 6 decreases during operation of the two heat source devices 1-1 and 1-2, the header differential pressure ΔPpv increases, so that ΔPpv = ΔPsp. In addition, the control device 15 reduces the inverter output to the pump 2-2. Even if the inverter output to the pump 2-2 reaches a preset lower limit value, if the flow rate required by the external load 6 is still smaller, the control device 15 opens the bypass valve 10 and the differential pressure between the headers. The opening degree of the bypass valve 10 is controlled so that ΔP is constant. This is called constant pressure control based on the opening degree of the bypass valve.

制御装置15は、上述した「熱源機運転台数制御」の機能の一部として、当日の制御開始時刻および制御終了時刻から一定時間前(制御終了一定時間前時刻)における熱源機の運転台数を決定する運転台数決定機能を備えている。また、制御装置15は、過去の各日の制御開始時刻から一定時間経過後の負荷流量の実績値F1と制御終了時刻から一定時間前の負荷流量の実績値F2(負荷熱量で熱源機の運転台数の制御を行う場合には負荷熱量Q1,Q2)を負荷データとして記憶する機能を備えている。図3に過去の各日の負荷データを記憶したテーブルの一例を示す。1日の制御開始時刻から一定時間経過後の負荷流量F1および制御終了時刻から一定時間前の負荷流量F2は季節により変動し、制御装置15はこの負荷流量の実績値F1,F2を負荷データとして毎日記憶する。なお、制御装置15は、プロセッサや記憶装置からなるハードウェアと、これらのハードウェアと協働して各種機能を実現させるソフトウェアとによって実現される。   The control device 15 determines the number of operating heat source units at a certain time before the control start time and the control end time on that day (a time before the control end time) as part of the above-described “heat source unit operation number control” function. It has a function to determine the number of units to be operated. Moreover, the control device 15 performs the actual value F1 of the load flow rate after a predetermined time has elapsed from the control start time of each past day and the actual value F2 of the load flow rate after a predetermined time from the control end time (the operation of the heat source machine with the load heat amount). In the case of controlling the number of units, it has a function of storing the load heat quantity Q1, Q2) as load data. FIG. 3 shows an example of a table storing the past load data for each day. The load flow F1 after a certain time has elapsed from the control start time of the day and the load flow F2 a certain time before the control end time fluctuate depending on the season, and the control device 15 uses the actual values F1, F2 of the load flow as load data. Remember every day. The control device 15 is realized by hardware including a processor and a storage device, and software that realizes various functions in cooperation with these hardware.

〔制御開始時刻および制御終了一定時間前時刻の運転台数の決定〕
図2に制御装置15が実行する制御開始時刻および制御終了一定時間前時刻の運転台数の決定処理のフローチャートを示す。制御装置15は、この処理を当日の制御開始時刻に達する前に毎日実行し、当日の制御開始時刻における熱源機の運転台数と、当日の制御終了一定時間前時刻における熱源機の運転台数を決定する。
[Determining the number of units operating at the control start time and the time before the control end time]
FIG. 2 shows a flowchart of the process for determining the number of operating units executed by the control device 15 at the control start time and the predetermined time before the control end time. The control device 15 executes this process every day before reaching the control start time of the day, and determines the number of operating heat source units at the control start time of the day and the number of operating heat source units at the predetermined time before the end of control on the day. To do.

以下、このフローチャートに従って、制御装置15が実行する制御開始時刻および制御終了一定時間前時刻の運転台数の決定処理について説明する。制御装置15は、当日の制御開始時刻に達する前に、当日が平日であるか否かを確認する(ステップ201)。当日が平日であるか否かの確認は、予め記憶されているカレンダ(図4参照)に従って行い、当日が平日であればステップ202へ進み、平日でなければステップ206へ進む。なお、図4は「2003年7月」のカレンダであり、このカレンダにおいて無印は平日、○は休日、△は特別日(例えば、創立記念日)を示す。制御装置15はこのようなカレンダを所要年数分記憶している。   Hereinafter, according to this flowchart, the process for determining the number of operating units at the control start time and the predetermined time before the control end time executed by the control device 15 will be described. The control device 15 checks whether or not the current day is a weekday before reaching the control start time of the current day (step 201). Whether the current day is a weekday is confirmed according to a calendar (see FIG. 4) stored in advance. If the current day is a weekday, the process proceeds to step 202. If not, the process proceeds to step 206. FIG. 4 shows a calendar for “July 2003”. In this calendar, no mark indicates a weekday, ○ indicates a holiday, and Δ indicates a special day (for example, the anniversary). The control device 15 stores such a calendar for the required number of years.

〔当日が平日の場合〕
制御装置15は、当日が平日であることを確認すると(ステップ201のYES)、記憶されている過去の各日の負荷データから直近の平日の負荷データを探し出し、この負荷データにおける制御開始時刻から一定時間経過後の負荷流量の実績値F1を制御開始一定時間経過後負荷として読み出す(ステップ202)。例えば、当日が2003年7月29日(火)であれば、直近の平日の負荷データとして2003年7月28日(月)の負荷データを探し出し、この負荷データから制御開始一定時間経過後負荷を読み出す
[If the day is a weekday]
When the control device 15 confirms that the current day is a weekday (YES in step 201), the control device 15 searches for the load data of the latest weekday from the stored load data of each past day, and from the control start time in this load data. The actual value F1 of the load flow rate after a lapse of a certain time is read as a load after the lapse of a certain control start time (step 202). For example, if the current day is July 29, 2003 (Tuesday), the load data for July 28, 2003 (Monday) will be searched for as the load data for the most recent weekday, and the load after a certain time has elapsed since the start of control. Read out

図5に探し出された直近の平日の負荷曲線上の負荷データの一例を示す。制御装置15は、この負荷曲線における制御開始時刻ts(この例では、ts=8:00)から一定時間TA(この例では、TA=2時間)経過後の負荷流量の実績値F1、すなわち制御開始一定時間経過後時刻tsA (この例では、tsA =10:00)における負荷流量の実績値AGJを制御開始一定時間経過後負荷として読み出す。 FIG. 5 shows an example of load data on the most recent weekday load curve found. The control device 15 performs the actual value F1 of the load flow rate after a certain time TA (in this example, TA = 2 hours) from the control start time ts (in this example, ts = 8: 00) in this load curve, that is, the control. The actual value AGJ of the load flow rate at time ts A (in this example, ts A = 10: 00) after the elapse of a certain start time is read as the load after the elapse of a certain control start time.

次に、制御装置15は、この負荷曲線における制御終了時刻te(この例では、te=19:00)から一定時間TB(この例では、TB=2時間)前の負荷流量の実績値F2、すなわち制御終了一定時間前時刻teB (この例では、teB =17:00)における負荷流量の実績値BGJを制御終了一定時間前負荷として読み出す(ステップ203)。 Next, the control device 15 records the actual value F2 of the load flow rate before a certain time TB (TB = 2 hours in this example) from the control end time te (in this example, te = 19: 00) in this load curve, That is, the actual value BGJ of the load flow rate at the time te B before the control end constant time (in this example, te B = 17: 00) is read out as the load before the control end constant time (step 203).

そして、制御装置15は、ステップ202で読み出した制御開始一定時間経過後負荷(AGJ)に基づいて当日の制御開始時刻tsにおける熱源機の運転台数を決定する(ステップ204)。また、ステップ203で読み出した制御終了一定時間前負荷(BGJ)に基づいて当日の制御終了一定時間前時刻teB における熱源機の運転台数を決定する(ステップ205)。なお、この実施の形態では、制御開始一定時間経過後負荷や制御終了一定時間前負荷が負荷流量として得られるので、この負荷流量を熱源機1台当たりの定格流量で除することにより必要な熱源機の運転台数を求める。 Then, the control device 15 determines the number of operating heat source units at the control start time ts of the current day based on the load (AGJ) after a certain control start time read out in Step 202 (Step 204). Further, the number of operating heat source devices at the time te B before the control end fixed time on the current day is determined based on the load (BGJ) before the control end fixed time read in Step 203 (Step 205). In this embodiment, since a load after a certain time of control start and a load before a certain time of control end are obtained as the load flow rate, a necessary heat source is obtained by dividing this load flow rate by the rated flow rate per heat source unit. Find the number of units operating.

〔当日が休日の場合〕
制御装置15は、当日が休日であることを確認すると(ステップ206のYES)、記憶されている過去の各日の負荷データから直近の休日の負荷データを探し出し、この負荷データにおける制御開始時刻から一定時間経過後の負荷流量の実績値F1を制御開始一定時間経過後負荷として読み出す(ステップ207)。例えば、当日が2003年7月27日(日)であれば、直近の休日の負荷データとして2003年7月26日(土)の負荷データを探し出し、この負荷データから制御開始一定時間経過後負荷を読み出す
[If the day is a holiday]
When the control device 15 confirms that the current day is a holiday (YES in step 206), the control device 15 searches the load data for the most recent holiday from the stored load data for each past day, and starts from the control start time in this load data. The actual value F1 of the load flow rate after a lapse of a certain time is read as a load after the lapse of a certain control start time (step 207). For example, if the current day is July 27, 2003 (Sunday), the load data for July 26, 2003 (Saturday) is searched as the load data for the most recent holiday, and the load after a certain time has elapsed since the start of control. Read out

図6に探し出された直近の休日の負荷曲線上の負荷データの一例を示す。制御装置15は、この負荷曲線における制御開始時刻ts(この例では、ts=10:00)から一定時間TA(この例では、TA=2時間)経過後の負荷流量の実績値F1、すなわち制御開始一定時間経過後時刻tsA (この例では、tsA =12:00)における負荷流量の実績値AGJを制御開始一定時間経過後負荷として読み出す。 FIG. 6 shows an example of load data on the load curve of the latest holiday found. The control device 15 performs the actual value F1 of the load flow rate after a certain time TA (in this example, TA = 2 hours) from the control start time ts (in this example, ts = 10: 00) in this load curve, that is, the control. The actual value AGJ of the load flow rate at time ts A (in this example, ts A = 12: 00) after the elapse of the fixed start time is read as the load after the elapse of the fixed control start time.

次に、制御装置15は、この負荷曲線における制御終了時刻te(この例では、te=15:00)から一定時間TB(この例では、TB=2時間)前の負荷流量の実績値F2、すなわち制御終了一定時間前時刻teB (この例では、teB =13:00)における負荷流量の実績値BGJを制御終了一定時間前負荷として読み出す(ステップ208)。 Next, the control device 15 performs the actual value F2 of the load flow rate before a predetermined time TB (in this example, TB = 2 hours) from the control end time te (in this example, te = 15: 00) in this load curve, That is, the actual value BGJ of the load flow rate at the time te B before the control end constant time (in this example, te B = 13: 00) is read as the load before the control end constant time (step 208).

そして、制御装置15は、ステップ207で読み出した制御開始一定時間経過後負荷(AGJ)に基づいて当日の制御開始時刻tsにおける熱源機の運転台数を決定する(ステップ204)。また、ステップ208で読み出した制御終了一定時間前負荷(BGJ)に基づいて当日の制御終了一定時間前時刻teB における熱源機の運転台数を決定する(ステップ205)。 Then, the control device 15 determines the number of operating heat source units at the control start time ts of the current day based on the load (AGJ) after a certain control start time read out in Step 207 (Step 204). Further, the number of operating heat source devices at the time te B before the control end fixed time on that day is determined based on the control end fixed time previous load (BGJ) read out at Step 208 (Step 205).

〔当日が特別日の場合〕
制御装置15は、当日が特別日であることを確認すると(ステップ206のNO)、記憶されている過去の特別日の負荷データから直近の特別日の負荷データを探し出し、この負荷データにおける制御開始時刻から一定時間経過後の負荷流量の実績値F1を制御開始一定時間経過後負荷として読み出す(ステップ209)。例えば、当日が2003年7月1日で創立記念日であれば、直近の創立記念日の負荷データとして2002年7月1日の負荷データを探し出し、この負荷データから制御開始一定時間経過後負荷を読み出す
[If the day is a special day]
When the control device 15 confirms that the current day is a special day (NO in step 206), the control device 15 searches for the load data of the latest special day from the stored load data of the past special day, and starts control based on the load data. The actual value F1 of the load flow rate after a lapse of a certain time from the time is read as a load after the lapse of a certain control start time (step 209). For example, if the day is July 1, 2003 and the founding anniversary, the load data of July 1, 2002 is searched as the load data of the most recent founding anniversary, and the load after a certain time has elapsed since the start of control from this load data. Read out

図7に探し出された直近の特別日の負荷曲線上の負荷データの一例を示す。制御装置15は、この負荷曲線における制御開始時刻ts(この例では、ts=8:00)から一定時間TA(この例では、TA=2時間)経過後の負荷流量の実績値F1、すなわち制御開始一定時間経過後時刻tsA (この例では、tsA =10:00)における負荷流量の実績値AGJを制御開始一定時間経過後負荷として読み出す。 FIG. 7 shows an example of load data on the load curve of the most recent special day searched for. The control device 15 performs the actual value F1 of the load flow rate after a certain time TA (in this example, TA = 2 hours) from the control start time ts (in this example, ts = 8: 00) in this load curve, that is, the control. The actual value AGJ of the load flow rate at time ts A (in this example, ts A = 10: 00) after the elapse of a certain start time is read as the load after the elapse of a certain control start time.

次に、制御装置15は、この負荷曲線における制御終了時刻te(この例では、te=17:00)から一定時間TB(この例では、TB=2時間)前の負荷流量の実績値F2、すなわち制御終了一定時間前時刻teB (この例では、teB =15:00)における負荷流量の実績値BGJを制御終了一定時間前負荷として読み出す(ステップ210)。 Next, the control device 15 performs the actual value F2 of the load flow rate before a certain time TB (TB = 2 hours in this example) from the control end time te (in this example, te = 17: 00) in the load curve, That is, the actual value BGJ of the load flow rate at the time te B before the control end fixed time (in this example, te B = 15: 00) is read as the control end constant time preload (step 210).

そして、制御装置15は、ステップ209で読み出した制御開始一定時間経過後負荷(AGJ)に基づいて当日の制御開始時刻tsにおける熱源機の運転台数を決定する(ステップ204)。また、ステップ210で読み出した制御終了一定時間前負荷(BGJ)に基づいて当日の制御終了一定時間前時刻teB における熱源機の運転台数を決定する(ステップ205)。 Then, the control device 15 determines the number of operating heat source units at the control start time ts on the current day based on the load (AGJ) after a certain control start time read out in Step 209 (Step 204). Further, the number of operating heat source devices at the time te B before the control end fixed time on that day is determined based on the control end constant time preload (BGJ) read out at step 210 (step 205).

以上の説明から分かるように、本実施の形態によれば、当日の制御開始時刻における熱源機の運転台数が直近の当日と同一種別の日の制御開始一定時間経過後負荷(AGJ)に基づいて決定されるので、制御開始時(始動時)の熱源機の運転台数が多すぎたり、少なすぎたりすることがない。また、当日の制御終了一定時間前時刻における熱源機の運転台数が直近の当日と同一種別の日の制御終了一定時間前負荷(BGJ)に基づいて決定されるので、制御終了前(例えば、残業時)の熱源機の運転台数が多すぎたり、少なすぎたりすることがない。このように、本実施の形態によれば、毎日、過不足なく当日の制御開始時刻および制御終了一定時間前時刻における熱源機の運転台数を決定することができ、省エネルギーの実現と快適な環境を提供することができるようになる。   As can be seen from the above description, according to the present embodiment, the number of operating heat source units at the control start time of the day is based on the load (AGJ) after a certain period of control start on the same type of day as the most recent day. Therefore, the number of operating heat source units at the start of control (at the start) is neither too much nor too little. In addition, since the number of operating heat source units at the time before the end of control on the current day is determined based on the load before the end of control end (BGJ) on the same type of day as the most recent day, before the end of control (for example, overtime) The number of operating heat source machines is not too many or too few. As described above, according to the present embodiment, the number of operating heat source units at the control start time and the control end time before the end of the day can be determined every day without excess or deficiency, realizing energy saving and a comfortable environment. Will be able to provide.

なお、上述した実施の形態では、当日が平日の場合として2003年7月29日(火)を例にとったが、当日が2003年7月28日(月)であれば、直近の平日は2003年7月25日(金)となる。また、当日が休日の場合として2003年7月27日(日)を例にとったが、当日が2003年7月26日(土)であれば、直近の休日は2003年7月21日(海の日)となる。   In the embodiment described above, July 29, 2003 (Tue) was taken as an example when the day is a weekday. However, if the day is July 28, 2003 (Monday), the most recent weekday is It will be Friday, July 25, 2003. In addition, when the day is a holiday, July 27, 2003 (Sunday) is taken as an example. However, if the day is July 26, 2003 (Saturday), the most recent holiday is July 21, 2003 ( Sea day).

また、上述した実施の形態では、過去の各日の制御開始一定時間経過後負荷の実績値および過去の各日の制御終了一定時間前負荷の実績値を記憶するようにしたが、過去の各日の負荷曲線を記憶するようにしてもよい。
また、上述した実施の形態では、当日の制御開始時刻における熱源機の運転台数と当日の制御終了一定時間前時刻における熱源機の運転台数を決定するようにしたが、当日の制御開始時刻における熱源機の運転台数のみを決定するようにしてもよい。逆に、当日の制御終了一定時間前時刻における熱源機の運転台数のみを決定するようしてもよい。
また、当日の制御開始時刻における熱源機の運転台数や当日の制御終了一定時間前時刻における熱源機の運転台数に限らず、同様の方法によって当日の所望の時刻における熱源機の運転台数を決定することが可能である。
In the above-described embodiment, the past actual value of the load after a certain period of control start in each past day and the past actual value of the load after the predetermined period of control end in each past day are stored. You may make it memorize | store the load curve of a day.
Further, in the above-described embodiment, the number of operating heat source units at the control start time of the day and the number of operating heat source units at the time before the end of the control of the day are determined, but the heat source at the control start time of the day is determined. Only the number of operating machines may be determined. Conversely, only the number of operating heat source units at a certain time before the end of control on that day may be determined.
In addition, the number of operating heat source units at a desired time of the day is determined by the same method, not limited to the number of operating heat source units at the control start time of the day or the number of operating heat source units at a certain time before the end of control on the day. It is possible.

また、上述した実施の形態では、同一の種別の日として「平日」、「休日」、「特別日」を例にとって説明したが、月曜日,火曜日などの「曜日」を同一種別の日としてもよい。本発明において、同一種別の日とは、負荷データが類似する日のことを意味する。   In the embodiment described above, “weekdays”, “holidays”, and “special days” have been described as examples of the same type of day, but “day of the week” such as Monday, Tuesday, etc. may be the same type of day. . In the present invention, the same type of day means a day with similar load data.

また、上述した実施の形態では、ポンプ2−1〜2−Nにインバータ3−1〜3−Nを付設したシステムとしたが、このようなシステムに限られるものではない。すなわち、ポンプ2−1〜2−Nにインバータ3−1〜3−Nを付設しないシステムへの適用も可能である。   In the above-described embodiment, the inverters 3-1 to 3-N are attached to the pumps 2-1 to 2-N. However, the present invention is not limited to such a system. That is, the present invention can be applied to a system in which the inverters 3-1 to 3-N are not attached to the pumps 2-1 to 2-N.

本発明に係る運転台数制御装置を含む熱源システムの一実施の形態を示す計装図である。1 is an instrumentation diagram showing an embodiment of a heat source system including an operating number control device according to the present invention. この熱源システムにおける制御装置が実行する制御開始時刻および制御終了一定時間前時刻の運転台数の決定処理を示すフローチャートである。It is a flowchart which shows the control start time of the control apparatus in this heat-source system, and the determination process of the number of operation at the time before control completion fixed time. 過去の各日の負荷データ(F1,F2)を記憶したテーブルの一例を示す図である。It is a figure which shows an example of the table which memorize | stored the load data (F1, F2) of each past day. 制御装置が記憶しているカレンダを例示する図である。It is a figure which illustrates the calendar which the control device has memorized. 平日の負荷曲線の負荷データ(F1,F2)の一例を示す図である。It is a figure which shows an example of the load data (F1, F2) of the load curve of a weekday. 休日の負荷曲線の負荷データ(F1,F2)の一例を示す図である。It is a figure which shows an example of the load data (F1, F2) of the load curve of a holiday. 特別日の負荷曲線の負荷データ(F1,F2)の一例を示す図である。It is a figure which shows an example of the load data (F1, F2) of the load curve of a special day.

符号の説明Explanation of symbols

1(1−1〜1−N)…熱源機、2(2−1〜2−N)…ポンプ、3(3−1〜3−N)…インバータ、4…往ヘッダ、5…往水管路、6…外部負荷、7…還水管路、8…還ヘッダ、9…バイパス管路、10…バイパス弁、11…差圧計、12…往水温度センサ、13…還水温度センサ、14…流量計、15…制御装置。
DESCRIPTION OF SYMBOLS 1 (1-1 to 1-N) ... Heat source machine, 2 (2-1 to 2-N) ... Pump, 3 (3-1 to 3-N) ... Inverter, 4 ... Out header, 5 ... Outbound pipe line , 6 ... external load, 7 ... return water line, 8 ... return header, 9 ... bypass line, 10 ... bypass valve, 11 ... differential pressure gauge, 12 ... outgoing water temperature sensor, 13 ... return water temperature sensor, 14 ... flow rate Total, 15 ... control device.

Claims (8)

熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた熱源システムに用いられ、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御装置において、
少なくとも過去の各日の所定時刻における前記要求負荷量の実績値を所定時刻負荷として記憶する記憶手段と、
当日の日の種別に応じて直近の同一種別の日の前記所定時刻負荷を読み出し、この読み出した所定時刻負荷に基づいて当日の所望の時刻における前記熱源機の運転台数を決定する運転台数決定手段と
を備えたことを特徴とする運転台数制御装置。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In the operation number control device that is used in the heat source system and controls the operation number of the heat source units based on the required load amount required by the external load,
Storage means for storing the actual value of the required load amount at a predetermined time of each day in the past as a predetermined time load;
The number-of-operating-unit determining means for reading the predetermined time load of the day of the most recent same type according to the type of the current day and determining the number of operating heat source units at a desired time of the day based on the read predetermined time load And a control unit for the number of operating units.
熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた熱源システムに用いられ、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御装置において、
少なくとも過去の各日の制御開始時刻から一定時間経過後の前記要求負荷量の実績値を制御開始一定時間経過後負荷として記憶する記憶手段と、
当日の日の種別に応じて直近の同一種別の日の前記制御開始一定時間経過後負荷を読み出し、この読み出した制御開始一定時間経過後負荷に基づいて当日の制御開始時刻における前記熱源機の運転台数を決定する運転台数決定手段と
を備えたことを特徴とする運転台数制御装置。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In the operation number control device that is used in the heat source system and controls the operation number of the heat source units based on the required load amount required by the external load,
Storage means for storing the actual value of the required load amount after a lapse of a certain time from the control start time of each past day as a load after the lapse of a certain control start time;
According to the type of the day of the day, the load is read after a certain period of control start for the same day of the most recent day, and the operation of the heat source machine at the control start time of the day is based on the read load after the certain period of control start An operating number control device comprising: an operating number determining means for determining the number of units.
熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた熱源システムに用いられ、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御装置において、
少なくとも過去の各日の制御終了時刻から一定時間前の前記要求負荷量の実績値を制御終了一定時間前負荷として記憶する記憶手段と、
当日の日の種別に応じて直近の同一種別の日の前記制御終了一定時間前負荷を読み出し、この読み出した制御終了一定時間前負荷に基づいて当日の制御終了時刻から一定時間前における前記熱源機の運転台数を決定する運転台数決定手段と
を備えたことを特徴とする運転台数制御装置。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In the operation number control device that is used in the heat source system and controls the operation number of the heat source units based on the required load amount required by the external load,
Storage means for storing the actual value of the required load amount at a certain time before the control end time of each past day as a load at the end of the control end time;
According to the type of the day of the day, the load of the control end constant time before the day of the most recent same type is read, and the heat source machine at a predetermined time before the control end time of the day based on the read control end constant time before load An operation number control device comprising: an operation number determination means for determining the number of operation.
熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた熱源システムに用いられ、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御装置において、
少なくとも、過去の各日の制御開始時刻から一定時間経過後の前記要求負荷量の実績値および過去の各日の制御終了時刻から一定時間前の前記要求負荷量の実績値をそれぞれ制御開始一定時間経過後負荷および制御終了一定時間前負荷として記憶する記憶手段と、
当日の日の種別に応じて直近の同一種別の日の前記制御開始一定時間経過後負荷を読み出し、この読み出した制御開始一定時間経過後負荷に基づいて当日の制御開始時刻における前記熱源機の運転台数を決定し、当日の日の種別に応じて直近の同一種別の日の前記制御終了一定時間前負荷を読み出し、この読み出した制御終了一定時間前負荷に基づいて当日の制御終了時刻から一定時間前における前記熱源機の運転台数を決定する運転台数決定手段と
を備えたことを特徴とする運転台数制御装置。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In the operation number control device that is used in the heat source system and controls the operation number of the heat source units based on the required load amount required by the external load,
At least the actual value of the required load amount after a predetermined time has elapsed from the control start time of each past day and the actual value of the required load amount before the predetermined time from the control end time of each past day, respectively. Storage means for storing the post-elapse load and the pre-load for a certain period of time after the control;
According to the type of the day of the day, the load is read after a certain period of control start for the same day of the most recent day, and the operation of the heat source machine at the control start time of the day is based on the read load after the certain period of control start The number of units is determined, and the control end fixed time preload is read for the day of the same type most recently according to the type of the current day, and a predetermined time from the control end time of the day based on the read control end constant time preload. An operating number control device comprising: an operating number determining means for determining the operating number of the heat source unit before.
熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた熱源システムに適用され、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御方法において、
少なくとも過去の各日の所定時刻における前記要求負荷量の実績値を所定時刻負荷として記憶する工程と、
当日の日の種別に応じて直近の同一種別の日の前記所定時刻負荷を読み出し、この読み出した所定時刻負荷に基づいて当日の所望の時刻における前記熱源機の運転台数を決定する工程と
を備えたことを特徴とする運転台数制御方法。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In an operation number control method that is applied to a heat source system and controls the operation number of the heat source units based on a required load amount required by the external load,
Storing the actual value of the required load amount at a predetermined time of each day in the past as a predetermined time load;
Reading the predetermined time load of the day of the same type most recently according to the type of the day, and determining the number of operating heat source units at a desired time of the day based on the read predetermined time load. A method for controlling the number of operating units.
熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた適用され、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御方法において、
少なくとも過去の各日の制御開始時刻から一定時間経過後の前記要求負荷量の実績値を制御開始一定時間経過後負荷として記憶する工程と、
当日の日の種別に応じて直近の同一種別の日の前記制御開始一定時間経過後負荷を読み出し、この読み出した制御開始一定時間経過後負荷に基づいて当日の制御開始時刻における前記熱源機の運転台数を決定する工程と
を備えたことを特徴とする運転台数制御方法。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In an operation number control method for controlling the number of operating heat source units based on a required load amount applied by the external load,
Storing the actual value of the required load amount after a lapse of a certain time from the control start time of each past day as a load after the lapse of a certain control start time;
According to the type of the day of the day, the load is read after a certain period of control start for the same day of the most recent day, and the operation of the heat source machine at the control start time of the day is based on the read load after the certain period of control start A method for controlling the number of operating units, comprising the step of determining the number of units.
熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた適用され、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御方法において、
少なくとも過去の各日の制御終了時刻から一定時間前の前記要求負荷量の実績値を制御終了一定時間前負荷として記憶する工程と、
当日の日の種別に応じて直近の同一種別の日の前記制御終了一定時間前負荷を読み出し、この読み出した制御終了一定時間前負荷に基づいて当日の制御終了時刻から一定時間前における前記熱源機の運転台数を決定する工程と
を備えたことを特徴とする運転台数制御方法。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In an operation number control method for controlling the number of operating heat source units based on a required load amount applied by the external load,
Storing the actual value of the required load amount at a certain time before the control end time of each past day as a load at the control end certain time; and
According to the type of the day of the day, the load of the control end constant time before the day of the most recent same type is read, and the heat source machine at a predetermined time before the control end time of the day based on the read control end constant time before load A method for controlling the number of operating units, comprising the step of determining the number of operating units.
熱源水を生成する第1〜第N(N≧2)の熱源機と、この第1〜第Nの熱源機が生成する熱源水を搬送する第1〜第Nのポンプと、前記第1〜第Nの熱源機からの熱源水を混合する往ヘッダと、この往ヘッダを介する熱源水の供給を受ける外部負荷と、この外部負荷において熱交換された熱源水が戻される還ヘッダとを備えた適用され、前記外部負荷が要求する要求負荷量に基づいて前記熱源機の運転台数を制御する運転台数制御方法において、
少なくとも、過去の各日の制御開始時刻から一定時間経過後の前記要求負荷量の実績値および過去の各日の制御終了時刻から一定時間前の前記要求負荷量の実績値をそれぞれ制御開始一定時間経過後負荷および制御終了一定時間前負荷として記憶する工程と、
当日の日の種別に応じて直近の同一種別の日の前記制御開始一定時間経過後負荷を読み出し、この読み出した制御開始一定時間経過後負荷に基づいて当日の制御開始時刻における前記熱源機の運転台数を決定し、当日の日の種別に応じて直近の同一種別の日の前記制御終了一定時間前負荷を読み出し、この読み出した制御終了一定時間前負荷に基づいて当日の制御終了時刻から一定時間前における前記熱源機の運転台数を決定する工程と
を備えたことを特徴とする運転台数制御方法。
The first to Nth (N ≧ 2) heat source units that generate heat source water, the first to Nth pumps that transport the heat source water generated by the first to Nth heat source units, and the first to first units. A forward header that mixes the heat source water from the Nth heat source machine, an external load that receives supply of the heat source water via the forward header, and a return header that returns the heat source water heat-exchanged in the external load In an operation number control method for controlling the number of operating heat source units based on a required load amount applied by the external load,
At least the actual value of the required load amount after a predetermined time has elapsed from the control start time of each past day and the actual value of the required load amount before the predetermined time from the control end time of each past day, respectively. Storing the post-elapsed load and the pre-load for a predetermined time after the control;
According to the type of the day of the day, the load is read after a certain period of control start for the same day of the most recent day, and the operation of the heat source machine at the control start time of the day is based on the read load after the certain period of control start The number of units is determined, and the control end fixed time preload is read for the day of the same type most recently according to the type of the current day, and a predetermined time from the control end time of the day based on the read control end constant time preload. A step of determining the number of operating heat source units before.
JP2003395692A 2003-11-26 2003-11-26 Operation number control device and method Expired - Fee Related JP4291116B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003395692A JP4291116B2 (en) 2003-11-26 2003-11-26 Operation number control device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003395692A JP4291116B2 (en) 2003-11-26 2003-11-26 Operation number control device and method

Publications (2)

Publication Number Publication Date
JP2005156035A true JP2005156035A (en) 2005-06-16
JP4291116B2 JP4291116B2 (en) 2009-07-08

Family

ID=34721391

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003395692A Expired - Fee Related JP4291116B2 (en) 2003-11-26 2003-11-26 Operation number control device and method

Country Status (1)

Country Link
JP (1) JP4291116B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008309428A (en) * 2007-06-15 2008-12-25 Mitsubishi Heavy Ind Ltd Flow rate control device of heat source system and flow rate control method of heat source system
JP2011169533A (en) * 2010-02-19 2011-09-01 Mitsubishi Heavy Ind Ltd Heat source system and method of controlling the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008309428A (en) * 2007-06-15 2008-12-25 Mitsubishi Heavy Ind Ltd Flow rate control device of heat source system and flow rate control method of heat source system
JP2011169533A (en) * 2010-02-19 2011-09-01 Mitsubishi Heavy Ind Ltd Heat source system and method of controlling the same

Also Published As

Publication number Publication date
JP4291116B2 (en) 2009-07-08

Similar Documents

Publication Publication Date Title
US6627858B2 (en) Hot-water supply system
JP4552119B2 (en) Multi air conditioner demand control system
JP4435533B2 (en) Heat source system and control device
JP5001098B2 (en) Heat source control device and heat source control method
JP5515166B2 (en) Heat source system
JPH0131101B2 (en)
WO2014002133A1 (en) Heat-pump type hot water supply/heating system
JP2013170753A (en) Refrigerator system
JP3828485B2 (en) Control device
JP3864768B2 (en) Heat pump type water heater
JP4291116B2 (en) Operation number control device and method
JP5492712B2 (en) Water supply temperature control apparatus and method
US20070194139A1 (en) Setback control for temperature controlled system
JP5140341B2 (en) Heat source control device and heat source control method
JP4181362B2 (en) Optimal start-up controller for air conditioning system
JP5584163B2 (en) Hot water storage water heater
EP4160121A1 (en) Efficiency control algorithm for a cascade system of heat pumps
JP2020085317A (en) Heat pump device, air conditioner and water heating unit
JP2018159526A (en) Hot water supply system
JP3091414B2 (en) District heating and cooling system receiving equipment
JPH0876858A (en) Heat source control system
JP2012215361A (en) Storage type water heater
JP6513498B2 (en) Hot water supply system
JP2002031393A (en) Air-conditioning system
JPH05172383A (en) Control method of operation in ice heat accumulation system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081016

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081028

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090331

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090402

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120410

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees