JP2003285018A - Waste landfilling method - Google Patents

Waste landfilling method

Info

Publication number
JP2003285018A
JP2003285018A JP2002092773A JP2002092773A JP2003285018A JP 2003285018 A JP2003285018 A JP 2003285018A JP 2002092773 A JP2002092773 A JP 2002092773A JP 2002092773 A JP2002092773 A JP 2002092773A JP 2003285018 A JP2003285018 A JP 2003285018A
Authority
JP
Japan
Prior art keywords
landfill
landfilling
waste
movable
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002092773A
Other languages
Japanese (ja)
Inventor
Takeo Seguchi
瀬口健夫
Katsuto Hattori
服部克人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2002092773A priority Critical patent/JP2003285018A/en
Publication of JP2003285018A publication Critical patent/JP2003285018A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a waste landfilling method capable of effectively putting the site of a landfill scheduled area to practical use and preventing filled-up waste from being exposed to the weather. <P>SOLUTION: In the waste landfilling method for filling up excavated land with waste, the landfill scheduled area 1a is divided into a plurality of lots 11 by a partition bank 21 and a movable shed 31 covering the upper part of the lot to be first filled up is installed to perform the landfilling of the lot where the movable shed is installed. After the surface after landfilling is subjected to waterproof treatment 5, the movable shed is moved to the adjacent lot to perform landfilling and surface waterproof treatment in this lot. The partition bank positioned between the lots after the completion of landfilling is excavated to perform landfilling and waterproof treatment at the place where the partition bank is excavated in the movable shed. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、掘削した地中に産
業廃棄物などの廃棄物を埋め立てる廃棄物の埋立て方法
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of landfilling waste such as industrial waste in the excavated ground.

【0002】[0002]

【従来の技術】従来の産業廃棄物の最終処分地としての
内陸型最終処分場は、山あいの広大な地形を利用して埋
立地を確保している。埋立てを実施するにあたっては、
広大な敷地に対して順次、埋立てを行うため、最終的に
埋立てが完了して表面に防水処理を施すまでに長い年月
が経過する。また、埋立て予定区域を土留め壁等で区切
って複数の区画を設け、区画毎に埋立てをおこなう方法
もある。
2. Description of the Related Art An inland type final disposal site as a conventional final disposal site for industrial waste secures a landfill site by utilizing the vast landforms of the mountains. In carrying out landfill,
Landfilling is carried out sequentially on vast sites, so it will take a long time before the landfill is finally completed and the surface is waterproofed. There is also a method in which the planned landfill area is divided by a retaining wall or the like to provide a plurality of sections, and each section is landfilled.

【0003】[0003]

【発明が解決しようとする課題】前記した従来の廃棄物
の埋立て方法にあっては、次のような問題点がある。 <イ>長期間にわたり廃棄物が野ざらしになるため、周
辺への埃や埋立て途中の廃棄物の飛散及び拡散防止等の
養生処理が大変である。特に、掘削して遮水シートで覆
った埋立て区域に、廃棄物と被覆土とを何層にも積み重
ねていく方法を実施した場合、維持管理にも多くの費用
と手間がかかる。 <ロ>最終的に埋立てが完了して、表面に防水処理が施
されるまで、廃棄物を通過した雨水や廃棄物から出る浸
出水等の汚染された水が大量に発生し、水処理施設に膨
大な費用がかかる。 <ハ>処分地のすべての領域に対して、施設を構築して
から埋立てを開始するまでに長時間を費やすため、埋立
てを実施する前に遮水シートなどが劣化するおそれもあ
る。また、広大な敷地が埋立て地として長期間出現する
ため、周囲の景観が悪化するおそれもある。 <ニ>土留め壁で仕切る場合は、土留め壁を構築する必
要がある。最終処分場のように掘削深度が深くなる場合
は、大規模な土留め壁を構築する必要があり建設費が増
加する。また、土留め壁を構築する場所には廃棄物を埋
め立てることができないため、有効に敷地を活用してい
るとは必ずしもいえない。
The above-mentioned conventional waste landfill method has the following problems. <B> Since the waste is left uncovered for a long period of time, it is difficult to carry out curing treatments such as preventing dust from scattering around the area and scattering and dispersion of the waste during landfill. In particular, when a method of stacking multiple layers of waste and coated soil in a landfill area that has been excavated and covered with a water-blocking sheet, maintenance and management requires a lot of cost and labor. <B> Until the landfill is finally completed and the surface is waterproofed, a large amount of contaminated water such as rainwater that has passed through the waste and leachate from the waste is generated, and the water treatment The facility costs a huge amount. <C> For all areas of the disposal site, since it takes a long time from the construction of the facility to the start of the landfill, there is a possibility that the waterproof sheet etc. may deteriorate before the landfill. In addition, a vast site may appear as a landfill for a long period of time, which may worsen the surrounding scenery. <D> When partitioning with an earth retaining wall, it is necessary to construct an earth retaining wall. If the excavation depth is deeper, as in the final disposal site, it will be necessary to construct a large retaining wall and construction costs will increase. Moreover, it is not always possible to say that the site is effectively utilized because waste cannot be filled in the place where the retaining wall is constructed.

【0004】[0004]

【発明の目的】本発明は上記したような従来の問題を解
決するためになされたもので、埋立て予定区域の敷地を
有効に活用できる廃棄物の埋立て方法を提供することを
目的とする。また、埋め立てた廃棄物が風雨にされされ
ることのない廃棄物の埋立て方法を提供することを目的
とする。さらに、浄化処理が必要な排水の発生量を低減
できる廃棄物の埋立て方法を提供することを目的とす
る。本発明は、これらの目的の少なくとも一つを達成す
るものである。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and an object of the present invention is to provide a method of landfilling wastes which can effectively utilize the site of the landfill planned area. . Another object of the present invention is to provide a waste landfilling method in which the landfilled waste is not exposed to wind and rain. Further, it is an object of the present invention to provide a waste landfill method that can reduce the amount of wastewater that requires purification treatment. The present invention achieves at least one of these objectives.

【0005】[0005]

【課題を解決するための手段】上記のような目的を達成
するために、本発明の廃棄物の埋立て方法は、掘削した
地中に廃棄物を埋め立てる廃棄物の埋立て方法におい
て、埋立て予定区域を中仕切り堤によって複数の区画に
分割し、最初に埋立てをおこなう区画上部を覆う可動式
上屋を設置し、前記可動式上屋を設置した区画の埋立て
をおこない、埋立て後の表面を防水処理した後に前記可
動式上屋を隣接する区画に移動し、該区画において埋立
てと表面の防水処理をおこない、埋立てが完了した区画
間に位置する前記中仕切り堤を掘削して、前記可動式上
屋内で該中仕切り堤を掘削した場所に埋立て及び防水処
理をおこなう方法である。ここで、各区画の掘削は、該
区画の埋立てが開始するまでにおこなわれていればよ
い。また区画の掘削は、可動式上屋で覆う前であって
も、覆った後であってもよい。
In order to achieve the above object, the method of landfilling waste according to the present invention is a method of landfilling waste in the excavated ground. The planned area is divided into multiple sections by a partition wall, a movable roof is installed to cover the upper part of the area where landfill is performed first, and the area where the movable roof is installed is landfilled. After waterproofing the surface of the, the movable shed is moved to an adjacent section, landfill and surface waterproofing are performed in the section, and the partition wall located between the sections where landfilling is completed is excavated. The landfill and waterproof treatment are performed at the location where the partition wall is excavated in the movable upper chamber. Here, the excavation of each section may be performed before the landfill of the section starts. The excavation of the section may be performed before or after covering with the movable shed.

【0006】また、埋立て予定区域の平面形が略円形の
場合は、埋立て予定区域を中仕切り堤によって複数の区
画に分割し、最初に埋立てをおこなう区画に、前記埋立
て予定区域の略中心を軸に回転可能な区画上部を覆う可
動式上屋を設置し、前記可動式上屋を設置した区画の埋
立てをおこない、埋立て後の表面を防水処理した後に前
記可動式上屋を隣接する区画に回転移動し、該区画にお
いて埋立てと表面の防水処理をおこない、埋立てが完了
した区画間に位置する前記中仕切り堤を掘削して、前記
可動式上屋内で該中仕切り堤を掘削した場所に埋立て及
び防水処理をおこなう。
In addition, when the planed landfill area is substantially circular, the landfill planned area is divided into a plurality of sections by a partition wall, and the first landfill section is filled with the above-mentioned landfill planned area. A movable shed that covers the upper part of the compartment that can rotate about the center is installed, and the compartment in which the movable shed is installed is landfilled, and the surface after landfill is waterproofed, and then the movable shed To the adjacent compartment, perform landfilling and waterproofing of the surface in the compartment, excavate the partition wall located between the compartments where landfilling is completed, and place the partition inside the movable upper room. Landfill and waterproof treatment will be applied to the place where the bank was excavated.

【0007】[0007]

【発明の実施の形態1】以下、図面を参照しながら本発
明の実施の形態1について説明する。
Embodiment 1 of the present invention will be described below with reference to the drawings.

【0008】<イ>埋立て予定区域 埋立て予定区域1は、最終的に廃棄物4の埋立地となる
敷地をいう。実施の形態1では、埋立て予定区域1aが
長方形である場合を例に説明する(図2(d)参照)。
埋立て予定区域1aには、複数の区画11を設ける。区
画11は、中仕切り堤21によって仕切られた埋立て領
域である。区画11の数は、埋立て予定区域1aの広さ
や使用態様に応じて任意に設定することができる。ま
た、区画11の大きさは出来るだけ等しい方が好まし
い。同じ大きさの可動式上屋31で天蓋をするのに都合
がいいからである。埋立て予定区域1aは、予め掘削を
おこなってすべての区画を構築しても良いし、ある区画
11aの埋立てと並行して他の区画11bの掘削をおこ
なっても良い。中仕切り堤21は、区画11a,11b
間に残された未掘削の地盤からなる堤体である。本発明
では、最終的には中仕切り堤21も掘削して埋立てをお
こなう。
<a> Planned landfill area The planned landfill area 1 is the site where the waste 4 will eventually be reclaimed. In the first embodiment, the case where the planned landfill area 1a is rectangular will be described as an example (see FIG. 2D).
A plurality of sections 11 are provided in the planned landfill area 1a. The section 11 is a landfill area partitioned by a partition wall 21. The number of the sections 11 can be arbitrarily set according to the size of the planned landfill area 1a and the manner of use. Further, it is preferable that the sizes of the sections 11 are as equal as possible. This is because it is convenient to cover the canopy with the movable shed 31 having the same size. The planned landfill area 1a may be excavated in advance to construct all the sections, or the other section 11b may be excavated in parallel with the reclamation of one section 11a. The partition wall 21 is divided into sections 11a and 11b.
It is a levee body made of unexcavated ground left in between. In the present invention, finally, the partition wall 21 is also excavated for landfilling.

【0009】<ロ>可動式上屋 可動式上屋31は、埋立て中の区画11等の天蓋となる
移動可能な構造体である。可動式上屋31は、埋立て中
に廃棄物4が風雨にさらされるのを防ぐために設置す
る。例えば、底面を開放した壁と屋根から構成される公
知の構造体が使用できる。壁の一部には、廃棄物4を搬
入するための搬入口を設ける。屋根の構造は、平面形に
限定されず、山形やシェル型であってもよい。可動式上
屋31は、脚部に車輪を取り付けるなどして移動可能に
構成する。例えば、埋立て予定区域1aの両側の側部に
おいて、区画11が連なる方向に向けて軌条(図示せ
ず)を並行に敷設する。この結果、軌条上に設置され、
区画を跨ぐ可動式上屋31は、区画11a,11b間を
自由に移動できるようになる。
<B> Movable Shed The movable shed 31 is a movable structure that serves as a canopy for the section 11 or the like that is being reclaimed. The movable shed 31 is installed to prevent the waste 4 from being exposed to wind and rain during landfill. For example, a known structure including a wall having an open bottom and a roof can be used. A carry-in port for carrying in the waste 4 is provided in a part of the wall. The structure of the roof is not limited to a flat shape, and may be a mountain shape or a shell shape. The movable roof 31 is configured to be movable by attaching wheels to its legs. For example, rails (not shown) are laid in parallel on both sides of the planned landfill area 1a in a direction in which the sections 11 are continuous. As a result, it is installed on the rail,
The movable shed 31 straddling the compartments can freely move between the compartments 11a and 11b.

【0010】<ハ>廃棄物の埋立て方法 最初に地盤を掘削して少なくとも一箇所の区画11aを
構築する。他の区画11bは、区画11aの埋立てを開
始してから構築することもできる。埋立てをおこなう区
画11aを覆うように可動式上屋31を設置する(図1
(a)、図2(a)参照)。可動式上屋31の設置は、
区画11aの掘削前でも、掘削後でもどちらでも良い。
区画11aは、中仕切り堤21と可動式上屋31に囲ま
れることによって、ほぼ密閉された空間となる。このた
め、埋立て中の区画11a内に降雨が入り込んだり、埋
め立てた廃棄物4が風に飛ばされたりすることがない。
最初の区画11aにおいて埋立てが完了した後に、埋め
立てた廃棄物4の表面に防水処理5を施す。防水処理5
は、公知の遮水シートを敷設したり、ベントナイトやア
スファルトで遮水層を構築したりするなど、公知の方法
でおこなう。防水処理5により廃棄物4の表面を遮蔽し
た後に、可動式上屋31を隣接する区画11bに移動す
る(図1(b)、図2(b)参照)。区画11bにおい
ても、区画11aと同様にして埋立て及び防水処理5を
施す(図1(c)、図2(c)参照)。隣接する2区画
11a,11bの埋立てが完了した後に、区画を仕切る
中仕切り堤21を掘削し、残りの部分の埋立てをおこな
う。この埋立て時にも、可動式上屋21は、埋立てをお
こなう領域を覆うように配置しておく(図1(d)、図
2(d)参照)。
<C> Waste landfill method First, the ground is excavated to construct at least one section 11a. The other section 11b can be constructed after the landfill of the section 11a is started. A movable shed 31 is installed so as to cover the section 11a for landfill (Fig. 1
(A) and FIG. 2 (a)). Installation of the movable shed 31
Either before or after excavation of the section 11a may be performed.
The partition 11a is a substantially sealed space by being surrounded by the partition wall 21 and the movable shed 31. For this reason, rainfall does not enter the compartment 11a that is being landfilled, and the landfilled waste 4 is not blown away by the wind.
After the landfill is completed in the first section 11a, the surface of the landfilled waste 4 is subjected to the waterproof treatment 5. Waterproof treatment 5
Is carried out by a known method such as laying a known waterproof sheet or constructing a waterproof layer with bentonite or asphalt. After the surface of the waste 4 is shielded by the waterproof treatment 5, the movable shed 31 is moved to the adjacent section 11b (see FIG. 1 (b) and FIG. 2 (b)). Similarly to the section 11a, the section 11b is also subjected to landfilling and waterproofing treatment 5 (see FIGS. 1C and 2C). After the landfilling of the two adjacent sections 11a and 11b is completed, the partition wall 21 for partitioning the sections is excavated, and the remaining portion is landfilled. Even at the time of this landfill, the movable shed 21 is arranged so as to cover the area for landfill (see FIGS. 1D and 2D).

【0011】[0011]

【発明の実施の形態2】以下、図3,4を参照しなが
ら、埋立て予定区域1bの平面形がほぼ円形となる実施
の形態2について説明する。
Second Embodiment Hereinafter, a second embodiment in which the planed landfill area 1b has a substantially circular plan shape will be described with reference to FIGS.

【0012】<イ>区画の造成 円形の埋立て予定区域1bの内部に、複数の区画12,
13を設ける。区画12,13の数は任意に設定でき、
2区画に分割した場合を図3に、3区画に分割した場合
を図4に示した。区画12,13間の仕切りは、上記し
た実施の形態1と同様に中仕切り堤22,23でおこな
う。例えば、埋立て予定区域1bを2分割する場合は、
直径の長さに等しい中仕切り堤22で仕切り(図3参
照)、3分割する場合は半径の長さの中仕切り堤23
a,23b,23cで埋立て予定区域1bを仕切る(図
4参照)。
<a> Construction of compartments A plurality of compartments 12, inside the circular planned landfill area 1b,
13 is provided. The number of sections 12, 13 can be set arbitrarily,
FIG. 3 shows the case of division into two sections, and FIG. 4 shows the case of division into three sections. Partitioning between the sections 12 and 13 is performed by the middle partition walls 22 and 23 as in the first embodiment described above. For example, when dividing the planned landfill area 1b into two,
A partition 22 with a length equal to the diameter (see FIG. 3). A partition 23 with a radius of 3 when divided into three.
The planned landfill area 1b is partitioned by a, 23b, and 23c (see FIG. 4).

【0013】<ロ>可動式上屋 可動式上屋32は、埋立て中の区画12,13等の天蓋
となる回転移動が可能な構造体である。例えば、区画1
2の平面形状が半円形の場合は、平面形が半円形となる
可動式上屋32aを構築する(図3参照)。また、区画
13の平面形が扇形の場合は、平面形が扇形となる可動
式上屋32bを構築する(図4参照)。可動式上屋32
a,32bは、円形の埋立て予定区域1bのほぼ中央を
中心に回転移動させる。
<B> Movable Shed The movable shed 32 is a structure that can be rotated and serves as a canopy for the sections 12, 13 and the like that are being landfilled. For example, section 1
When the planar shape of 2 is semicircular, the movable shed 32a having a semicircular planar shape is constructed (see FIG. 3). Further, when the planar shape of the section 13 is a fan shape, the movable roof 32b having a fan-shaped planar shape is constructed (see FIG. 4). Movable shed 32
The a and 32b are rotated about the center of the circular planned landfill area 1b.

【0014】<ハ>廃棄物の埋立て方法(図4) 埋立て予定区域1bを3分割した場合を例に、廃棄物4
の埋立て方法について説明する。最初に区画13aの埋
立てを開始する。この区画13aを埋め立てる時点で
は、他の区画13b,13cの掘削は完了していなくて
もよい。実施の形態1と同様に、埋立て作業と並行して
区画13の構築をおこなえるからである。可動式上屋3
2bによって区画13aを覆った状態で埋立てをおこな
う。埋立て後は、廃棄物4の表面に防水処理5を施す
(図4(a)参照)。次に、隣接する区画13bの埋立
て及び防水処理5をおこなう(図4(b)参照)。隣接
する区画13a,13bの埋立てが完了した後に、両区
画13a,13bの間を仕切る中仕切り堤23aを掘削
する。可動式上屋32bの回転移動は、掘削の最中や前
後の何れであってもよいが、埋立て時には中仕切り堤2
3aのあった場所を覆う位置、すなわち新たに廃棄物4
の埋立てをおこなう位置に配置する(図4(c)参
照)。中仕切り堤23a部の埋立て及び防水処理5が完
了した後に、区画13cの埋立てをおこなう(図4
(d)参照)。
<C> Waste landfill method (FIG. 4) Waste 4 is taken as an example when the planned landfill area 1b is divided into three.
The landfill method will be described. First, the landfill of the section 13a is started. The excavation of the other sections 13b and 13c may not be completed at the time of filling the section 13a. This is because the partition 13 can be constructed in parallel with the landfill work as in the first embodiment. Movable shed 3
Landfilling is performed with the section 13a covered by 2b. After the landfill, the surface of the waste 4 is waterproofed 5 (see FIG. 4A). Next, landfilling and waterproofing 5 of the adjacent section 13b is performed (see FIG. 4B). After the landfills of the adjacent sections 13a and 13b are completed, the partition wall 23a for partitioning the sections 13a and 13b is excavated. The movable shed 32b may be rotationally moved during excavation, before or after excavation, but at the time of landfilling, the partition wall 2
Position where 3a was located, namely new waste 4
It is placed at a position for landfilling (see FIG. 4 (c)). After completion of the landfill and waterproofing treatment 5 of the parting wall 23a, landfill of the section 13c is performed (FIG. 4).
(See (d)).

【0015】なお、以上の説明においては、徐々に埋立
て区域を広げていくように、2区画13a,13bの埋
立ての完了後に、その間にある中仕切り堤23aの埋立
てをおこなうシステムで説明したが、予めすべての区画
13a,13b,13cに対して埋立てをおこない、後
から中仕切り堤23a,23b,23cの掘削及び埋立
てをおこなうこともできる。
In the above description, the system is such that after the landfill of the two sections 13a and 13b is completed, the intermediate partition 23a between them is landfilled so that the landfill area is gradually expanded. However, it is also possible to perform reclamation for all the sections 13a, 13b, 13c in advance, and then excavate and reclamate the partition walls 23a, 23b, 23c later.

【0016】[0016]

【発明の効果】本発明の廃棄物の埋立て方法は以上説明
したようになるから次のような効果を得ることができ
る。 <イ>埋立て予定区域のすべてに廃棄物を埋め立てるこ
とができる。このため、貴重な敷地を有効に活用するこ
とができる。また、埋立て区域を徐々に広げていくこと
ができるので、長期間にわたり広大な埋立て地が出現す
ることを抑えることができる。 <ロ>埋立て中の区画は可動式上屋や中仕切り堤などで
囲まれているため、廃棄物が野ざらしにならない。この
ため、埋立て中の廃棄物の飛散や拡散がない。 <ハ>防水処理を施す前に区画内に吹き込む降雨を遮断
できるので、浄化処理が必要な排水の発生量を低減でき
る。このため、水処理施設の経費を削減できる。
Since the method of landfilling waste according to the present invention is as described above, the following effects can be obtained. <B> Waste can be filled in all of the planned landfill areas. Therefore, the valuable site can be effectively used. Further, since the landfill area can be gradually expanded, it is possible to suppress the appearance of a vast landfill over a long period of time. <B> The landfills are surrounded by movable sheds and partition dikes, so the waste is not exposed. Therefore, there is no scattering or diffusion of waste during landfill. <C> Since rainfall that blows into the compartment before waterproofing can be blocked, the amount of wastewater that requires purification can be reduced. Therefore, the cost of the water treatment facility can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の廃棄物の埋立て方法の実施例の断面
図。
FIG. 1 is a sectional view of an embodiment of a waste landfill method of the present invention.

【図2】図1に対応する廃棄物の埋立て方法の実施例の
平面図。
FIG. 2 is a plan view of an embodiment of a waste landfill method corresponding to FIG.

【図3】(a)円形の埋立て予定区域を2分割する場合
の平面図。(b)円形の埋立て予定区域を2分割する場
合の断面図。
FIG. 3 (a) is a plan view when a circular landfill planned area is divided into two. (B) Sectional drawing at the time of dividing a circular planned landfill area into two.

【図4】円形の埋立て予定区域を3分割する場合の廃棄
物の埋立て方法の実施例の平面図。
FIG. 4 is a plan view of an embodiment of a waste landfill method when a circular landfill planned area is divided into three parts.

【符号の説明】[Explanation of symbols]

1・・・埋立て予定区域 11・・区画 12・・区画 13・・区画 21・・中仕切り堤 22・・中仕切り堤 23・・中仕切り堤 31・・可動式上屋 32・・可動式上屋 4・・・廃棄物 5・・・防水処理 1 ... Planned landfill area 11 ... division 12 ... 13 ... 21 ... 22 ... 23 ... 31 ... Movable shed 32. Movable shed 4 ... Waste 5 ... Waterproofing

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】掘削した地中に廃棄物を埋め立てる廃棄物
の埋立て方法において、 埋立て予定区域を中仕切り堤によって複数の区画に分割
し、 最初に埋立てをおこなう区画上部を覆う可動式上屋を設
置し、 前記可動式上屋を設置した区画の埋立てをおこない、 埋立て後の表面を防水処理した後に前記可動式上屋を隣
接する区画に移動し、該区画において埋立てと表面の防
水処理をおこない、 埋立てが完了した区画間に位置する前記中仕切り堤を掘
削して、前記可動式上屋内で該中仕切り堤を掘削した場
所に埋立て及び防水処理をおこなう、 廃棄物の埋立て方法。
1. A method of landfilling waste in an excavated ground, wherein a planned landfill area is divided into a plurality of sections by a partition wall, and a movable type covering the upper part of the section where landfill is performed first. Install a shed, reclaim the area where the movable shed is installed, move the movable shed to an adjacent area after waterproofing the surface after landing, and reclaim the land in the area. The surface is waterproofed, the partition wall located between the completed landfills is excavated, and the location where the partition wall is excavated in the movable upper room is reclaimed and waterproofed. How to reclaim things.
【請求項2】掘削した地中に廃棄物を埋め立てる廃棄物
の埋立て方法において、 平面形が略円形の埋立て予定区域を中仕切り堤によって
複数の区画に分割し、 最初に埋立てをおこなう区画に、前記埋立て予定区域の
略中心を軸に回転可能な区画上部を覆う可動式上屋を設
置し、 前記可動式上屋を設置した区画の埋立てをおこない、 埋立て後の表面を防水処理した後に前記可動式上屋を隣
接する区画に回転移動し、該区画において埋立てと表面
の防水処理をおこない、 埋立てが完了した区画間に位置する前記中仕切り堤を掘
削して、前記可動式上屋内で該中仕切り堤を掘削した場
所に埋立て及び防水処理をおこなう、廃棄物の埋立て方
法。
2. A landfill method for landfilling waste in an excavated ground, wherein a planned landfill area having a substantially circular plan shape is divided into a plurality of sections by a partition dike, and landfilling is performed first. In the section, install a movable shed that covers the upper part of the section that can rotate about the center of the planned landfill area, and reclaim the section with the movable shed installed. After the waterproof treatment, the movable shed is rotationally moved to the adjacent section, the landfill and the surface are waterproofed in the section, and the partition wall located between the sections where the landfill is completed is excavated, A method for landfilling waste, wherein landfilling and waterproofing are performed in a place where the partition wall is excavated in the movable upper room.
JP2002092773A 2002-03-28 2002-03-28 Waste landfilling method Pending JP2003285018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002092773A JP2003285018A (en) 2002-03-28 2002-03-28 Waste landfilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002092773A JP2003285018A (en) 2002-03-28 2002-03-28 Waste landfilling method

Publications (1)

Publication Number Publication Date
JP2003285018A true JP2003285018A (en) 2003-10-07

Family

ID=29237505

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002092773A Pending JP2003285018A (en) 2002-03-28 2002-03-28 Waste landfilling method

Country Status (1)

Country Link
JP (1) JP2003285018A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974899A (en) * 2010-11-08 2011-02-16 王彦 Method for converting obsolete refuse landfill into construction land
CN102011390A (en) * 2010-11-08 2011-04-13 王彦 Method for transforming waste landfill into construction land
JP2011194369A (en) * 2010-03-23 2011-10-06 Ohbayashi Corp Method of landfill disposal of waste
JP2017042715A (en) * 2015-08-26 2017-03-02 清水建設株式会社 Construction method for waste disposal site

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011194369A (en) * 2010-03-23 2011-10-06 Ohbayashi Corp Method of landfill disposal of waste
CN101974899A (en) * 2010-11-08 2011-02-16 王彦 Method for converting obsolete refuse landfill into construction land
CN102011390A (en) * 2010-11-08 2011-04-13 王彦 Method for transforming waste landfill into construction land
JP2017042715A (en) * 2015-08-26 2017-03-02 清水建設株式会社 Construction method for waste disposal site

Similar Documents

Publication Publication Date Title
CN111779027A (en) Construction method for constructing underground garage through cover-excavation top-down construction
JP2007313432A (en) Equipment at embankment covering waste disposal site
GB2276905A (en) Waste disposal structure
KR100667262B1 (en) Waste landfill site preventing landfill gas escape by using waterproof mat
JP2003285018A (en) Waste landfilling method
JP2814898B2 (en) Underground storage facility
JP2002239492A (en) Method for filling waste in landfill
KR100739417B1 (en) Waste landfill site having inner road made of construction wastes
KR102291820B1 (en) Method to landfill waste while constructing a landfill site
JP2002143801A (en) Waste disposal site
JP3106769B2 (en) Waste disposal site
CN206554944U (en) The interflow of boring construction regulate and store moldeed depth layer arched tunnel
JPH1157645A (en) Method for landfilling for waste disposal site
JP2005028233A (en) Method for precedent use of covered waste disposal site
JPH01304092A (en) Preparation of waste disposal site
CN100582383C (en) Construction method of setting site for pile base and structure in foundation pit
JP3243726B2 (en) Simple closed type management type waste disposal site and its construction method
JPH09141225A (en) Method for building shielding type final disposition plant of industrial waste
JP4188522B2 (en) Waste disposal site
JP3557957B2 (en) Repair method of existing waste disposal site
JPH1128435A (en) Reclamation method for waste in waste disposal site
JPH02187184A (en) Reclaiming construction method in final treatment plant of industrial waste and gas venting water shield sheet
JP3023410B1 (en) A method for treating and disposing of waste by layering it underground.
JPH0278476A (en) Method for creating waste disposing place
RU2136402C1 (en) Method of burial of wastes in dump