JP2004255409A - Method for rolling steel sheet - Google Patents

Method for rolling steel sheet Download PDF

Info

Publication number
JP2004255409A
JP2004255409A JP2003047917A JP2003047917A JP2004255409A JP 2004255409 A JP2004255409 A JP 2004255409A JP 2003047917 A JP2003047917 A JP 2003047917A JP 2003047917 A JP2003047917 A JP 2003047917A JP 2004255409 A JP2004255409 A JP 2004255409A
Authority
JP
Japan
Prior art keywords
rolling
pass
temperature
steel sheet
actual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2003047917A
Other languages
Japanese (ja)
Inventor
Masahito Fujimoto
雅人 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP2003047917A priority Critical patent/JP2004255409A/en
Publication of JP2004255409A publication Critical patent/JP2004255409A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Control Of Metal Rolling (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To perform rolling by deciding rolling pass schedule to make an actual material coincide with the target material and to reduce variation in the actual material. <P>SOLUTION: This method is a rolling method of a steel sheet 1 having a heating stage 5, a rough rolling stage 6 and a finish rolling stage 7, which has a basic calculation stage 17 for calculating a pass schedule taking the target value as a control factor and a calculation stage 18 before rough rolling for performing corrective calculation of the pass schedule taking the actual value as a control factor just before the rough rolling stage 6 and/or an intermediate calculation stage 20 for performing corrective calculation of the pass schedule by taking the actual value as the control factor at n-th pass before the final pass. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、鋼板の圧延方法に関するものである。
【0002】
【従来の技術】
最適な圧延パススケジュールを決定し鋼板の圧延を行う方法としては、特許文献1に記載のものがある。この方法は、目標板厚や目標材質を得るために、各パスでの実績圧下率・実績パス間時間・実績材料温度を取得しながら圧延パススケジュールを決定し、スラブを複数回圧延することで鋼板を成形するものである。
【0003】
【特許文献1】
特開2001−347308号公報 (第4〜9頁、図1,2)
【0004】
【発明が解決しようとする課題】
しかしながら、前記特許文献1に記載された技術、すなわち、実績圧下率、実績パス間時間、実績材料温度等を入力値として圧延パススケジュールを決定する方法では、目標とする材質(特に低温脆性)と実績材質とを一致させることが困難であり、加えて、実績材質にばらつきが発生していることが現場の作業実績から明らかになっている。
そこで、本発明は、上記問題点に鑑み、目標材質と実績材質を一致させ且つ実績材質のばらつきを少なくするべく圧延パススケジュールを決定して、それに従い各パスで圧延を行う鋼板の圧延方法を提供することを目的とするものである。
【0005】
【課題を解決するための手段】
前記目的を達成するため、本発明方法においては次の手段を講じた。
すなわち、本発明方法の特徴とするところは、スラブを加熱炉で加熱する加熱工程と、前記加熱工程後のスラブを複数回圧延し圧延材とする粗圧延工程と、この圧延材を複数回圧延し鋼板とする仕上げ圧延工程とを有する鋼板の圧延方法であって、目標値を制御要因として圧延パススケジュールを算出する基本計算工程を有し、前記粗圧延工程直前にスラブの実績値を制御要因として圧延パススケジュールを修正計算する粗圧延前計算工程、及び/又は、仕上げ圧延工程中であって最終パスのnパス目前に圧延材の実績値を制御要因として圧延パススケジュールを修正計算する中間計算工程を有しており、前記鋼板の材質ばらつきを押さえるべく前記各計算工程で算出された圧延パススケジュールにしたがって圧延を行う点にある。
【0006】
なお、好ましくは、前記nパス目は2パス目であるとよい。
これにより、基本計算工程でパススケジュールを決定して、さらに、粗圧延前計算工程で前記パススケジュールを修正、及び/又は、中間計算工程で前記パススケジュールを修正して、各パスで圧延を実行することで、鋼板の目標材質と実績材質を一致させ且つ実績材質のばらつきを押さえることができるようになる。また、本発明方法の特徴とするところは、前記仕上げ圧延工程直前に圧延材の実績値を制御要因として圧延パススケジュールを修正計算する仕上げ圧延前計算工程を有する点にある。
【0007】
これにより、基本計算工程でパススケジュールを決定して圧延を行い、仕上げ圧延前計算工程で前記パススケジュールを修正した上で、仕上げ圧延工程を実行することで、鋼板の目標材質と実績材質を一致させることができるようになる。また、本発明方法の特徴とするところは、前記基本計算工程は、制御要因としてスラブの化学成分値及び加熱温度と、仕上げ圧延工程に導入される圧延材の板厚である移送厚と、仕上げ圧延工程中であって最終パスのnパス目前における圧延材の温度である中間温調温度及び最終パスのnパス目前から最終パスまでの各パスでの圧下率である中間温調後圧下率と、仕上げ圧延工程終了直前における鋼板の温度である仕上げ温度とを有し、前記制御要因は全て目標値であり且つこれら制御要因を用いて各パスにおける板厚と温度とを決定する点にある。
【0008】
なお、好ましくは、前記nパス目は2パス目であるとよい。
これにより、基本計算工程で、各パスの圧下量配分を決定することができるようになる。
また、本発明方法の特徴とするところは、前記粗圧延前計算工程は、前記加熱工程を経たスラブの実績化学成分値及び実績加熱温度を制御要因とし、各パスにおける板厚と温度とを修正し且つ決定する点にある。
これにより、粗圧延前計算工程でスラブの実績値をもとに各パスにおける板厚と温度とを修正することができるようになる。
【0009】
また、本発明方法の特徴とするところは、前記仕上げ圧延前計算工程は、実績移送厚と仕上げ圧延工程における圧延ロールの実績クラウン形状とを制御要因とし、各パスにおける板厚と温度とを修正し且つ決定する点にある。
これにより、仕上げ圧延前計算工程で圧延材の実績値をもとに各パスにおける板厚と温度とを修正することができるようになる。
また、本発明方法の特徴とするところは、前記中間計算工程は、実績中間温調温度を制御要因とし、各パスにおける板厚と温度とを修正し且つ決定する点にある。
【0010】
これにより、中間計算工程で、中間温調実績値すなわち最終パスのnパス目前に圧延材の実績値をもとに各パスにおける板厚と温度とを修正することができるようになる。
また、本発明方法の特徴とするところは、前記各計算工程を、鋼板の圧延を行いつつオンライン処理で行う点にある。
これにより、圧延を行いつつ各計算工程をオンラインで行い、パススケジュール修正結果を製造ラインにリアルタイムに反映することが可能になる。
【0011】
【発明の実施の形態】
以下、本発明の実施の一形態を鋼板の製造工程を例として説明する。
図1は鋼板の製造工程を示す概念図であり、図2は鋼板の圧延方法を示すフローチャートである。
図1に示すように、鋼板1の製造ライン2は、スラブ3を鋳造する鋳造工程4と、スラブ3を加熱する加熱工程5と、スラブ3を粗圧延する粗圧延工程6と、仕上げ圧延工程7とを有している。
【0012】
前記鋳造工程4では、連続鋳造装置8に溶鋼9が注入されており、スラブ3が連続的に鋳造される。さらに、鋳造されたスラブ3は全体を均一に加熱されるために、前記加熱工程5へ装入される。この加熱工程5は加熱炉10から構成されており、スラブ3は例えば約600度で装入され、装出時には例えば約1100度まで加熱されることになる。
加熱されたスラブ3は、次に粗圧延工程6に搬入されることになる。当該粗圧延工程6は粗圧延ミル(圧延機)11を有し、少なくとも一対の粗圧延ロール12と一対のバックアップロール13とを備えるものである。前記スラブ3がこの粗圧延ミル11を複数回往復し圧延を施されることで、板状に変形され圧延材14となってゆく。
【0013】
前記圧延材14は、次に仕上げ圧延工程7に導入される。仕上げ圧延工程7は仕上げ圧延ミル(圧延機)15を有しており、この仕上げ圧延ミル15は少なくとも一対の仕上げ圧延ロール16と一対のバックアップロール13を備えるものである。圧延材14がこの仕上げ圧延ミル15を複数回往復し圧延を施されることで、目標形状・材質等を備えた鋼板1が成形されることとなる。
前述の鋼板1の製造ライン2において適用される圧延パススケジュールの決定方法について、図2に基づいて説明する。
【0014】
まず、鋳造工程4により成形されるスラブ3に対して、基本パススケジュール、すなわち各パスにおける出側板厚(板厚)と入側温度(温度)を算出する(基本計算工程17)。
この基本計算工程17では、入力値すなわち制御要因としては、スラブ3の化学成分値及び加熱工程5導出後の加熱温度と、仕上げ圧延工程7に導入される圧延材14の板厚である移送厚とがある。また、仕上げ圧延工程7中であって最終パスの2パス目前における圧延材14の温度である中間温調温度、及び最終パスの2パス目前から最終パスまでの各パスでの圧下率である中間温調後圧下率もある。加えて、仕上げ圧延工程7終了直前における鋼板1の温度である仕上げ温度も採用している。
【0015】
さらに、鋼板1の寸法である圧延サイズ、鋼板1の板クラウン、仕上げミルのロールクラウン、材質ばらつき補正式を制御要因に加えている。これら制御要因は、全て目標値すなわち仕上げ圧延が終わった時点での鋼板1の製品サイズである。
これら制御要因をインプット値として、所定のパススケジュールモデルを用いて、各パスの出側板厚と入側温度とを算出する。パススケジュールの計算は、製造ライン2に直結しているコンピュータ等で行われる。表1に基本計算工程17での制御要因と決定されたパススケジュールの一例を示す。25パスでスラブ3を鋼板1に圧延し、1〜11パスが粗圧延工程6で、12〜25パスが仕上げ圧延工程7となっている。
【0016】
【表1】

Figure 2004255409
【0017】
前記基本パススケジュールが適用されるスラブ3は、前記加熱工程5を経て一定の温度に加熱されている。この時点で、再度パススケジュールを計算し、基本パススケジュールを修正するようにしている(粗圧延前計算工程18)。
この粗圧延前計算工程18では、入力値すなわち制御要因としては、スラブ3の実績化学成分値及び実績加熱温度を使用する。スラブ3の実績化学成分値は蛍光分析計等を用いて計測し、実績加熱温度は放射温度計等を用いて計測する。
これら制御要因をインプット値として、所定のパススケジュールモデルを用いて、各パスの出側板厚と入側温度とを算出する。表2に粗圧延前計算工程18での制御要因と決定されたパススケジュールの一例を示す。23パスでスラブ3を鋼板1に圧延するように修正されており、1〜11パスが粗圧延工程6で、12〜23パスが仕上げ圧延工程7となっている。
【0018】
【表2】
Figure 2004255409
【0019】
前記出側板厚を基に粗圧延ミル11のロール間ギャップや圧下率を変更すると共に、各パス間の待ち時間を調整するなどして圧延材14の入側温度をパススケジュール決定値に一致させるようにし、当該スラブ3を粗圧延工程6へ進め、粗圧延を行う。
粗圧延工程6を経た圧延材14は、仕上げ圧延工程7に導入される前に、再度パススケジュールが計算され修正されるようになっている(仕上げ圧延前計算工程19)。
【0020】
仕上げ圧延前計算工程19では、仕上げ圧延工程7に入る前の圧延材14の板厚、換言すれば粗圧延工程6から排出された圧延材14の板厚である移送厚と、仕上げ圧延ミル15のロールクラウンとを制御要因とし、所定のパススケジュールモデルを利用し再度パススケジュールを計算して修正するものである。
なお、粗圧延ミル11には板厚計が設置されていないため、前記移送厚は圧延理論等で理論的に算出される板厚を使用し、前記ロールクラウンは、ロールの摩耗状態等を考慮した理論式より求められるものである。
【0021】
表3に仕上げ圧延前計算工程19での制御要因と決定されたパススケジュールの一例を示す。23パスでスラブ3を鋼板1に圧延し、1〜11パスが粗圧延工程6で、12〜23パスが仕上げ圧延工程7となっている。圧延材14は既に粗圧延が終了し仕上げ圧延工程7に導入されるわけであるため、前記12〜23パス目の出側板厚と入側温度とが製造ライン2に適用されることになる。
【0022】
【表3】
Figure 2004255409
【0023】
前記出側板厚を基に仕上げ圧延ミル15のロール間ギャップや圧下率を変更すると共に、各パス間の待ち時間を調整するなどして圧延材14の入側温度をパススケジュール決定値に一致させるようにし、仕上げ圧延を行うこととなる。
さらに、仕上げ圧延工程7で最終パスの2パス前においては、実績中間温調温度を制御要因とし、各パスにおける出側板厚と入側温度とを修正し再決定する(中間計算工程20)。
詳しくは、圧延作業において、最終パスの2パス目前に圧延材14の温度調整のため、一定時間圧延を猶予するようにしている。この際、圧延材14の温度を放射温度計等を用いて測定し実績中間温調温度とする。この実績中間温調温度を制御要因とし、所定のパススケジュールモデルにもとづいて圧延パススケジュールを再度修正計算する。この修正されたパススケジュールに従い、仕上げ圧延工程7の最後3パスを行うようにする。
【0024】
表4には中間計算工程20での制御要因である実績中間温調温度と決定されたパススケジュールの一例を示す。23パスでスラブ3を鋼板1に圧延し、1〜11パスが粗圧延工程6で、12〜23パスが仕上げ圧延工程7となっている。圧延材14は残り3パスで製品である鋼板1に圧延加工される状況であるため、表4の21〜23パス目の板厚(出側板厚)と温度が、各パスのロール間ギャップや圧下率ならびに入側温度に反映されることになる。
【0025】
【表4】
Figure 2004255409
【0026】
なお、前記各計算工程17,18,19,20は、製造ライン2に連結されているコンピュータ等でオンライン処理されている。したがって、表1〜4に示しているパススケジュールをリアルタイムで製造ライン2に反映させることが可能である。
本発明にかかる鋼板の圧延方法を採用した際に、例えば、目標材質として低温脆性を考えた場合、鋼板1の目標値をマイナス85度としたものが、実績値としてマイナス88度で成形できるようになった。従来は、目標値と実績値との差が約20度と大きかったが、本発明にかかる圧延方法で目標値と実績値を略一致させることができるようになったと共に、材質のばらつきを押さえることが可能となった。
【0027】
なお、本発明にかかる鋼板1の圧延方法は、上記実施の形態に限定されるものではない。
すなわち、中間計算工程20は、仕上げ圧延工程7の最終パスから2パス目に限定されるものではなく、仕上げ圧延工程7中であって温度調整を行うタイミングに実施するとよい。すなわち任意のnパス目であってよい。
また、各計算工程17,18,19,20はオンライン処理で行っているが、当然オフライン処理でもよく、所定のパススケジュールモデルとしては任意のものが採用可能である。
【0028】
また、各計算工程17,18,19,20の算出する板厚及び温度は、圧延ミル11,15の出側板厚及び入側温度であったが、それに限定されるものではなく、計算工程に使用するモデル(計算式)を適宜変更することで、入側板厚、出側温度とすることも可能である。
また、本実施例の場合は、最終パスの2パス目前に圧延材14の温度調整のため、圧延を一定時間圧延を猶予するようにしている(中間温調操作)。この中間温調操作は、仕上げ圧延工程7中の任意のパス間で行ってもよく、複数回行っても何ら問題はない。その都度、中間計算工程20を実施してもよい。
【0029】
【発明の効果】
本発明によれば、目標材質と実績材質を一致させ且つ実績材質のばらつきを少なくするべく圧延パススケジュールを決定して、それに従い各パスで圧延を行うことが可能となる。
【図面の簡単な説明】
【図1】鋼板の製造工程を示す概念図である。
【図2】鋼板の圧延方法を示すフローチャートである。
【符号の説明】
1 鋼板
5 加熱工程
6 粗圧延工程
7 仕上げ圧延工程
17 基本計算工程
18 粗圧延前計算工程
20 中間計算工程[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method for rolling a steel sheet.
[0002]
[Prior art]
As a method of determining an optimal rolling pass schedule and rolling a steel sheet, there is a method described in Patent Document 1. This method determines the rolling pass schedule while acquiring the actual rolling reduction, actual inter-pass time, and actual material temperature in each pass, in order to obtain the target plate thickness and target material, and rolling the slab multiple times. A steel plate is formed.
[0003]
[Patent Document 1]
JP 2001-347308 A (Pages 4 to 9, FIGS. 1 and 2)
[0004]
[Problems to be solved by the invention]
However, in the technique described in Patent Document 1, that is, the method of determining the rolling pass schedule by using the actual reduction rate, the actual inter-pass time, the actual material temperature, and the like as input values, the target material (particularly, low-temperature brittleness) is determined. It is difficult to match the actual material, and in addition, it has been clarified from the actual operation results at the site that the actual material is uneven.
Therefore, the present invention has been made in view of the above problems, and determines a rolling pass schedule in order to match the target material and the actual material and reduce the variation in the actual material. It is intended to provide.
[0005]
[Means for Solving the Problems]
In order to achieve the above object, the following measures have been taken in the method of the present invention.
That is, the method of the present invention is characterized in that a heating step of heating the slab in a heating furnace, a rough rolling step of rolling the slab after the heating step a plurality of times to form a rolled material, and rolling the rolled material a plurality of times. And a finish rolling step to produce a steel sheet, comprising a basic calculation step of calculating a rolling pass schedule using a target value as a control factor, and controlling the actual value of the slab immediately before the rough rolling step. And / or an intermediate calculation in which the rolling pass schedule is corrected and calculated during the finish rolling process and n-th pass before the final pass using the actual value of the rolled material as a control factor. And rolling is performed in accordance with the rolling pass schedule calculated in each of the calculation steps so as to suppress the material variation of the steel sheet.
[0006]
Preferably, the n-th pass is a second pass.
Thus, the pass schedule is determined in the basic calculation process, and the pass schedule is corrected in the rough rolling pre-calculation process, and / or the pass schedule is corrected in the intermediate calculation process, and rolling is performed in each pass. By doing so, it becomes possible to make the target material and the actual material of the steel sheet coincide with each other and to suppress the variation in the actual material. Further, the method of the present invention is characterized in that a calculation step before finish rolling is provided immediately before the finish rolling step, in which the rolling pass schedule is corrected and calculated using the actual value of the rolled material as a control factor.
[0007]
Thus, the pass schedule is determined in the basic calculation step, rolling is performed, the pass schedule is corrected in the pre-rolling calculation step, and then the finish rolling step is performed. Will be able to do that. Further, the method of the present invention is characterized in that the basic calculation step includes, as control factors, a chemical component value and a heating temperature of the slab, a transfer thickness which is a sheet thickness of a rolled material introduced into the finish rolling step, and a finishing step. During the rolling process, the intermediate temperature control temperature, which is the temperature of the rolled material before the n-th pass before the final pass, and the reduction rate after the intermediate temperature control, which is the reduction rate in each pass from the n-th pass to the final pass of the final pass, And the finishing temperature, which is the temperature of the steel sheet immediately before the end of the finish rolling step. The control factors are all target values, and the thickness and the temperature in each pass are determined using these control factors.
[0008]
Preferably, the n-th pass is a second pass.
This makes it possible to determine the reduction amount distribution of each pass in the basic calculation process.
Further, the method of the present invention is characterized in that the rough rolling pre-calculation step uses the actual chemical component value and the actual heating temperature of the slab subjected to the heating step as control factors, and corrects the thickness and temperature in each pass. And make decisions.
This makes it possible to correct the plate thickness and the temperature in each pass based on the actual values of the slab in the pre-rough rolling calculation step.
[0009]
Further, the method of the present invention is characterized in that the calculation step before finish rolling uses the actual transfer thickness and the actual crown shape of the rolling roll in the finish rolling step as control factors, and corrects the thickness and temperature in each pass. And make decisions.
This makes it possible to correct the plate thickness and the temperature in each pass based on the actual values of the rolled material in the calculation process before finish rolling.
Also, the method of the present invention is characterized in that the intermediate calculation step corrects and determines the plate thickness and the temperature in each pass using the actual intermediate adjusted temperature as a control factor.
[0010]
Accordingly, in the intermediate calculation step, the sheet thickness and the temperature in each pass can be corrected based on the intermediate temperature control actual value, that is, the actual value of the rolled material before the nth pass of the final pass.
A feature of the method of the present invention is that each of the calculation steps is performed in an on-line process while rolling the steel sheet.
This makes it possible to perform each calculation process online while rolling, and to reflect the result of the pass schedule correction on the production line in real time.
[0011]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of the present invention will be described by taking a manufacturing process of a steel sheet as an example.
FIG. 1 is a conceptual diagram showing a manufacturing process of a steel plate, and FIG. 2 is a flowchart showing a method of rolling a steel plate.
As shown in FIG. 1, a production line 2 for a steel sheet 1 includes a casting process 4 for casting a slab 3, a heating process 5 for heating the slab 3, a rough rolling process 6 for rough rolling the slab 3, and a finish rolling process. 7 are provided.
[0012]
In the casting step 4, the molten steel 9 is injected into the continuous casting device 8, and the slab 3 is continuously cast. Further, the cast slab 3 is charged into the heating step 5 in order to uniformly heat the whole. The heating step 5 includes a heating furnace 10, and the slab 3 is charged at, for example, about 600 degrees, and is heated to, for example, about 1100 degrees at the time of loading.
The heated slab 3 is then carried into the rough rolling step 6. The rough rolling step 6 includes a rough rolling mill (rolling machine) 11 and includes at least a pair of rough rolling rolls 12 and a pair of backup rolls 13. The slab 3 is reciprocated through the rough rolling mill 11 a plurality of times and rolled, so that the slab 3 is deformed into a plate shape and becomes a rolled material 14.
[0013]
The rolled material 14 is then introduced into the finish rolling step 7. The finish rolling step 7 includes a finish rolling mill (rolling machine) 15, and the finish rolling mill 15 includes at least a pair of finish rolling rolls 16 and a pair of backup rolls 13. By rolling the rolled material 14 back and forth through the finish rolling mill 15 a plurality of times, the steel sheet 1 having the target shape, material, and the like is formed.
A method of determining the rolling pass schedule applied in the above-described steel sheet manufacturing line 2 will be described with reference to FIG.
[0014]
First, with respect to the slab 3 formed in the casting step 4, a basic pass schedule, that is, an exit side plate thickness (plate thickness) and an entrance side temperature (temperature) in each pass are calculated (basic calculation step 17).
In the basic calculation step 17, the input values, that is, control factors, include the chemical component value of the slab 3, the heating temperature after deriving the heating step 5, and the transfer thickness which is the sheet thickness of the rolled material 14 introduced into the finish rolling step 7. There is. Also, during the finish rolling step 7, an intermediate temperature control temperature, which is the temperature of the rolled material 14 just before the second pass before the final pass, and an intermediate rolling rate, which is the rolling reduction in each pass from the second pass before the final pass to the final pass. There is also a reduction rate after temperature control. In addition, a finishing temperature, which is the temperature of the steel sheet 1 immediately before the end of the finish rolling step 7, is also employed.
[0015]
Further, the roll size, which is the dimension of the steel sheet 1, the sheet crown of the steel sheet 1, the roll crown of the finishing mill, and the material variation correction formula are added to the control factors. These control factors are all target values, that is, the product size of the steel sheet 1 at the time of finishing rolling.
Using these control factors as input values, the exit plate thickness and the entrance temperature of each pass are calculated using a predetermined pass schedule model. The calculation of the pass schedule is performed by a computer or the like directly connected to the manufacturing line 2. Table 1 shows an example of a path schedule determined as a control factor in the basic calculation step 17. The slab 3 is rolled into the steel sheet 1 in 25 passes, and the 1st to 11th pass is a rough rolling process 6 and the 12 to 25th pass is a finish rolling process 7.
[0016]
[Table 1]
Figure 2004255409
[0017]
The slab 3 to which the basic pass schedule is applied is heated to a constant temperature through the heating step 5. At this point, the pass schedule is calculated again to correct the basic pass schedule (calculation step before rough rolling 18).
In the pre-rough rolling calculation step 18, the actual chemical component value of the slab 3 and the actual heating temperature are used as input values, that is, control factors. The actual chemical component value of the slab 3 is measured using a fluorescence analyzer or the like, and the actual heating temperature is measured using a radiation thermometer or the like.
Using these control factors as input values, the exit plate thickness and the entrance temperature of each pass are calculated using a predetermined pass schedule model. Table 2 shows an example of the control schedule and the determined pass schedule in the rough rolling pre-calculation step 18. It is modified so that the slab 3 is rolled into the steel sheet 1 in 23 passes, and the 1st to 11th passes are the rough rolling process 6 and the 12 to 23 passes are the finish rolling process 7.
[0018]
[Table 2]
Figure 2004255409
[0019]
The gap between the rolls and the rolling reduction of the rough rolling mill 11 are changed based on the thickness of the delivery side, and the entrance temperature of the rolled material 14 is made to match the determined value of the pass schedule by adjusting the waiting time between passes. In this way, the slab 3 is advanced to the rough rolling step 6, where rough rolling is performed.
The roll schedule of the rolled material 14 that has passed through the rough rolling process 6 is calculated and corrected again before being introduced into the finish rolling process 7 (calculation process before finish rolling 19).
[0020]
In the pre-finish rolling calculation step 19, the thickness of the rolled material 14 before entering the finish rolling step 7, that is, the transfer thickness which is the thickness of the rolled material 14 discharged from the rough rolling step 6, and the finish rolling mill 15. The roll crown is used as a control factor, and the pass schedule is calculated again and corrected using a predetermined pass schedule model.
In addition, since a thickness gauge is not installed in the rough rolling mill 11, the transfer thickness uses a thickness theoretically calculated by a rolling theory or the like, and the roll crown takes into consideration the abrasion state of the roll and the like. It can be obtained from the theoretical formula.
[0021]
Table 3 shows an example of a pass schedule determined as a control factor in the calculation step 19 before finish rolling. The slab 3 is rolled into the steel sheet 1 in 23 passes, and the rough rolling process 6 is performed in passes 1 to 11, and the finish rolling process 7 is performed in passes 12 to 23. Since the rolled material 14 has already been subjected to the rough rolling and is introduced into the finish rolling step 7, the outlet plate thickness and the inlet temperature of the 12th to 23rd passes are applied to the production line 2.
[0022]
[Table 3]
Figure 2004255409
[0023]
The entrance temperature of the rolled material 14 is made to coincide with the pass schedule determination value by changing the inter-roll gap and the rolling reduction of the finish rolling mill 15 based on the exit side plate thickness and adjusting the waiting time between each pass. Then, finish rolling is performed.
Further, two passes before the final pass in the finish rolling step 7, the actual intermediate temperature control temperature is used as a control factor, and the exit side plate thickness and the entrance side temperature in each pass are corrected and determined again (intermediate calculation step 20).
More specifically, in the rolling operation, the rolling is delayed for a certain time in order to adjust the temperature of the rolled material 14 before the second pass of the final pass. At this time, the temperature of the rolled material 14 is measured using a radiation thermometer or the like, and the measured intermediate temperature is set. Using the actual intermediate temperature as a control factor, the rolling pass schedule is corrected and calculated again based on a predetermined pass schedule model. According to the modified pass schedule, the last three passes of the finish rolling step 7 are performed.
[0024]
Table 4 shows an example of the actual intermediate temperature control temperature which is a control factor in the intermediate calculation step 20 and the determined pass schedule. The slab 3 is rolled into the steel sheet 1 in 23 passes, and the rough rolling process 6 is performed in passes 1 to 11, and the finish rolling process 7 is performed in passes 12 to 23. Since the rolled material 14 is rolled into the product steel plate 1 in the remaining three passes, the plate thickness (outgoing plate thickness) and the temperature of the 21st to 23rd passes in Table 4 indicate the gap between the rolls in each pass. This will be reflected in the rolling reduction and the inlet temperature.
[0025]
[Table 4]
Figure 2004255409
[0026]
The calculation steps 17, 18, 19, and 20 are processed online by a computer or the like connected to the production line 2. Therefore, the pass schedules shown in Tables 1 to 4 can be reflected on the manufacturing line 2 in real time.
When the rolling method of a steel sheet according to the present invention is adopted, for example, when considering low-temperature brittleness as a target material, a steel sheet 1 having a target value of minus 85 degrees can be formed with a result value of minus 88 degrees. Became. Conventionally, the difference between the target value and the actual value was as large as about 20 degrees, but the rolling method according to the present invention has made it possible to substantially match the target value and the actual value, and to suppress the variation in the material. It became possible.
[0027]
The method for rolling the steel sheet 1 according to the present invention is not limited to the above embodiment.
That is, the intermediate calculation step 20 is not limited to the second pass from the final pass of the finish rolling step 7, and may be performed during the finish rolling step 7 at a timing when the temperature is adjusted. That is, any n-th pass may be used.
Further, although the calculation steps 17, 18, 19, and 20 are performed in online processing, naturally, offline processing may be performed, and any predetermined path schedule model can be adopted.
[0028]
The thickness and temperature calculated in each of the calculation steps 17, 18, 19, and 20 were the exit side thickness and the entrance side temperature of the rolling mills 11 and 15, but are not limited thereto. By appropriately changing the model (calculation formula) to be used, it is also possible to set the inlet side plate thickness and the outlet side temperature.
Further, in the case of the present embodiment, the rolling is delayed for a certain time in order to adjust the temperature of the rolled material 14 before the second pass of the final pass (intermediate temperature control operation). This intermediate temperature control operation may be performed between any passes in the finish rolling process 7, and there is no problem if it is performed a plurality of times. Each time, the intermediate calculation step 20 may be performed.
[0029]
【The invention's effect】
ADVANTAGE OF THE INVENTION According to this invention, it becomes possible to determine a rolling pass schedule so that a target material and an actual material may correspond, and to reduce the dispersion | variation of an actual material, and to perform a rolling in each pass according to it.
[Brief description of the drawings]
FIG. 1 is a conceptual diagram showing a manufacturing process of a steel sheet.
FIG. 2 is a flowchart showing a method for rolling a steel sheet.
[Explanation of symbols]
1 Steel plate 5 Heating step 6 Rough rolling step 7 Finish rolling step 17 Basic calculation step 18 Pre-rough rolling calculation step 20 Intermediate calculation step

Claims (8)

スラブを加熱炉で加熱する加熱工程と、前記加熱工程後のスラブを複数回圧延し圧延材とする粗圧延工程と、この圧延材を複数回圧延し鋼板とする仕上げ圧延工程とを有する鋼板の圧延方法であって、
目標値を制御要因として圧延パススケジュールを算出する基本計算工程を有し、前記粗圧延工程直前にスラブの実績値を制御要因として圧延パススケジュールを修正計算する粗圧延前計算工程、及び/又は、仕上げ圧延工程中であって最終パスのnパス目前に圧延材の実績値を制御要因として圧延パススケジュールを修正計算する中間計算工程を有しており、前記鋼板の材質ばらつきを押さえるべく前記各計算工程で算出された圧延パススケジュールにしたがって圧延を行うことを特徴とする鋼板の圧延方法。
A heating step of heating the slab in a heating furnace, a rough rolling step of rolling the slab after the heating step a plurality of times to form a rolled material, and a finish rolling step of rolling the rolled material a plurality of times to form a steel sheet. A rolling method,
A basic calculation step of calculating a rolling pass schedule with a target value as a control factor, and a pre-rough rolling calculation step of correcting and calculating a rolling pass schedule with the actual value of the slab as a control factor immediately before the rough rolling step; and / or During the finish rolling step and before the n-th pass of the final pass, there is an intermediate calculation step of correcting and calculating the rolling pass schedule using the actual value of the rolled material as a control factor, and performing each of the calculations to suppress the material variation of the steel sheet. A rolling method for a steel sheet, wherein rolling is performed according to a rolling pass schedule calculated in a process.
前記仕上げ圧延工程直前に圧延材の実績値を制御要因として圧延パススケジュールを修正計算する仕上げ圧延前計算工程を有することを特徴とする請求項1に記載の鋼板の圧延方法。The method for rolling a steel sheet according to claim 1, further comprising a pre-finish-rolling calculation step of correcting and calculating a rolling pass schedule using the actual value of the rolled material as a control factor immediately before the finish rolling step. 前記基本計算工程は、制御要因としてスラブの化学成分値及び加熱温度と、仕上げ圧延工程に導入される圧延材の板厚である移送厚と、仕上げ圧延工程中であって最終パスのnパス目前における圧延材の温度である中間温調温度及び最終パスのnパス目前から最終パスまでの各パスでの圧下率である中間温調後圧下率と、仕上げ圧延工程終了直前における鋼板の温度である仕上げ温度とを有し、前記制御要因は全て目標値であり且つこれら制御要因を用いて各パスにおける板厚と温度とを決定することを特徴とする請求項1又は2に記載の鋼板の圧延方法。The basic calculation step includes, as control factors, a chemical component value and a heating temperature of the slab, a transfer thickness which is a sheet thickness of a rolled material introduced into the finish rolling step, and an n-th pass before the final pass during the finish rolling step. The intermediate temperature control temperature, which is the temperature of the rolled material, and the intermediate temperature post-rolling reduction rate, which is the reduction rate in each pass from the nth pass to the final pass of the final pass, and the temperature of the steel sheet immediately before the end of the finish rolling step. 3. The rolling of a steel sheet according to claim 1, wherein a finishing temperature is set, all of the control factors are target values, and a thickness and a temperature in each pass are determined using the control factors. Method. 前記粗圧延前計算工程は、前記加熱工程を経たスラブの実績化学成分値及び実績加熱温度を制御要因とし、各パスにおける板厚と温度とを修正し且つ決定することを特徴とする請求項3に記載の鋼板の圧延方法。The said pre-rough rolling calculation step corrects and determines the sheet thickness and temperature in each pass using the actual chemical component value and the actual heating temperature of the slab subjected to the heating step as control factors. 3. The method for rolling a steel sheet according to item 1. 前記仕上げ圧延前計算工程は、実績移送厚と仕上げ圧延工程における圧延ロールの実績クラウン形状とを制御要因とし、各パスにおける板厚と温度とを修正し且つ決定することを特徴とする請求項3又は4に記載の鋼板の圧延方法。4. The method according to claim 3, wherein in the pre-rolling calculation step, the actual transfer thickness and the actual crown shape of the rolling roll in the final rolling step are used as control factors to correct and determine the thickness and temperature in each pass. Or the method of rolling a steel sheet according to 4. 前記中間計算工程は、実績中間温調温度を制御要因とし、各パスにおける板厚と温度とを修正し且つ決定することを特徴とする請求項3〜5のいずれかに記載の鋼板の圧延方法。The method for rolling a steel sheet according to any one of claims 3 to 5, wherein the intermediate calculation step corrects and determines the sheet thickness and the temperature in each pass using the actual intermediate temperature control temperature as a control factor. . 前記nパス目は2パス目であることを特徴とする請求項1〜6のいずれかに記載の鋼板の圧延方法。The method according to claim 1, wherein the n-th pass is a second pass. 前記各計算工程を、鋼板の圧延を行いつつオンライン処理で行うことを特徴とする請求項1〜7に記載の鋼板の圧延方法。The steel sheet rolling method according to claim 1, wherein each of the calculation steps is performed by online processing while rolling the steel sheet.
JP2003047917A 2003-02-25 2003-02-25 Method for rolling steel sheet Withdrawn JP2004255409A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003047917A JP2004255409A (en) 2003-02-25 2003-02-25 Method for rolling steel sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003047917A JP2004255409A (en) 2003-02-25 2003-02-25 Method for rolling steel sheet

Publications (1)

Publication Number Publication Date
JP2004255409A true JP2004255409A (en) 2004-09-16

Family

ID=33114034

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003047917A Withdrawn JP2004255409A (en) 2003-02-25 2003-02-25 Method for rolling steel sheet

Country Status (1)

Country Link
JP (1) JP2004255409A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010082646A (en) * 2008-09-30 2010-04-15 Jfe Steel Corp Method for rolling thick plate and rolling apparatus
CN114850213A (en) * 2022-05-20 2022-08-05 宝武集团鄂城钢铁有限公司 Reduced pass rolling production method for uncontrolled rolled steel plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010082646A (en) * 2008-09-30 2010-04-15 Jfe Steel Corp Method for rolling thick plate and rolling apparatus
CN114850213A (en) * 2022-05-20 2022-08-05 宝武集团鄂城钢铁有限公司 Reduced pass rolling production method for uncontrolled rolled steel plate

Similar Documents

Publication Publication Date Title
CN104511484B (en) The micro-middle wave board-shape control method of a kind of hot-strip
JP2004508933A (en) Method and equipment for the production of steel strips and sheets
CN106914495A (en) A kind of hot-strip camber control method and system
JP2006281300A (en) Cooling control method, device, and computer program
CN110576048B (en) Steel plate temperature control device of hot rolling endless rolling production line
KR102448426B1 (en) How the annealing furnace works
JP2004255409A (en) Method for rolling steel sheet
JP5932143B2 (en) Edge mask control method for cooling device
JP5487652B2 (en) Temperature control method in hot rolling
JP6021659B2 (en) Heating furnace operation support system
JP5786844B2 (en) Control method and control device for tandem rolling mill
JP4079098B2 (en) Manufacturing method and manufacturing apparatus for hot-rolled steel sheet
JP2002126814A (en) Hot rolling method
JPH0818057B2 (en) Control method of material input pitch in thick steel plate rolling line
JP3582517B2 (en) Manufacturing method of hot-rolled steel strip
JPH0698370B2 (en) Board width control method
JP2004283846A (en) Hot rolling method and its equipment
JP4226516B2 (en) How to change the pass schedule in a plate rolling machine
US11779977B2 (en) Method for setting different cooling curves of rolling material over the strip width of a cooling stretch in a hot-strip mill or heavy-plate mill
JP6822390B2 (en) Rough rolling time calculation method for thick steel sheets, rough rolling time calculation device for thick steel sheets, and manufacturing method for thick steel sheets
JPH0775816A (en) Method for automatically controlling water injection between stands
JP2004034032A (en) Method for controlling edge drop in tandem cold- rolling
JPS6240919A (en) Plate width control method for hot continuous rough rolling mill
JP2006051512A (en) Method for controlling width of material to be rolled in hot rolling and method for manufacturing hot-rolled metallic sheet
JP2001259718A (en) Method and device for setting rolling pass schedule

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051221

A761 Written withdrawal of application

Free format text: JAPANESE INTERMEDIATE CODE: A761

Effective date: 20060925