JP2016017273A - Structure and method for reinforcing existing coastal structure - Google Patents
Structure and method for reinforcing existing coastal structure Download PDFInfo
- Publication number
- JP2016017273A JP2016017273A JP2014138756A JP2014138756A JP2016017273A JP 2016017273 A JP2016017273 A JP 2016017273A JP 2014138756 A JP2014138756 A JP 2014138756A JP 2014138756 A JP2014138756 A JP 2014138756A JP 2016017273 A JP2016017273 A JP 2016017273A
- Authority
- JP
- Japan
- Prior art keywords
- ground
- ground improvement
- anchor
- existing
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 18
- 238000003780 insertion Methods 0.000 claims abstract description 57
- 230000037431 insertion Effects 0.000 claims abstract description 57
- 239000000463 material Substances 0.000 claims abstract description 55
- 238000005553 drilling Methods 0.000 claims description 34
- 230000002787 reinforcement Effects 0.000 claims description 24
- 238000005452 bending Methods 0.000 claims description 11
- 238000009412 basement excavation Methods 0.000 claims description 9
- 230000035515 penetration Effects 0.000 claims description 3
- 230000000087 stabilizing effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 26
- 239000011440 grout Substances 0.000 description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000005728 strengthening Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Abstract
Description
本発明は、グラウンドアンカー等のアンカー材を使用した護岸又は岸壁等の既設岸構造物の補強構造及び補強方法に関する。 The present invention relates to a reinforcing structure and a reinforcing method for an existing bank structure such as a seawall or a quay using an anchor material such as a ground anchor.
港湾施設においては、船舶の大型化に伴う大水深化や耐震補強を図るため護岸又は岸壁等の既設岸構造物の補強が必要な場合がある。 In harbor facilities, reinforcement of existing shore structures such as revetments or quay walls may be necessary to increase the depth of water and increase seismic reinforcement associated with the enlargement of ships.
従来、既設岸構造物の補強方法としては、矢板や鋼管矢板からなる既設壁の後方地盤を改良し、既設壁に対する作用土圧の低減を図る地盤改良工法や、既設壁の前面又は背面側に新規に矢板や鋼管矢板を設置するとともに、その後方に新規に控え工を設置し、新規控え工と新規矢板との上端部同士をタイロッドで連結するようにした矢板構造物工法、又は地盤改良工法と矢板構造物工法とを併用する工法等が知られている。 Conventionally, as a method of reinforcing existing shore structures, the ground improvement method for reducing the earth pressure acting on the existing wall by improving the ground behind the existing wall made of sheet piles and steel pipe sheet piles, or on the front or back side of the existing wall A new sheet pile and steel pipe sheet pile, and a new construction behind the sheet pile, and a new pile construction and a new sheet pile connected to each other with a tie rod, a sheet pile structure construction method or ground improvement construction method A construction method that uses both a sheet pile structure construction method and the like is known.
また、その他の既設岸構造物の補強方法としては、図10に示すように、矢板からなる既設壁100の海側に仮設架台101(又は作業台船)を設置し、この仮設架台101に削孔機102を設置して海側から斜め方向に安定地盤103に至るアンカー挿通孔を削孔し、このアンカー挿通孔にグラウンドアンカー等のアンカー材104を挿通し、アンカー材104の一端を安定地盤103に定着させるとともに、他端を既設壁(又はそれを構成する矢板)100に定着させ、アンカー材104を介して既設壁100を安定地盤103に支持させる工法も知られている(例えば、特許文献1を参照)。
As another method for reinforcing the existing shore structure, as shown in FIG. 10, a temporary base 101 (or a work table ship) is installed on the sea side of the existing
しかしながら、従来の地盤改良工法では、地盤改良部の安定性確保のため地盤改良範囲が広範囲となり、経済的負担が大きいという問題があった。 However, the conventional ground improvement method has a problem that the ground improvement range is wide in order to ensure the stability of the ground improvement part, and the economic burden is large.
また、従来の矢板構造物工法にあっては、新たに控え工を設置し、新規控え工と新規矢板との上部工同士をタイロッドで連結する構造であるため、地表部を掘り起こさなければならず、施工中は岸壁等の既設岸構造物を稼働させることができないという問題や地上施設が存在すると控え工の設置が困難であるという問題があった。 In addition, in the conventional sheet pile structure construction method, it is a structure in which a new construction is installed and the upper construction of the new construction and the new sheet pile is connected with tie rods, so the surface part must be dug up During construction, there was a problem that existing quay structures such as quay walls could not be operated, and there was a problem that it was difficult to install a construction work if there were ground facilities.
また、タイロッドが既設壁の上部工に固定されるため、既設壁の曲げ耐力向上効果があまり望めないものであった。 Further, since the tie rod is fixed to the superstructure of the existing wall, the effect of improving the bending strength of the existing wall cannot be expected.
一方、従来のアンカー材による補強方法では、アンカー挿通孔及びアンカー材の設置のために、水面上に仮設架台や作業台船を設置し、施工後はそれらを撤去しなければならないため施工効率が悪く、工費が嵩むという問題があり、水面上に仮設架台や作業台船を設置した状態では、船舶の接岸が制限され、岸壁の稼働も制限されていた。 On the other hand, in the conventional reinforcement method using anchor material, the installation efficiency of the anchor insertion hole and anchor material must be set up on the surface of the water and the work table ship must be removed after construction. Unfortunately, there was a problem that the construction cost increased, and in the state where a temporary mount and work table ship were installed on the water surface, the berthing of the ship was restricted and the operation of the quay was also restricted.
また、海側のアンカー材の定着位置は、施工上の問題から海上に設定せざるを得ず、既設控え工の耐力増強には寄与するが、矢板からなる既設壁の応力算定時の支点位置が高い位置となるので、既設壁の耐力増強に寄与し難いという問題もあった。 In addition, the anchoring position of the anchor material on the sea side must be set on the sea due to construction problems, which contributes to the strengthening of the strength of the existing construction work, but the fulcrum position when calculating the stress of the existing wall made of sheet piles Since it becomes a high position, there also existed a problem that it was difficult to contribute to the strengthening of the proof stress of the existing wall.
そこで、本発明は、このような従来の問題に鑑み、施工性に優れ、既設壁の曲げ耐力向上を図ることができる既設岸構造物の補強構造及び補強方法の提供を目的としてなされたものである。 Therefore, in view of such conventional problems, the present invention has been made for the purpose of providing a reinforcing structure and a reinforcing method for an existing shore structure that is excellent in workability and can improve the bending strength of an existing wall. is there.
上述の如き従来の問題を解決するための請求項1に記載の発明の特徴は、前面側に既設壁が設置された既設岸構造物の補強構造において、前記既設壁の後方の地盤を改良した地盤改良部と、一端が該地盤改良部の地表面に開口し、他端が安定地盤に至るアンカー挿通孔と、該アンカー挿通孔に沿って挿通され、一端が前記安定地盤に定着され、他端が前記地盤改良部に定着されたアンカー材とを備え、前記アンカー材を介して前記地盤改良部を前記安定地盤に支持させるようにしたことを特徴とする既設岸構造物の補強構造にある。
The feature of the invention according to
請求項2に記載の発明の特徴は、請求項1の構成に加え、前記アンカー挿通孔は、所望の深さで前記地盤改良部から所望の角度で傾斜して延出し安定地盤に至る斜孔部を有することにある。 According to a second aspect of the present invention, in addition to the structure of the first aspect, the anchor insertion hole is a slant hole extending at a desired depth from the ground improvement portion at a desired angle and extending to a stable ground. To have a part.
請求項3に記載の発明の特徴は、請求項2の構成に加え、前記アンカー挿通孔は、前記地盤改良部の地表面より所望の深さまで削孔した縦孔部と、該縦孔部から後方に向けて屈曲した屈曲孔部と、該屈曲孔部と連続して所望の角度で傾斜し、所望深さで地盤改良部より延出して前記安定地盤に至る斜孔部とを備えたことにある。 According to a third aspect of the present invention, in addition to the structure of the second aspect, the anchor insertion hole includes a vertical hole portion drilled to a desired depth from the ground surface of the ground improvement portion, and the vertical hole portion. A bent hole portion bent toward the rear, and an inclined hole portion that is inclined at a desired angle continuously with the bent hole portion and extends from the ground improvement portion at a desired depth to reach the stable ground. It is in.
請求項4に記載の発明の特徴は、請求項2又は3の構成に加え、前記斜孔部の前記地盤改良部の後端面における深さが異なる複数のアンカー挿通孔を並列に配置したことにある。
The feature of the invention described in
請求項5に記載の発明の特徴は、請求項1〜4の何れか1項の構成に加え、前記地盤改良部の地表部に前記アンカー材の一端が定着される定着体を備えたことにある。 According to a fifth aspect of the present invention, in addition to the structure of any one of the first to fourth aspects, a fixing body is provided in which one end of the anchor material is fixed to the ground surface portion of the ground improvement portion. is there.
請求項6に記載の発明の特徴は、前面側に既設壁が設置された既設岸構造物の補強方法において、前記既設壁の後方の地盤を改良して地盤改良部を形成し、既設護岸の地表面に削孔機を設置し、該削孔機により前記地盤改良部の地表面に開口し、且つ、安定地盤に至るアンカー挿通孔を削孔し、該アンカー挿通孔にアンカー材を挿通させ、該アンカー材の一端を前記安定地盤に定着させるとともに、他端を前記地盤改良部に定着させ、前記地盤改良部を前記アンカー材により前記安定地盤に支持させる既設岸構造物の補強方法にある。 According to a sixth aspect of the present invention, in the method for reinforcing an existing shore structure in which an existing wall is installed on the front side, a ground improvement portion is formed by improving the ground behind the existing wall, A hole drilling machine is installed on the ground surface, the hole drilling machine opens the ground surface of the ground improvement part, and drills an anchor insertion hole leading to the stable ground, and allows the anchor material to pass through the anchor insertion hole. The anchor material is fixed to the stable ground, the other end is fixed to the ground improvement portion, and the ground improvement portion is supported by the anchor material on the stable ground. .
請求項7に記載の発明の特徴は、請求項6の構成に加え、直進掘削及び所望の曲率半径で屈曲掘削が可能な削孔機を使用し、前記地盤改良部の地表面から所望の深さまで縦方向に縦孔部を削孔した後、該縦孔部より後方に向けて屈曲した屈曲孔部を削孔し、前記屈曲孔部と連続して所望深さで前記地盤改良部の後端面を通り、該地盤改良部の後端面から所望の角度で傾斜した斜孔部を削孔して前記地盤改良部の地表部から前記安定地盤に到る前記アンカー挿通孔を形成し、然る後、該アンカー挿通孔に沿って前記アンカー材を挿通させることにある。 According to a seventh aspect of the present invention, in addition to the configuration of the sixth aspect, a drilling machine capable of straight excavation and bending excavation with a desired curvature radius is used, and a desired depth is obtained from the ground surface of the ground improvement portion. After the vertical hole portion is drilled in the vertical direction, a bent hole portion bent backward from the vertical hole portion is drilled, and after the ground improvement portion at a desired depth continuously with the bent hole portion. The anchor insertion hole extending from the ground surface portion of the ground improvement portion to the stable ground is formed by drilling a slant hole portion that passes through the end surface and is inclined at a desired angle from the rear end surface of the ground improvement portion. Then, the anchor material is inserted along the anchor insertion hole.
本発明に係る既設岸構造物の補強構造は、上述したように、前面側に既設壁が設置された既設岸構造物の補強構造において、前記既設壁の後方の地盤を改良した地盤改良部と、一端が該地盤改良部の地表面に開口し、他端が安定地盤に至るアンカー挿通孔と、該アンカー挿通孔に沿って挿通され、一端が前記安定地盤に定着され、他端が前記地盤改良部に定着されたアンカー材とを備え、前記アンカー材を介して前記地盤改良部を前記安定地盤に支持させるようにしたことにより、地盤改良範囲を小さくできるとともに地上で施工可能であるので、施工性に優れ且つ安価に護岸や岸壁等の既設岸構造物を補強することができる。また、地表部の掘り起こしを要せず、水上に架設架台や作業台船を設置する必要が無く施工中の接岸も可能なので、施工中の占有範囲を小さくでき、施工に伴う既設岸構造物の占有期間の短縮を図れ、既設岸構造物の効率的な稼働を確保することができる。 As described above, the reinforcement structure for an existing shore structure according to the present invention is a ground improvement portion that improves the ground behind the existing wall in the reinforcement structure for an existing shore structure in which an existing wall is installed on the front side. , One end opened to the ground surface of the ground improvement part, the other end is inserted along the anchor insertion hole, and the other end is fixed to the stable ground, and the other end is fixed to the ground. With the anchor material fixed to the improved portion, and by allowing the ground improved portion to be supported by the stable ground via the anchor material, the ground improved range can be reduced and construction can be performed on the ground. It is excellent in workability and can reinforce existing shore structures such as revetments and quay walls. In addition, there is no need to dig up the ground surface, and there is no need to install an erection frame or work platform on the water. The occupation period can be shortened and efficient operation of the existing shore structure can be secured.
また、本発明において、前記アンカー挿通孔は、所望の深さで前記地盤改良部から所望の角度で傾斜して延出し安定地盤に至る斜孔部を有することにより、作用土圧の低減を図ることができる。 In the present invention, the anchor insertion hole has a slanted hole portion extending from the ground improvement portion at a desired depth at a desired angle and extending to a stable ground, thereby reducing the working earth pressure. be able to.
更に、本発明において、前記アンカー挿通孔は、前記地盤改良部の地表面より所望の深さまで削孔した縦孔部と、該縦孔部から後方に向けて屈曲した屈曲孔部と、該屈曲孔部と連続して所望の角度で傾斜し、所望深さで地盤改良部の後端面より延出して前記安定地盤に至る斜孔部とを備えたことにより、アンカー材による支持点を低い位置に設定でき、地盤改良部の曲げ耐力の増強を図ることができる。 Further, in the present invention, the anchor insertion hole includes a vertical hole portion drilled to a desired depth from the ground surface of the ground improvement portion, a bent hole portion bent backward from the vertical hole portion, and the bent portion. The support point by the anchor material is located at a low position by providing an inclined hole portion that is inclined continuously at a desired angle with the hole portion and extends from the rear end surface of the ground improvement portion at a desired depth to reach the stable ground. The bending strength of the ground improvement part can be increased.
更にまた、本発明において、前記斜孔部の前記地盤改良部の後端面における深さが異なる複数のアンカー挿通孔を並列に配置したことにより、深さ方向の支点スパンをさらに小さくでき、地盤改良部の強度負担を低減することができる。 Furthermore, in the present invention, by arranging in parallel a plurality of anchor insertion holes having different depths at the rear end surface of the ground improvement portion of the oblique hole portion, the fulcrum span in the depth direction can be further reduced, and the ground improvement The strength burden on the part can be reduced.
また、本発明において、前記地盤改良部の地表部に前記アンカー材の一端が定着される定着体を備えたことにより、定着作業を容易に行うことができる。 Further, in the present invention, the fixing work can be easily performed by providing a fixing body to which one end of the anchor material is fixed on the ground surface portion of the ground improvement portion.
また、本発明において、前面側に既設壁が設置された既設岸構造物の補強方法において、前記既設壁の後方の地盤を改良して地盤改良部を形成し、既設護岸の地表面に削孔機を設置し、該削孔機により前記地盤改良部の地表面に開口し、且つ、安定地盤に至るアンカー挿通孔を削孔し、該アンカー挿通孔にアンカー材を挿通させ、該アンカー材の一端を前記安定地盤に定着させるとともに、他端を前記地盤改良部に定着させ、前記地盤改良部を前記アンカー材により前記安定地盤に支持させることにより、地盤改良範囲を小さくできるとともに、海上に仮設架台等を必要とせず地上施工が可能であり、また、地表部の掘り起こしも必要ないので、施工中の占有範囲を小さくでき、施工に伴う既設岸構造物の占有期間の短縮を図れ、護岸又は岸壁等の既設岸構造物の効率的な稼働を確保することができ、施工性及び経済性の向上を図ることができる。 Further, in the present invention, in the method for reinforcing an existing shore structure in which an existing wall is installed on the front side, a ground improvement portion is formed by improving the ground behind the existing wall, and a hole is drilled in the ground surface of the existing revetment. A drilling machine, drilling an anchor insertion hole reaching the ground surface of the ground improvement portion by the drilling machine and reaching the stable ground, inserting an anchor material into the anchor insertion hole, and By fixing one end to the stable ground, fixing the other end to the ground improvement portion, and supporting the ground improvement portion to the stable ground by the anchor material, the ground improvement range can be reduced and temporarily installed on the sea. The ground construction is possible without the need for a pedestal, etc., and it is not necessary to dig up the surface part, so the occupation range during construction can be reduced, and the occupation period of existing shore structures can be shortened due to construction. shore It is possible to ensure efficient operation of the existing coast structures etc., it is possible to improve the workability and economy.
また、本発明において、直進掘削及び所望の曲率半径で屈曲掘削が可能な削孔機を使用し、前記地盤改良部の地表面から所望の深さまで縦方向に縦孔部を削孔した後、該縦孔部より後方に向けて屈曲した屈曲孔部を削孔し、前記屈曲孔部と連続して所望深さで前記地盤改良部の後端面を通り、該地盤改良部の後端面から所望の角度で傾斜した斜孔部を削孔して前記地盤改良部の地表部から前記安定地盤に到る前記アンカー挿通孔を形成し、然る後、該アンカー挿通孔に沿って前記アンカー材を挿通させることにより、アンカー材の設置作業を地上で行えるとともに、地盤改良部に対するアンカー材の支持力作用位置を自由に設計することができる。 Further, in the present invention, using a drilling machine capable of straight excavation and bending excavation with a desired radius of curvature, after drilling the vertical hole portion in the vertical direction from the ground surface of the ground improvement portion to a desired depth, A bent hole portion bent toward the rear from the vertical hole portion is drilled, and passes through the rear end surface of the ground improvement portion at a desired depth continuously with the bent hole portion, and is desired from the rear end surface of the ground improvement portion. The anchor insertion hole extending from the ground surface portion of the ground improvement portion to the stable ground is formed by drilling a slant hole portion inclined at an angle of, and then the anchor material is disposed along the anchor insertion hole. By inserting the anchor member, the anchor member can be installed on the ground, and the support force acting position of the anchor member with respect to the ground improvement portion can be freely designed.
次に、本発明に係る既設岸構造物の補強構造の実施態様を図1〜図3に示した実施例に基づいて説明する。尚、図中符号1は護岸又は岸壁等の既設岸構造物、符号2は水面、符号3は安定地盤である。また、本発明においては、岸の海側を前、平面において前後方向と交差する方向を横方向として説明する。
Next, the embodiment of the reinforcement structure of the existing shore structure according to the present invention will be described based on the embodiment shown in FIGS. In the figure,
護岸や岸壁等の既設岸構造物1は、前面に設置された矢板からなる既設壁4と、既設壁4の後方に間隔を置いて埋設された杭からなる既設控え工5とを備え、既設壁4の上部工4aと既設控え工5の上部工とがタイロッド等の支持部材6により連結されている。
An existing
この既設岸構造物1の補強構造は、図1、図2に示すように、既設壁4の後方の地盤1aを改良した地盤改良部10と、地盤改良部10の地表面に開口し、且つ、所望の深さで地盤改良部10の後端面10aから所望の角度で傾斜して安定地盤3に至る斜孔部11cを有するアンカー挿通孔11と、アンカー挿通孔11に沿って挿通され、一端が安定地盤3に定着され、他端が地盤改良部10に定着されたアンカー材12とを備え、アンカー材12を介して地盤改良部10を安定地盤3に支持させるようになっている。
As shown in FIGS. 1 and 2, the reinforcing structure of the existing
地盤改良部10は、薬液注入等により既設壁4の後面側地盤を所望の範囲に亘って改良することにより形成され、アンカー定着にも耐え得る安定した強度を有している。
The
尚、その前後方向の地盤改良範囲は、既設壁4と既設控え工5との距離及び従来の地盤改良による既設護岸補強方法の地盤改良範囲に比べ小さくなっている。
The ground improvement range in the front-rear direction is smaller than the distance between the existing
アンカー挿通孔11は、それぞれ地盤改良部10の地表面より所望の深さまで縦方向に削孔した縦孔部11aと、縦孔部11aから後方に向けて屈曲した屈曲孔部11bと、屈曲孔部11bから所望の角度で傾斜し、所望の深さ位置で地盤改良部10の後端面10aを通って安定地盤3に至る斜孔部11cとを備えている。
The
各アンカー挿通孔11は、図2に示すように、並列に配置され、隣り合うアンカー挿通孔11は、斜孔部11cの地盤改良部10の後端面10aにおける深さh1、h2が異なるように形成され、アンカー材12による支持力が作用する点を互いに深さ方向で異なるようにしている。
As shown in FIG. 2, the anchor insertion holes 11 are arranged in parallel, and adjacent anchor insertion holes 11 have different depths h1 and h2 in the
アンカー材12は、PC鋼材等により構成され、その一端がアンカー挿通孔11の先端部にグラウト13等の固化材を加圧注入し、固化させることにより安定地盤3に定着され、他端が地盤改良部10の地表部に設置された定着体14に緊張した状態で定着されている。
The
尚、図中符号16は、アンカー挿通孔11を塞ぐためのパッカーであって、このパッカー16を膨らませてアンカー挿通孔11の先端部を封鎖した状態でそこにグラウト13等の固化材を加圧注入するようになっている。
定着体14は、版状のプレキャストコンクリートブロック等により構成され、地盤改良部10の地表面部であって既設壁4の上部工4a近傍に設置されている。
The fixing
図中符号15は、アンカー材12を定着体14に定着させる定着手段である。この定着手段15は、特に限定されないが、例えば、アンカー材12の端部にねじ部を設け、このねじ部にナットをねじ嵌めして締め付けるようにしてもよく、楔状の定着具等の他の定着手段を用いてもよい。
このように構成された既設岸構造物の補強構造は、既設壁4の後面側に地盤改良部10を備え、地盤改良部10がアンカー材12により安定地盤3に支持されているので、既設壁4に対する作用土圧が低減される。
The reinforcement structure of the existing shore structure thus configured includes the
また、地盤改良部10自体がアンカー材12により安定地盤3に支持されるので、従来工法よりも狭い地盤改良範囲で地盤改良部10の高い安定性を確保することができる。
Moreover, since the
更に、地盤改良部10は、梁モデルとして考えることができ、アンカー挿通孔11が斜孔部11cの前方への延長線が既設壁4と水面下の所望高さで交差するように形成されたことにより、図3(a)に示すように、アンカー材12による支点15aの位置を所望の深さ位置まで下げ、深さ方向の支点スパンを小さくすることができる。
Furthermore, the
更にまた、斜孔部11cの地盤改良部10後端面10aにおける深さh1,h2が異なる複数のアンカー挿通孔11を並列に配置したことにより、図3(b)に示すように、深さ方向において地盤改良部10を複数の支点15b,15bで支持することにより、深さ方向の支点スパンをさらに小さくでき、地盤改良部10の強度負担を小さくすることができる。
Furthermore, by arranging a plurality of anchor insertion holes 11 having different depths h1 and h2 in the
次に、本発明に係る既設岸構造物の補強方法について図1及び図4〜図7に基づいて説明する。尚、上述の実施例と同様の構成には、同一符号を付して説明する。また、図4は補強前の護岸や岸壁等の既設岸構造物の状態を示し、図中符号4は既設壁、符号5は既設控え工である。
Next, the reinforcement method of the existing shore structure based on this invention is demonstrated based on FIG.1 and FIGS. In addition, the same code | symbol is attached | subjected and demonstrated to the structure similar to the above-mentioned Example. Moreover, FIG. 4 shows the state of the existing shore structures, such as a revetment and a quay before reinforcement, and the code |
本発明方法では、まず、図5に示すように、薬液注入等により既設壁4の後面側地盤1aを所望の範囲に亘って改良し、地盤改良部10を形成する。
In the method of the present invention, first, as shown in FIG. 5, the rear surface side ground 1 a of the existing
地盤改良範囲は、既設壁4と既設控え工5との距離及び従来の地盤改良による既設護岸補強方法の地盤改良範囲に比べ小さくて良い。
The ground improvement range may be smaller than the distance between the existing
次に、図6に示すように、護岸や岸壁等の既設岸構造物1の地上に削孔機20を設置し、削孔機20により地盤改良部10の地表面に開口し、且つ、所望の深さで地盤改良部10の後端面10aから所望の角度で傾斜して安定地盤3に至るアンカー挿通孔11を削孔する。
Next, as shown in FIG. 6, a
削孔機20は、傾斜掘削法や曲がり削孔に使用される削孔機であって、直進掘削及び所望の曲率半径での曲線削孔が可能なものが使用され、掘削ビット23の後方にケーシング22が埋設されるようになっている。
The
尚、この削孔機20には、各種センサーからなる掘削ビット23位置を測定するビット位置測定手段を備え、このビット位置計測手段からの情報に基づいて推進距離、屈曲削孔時の屈曲半径等を制御できるようになっている。
The
アンカー挿通孔11の削孔作業は、まず、地盤改良部10の地表面側より縦方向に直進的に推進することにより所望深さに至る縦孔部11aを削孔する。
In the drilling operation of the
次に、縦孔部11aが所望深さまで至ったら、掘削ビット23の削孔向きを所望の曲率半径で後方に曲げつつ削孔し、縦孔部11aと連続して後方に向けて屈曲した屈曲孔部11bを削孔する。
Next, when the
そして、屈曲孔部11bが所望の位置、即ち、掘削ビット23の削孔方向が斜孔部11cの傾斜方向と一致する位置にまで至ったら、その位置から斜め方向に直進的に削孔することにより所望の深さで地盤改良部10の後端面10aに至り、更に、その地盤改良部10の後端面10aから所望の角度で傾斜し、安定地盤3にまで至る斜孔部11cを削孔する。
Then, when the
これにより、地盤改良部10の地表面に開口し、且つ、所望の深さで地盤改良部10の後端面10aから所望の角度で傾斜して安定地盤3に至る斜孔部11cを有するアンカー挿通孔11が形成される。
As a result, the anchor is inserted into the
アンカー挿通孔11が形成されたら、図1に示すように、このアンカー挿通孔11にアンカー材12を挿通させ、アンカー材12の先端が安定地盤3にまで至っていることを確認し、グラウトを注入しつつケーシング22を引き抜きながら、アンカー挿通孔11の先端部にグラウト等の固化材を加圧注入し、この先端部のグラウトを固化させることによりアンカー材12の一端を安定地盤3に定着させる。
When the
一方、アンカー挿通孔11を形成した後、地盤改良部10の地表部には、アンカー材12の上端が定着される定着体14を配置する。
On the other hand, after the
そして、アンカー材12の一端を安定地盤3に定着させた状態で緊張させ、その状態で他端を定着体14にナット締め等の定着手段15により定着させ、地盤改良部10をアンカー材12により安定地盤3に支持させる。
Then, one end of the
そして、アンカー挿通孔11の形成、アンカー材12の挿入及びアンカー材12の定着までの一連の作業を、削孔機20を横方向(図2中の上下方向)に移動させつつ繰り返すことによりアンカー挿通孔11を並列に配置する。
Then, a series of operations from the formation of the
尚、互いに隣り合うアンカー挿通孔11で縦孔部11aの到達深度を違えることにより、斜孔部11cの地盤改良部10の後端面10aにおける深さが異なる複数のアンカー挿通孔11を並列に配置する。
A plurality of anchor insertion holes 11 having different depths in the
このように構成された既設岸構造物の補強方法では、仮設架台や作業台船の設置及び地表部の大幅な掘り起こしを必要としないため、施工中の占有範囲が小さく、施工中の接岸も可能となるので、護岸又は岸壁等の既設岸構造物の施工に伴う占有期間も大幅に短縮でき、既設構造物の効率的な稼働を確保することができる。 The existing shore structure reinforcement method constructed in this way does not require the installation of temporary mounts or work table boats, and does not require significant excavation of the ground surface, so the occupation area during construction is small and berthing during construction is possible. Therefore, the occupation period accompanying the construction of existing shore structures such as revetments or quay walls can be greatly shortened, and efficient operation of the existing structures can be ensured.
また、本発明に係る既設岸構造物の補強構造においては、定着体14を使用せず、図7に示すように、アンカー挿通孔11の屈曲孔部11b内にグラウト30を加圧注入し、アンカー材12を地盤改良部10内に定着させたものであってもよい。尚、本実施例において上述の実施例と同様の構成には同一符号を付して説明を省略する。
Further, in the reinforcing structure of the existing shore structure according to the present invention, the fixing
アンカー材12の地盤改良部10への定着は、アンカー材12の所定の位置にパッカー31,31等の封鎖部材を収縮させた状態で設置しておき、アンカー材12をアンカー挿通孔11に挿通させ、先端部を安定地盤3に定着した後、両パッカー31,31にグラウト等を注入して膨張させ、屈曲孔部11bの両端を塞いだ後、図示しない注入管を通して両パッカー31,31間にグラウトを加圧注入することにより行う。
The
この様に屈曲孔部11bにグラウト30を加圧注入し、アンカー材12を地盤改良部10に定着することにより、地盤改良部10にアンカー材12を確実に定着でき、屈曲孔部11bにおけるアンカー材12に作用する張力が地盤改良部10に及ぼす影響を排除し、地盤改良部10の乱れを防止することができる。
In this way, the
また、上述の実施例では、定着体14を設ける場合、既設壁4と別個に設ける場合について説明したが、定着体14を既設壁4の上部工4aと一体化し、アンカー材12による支持力が既設壁4にも作用するようにしてもよい。
Further, in the above-described embodiment, the case where the fixing
尚、アンカー挿通孔11は、地盤改良部10の地表面に開口し、且つ、安定地盤3に至るものであればよく、例えば、図8に示すように、全体が斜孔部11cを成し、所望の深さで地盤改良部10の後端面10aより斜め後方に延出した形状のものでもよく、図9に示すように、アンカー挿通孔11を垂直方向に向けて形成したものであってもよい。尚、上述の実施例と同様の構成には、同一符号を付して説明を省略する。
The
1 既設護岸
1a 地盤
2 水面
3 安定地盤
4 既設壁
5 既設控え工
10 地盤改良部
10a 後端面
11 アンカー挿通孔
11a 縦孔部
11b 屈曲孔部
11c 斜孔部
12 アンカー材
13 グラウト
14 定着体
16 パッカー
15 定着手段
20 削孔機
22 ケーシング
23 掘削ビット
30 グラウト
31 パッカー
DESCRIPTION OF
Claims (7)
前記既設壁の後方の地盤を改良した地盤改良部と、一端が該地盤改良部の地表面に開口し、他端が安定地盤に至るアンカー挿通孔と、該アンカー挿通孔に沿って挿通され、一端が前記安定地盤に定着され、他端が前記地盤改良部に定着されたアンカー材とを備え、前記アンカー材を介して前記地盤改良部を前記安定地盤に支持させるようにしたことを特徴とする既設岸構造物の補強構造。 In the reinforcement structure of the existing shore structure where the existing wall is installed on the front side,
The ground improvement part which improved the ground behind the existing wall, one end opened to the ground surface of the ground improvement part, the other end is inserted along the anchor insertion hole, the anchor insertion hole reaching the stable ground, An anchor material fixed at one end to the stable ground and the other end fixed at the ground improvement portion, and the ground improvement portion is supported by the stable ground via the anchor material. Reinforcing structure for existing shore structures.
前記既設壁の後方の地盤を改良して地盤改良部を形成し、既設護岸の地表面に削孔機を設置し、該削孔機により前記地盤改良部の地表面に開口し、且つ、安定地盤に至るアンカー挿通孔を削孔し、該アンカー挿通孔にアンカー材を挿通させ、該アンカー材の一端を前記安定地盤に定着させるとともに、他端を前記地盤改良部に定着させ、前記地盤改良部を前記アンカー材により前記安定地盤に支持させることを特徴とする既設岸構造物の補強方法。 In the reinforcement method of the existing shore structure where the existing wall is installed on the front side,
Improving the ground behind the existing wall to form a ground improvement part, installing a drilling machine on the ground surface of the existing revetment, opening to the ground surface of the ground improvement part by the drilling machine, and stabilizing The anchor insertion hole reaching the ground is drilled, the anchor material is inserted into the anchor insertion hole, one end of the anchor material is fixed to the stable ground, and the other end is fixed to the ground improvement portion, and the ground improvement is performed. A portion is supported on the stable ground by the anchor material, and a method for reinforcing an existing shore structure is provided.
前記地盤改良部の地表面から所望の深さまで縦方向に縦孔部を削孔した後、該縦孔部より後方に向けて屈曲した屈曲孔部を削孔し、前記屈曲孔部と連続して所望深さで前記地盤改良部の後端面を通り、該地盤改良部の後端面から所望の角度で傾斜した斜孔部を削孔して前記地盤改良部の地表部から前記安定地盤に到る前記アンカー挿通孔を形成し、
然る後、該アンカー挿通孔に沿って前記アンカー材を挿通させる請求項6に記載の既設岸構造物の補強方法。 Using a drilling machine capable of straight excavation and bending excavation with a desired radius of curvature,
After the vertical hole portion is drilled in the vertical direction from the ground surface of the ground improvement portion to a desired depth, a bent hole portion bent backward from the vertical hole portion is drilled, and continuous with the bent hole portion. Pass through the rear end surface of the ground improvement portion at a desired depth and drill a slant hole portion inclined at a desired angle from the rear end surface of the ground improvement portion to reach the stable ground from the ground surface portion of the ground improvement portion. Forming the anchor insertion hole,
Then, the reinforcing method of the existing shore structure according to claim 6, wherein the anchor material is inserted along the anchor insertion hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014138756A JP6337396B2 (en) | 2014-07-04 | 2014-07-04 | Reinforcement structure and reinforcement method for existing shore structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014138756A JP6337396B2 (en) | 2014-07-04 | 2014-07-04 | Reinforcement structure and reinforcement method for existing shore structures |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016017273A true JP2016017273A (en) | 2016-02-01 |
JP6337396B2 JP6337396B2 (en) | 2018-06-06 |
Family
ID=55232707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014138756A Active JP6337396B2 (en) | 2014-07-04 | 2014-07-04 | Reinforcement structure and reinforcement method for existing shore structures |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6337396B2 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1004707A1 (en) * | 1998-11-25 | 2000-05-31 | Hydro Soil Services | Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin |
JP2002047676A (en) * | 2000-08-02 | 2002-02-15 | Hanshin Expressway Public Corp | Buoyancy preventing structure and its construction method |
JP2003193475A (en) * | 2001-12-27 | 2003-07-09 | Okabe Co Ltd | Slope stabilization method |
JP2010053644A (en) * | 2008-08-29 | 2010-03-11 | Railway Technical Res Inst | Abutment and method for reinforcing fill provided on backside of the same |
-
2014
- 2014-07-04 JP JP2014138756A patent/JP6337396B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1004707A1 (en) * | 1998-11-25 | 2000-05-31 | Hydro Soil Services | Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin |
JP2002047676A (en) * | 2000-08-02 | 2002-02-15 | Hanshin Expressway Public Corp | Buoyancy preventing structure and its construction method |
JP2003193475A (en) * | 2001-12-27 | 2003-07-09 | Okabe Co Ltd | Slope stabilization method |
JP2010053644A (en) * | 2008-08-29 | 2010-03-11 | Railway Technical Res Inst | Abutment and method for reinforcing fill provided on backside of the same |
Also Published As
Publication number | Publication date |
---|---|
JP6337396B2 (en) | 2018-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102953341B (en) | A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock | |
JP5347898B2 (en) | Strengthening structure and method of existing sheet pile quay | |
CN102979039B (en) | Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream | |
WO2015135471A1 (en) | Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same | |
CN109797749A (en) | A kind of underwater foundation pit construction device and construction method | |
KR100733263B1 (en) | Guide frame apparatus for piling of casing and construction of inserting inconcrete pile on the sea or on the river | |
JP4663541B2 (en) | Seismic reinforcement method for existing concrete pier | |
CN104805828B (en) | W-shaped steel sheet pile structure | |
CN105386444A (en) | Foundation pile hole forming device and method | |
JP6337396B2 (en) | Reinforcement structure and reinforcement method for existing shore structures | |
JP4876991B2 (en) | Rehabilitation and reinforcement method for existing quay and rehabilitation structure | |
JP5028781B2 (en) | Reinforcing and reinforcing method for existing quay and its reinforcing structure | |
JP2013147926A (en) | Tubular pile installation method, excavation method, inner digger device and gripping device | |
KR20200014531A (en) | Fixed anchor construction method of marine structure | |
CN204875664U (en) | A retaining wall structure for interim pier in bay | |
CN113882431A (en) | Construction method for dismantling end cofferdam | |
JP5360657B2 (en) | Retaining wall made of precast concrete | |
JP4911242B2 (en) | Reinforcement structure of existing gravity quay | |
JP5360659B2 (en) | Retaining wall made of precast concrete | |
CN106567381B (en) | Construction process of large U-shaped steel sheet pile | |
JP6322560B2 (en) | Renewal method of existing revetment or quay and revetment or quay structure | |
JP4058551B2 (en) | Seismic reinforcement method for existing structures | |
JP2020122286A (en) | Foundation structure for offshore wind power generation and construction method of foundation structure for offshore wind power generation | |
CN217870557U (en) | Cofferdam structure located on bias water-approaching slope | |
CN108487273A (en) | A kind of foundation in water construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170529 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180322 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180328 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180420 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6337396 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |