JP2003193475A - Slope stabilization method - Google Patents

Slope stabilization method

Info

Publication number
JP2003193475A
JP2003193475A JP2001395696A JP2001395696A JP2003193475A JP 2003193475 A JP2003193475 A JP 2003193475A JP 2001395696 A JP2001395696 A JP 2001395696A JP 2001395696 A JP2001395696 A JP 2001395696A JP 2003193475 A JP2003193475 A JP 2003193475A
Authority
JP
Japan
Prior art keywords
ground
slope
cut
anchor body
cut surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001395696A
Other languages
Japanese (ja)
Other versions
JP3862067B2 (en
Inventor
Kazuo Kiuchi
和夫 木内
Kazunori Maeda
和徳 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okabe Co Ltd
Original Assignee
Okabe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okabe Co Ltd filed Critical Okabe Co Ltd
Priority to JP2001395696A priority Critical patent/JP3862067B2/en
Publication of JP2003193475A publication Critical patent/JP2003193475A/en
Application granted granted Critical
Publication of JP3862067B2 publication Critical patent/JP3862067B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide a work method having improved safety and workability when performing inverted working in which the work is carried out by cutting the slope of collapsible natural ground from the top to downward stepwise. <P>SOLUTION: For a proposed cutting area 2B, a solidifying material 6 is penetrated in advance through a filling pipe 5 in surrounding ground of a portion 3B which becomes a cutting surface, and the ground is stabilized based on the solidification. Thereafter, the proposed cutting area 2B is cut and removed, and an anchor body 11 is driven from the exposed cutting surface 3B to the ground of the natural ground 1. A series of these work is sequentially repeated to a lower proposed cutting area and a slope can be developed. <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、逆巻き施工による
地山斜面の造成において、安全性と作業性が向上した斜
面安定工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a slope stabilizing method which is improved in safety and workability in forming a natural slope by reverse winding.

【0002】[0002]

【従来の技術】従来、地山斜面の地滑り対策、あるいは
切土斜面の急勾配化対策などにおいて、それら斜面に対
して各種の補強工法が適用されている。この補強工法の
代表的なものとしては、地山表面から地山内に向けて多
数本の鉄筋、ロックボルトあるいはグラウンドアンカー
等のアンカー体を適宜の間隔で打設した後、その打設孔
内に適宜のグラウト材を充填してアンカー体を地山に定
着させ、その剪断抵抗力をもって斜面全体の安定性を高
める工法が広く採用されている。ところで、地山の切取
りにより斜面崩壊が想定されるような、特に不安定な地
山においては、掘削中に切土面周辺が崩れる危険性があ
る。このため、例えば特開平11−61840号あるい
は特開平11−310925号に開示されるように、地
山斜面に対して、上記アンカー体により適宜補強しなが
ら斜面上部から下部に向けて段階的に切り取る、いわゆ
る「逆巻き施工」が一般的に行われている。
2. Description of the Related Art Conventionally, various reinforcement construction methods have been applied to slopes, such as measures against landslides on rock slopes and steep slopes on cut slopes. As a typical example of this reinforcement method, a large number of reinforcing bars, rock bolts or anchors such as ground anchors are driven from the surface of the natural ground toward the inside of the natural ground at appropriate intervals, and then placed in the driving holes. A method is widely adopted in which an appropriate grout material is filled to fix the anchor body to the natural ground, and the shear resistance is used to enhance the stability of the entire slope. By the way, there is a risk that the surroundings of the cut surface will collapse during excavation, especially in unstable ground where it is assumed that the slope will collapse due to the cutting of the ground. Therefore, as disclosed in, for example, Japanese Patent Application Laid-Open No. 11-61840 or No. 11-310925, the ground slope is cut off stepwise from the upper part to the lower part of the slope while appropriately reinforcing it with the anchor body. So-called "reverse winding construction" is generally performed.

【0003】上記特開平11−61840号公報に記載
の技術は、施工時の短期的な斜面安定を確保するための
簡便な構造の1次支圧板と、施工後の長期的な斜面安定
を目的とするコンクリート吹付けによる2次支圧板を、
ロックボルトとともに使用することを特徴としている。
この場合、1次支圧板の斜面抑止効果により、2次支圧
板のモルタルまたはコンクリートが硬化途中でその強度
が十分に発現しない状態においても、斜面上端部から下
端部に向けて下段のロックボルト施工が可能な高さの切
土作業を行うことができるものである。また、特開平1
1−310925号公報に記載の技術では、地山の上方
から段階的に掘削するごとに地山にアンカー体を打設し
て、このアンカー体の地表からの突出部分の周囲に切土
面を押さえる受圧パットをコンクリート等の硬化材によ
り形成し、アンカー体と一体になった受圧パットによ
り、土砂荷重を一時的すなわち仮留めしながら下の段の
切土を行う。これらの作業を下方に向けて繰り返し、全
ての切土作業が終了した後で、各アンカー体の頭部にプ
レキャスト製の土留め用ブロックを固定する構成になっ
ている。
The technique disclosed in Japanese Patent Laid-Open No. 11-61840 is intended for a primary bearing plate having a simple structure for ensuring short-term slope stability during construction and for long-term slope stabilization after construction. The secondary bearing plate by concrete spraying,
It is characterized by being used with a lock bolt.
In this case, due to the slope restraining effect of the primary bearing plate, even if the strength of the mortar or concrete of the secondary bearing plate is not fully developed during hardening, construction of the lower lock bolt from the upper end to the lower end of the slope is performed. It is possible to perform the cutting work at a height that is possible. In addition, JP-A-1
In the technique described in Japanese Patent Publication No. 1-310925, an anchor body is placed in the ground every time the rock is excavated in stages from above, and the cut surface is pressed around the protruding portion of the anchor body from the ground surface. The pressure receiving pad is formed of a hardening material such as concrete, and the pressure receiving pad integrated with the anchor body cuts the lower step while temporarily or temporarily fixing the earth and sand load. These operations are repeated downward, and after all cutting work is completed, a precast earth retaining block is fixed to the head of each anchor body.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記従
来例では、いずれも切土を始める斜面上部の第1段目に
おいては、アンカー体による安定化が図られる前に切土
作業を行うため、第1段目の切土に伴う崩落の危険性に
ついては何ら改善されていない。さらに、切土面の崩壊
を一時的に止めるための前者における1次支圧板、ある
いは後者の受圧パットがきちんと設置されるまでは、特
に切土した部分の周辺では崩落の危険性がより高くなっ
ている。しかも、いずれの場合にあっても、その使用目
的からしてそれほど大きくない設置面の部材で切土面を
押さえつけるものであるから、その抑止効果に大きな期
待はできない。したがって、このような危険性が残され
ている条件下での作業は、慎重にならざるを得ず、作業
効率を低下させる原因にもなっている。本発明は、これ
ら従来技術の問題点に鑑みなされたもので、安全性と作
業性の向上した斜面安定工法の提供を目的とするもので
ある。
However, in the above-mentioned conventional examples, since the cutting work is performed before the stabilization by the anchor body is performed in the first step on the upper part of the slope where cutting is started, There has been no improvement in the risk of collapse associated with the first cut. Furthermore, until the primary pressure bearing plate of the former or the pressure receiving pad of the latter for temporarily stopping the collapse of the cut surface is properly installed, the risk of collapse becomes higher especially around the cut part. ing. Moreover, in any case, since the cut surface is pressed by the member of the installation surface, which is not so large in view of the purpose of use, it is not possible to expect great effect on the suppression effect. Therefore, work under the condition where such a danger remains is unavoidable and causes a decrease in work efficiency. The present invention has been made in view of these problems of the prior art, and an object thereof is to provide a slope stabilization method with improved safety and workability.

【0005】[0005]

【課題を解決するための手段】上記課題を解決するた
め、本発明では、地山斜面をアンカー体で補強しながら
上方から段階的に切り取る斜面安定工法において、切土
予定区域に対して、切土面となる部分の周辺の地盤に予
め削孔を介して固結材を浸透させ、その固化に基づき当
該地盤の改良を行い、しかる後に切土予定区域を切り取
り、その露出した切土面から地山の地盤に向けてアンカ
ー体を打設し、これら一連の作業を下方の切土予定区域
に順次繰り返すことにより斜面を造成することを特徴と
している。
In order to solve the above problems, in the present invention, in the slope stabilization method in which the ground slope is gradually cut from above while being reinforced with an anchor body, the cut slope is cut against the planned cut area. A solidifying material is preliminarily infiltrated into the ground around the part to be the soil surface through a drilling hole, and the ground is improved based on the solidification, and then the planned cutting area is cut off and the exposed cut surface is removed. The feature is that an anchor body is driven toward the ground of the natural ground, and the slope is constructed by sequentially repeating these series of work in the planned cut area below.

【0006】すなわち、上記構成によれば、掘削により
崩壊の危険性がある地山斜面に対して、上方から段階的
に切り取る逆巻き施工を行う場合において、切土作業に
先立ち、予め適宜の固結材の注入により切土予定区域の
地盤改良を行うものであるから、第1段目の施工におい
ても斜面の崩落が確実に阻止され、その後の各段におけ
る切土作業およびアンカー体の打設作業等を安全に行う
ことができる。このため、安全性が十分に確保された条
件下での作業であるから、その効率が従来の施工方法に
比べて大きく向上する。
[0006] That is, according to the above construction, in the case where reverse winding construction is performed in which the ground slope, which is in danger of collapsing due to excavation, is cut off from the top in a stepwise manner, prior to cutting work, appropriate consolidation is performed in advance. Since the ground is improved in the planned cutting area by injecting the timber, the slope collapse can be reliably prevented even in the first stage construction, and the cutting work and anchor body placement work at each subsequent stage. Etc. can be performed safely. Therefore, since the work is performed under the condition that the safety is sufficiently ensured, the efficiency is greatly improved as compared with the conventional construction method.

【0007】また、上記構成において、削孔を介して切
土面周辺に注入する固結材としては、平均粒径6μm以
下の微粒子セメントとアルカリ金属珪酸塩を主成分と
し、固形分含量10〜50重量%の水性懸濁液が、その
使用態様からして特に好適である。すなわち、懸濁液状
の固結材は、液中に分散するセメントの粒子径がきわめ
て小さいため、地山の亀裂部分や砂質地盤内に浸透しや
すい特性がある。この場合、アルカリ金属珪酸塩と前記
セメント成分とが混合されると、両者の反応により水性
懸濁液はゲル化して流動停止に向かうが、その流動停止
時間は適宜調節することが可能である。このため、固結
材を削孔から所望の範囲内に確実に浸透させることがで
き、しかも地山から湧水のある場合でも固結材が流され
ることもない。すなわち、この固結材を使用すれば、必
要な区域の地盤に浸透して固化することにより、切土を
したときに確実に斜面の崩落を阻止することができる。
なお、水性懸濁液中での固形分含量が多すぎると、削孔
内への注入操作が困難であるばかりか削孔周辺部分への
浸透が不十分となる。また、少なすぎると固結材の硬化
自体が困難となり、より好ましくは15〜40重量%の
範囲である。
Further, in the above-mentioned structure, the solidifying material to be injected into the periphery of the cut surface through the drilling is mainly composed of fine particle cement having an average particle size of 6 μm or less and alkali metal silicate and having a solid content of 10 to 10. A 50% by weight aqueous suspension is particularly suitable due to its mode of use. That is, the solidified material in the form of suspension has a characteristic that the cement dispersed in the liquid has an extremely small particle diameter, and thus it easily penetrates into the cracked portion of the ground or the sandy ground. In this case, when the alkali metal silicate and the cement component are mixed, the reaction between the two causes the aqueous suspension to gel and stop flowing, but the flowing stop time can be appropriately adjusted. Therefore, the solidifying material can be surely infiltrated into the desired range from the drilled hole, and the solidifying material is not washed away even if there is spring water from the natural ground. That is, if this solidifying material is used, it is possible to reliably prevent the slope from collapsing when the soil is cut by infiltrating into the ground in a necessary area and solidifying.
If the solid content in the aqueous suspension is too high, not only the injection operation into the drilling hole is difficult but also the permeation into the peripheral area of the drilling hole is insufficient. On the other hand, if the amount is too small, it becomes difficult to cure the solidifying material itself, and it is more preferably in the range of 15 to 40% by weight.

【0008】さらに、請求項2に記載の上記固結材につ
いて詳述する。まず、微粒子セメントについては、平均
粒径が6μm以下のセメントであればよく、例えば普通
ポルトランドセメント、早強ポルトランドセメント、中
庸熱ポルトランドセメントなどの各種セメントを用いる
ことができる。また、必要に応じて石灰、石膏、ドロマ
イトプラスター、フライアッシュ、高炉水砕スラグ等の
添加剤を加えてもよい。なお、粒径を比表面積で表した
場合には、5000cm/g以上であり、好ましくは
10000cm/g以上である。セメント粒子の比表
面積が大きいほど浸透性が高まり、より強固に地盤改良
を行うことができるが、極端に大きすぎると、アルカリ
金属珪酸塩と混合して水性懸濁液としたときに凝集しや
すくなり、コスト的な面からも不利であるので、100
00cm/g〜15000cm /gの範囲が最も好
ましい。固結材中での使用量は、地盤改良効果を考慮す
ると、なるべく多く配合するのが好ましいが、多くなる
に伴って水性懸濁液の粘度が増加する。したがって、注
入効果と粘度のバランスを考慮したときのセメントの配
合量は、固結材水性懸濁液1リットルに対して好ましく
は100〜500g、より好ましくは150〜350g
の範囲である。
The solidifying material according to claim 2
Will be described in detail. First, for fine particle cement, the average
Any cement with a particle size of 6 μm or less, for example, ordinary
Portland Cement, Early Strength Portland Cement, Medium
Various types of cement such as normal heat Portland cement are used.
be able to. Also, if necessary, lime, plaster, doloma
For it plaster, fly ash, granulated blast furnace slag, etc.
Additives may be added. The particle size was expressed by the specific surface area.
In case of 5000 cmTwo/ G or more, preferably
10000 cmTwo/ G or more. Cement particle ratio chart
The larger the area, the higher the permeability, and the stronger the ground is improved.
Can be done, but if it is too large, the alkali
When mixed with metal silicate to form an aqueous suspension,
It is easy to use and is disadvantageous in terms of cost.
00 cmTwo/ G-15000 cm Two/ G range is most preferred
Good The amount used in the solidifying material takes into consideration the ground improvement effect.
Then, it is preferable to mix as much as possible, but it will increase.
The viscosity of the aqueous suspension increases with. Therefore, note
Of cement with consideration of the balance of injection effect and viscosity
The total amount is preferably 1 liter of the aqueous binder suspension.
Is 100-500 g, more preferably 150-350 g
Is the range.

【0009】次に、アルカリ金属珪酸塩としては、珪酸
カリウム、珪酸ナトリウム等が挙げられるが、コスト面
からは珪酸ナトリウムが好ましい。これらのアルカリ金
属珪酸塩は、アルカリ金属珪酸塩におけるモル比(Si
/MO:但しMはアルカリ金属原子を表す)が、
2.0〜4.0の範囲であることが、懸濁液状に調製さ
れた固結材の流動停止時間の関係で好ましい。すなわ
ち、この固結材は、地山斜面の表面から切土面周辺に到
達する削孔内に注入され、その周囲に拡散浸透するもの
であるが、流動停止時間が短すぎると固結材が十分に浸
透する前に流動を停止し、その注入効果が不十分となる
ことがある。また、それとは反対に流動停止時間が極端
に長い場合には、硬化範囲が不明確となって的確な地盤
改良ができない場合もある。そこで、懸濁液状に調製さ
れた固結材中におけるアルカリ金属珪酸塩中のSiO
分の割合と、アルカリ金属珪酸塩におけるモル比を特定
の範囲内とすることにより、流動停止時間がより適切と
なり、且つ流動停止時点において明確なゲル体となり、
地山から湧水のある場合でも固結材が流出することなく
的確に地盤改良ができる。
Next, examples of the alkali metal silicate include potassium silicate and sodium silicate, and sodium silicate is preferable from the viewpoint of cost. These alkali metal silicates have a molar ratio (Si
O 2 / M 2 O: provided that M represents an alkali metal atom,
It is preferably in the range of 2.0 to 4.0 in view of the flow stop time of the solidified material prepared in the suspension form. That is, this solidifying material is injected into the drilling hole that reaches from the surface of the ground slope to the periphery of the cut surface and diffuses and permeates into the surrounding area, but if the flow stop time is too short, the solidifying material will The flow may be stopped before it has sufficiently penetrated, and its injection effect may be insufficient. On the contrary, if the flow stop time is extremely long, the hardening range may be unclear and the ground may not be improved appropriately. Therefore, SiO 2 in the alkali metal silicate in the solidified material prepared as a suspension is used.
By setting the ratio of minutes and the molar ratio in the alkali metal silicate within a specific range, the flow stop time becomes more appropriate, and a clear gel body is formed at the time of the flow stop,
Even if there is spring water from the ground, it is possible to improve the ground accurately without the solidifying material flowing out.

【0010】上記の特定範囲とは、アルカリ金属珪酸塩
におけるモル比(SiO/MO:但しMはアルカリ
金属原子を表す)をx、固結材懸濁液1リットル中にお
けるアルカリ金属珪酸塩中のSiO分の割合をyとし
たとき、次式(1)〜(5)で表される関係を満足する
範囲である。 (1)y≦200 (2)x≧2.4 (3)x≦4.0 (4)y≧120x−260 (但し、2.4≦x≦
3.0の範囲) (5)y≧100 (但し、3.0<x≦4.0の範
囲) より好ましくは、上記式(1)〜(5)に加え、次式
(6)および(7)で表される関係をも満足する範囲で
ある。 (6)y≧120x−230 (但し、2.4≦x≦
3.0の範囲) (7)y≧−10x+160 (但し、3.0<x≦
4.0の範囲)
The above-mentioned specific range is x in the molar ratio of the alkali metal silicate (SiO 2 / M 2 O: M is an alkali metal atom), x is the alkali metal silicic acid in 1 liter of the binder suspension. When the ratio of SiO 2 in the salt is y, it is a range that satisfies the relationships represented by the following formulas (1) to (5). (1) y ≤ 200 (2) x ≥ 2.4 (3) x ≤ 4.0 (4) y ≥ 120x-260 (however, 2.4 ≤ x ≤
3.0 range) (5) y ≧ 100 (however, 3.0 <x ≦ 4.0 range) More preferably, in addition to the above formulas (1) to (5), the following formulas (6) and ( It is a range that also satisfies the relationship represented by 7). (6) y ≧ 120x−230 (However, 2.4 ≦ x ≦
3.0 range) (7) y ≧ −10x + 160 (however, 3.0 <x ≦
(Range of 4.0)

【0011】そして、固結材の調製は、上記粒径の微粒
子セメントを必須成分とする水性懸濁液と、アルカリ金
属珪酸塩を必須成分とする水溶液とを予め用意し、施工
場所において注入の直前にこれら二液を固形分含量が1
0〜50重量%となるように混合するものである。ここ
で、セメント成分とアルカリ金属珪酸塩成分とを混合し
た後に水を加えて水性懸濁液にしたり、あるいは何れか
の成分を水性懸濁液または水溶液とした後に他の成分を
混合し、これにさらに水を加えて固形分含量を調節する
場合、実用上支障のない程度に均質化するのに時間がか
かる。このように混合に時間を費やした状態で注入を行
うと、周囲に十分に浸透しないうちに流動停止してしま
うことになる。したがって、上記のような調製方法が採
用される。
For the preparation of the solidifying material, an aqueous suspension containing the above-mentioned particle size fine particle cement as an essential component and an aqueous solution containing an alkali metal silicate as an essential component are prepared in advance and injected at the construction site. Immediately before, these two liquids had a solid content of 1
It is mixed so as to be 0 to 50% by weight. Here, after mixing the cement component and the alkali metal silicate component, water is added to make an aqueous suspension, or either component is made an aqueous suspension or an aqueous solution and then the other components are mixed, When water is further added to adjust the solid content, it takes time to homogenize to the extent that there is no practical problem. If the injection is carried out while spending time for mixing in this way, the flow will stop before it sufficiently penetrates into the surroundings. Therefore, the preparation method as described above is adopted.

【0012】また、上記組成の固結材に限らず、切土予
定区域において、切土面となる部分の周辺の地盤に各種
の固結材を浸透させるための削孔は、当該削孔が切土面
となる部分の近傍においてその上部から下方に向けて形
成すると好都合である。すなわち、このようにすれば、
切土により崩落の起こりやすい場所を重点的に地盤改良
することができるので、その注入効果が無駄無く発揮さ
れ効率的である。
Further, not only the solidifying material having the above-mentioned composition but also the drilling hole for allowing various solidifying materials to permeate into the ground around the cut surface in the planned cutting area is It is convenient to form from the upper part to the lower part in the vicinity of the cut surface. That is, if you do this,
Since it is possible to improve the ground by emphasizing the place where collapse is likely to occur due to the cut soil, the pouring effect is efficiently exhibited without waste.

【0013】[0013]

【発明の実施の形態】本発明による斜面安定工法は、崩
壊の可能性がある地山斜面を上方から段階的に切り取る
逆巻き施工を行う場合に、切土作業に先立って適宜の固
結材の注入により切土予定区域の地盤改良を予め行い、
斜面の崩壊を確実に阻止する措置を施した後に、次工程
である切土作業およびアンカー体の打設作業を行うこと
を技術的特徴としている。これにより、施工現場の安全
性が十分に確保され、その後の作業を効率的に行うこと
ができる。固結材の注入は、削岩機で穿孔した削孔内
に、ホースを挿入して注入したり、鋼管あるいは合成樹
脂管等の適宜の注入用管材を削孔内に挿入した状態で行
うこともできる。さらに、注入用管材の挿入に代えて、
先端側に穿孔ビットを取り付けた注入用管材を使用すれ
ば、削岩機に取り付けて穿孔しながら打ち込むことがで
きるので好都合である。なお、これらの注入用管材につ
いては、そのまま削孔内に残置してもよく、あるいは注
入後に引き抜いてもよい。また、本発明において切土面
を補強するアンカー体としては、異形鉄筋、ロックボル
トあるいはグラウンドアンカー等を施工場所の条件等に
応じ、適宜選択して適用すればよい。なお、施工方法の
具体的構成に関しては、以下に例示するが、もちろんこ
れに限定されない。
BEST MODE FOR CARRYING OUT THE INVENTION The slope stabilizing method according to the present invention uses an appropriate solidifying material prior to cutting work when reverse winding construction is performed in which a slope that may collapse is cut out stepwise from above. Ground improvement in the planned cut area by injection,
The technical feature is that the cutting work and the anchor body placing work, which are the next steps, are performed after taking measures to reliably prevent the slope from collapsing. As a result, the safety of the construction site is sufficiently ensured and the subsequent work can be efficiently performed. The injection of the solidifying material should be done by inserting a hose into the hole drilled by a rock drilling machine or by inserting an appropriate injection pipe material such as steel pipe or synthetic resin pipe into the hole drilling hole. You can also Furthermore, instead of inserting the pipe material for injection,
It is convenient to use an injection pipe material having a drill bit attached to the tip side because it can be mounted on a rock drill and driven while drilling. Note that these injection pipe materials may be left as they are in the drilled hole, or may be pulled out after injection. Further, in the present invention, as the anchor body for reinforcing the cut surface, deformed bar, rock bolt, ground anchor or the like may be appropriately selected and applied according to the conditions of the construction site and the like. The specific configuration of the construction method will be exemplified below, but the construction is not limited to this.

【0014】[0014]

【実施例】以下、図面に基づき本発明の実施例について
説明する。図1ないし図5は、本発明による斜面安定工
法において、それぞれ施工手順を段階的に示した各工程
での要部断面を示す説明図である。まず、図1に示すよ
うに、地山斜面1における第1段目の切土予定区域2A
に対して、切土面3Aとなる部分の上端に近い上方位置
から、切土面3Aに沿うように削孔4を掘削し、その内
部に注入管5を設置する。次いで、注入管5の基端側か
ら固結材6を注入し、削孔4の内壁面から周囲の地盤に
拡散浸透させることにより、切土面3Aの周辺部分の地
盤を改良する。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 5 are explanatory views showing a cross section of a main part in each step in which a construction procedure is shown stepwise in the slope stabilizing method according to the present invention. First, as shown in FIG. 1, the planned cut area 2A of the first stage on the ground slope 1
On the other hand, the drilling hole 4 is excavated along the cut surface 3A from an upper position near the upper end of the cut surface 3A, and the injection pipe 5 is installed therein. Next, the solidifying material 6 is injected from the base end side of the injection pipe 5 and diffused and permeated from the inner wall surface of the drilled hole 4 into the surrounding ground to improve the ground around the cut surface 3A.

【0015】この実施例において使用する固結材6は、
平均粒径が6μm以下の微粒子セメントを必須成分とす
る水性懸濁液と、アルカリ金属珪酸塩を必須成分とする
水溶液で構成される2液反応型の地盤改良材であり、こ
れら二液を固形分含量が10〜50重量%となるように
混合した状態で使用するものである。かかる組成の固結
材6は、地盤への浸透性が高く、且つ短時間で反応して
固化する特性を有し、軟弱な地盤の表層部分をごく短い
時間で固め、補強する効果がある。
The solidifying material 6 used in this embodiment is
A two-component reaction type ground improvement material composed of an aqueous suspension containing fine particle cement having an average particle size of 6 μm or less as an essential component and an aqueous solution containing an alkali metal silicate as an essential component. It is used in a mixed state so that the content of the component is 10 to 50% by weight. The solidifying material 6 having such a composition has a high permeability to the ground and has a property of reacting and solidifying in a short time, and has an effect of solidifying and reinforcing the surface layer portion of the soft ground in a very short time.

【0016】また、上記実施例の注入管5には、中空状
の自穿孔ロックボルトが使用されている。そして、固結
材6は基端側に連結した注入アダプター7とホース8を
介して中空部内を通過し、先端に取り付けられたビット
5aから削孔4の内部に流出する。この際、削孔4の入
り口は、空気抜きチューブを挿入した状態で適宜の閉塞
材により封止されている。したがって、先端側から押し
出された固結材6は、削孔4の全体に行き渡り、さらに
削孔4の内壁面から周囲の地盤に浸透して拡散し、そこ
で固化する。これにより切土面3となる部分の周辺の地
盤が確実に改良される。
A hollow self-piercing lock bolt is used for the injection pipe 5 of the above embodiment. Then, the solidifying material 6 passes through the inside of the hollow portion through the injection adapter 7 and the hose 8 which are connected to the base end side, and flows out into the drilled hole 4 from the bit 5a attached to the tip. At this time, the entrance of the drilled hole 4 is sealed with an appropriate blocking material with the air vent tube inserted. Therefore, the solidifying material 6 extruded from the tip side spreads throughout the drilled hole 4, further penetrates and diffuses from the inner wall surface of the drilled hole 4 to the surrounding ground, and solidifies there. As a result, the ground around the cut surface 3 is surely improved.

【0017】なお、2液で構成される固結材の注入方法
については、その組成や地盤の改良条件、作業環境等に
応じて適宜選択すればよい。具体的には、例えば通常の
地盤注入工法でなどで注入材の混合と注入を行う際に用
いられる1ショット法、1.5ショット法および2ショ
ット法などが好適であり、これらはタイムロスが少な
く、製造後直ちに注入に利用できる利点がある。
The method of injecting the solidifying material composed of the two liquids may be appropriately selected depending on the composition, conditions for improving the ground, working environment and the like. Specifically, for example, the one-shot method, the 1.5-shot method, and the two-shot method, which are used when mixing and injecting the injection material by a normal ground injection method, are suitable, and these have less time loss. , There is an advantage that it can be used for injection immediately after manufacturing.

【0018】1ショット法とは、1本の注入管から注入
するもので、微粒子セメントを必須成分とする水性懸濁
液と、アルカリ金属珪酸塩を必須成分とする水溶液を合
わせてグラウトミキサー等で混合して液状の固結材を調
製する。そして、この液状固結材をグラウトポンプの吸
入口から吸入し、その吐出口から注入管に圧送する方法
である。
The one-shot method is a method of injecting from a single injection pipe. An aqueous suspension containing fine particle cement as an essential component and an aqueous solution containing an alkali metal silicate as an essential component are combined with a grout mixer or the like. Mix to prepare a liquid solidifying material. Then, this liquid consolidating material is sucked from the suction port of the grout pump, and pressure-fed to the injection pipe from the discharge port.

【0019】次に、1.5ショット法とは、2液を別々
に圧送して注入の直前で合流させて混合する方式であ
る。すなわち、前記水性懸濁液と前記水溶液をそれぞれ
グラウトミキサー等で調製しておき、吸入口および吐出
口を各2個ずつ備えるグラウトポンプの各吸入口から水
性懸濁液および水溶液を吸入する。そして、これら2液
をY字状の注入アダプターにそれぞれ吐出し、Y字部で
これらを混合して固結材液とし、注入管へ圧送する方法
である。
Next, the 1.5-shot method is a method in which two liquids are separately fed under pressure and joined together immediately before injection to be mixed. That is, the aqueous suspension and the aqueous solution are respectively prepared by a grout mixer or the like, and the aqueous suspension and the aqueous solution are sucked through the respective suction ports of a grout pump having two suction ports and two discharge ports. Then, these two liquids are respectively discharged to a Y-shaped injection adapter, and these are mixed at a Y-shaped portion to form a solidifying material liquid, which is pressure-fed to an injection pipe.

【0020】さらに、2ショット法では、二重構造の注
入管を使用し、2液を別々の流路を流通させて地盤中で
混合するものである。すなわち、前記水性懸濁液と前記
水溶液をそれぞれグラウトミキサー等で調製しておき、
吸入口および吐出口を各2個ずつ備えるグラウトポンプ
の各吸入口から水性懸濁液および水溶液を吸入し、その
各吐出口からそれぞれの液を前記注入管の各流路内に吐
出し、注入管から吐出した時点で両液を混合して使用す
るものである。
Further, in the two-shot method, an injection pipe having a double structure is used, and the two liquids are mixed in the ground by flowing through separate flow paths. That is, the aqueous suspension and the aqueous solution are respectively prepared with a grout mixer or the like,
An aqueous suspension and an aqueous solution are sucked from each suction port of a grout pump having two suction ports and two discharge ports, and each liquid is discharged from each discharge port into each flow path of the injection pipe for injection. Both liquids are mixed and used when discharged from the pipe.

【0021】このようにして、第1段目の切土予定区域
2Aにおいて、切土面3Aの周辺部分の地盤を改良した
後、図2に示すように切土予定区域2Aの掘削を行う。
なお、実施例では、注入管5として自穿孔ロックボルト
を使用することにより、アンカー体としての補強効果も
併せて期待している。このため、注入管5の頭部に防錆
のためのキャップ9を取り付けている。注入管としての
機能だけを求めるなら、このようなキャップ9は不要で
ある。なお、固結材6の注入後に注入管5を撤去しても
よく、この場合には、削孔4を含めて掘削する際に作業
の障害にならない。また、合成樹脂もしくはゴム製のも
のを使用した場合には、そのまま残置しても同様であ
る。そして、これに続いて、図3に示すように露出した
切土面3Aの表面に対して、ラス金網あるいはエキスパ
ンドメタル等の簡易的な保護被覆材10を敷設する。こ
の保護被覆材10は、現場の状況に応じて適宜設置すれ
ばよいものであり、前記キャップ9と同様に本発明の必
須要件ではない。
In this way, in the first cut planned area 2A, the ground around the cut surface 3A is improved, and then the cut planned area 2A is excavated as shown in FIG.
In the embodiment, the self-drilling rock bolt is used as the injection pipe 5, so that the reinforcing effect as the anchor body is also expected. Therefore, a cap 9 for rust prevention is attached to the head of the injection pipe 5. If only the function as an injection tube is desired, such a cap 9 is unnecessary. It should be noted that the injection pipe 5 may be removed after the injection of the solidifying material 6, and in this case, it does not hinder the work when excavating including the drilled hole 4. Further, when a synthetic resin or rubber is used, it is the same even if it is left as it is. Then, subsequently, as shown in FIG. 3, a simple protective covering material 10 such as a lath wire mesh or expanded metal is laid on the exposed surface of the cut surface 3A. The protective covering material 10 may be appropriately installed depending on the situation of the site, and like the cap 9, is not an essential requirement of the present invention.

【0022】次に、図4に示すように、切土面3Aから
地山に向けてアンカー体11を挿入し、地盤改良に用い
た上記固結材6をアンカー体11の周囲に充填して地盤
に定着させる。実施例に用いたアンカー体11は、注入
管5と同様な自穿孔ロックボルトである。その定着は、
地盤改良と同じようにアンカー体11の中空部を介して
固結材6を削孔内に注入することにより行われる。アン
カー体11の定着材には、上記固結材6がその特性から
して好適に使用されるが、一般に使用されている適宜の
グラウト材でも何ら支障はない。さらに、アンカー体1
1の突出部分に適宜の支圧板12を装着し、先に敷設し
た保護被覆材10を押え込む形で固定する。ここで、ア
ンカー体11の頭部にも防錆のためのキャップ9を取り
付ける。これに続いて、切土面3Aの下端部から同様に
注入管5を打ち込み、第2段目の切土予定区域2Bにお
ける切土面3Bとなる部分の周辺を地盤改良する。な
お、この第2段目用の注入管5の施工にあたっては、切
土面3Aに対して鋭角的に設置されることが多いことか
ら、適宜の角度調整座金13を併用すると好都合であ
る。
Next, as shown in FIG. 4, the anchor body 11 is inserted from the cut surface 3A toward the ground, and the above-mentioned binding material 6 used for ground improvement is filled around the anchor body 11. Fix it on the ground. The anchor body 11 used in the example is a self-piercing lock bolt similar to the injection tube 5. The settlement is
It is carried out by injecting the solidifying material 6 into the drilled hole through the hollow portion of the anchor body 11 as in the case of ground improvement. The fixing material 6 is preferably used as the fixing material of the anchor body 11 due to its characteristics, but any suitable grout material that is generally used will not cause any problems. Furthermore, the anchor body 1
An appropriate pressure bearing plate 12 is attached to the projecting portion of 1, and the protective covering material 10 laid earlier is fixed by being pressed. Here, the cap 9 for rust prevention is also attached to the head of the anchor body 11. Subsequently, the injection pipe 5 is similarly driven from the lower end of the cut surface 3A to improve the ground around the cut surface 3B in the second cut planned area 2B. When constructing the injection pipe 5 for the second stage, it is often installed at an acute angle to the cut surface 3A, so it is convenient to use an appropriate angle adjustment washer 13 together.

【0023】図5は、図4の状態から第2段目の切土予
定区域2Bの切土を行い、切土面3Bを押さえるための
アンカー体11を同様に定着させ、さらに第3段目の切
土予定区域2Cにおける切土面3Cの内側に注入管5を
設置し、その周辺部分を固結材6により地盤改良した状
態を示すものである。
In FIG. 5, the planned cutting area 2B of the second step is cut from the state of FIG. 4, the anchor body 11 for pressing the cut surface 3B is similarly fixed, and the third step is further fixed. The injection pipe 5 is installed inside the cut surface 3C in the planned cut area 2C, and the peripheral portion of the injection pipe 5 is improved by the solidifying material 6.

【0024】以上のように、注入管5による切土予定区
域の地盤改良、切土およびアンカー体11の打設の各作
業を、掘削予定線の上から下にかけて順次繰り返すこと
により、地山斜面1を安全且つ効率的に造成することが
できる。なお、上記実施例において、地山斜面としては
自然斜面に限定されることはなく、各種構造物の構築に
伴う地下開削傾斜壁面などに適用することもでき、さら
にアンカー体の種類やその定着材を変更するなど、この
発明の技術思想内での種々の変更実施はもちろん可能で
ある。
As described above, the ground improvement of the planned cut area by the injection pipe 5, the cutting work, and the placement of the anchor body 11 are sequentially repeated from the top of the planned excavation line to the bottom of the planned excavation line to obtain the ground slope. 1 can be created safely and efficiently. In addition, in the above-mentioned embodiment, the natural slope is not limited to the natural slope, and can be applied to the underground excavation sloped wall surface associated with the construction of various structures, and the type of anchor body and its fixing material. It is of course possible to make various modifications within the technical idea of the present invention, such as changing the.

【0025】[0025]

【発明の効果】以上説明したように、本発明による斜面
安定工法は、崩壊の可能性がある地山斜面を上方から段
階的に切り取る逆巻き施工において、切土作業に先立ち
適宜の固結材の注入により切土予定区域の地盤改良を予
め行い、斜面の崩壊を確実に阻止する措置を施した後
に、次工程である切土作業およびアンカー体の打設作業
とを行うものである。これにより、施工現場での安全性
が十分に確保されることになり、それに続くアンカー体
の打設作業等の次行程の作業を効率的に行うことができ
るなど、その実用上の効果はきわめて大である。
As described above, in the slope stabilizing method according to the present invention, in the reverse winding construction in which the ground slope having a possibility of collapsing is cut out stepwise from above, a suitable solidifying material is used before cutting work. After the soil is preliminarily improved in the planned cut area by pouring and measures for surely preventing the collapse of the slope are taken, the next step, the cutting operation and the anchor body placing operation, is performed. As a result, safety at the construction site will be sufficiently ensured, and subsequent work such as anchor body placement work can be efficiently performed, and its practical effects are extremely high. Is large.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明による施工手順の最初の工程を示す
説明図である。
FIG. 1 is an explanatory view showing a first step of a construction procedure according to the present invention.

【図2】 図1の次の工程を示す説明図である。FIG. 2 is an explanatory diagram showing the next step of FIG.

【図3】 図2の次の工程を示す説明図である。FIG. 3 is an explanatory diagram showing a next step of FIG. 2.

【図4】 図3の次の工程を示す説明図である。FIG. 4 is an explanatory diagram showing the next step of FIG.

【図5】 図4の次の工程を示す説明図である。FIG. 5 is an explanatory diagram showing the next step of FIG.

【符号の説明】[Explanation of symbols]

1…地山斜面、2A,2B,2C…切土予定区域、3
A,3B,3C…切土面、4…削孔、5…注入管、6…
固結材、7…注入アダプター、9…キャップ、10…保
護被覆材、11…アンカー体、12…支圧板、13…角
度調整座金
1 ... Ground slope 2A, 2B, 2C ... Cut area, 3
A, 3B, 3C ... Cut surface, 4 ... Drilling hole, 5 ... Injection pipe, 6 ...
Solidifying material, 7 ... Injection adapter, 9 ... Cap, 10 ... Protective covering material, 11 ... Anchor body, 12 ... Bearing plate, 13 ... Angle adjustment washer

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地山斜面をアンカー体で補強しながら上
方から段階的に切り取る斜面安定工法であって、切土予
定区域に対して、切土面となる部分の周辺の地盤に予め
削孔を介して固結材を浸透させ、その固化に基づき当該
地盤の改良を行い、しかる後に切土予定区域を切り取
り、その露出した切土面から地山の地盤に向けてアンカ
ー体を打設し、これら一連の作業を下方の切土予定区域
に順次繰り返すことにより斜面を造成することを特徴と
する斜面安定工法。
1. A slope stabilization method for gradually cutting a ground slope from above while reinforcing the ground slope with an anchor body, and preliminarily drilling holes in the ground around a portion to be the cut surface with respect to a planned cut area. The solidification material is infiltrated through it, and the ground is improved based on the solidification, after which the planned cut area is cut out, and the anchor body is placed from the exposed cut surface toward the ground of the ground. The slope stabilization method is characterized in that a slope is constructed by sequentially repeating these series of operations in the planned cut area below.
【請求項2】 前記固結材が平均粒径6μm以下の微粒
子セメントとアルカリ金属珪酸塩を主成分とし、固形分
含量10〜50重量%の水性懸濁液の状態で注入される
ことを特徴とする請求項1に記載の斜面安定工法。
2. The solidifying material is injected as an aqueous suspension containing fine particle cement having an average particle size of 6 μm or less and an alkali metal silicate as main components and having a solid content of 10 to 50% by weight. The slope stabilizing method according to claim 1.
【請求項3】 前記削孔が切土面となる部分の近傍にお
いてその上部から下方に向けて形成されることを特徴と
する請求項1または2に記載の斜面安定工法。
3. The slope stabilizing method according to claim 1, wherein the drilled hole is formed in the vicinity of a portion to be a cut surface, from its upper portion to a lower portion.
JP2001395696A 2001-12-27 2001-12-27 Slope stabilization method Expired - Fee Related JP3862067B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001395696A JP3862067B2 (en) 2001-12-27 2001-12-27 Slope stabilization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001395696A JP3862067B2 (en) 2001-12-27 2001-12-27 Slope stabilization method

Publications (2)

Publication Number Publication Date
JP2003193475A true JP2003193475A (en) 2003-07-09
JP3862067B2 JP3862067B2 (en) 2006-12-27

Family

ID=27602003

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001395696A Expired - Fee Related JP3862067B2 (en) 2001-12-27 2001-12-27 Slope stabilization method

Country Status (1)

Country Link
JP (1) JP3862067B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014156698A (en) * 2013-02-14 2014-08-28 Raito Kogyo Co Ltd Foundation reinforcement method and reinforcement structure
JP2016017273A (en) * 2014-07-04 2016-02-01 五洋建設株式会社 Structure and method for reinforcing existing coastal structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014156698A (en) * 2013-02-14 2014-08-28 Raito Kogyo Co Ltd Foundation reinforcement method and reinforcement structure
JP2016017273A (en) * 2014-07-04 2016-02-01 五洋建設株式会社 Structure and method for reinforcing existing coastal structure

Also Published As

Publication number Publication date
JP3862067B2 (en) 2006-12-27

Similar Documents

Publication Publication Date Title
CN107447765A (en) Side slope construction supported with framed anchor construction
CN110130363A (en) Assembled is implanted into foundation pit enclosure stake and pile wall interaction structure and its construction method
Shaw-Shong Soil nailing for slope strengthening
JPH09291526A (en) Injection execution and injection device
KR100656142B1 (en) The foundation grouting construction method of having used foundation digging and the equipment for grout material and this
JP3862067B2 (en) Slope stabilization method
CN207160041U (en) Anchor rod type artificial digging pile
JP3676441B2 (en) Pit and construction method of basement using it
JP2003119790A (en) Earth retaining method and concrete block masonry
KR20040005756A (en) Compaction grouting system for a construction of water-proof wall
JP4672213B2 (en) Slope stabilization method
JPH0841870A (en) Method of connection precast concrete pile
JP2003213665A (en) Double composite injection method
JP2758138B2 (en) Face independent construction method of collapsed mountain tunnel
JP3168197B2 (en) Caisson anchor structure and construction method
CN109056740A (en) A kind of construction method whether novel judgement interlocking pile is engaged
JP3200240B2 (en) Filling method of self-hardening material in ground reinforcement method
US20220298821A1 (en) Simultaneous installer/injector/auger systems and methods
CN216130104U (en) Large-scale stake of water conservancy picture peg
JPS59138616A (en) Avalanche prevention work for sloped ground
JP2002201635A (en) Replacing construction method
JPS6013118A (en) Pile erection work and excavation head for forming consolidated perforated wall therefor
US4834583A (en) Method for installing a hollow pipe
TWI374961B (en)
JP2023171016A (en) Existing pile extraction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20040909

Free format text: JAPANESE INTERMEDIATE CODE: A621

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060912

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060920

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060920

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees