JP2004086911A - プロセス管理を改善する方法、システム及び記憶媒体 - Google Patents

プロセス管理を改善する方法、システム及び記憶媒体 Download PDF

Info

Publication number
JP2004086911A
JP2004086911A JP2003299456A JP2003299456A JP2004086911A JP 2004086911 A JP2004086911 A JP 2004086911A JP 2003299456 A JP2003299456 A JP 2003299456A JP 2003299456 A JP2003299456 A JP 2003299456A JP 2004086911 A JP2004086911 A JP 2004086911A
Authority
JP
Japan
Prior art keywords
machine
system model
response
output parameter
process management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003299456A
Other languages
English (en)
Japanese (ja)
Other versions
JP2004086911A5 (https=
Inventor
Scott R Parent
スコット・アール・ペアレント
Aaron J Avagliano
アーオン・ジェイ・アバグリアーノ
E Davis John
ジョン・イー・デイビス
Glen Juback
グレン・ジューバック
John A Kaminsky
ジョン・エー・カミンスキー
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Publication of JP2004086911A publication Critical patent/JP2004086911A/ja
Publication of JP2004086911A5 publication Critical patent/JP2004086911A5/ja
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/042Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32191Real time statistical process monitoring
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • General Factory Administration (AREA)
  • Testing And Monitoring For Control Systems (AREA)
JP2003299456A 2002-08-23 2003-08-25 プロセス管理を改善する方法、システム及び記憶媒体 Pending JP2004086911A (ja)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/064,852 US6915172B2 (en) 2001-11-21 2002-08-23 Method, system and storage medium for enhancing process control

Publications (2)

Publication Number Publication Date
JP2004086911A true JP2004086911A (ja) 2004-03-18
JP2004086911A5 JP2004086911A5 (https=) 2006-10-05

Family

ID=32041294

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003299456A Pending JP2004086911A (ja) 2002-08-23 2003-08-25 プロセス管理を改善する方法、システム及び記憶媒体

Country Status (3)

Country Link
US (1) US6915172B2 (https=)
EP (1) EP1411403A1 (https=)
JP (1) JP2004086911A (https=)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013020433A (ja) * 2011-07-11 2013-01-31 Sanyo Denki Co Ltd 作業誘導システム
JP2013525887A (ja) * 2010-04-16 2013-06-20 ザ・ボーイング・カンパニー ネットワーク対応型ツールのためのアーキテクチャ
CN103439889A (zh) * 2013-08-28 2013-12-11 山西太钢不锈钢股份有限公司 基于排放烟气分析的烧结终点预测方法
JP2018513490A (ja) * 2015-04-16 2018-05-24 シーメンス アクチエンゲゼルシヤフトSiemens Aktiengesellschaft 自動化システムを動作させる方法及び装置
CN109074051A (zh) * 2016-03-28 2018-12-21 三菱电机株式会社 质量管理装置、质量管理方法及质量管理程序

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7031796B2 (en) * 2003-09-03 2006-04-18 Kla-Tencor Technologies Corporation Radiation damage reduction
US7079904B1 (en) * 2003-09-12 2006-07-18 Itt Manufacturing Enterprises, Inc. Adaptive software management
US7490027B2 (en) * 2003-11-06 2009-02-10 Theodora Retsina Method and system for linear optimization of a continuous or semi-continuous process
DE102004020495A1 (de) * 2004-04-26 2005-11-24 Siemens Ag Verfahren und Anlage zur Aufbereitung von Altpapier
WO2006046251A2 (en) * 2004-10-28 2006-05-04 Insyst Ltd. Detection system for rare situation in processes
TW200622777A (en) * 2004-12-31 2006-07-01 Inventec Corp Manufacturing-order giving system and method thereof
DE102005013290B4 (de) * 2005-03-22 2007-04-05 Siemens Ag Verfahren zum elektronischen Betreiben einer Werkzeugmaschine
DE102005013289B4 (de) * 2005-03-22 2007-01-04 Siemens Ag Verfahren zum Kompensieren langsam veränderlicher Merkmale einer Werkzeugmaschine
EP1994456A4 (en) * 2006-03-16 2010-05-19 Applied Materials Inc METHOD AND DEVICE FOR PRESSURE CONTROL IN MANUFACTURING SYSTEMS FOR ELECTRONIC DEVICES
DE102007025447A1 (de) * 2006-10-09 2008-04-17 Siemens Ag Verfahren zur Steuerung und/oder Regelung eines industriellen Prozesses
KR101346731B1 (ko) * 2007-03-12 2014-01-03 삼성전자주식회사 피드 정보를 동기화하는 방법 및 장치
US8078303B2 (en) 2007-07-03 2011-12-13 Southwire Company Electronic supervisor
ITBO20070486A1 (it) * 2007-07-18 2007-10-17 Gd Spa Metodo di controllo di una macchina automatica confezionatrice/impacchettatrice.
US7684886B2 (en) * 2007-08-31 2010-03-23 Caterpillar Inc. Method and system for managing and validating product development
US20090063546A1 (en) * 2007-08-31 2009-03-05 Caterpillar, Inc. Method and system for creating a data dictionary
DE102007057803A1 (de) * 2007-11-30 2009-06-04 Fit Fruth Innovative Technologien Gmbh Verfahren und Fertigungssysteme zum Herstellen von Bauteilen unter Ausnutzung von geometrischen Freiräumen auf Fertigungsanlagen
US20100082143A1 (en) * 2008-09-30 2010-04-01 Rockwell Automation Technologies, Inc. Data Recorder For Industrial Automation Systems
US20100161374A1 (en) * 2008-11-26 2010-06-24 Jim Horta Real-Time Quality Data and Feedback for Field Inspection Systems and Methods
US9323234B2 (en) * 2009-06-10 2016-04-26 Fisher-Rosemount Systems, Inc. Predicted fault analysis
CN103676778A (zh) * 2012-09-18 2014-03-26 财团法人精密机械研究发展中心 可同时对多台加工机进行热变形补偿的方法
US20160217405A1 (en) * 2015-01-28 2016-07-28 Jochen Steinbach Change Requests
CN108885438A (zh) * 2016-03-24 2018-11-23 西门子股份公司 用于控制的方法、控制系统和设备
US20200230713A1 (en) * 2016-06-15 2020-07-23 Mitsubishi Electric Corporation Length measurement control apparatus, manufacturing system, length measurement control method, and non-transitory computer readable medium storing length measurement control program
US20190139441A1 (en) * 2017-11-03 2019-05-09 Drishti Technologies, Inc. Contextual training systems and methods
CN111615673B (zh) * 2018-01-22 2023-09-29 西门子股份公司 一种用于工业控制中的技能匹配的系统
US11610273B2 (en) 2018-04-26 2023-03-21 InfinityQS International, Inc. Enterprise-wide process stream analysis and grading engine with interactive user interface method, system, and computer program product
JP7291061B2 (ja) * 2019-11-14 2023-06-14 株式会社日立製作所 分析システムおよび分析方法

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4228509A (en) 1977-04-07 1980-10-14 Kennedy James P Multivariable control system for regulating process conditions and process optimizing
US4858147A (en) 1987-06-15 1989-08-15 Unisys Corporation Special purpose neurocomputer system for solving optimization problems
US5155677A (en) 1989-11-21 1992-10-13 International Business Machines Corporation Manufacturing process optimizations
US5142612A (en) 1990-08-03 1992-08-25 E. I. Du Pont De Nemours & Co. (Inc.) Computer neural network supervisory process control system and method
US5212765A (en) 1990-08-03 1993-05-18 E. I. Du Pont De Nemours & Co., Inc. On-line training neural network system for process control
US5671335A (en) 1991-05-23 1997-09-23 Allen-Bradley Company, Inc. Process optimization using a neural network
US5339249A (en) 1991-10-29 1994-08-16 Parker Hannifin Corporation Machine control system
FI930877A7 (fi) 1992-11-30 1994-05-31 Pfu Ltd Maongsidigt produktionssystem och metod foer anvaendning av detta
CA2118885C (en) 1993-04-29 2005-05-24 Conrad K. Teran Process control system
US5408405A (en) * 1993-09-20 1995-04-18 Texas Instruments Incorporated Multi-variable statistical process controller for discrete manufacturing
DE19508476A1 (de) 1995-03-09 1996-09-12 Siemens Ag Leitsystem für eine Anlage der Grundstoff- oder der verarbeitenden Industrie o. ä.
DE19508474A1 (de) 1995-03-09 1996-09-19 Siemens Ag Intelligentes Rechner-Leitsystem
DE19535084A1 (de) 1995-09-21 1997-03-27 Ibm Verfahren und Vorrichtung zur dynamischen Optimierung von durch ein Computersystem gemanagten Geschäftsprozessen
US5864773A (en) 1995-11-03 1999-01-26 Texas Instruments Incorporated Virtual sensor based monitoring and fault detection/classification system and method for semiconductor processing equipment
US5765137A (en) 1996-03-04 1998-06-09 Massachusetts Institute Of Technology Computer system and computer-implemented process for correlating product requirements to manufacturing cost
US6144885A (en) 1997-06-03 2000-11-07 Scarrah; Warren P. Method for the interactive improvement of manufacturing processes
US20020070469A1 (en) 1999-12-13 2002-06-13 Hiatt Roger D. Method and apparatus for optimizing a rubber manufacturing process
US7200459B1 (en) 2000-01-04 2007-04-03 Advanced Micro Devices, Inc. Method for determining optimal photolithography overlay targets based on process performance and yield in microelectronic fabrication
US6819963B2 (en) * 2000-12-06 2004-11-16 Advanced Micro Devices, Inc. Run-to-run control method for proportional-integral-derivative (PID) controller tuning for rapid thermal processing (RTP)
US6725121B1 (en) * 2001-05-24 2004-04-20 Advanced Micro Devices, Inc. Method and apparatus for using a dynamic control model to compensate for a process interrupt

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013525887A (ja) * 2010-04-16 2013-06-20 ザ・ボーイング・カンパニー ネットワーク対応型ツールのためのアーキテクチャ
JP2013020433A (ja) * 2011-07-11 2013-01-31 Sanyo Denki Co Ltd 作業誘導システム
CN103439889A (zh) * 2013-08-28 2013-12-11 山西太钢不锈钢股份有限公司 基于排放烟气分析的烧结终点预测方法
JP2018513490A (ja) * 2015-04-16 2018-05-24 シーメンス アクチエンゲゼルシヤフトSiemens Aktiengesellschaft 自動化システムを動作させる方法及び装置
US11030536B2 (en) 2015-04-16 2021-06-08 Siemens Aktiengesellschaft Method and apparatus for operating an automation system and accounting for concept drift
CN109074051A (zh) * 2016-03-28 2018-12-21 三菱电机株式会社 质量管理装置、质量管理方法及质量管理程序

Also Published As

Publication number Publication date
EP1411403A1 (en) 2004-04-21
US20030097197A1 (en) 2003-05-22
US6915172B2 (en) 2005-07-05

Similar Documents

Publication Publication Date Title
JP2004086911A (ja) プロセス管理を改善する方法、システム及び記憶媒体
US6915235B2 (en) Generation of data indicative of machine operational condition
US6795798B2 (en) Remote analysis of process control plant data
EP1364262B1 (en) Creation and display of indices within a process plant
US7738975B2 (en) Analytical server integrated in a process control network
CN101004589B (zh) 过程控制系统中的过程模型识别
JP2004537773A (ja) プロセスプラントにおけるキャビテーションの監視システム及び検出方法、並びにフィールドデバイス
WO2002071173A2 (en) Data sharing in a process plant
US20220206476A1 (en) Systems and methods for addressing gaps in an industrial operation due to operator variability
EP4650895A1 (en) Multi-tenant manufacturing cloud system
EP4651012A1 (en) Manufacturing cloud system
CN121456804A (zh) 一种锡膏多维度数据融合管理方法及系统
Johnson Leveraging Digital Twins for Enhanced Real-Time Data Collection and Predictive Maintenance in Manufacturing
Kinney et al. Benefits of Controller Monitoring and Integrated PID Optimization
HK1236157A1 (en) Cutting tool condition monitoring and prediction method

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060818

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060818

RD13 Notification of appointment of power of sub attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7433

Effective date: 20080125

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20090130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090902

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100217