JP2005016073A - Plumbing correction fixture and plumbing correction method - Google Patents

Plumbing correction fixture and plumbing correction method Download PDF

Info

Publication number
JP2005016073A
JP2005016073A JP2003179720A JP2003179720A JP2005016073A JP 2005016073 A JP2005016073 A JP 2005016073A JP 2003179720 A JP2003179720 A JP 2003179720A JP 2003179720 A JP2003179720 A JP 2003179720A JP 2005016073 A JP2005016073 A JP 2005016073A
Authority
JP
Japan
Prior art keywords
anchor
base plate
steel column
jig
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2003179720A
Other languages
Japanese (ja)
Other versions
JP2005016073A6 (en
Inventor
Itaru Nishida
致 西多
Satoshi Fujiwara
智 藤原
Kazuhiro Suzuki
和廣 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
KYB Corp
Original Assignee
Kayaba Industry Co Ltd
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kayaba Industry Co Ltd, Maeda Corp filed Critical Kayaba Industry Co Ltd
Priority to JP2003179720A priority Critical patent/JP2005016073A/en
Publication of JP2005016073A publication Critical patent/JP2005016073A/en
Publication of JP2005016073A6 publication Critical patent/JP2005016073A6/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a plumbing correction fixture of a steel framed column capable of carrying out work even in a narrow site by eliminating high place work and a plumbing correction method. <P>SOLUTION: The plumbing correction fixture of the steel framed column is equipped with an anchor 20 set on a foundation 1 in a vertically movable manner and an anchor holding device 33 holding the anchor 20 mounted on the circumferential edge of a base plate 5 of the steel framed column 4 built on the foundation 1. The base plate 5 is vertically moved in a state to hold the anchor 20 set on the foundation 1 by the anchor holding device 33 mounted on the circumferential edge of the base plate 5 of the steel framed column 4 in a vertically movable manner, and the verticality of the steel framed column 4 built on the foundation 1 can be adjusted. Three or more anchor holding devices 30 are mounted on the circumferential edge of the base plate 5 to enable the decenter of the steel framed column 4 to prevent by the plumbing correction method. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、鉄骨柱の建て入れ直し治具及び建て入れ直し方法に関する。
【0002】
【従来の技術】
鉄骨造や鉄骨鉄筋コンクリート造等における鉄骨柱の鉛直度の精度を確保する建て入れ直し方法としては、鉄骨柱上端にワイヤーを取り付けてレバーブロック等でワイヤーを緊張させて鉄骨柱の鉛直度を所定の精度に納める方法があった。
【0003】
また、ボルト締めで調整する治具を用いて鉄骨柱のベースプレートを持ち上げて調整する方法もあった(例えば、特許文献1参照)。
【0004】
【特許文献1】
特開2000−73568号公報(第3図)
【0005】
【発明が解決しようとする課題】
しかし、ワイヤーで鉄骨柱の鉛直度を調整するためには、鉄骨柱上端にワイヤーを取り付けるため、高所の作業が必要となる。また、ワイヤーを張った状態では、ワイヤーが床工事の障害となる。また柱上端と床にワイヤー取り付け用の仮設部材が必要となる。
【0006】
また、ボルト締めで調整する治具で鉄骨柱のベースプレートを持ち上げる方法では、ベースプレートを下げて高さを調節することができなかった。また、狭い地下部や柱筋がある場合にボルトを締めるスパナを使用することが困難であった。また鉄骨柱の片側のみを押す方式では、鉄骨柱の芯ずれが生じる恐れがあった。
【0007】
本発明の課題は、高所作業をなくし、狭い場所でも作業可能な鉄骨柱の建て入れ直し治具及び建て入れ直し方法を提供することである。
【0008】
【課題を解決するための手段】
以上の課題を解決するため、本発明の請求項1に記載の発明は、鉄骨柱の建て入れ直し治具であって、例えば図1に示すように、基礎1上に設けられたアンカー(治具アンカー20)と、基礎1上に建て入れられる鉄骨柱4のベースプレート5の周縁に上下動自在に設けられ前記アンカー20を把持するアンカー把持具33とを備えることを特徴とする。
【0009】
請求項1に記載の発明によれば、鉄骨柱4のベースプレート5の周縁に上下動自在に設けられたアンカー把持具33により、基礎1上に設けられたアンカー20を把持した状態でベースプレート5を上下動させ、基礎1上に建て入れられる鉄骨柱4の鉛直度を調整することができる。
【0010】
請求項2に記載の発明は、請求項1に記載の鉄骨柱の建て入れ直し治具において、ベースプレート5上に設けられるフレーム31と、上部(上側ねじ部32a)が前記フレーム31の上部に垂直に貫通して螺合するジャッキ32と、前記ジャッキ32の上部32aと異なるピッチ幅を有する下部(下側ねじ部32b)が螺合する前記アンカー把治具33と、前記アンカー把治具33により把持される前記アンカー20とからなることを特徴とする。
【0011】
請求項2に記載の発明によれば、ジャッキ32がフレーム31とアンカー把治具33とに対して異なるピッチ幅で螺合するので、より小さい力でジャッキ32を回転させてアンカー把治具33を動かすことができ、治具アンカーボルト20に対してベースプレート5を上下動させることができる。
【0012】
請求項3に記載の発明は、請求項1に記載の鉄骨柱の建て入れ直し治具において、ベースプレート5上に設けられるフレーム31と、前記フレーム31に設けられる油圧ジャッキ34と、前記油圧ジャッキ34の下端に設けられる前記アンカー把治具33と、前記アンカー把治具33により把持される前記アンカー20とからなることを特徴とする。
【0013】
請求項3に記載の発明によれば、油圧ジャッキ34により、ジャッキ32の下部に設けられたアンカー把治具33をベースプレート5に対して上下動させることができる。
【0014】
請求項4に記載の発明は、鉄骨柱の建て入れ直し方法であって、基礎1上にアンカー20を設けるとともに、基礎1上に建て入れる鉄骨柱4のベースプレート5の周縁にアンカー把持具33を上下動自在に3個以上設け、前記アンカー20を把持した状態で前記アンカー把持具33をベースプレート5に対して上下動させることを特徴とする。
【0015】
請求項4に記載の発明によれば、アンカー把持具30をベースプレート5に対して上下動させることで、鉄骨柱4の鉛直度を調整することができる。またアンカー把持具30をベースプレート5の周縁に3個以上設けることにより、建て入れ直しによる鉄骨柱4の芯ずれを防ぐことができる。
【0016】
【発明の実施の形態】
以下に、本発明の実施の形態例について詳細に述べる。
図1(a)は本発明が適用される鉄骨柱の土台部分を示す立面図である。図1(a)において、基礎1上にアンカーフレーム2が組み上げられている。アンカーフレーム2の上面には柱アンカーボルト3と、治具10を構成する治具アンカーボルト20とが上に突出して設けられている。柱アンカーボルト3には鉄骨柱4のベースプレート5がボルトで固定される。
【0017】
図1(b)は鉄骨柱4のベースプレート5を示す平面図である。ベースプレート5の四隅には、治具アンカーボルトを貫通させる孔(図示せず)が空いており、その上に孔を貫通した治具アンカーボルト20を支持するアンカー支持部30が設けられている。また柱部分の角部には柱アンカーボルトを貫通させる孔が設けられている。なお図では鉄骨4は角形の鋼管であるが、H形鋼やI形鋼等の任意の形状の鉄骨を用いることができる。
【0018】
図2は治具アンカー20とともに治具10を構成するアンカー支持部30を示す図である。アンカー支持部30は、ベースプレート5上に設けられており、フレーム31と、ジャッキ32と、アンカー把持具33とから構成される。
フレーム31はボルトによりベースプレート5に固定されている。フレーム31の上部にはジャッキ32が垂直に貫通して螺合している。
【0019】
ジャッキ32はフレーム31と螺合する上側ねじ部32aと、アンカー把治具33と螺合する下側ねじ部32bとからなる。上側ねじ部32aと下側ねじ部32bとは、ねじのピッチ幅が異なっており、例えば上側ねじ部32aのピッチ幅を3mm、下側ねじ部32bのピッチ幅を2mmとするなど、上側ねじ部32aのほうがピッチ幅が大きいことが好ましい。
アンカー把持具33にはジャッキ32の下側ねじ部32bが螺合しており、治具アンカーボルト20の頭部を把持する。下側ねじ部32bのほうが上側ねじ部32aよりもピッチ幅が小さいため、アンカー把治具33がフレームに対して上下動する変位は、ジャッキ32がフレーム31に対して上下動する変位よりも小さい。このため、より小さい力で治具アンカーボルト20に対してベースプレート5を動かすことができる。
【0020】
次に、本実施の形態における鉄骨柱の建て入れ直しについて説明する。まず、従来と同様にして基礎1上にアンカーフレーム2を組み、その上に鉄骨架構を組み上げる。そして鉄骨架構を構成する鉄骨柱4のベースプレート5を柱アンカーボルト3に仮固定するとともに、ベースプレート5の四隅に設けられたアンカー支持部30で治具アンカーボルト20の頭部を把持する。
【0021】
ジャッキ32はアンカー把持具33によって治具アンカーボルト20に固定されている。したがってジャッキ32を左右に回転させると、ジャッキ32に対してフレーム31が上下動するので、図2(a)〜(c)に示すように、ベースプレート5を上下動させることができる。4つのアンカー把持具33の高さバランスを調整することにより、鉄骨柱4の鉛直度を微調整することができる。
【0022】
本実施の形態によれば、ワイヤーの取り付けなどの高所作業が不要となり作業員の危険も減らすことができる。また鉄骨柱の下部で作業を行うので、狭い地下部や、また鉄骨鉄筋コンクリート造など、柱筋がある場合も建て入れ直しをすることができる。
【0023】
なお、図面ではベースプレート5の四隅にアンカー支持部30を設けているが、3個以上であればその数は任意である。例えば鉄骨4として断面が円形の鋼管を用いた場合には、柱部分を囲むように複数の治具10を設けてもよい。
【0024】
図3は本発明の第2の実施の形態として、アンカー支持部30のジャッキ32の代わりに油圧ジャッキ34を用いた例を示す図である。フレーム31に設けられた油圧ジャッキ34のレバー35を立てたり倒したりすると、アンカー把持具33が上下動する。これにより、第1の実施の形態と同様にベースプレート5を上下動させて鉄骨柱4の傾きを微調整することができる。
【0025】
なお、以上の実施の形態においては、基礎1上のアンカーフレーム2上に鉄骨柱4を建て入れる場合について説明したが、場所打ち杭などの基礎上にアンカーボルトを設け、同様にして直接鉄骨架構を組むこともできる。
【0026】
また、治具アンカーボルト20を柱アンカーボルト3と兼用して用いてもよい。その場合、治具アンカーボルト20及びアンカー支持部30は撤去せずに鉄骨柱4を固定する。
その他、鉄骨柱4の断面形状等、具体的な細部構造等についても適宜に変更可能であることは勿論である。
【0027】
【発明の効果】
以上説明したように、本発明の請求項1に記載の発明によれば、鉄骨柱のベースプレートの周縁に上下動自在に設けられたアンカー把持具により、基礎上に設けられるアンカーを把持した状態でベースプレートを上下動させ、基礎上に建て入れられる鉄骨柱の鉛直度を調整することができる。
【0028】
請求項2に記載の発明によれば、請求項1に記載の発明と同様の効果が得られるとともに、ジャッキがフレームとアンカー把治具とに対して異なるピッチ幅で螺合するので、より小さい力でジャッキを回転させてアンカー把治具を動かすことができ、治具アンカーボルトに対してベースプレートを上下動させることができる。
【0029】
請求項3に記載の発明によれば、請求項1に記載の発明と同様の効果が得られるとともに、油圧ジャッキにより、ジャッキの下部に設けられたアンカー把治具をベースプレートに対して上下動させることができる。
【0030】
請求項4に記載の発明によれば、アンカー把持具をベースプレートに対して上下動させることで、鉄骨柱の鉛直度を調整することができる。またアンカー把持具をベースプレートの周縁に3個以上設けることにより、建て入れ直しによる鉄骨柱の芯ずれを防ぐことができる。
【図面の簡単な説明】
【図1】(a)は本発明が適用される鉄骨柱の土台部分を示す立面図であり、(b)はベースプレート5を示す平面図である。
【図2】アンカー把治具の動作を示す断面図であり、(a)はアンカー把治具をフレームの最上端に上げた状態、(c)はフレームの最下端に下げた状態、(b)はその中間の状態を示す。
【図3】ジャッキの代わりに油圧ジャッキを用いたアンカー支持部を示す図であり、(a)はフレームに垂直な面から見た断面図、(b)はフレームと平行な面から見た断面図である。
【符号の説明】
1 基礎
2 アンカーフレーム
3 柱アンカーボルト
4 鉄骨柱
5 ベースプレート
10 治具
20 治具アンカーボルト
30 アンカー支持部
31 フレーム
32 ジャッキ
32a 上側ねじ部
32b 下側ねじ部
33 アンカー把持具
34 油圧ジャッキ
35 レバー
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a steel column re-installation jig and a re-installation method.
[0002]
[Prior art]
As a rebuilding method to ensure the accuracy of the verticality of the steel column in steel structures and steel reinforced concrete structures, attach the wire to the upper end of the steel column and tension the wire with a lever block etc. There was a way to pay.
[0003]
In addition, there has been a method of lifting and adjusting the base plate of the steel column using a jig that is adjusted by bolting (for example, see Patent Document 1).
[0004]
[Patent Document 1]
Japanese Patent Laid-Open No. 2000-73568 (FIG. 3)
[0005]
[Problems to be solved by the invention]
However, in order to adjust the vertical degree of the steel column with the wire, the wire is attached to the upper end of the steel column, which requires work at a high place. In addition, when the wire is stretched, the wire becomes an obstacle to floor construction. Moreover, a temporary member for wire attachment is required on the column upper end and the floor.
[0006]
Further, in the method of lifting the steel column base plate with a jig that is adjusted by bolting, the height cannot be adjusted by lowering the base plate. In addition, it is difficult to use a spanner that tightens a bolt when there is a narrow underground part or column. Further, in the method in which only one side of the steel column is pushed, there is a possibility that the center displacement of the steel column occurs.
[0007]
An object of the present invention is to provide a steel column re-installation jig and a re-installation method that can eliminate work at high places and can be operated even in a narrow place.
[0008]
[Means for Solving the Problems]
In order to solve the above problems, the invention according to claim 1 of the present invention is a steel column re-installation jig, for example, an anchor (jig) provided on a foundation 1 as shown in FIG. An anchor 20) and an anchor gripping tool 33 that grips the anchor 20 and is provided on the periphery of the base plate 5 of the steel column 4 built on the foundation 1 so as to freely move up and down.
[0009]
According to the first aspect of the present invention, the base plate 5 is held in a state where the anchor 20 provided on the foundation 1 is gripped by the anchor gripping tool 33 provided on the periphery of the base plate 5 of the steel column 4 so as to be movable up and down. By moving up and down, the verticality of the steel column 4 built on the foundation 1 can be adjusted.
[0010]
The invention according to claim 2 is the steel column repositioning jig according to claim 1, wherein the frame 31 provided on the base plate 5 and the upper part (upper screw part 32a) are perpendicular to the upper part of the frame 31. A jack 32 that penetrates and is screwed, an anchor grip jig 33 in which a lower portion (lower screw portion 32b) having a different pitch width from the upper portion 32a of the jack 32 is screwed, and the anchor grip jig 33 holds the grip. It is characterized by comprising the anchor 20 which is made.
[0011]
According to the second aspect of the present invention, the jack 32 is screwed into the frame 31 and the anchor handle jig 33 with different pitch widths, so that the jack 32 is rotated with a smaller force to fix the anchor handle jig 33. The base plate 5 can be moved up and down with respect to the jig anchor bolt 20.
[0012]
According to a third aspect of the present invention, in the steel column repositioning jig according to the first aspect, the frame 31 provided on the base plate 5, the hydraulic jack 34 provided on the frame 31, and the hydraulic jack 34 The anchor grip jig 33 provided at the lower end and the anchor 20 gripped by the anchor grip jig 33 are characterized in that
[0013]
According to the invention described in claim 3, the anchor grip jig 33 provided at the lower portion of the jack 32 can be moved up and down with respect to the base plate 5 by the hydraulic jack 34.
[0014]
The invention according to claim 4 is a method of rebuilding a steel column, wherein the anchor 20 is provided on the foundation 1 and the anchor gripping tool 33 is vertically moved around the base plate 5 of the steel column 4 to be built on the foundation 1. Three or more are provided so as to be movable, and the anchor gripping tool 33 is moved up and down with respect to the base plate 5 while the anchor 20 is gripped.
[0015]
According to the invention described in claim 4, the verticality of the steel column 4 can be adjusted by moving the anchor gripping tool 30 up and down relative to the base plate 5. Further, by providing three or more anchor gripping tools 30 on the periphery of the base plate 5, misalignment of the steel column 4 due to re-installation can be prevented.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail.
FIG. 1A is an elevation view showing a base portion of a steel column to which the present invention is applied. In FIG. 1A, an anchor frame 2 is assembled on a foundation 1. Column anchor bolts 3 and jig anchor bolts 20 constituting the jig 10 are provided on the upper surface of the anchor frame 2 so as to protrude upward. A base plate 5 of a steel column 4 is fixed to the column anchor bolt 3 with a bolt.
[0017]
FIG. 1B is a plan view showing the base plate 5 of the steel column 4. At the four corners of the base plate 5, holes (not shown) through which the jig anchor bolts are pierced are provided, and the anchor support portions 30 for supporting the jig anchor bolts 20 penetrating the holes are provided thereon. In addition, a hole for penetrating the column anchor bolt is provided at the corner of the column portion. In the figure, the steel frame 4 is a square steel pipe, but a steel frame having an arbitrary shape such as an H-shaped steel or an I-shaped steel can be used.
[0018]
FIG. 2 is a view showing an anchor support portion 30 that constitutes the jig 10 together with the jig anchor 20. The anchor support portion 30 is provided on the base plate 5 and includes a frame 31, a jack 32, and an anchor gripping tool 33.
The frame 31 is fixed to the base plate 5 with bolts. A jack 32 is vertically passed through and screwed into the upper portion of the frame 31.
[0019]
The jack 32 includes an upper screw portion 32 a that is screwed with the frame 31, and a lower screw portion 32 b that is screwed with the anchor handle jig 33. The upper screw portion 32a and the lower screw portion 32b have different screw pitch widths. For example, the upper screw portion 32a has a pitch width of 3 mm and the lower screw portion 32b has a pitch width of 2 mm. 32a preferably has a larger pitch width.
A lower threaded portion 32b of the jack 32 is screwed into the anchor gripping tool 33, and grips the head of the jig anchor bolt 20. Since the lower screw portion 32b has a smaller pitch width than the upper screw portion 32a, the displacement in which the anchor grip jig 33 moves up and down relative to the frame is smaller than the displacement in which the jack 32 moves up and down relative to the frame 31. . For this reason, the base plate 5 can be moved with respect to the jig anchor bolt 20 with a smaller force.
[0020]
Next, the rebuilding of the steel column in the present embodiment will be described. First, the anchor frame 2 is assembled on the foundation 1 in the same manner as in the prior art, and the steel frame is assembled thereon. Then, the base plate 5 of the steel column 4 constituting the steel frame is temporarily fixed to the column anchor bolt 3 and the head of the jig anchor bolt 20 is held by the anchor support portions 30 provided at the four corners of the base plate 5.
[0021]
The jack 32 is fixed to the jig anchor bolt 20 by an anchor gripping tool 33. Therefore, when the jack 32 is rotated left and right, the frame 31 moves up and down with respect to the jack 32, so that the base plate 5 can be moved up and down as shown in FIGS. By adjusting the height balance of the four anchor grippers 33, the verticality of the steel column 4 can be finely adjusted.
[0022]
According to the present embodiment, work at a high place such as attachment of a wire is not necessary, and the danger of workers can be reduced. In addition, since the work is performed below the steel column, it can be rebuilt even when there is a column such as a narrow underground part or a steel reinforced concrete structure.
[0023]
In the drawing, the anchor support portions 30 are provided at the four corners of the base plate 5, but the number thereof is arbitrary as long as it is three or more. For example, when a steel pipe having a circular cross section is used as the steel frame 4, a plurality of jigs 10 may be provided so as to surround the column portion.
[0024]
FIG. 3 is a view showing an example in which a hydraulic jack 34 is used instead of the jack 32 of the anchor support portion 30 as a second embodiment of the present invention. When the lever 35 of the hydraulic jack 34 provided on the frame 31 is raised or lowered, the anchor gripping tool 33 moves up and down. Thereby, the inclination of the steel column 4 can be finely adjusted by moving the base plate 5 up and down similarly to the first embodiment.
[0025]
In the embodiment described above, the case where the steel column 4 is built on the anchor frame 2 on the foundation 1 has been described. Can also be assembled.
[0026]
Further, the jig anchor bolt 20 may be used also as the column anchor bolt 3. In that case, the jig | tool anchor bolt 20 and the anchor support part 30 fix the steel column 4 without removing.
In addition, it is needless to say that specific details such as the cross-sectional shape of the steel column 4 can be appropriately changed.
[0027]
【The invention's effect】
As described above, according to the first aspect of the present invention, the anchor provided on the foundation is gripped by the anchor gripper provided on the periphery of the base plate of the steel column so as to be movable up and down. The base plate can be moved up and down to adjust the verticality of the steel column built on the foundation.
[0028]
According to the second aspect of the present invention, the same effect as that of the first aspect of the present invention can be obtained, and the jack can be screwed into the frame and the anchor grip jig with different pitch widths. The jack can be rotated by force to move the anchor grip jig, and the base plate can be moved up and down relative to the jig anchor bolt.
[0029]
According to the invention described in claim 3, the same effect as that of the invention described in claim 1 can be obtained, and the anchor grip jig provided at the lower part of the jack is moved up and down with respect to the base plate by the hydraulic jack. be able to.
[0030]
According to the fourth aspect of the present invention, the verticality of the steel column can be adjusted by moving the anchor gripping tool up and down with respect to the base plate. Further, by providing three or more anchor grippers on the periphery of the base plate, it is possible to prevent misalignment of the steel column due to rebuilding.
[Brief description of the drawings]
1A is an elevation view showing a base portion of a steel column to which the present invention is applied, and FIG. 1B is a plan view showing a base plate 5;
FIGS. 2A and 2B are cross-sectional views showing the operation of the anchor handle jig, wherein FIG. 2A shows a state in which the anchor handle jig is raised to the uppermost end of the frame, FIG. 2C shows a state lowered to the lowermost end of the frame; ) Indicates an intermediate state.
FIGS. 3A and 3B are views showing an anchor support portion using a hydraulic jack instead of a jack, wherein FIG. 3A is a cross-sectional view seen from a plane perpendicular to the frame, and FIG. 3B is a cross-sectional view seen from a plane parallel to the frame; FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Foundation 2 Anchor frame 3 Column anchor bolt 4 Steel column 5 Base plate 10 Jig 20 Jig anchor bolt 30 Anchor support part 31 Frame 32 Jack 32a Upper screw part 32b Lower screw part 33 Anchor holding tool 34 Hydraulic jack 35 Lever

Claims (4)

基礎上に設けられるアンカーと、基礎上に建て入れられる鉄骨柱のベースプレートの周縁に上下動自在に設けられ前記アンカーを把持するアンカー把持具とを備えることを特徴とする鉄骨柱の建て入れ直し治具。A steel column re-installation jig comprising: an anchor provided on a foundation; and an anchor gripping tool provided on the periphery of a base plate of a steel column built on the foundation so as to be movable up and down. . ベースプレート上に設けられるフレームと、上部が前記フレームの上部に垂直に貫通して螺合するジャッキと、前記ジャッキの上部と異なるピッチ幅を有する下部が螺合する前記アンカー把治具と、前記アンカー把治具により把持される前記アンカーとからなることを特徴とする請求項1に記載の鉄骨柱の建て入れ直し治具。A frame provided on a base plate; a jack having an upper portion vertically passing through and screwed into the upper portion of the frame; and an anchor grip jig in which a lower portion having a pitch width different from that of the upper portion of the jack is screwed, and the anchor The steel column re-installation jig according to claim 1, comprising the anchor held by a grip jig. ベースプレート上に設けられるフレームと、前記フレームに設けられる油圧ジャッキと、前記油圧ジャッキの下端に設けられる前記アンカー把治具と、前記アンカー把治具により把持される前記アンカーとからなることを特徴とする請求項1に記載の鉄骨柱の建て入れ直し治具。It comprises a frame provided on a base plate, a hydraulic jack provided on the frame, the anchor grip jig provided at a lower end of the hydraulic jack, and the anchor gripped by the anchor grip jig. The steel column re-installation jig according to claim 1. 基礎上にアンカーを設けるとともに、
基礎上に建て入れる鉄骨柱のベースプレートの周縁にアンカー把持具を上下動自在に3個以上設け、
前記アンカーを把持した状態で前記アンカー把持具をベースプレートに対して上下動させることを特徴とする鉄骨柱の建て入れ直し方法。
While providing an anchor on the foundation,
Three or more anchor grips are provided on the periphery of the base plate of the steel column to be built on the foundation so that it can move up and down.
A method for rebuilding a steel column, wherein the anchor gripping tool is moved up and down relative to a base plate in a state where the anchor is gripped.
JP2003179720A 2003-06-24 2003-06-24 Plumbing correction fixture and plumbing correction method Withdrawn JP2005016073A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003179720A JP2005016073A (en) 2003-06-24 2003-06-24 Plumbing correction fixture and plumbing correction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003179720A JP2005016073A (en) 2003-06-24 2003-06-24 Plumbing correction fixture and plumbing correction method

Publications (2)

Publication Number Publication Date
JP2005016073A true JP2005016073A (en) 2005-01-20
JP2005016073A6 JP2005016073A6 (en) 2005-06-30

Family

ID=34180975

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003179720A Withdrawn JP2005016073A (en) 2003-06-24 2003-06-24 Plumbing correction fixture and plumbing correction method

Country Status (1)

Country Link
JP (1) JP2005016073A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186923A (en) * 2006-01-13 2007-07-26 Kayaba System Machinery Kk Plumbing adjusting device
EP1998218A1 (en) 2007-05-30 2008-12-03 Palo Alto Research Center Incorporated Surface energy control methods for color filter printing
CN108643594A (en) * 2018-06-29 2018-10-12 浙江省二建钢结构有限公司 The hand apparatus for correcting and its construction method of cantilever steel girder
WO2020133972A1 (en) * 2018-12-28 2020-07-02 上海建工集团股份有限公司 High-precision automatic positioning and verticality adjustment system for ultra-long steel column by reverse construction method and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186923A (en) * 2006-01-13 2007-07-26 Kayaba System Machinery Kk Plumbing adjusting device
EP1998218A1 (en) 2007-05-30 2008-12-03 Palo Alto Research Center Incorporated Surface energy control methods for color filter printing
CN108643594A (en) * 2018-06-29 2018-10-12 浙江省二建钢结构有限公司 The hand apparatus for correcting and its construction method of cantilever steel girder
WO2020133972A1 (en) * 2018-12-28 2020-07-02 上海建工集团股份有限公司 High-precision automatic positioning and verticality adjustment system for ultra-long steel column by reverse construction method and construction method

Similar Documents

Publication Publication Date Title
US9845606B2 (en) Safety rail system and method for using same
JP2010043468A (en) Anchor bolt setting apparatus and construction method of foundation
CN111877345B (en) Steel pipe pile positioning device for steel trestle construction in water area and construction method
JP2005016073A (en) Plumbing correction fixture and plumbing correction method
JP2005016073A6 (en) Rebuilding jig and rebuilding method
JP4377311B2 (en) Pile column erection device
JP4764191B2 (en) Load release device for pipe support for support
JP3483522B2 (en) Position adjustment device for steel columns
CN214834907U (en) Prefabricated assembled post hoist and mount counterpoint installing the system
JP5412307B2 (en) Installation method of bridge support device and fixing jig used in the method
JP2008291438A (en) Anchor frame
JP4945230B2 (en) Anchor bolt support
JP2012092605A (en) Building demolition method and lifting/fastening device used for the same
JP2019090266A (en) Installation method of main leg material and installation jig of main leg material
JP3752310B2 (en) Anchor bolt positioning tool and method
CN210049110U (en) Pier adjusting device and pier adjusting system
JP2006200162A (en) Jack base and method of constructing form timbering
CN102704696A (en) Space locator for high, big and heavy steel upright column
WO2005007551A1 (en) Working scaffold system of elevator
JP4573355B2 (en) Floor slab peeling method and floor slab peeling apparatus
JP2001065175A (en) Finely adjusting support base for structure
JPH08199819A (en) Method and equipment for constructing steel pipe column
JP3792692B2 (en) Bundle
JP4034778B2 (en) Steel column re-installation jig
KR101505800B1 (en) Wedge device for machine installation

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20050518

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20050518

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050902

A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20060905