JP2003129471A - Method of reinforcing of foot protection pile - Google Patents

Method of reinforcing of foot protection pile

Info

Publication number
JP2003129471A
JP2003129471A JP2001322039A JP2001322039A JP2003129471A JP 2003129471 A JP2003129471 A JP 2003129471A JP 2001322039 A JP2001322039 A JP 2001322039A JP 2001322039 A JP2001322039 A JP 2001322039A JP 2003129471 A JP2003129471 A JP 2003129471A
Authority
JP
Japan
Prior art keywords
pile
tip
ready
unevenness
root
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001322039A
Other languages
Japanese (ja)
Inventor
Yoichi Asai
陽一 浅井
Norimasa Nishimoto
憲正 西本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOCON CORP
Toyo Asano Foundation Co Ltd
Original Assignee
YOCON CORP
Toyo Asano Foundation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YOCON CORP, Toyo Asano Foundation Co Ltd filed Critical YOCON CORP
Priority to JP2001322039A priority Critical patent/JP2003129471A/en
Publication of JP2003129471A publication Critical patent/JP2003129471A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To solve the problem of cracks and subsequent breakage of a foot protection part in which an expanded foot protection part is provided at an end portion of a conventional pile by using a foot protection liquid such as cement milk. SOLUTION: Projection and recess portions 4 are formed on either one of outer or inner periphery, or both peripheries of the conventional pile. A foot protection part 2 and an end portion 3a of a conventional pile 3 are joined firmly to each other via the projection and recess portions 4, whereby breakage caused by punching shear may be prevented.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する利用分野】本発明はプレボーリング工法
或は中掘り工法を実施する際に、杭の先端部に根固めブ
ロック(根固め球根部とも言う)を一体的に設けた根固
め杭の補強方法に係り、特に杭の先端部に凹凸を設ける
ことによって杭と根固めブロックを一体的に固定するこ
とによって、該根固めブロックに押し抜きせん断破壊の
発生を防止した根固め杭の補強方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rooting pile in which a rooting block (also referred to as rooting bulb) is integrally provided at the tip of the pile when the pre-boring method or the medium excavation method is carried out. Reinforcement method, in particular, a method for reinforcing a pile to prevent the occurrence of punching shear failure by fixing the pile and the consolidation block integrally by providing unevenness at the tip of the pile to prevent the pile from breaking by shearing. It is about.

【0002】[0002]

【従来の技術】従来の杭の根固めは、例えば図9に示す
如く、地盤に削孔された孔内(図示せず)にセメントミ
ルク等の根固め液51を充填させた後で既製杭52を挿
入して構成した根固め構造53に於いては、圧縮強度が
200kg/cm2 以上の根固め液51を使用し、先端
支持力の増強を行っている。
2. Description of the Related Art Conventional consolidation of piles is carried out, for example, as shown in FIG. 9, after filling a consolidation solution 51 such as cement milk into a hole (not shown) drilled in the ground, the ready-made pile is prepared. In the root consolidation structure 53 configured by inserting 52, the root consolidation solution 51 having a compressive strength of 200 kg / cm 2 or more is used to enhance the tip supporting force.

【0003】しかし、前述のような根固め構造53に於
ける強度は、根固め液51の圧縮強度のみで決定される
わけではなく、図9の点線及び矢印で示すようなひび割
れ現象は、根固め部に押し抜きせん断破壊が発生するた
めに生ずるものであると考えられる。
However, the strength of the root-setting structure 53 as described above is not determined only by the compressive strength of the root-setting liquid 51, and the cracking phenomenon shown by the dotted line and arrow in FIG. It is considered that this is caused by punching shear failure in the solidified part.

【0004】従来も、例えば特開平7−76830号公
報に示す如く、根固め杭の支持力を増強するために、挿
入される杭の下方のソイルセメント内に予め杭の外径よ
り大きいリング、円板、スパイラルスプリングを配設す
ることによって、根固め杭の支持力を補強する方法が開
発されている。
Conventionally, for example, as disclosed in Japanese Patent Laid-Open No. 7-76830, a ring larger than the outer diameter of the pile is previously provided in the soil cement below the pile to be inserted in order to enhance the supporting force of the pile. A method has been developed to reinforce the bearing capacity of a rooting pile by arranging a disc and a spiral spring.

【0005】[0005]

【発明が解決しようとする課題】然るに、前述の特開平
7−76830号公報に示す技術は、杭の下方のソイル
セメント内に杭の外径より大きいリング、円板等を配設
施工をするので、ある程度の支持力を補強することは出
来るが、杭に上下方向或は円周方向に大きな力が加わっ
た場合には、根固め液で形成された根固め部に押し抜き
せん断破壊が発生し、これによって根固め部にひび割れ
が生じて杭の支持力が著しく弱められる問題があった。
However, in the technique disclosed in the above-mentioned Japanese Patent Laid-Open No. 7-76830, a ring, a disk or the like having a diameter larger than the outer diameter of the pile is installed in the soil cement below the pile. Therefore, it is possible to reinforce the bearing capacity to some extent, but when a large force is applied to the pile in the vertical direction or the circumferential direction, punch-out shear failure occurs in the root consolidation part formed by the root consolidation solution. However, this has caused a problem that cracks occur in the root consolidation portion and the bearing capacity of the pile is significantly weakened.

【0006】本発明に係る根固め杭の補強方法は、前述
の従来の問題点に鑑み開発された全く新しい発明であっ
て、特に根固め液の中に挿入される杭の先端部に凹凸を
設けることによって、杭の先端部と根固め部との結合を
強化し、これによって杭と根固め部との周面摩擦力を増
加させ、杭先端部の根固め部に伝達する力を低減し、さ
らに先端部を補強し、これによって先端部のせん断力の
増強及び先端破壊する領域を拘束し、根固め部の押し抜
きせん断破壊が発生することを防止するようにした全く
新しい発明を提供するものである。
A method of reinforcing a pile for piling according to the present invention is a completely new invention developed in view of the above-mentioned conventional problems, and in particular, unevenness is formed at the tip of the pile to be inserted into the piling solution. By installing the pile, it strengthens the connection between the pile tip and the root consolidation part, which increases the peripheral frictional force between the pile and the root consolidation part, and reduces the force transmitted to the root consolidation part of the pile tip. Further, there is provided a completely new invention in which the tip portion is further reinforced so that the shearing force of the tip portion is strengthened and the region where the tip is broken is restrained to prevent the punching shear fracture of the root consolidation portion. It is a thing.

【0007】[0007]

【課題を解決するための手段】本発明に係る根固め杭の
補強方法は、前述の従来の問題点を根本的に改善した発
明であって、その第1発明の要旨は、地盤に削孔された
孔内にセメントミルク等の根固め液を充填させた後で既
製杭を挿入して支持基盤を形成させて根固め杭を施工す
る方法に於いて、該根固め液内に挿入される既製杭の先
端部の外周或は内周またはその両方に予め凹凸を設けて
施工することを特徴とした根固め杭の補強方法である。
A method of reinforcing a pile for consolidation according to the present invention is an invention which has been fundamentally improved from the above-mentioned conventional problems. The gist of the first invention is to drill a hole in the ground. In a method for constructing a support foundation by inserting a ready-made pile after filling a cement hardening solution such as cement milk into the formed hole, the method is inserted into the consolidation solution. It is a method of reinforcing a root-consolidated pile, characterized by constructing unevenness in advance on the outer circumference, the inner circumference, or both of the tip of a ready-made pile.

【0008】前記第1発明に於いては、セメントミルク
等の根固め液内に挿入される既製杭の先端部の外周或は
内周またはその両方に凹凸を設けて施工するので、前記
根固め液によって形成される根固め部と既製杭の先端部
とを前記凹凸の作用によって強固に結合させることが出
来る。従ってこれによって杭と根固め部との周面摩擦力
を増加させ、杭先端部の根固め部に伝達する力を低減せ
しめ、杭の先端部のせん断力の増強及び先端破壊する領
域を拘束せしめ、根固め部の押し抜きせん断破壊が発生
することを防止出来る。
According to the first aspect of the present invention, since the unevenness is provided on the outer circumference and / or the inner circumference of the tip portion of the ready-made pile to be inserted into the root hardening liquid such as cement milk, the root hardening is performed. It is possible to firmly bond the root consolidation portion formed by the liquid and the tip portion of the ready-made pile by the effect of the unevenness. Therefore, this increases the peripheral frictional force between the pile and the root consolidation part, reduces the force transmitted to the root consolidation part at the pile tip, and strengthens the shearing force at the tip of the pile and restrains the area where the tip breaks. It is possible to prevent the punching shear fracture of the root consolidation part.

【0009】本発明に係る根固め杭の補強方法の第2発
明の要旨は、前記凹凸が設けられた既製杭の先端部に根
固め液が流入し得る窓を予め穿設して施工することを特
徴とした第1発明の根固め杭の補強方法である。
The gist of the second invention of the method for reinforcing a soil-consolidating pile according to the present invention is to construct by constructing a window through which a soil-comprising fluid can flow in advance at the tip of the ready-made pile provided with the unevenness. Is a method for reinforcing a rooting pile according to the first invention.

【0010】前記第2発明に於いては、前記凹凸面が設
けられた既製杭の先端部に根固め液が流入し得る窓を予
め穿設して施工したので、前記根固め液によって形成さ
れる根固め部と杭の先端部とを前記先端部に設けた凹凸
と及び窓との2重作用によって強固に結合させて、杭と
根固め部とを一体化させることが出来る。従って、これ
によって杭の先端部のせん断力の増強及び先端破壊する
領域を拘束し、根固め部の押し抜きせん断破壊力が発生
することを防止出来る。
According to the second aspect of the present invention, since a window through which the rooting liquid can flow is previously formed at the tip of the prefabricated pile provided with the uneven surface, it is formed by the rooting liquid. The pile and the root consolidation portion can be integrated by firmly joining the root consolidation portion and the tip portion of the pile by the double action of the unevenness provided on the tip portion and the window. Therefore, by this, the shearing force of the tip portion of the pile is strengthened and the region where the tip is broken can be restrained, and the punching shear breaking force of the root consolidation portion can be prevented from being generated.

【0011】本発明に係る根固め杭の補強方法の第3発
明の要旨は、前記凹凸が設けられた既製杭の先端部の先
端縁に、別に形成した窓付き鋼管、鉄筋かご等の補強部
材を一体的に取り付けて施工することを特徴とした第1
発明の根固め杭の補強方法である。
The gist of the third invention of the method of reinforcing a pile for consolidation according to the present invention is to reinforce a member such as a steel pipe with a window or a reinforcing bar cage, which is separately formed at the tip edge of the tip of the ready-made pile provided with the unevenness. The first that is characterized by the fact that the
It is a method of reinforcing a rooting pile of the invention.

【0012】前記第3発明に於いては、別に形成した窓
付き鋼管、鉄筋かご等の補強部材を前記凹凸が設けられ
た既製杭の先端部の先端縁に一体的に取り付けて施工し
たので、前記根固め液によって形成された根固め部と、
杭の先端部の凹凸と及び補強部材との2重作用によって
強固に結合させて杭と根固め部とを一体化させることが
出来る。従って、これによって、杭の先端部のせん断力
の増強及び先端破壊する領域を拘束し、根固め部の押し
抜きせん断破壊力が発生することを防止出来る。
In the third aspect of the invention, since the reinforcing member such as a steel pipe with a window and a reinforcing bar cage which is separately formed is integrally attached to the tip edge of the tip portion of the ready-made pile provided with the unevenness, the construction is carried out. A root-hardening portion formed by the root-hardening solution,
By the double action of the unevenness of the tip portion of the pile and the reinforcing member, the pile and the root consolidation portion can be integrated by firmly connecting them. Therefore, by this, it is possible to increase the shearing force at the tip of the pile and restrain the region where the tip breaks, thereby preventing the punching shear breaking force of the root consolidation part from being generated.

【0013】[0013]

【発明の実施の形態】本発明に係る根固め杭の補強方法
の一実施例を図により説明すると、図1は本発明の補強
方法の第1実施例の要部の簡略説明図、図2(a)、
(b)、(c)は夫々、本発明に使用される杭の先端部の一
部切欠縦断面説明図、図3は本発明の第1実施例の作用
効果を説明するための説明図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to the drawings, an embodiment of the method of reinforcing a pile for piling according to the present invention will be described. FIG. 1 is a simplified explanatory view of the essential parts of a first embodiment of the reinforcing method of the present invention. (a),
(b), (c) is a partially cutaway vertical cross-sectional explanatory view of the tip portion of the pile used in the present invention, and FIG. 3 is an explanatory diagram for explaining the function and effect of the first embodiment of the present invention. is there.

【0014】図4(a)、(b)は夫々本発明の第2実施例
の一部切欠縦断面説明図、図5は本発明の第3実施例の
説明図、図6は本発明の第4実施例の説明図、図7は本
発明の第2実施例乃至第4実施例の作用効果を説明する
ための説明図、図8(a)、(b)は本発明の第5実施
例及び第6実施例の説明図である。
4 (a) and 4 (b) are partially cutaway vertical sectional explanatory views of the second embodiment of the present invention, FIG. 5 is an explanatory view of the third embodiment of the present invention, and FIG. 6 is the present invention. Explanatory drawing of 4th Example, FIG. 7 is explanatory drawing for demonstrating the effect of 2nd Example-4th Example of this invention, FIG.8 (a), (b) is 5th Example of this invention. It is explanatory drawing of an example and 6th Example.

【0015】図1に於いて、1は根固め杭の補強構造で
あって、本発明に係る根固め杭の補強方法の第1実施例
を施工することによって構成されている。2は根固め部
であって、地盤に削孔された孔(図示せず)内にセメン
トミルク等の根固め液が充填されて固化したブロックで
ある。
In FIG. 1, reference numeral 1 denotes a reinforcement structure for a soil consolidation pile, which is constructed by applying a first embodiment of the method for reinforcing a soil consolidation pile according to the present invention. Reference numeral 2 denotes a root-hardening portion, which is a block in which a root-hardening liquid such as cement milk is filled and solidified in a hole (not shown) formed in the ground.

【0016】3は既製杭であって、その既製杭3の先端
部3aの外周及び内周には多数の凹凸4が設けられてい
る。この既製杭3の先端部3aは前記根固め部2に挿入
されて一体的に結合されている。5は既製杭3の先端縁
に取り付けられた端板である。
Reference numeral 3 is a ready-made pile, and a large number of irregularities 4 are provided on the outer circumference and the inner circumference of the tip portion 3a of the ready-made pile 3. The tip portion 3a of the ready-made pile 3 is inserted into the root consolidation portion 2 and is integrally connected thereto. Reference numeral 5 denotes an end plate attached to the tip edge of the ready-made pile 3.

【0017】本発明の第1実施例の方法について工程順
に説明すると、第1実施例に於いては、図1に示す如
く、地盤に既製杭3を埋設するための削孔(図示せず)
を所定の外径と深さを持って削孔し、該削孔内にセメン
トミルク等の根固め液を充填する。
The method of the first embodiment of the present invention will be described in order of steps. In the first embodiment, as shown in FIG. 1, a drilling hole (not shown) for burying the ready-made pile 3 in the ground.
Is drilled with a predetermined outer diameter and depth, and a rooting liquid such as cement milk is filled in the drilled holes.

【0018】次に、先端部3aに凹凸4を有する既製杭
3を削孔の中に挿入しながら、その先端部3aを根固め
液内に深く差し込み、この状態で根固め液を固化させて
ブロック状の根固め部2を形成する。
Next, while inserting the ready-made pile 3 having the projections and depressions 4 on the tip portion 3a into the drilling hole, the tip portion 3a is deeply inserted into the rooting solution, and the rooting solution is solidified in this state. A block-shaped root consolidation portion 2 is formed.

【0019】従って、既製杭3の先端部3aの外周及び
内周には夫々凹凸4を設けたので、既製杭3の先端部3
aと根固め部2とは、この凹凸4を介して相互に一体的
に結合させることが出来る。
Therefore, since the unevenness 4 is provided on the outer circumference and the inner circumference of the tip portion 3a of the ready-made pile 3, the tip portion 3 of the ready-made pile 3 is formed.
The a and the root-hardening portion 2 can be integrally connected to each other through the unevenness 4.

【0020】前述の既製杭3は、図2(a)、(b)、(c)
に例示する如く、既製杭3の先端部3aに凹凸4を設け
るに当っては、先端部3aの外周のみに凹凸4を設ける
ことも、或は先端部3aの内周のみに凹凸4を設けるこ
とも、または先端部3aの外周及び内周の両方に凹凸4
を設けることもいずれも可能である。しかし、図1及び
図2(c)に示す如く、先端部3aの外周および内周の両
方に凹凸4を設ける場合がより効果的である。
The above-mentioned ready-made pile 3 is shown in FIGS. 2 (a), 2 (b) and 2 (c).
As illustrated in FIG. 2, when providing the unevenness 4 on the tip 3a of the ready-made pile 3, the unevenness 4 may be provided only on the outer circumference of the tip 3a, or the unevenness 4 may be provided only on the inner circumference of the tip 3a. Also, or unevenness 4 on both the outer and inner circumferences of the tip 3a.
Both can be provided. However, as shown in FIGS. 1 and 2 (c), it is more effective to provide the unevenness 4 on both the outer circumference and the inner circumference of the tip 3a.

【0021】前記第1実施例に於いては、既に説明した
ように、既製杭3の先端部3aに凹凸4を設け、この先
端部3aを根固め部2に挿入して両者を一体的に結合す
るように構成したので、図3に示す如く、既製杭3に地
震等によって図3に示すような外力が加わった場合に
も、既製杭3の先端部3aは凹凸4を介して根固め部2
に強固に結合されているので、既製杭3と根固め部2と
は相互に周面摩擦力を増加させることが出来る。
In the first embodiment, as described above, the unevenness 4 is provided on the tip portion 3a of the ready-made pile 3, and the tip portion 3a is inserted into the root fixing portion 2 to integrally integrate the two. Since it is configured to be coupled, as shown in FIG. 3, even when an external force such as that shown in FIG. 3 is applied to the prefabricated pile 3 due to an earthquake or the like, the tip portion 3a of the prefabricated pile 3 is consolidated through the unevenness 4 Part 2
Since they are firmly connected to each other, the prefabricated pile 3 and the root consolidation portion 2 can mutually increase the peripheral frictional force.

【0022】従って、既製杭3の先端部3aと根固め部
2に伝達する力を低減せしめることが出来、既製杭3の
先端部3aのせん断力の増強及び先端破壊する領域を拘
束し、これによって根固め部2の押し抜きせん断破壊が
発生することを防止出来る。
Therefore, the force transmitted to the tip portion 3a of the ready-made pile 3 and the root consolidation portion 2 can be reduced, the shearing force of the tip portion 3a of the ready-made pile 3 is strengthened, and the area where the tip is destroyed is restricted. As a result, it is possible to prevent the punch-out shear failure of the root consolidation portion 2.

【0023】前記第1実施例に於いては、既製杭3の先
端部3aの外周或は内周に凹凸4を設ける実施例につい
て説明したが、図4(a)、(b)に示す第2実施例に示す
如く、前述の既製杭3の凹凸4を設けた先端部3aの壁
面に、根固め液が流入することが出来る複数の窓6を穿
設して実施することが出来る。この場合には、根固め部
2の一部が窓6の中に挿入されるので、根固め部2と既
製杭3とをより強固に一体的に連絡することが出来る。
In the first embodiment, the embodiment in which the unevenness 4 is provided on the outer circumference or the inner circumference of the tip portion 3a of the prefabricated pile 3 has been described, but it is shown in FIGS. 4 (a) and 4 (b). As shown in the second embodiment, a plurality of windows 6 can be formed in the wall surface of the tip portion 3a provided with the unevenness 4 of the above-mentioned ready-made pile 3 to allow the rooting liquid to flow therein. In this case, since a part of the root consolidation part 2 is inserted into the window 6, the root consolidation part 2 and the ready-made pile 3 can be more firmly and integrally connected.

【0024】前記第2実施例の場合には、既製杭3の先
端部3aに複数の窓6を穿設して施工する場合について
説明したが、図5に示す第3実施例に示す如く、予め複
数の窓6を穿設した鋼管7、8を既製杭3の先端の端板
5に一体的に取り付け固定した鋼管付の既製杭3を用い
て施工することも可能である。前記鋼管7と鋼管8との
違いは、窓6の側縁に打抜片9が設けられているか否か
の点である。打抜片9が設けられた鋼管8の方が、根固
め部2とより強固に結合するので効果的である。
In the case of the second embodiment, the case where the plurality of windows 6 are bored in the tip portion 3a of the prefabricated pile 3 has been described, but as shown in the third embodiment shown in FIG. It is also possible to perform the construction using the ready-made piles 3 with steel pipes in which the steel pipes 7 and 8 in which a plurality of windows 6 are preliminarily drilled are integrally attached and fixed to the end plate 5 at the tip of the ready-made piles 3. The difference between the steel pipe 7 and the steel pipe 8 is whether or not a punching piece 9 is provided on the side edge of the window 6. The steel pipe 8 provided with the punched piece 9 is more effective because it is more firmly connected to the root consolidation portion 2.

【0025】前記第3実施例に於いては、窓6を有する
鋼管7、8を用いる実施例について説明したが、図6
(a)、(b)の第4実施例に示す如く、前記鋼管7、8の
代わりに鉄筋かご10、11を既製杭3の先端の端板5
に一体的に取り付けて固定した鋼管付の既製杭3を用い
て施工することも可能である。
In the third embodiment, the embodiment in which the steel pipes 7 and 8 having the window 6 are used has been described.
As shown in the fourth embodiment of (a) and (b), instead of the steel pipes 7 and 8, rebar cages 10 and 11 are attached to the end plate 5 at the tip of the ready-made pile 3.
It is also possible to carry out construction using the ready-made piles 3 with steel pipes that are integrally attached and fixed to.

【0026】前記鉄筋かご10は一般的な構造である
が、鉄筋かご11は2本の鋼棒11aの周りにスパイラ
ル鉄筋11bを巻き付けて構成したものである。これ等
の鉄筋かご10、11は鉄筋かごの一部のものを例示し
たに過ぎず、この他に種々の構造を持った鉄筋かごも同
様に使用することが出来る。
The rebar cage 10 has a general structure, but the rebar cage 11 is constructed by winding a spiral rebar 11b around two steel rods 11a. These rebar cages 10 and 11 merely exemplify some of the rebar cages, and other rebar cages having various structures can be similarly used.

【0027】前述の図4の第2実施例乃至図6の第4実
施例に示す方法を実施した場合には、図7に例示する如
く、既製杭3の先端部3aに設けた凹凸4の他に、既製
杭3の先端部3aの窓6、或は窓6が設けられた鋼管
7、8、または鉄筋かご10、11が夫々根固め部2の
一部と深く噛合って結合されるので、既製杭3と根固め
部2のせん断力を増強して先端破壊される領域を拘束す
ることが出来、これによって根固め部2の押し抜きせん
断破壊が発生することを防止出来る。
When the method shown in the second embodiment of FIG. 4 to the fourth embodiment of FIG. 6 is carried out, as shown in FIG. 7, the unevenness 4 formed on the tip 3a of the ready-made pile 3 is formed. In addition, the window 6 of the tip portion 3a of the ready-made pile 3 or the steel pipes 7 and 8 provided with the window 6 or the rebar cages 10 and 11 are deeply meshed with a part of the root consolidation portion 2 and are coupled to each other. Therefore, the shearing force between the ready-made pile 3 and the root consolidation portion 2 can be increased to restrain the region where the tip is broken, and thus the punching shear fracture of the root consolidation portion 2 can be prevented.

【0028】従って、既製杭3の先端部と根固め部2の
せん断力を増強して先端破壊される領域を拘束すること
が出来、これによって根固め部2の押し抜きせん断破壊
が発生することを防止出来る。前記実施例の他に、図8
(a)に示す第5実施例の如く、既製杭3の先端部3a
の外周面に1cm程度のリング溝12を複数設けたり、
或は同図(b)の第6実施例に示す如く、該先端部3a
の外周に複数の丸鋼、異形鉄筋を溶接して複数の凸リン
グ13を設けたりして先端部3aの外周に凹凸4を形成
することも可能である。
Therefore, it is possible to enhance the shearing force between the tip portion of the ready-made pile 3 and the root consolidation portion 2 to restrain the region where the tip is broken, and thereby the punching shear fracture of the root consolidation portion 2 occurs. Can be prevented. In addition to the above embodiment, FIG.
As in the fifth embodiment shown in (a), the tip portion 3a of the ready-made pile 3
A plurality of ring grooves 12 of about 1 cm are provided on the outer peripheral surface of
Alternatively, as shown in the sixth embodiment of FIG. 9B, the tip portion 3a is
It is also possible to weld a plurality of round steels and deformed rebars on the outer circumference of the above and form a plurality of convex rings 13 to form the unevenness 4 on the outer circumference of the tip portion 3a.

【0029】[0029]

【発明の効果】本発明に於いては、セメントミルク等の
根固め液内に挿入される既製杭の先端部の外周或は内周
またはその両方に凹凸を設けて施工するので、前記根固
め液によって形成される根固め部と既製杭の先端部とを
前記凹凸の作用によって強固に結合させることが出来る
効果を有する。従ってこれによって杭と根固め部との周
面摩擦力を増加させ、杭先端部の根固め部に伝達する力
を低減せしめ、杭の先端部のせん断力の増強及び先端破
壊する領域を拘束せしめ、根固め部の押し抜きせん断破
壊が発生することを防止出来る効果を有している。
According to the present invention, since unevenness is provided on the outer circumference and / or the inner circumference of the tip portion of the ready-made pile to be inserted into the rooting liquid such as cement milk, the rooting is carried out. There is an effect that the root consolidation portion formed by the liquid and the tip portion of the ready-made pile can be firmly bonded by the action of the unevenness. Therefore, this increases the peripheral frictional force between the pile and the consolidation section, reduces the force transmitted to the consolidation section at the pile tip, strengthens the shearing force at the pile tip, and restrains the area where the tip breaks. It also has the effect of preventing the occurrence of punching shear failure of the root consolidation part.

【0030】また、前記凹凸面が設けられた既製杭の先
端部に根固め液が流入し得る窓を予め穿設して施工した
場合には、前記根固め液によって形成される根固め部と
杭の先端部とを前記先端部に設けた凹凸と及び窓との2
重作用によって強固に結合させて、杭と根固め部とを一
体化させることが出来る効果を有している。従って、こ
れによって杭の先端部のせん断力の増強及び先端破壊す
る領域を拘束し、根固め部の押し抜きせん断破壊力が発
生することを防止出来る等の効果を有している。
In addition, when a window through which rooting solution can flow is previously formed in the tip of the ready-made pile provided with the uneven surface, the rooting section formed by the rooting solution and 2 with unevenness provided on the tip of the pile and the window and
It has an effect that it can be firmly connected by a heavy action to integrate the pile and the root consolidation part. Therefore, this has the effect of increasing the shearing force at the tip of the pile and restricting the region where the tip breaks, thereby preventing the generation of the punching shear breaking force at the root consolidation part.

【0031】さらに、別に形成した窓付き鋼管、鉄筋か
ご等の補強部材を前記凹凸が設けられた既製杭の先端部
の先端縁に一体的に取り付けて施工した場合には、前記
根固め液によって形成された根固め部と、杭の先端部の
凹凸と及び補強部材との2重作用によって強固に結合さ
せて杭と根固め部とを一体化させることが出来る効果を
有している。従って、これによって、杭の先端部のせん
断力の増強及び先端破壊する領域を拘束し、根固め部の
押し抜きせん断破壊力が発生することを防止出来る等の
効果を有している。
Further, when a separately formed reinforcing member such as a steel pipe with a window and a reinforcing bar cage is integrally attached to the tip edge of the tip portion of the ready-made pile provided with the unevenness, and the construction is carried out, the rooting liquid is used. It has an effect that the pile and the root consolidation portion can be integrated by firmly connecting them by the double action of the formed root consolidation portion, the unevenness of the tip of the pile and the reinforcing member. Therefore, this has the effect of increasing the shearing force at the tip of the pile and restricting the region where the tip breaks, thus preventing the generation of the punching shear breaking force at the root consolidation part.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の補強方法の第1実施例の要部の簡略説
明図である。
FIG. 1 is a simplified explanatory view of a main part of a first embodiment of a reinforcing method of the present invention.

【図2】図2(a)、(b)、(c)は夫々、本発明に使用さ
れる杭の先端部の一部切欠縦断面説明図である。
FIG. 2 (a), (b), (c) is a partially cutaway vertical cross-sectional explanatory view of a tip portion of a pile used in the present invention.

【図3】本発明の第1実施例の作用効果を説明するため
の説明図である。
FIG. 3 is an explanatory diagram for explaining a function and effect of the first embodiment of the present invention.

【図4】図4(a)、(b)は夫々本発明の第2実施例の一
部切欠縦断面説明図である。
4 (a) and 4 (b) are partially cutaway vertical cross-sectional explanatory views of a second embodiment of the present invention.

【図5】本発明の第3実施例の説明図である。FIG. 5 is an explanatory diagram of a third embodiment of the present invention.

【図6】本発明の第4実施例の説明図である。FIG. 6 is an explanatory diagram of a fourth embodiment of the present invention.

【図7】本発明の第2実施例乃至第4実施例の作用効果
を説明するための説明図である。
FIG. 7 is an explanatory diagram for explaining the function and effect of the second embodiment to the fourth embodiment of the present invention.

【図8】図8(a)、(b)は本発明の第5実施例或は
第6実施例の要部の説明図である。
8 (a) and 8 (b) are explanatory views of the essential parts of the fifth or sixth embodiment of the present invention.

【図9】従来の根固め杭の破壊状況を示す説明図であ
る。
FIG. 9 is an explanatory diagram showing a breakage state of a conventional rooting pile.

【符号の説明】[Explanation of symbols]

1 …根固め杭の補強構造 2 …根固め部 3 …既製杭 3a …先端部 4 …凹凸 5 …端板 6 …窓 7 …鋼管 8 …鋼管 9 …打抜片 10 …鉄筋かご 11 …鉄筋かご 11a…鋼棒 11b…スパイラル鉄筋 12 …リング溝 13 …凸リング 51 …根固め液 52 …既製杭 53 …根固め構造 1… Reinforcement structure of root pile 2… Rooting part 3… Ready-made pile 3a ... Tip 4 ... unevenness 5 ... End plate 6 ... window 7… Steel pipe 8… Steel pipe 9 ... Punched piece 10 ... Reinforcing cage 11 ... Rebar cage 11a ... steel rod 11b ... spiral rebar 12… Ring groove 13 ... Convex ring 51 ... root fixative 52… Ready-made pile 53 ... Root consolidation structure

───────────────────────────────────────────────────── フロントページの続き (72)発明者 西本 憲正 愛知県名古屋市東区葵三丁目24番2号 ヨ ーコン株式会社内 Fターム(参考) 2D041 AA03 BA13 CA03 CB06 DA01 DB02 DB03 EB07 EB08 EB10 FA04    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Kensei Nishimoto             3-24 Aoi 3-chome, Higashi-ku, Nagoya-shi, Aichi             -Con Co., Ltd. F-term (reference) 2D041 AA03 BA13 CA03 CB06 DA01                       DB02 DB03 EB07 EB08 EB10                       FA04

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地盤に削孔された孔内にセメントミルク
等の根固め液を充填させた後で既製杭を挿入して支持基
盤を形成させて根固め杭を施工する方法に於いて、該根
固め液内に挿入される既製杭の先端部の外周或は内周ま
たはその両方に予め凹凸を設けて施工することを特徴と
した根固め杭の補強方法。
1. A method for constructing a rooting pile by forming a support base by inserting a ready-made pile after filling a rooting liquid such as cement milk into the hole drilled in the ground. A method for reinforcing a root-mounting pile, characterized in that unevenness is provided in advance on the outer circumference and / or the inner circumference of the tip of a ready-made pile to be inserted into the root-hardening liquid.
【請求項2】 前記凹凸が設けられた既製杭の先端部に
根固め液が流入し得る窓を予め穿設して施工することを
特徴とした請求項1の根固め杭の補強方法。
2. The method of reinforcing a peg as claimed in claim 1, wherein a window through which a puddle can flow is pre-drilled at the tip of the ready-made pile provided with the unevenness.
【請求項3】 前記凹凸が設けられた既製杭の先端部の
先端縁に、別に形成した窓付き鋼管、鉄筋かご等の補強
部材を一体的に取り付けて施工することを特徴とした請
求項1の根固め杭の補強方法。
3. The reinforcing member such as a steel pipe with a window or a reinforcing bar cage, which is separately formed, is integrally attached to the tip edge of the tip portion of the ready-made pile provided with the unevenness for construction. Reinforcement method for soil consolidation piles.
JP2001322039A 2001-10-19 2001-10-19 Method of reinforcing of foot protection pile Pending JP2003129471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001322039A JP2003129471A (en) 2001-10-19 2001-10-19 Method of reinforcing of foot protection pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001322039A JP2003129471A (en) 2001-10-19 2001-10-19 Method of reinforcing of foot protection pile

Publications (1)

Publication Number Publication Date
JP2003129471A true JP2003129471A (en) 2003-05-08

Family

ID=19139152

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001322039A Pending JP2003129471A (en) 2001-10-19 2001-10-19 Method of reinforcing of foot protection pile

Country Status (1)

Country Link
JP (1) JP2003129471A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002561A (en) * 2003-06-09 2005-01-06 Chowa Kogyo Kk Hybrid cell and construction method therefor
JP2006200190A (en) * 2005-01-19 2006-08-03 Nippon Concrete Ind Co Ltd Pile for inner excavating and foot protecting construction method
JPWO2011136350A1 (en) * 2010-04-30 2013-07-22 新日鐵住金株式会社 Planar body support frame and solar power generation device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002561A (en) * 2003-06-09 2005-01-06 Chowa Kogyo Kk Hybrid cell and construction method therefor
JP2006200190A (en) * 2005-01-19 2006-08-03 Nippon Concrete Ind Co Ltd Pile for inner excavating and foot protecting construction method
JP4596930B2 (en) * 2005-01-19 2010-12-15 日本コンクリート工業株式会社 Pile for medium digging
JPWO2011136350A1 (en) * 2010-04-30 2013-07-22 新日鐵住金株式会社 Planar body support frame and solar power generation device

Similar Documents

Publication Publication Date Title
JP4010383B2 (en) Pile method
JP5133103B2 (en) Pile head joint connecting material and pile head joint structure using the same
KR101644498B1 (en) Micropile reinforcement structure and Reinforcing method of foot concrete using it
JP5358423B2 (en) Column and pile connection structure
JP2009007745A (en) Axial-force transmission structure for permanent sub-substructural column and foundation pile, and construction method for permanent sub-substructural column
JP6650257B2 (en) Mountain retaining structure and construction method thereof
JP5919675B2 (en) Composite foundation pile and construction method of composite foundation pile
JP4771244B2 (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
KR20120102480A (en) Phc pile with improved end bearing capacity and piling method of phc pile using the same
JP2007077639A (en) Prefabricated pile and foundation pile structure
JP2003129471A (en) Method of reinforcing of foot protection pile
JP6172501B2 (en) Seismic reinforcement structure and seismic reinforcement method
JP2006016893A (en) Shearing reinforcing method of existing structure
JP2004285698A (en) Deformed precast pile
JP5512600B2 (en) Retaining wall extension method and retaining wall structure
JPH11100841A (en) Steel pipe pile
KR101791211B1 (en) Helix steel pipe pile construction method for reinforcement of buckling
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
JP4877252B2 (en) Wall pile structure, construction method of wall pile structure
JP3899307B2 (en) Cast-in-place concrete filled steel pipe pile and method for constructing cast-in-place concrete filled steel pipe pile
JP2007051500A (en) Joint structure of column and pile
JP3887248B2 (en) Support structure for concrete foundation
JP5659275B2 (en) Column and pile connection structure
JP2007051485A (en) Structure and method for joining foundation of structure and sheet pile together
JP6233753B2 (en) Pile head structure and construction method of pile head structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040803

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060822

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060912

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070313

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070724