Method for filling sleeper into blast furnace and hanging tool for sleeper

Info

Publication number
JP2003049209A
JP2003049209A JP2001237215A JP2001237215A JP2003049209A JP 2003049209 A JP2003049209 A JP 2003049209A JP 2001237215 A JP2001237215 A JP 2001237215A JP 2001237215 A JP2001237215 A JP 2001237215A JP 2003049209 A JP2003049209 A JP 2003049209A
Authority
JP
Japan
Prior art keywords
sleeper
rope
sleepers
filling
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001237215A
Other languages
Japanese (ja)
Other versions
JP4744030B2 (en
Inventor
Hiroshi Ookusu
洋 大楠
Shigeru Kotani
茂 小谷
Kenichi Fujinaga
謙一 藤永
Yasunobu Hoshino
靖信 星野
Kunio Mukai
邦雄 向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Nisshin Co Ltd
Sankyu Inc
Original Assignee
Sankyu Inc
Nisshin Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sankyu Inc, Nisshin Steel Co Ltd filed Critical Sankyu Inc
Priority to JP2001237215A priority Critical patent/JP4744030B2/en
Publication of JP2003049209A publication Critical patent/JP2003049209A/en
Application granted granted Critical
Publication of JP4744030B2 publication Critical patent/JP4744030B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for filling sleepers by which the filling work of the sleeper performed for preparing of an initial firing in a newly constructed or reconstructed blast furnace, is done with few workers and with reduced labor. SOLUTION: A wire rope 3 is hung down from a manhole for initial firing at the furnace top part in the blast furnace and a power hoist 5 is fitted to the lower end thereof. A wire rope 8 is hung from a hook 6 for hanging down of the power hoist 5, and hanging tool 9 fitted to both ends of the wire rope 8, are detachably attached to the sleeper 13. Further, the sleeper 13 hung up with the power hoist 5 is transported to a prescribed position by drawing a guiding rope 7 connected to the hook 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明が属する技術分野】本発明は、新設し或いは改修
した高炉の火入れ準備のために行われる枕木の填充方法
と、該方法で用いる枕木の吊り具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sleeper filling method performed in preparation for firing of a newly installed or refurbished blast furnace, and a sleeper suspender used in the method.

【0002】[0002]

【従来技術】新設し或いは改修した高炉は、乾燥後、火
入れ準備のため炉底から羽口レベルまで枕木が積み重ね
られ、その上からコークスが充填され、更にその上から
コークスと鉱石が交互に充填される。枕木を充填するの
は、炉底部の早期昇温のためガスの通りをよくするため
と、降下する銑滓に対して熱容量の大きな低温のコーク
スがないようにするためである。
2. Description of the Related Art In a newly installed or renovated blast furnace, after drying, sleepers are piled from the furnace bottom to the tuyere level in preparation for firing, and coke is filled from above, and coke and ore are alternately filled from above. To be done. The sleepers are filled in order to improve the gas flow for the early heating of the bottom of the furnace and to prevent low-temperature coke having a large heat capacity from the falling slag.

【0003】枕木の充填は従来、高炉羽口の開口部から
枕木を数本ないし数10本単位で投げ込み、その間、炉
内の安全な場所に退避していた作業者が投げ込まれた
枕木を人力で所定箇所まで運んで高炉炉底から羽口直
下まで一段一段規則正しく積み上げていく「井桁積み」
と呼ばれる方法により行っていた。
[0003] Filling of the sleepers conventionally, throw in several to several ten units sleepers from the opening of the blast furnace tuyeres, while the long workers have been saved in a secure location in the furnace was thrown
The stomach sleepers will carry is piled up one step by one step from the blast furnace bottom to just below the tuyere regularly to a predetermined place in the human power "curb loading"
It was done by the method called.

【0004】[0004]

【発明が解決しようとする課題】上述する従来の枕木の
積み上げ方法は、多くの作業者と時間を必要とする。本
発明は、上述する枕木の填充作業が少人数で効率よく短
時間で行えるような方法と、該方法で用いる枕木の吊り
具を提供することを目的とする。
The above-mentioned conventional method of stacking sleepers requires a lot of workers and time. An object of the present invention is to provide a method by which the above-mentioned sleeper filling work can be efficiently performed in a short time by a small number of people, and a sleeper hanging tool used in the method.

【0005】[0005]

【課題の解決手段】請求項1に係わる発明は、新設し、
或いは改修した高炉の火入れ準備のために行われる枕木
の填充方法であって、下端にチェーンブロック、ホイス
ト等の巻上装置を取付けたワイヤー、ロープ、チェーン
等の索条を炉頂部ないしその近傍から垂下させる。そし
て巻上装置の吊り上げ用フックに上記索条とは別のワイ
ヤー、ロープ、チェーン等の索条を掛け、この索条端に
取付けた吊り治具を枕木に着脱可能に取着する。その
後、巻上装置を操作して枕木を吊り上げ、上記索条、巻
上装置、吊り上げ用フック或いは吊り治具の任意の箇所
に連結した案内ワイヤー、ロープ、チェーン等の案内索
条を所要の向きに牽引して吊り上げた枕木を所要の箇所
まで運ぶことを特徴とする。
The invention according to claim 1 is newly established,
Alternatively, it is a method of filling sleepers that is carried out in preparation for the burning of a modified blast furnace, where wires such as chain blocks and hoists at the lower end, ropes, and ropes such as chains are attached from the furnace top or its vicinity. Let it hang. Then, a wire such as a wire, rope or chain other than the above-mentioned rope is hung on the lifting hook of the hoisting device, and the hanging jig attached to the end of the rope is detachably attached to the sleeper. After that, the hoisting device is operated to hoist the sleeper, and the guide wire such as the guide wire, rope, or chain connected to the rope, the hoisting device, the hoisting hook, or any position of the hoisting jig is guided in the desired direction. The feature is that the sleepers that are pulled to and lifted up are carried to the required places.

【0006】本発明によると、巻上装置を操作して枕木
を吊り上げ、案内索条を所要の向きに牽引することによ
り少人数の作業者でも炉内の枕木填充作業を行うことが
でき、しかもその作業を従来に比べ、軽作業で能率よく
行うことができる。
According to the present invention, a sleeper can be filled in the furnace by a small number of workers by operating the hoisting device to suspend the sleeper and pull the guide rope in the required direction. The work can be performed lighter and more efficiently than in the past.

【0007】請求項2に係わる発明は、請求項1に係わ
る発明方法で用いる吊り治具に関するもので、枕木に端
面から或いは側面から嵌合するコ形断面の治具本体と、
該本体に中間部が軸支されてこの支軸点を中心にして旋
回可能であり、一端に枕木に係止する爪部を有し、他端
が索条に連結されるレバーとよりなることを特徴とす
る。
The invention according to claim 2 relates to a hanging jig used in the method according to claim 1, wherein the jig main body has a U-shaped cross section and is fitted to the sleeper from an end face or a side face.
An intermediate portion is pivotally supported by the main body and is rotatable around this pivot point, and has a claw portion which is engaged with a sleeper at one end and a lever which is connected to the rope at the other end. Is characterized by.

【0008】本発明によると、治具本体を枕木に嵌合さ
せて吊り上げると、レバー他端が索条で引張り上げられ
るレバーは旋回して一端の爪部が枕木に食い込み固定さ
れる。これにより、枕木は例え傾いた状態で吊り上げら
れても捩じれたり、ずれたりすることなく運ばれる。
According to the present invention, when the jig body is fitted to the sleeper and lifted up, the lever, the other end of which is pulled up by the rope, pivots and the claw portion at one end bites into the sleeper and is fixed. As a result, the sleeper can be carried without being twisted or displaced even if it is lifted in an inclined state.

【0009】[0009]

【発明の実施の形態】新設し或いは改修した高炉を乾燥
後、火入れ準備のため炉底に枕木を積み重ねる本発明方
法で用いる装置の一態様を以下図面により説明する。図
1に示す高炉1において、炉頂部近傍のマンホール、例
えば左右の点火マンホール2からそれぞれ索条としての
ワイヤーロープ3を垂下する。各ワイヤーロープ3には
それぞれ下端に巻上装置としての電動ホイスト5が取付
けてあり、電動ホイスト5は羽口4レベルの数m上に位
置させている。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of an apparatus used in the method of the present invention for stacking sleepers on the bottom of a furnace for preparing for burning after drying a newly installed or refurbished blast furnace will be described below with reference to the drawings. In the blast furnace 1 shown in FIG. 1, a wire rope 3 as a cord is hung from a manhole near the furnace top, for example, left and right ignition manholes 2. An electric hoist 5 as a hoisting device is attached to the lower end of each wire rope 3, and the electric hoist 5 is positioned a few meters above the tuyere 4 level.

【0010】電動ホイスト5より吊り下げられ、コント
ローラ(図示しない)の操作により昇降する吊り下げ用
のフック6は炉底まで降下可能で、案内索条としての案
内ロープ7が連結され、案内ロープ7を牽引することに
よりフック6を任意の方向に移動させることができるよ
うになっている。
A hanging hook 6 which is suspended from an electric hoist 5 and which is lifted and lowered by the operation of a controller (not shown) can be lowered to the furnace bottom. A guide rope 7 serving as a guide rope is connected to the hook 6 to guide the rope. The hook 6 can be moved in any direction by towing.

【0011】図2に示すように中間部をフック6に引掛
ける索条のワイヤーロープ8は、両端に吊り治具9を取
付けている。この吊り治具9は図4に示されるように、
コ形断面の治具本体11と、治具本体11に中間部が軸
支されてこの支軸点16を中心にして旋回可能であり、
一端に治具本体11に形成されるスリット12を通して
枕木13に掛止する爪部14を有し、他端が上記ワイヤ
ーロープ8に連結されるレバー15よりなり、治具本体
11を枕木13に嵌合させた状態でワイヤーロープ8を
引き上げると、レバー15が図4の一点鎖線位置より時
計方向に旋回し、爪部14が枕木13に食い込んで枕木
13を固定する作用を行う。
As shown in FIG. 2, the wire rope 8 of the rope for hooking the intermediate portion on the hook 6 has the hanging jigs 9 attached to both ends. This hanging jig 9 is, as shown in FIG.
The jig main body 11 having a U-shaped cross section, and the intermediate portion is pivotally supported by the jig main body 11 so that the jig main body 11 can swivel around the pivot point 16.
The one end has a claw portion 14 that is hooked on the sleeper 13 through the slit 12 formed in the jig body 11, and the other end includes a lever 15 connected to the wire rope 8. When the wire rope 8 is pulled up in the fitted state, the lever 15 pivots clockwise from the position indicated by the alternate long and short dash line in FIG. 4, and the claw portion 14 bites into the sleeper 13 to fix the sleeper 13.

【0012】図3は、ワイヤーロープが掛けられるフッ
クの別の例を示すもので、ワイヤーロープ17端にはフ
ック19に掛けられる吊り輪18が形成され、フック1
9には根元付近に吊り輪18抜け止め用のストッパー2
0が開閉可能に取付けられている。このストッパー20
は図示しないバネにより常には閉じて吊り輪18の抜け
止めを行い、吊り輪18を押込むと、バネの作用に抗し
て押し下げられ、開口するようになっている。
FIG. 3 shows another example of a hook on which the wire rope can be hung. At the end of the wire rope 17, a hanging ring 18 to be hung on the hook 19 is formed.
9 has a stopper 2 near the base to prevent the suspension ring 18 from coming off.
0 is mounted so that it can be opened and closed. This stopper 20
The suspension ring 18 is always closed by a spring (not shown) to prevent the suspension ring 18 from coming off, and when the suspension ring 18 is pushed in, the suspension ring 18 is pushed down against the action of the spring and opened.

【0013】次に高炉炉底への枕木の填充方法について
説明する。先ず、高炉内の作業者を安全な場所に避難さ
せたのち、羽口4から枕木を数本ないし数10本単位で
炉底部に投げ込む。投げ込み後、作業者は上記コントロ
ーラの操作により電動ホイスト5から吊り下げ用のフッ
ク6或いは19を降ろす。フック6或いは19を降ろす
のに前後してワイヤーロープ8両端の吊り治具9の治具
本体11を炉内に投げ込まれた枕木13に対し、その両
側端部にそれぞれ嵌合掛止させる。ついで案内ロープ7
を手繰り寄せてワイヤーロープ8の中間部を吊り下げ用
のフック6或いはワイヤーロープ17端の吊り輪18
をフック19に引掛ける。その後、片手で案内ロープ7
を掴み、別の片手でコントローラを操作してフック6或
いは19を上昇させ、枕木13を吊り上げる。そして案
内ロープを牽引して目的の箇所まで枕木を運び、枕木1
3の向きを所定の方向に向けて降ろす。
Next, a method for filling the sleepers on the bottom of the blast furnace will be described. First, the worker inside the blast furnace is evacuated to a safe place, and then several to several tens of sleepers are thrown from the tuyere 4 to the bottom of the furnace. After throwing, the operator lowers the hanging hook 6 or 19 from the electric hoist 5 by operating the controller. Before and after the hook 6 or 19 is unloaded, the jig main bodies 11 of the hanging jigs 9 at both ends of the wire rope 8 are fitted and locked to the sleepers 13 thrown into the furnace at both ends thereof. Then guide rope 7
The the drag hanging of the intermediate portion of the suspension hook 6 or wire rope 17 ends for wire rope 8 wheels 18
Is hooked on the hook 19. After that, guide rope 7 with one hand
Grasp and operate the controller with another hand to raise the hook 6 or 19 and suspend the sleeper 13. Then, pull the guide rope to carry the sleepers to the desired location, and sleepers 1
Lower the direction of 3 toward the specified direction.

【0014】以上のようにして、枕木の積み重ねが行わ
れ、炉内の枕木の積み重ねが終わると、新たな枕木が作
業者を退避させた状態で同様にして投げ込まれる。以
後、同様にして枕木の積み重ねが行われ炉内への填充が
行われる。
As described above, the sleepers are stacked and when the sleepers in the furnace are finished, a new sleeper is similarly thrown in a state where the worker is evacuated. After that, sleepers are stacked and filled in the furnace in the same manner.

【0015】別の方法では、図5に示すように炉内に羽
口に達する高さの張り出しデッキ21を仮設し、ローラ
コンベア22を羽口4に通してデッキ21に設置する。
枕木の搬送は、ローラコンベア22により羽口4を通し
て炉内に水平搬送し、デッキ21上の作業者が吊り治具
9を枕木13の各側端部に嵌合掛止させる。ついで電動
ホイスト5のコントローラ23を操作して枕木13を吊
り上げ、炉底まで降ろす。この間、炉底に配置される別
の作業者が案内ロープ7を牽引して吊り降ろされる枕木
13を所定の箇所まで運び、所定の向きにして枕木を積
み重ねる誘導作業を行い、積み重ね後、枕木から吊り治
具9を取外す。以後同様な作業が繰り返される。
In another method, as shown in FIG. 5, an overhanging deck 21 having a height reaching the tuyere is temporarily installed in the furnace, and a roller conveyor 22 is passed through the tuyere 4 and installed on the deck 21.
The sleepers are conveyed horizontally through the tuyere 4 by the roller conveyor 22 into the furnace, and the worker on the deck 21 fits and suspends the hanging jigs 9 on the respective side ends of the sleepers 13. Then, the controller 23 of the electric hoist 5 is operated to lift the sleeper 13 and lower it to the bottom of the furnace. During this time, another worker who is placed on the bottom of the furnace carries the sleeper 13 that is pulled down by pulling the guide rope 7 to a predetermined position, performs a guiding operation to stack the sleepers in a predetermined direction, and after stacking the sleepers, Remove the hanging jig 9. After that, the same work is repeated.

【0016】[0016]

【発明の効果】請求項1に係わる発明によると、案内索
条を牽引しながら巻上装置を操作することにより、少人
数の作業者でも炉内の枕木填充作業が行えること、作業
者は人力で枕木を運ぶ必要がなくなり、枕木填充作業の
労力が軽減され、枕木の填充が短時間で能率よく行うこ
とができること等の効果を奏する。
According to the invention of claim 1, even a small number of workers can fill the sleepers in the furnace by operating the hoisting device while pulling the guide rope. Since it is not necessary to carry the sleepers, the labor of the work of filling the sleepers is reduced, and the effects of filling the sleepers efficiently in a short time can be achieved.

【0017】請求項2に係わる発明の吊り治具による
と、枕木を吊り上げたとき、レバーの爪部が枕木に食い
込むようになるため、枕木がしっかりと固定され、搬送
時にずり落ちることなく確実に搬送することができる。
According to the hoisting jig of the invention of claim 2, when the sleeper is lifted, the claw portion of the lever comes to bite into the sleeper, so that the sleeper is firmly fixed and is reliably transported without slipping during transportation. can do.

【図面の簡単な説明】[Brief description of drawings]

【図1】炉頂部から電動ホイストを吊り下げた高炉の概
略断面図。
FIG. 1 is a schematic cross-sectional view of a blast furnace in which an electric hoist is suspended from the furnace top.

【図2】電動ホイストで枕木を吊り上げた状態を示す
図。
FIG. 2 is a diagram showing a state where the sleepers are lifted by an electric hoist.

【図3】ワイヤーロープ端の吊り輪が掛けられるフック
の別の態様を示す図。
FIG. 3 is a view showing another mode of the hook on which the suspension ring at the end of the wire rope is hung.

【図4】吊り治具の断面図。FIG. 4 is a sectional view of a hanging jig.

【図5】枕木填充の別の方法で用いられる装置の斜視
図。
FIG. 5 is a perspective view of an apparatus used in another method of filling sleepers.

【符号の説明】[Explanation of symbols]

1・・高炉 2・・点火マンホール 3、8、17・・ワイヤーロープ 4・・羽口 5・・電動ホイスト 6、19・・フック 7・・案内ロープ 9・・吊り治具 12・・スリット 13・・枕木 14・・爪部 15・・レバー 16・・支軸点 18・・吊り輪 21・・張り出しデッキ 22・・ローラコンベア 23・・コントローラ 1. Blast furnace 2. Ignition manhole 3, 8, 17 ... Wire rope 4 ... 5. Electric hoist 6, 19, ... Hooks 7 ... Guide rope 9 ... Hanging jig 12 ... Slit 13 ... Sleepers 14 ... Claws 15 ... Lever 16 ... Support point 18 ... 21 ... Overhang deck 22 .. Roller conveyor 23 ... Controller

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小谷 茂 広島県呉市昭和町11番1号 日新製鋼株式 会社呉製鉄所内 (72)発明者 藤永 謙一 北九州市小倉北区中井2−14−22−301 (72)発明者 星野 靖信 広島県賀茂郡黒瀬町大字楢原568−80 (72)発明者 向 邦雄 広島県安芸郡音戸町波多見10−15−34 Fターム(参考) 3F004 AA06 AB11 AD01 EA40 LA07   ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Shigeru Otani             11-1 Showa-cho, Kure-shi, Hiroshima Nisshin Steel Co., Ltd.             Company Kure Steel Works (72) Inventor Kenichi Fujinaga             2-14-22-301 Nakai, Kokurakita-ku, Kitakyushu (72) Inventor Yasunobu Hoshino             568-80 Narahara, Kurose Town, Kamo District, Hiroshima Prefecture (72) Inventor Kunio Mukai             10-15-34 Hatami, Onto-cho, Aki-gun, Hiroshima Prefecture F term (reference) 3F004 AA06 AB11 AD01 EA40 LA07

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】新設し、或いは改修した高炉の火入れ準備
のために行われる枕木の填充方法であって、炉頂部ない
しその近傍からワイヤー、ロープ、チェーン等の索条を
垂下させ、その下端にチェーンブロック、ホイスト等の
巻上装置を取付け、該巻上装置の吊り上げ用フックに掛
けた上記索条とは別のワイヤー、ロープ、チェーン等の
索条端に取付けた吊り治具を枕木に着脱可能に取着した
のち、巻上装置を操作して枕木を吊り上げ、上記索条、
巻上装置、吊り上げ用フック或いは吊り治具の任意の箇
所に連結した案内ワイヤー、ロープ、チェーン等の案内
索条を所要の向きに牽引して吊り上げた上記枕木を所要
の箇所まで運ぶことを特徴とする高炉への枕木の填充方
法。
Claims: 1. A method of filling a sleeper, which is carried out in preparation for the burning of a newly installed or modified blast furnace, in which a rope such as a wire, rope or chain is hung from the furnace top or in the vicinity thereof and the lower end thereof is suspended. Attach a hoisting device such as a chain block or hoist, and attach / detach the hanging jig attached to the end of the rope, such as a wire, rope, chain, etc., other than the above-mentioned rope hooked on the hoisting hook of the hoisting device After attaching as much as possible, operate the hoisting device to hang the sleepers,
Characterized by carrying the above sleepers by pulling a guide wire such as a guide wire, rope, chain, etc. connected to an arbitrary position of a hoisting device, a lifting hook or a hanging jig in a desired direction to the desired position. A method of filling sleepers into the blast furnace.
【請求項2】請求項1記載の填充方法で用いる吊り具で
あって、枕木に端面から或いは側面から嵌合するコ形断
面の治具本体と、該本体に中間部が軸支されてこの支軸
点を中心にして旋回可能であり、一端に枕木に係止する
爪部を有し、他端が索条に連結されるレバーとよりなる
ことを特徴とする吊り具。
2. A hanger used in the filling method according to claim 1, wherein a jig main body having a U-shaped cross section fitted to the sleeper from an end surface or a side surface, and an intermediate portion pivotally supported by the main body. A suspender which is rotatable about a pivot point, has a claw portion which is engaged with a sleeper at one end, and is a lever which is connected to a rope at the other end.
JP2001237215A 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace Expired - Fee Related JP4744030B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001237215A JP4744030B2 (en) 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001237215A JP4744030B2 (en) 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace

Publications (2)

Publication Number Publication Date
JP2003049209A true JP2003049209A (en) 2003-02-21
JP4744030B2 JP4744030B2 (en) 2011-08-10

Family

ID=19068334

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001237215A Expired - Fee Related JP4744030B2 (en) 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace

Country Status (1)

Country Link
JP (1) JP4744030B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017098749A1 (en) * 2015-12-08 2017-06-15 三菱重工コンプレッサ株式会社 Rotor tool
WO2019001870A1 (en) 2017-06-28 2019-01-03 Paul Wurth S.A. Device for mounting and/or dismantling staves in a shaft furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0540281U (en) * 1991-10-31 1993-05-28 ミサワホーム株式会社 Hanging equipment
JPH0551877U (en) * 1991-12-17 1993-07-09 川鉄鉄構工業株式会社 Auxiliary tool for slinging a suspended object having a plate-shaped end
JPH10194658A (en) * 1997-01-07 1998-07-28 Shigeru Fukazawa Hanging clamp

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0540281U (en) * 1991-10-31 1993-05-28 ミサワホーム株式会社 Hanging equipment
JPH0551877U (en) * 1991-12-17 1993-07-09 川鉄鉄構工業株式会社 Auxiliary tool for slinging a suspended object having a plate-shaped end
JPH10194658A (en) * 1997-01-07 1998-07-28 Shigeru Fukazawa Hanging clamp

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017098749A1 (en) * 2015-12-08 2017-06-15 三菱重工コンプレッサ株式会社 Rotor tool
WO2019001870A1 (en) 2017-06-28 2019-01-03 Paul Wurth S.A. Device for mounting and/or dismantling staves in a shaft furnace
LU100328B1 (en) * 2017-06-28 2019-01-08 Wurth Paul Sa Device for mounting and/or dismantling staves in a shaft furnace
US11268764B2 (en) 2017-06-28 2022-03-08 Paul Wurth S.A. Device for mounting and/or dismantling staves in a shaft furnace

Also Published As

Publication number Publication date
JP4744030B2 (en) 2011-08-10

Similar Documents

Publication Publication Date Title
US5480201A (en) Safety pipe handler
CN101830388B (en) Installation method of counter-weight frame of elevator
JP2003049209A (en) Method for filling sleeper into blast furnace and hanging tool for sleeper
CN110065884A (en) A kind of pile press machine hello stake hanging method and lifting device
CN2923220Y (en) Mechanical grip
CN206088741U (en) Hoist of safe handling converter sublance
CN106348152B (en) A kind of suspender and handling method of safety jaw fortune revolving furnace sublance
US2263857A (en) Handling apparatus
CN211034878U (en) External holding type hoisting tool
JP4805054B2 (en) Hamaglab and its crown device
CN206645746U (en) A kind of quick pulling off device of sintering pallet
CN207046671U (en) A kind of suspender for safely and efficiently loading and unloading high line
US3219216A (en) Apparatus for handling sheets
JP2842780B2 (en) Cylindrical heavy lifting equipment
CN110654973A (en) Automatic unhooking hanger
CA1151144A (en) Pipe handling method and apparatus
CN107188023A (en) Nacelle device
CN211141295U (en) Simple hoisting clamp for broken electrode in electric arc furnace
SU1079856A1 (en) Method of running loads into mines through vertical shaft with hoists of the balancing rope type
CN211078182U (en) Automatic unhooking hanger
CN208413626U (en) A kind of transition apparatus that clamshell crane grab bucket is connect with wirerope
JP3341871B2 (en) Crop bucket hanging device retaining mechanism and method
JPS6038160Y2 (en) Furnace lid mounting device
JP4027628B2 (en) Kibble replacement method in shaft excavation
CN207046658U (en) A kind of vertical coal bunker handling and grouting device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080707

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101221

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110221

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110510

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110510

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140520

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4744030

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees