JP2004197475A - Banking structure and method of constructing the same - Google Patents

Banking structure and method of constructing the same Download PDF

Info

Publication number
JP2004197475A
JP2004197475A JP2002368960A JP2002368960A JP2004197475A JP 2004197475 A JP2004197475 A JP 2004197475A JP 2002368960 A JP2002368960 A JP 2002368960A JP 2002368960 A JP2002368960 A JP 2002368960A JP 2004197475 A JP2004197475 A JP 2004197475A
Authority
JP
Japan
Prior art keywords
soil
embankment
steel wall
mixed
mixed soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2002368960A
Other languages
Japanese (ja)
Inventor
Misao Suzuki
操 鈴木
Hiroshi Abe
大志 安部
Toshihiko Nanbu
俊彦 南部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2002368960A priority Critical patent/JP2004197475A/en
Publication of JP2004197475A publication Critical patent/JP2004197475A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a banking structure which minimizes its installation area, can be formed of any type of earth inclusive of generated soil, and can be constructed in a short construction period without intermittence, and to provide a method of constructing the banking structure. <P>SOLUTION: The banking structure is formed of steel wall members 1, 3 functioning as forms, and mixed earth 5 placed inside the steel wall members 1, 3. The mixed earth 5 is a mixture of a hardener, earth, and water. Its slump flow is set in a range of not smaller than 350 mm and smaller than 1,000 mm, and its uniaxial compression strength after 28 days is set not smaller than 50 kN/m<SP>2</SP>. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、鉄道、道路などの盛土構造及びその施工方法に関する。
【0002】
【従来の技術】
従来、鉄道、道路などの盛土構造は、ほぼ水平な路面の部分とその両側のなだらかな勾配の法面の部分とからなる八の字形の形状をしている。そして、盛土上を電車、車が走行することから、盛土には一定の圧縮強度が要求される。
このような、一定の圧縮強度を確保するため、一般的な盛土は締め固めが容易で、外力に対し安定を保ち有害な圧縮沈下が生じない土砂により形成されているのが一般的である。
また、施工に際しては、数十cmごとに土砂を敷き均し、締め固め、締め固め管理を行い、これを所定の高さになるまで繰り返し行うという方法が標準的である。
【0003】
また、最近では、八の字形ではなく法面が急勾配、あるいは鉛直で、法面部分にブロック状の壁材を設置した構造の「急勾配高盛土」も提案されている(例えば、特許文献等1参照)。この急勾配高盛土の施工方法も、上記の八の字形の盛土と同様に積層状に行うものであり、壁材などを設置した後、数十cmごとに土砂を盛っていくのが標準的になっている。
さらに、土砂を石灰処理し、これに流動性と水硬性を付与した混合土を用いる「石灰処理土を用いた盛土工法」もある(例えば、特許文献等2参照)。この施工方法は積層状に盛っていくのではなく、土砂を一気に盛り上げていく方法である。
【0004】
【特許文献1】
特開2000−87355号公報
【特許文献2】
特開2000−256669号公報
【0005】
【発明が解決しようとする課題】
上記の従来型の盛土構造及び工法には以下のような問題がある。
まず、八の字形の盛土構造は、施工が簡単で初期コストは安いが、沈下しやすく、耐雨性、耐震性に乏しい。そのため、保守、防災に多大の労力、費用を要する。また、八の字形をしていることから広い範囲の平面積を必要とし、高地価の場所では用地取得コストが高く、土地が高度に利用されている場所では用地そのものを取得できないため、適用場所が限定される。さらに、土砂は盛土構造に有害な影響を及ぼさない土砂である必要があり、土砂材料が限定される。
【0006】
また、特許文献等1に示された「急勾配高盛土」は、一層一層施工しながら盛土を構築するため工期が長い。さらに、土砂は上記構造同様、盛土構造に有害な影響を及ぼさないものである必要があり、土砂材料が限定される。
【0007】
また、特許文献等2に示された「石灰処理土を用いた盛土工法」は、土を一旦改良するため、土砂が限定されないが、改良のためのコストと場所が必要となる。
【0008】
以上のように、従来の盛土はいずれも満足するものではなく、よりよい盛土構造およびその施工方法が望まれていた。
【0009】
本発明は、かかる課題を解決するためになされたもので、設置面積が最小化でき、発生土を含むあらゆる土砂が使用可能で、短工期で一気に施工することができる盛土構造とその施工方法を提供することを目的としている。
【0010】
【課題を解決するための手段】
本発明に係る盛土構造は、型枠として機能する鋼製壁材と、該鋼製壁材内に打設された混合土からなるものであって、前記混合土は固化材と土と水を混合されてなり、スランプフローが350mm以上1000mm未満で、28日後の一軸圧縮強さが50kN/m2以上であることを特徴とするものである。
【0011】
混合土を、上記の性状になるようにすれば、粗粒土でも細粒土でも、土砂が土塊状であっても、硬化後の混合土の圧密沈下量はほとんど0となり、盛土構造の圧密沈下を防止することができる。このため、掘削発生土を含むあらゆる土をそのままの状態で大量に使うことができ、環境負荷低減、循環型社会形成に寄与することができる。
【0012】
また、本発明に係る盛土構造は、混合土の混合割合を、混合土1m3あたり、水が300kg以上400kg以下、固化材が、粒径0.075mm以下の土を50%以上含む場合には120kg以上、粒径0.075mm〜75mmの土を50%超える量を含む場合には60kg以上としたものである。
【0013】
また、本発明に係る盛土構造は、使用する土砂として掘削発生土を用いたものである。
使用する土砂を掘削発生土とすることで、発生土の有効利用が図られ、天然の盛土資材を使用しないですむ。
【0014】
また、本発明に係る盛土構造は、鋼製壁材の内面側に複数の突起を設けたものである。鋼製壁材の面に複数の突起を設けることで鋼製壁材と固化後の混合土とが構造的に一体となり、剛性が大となるため、外力に対する変形抵抗が大となり、構造的な安定度が大となる。
【0015】
また、本発明に係る盛土構造の施工方法は、鋼製壁材を型枠用途として設置し、該鋼製壁材内に混合土を打設するものであって、前記混合土は、固化材と土砂と水を混合することにより製造され、スランプフローが350mm以上1000mm未満で、28日後の一軸圧縮強さが50kN/m2以上であることを特徴とするものである。
【0016】
また、混合土の混合割合を、混合土1m3あたり、水が300kg以上400kg以下、固化材が、粒径0.075mm以下の土を50%以上含む場合には120kg以上、粒径0.075mm〜75mmの土を50%超える量を含む場合には60kg以上としたものである。
【0017】
また、使用する土砂として掘削発生土を用いたものである。
また、鋼製壁材の内面側に複数の突起を設けたものである。
【0018】
【発明の実施の形態】
実施の形態1.
図1は本発明の一実施の形態の盛土構造の説明図である。まず、完成状態について説明する。本実施の形態の盛土構造は鉄道盛土に関するものである。本実施の形態の盛土構造は両側に設置した鋼製板材からなる鋼製壁材1,3、鋼製壁材1,3に挟まれた部分に設置した混合土5、路盤7からなる。
【0019】
混合土5は、固化材と、水と、土を混合して製造され、流動性及び水硬性を有する混合土が硬化したものである。そして、混合時のスランプフローが350mm以上1000mm未満、28日後の一軸圧縮強さが50kN/m2以上のものである。
ここで、混合土5の性状として、スランプフローを350mm以上1000mm未満とし、28日後の一軸圧縮強さを50kN/m2以上とした根拠について説明する。
【0020】
まず、スランプフローについて説明すると、スランプフローを350mm以上とすることで、適度な流動性を確保でき、施工時において、鋼製壁材1,3を型枠として先に設置し、ついで、混合土を一気に打設することが可能となる。これによって、施工の効率化、短工期化が図られ、施工コスト低減が実現される。
他方、スランプフローが1000mm以上になると、混合土の材料分離の程度が大きくなりすぎて、強度が大きくばらつくことになるので適切でない。
また、スランプフローが350mm未満では盛土施工時に流動性が不足し、混合土均しの作業を必要とするため、施工の手間がかかる。
【0021】
なお、スランプフロー値(mm)の測定は以下のようにして行う。
試験用具としてスランプコーンを用いる。スランプコーンは、上端内径10cm、下端内径20cm、高さ30cmの鉄製のものを用い、適当な位置に取っ手をつけている。
試験方法は、内面を湿布などで拭き、水平に設置した水密性平板上に置き、試料を詰める。上端を均した後、直ちにスランプコーンを引き上げる。引き上げる時間は、高さ30cmで2〜3秒とする。広がった試料の長径とその直角方向の径を測定し、その平均値をスランプフロー値(mm)とする。
【0022】
次に、混合土の強度として、28日後の一軸圧縮強さが50kN/m2以上であることとした点について説明する。
土、水、固化材を混合した混合土と、埋戻し用の良質な山砂を資料土として、自動車走行を想定した繰り返し載荷試験を行い、前記混合土と前記山砂とを比較した。
【0023】
具体的には以下の実験を行った。
内径15cm、高さ17.5cmの鋼製モールドに試料土を12.5cmの深さまで詰め、試料土の中心に直径5cmの円柱棒で繰り返し載荷をし、そのときの円柱棒の貫入量を測定した。繰り返し載荷は、1回/1秒の正弦波載荷とし、荷重は50kN/m2とした。
混合土の試料土は、固化材と土砂(関東ローム土)と水を混合させてモールドにいれ、28日間室内養生し、作製した。
また、埋戻し用の良質砂質土の試料土は、最適含水比でJIS A 1210により3層55回の突き固め方法で作製した。
【0024】
繰り返し載荷10万回後の貫入量をそれぞれ測定し、その結果を、
(貫入量比)=(混合土の貫入量)/(埋戻し用の良質な山砂の貫入量)
で求め、この値が1以上あれば盛土構造としての機能を有するものとして評価した。結果を表1に示す。
【0025】
【表1】

Figure 2004197475
【0026】
表1より、混合土の一軸圧縮強さが50kN/m2以上あれば盛土構造としての機能を有するものとした。
【0027】
以上のように、混合土として備えるべき性状を規定したとして、次に、上記性状になるために、固化材と土砂と水をいかなる割合で混合すればよいかにつき、鋭意研究した。以下、この点について説明する。
【0028】
現実の施工現場で想定できる土砂には、その粒径等種々のものがある。そこで、発明者は、全ての土砂について実験することは不可能であることから、地盤工学会基準に定義される5種類の土についての実験を行い、その実験値をもって現実の土砂に代用できると考えた。
【0029】
実験は、固化材と水の混合割合を種々変更して混合土を製造し、直ちに前述した方法でスランプフロー試験を行いスランプフローを求め、また28日後にJIS A 1216−1998「土の一軸圧縮試験方法」により圧縮試験を行い混合土の一軸圧縮強さを求めた。
【0030】
資料として用いた土は、火山灰質粘性土、粘土、シルト、砂、細粒分質砂の5つに分類されるものを用いた。この5分類の土の性状を以下に示す。
(1)火山灰質粘性土:粒径0.075mm以下の土が50%以上の火山灰土
(2)粘土:粒径0.075mm以下の土が50%以上で、土の塑性指数が
「 0.73×(含水比−20) 」以下の土
(3)シルト:粒径0.075mm以下の土が50%以上で、土の塑性指数が
「 0.73×(含水比−20) 」を超える土
(4)砂:粒径0.075mm〜75mmの土が50%を超え、0.075mm以 下の土が15%を超える土
(5)細粒分質砂:粒径0.075mm〜75mmの土が50%を超え、
0.075mm以下の土が15%以下の土
【0031】
実験の結果を表2に示す。
【表2】
Figure 2004197475
【0032】
表2の結果を整理してグラフ化したものを図3〜図5に示す。
図3は、粒径が0.075mm以下の土を50%以上含むもの(火山灰質粘性土、粘土、シルト)を対象に、縦軸に一軸圧縮強さqu(kN/m2)を、横軸にセメント量C(kg)を取って整理している。
図3から、粒径が0.075mm以下の土を50%以上含むものにおいては、一軸圧縮強さを50kN/m2以上とするために、セメントを混合土1m3あたり120kg以上必要であることが分かる。
【0033】
図4は、粒径が0.075mm〜75mmの土を50%超える量含むもの(砂、細粒分質砂)を対象に、縦軸に一軸圧縮強さqu(kN/m2)を、横軸にセメント量C(kg)を取って整理している。
図4から、粒径が0.075mm〜75mmの土を50%超える量含むものにおいては、一軸圧縮強さを50kN/m2以上とするために、セメントを混合土1m3あたり60kg以上必要であることが分かる。
【0034】
図5は、全ての土を対象として、縦軸にスランプフローF(mm)を、横軸に水量W(kg)を取って整理している。
図5から、全ての土においてスランプフロー値を350mm以上1000未満にするために、水を混合土1m3あたり300kg以上、400kg以下にする必要があることが分かる。
【0035】
結局、以上、図3〜図5から、全ての土において、スランプフローのを350mm以上1000mm未満とし、28日後の一軸圧縮強さを50kN/m2以上とするためには、以下の要件があればよい。
混合土1m3あたり、水は300kg以上400kg以下で、セメントは、土が粒径0.075mm以下の土を50%以上含む場合には120kg以上、土が粒径0.075mm〜75mmの土を50%超える量を含む場合には60kg以上であること。
【0036】
次に上述した盛土構造の構築方法を説明する。
最初に、両側の鋼製壁材1,3を地盤中に根入れして設置する。根入れする場合の長さは、施工中及び完成後に鋼製壁材1,3に作用する力に対して構造的に安定する条件に基づいて決定する。なお、構造的な安定性を増すために、鋼製壁材1,3を根入れした後、対向する鋼製壁材同士をタイロッド11で結んでもよい。このようにすれば、外力に対する抵抗力が増す。
【0037】
また、構造的な安定性を増す方法として、鋼製壁材1,3の内面に図2に示すような突起13を複数設けるようにしてもよい。このような突起13を設けることで、鋼製壁材1,3と混合土5とが一体となり、外力に対する抵抗力が増す。
【0038】
次に、前記説明した混合割合で、土、セメント、水を混合して混合土を製造する。混合土の具体例としては、例えば、固化材として普通ポルトランドセメントを使用した場合であれば、混合土1m3あたり固化材を100kg以上、土砂を0.6m3以上、水を250kg以上450kg以下とする。このような混合割合であればほとんどの場合にスランプフロー及び一軸圧縮強さが所定の範囲に入る性状の混合土を製造することができる。
【0039】
混合土製造後、混合土を鋼製壁材1,3間に打設する。打設の方法としては、例えばミキサー車で混合する場合には、ミキサー車を打設場所に移動して打設してもよいし、スクリューポンプなどの混合土輸送装置を使って混合装置の混合土を打設場所まで輸送して打設してもよい。
【0040】
以上のようにして、打設が完了すると、混合土の一軸圧縮強さが50kN/m2以上になった時点で、路盤7を構築し、線路などの敷設工事を行う。
【0041】
以上のように、本実施の形態によれば、設置面積を最小化でき、また、発生土を含むあらゆる土砂が使用可能となり、さらに、短工期で一気に施工することができる盛土構造及び施工方法を得ることができる。
【0042】
また、鋼製壁材と水硬性を有する混合土からなる盛土構造としたことで、耐雨性、耐震性に優れた構造となり、保守、維持を省力化できるため、ライフサイクルコスト低減に寄与することができる。
【0043】
実施の形態2.
実施の形態1では鉄道盛土に関し、特に新設の盛土形成の例を説明した。本実施の形態では、一般的な八の字形の鉄道盛土の増線化のための盛土構造について述べる。
【0044】
図6は本実施の形態の盛土構造の説明図であり、図1と同一部分には同一の符号を付している。
以下、図6に示した盛土構造の施工法について説明する。
最初に鋼製壁材1,3を設置する。鋼製壁材1,3の設置位置は、図6に示すように、既設の線路15側と増設の線路17側に、増設に必要とされる間隔を離して設置する。設置の方法は実施の形態1と同様に、鋼製壁材1,3を地盤9中に根入れして設置する。根入れする場合の長さ、スタッド13の設置等については、実施の形態1と同様にして決定する。
【0045】
鋼製壁材1,3を設置後、既設線路15側に設置した鋼製壁材1の外側の既設盛土部分19を削り取る。この削り取った土砂は混合土製造時の土砂として使用する。
既設盛土を切削した後、削り取った土砂と固化材と水とを混合し、混合土を製造する。混合土の製造方法、打設方法は上記実施の形態1と同じである。なお、必要に応じて、アンカー14を設置する。
【0046】
この実施の形態によれば、既設盛土部分19を削り取り、その土砂を混合土の土砂として用いるので、別途の掘削が不要である。しかも、既設線路側の既設盛土を削るので、この部分の土地の有効利用ができる。つまり、図6にも示されるように、本実施の形態では単線を複線化したにも拘わらず、占有される土地の面積は狭くなり、土地の有効利用ができる。
【0047】
実施の形態3.
本実施の形態は被災した鉄道盛土の早期復旧のために本発明の盛土構造を利用したものである。
図7は本実施の形態の盛土構造の説明図であり、図1と同一部分には同一の符号を付している。
この実施の形態の構築方法は実施の形態1と同様である。ただ、既設盛土21の土砂を混合土の土砂として利用できる点は実施の形態2と同様である。また、既設盛土21に比べて占有面積が小さくなり、土地の有効活用ができる点も実施の形態2と同様である。
【0048】
なお、上記の実施の形態においては鉄道盛土について説明したが、道路盛土でも全く同じように構築できる。
【0049】
【発明の効果】
以上のように、本発明によれば、掘削発生土を含むあらゆる土砂を用いた盛土構造を、経済的に短期間に施工することができ、環境負荷低減、循環型社会形成に寄与するとすることができる盛土構造とその施工方法を提供することができる。
【図面の簡単な説明】
【図1】本発明の一実施の形態の盛土構造の説明図である。
【図2】本発明の一実施の形態の他の態様の説明図である。
【図3】本発明の一実施の形態における実験結果のグラフである。
【図4】本発明の一実施の形態における実験結果のグラフである。
【図5】本発明の一実施の形態における実験結果のグラフである。
【図6】本発明の他の実施の形態の盛土構造の説明図である。
【図7】本発明の他の実施の形態の盛土構造の説明図である。
【符号の説明】
1、3 鋼製壁材
5 混合土[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an embankment structure such as a railway and a road, and a method for constructing the embankment structure.
[0002]
[Prior art]
BACKGROUND ART Conventionally, embankment structures such as railways and roads have an eight-shaped shape including a substantially horizontal road surface portion and gentle slope portions on both sides thereof. And since a train and a car run on the embankment, a certain compressive strength is required for the embankment.
In order to secure such a certain compressive strength, general embankment is easy to compact, and is generally formed of earth and sand which is stable against external force and does not cause harmful compression settlement.
In addition, at the time of construction, a standard method is to spread earth and sand every several tens of cm, compact, manage compaction, and repeat this until a predetermined height is reached.
[0003]
In addition, recently, a “steep high embankment” having a structure in which a slope is steep or vertical, instead of an eight-shape, and a block-shaped wall material is installed on the slope has been proposed (for example, Patent Document 1). Etc. 1). This steep high embankment construction method is also performed in the form of a stack like the figure eight-shaped embankment. After installing wall materials, it is standard to pile up sand every several tens of cm. It has become.
Further, there is also a “filling method using lime-treated soil” using lime-treated soil and mixed soil obtained by imparting fluidity and hydraulic property thereto (for example, see Patent Document 2). This construction method is a method of building up earth and sand at a stretch, instead of building up in a layered manner.
[0004]
[Patent Document 1]
JP 2000-87355 A [Patent Document 2]
JP 2000-256669 A
[Problems to be solved by the invention]
The above-mentioned conventional embankment structure and construction method have the following problems.
First, the figure-eight embankment structure is easy to construct and the initial cost is low, but tends to sink, and is poor in rain resistance and earthquake resistance. Therefore, a great deal of labor and cost are required for maintenance and disaster prevention. In addition, because it has a figure-eight shape, it requires a wide area of flat area, land acquisition costs are high in places with high land prices, and land itself cannot be acquired in places where land is highly used. Is limited. Furthermore, the earth and sand must be earth and sand that does not have a detrimental effect on the embankment structure, and the earth and sand material is limited.
[0006]
Further, the “steep slope high embankment” disclosed in Patent Document 1 or the like has a long construction period because the embankment is constructed while being further constructed. Furthermore, the earth and sand need to have no detrimental effect on the embankment structure similarly to the above-mentioned structure, and the earth and sand material is limited.
[0007]
In the “filling method using lime-treated soil” disclosed in Patent Document 2 and the like, soil is not limited because soil is once improved, but cost and space for the improvement are required.
[0008]
As described above, none of the conventional embankments is satisfactory, and a better embankment structure and a construction method thereof have been desired.
[0009]
The present invention has been made in order to solve such a problem, an installation area can be minimized, all kinds of earth and sand including generated soil can be used, and an embankment structure and an execution method that can be executed at a stretch in a short construction period. It is intended to provide.
[0010]
[Means for Solving the Problems]
The embankment structure according to the present invention comprises a steel wall material functioning as a formwork and a mixed soil cast in the steel wall material, wherein the mixed soil is obtained by solidifying a material, soil and water. It is characterized by having a slump flow of 350 mm or more and less than 1000 mm and a uniaxial compressive strength of 50 kN / m 2 or more after 28 days.
[0011]
If the mixed soil is made to have the above-mentioned properties, the consolidation settlement amount of the hardened mixed soil will be almost 0, regardless of whether it is coarse-grained soil, fine-grained soil, or soil mass, and consolidation of the embankment structure Subsidence can be prevented. For this reason, a large amount of all soil including excavated soil can be used as it is, which can contribute to reduction of environmental load and formation of a recycling-oriented society.
[0012]
Further, the embankment structure according to the present invention, when the mixing ratio of the mixed soil per 1 m 3 of mixed soil, water is 300 kg or more and 400 kg or less, and the solidified material contains 50% or more of soil having a particle size of 0.075 mm or less. When the amount of soil exceeds 120 kg and the soil having a particle size of 0.075 mm to 75 mm exceeds 50%, the amount is 60 kg or more.
[0013]
Further, the embankment structure according to the present invention uses excavated soil as earth and sand to be used.
By using the excavated soil as the soil to be used, effective use of the generated soil is achieved, and natural embankment materials are not required.
[0014]
In the embankment structure according to the present invention, a plurality of projections are provided on the inner surface side of the steel wall material. By providing a plurality of protrusions on the surface of the steel wall material, the steel wall material and the solidified mixed soil are structurally integrated, and the rigidity is increased. Greater stability.
[0015]
Further, the construction method of the embankment structure according to the present invention is to install a steel wall material as a formwork and to cast a mixed soil into the steel wall material, wherein the mixed soil is a solidified material. And sludge flow of 350 mm or more and less than 1000 mm, and a uniaxial compressive strength of 50 kN / m 2 or more after 28 days.
[0016]
Further, the mixing ratio of the mixed soil per 1 m 3 of mixed soil is 120 kg or more and 0.075 mm in the case where water is 300 kg or more and 400 kg or less and the solidified material contains 50% or more of the soil having a particle size of 0.075 mm or less. In the case where the amount of soil exceeding 50% of the soil of ~ 75 mm is included, it is set to 60 kg or more.
[0017]
The excavated soil is used as the earth and sand used.
Further, a plurality of protrusions are provided on the inner surface side of the steel wall material.
[0018]
BEST MODE FOR CARRYING OUT THE INVENTION
Embodiment 1 FIG.
FIG. 1 is an explanatory diagram of an embankment structure according to an embodiment of the present invention. First, a completed state will be described. The embankment structure of the present embodiment relates to a railway embankment. The embankment structure according to the present embodiment includes steel wall materials 1 and 3 made of steel plate materials installed on both sides, mixed soil 5 and a roadbed 7 installed at a portion sandwiched between the steel wall materials 1 and 3.
[0019]
The mixed soil 5 is produced by mixing a solidified material, water, and soil, and is a hardened mixed soil having fluidity and hydraulic properties. The slump flow during mixing is 350 mm or more and less than 1000 mm, and the uniaxial compressive strength after 28 days is 50 kN / m 2 or more.
Here, the grounds that the slump flow is set to 350 mm or more and less than 1000 mm and the uniaxial compressive strength after 28 days is set to 50 kN / m 2 or more as the properties of the mixed soil 5 will be described.
[0020]
First, the slump flow will be described. By setting the slump flow to 350 mm or more, appropriate fluidity can be secured, and at the time of construction, steel wall materials 1 and 3 are installed first as a formwork, and then the mixed soil is formed. Can be installed at once. Thereby, the efficiency of construction and the shortening of the construction period are achieved, and the construction cost is reduced.
On the other hand, if the slump flow is 1000 mm or more, the degree of material separation of the mixed soil becomes too large, and the strength greatly varies, which is not appropriate.
Further, when the slump flow is less than 350 mm, the fluidity is insufficient at the time of embankment construction, and a work for leveling the mixed soil is required.
[0021]
The measurement of the slump flow value (mm) is performed as follows.
A slump cone is used as a test tool. The slump cone is made of iron having an upper end inner diameter of 10 cm, a lower end inner diameter of 20 cm, and a height of 30 cm, and has a handle at an appropriate position.
In the test method, the inner surface is wiped with a compress or the like, placed on a horizontally installed watertight flat plate, and the sample is packed. Immediately after the top is leveled, pull up the slump cone. The lifting time is 2 to 3 seconds at a height of 30 cm. The length of the extended sample and the diameter in the direction perpendicular thereto are measured, and the average value is defined as a slump flow value (mm).
[0022]
Next, the fact that the uniaxial compressive strength after 28 days is 50 kN / m 2 or more as the strength of the mixed soil will be described.
Using a mixed soil obtained by mixing soil, water, and solidified material and high-quality mountain sand for backfill as a reference soil, a repeated loading test was performed assuming that the vehicle was running, and the mixed soil and the mountain sand were compared.
[0023]
Specifically, the following experiment was performed.
Sample soil was packed into a steel mold with an inner diameter of 15 cm and a height of 17.5 cm to a depth of 12.5 cm, and the sample soil was repeatedly loaded with a 5 cm diameter cylindrical rod at the center, and the penetration amount of the cylindrical rod at that time was measured. did. The repetitive loading was a sine wave loading once per second, and the load was 50 kN / m 2 .
The sample soil of the mixed soil was prepared by mixing a solidifying material, earth and sand (Kanto loam soil) and water, putting the mixture in a mold, and curing the room indoors for 28 days.
In addition, a sample soil of good-quality sandy soil for backfilling was produced by a method of tamping three layers 55 times according to JIS A1210 at an optimum water content.
[0024]
Repeatedly measure the penetration amount after 100,000 times loading, and the result is
(Penetration amount ratio) = (penetration amount of mixed soil) / (penetration amount of high quality mountain sand for backfill)
When this value was 1 or more, it was evaluated as having a function as an embankment structure. Table 1 shows the results.
[0025]
[Table 1]
Figure 2004197475
[0026]
From Table 1, if the uniaxial compressive strength of the mixed soil is 50 kN / m 2 or more, the mixed soil has a function as the embankment structure.
[0027]
As described above, assuming that the properties to be provided as the mixed soil were specified, next, the present inventors conducted intensive research on what ratio of the solidified material, the earth and sand, and water should be mixed in order to obtain the above properties. Hereinafter, this point will be described.
[0028]
There are various types of earth and sand that can be assumed in actual construction sites, such as the particle size. Therefore, since it is impossible to perform experiments on all soils, the inventor conducted experiments on five types of soils defined in the Japanese Geotechnical Standards, and found that the experimental values could be substituted for actual soils. Thought.
[0029]
In the experiment, a mixed soil was manufactured by changing the mixing ratio of the solidified material and water in various ways, and a slump flow test was immediately performed by the above-described method to determine a slump flow. After 28 days, JIS A 1216-1998 “Uniaxial compression of soil” was performed. A compression test was performed according to “Test method” to determine the uniaxial compressive strength of the mixed soil.
[0030]
The soil used as the material was classified into five types: volcanic ash cohesive soil, clay, silt, sand, and fine-grained sedimentary sand. The properties of these five classes of soil are shown below.
(1) Volcanic ash cohesive soil: volcanic ash soil in which the soil having a particle size of 0.075 mm or less is 50% or more. (2) Clay: soil having a particle size of 0.075 mm or less is 50% or more, and the plasticity index of the soil is “0.0. (3) Silt: soil having a particle size of 0.075 mm or less is 50% or more, and the plasticity index of the soil exceeds 0.73 × (water content-20). Soil (4) Sand: Soil with a particle size of 0.075 mm to 75 mm exceeds 50%, and soil with a particle size of 0.075 mm or less exceeds 15%. (5) Fine-grained sedimentary sand: 0.075 mm to 75 mm in particle size Soil exceeds 50%
Soil of 0.075 mm or less is soil of 15% or less.
Table 2 shows the results of the experiment.
[Table 2]
Figure 2004197475
[0032]
FIGS. 3 to 5 show the results of Table 2 arranged and graphed.
FIG. 3 shows the uniaxial compressive strength qu (kN / m 2 ) on the vertical axis and the horizontal axis for those containing 50% or more of soil with a particle size of 0.075 mm or less (volcanic ash clayey clay, silt). The amount of cement C (kg) is arranged on the shaft and arranged.
From Figure 3, in one containing a particle diameter less soil 0.075 mm 50% or more, unconfined compressive strength and in order to 50 kN / m 2 or more, it is necessary cement mixed soil 1 m 120 kg or more per 3 I understand.
[0033]
FIG. 4 is a graph showing the uniaxial compressive strength qu (kN / m 2 ) on the vertical axis, for those containing more than 50% of soil having a particle size of 0.075 mm to 75 mm (sand, fine-grained sedimentary sand). The amount of cement C (kg) is plotted on the horizontal axis.
From FIG. 4, it is necessary to use cement of 60 kg or more per 1 m 3 of mixed soil in order to increase the unconfined compressive strength to 50 kN / m 2 or more in the case of containing soil having a particle size of 0.075 mm to 75 mm exceeding 50%. You can see that there is.
[0034]
FIG. 5 arranges the slump flow F (mm) on the vertical axis and the water amount W (kg) on the horizontal axis for all soils.
From FIG. 5, it can be seen that in order to make the slump flow value of all soils 350 mm or more and less than 1000, it is necessary to make water 300 kg or more and 400 kg or less per 1 m 3 of mixed soil.
[0035]
After all, from FIGS. 3 to 5 above, in all soils, in order to set the slump flow to 350 mm or more and less than 1000 mm and to set the uniaxial compressive strength after 50 days to 50 kN / m 2 or more, the following requirements must be satisfied. Just fine.
Water is 300 kg or more and 400 kg or less per 1 m 3 of mixed soil, and cement is 120 kg or more when the soil contains 50% or more of soil having a particle size of 0.075 mm or less, and the soil is soil of 0.075 mm to 75 mm in size. If it contains more than 50%, it must be 60kg or more.
[0036]
Next, a method of constructing the embankment structure described above will be described.
First, the steel wall materials 1 and 3 on both sides are laid and installed in the ground. The length of embedding is determined based on conditions that are structurally stable against the forces acting on the steel wall materials 1, 3 during and after construction. In addition, in order to increase structural stability, after the steel wall materials 1 and 3 are inserted, the opposite steel wall materials may be connected with the tie rods 11. By doing so, the resistance to external force increases.
[0037]
As a method of increasing the structural stability, a plurality of projections 13 as shown in FIG. 2 may be provided on the inner surfaces of the steel wall materials 1 and 3. By providing such projections 13, the steel wall materials 1, 3 and the mixed soil 5 are integrated, and the resistance to external force is increased.
[0038]
Next, soil, cement, and water are mixed at the mixing ratio described above to produce a mixed soil. Specific examples of the mixed soil, for example, in the case of using the ordinary Portland cement as a solidifying agent, mixed soil 1 m 3 per a solidifying material 100kg or more, sediment and 0.6 m 3 or more, and water 250kg or 450kg or less I do. With such a mixing ratio, it is possible to produce a mixed soil having properties such that the slump flow and the unconfined compressive strength fall within a predetermined range in most cases.
[0039]
After the production of the mixed soil, the mixed soil is cast between the steel wall materials 1 and 3. As a method of casting, for example, when mixing with a mixer truck, the mixer truck may be moved to a casting site and cast, or the mixing device may be mixed using a mixed soil transport device such as a screw pump. The soil may be transported to a casting location and cast.
[0040]
As described above, when the placing is completed, when the uniaxial compressive strength of the mixed soil becomes 50 kN / m 2 or more, the roadbed 7 is constructed, and the laying work of the track and the like is performed.
[0041]
As described above, according to the present embodiment, the installation area can be minimized, and all kinds of earth and sand including generated soil can be used, and further, the embankment structure and the construction method that can be constructed at a stretch in a short construction period. Obtainable.
[0042]
In addition, the embankment structure is made of steel wall material and hydraulically mixed soil, resulting in a structure with excellent rain resistance and earthquake resistance, which can save maintenance and maintenance, thereby contributing to a reduction in life cycle costs. Can be.
[0043]
Embodiment 2 FIG.
In the first embodiment, an example of the formation of a newly embankment was described with respect to the railway embankment. In the present embodiment, an embankment structure for increasing the number of lines of a general figure-eight railway embankment will be described.
[0044]
FIG. 6 is an explanatory view of the embankment structure of the present embodiment, and the same parts as those in FIG. 1 are denoted by the same reference numerals.
Hereinafter, the construction method of the embankment structure shown in FIG. 6 will be described.
First, steel wall materials 1 and 3 are installed. As shown in FIG. 6, the steel wall materials 1 and 3 are installed on the existing line 15 side and the additional line 17 side with an interval required for expansion. As in the first embodiment, the steel wall materials 1 and 3 are installed in the ground 9 in the same manner as in the first embodiment. The length in the case of embedding, the installation of the stud 13, and the like are determined in the same manner as in the first embodiment.
[0045]
After the steel wall materials 1 and 3 are installed, the existing embankment portion 19 outside the steel wall material 1 installed on the existing track 15 side is scraped off. The shaved earth and sand is used as earth and sand when producing mixed soil.
After cutting the existing embankment, the shaved soil, solidified material and water are mixed to produce a mixed soil. The method of manufacturing and placing the mixed soil is the same as in the first embodiment. In addition, the anchor 14 is installed as needed.
[0046]
According to this embodiment, the existing embankment portion 19 is shaved and the earth and sand is used as earth and sand of the mixed soil, so that separate excavation is unnecessary. In addition, since the existing embankment on the existing track is shaved, the land in this portion can be effectively used. That is, as shown in FIG. 6, in the present embodiment, the area of the occupied land is reduced and the land can be used effectively, even though the single track is doubled.
[0047]
Embodiment 3 FIG.
In the present embodiment, the embankment structure of the present invention is used for early restoration of a damaged railway embankment.
FIG. 7 is an explanatory view of the embankment structure of the present embodiment, and the same parts as those in FIG. 1 are denoted by the same reference numerals.
The construction method of this embodiment is the same as that of the first embodiment. However, it is the same as the second embodiment in that the earth and sand of the existing embankment 21 can be used as the earth and sand of the mixed soil. Also, the occupied area is smaller than that of the existing embankment 21 and the land can be effectively used as in the second embodiment.
[0048]
Although the railway embankment has been described in the above embodiment, the same can be applied to road embankment.
[0049]
【The invention's effect】
As described above, according to the present invention, an embankment structure using all kinds of earth and sand including excavated soil can be economically constructed in a short period of time, which contributes to reducing environmental load and forming a recycling-oriented society. It is possible to provide an embankment structure and a method for constructing the embankment.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram of an embankment structure according to an embodiment of the present invention.
FIG. 2 is an explanatory diagram of another mode of one embodiment of the present invention.
FIG. 3 is a graph of an experimental result in one embodiment of the present invention.
FIG. 4 is a graph of an experimental result in the embodiment of the present invention.
FIG. 5 is a graph of an experimental result in the embodiment of the present invention.
FIG. 6 is an explanatory diagram of an embankment structure according to another embodiment of the present invention.
FIG. 7 is an explanatory view of an embankment structure according to another embodiment of the present invention.
[Explanation of symbols]
1,3 steel wall material 5 mixed soil

Claims (8)

型枠として機能する鋼製壁材と、該鋼製壁材内に打設された混合土からなる盛土構造であって、
前記混合土は固化材と土と水を混合されてなり、スランプフローが350mm以上1000mm未満で、28日後の一軸圧縮強さが50kN/m2以上であることを特徴とする盛土構造。
A steel wall material functioning as a formwork, and an embankment structure including a mixed soil cast in the steel wall material,
An embankment structure, wherein the mixed soil is obtained by mixing a solidified material, soil and water, has a slump flow of 350 mm or more and less than 1000 mm, and has a uniaxial compressive strength of 50 kN / m 2 or more after 28 days.
混合土の混合割合は、混合土1m3あたり、水が300kg以上400kg以下、固化材が、粒径0.075mm以下の土を50%以上含む場合には120kg以上、粒径0.075mm〜75mmの土を50%超える量を含む場合には60kg以上であることを特徴とする請求項1記載の盛土構造。The mixing ratio of the mixed soil is per mixed soil 1 m 3, water or 300 kg 400 kg or less, solidifying material is, in a case containing the following soil particle size 0.075 mm 50% or more is 120kg or more, the particle size 0.075mm~75mm The embankment structure according to claim 1, wherein the weight of the embankment is 60 kg or more when the amount of the soil exceeds 50%. 土砂が掘削発生土であることを特徴とする請求項1又は2記載の盛土構造。The embankment structure according to claim 1 or 2, wherein the soil is excavated soil. 鋼製壁材の内面側に複数の突起を設けたことを特徴とする請求項1〜3のいずれかに記載の盛土構造。The embankment structure according to any one of claims 1 to 3, wherein a plurality of projections are provided on an inner surface side of the steel wall material. 鋼製壁材を型枠用途として設置し、該鋼製壁材内に混合土を打設する盛土構造の施工方法であって、
前記混合土は、固化材と土砂と水を混合することにより製造され、スランプフローが350mm以上1000mm未満で、28日後の一軸圧縮強さが50kN/m2以上であることを特徴とする盛土構造の施工方法。
A method of constructing an embankment structure in which a steel wall material is installed as a formwork application and a mixed soil is poured into the steel wall material,
An embankment structure, wherein the mixed soil is manufactured by mixing a solidified material, earth and sand, and water, has a slump flow of 350 mm or more and less than 1000 mm, and has a uniaxial compressive strength of 50 kN / m 2 or more after 28 days. Construction method.
混合土の混合割合は、混合土1m3あたり、水が300kg以上400kg以下、固化材が、粒径0.075mm以下の土を50%以上含む場合には120kg以上、粒径0.075mm〜75mmの土を50%超える量を含む場合には60kg以上であることを特徴とする請求項5記載の盛土構造の施工方法。The mixing ratio of the mixed soil is per mixed soil 1 m 3, water or 300 kg 400 kg or less, solidifying material is, in a case containing the following soil particle size 0.075 mm 50% or more is 120kg or more, the particle size 0.075mm~75mm The embankment construction method according to claim 5, wherein the amount of the embankment is 60 kg or more when the amount of soil exceeds 50%. 土砂が掘削発生土であることを特徴とする請求項5又は6記載の盛土構造の施工方法。The method according to claim 5 or 6, wherein the soil is excavated soil. 鋼製壁材の内面側に複数の突起を設けたことを特徴とする請求項5〜7のいずれかに記載の盛土構造の施工方法。The method according to any one of claims 5 to 7, wherein a plurality of protrusions are provided on an inner surface side of the steel wall material.
JP2002368960A 2002-12-19 2002-12-19 Banking structure and method of constructing the same Withdrawn JP2004197475A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002368960A JP2004197475A (en) 2002-12-19 2002-12-19 Banking structure and method of constructing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002368960A JP2004197475A (en) 2002-12-19 2002-12-19 Banking structure and method of constructing the same

Publications (1)

Publication Number Publication Date
JP2004197475A true JP2004197475A (en) 2004-07-15

Family

ID=32765371

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002368960A Withdrawn JP2004197475A (en) 2002-12-19 2002-12-19 Banking structure and method of constructing the same

Country Status (1)

Country Link
JP (1) JP2004197475A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2509419A (en) * 2014-03-12 2014-07-02 Epicuro Ltd Method for forming a reinforced soil structure
CN113105174A (en) * 2021-03-09 2021-07-13 东南大学 Anti-collision damping unit structure and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2509419A (en) * 2014-03-12 2014-07-02 Epicuro Ltd Method for forming a reinforced soil structure
GB2509419B (en) * 2014-03-12 2018-04-18 Epicuro Ltd Reinforced soil structures
CN113105174A (en) * 2021-03-09 2021-07-13 东南大学 Anti-collision damping unit structure and preparation method thereof
CN113105174B (en) * 2021-03-09 2022-08-26 东南大学 Anti-collision damping unit structure and preparation method thereof

Similar Documents

Publication Publication Date Title
Patel Geotechnical investigations and improvement of ground conditions
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
KR100816382B1 (en) A stone column reinforced with uniformly graded permeable concrete and method for it
JPH11181751A (en) Method for reinforcing soft ground using slag
CN102839683A (en) Discrete pile-water permeability concrete pile novel binary composite foundation and treatment method of composite foundation
JP2007016584A (en) Reinforced earth method
HU225407B1 (en) Procedure for augmentation physical parameters and bearing capacity of ground and for diminution time of consolidation and expected consolidation settlement of thereof
CN111908853A (en) Self-compacting soil, preparation method thereof and construction method for backfilling municipal cavity
JPH06344328A (en) Fast-curing fluidized threaded soil and rapid construction of roadbed/road body using the same
KR20020072416A (en) Lightweight fill materials using waste styrofoam beads and lightweight fill method applying the same
JP2004197475A (en) Banking structure and method of constructing the same
CN210636251U (en) Highway subgrade reinforced structure
JP3583181B2 (en) Embankment construction method
JPH10227003A (en) Construction of base course
JP4882105B2 (en) Reinforced earth method using temporal change of flow and consolidation characteristics of self-hardening and plastic gel
JP3519032B2 (en) Lightweight embankment method
JP2004225453A (en) Construction method of civil engineering structure
KR101372163B1 (en) Structure on soft ground using a compensated foundation and improved surface layer and construction method for the compensated foundation
JP2764645B2 (en) Effective use of construction surplus soil
JP2004197474A (en) Vibration isolation banking structure
JP2005127100A (en) Tamping method for subgrade base course using artificial lightweight aggregate
CN217997975U (en) Hydraulic engineering seepage prevention structure
KR100462529B1 (en) Lightweight fill method applying lightweight fill materials using waste styrofoam beads
CN215051733U (en) Construction access road structure in deep soft soil area
JP3738496B2 (en) Artificial consolidation material

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20060307