JP4744030B2 - A sleeper hanging jig filled in the blast furnace - Google Patents

A sleeper hanging jig filled in the blast furnace Download PDF

Info

Publication number
JP4744030B2
JP4744030B2 JP2001237215A JP2001237215A JP4744030B2 JP 4744030 B2 JP4744030 B2 JP 4744030B2 JP 2001237215 A JP2001237215 A JP 2001237215A JP 2001237215 A JP2001237215 A JP 2001237215A JP 4744030 B2 JP4744030 B2 JP 4744030B2
Authority
JP
Japan
Prior art keywords
sleepers
sleeper
rope
jig
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001237215A
Other languages
Japanese (ja)
Other versions
JP2003049209A (en
Inventor
洋 大楠
茂 小谷
謙一 藤永
靖信 星野
邦雄 向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Nisshin Co Ltd
Original Assignee
Nippon Steel Nisshin Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Nisshin Co Ltd filed Critical Nippon Steel Nisshin Co Ltd
Priority to JP2001237215A priority Critical patent/JP4744030B2/en
Publication of JP2003049209A publication Critical patent/JP2003049209A/en
Application granted granted Critical
Publication of JP4744030B2 publication Critical patent/JP4744030B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

【0001】
【発明が属する技術分野】
本発明は、新設し或いは改修した高炉の火入れ準備のために行われる枕木の填充方法で用いる枕木の吊り具に関する。
【0002】
【従来技術】
新設し或いは改修した高炉は、乾燥後、火入れ準備のため炉底から羽口レベルまで枕木が積み重ねられ、その上からコークスが充填され、更にその上からコークスと鉱石が交互に充填される。枕木を充填するのは、炉底部の早期昇温のためガスの通りをよくするためと、降下する銑滓に対して熱容量の大きな低温のコークスがないようにするためである。
【0003】
枕木の充填は従来、高炉羽口の開口部から枕木を数本ないし数10本単位で投げ込み、その間、炉内の安全な場所に退避していた作業者が投げ込まれた長い枕木を人力で所定箇所まで運んで高炉炉底から羽口直下まで一段一段規則正しく積み上げていく「井桁積み」と呼ばれる方法により行っていた。
【0004】
【発明が解決しようとする課題】
上述する従来の枕木の積み上げ方法は、多くの作業者と時間を必要とする。
本発明は、上述する枕木の填充作業が少人数で効率よく短時間で行えるような方法と、該方法で用いる枕木の吊り具を提供することを目的とする。
【0005】
【課題の解決手段】
請求項1に係わる発明は、新設し、或いは改修した高炉の火入れ準備のため、炉頂部ないしその近傍から垂下されるワイヤー、ロープ、チェーン等の索条の下端に取付けたチェーンブロック、ホイスト等の巻上装置の吊り上げ用フックに掛けた上記索条とは別のワイヤー、ロープ、チェーン等の索条端に取付けた吊り治具を枕木に着脱可能に取着したのち、前記巻上装置を操作して枕木を吊り上げ、上記索条、巻上装置、吊り上げ用フック或いは吊り治具の任意の箇所に連結した案内ワイヤー、ロープ、チェーン等の案内索条を所要の向きに牽引して吊り上げた上記枕木を所要の箇所まで運ぶことよりなる、高炉への枕木の充填方法で用いられる前記吊り治具であって、枕木に端面から或いは側面から嵌合するコ形断面の治具本体と、該本体に中間部が軸支されてこの支軸点を中心にして旋回可能であり、一端に枕木に係止する爪部を有し、他端が前記吊り上げ用フックに掛けた索条に連結されるレバーとよりなることを特徴とする。
【0006】
本発明における炉内の枕木充填作業は、巻上装置を操作して枕木を吊り上げ、案内索条を所要の向きに牽引することにより行われ、枕木の吊り下げは、治具本体を枕木に端面から或いは側面から嵌合させて吊り上げることにより、レバー他端が索条で引張り上げられるレバーが旋回して一端の爪部が枕木に食い込み固定されるため、枕木が例え傾いた状態で吊り上げられても捩じれたり、ずれたりすることなく運ばれる。
【0009】
【発明の実施の形態】
新設し或いは改修した高炉を乾燥後、火入れ準備のため炉底に枕木を積み重ねる本発明方法で用いる装置の一態様を以下図面により説明する。
図1に示す高炉1において、炉頂部近傍のマンホール、例えば左右の点火マンホール2からそれぞれ索条としてのワイヤーロープ3を垂下する。各ワイヤーロープ3にはそれぞれ下端に巻上装置としての電動ホイスト5が取付けてあり、電動ホイスト5は羽口4レベルの数m上に位置させている。
【0010】
電動ホイスト5より吊り下げられ、コントローラ(図示しない)の操作により昇降する吊り下げ用のフック6は炉底まで降下可能で、案内索条としての案内ロープ7が連結され、案内ロープ7を牽引することによりフック6を任意の方向に移動させることができるようになっている。
【0011】
図2に示すように中間部をフック6に引掛ける索条のワイヤーロープ8は、両端に吊り治具9を取付けている。この吊り治具9は図4に示されるように、コ形断面の治具本体11と、治具本体11に中間部が軸支されてこの支軸点16を中心にして旋回可能であり、一端に治具本体11に形成されるスリット12を通して枕木13に掛止する爪部14を有し、他端が上記ワイヤーロープ8に連結されるレバー15よりなり、治具本体11を枕木13に嵌合させた状態でワイヤーロープ8を引き上げると、レバー15が図4の一点鎖線位置より時計方向に旋回し、爪部14が枕木13に食い込んで枕木13を固定する作用を行う。
【0012】
図3は、ワイヤーロープが掛けられるフックの別の例を示すもので、ワイヤーロープ17端にはフック19に掛けられる吊り輪18が形成され、フック19には根元付近に吊り輪18抜け止め用のストッパー20が開閉可能に取付けられている。このストッパー20は図示しないバネにより常には閉じて吊り輪18の抜け止めを行い、吊り輪18を押込むと、バネの作用に抗して押し下げられ、開口するようになっている。
【0013】
次に高炉炉底への枕木の填充方法について説明する。
先ず、高炉内の作業者を安全な場所に避難させたのち、羽口4から枕木を数本ないし数10本単位で炉底部に投げ込む。投げ込み後、作業者は上記コントローラの操作により電動ホイスト5から吊り下げ用のフック6或いは19を降ろす。フック6或いは19を降ろすのに前後してワイヤーロープ8両端の吊り治具9の治具本体11を炉内に投げ込まれた枕木13に対し、その両側端部にそれぞれ嵌合掛止させる。ついで案内ロープ7を手繰り寄せてワイヤーロープ8の中間部を吊り下げ用のフック6或いはワイヤーロープ17端の吊り輪18をフック19に引掛ける。その後、片手で案内ロープ7を掴み、別の片手でコントローラを操作してフック6或いは19を上昇させ、枕木13を吊り上げる。そして案内ロープを牽引して目的の箇所まで枕木を運び、枕木13の向きを所定の方向に向けて降ろす。
【0014】
以上のようにして、枕木の積み重ねが行われ、炉内の枕木の積み重ねが終わると、新たな枕木が作業者を退避させた状態で同様にして投げ込まれる。以後、同様にして枕木の積み重ねが行われ炉内への填充が行われる。
【0015】
別の方法では、図5に示すように炉内に羽口に達する高さの張り出しデッキ21を仮設し、ローラコンベア22を羽口4に通してデッキ21に設置する。枕木の搬送は、ローラコンベア22により羽口4を通して炉内に水平搬送し、デッキ21上の作業者が吊り治具9を枕木13の各側端部に嵌合掛止させる。ついで電動ホイスト5のコントローラ23を操作して枕木13を吊り上げ、炉底まで降ろす。この間、炉底に配置される別の作業者が案内ロープ7を牽引して吊り降ろされる枕木13を所定の箇所まで運び、所定の向きにして枕木を積み重ねる誘導作業を行い、積み重ね後、枕木から吊り治具9を取外す。以後同様な作業が繰り返される。
【0016】
【発明の効果】
請求項1に係わる発明によると、案内索条を牽引しながら巻上装置を操作することにより、少人数の作業者でも炉内の枕木填充作業が行えること、作業者は人力で枕木を運ぶ必要がなくなり、枕木填充作業の労力が軽減され、枕木の填充が短時間で能率よく行うことができること等の効果を奏する。
【0017】
請求項2に係わる発明の吊り治具によると、枕木を吊り上げたとき、レバーの爪部が枕木に食い込むようになるため、枕木がしっかりと固定され、搬送時にずり落ちることなく確実に搬送することができる。
【図面の簡単な説明】
【図1】炉頂部から電動ホイストを吊り下げた高炉の概略断面図。
【図2】電動ホイストで枕木を吊り上げた状態を示す図。
【図3】ワイヤーロープ端の吊り輪が掛けられるフックの別の態様を示す図。
【図4】吊り治具の断面図。
【図5】枕木填充の別の方法で用いられる装置の斜視図。
【符号の説明】
1・・高炉
2・・点火マンホール
3、8、17・・ワイヤーロープ
4・・羽口
5・・電動ホイスト
6、19・・フック
7・・案内ロープ
9・・吊り治具
12・・スリット
13・・枕木
14・・爪部
15・・レバー
16・・支軸点
18・・吊り輪
21・・張り出しデッキ
22・・ローラコンベア
23・・コントローラ
[0001]
[Technical field to which the invention belongs]
The present invention relates to a sleeper suspending jig used in a method of filling sleepers which is performed in preparation for burning a newly installed or modified blast furnace.
[0002]
[Prior art]
Newly constructed or modified blast furnaces are dried, and then sleepers are stacked from the bottom of the furnace to the tuyere level to prepare for burning, and coke is filled from above, and coke and ore are alternately filled from above. The reason why the sleepers are filled is to improve the passage of gas for an early temperature rise at the bottom of the furnace, and to prevent low-temperature coke having a large heat capacity from descending dredging.
[0003]
Traditionally, sleepers are filled in by several to several tens of sleepers from the opening of the blast furnace tuyere, and during that time, long sleepers thrown by workers who have been evacuated to a safe place in the furnace are manually specified. It was carried out by a method called “well girder loading” in which it was transported to the location and stacked up one step at a time from the bottom of the blast furnace to just below the tuyere.
[0004]
[Problems to be solved by the invention]
The conventional sleeper stacking method described above requires many workers and time.
An object of this invention is to provide the method of filling the sleeper mentioned above with a small number of people efficiently and in a short time, and the sleeper used in the method.
[0005]
[Means for solving problems]
The invention according to claim 1 includes a chain block, a hoist, etc., attached to the lower end of a wire, rope, chain, etc. suspended from the top of the furnace or in the vicinity thereof, in order to prepare for the newly installed or modified blast furnace. another wire and the rope was subjected to lifting hook of the hoisting device, the rope, after hanging jig attached to rope end of such chain was attached detachably on sleepers, operating the hoisting device Then, the sleeper is lifted, and the guide wire such as the guide wire, rope, chain, etc. connected to the above-mentioned rope, hoisting device, lifting hook or hanging jig is pulled up in the required direction and lifted. consists in carrying sleepers to desired positions, a said lifting jig used in the filling method of sleepers to the blast furnace, the jig body co-section to be fitted from the end face or side surface sleepers, body A lever that is pivotally supported by the middle part and is pivotable about this pivot point, has a claw part that engages with a sleeper at one end, and is connected to a rope that is hung on the lifting hook at the other end It is characterized by comprising.
[0006]
Sleepers filling operation definitive furnace to the present invention, lifting the sleepers by operating the hoist device is performed by pulling the guide rope to the required orientation, hanging the sleeper, the jig body sleepers By lifting from the end face or from the side, the lever whose other end is pulled up by the rope turns and the claw part at one end bites into the sleeper and is fixed, so the sleeper is lifted in an inclined state, for example. However, it is carried without being twisted or displaced.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of an apparatus used in the method of the present invention for stacking sleepers on the bottom of a furnace for preparation for burning after drying a newly installed or modified blast furnace will be described below with reference to the drawings.
In the blast furnace 1 shown in FIG. 1, wire ropes 3 as ropes are suspended from manholes near the top of the furnace, for example, left and right ignition manholes 2. Each wire rope 3 is provided with an electric hoist 5 as a hoisting device at the lower end, and the electric hoist 5 is positioned several meters above the tuyere 4 level.
[0010]
A hanging hook 6 suspended from the electric hoist 5 and moved up and down by an operation of a controller (not shown) can be lowered to the furnace bottom, and a guide rope 7 as a guide rope is connected to pull the guide rope 7. Thus, the hook 6 can be moved in an arbitrary direction.
[0011]
As shown in FIG. 2, the wire rope 8 of the rope which hooks an intermediate part on the hook 6 has the hanging jig 9 attached to both ends. As shown in FIG. 4, the hanging jig 9 has a U-shaped jig body 11, and an intermediate portion is pivotally supported by the jig body 11, and can be turned around the pivot point 16. It has a claw portion 14 that is hooked to the sleeper 13 through a slit 12 formed in the jig body 11 at one end, and a lever 15 that is connected to the wire rope 8 at the other end. When the wire rope 8 is pulled up in the fitted state, the lever 15 rotates in the clockwise direction from the one-dot chain line position in FIG. 4, and the claw portion 14 bites into the sleeper 13 and fixes the sleeper 13.
[0012]
FIG. 3 shows another example of a hook on which a wire rope is hung. A suspension ring 18 that is hung on the hook 19 is formed at the end of the wire rope 17. The stopper 20 is attached so that it can be opened and closed. The stopper 20 is always closed by a spring (not shown) to prevent the suspension ring 18 from coming off, and when the suspension ring 18 is pushed in, it is pushed down against the action of the spring and opened.
[0013]
Next, a method for filling sleepers into the bottom of the blast furnace will be described.
First, the workers in the blast furnace are evacuated to a safe place, and then sleepers are thrown from the tuyere 4 into the bottom of the furnace in units of several to several tens. After throwing, the operator lowers the hanging hook 6 or 19 from the electric hoist 5 by operating the controller. Before and after the hook 6 or 19 is lowered, the jig main body 11 of the hanging jig 9 at both ends of the wire rope 8 is fitted and latched to the sleepers 13 thrown into the furnace. Then hooking the hanging ring 18 of the intermediate portion of the suspension hook 6 or wire rope 17 ends for wire rope 8 hauled guide rope 7 on the hook 19. Thereafter, the guide rope 7 is grasped with one hand, the controller 6 is operated with another hand, the hook 6 or 19 is raised, and the sleeper 13 is lifted. Then, the guide rope is pulled to carry the sleeper to a target location, and the direction of the sleeper 13 is lowered in a predetermined direction.
[0014]
As described above, the sleepers are stacked, and when the sleepers in the furnace are stacked, a new sleeper is thrown in the same manner with the operator retracted. Thereafter, the sleepers are stacked in the same manner, and the furnace is filled.
[0015]
In another method, as shown in FIG. 5, an overhanging deck 21 having a height reaching the tuyere is temporarily installed in the furnace, and the roller conveyor 22 is installed on the deck 21 through the tuyere 4. The sleepers are transported horizontally into the furnace through the tuyere 4 by the roller conveyor 22, and an operator on the deck 21 fits and hangs the hanging jig 9 to each side end of the sleepers 13. Next, the sleeper 13 is lifted by operating the controller 23 of the electric hoist 5 and lowered to the furnace bottom. During this time, another worker placed at the bottom of the furnace pulls the guide rope 7 to carry the sleeper 13 suspended to a predetermined location, performs a guiding operation to stack the sleepers in a predetermined direction, and after stacking, from the sleepers Remove the hanging jig 9. Thereafter, the same operation is repeated.
[0016]
【The invention's effect】
According to the invention according to claim 1, by operating the hoisting device while pulling the guide rope, even a small number of workers can perform sleeper filling work in the furnace, and the operator needs to carry the sleepers manually. Thus, the labor for filling the sleepers is reduced, and the sleepers can be filled efficiently in a short time.
[0017]
According to the suspension jig of the invention according to claim 2, when the sleeper is lifted, the claw part of the lever comes to bite into the sleeper, so that the sleeper is firmly fixed and can be reliably transported without slipping down during transport. it can.
[Brief description of the drawings]
FIG. 1 is a schematic sectional view of a blast furnace in which an electric hoist is suspended from the top of the furnace.
FIG. 2 is a diagram showing a state where sleepers are lifted by an electric hoist.
FIG. 3 is a view showing another embodiment of a hook on which a suspension ring at the end of a wire rope is hung.
FIG. 4 is a cross-sectional view of a hanging jig.
FIG. 5 is a perspective view of an apparatus used in another method of filling sleepers.
[Explanation of symbols]
1. ・ Blast furnace 2 ・ Ignition manholes 3, 8, 17 ・ Wire rope 4 ・ ・ Feather 5 ・ ・ Electric hoist 6, 19 ・ ・ Hook 7 ・ ・ Guide rope 9 ・ ・ Hanging jig 12 ・ ・ Slit 13 · · Sleepers 14 · · claw 15 · · lever 16 · · pivot point 18 · · suspension ring 21 · · overhang deck 22 · · roller conveyor 23 · · controller

Claims (1)

新設し、或いは改修した高炉の火入れ準備のため、炉頂部ないしその近傍から垂下されるワイヤー、ロープ、チェーン等の索条の下端に取付けたチェーンブロック、ホイスト等の巻上装置の吊り上げ用フックに掛けた上記索条とは別のワイヤー、ロープ、チェーン等の索条端に取付けた吊り治具を枕木に着脱可能に取着したのち、前記巻上装置を操作して枕木を吊り上げ、上記索条、巻上装置、吊り上げ用フック或いは吊り治具の任意の箇所に連結した案内ワイヤー、ロープ、チェーン等の案内索条を所要の向きに牽引して吊り上げた上記枕木を所要の箇所まで運ぶことよりなる、高炉への枕木の充填方法で用いられる前記吊り治具であって、枕木に端面から或いは側面から嵌合するコ形断面の治具本体と、該本体に中間部が軸支されてこの支軸点を中心にして旋回可能であり、一端に枕木に係止する爪部を有し、他端が前記吊り上げ用フックに掛けた索条に連結されるレバーとよりなることを特徴とする枕木の吊り治具To prepare for the burning of a newly installed or modified blast furnace, on the lifting hooks of hoisting devices such as chain blocks and hoists attached to the lower ends of wires, ropes, chains, etc. suspended from the top of the furnace or in the vicinity thereof over a separate wire from the above rope, rope, after hanging jig attached to rope end of such chain was attached detachably on sleepers, lift the sleeper by operating the hoisting device, the search Carrying the above-mentioned sleeper that has been lifted by pulling guide ropes such as guide wires, ropes, chains, etc. connected to any part of the strip, hoisting device, lifting hook or suspension jig in the required direction The suspension jig used in the method of filling sleepers into a blast furnace, comprising a jig body having a U-shaped cross section that is fitted to the sleepers from an end surface or from a side surface, and an intermediate portion is pivotally supported by the body. this Is pivotable about the axis point, sleepers, characterized in that has a claw portion for engaging the sleeper, the more the lever connected to rope the other end is hooked on the lifting hook at one end Hanging jig .
JP2001237215A 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace Expired - Fee Related JP4744030B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001237215A JP4744030B2 (en) 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001237215A JP4744030B2 (en) 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace

Publications (2)

Publication Number Publication Date
JP2003049209A JP2003049209A (en) 2003-02-21
JP4744030B2 true JP4744030B2 (en) 2011-08-10

Family

ID=19068334

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001237215A Expired - Fee Related JP4744030B2 (en) 2001-08-06 2001-08-06 A sleeper hanging jig filled in the blast furnace

Country Status (1)

Country Link
JP (1) JP4744030B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6662625B2 (en) * 2015-12-08 2020-03-11 三菱重工コンプレッサ株式会社 Tools for rotor
LU100328B1 (en) 2017-06-28 2019-01-08 Wurth Paul Sa Device for mounting and/or dismantling staves in a shaft furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0540281U (en) * 1991-10-31 1993-05-28 ミサワホーム株式会社 Hanging equipment
JPH0551877U (en) * 1991-12-17 1993-07-09 川鉄鉄構工業株式会社 Auxiliary tool for slinging a suspended object having a plate-shaped end
JPH10194658A (en) * 1997-01-07 1998-07-28 Shigeru Fukazawa Hanging clamp

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0540281U (en) * 1991-10-31 1993-05-28 ミサワホーム株式会社 Hanging equipment
JPH0551877U (en) * 1991-12-17 1993-07-09 川鉄鉄構工業株式会社 Auxiliary tool for slinging a suspended object having a plate-shaped end
JPH10194658A (en) * 1997-01-07 1998-07-28 Shigeru Fukazawa Hanging clamp

Also Published As

Publication number Publication date
JP2003049209A (en) 2003-02-21

Similar Documents

Publication Publication Date Title
US5480201A (en) Safety pipe handler
EA004969B1 (en) Method and apparatus for feeding a stack of metallic sheets into a melting furnace
JP4744030B2 (en) A sleeper hanging jig filled in the blast furnace
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
US3469879A (en) Tong device for metal scrap blocks
US3674302A (en) Ingot and mold handling tongs
US2369727A (en) Block transfer mechanism
US1781943A (en) Crane-operated device
CN2923220Y (en) Mechanical grip
CN106348152B (en) A kind of suspender and handling method of safety jaw fortune revolving furnace sublance
US2757038A (en) Grapple attachment for tongs
CN213651597U (en) Mechanical remote unlocking and separating mechanism
CN209127874U (en) A kind of concurrent lifting device
JP2842780B2 (en) Cylindrical heavy lifting equipment
CN211141295U (en) Simple hoisting clamp for broken electrode in electric arc furnace
JP2551442Y2 (en) Steel pipe suspension system
SU1089036A1 (en) Cable crane
CN108946464B (en) Industrial grabbing device
JP3465781B2 (en) Shaft excavation equipment
JP2526261Y2 (en) Immersion hood lifting device
JP4625163B2 (en) Mobile crane hoisting cylinder load reduction device
JPH0313477A (en) Main rope replacing method
CN207726590U (en) A kind of hanging basket of fast removal brick
RU103102U1 (en) SINGLE ROPE GRIP
SU1079856A1 (en) Method of running loads into mines through vertical shaft with hoists of the balancing rope type

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080707

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101221

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110221

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110510

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110510

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140520

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4744030

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees