SU1079856A1 - Method of running loads into mines through vertical shaft with hoists of the balancing rope type - Google Patents

Method of running loads into mines through vertical shaft with hoists of the balancing rope type Download PDF

Info

Publication number
SU1079856A1
SU1079856A1 SU823466998A SU3466998A SU1079856A1 SU 1079856 A1 SU1079856 A1 SU 1079856A1 SU 823466998 A SU823466998 A SU 823466998A SU 3466998 A SU3466998 A SU 3466998A SU 1079856 A1 SU1079856 A1 SU 1079856A1
Authority
SU
USSR - Soviet Union
Prior art keywords
container
cage
stand
mine
lowering
Prior art date
Application number
SU823466998A
Other languages
Russian (ru)
Inventor
Андрей Андреевич Ткаченко
Original Assignee
Ворошиловградский машиностроительный институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ворошиловградский машиностроительный институт filed Critical Ворошиловградский машиностроительный институт
Priority to SU823466998A priority Critical patent/SU1079856A1/en
Application granted granted Critical
Publication of SU1079856A1 publication Critical patent/SU1079856A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

СПОСОБ СПУСКА ГРУЗОВ В ШАХТУ ПО,ВЕРТИКАЛЬНОМУ СТВОЛУ В ПОДЪЕМАХ с УРАВНОВЕШИВАЮЩИМИ КАНАТАМИ, включающий подвешивание контейнера с грузом сбоку от уравновешивающего каната под клетью / на нулевой площадке ствола, заведение его над стволом путем переподъема . клети, опускание его на уровень рудничного двора, выт гивание лебедкой за нижний конец, установку на транспортное средство и возврат клети на поверхность, отличающийс  тем, что, с целью повышени  надежности спуска, в клеть на период спуска временно устанавливают дополнительный груз со стороны, свободной от основного груза, а после опускани  контейнера на уровень рудничного двора и устано&- ки его на транспортное средство допорниу тепьный груз перемещают в центр кл&- ти и после возврата ее на поверхность удал ют из клети.(ЛсMETHOD OF TRUNKING CARGO INTO THE MINE ON A VERTICAL BAR IN ELEVATED EQUALIZING ROOTS, including hanging the container with a load on the side of the balancing cable under the cage / on the zero trunk area, putting it above the trunk by re-lifting. cage, lowering it to the level of a mine yard, pulling the winch at the lower end, installing it on the vehicle and returning the cage to the surface, characterized in that, in order to improve the reliability of the descent, additional load is temporarily installed in the cage for the period of descent from the main load, and after lowering the container to the level of the mine yard and installing it to the vehicle, the warm cargo is moved to the center of the key & and after returning it to the surface is removed from the cage (Ls

Description

соwith

СХ) СПSH) SP

ОдOd

110110

Изобретение относитс  к промьшшенному транспорту, в частности руцнкчкого транспорта, и касаетс  способов спуска грузов, в особенности цтшномернык., по вертикальному стволу в шакту итга руцнкк в поцвешенном поц клетью состо нии в лоцъемах с уравновеил1ваюшими каната МИоThe invention relates to an industrial transport, in particular a rocket transport, and relates to methods of lowering cargo, in particular by ticking, along a vertical trunk in a shaktum and pitka in a posed hinge condition in pilots with balanced ropes Mio

Известен способ спуска цгганномерных грузов в шахту по вертикальному ствопу , при котором пакет или какое пнбо цругое у1 гройство загруженное цт нно-мерными грузами, вместе с транспортировочньгми тепежками оцним концом лоц вешивают на нулевой ппощапке сгвопа поп кпетью, осуществл ют перепоа7 ем кпети н тем самым завод т контейнер нац ствопом . поодержива  второй его конец от раскачивани  канатом от пебецки, опуска ют контейнер поц кпетью по вертикапьному стволу цо уровн  сопр жени  ствола с окопоствопьным цвором шахты, выт ги ™ ВВ.ЮТ контейнер с помощью пебецки за нижний конец при одновременном опускан и кпети и устанавпивают его транспор тировочнымн тепежками на репьсы на горизонте L1 3 There is a method of lowering tsggannomnyh goods into the mine on a vertical stop, in which a package or some kind of loaded cargo with material-dimensional goods, together with the transport tepecks, with the dead end of the pilots, is hung on a zero pad with a pile of pepetus, and reapplied in the form of a different heat transfer point on the bottom of the pile, this way is carried out by means of a fuse on a zero pad on the bottom of the pile. plant t container natstopom. supporting the second end of it from swinging the rope from the pebetzki, lower the container with the end of the trunk along the vertical trunk stem of the trunk conjugation level with the shaft near the shaft, extract the b.yu.YT container with the help of the pebotka at the lower end while simultaneously lowering and holding the kpeti and installing its transport tiperazhnik tepezhki on reps on the horizon L1 3

ГТри этом способе спуска цпинномер нык грузов в шахту пакет или контейнер может поивешен поц кпетью топько со cMeuieHHevj от ее центра, поскольку центральна  часть поц днищем клети зан та уравновешивающими канатами, В св зи с татдам внецентренным поцвеашвание происхоцит внецентренное нагружение кпети, перекос кпети и ее проводников, особенно канатных. По этой причине спо соб не может быть применен цп  спуска апинномерных грузов в шахту в подъемах. с уравновешивающтгми канатами.This method of launching cargo into a mine package or container can be displaced with a core from its center, since the central part of the bottom of the stand is occupied by balancing ropes. conductors, especially cable. For this reason, the method cannot be applied to lowering the lifting of load-bearing loads into the mine in ascents. with balancing ropes.

Наиболее близким к изобретению  вл  етс  способ спуска грузов в шахту по вертикапьЕОму стволу в по №емах с уравновешивающими канатами, включающи г-иоцвешквание контейнера с грузом сбоку от уравновеш- 1вающего каната поц кпетью не щпгевой ппощацке ствола, заведение его нац стволом путем перепоцъема кп&ти , опускание его на уровень рудничного цвора, выт гивание лебедкой за нижний конец, установку на транспортное срецство и возврат кпети на поверхность С23 Недостатком способа  вл етс  наличие перекосов клети и ее проводников, особен но канагных, из-за внеценгренного нагру-жени г поскольку контейнер не может быть подвешен поц центром цнища кпети, так кнк в центре помещены ( прикреплены) уравновешивающие канаты. По этой прИThe closest to the invention is a method for lowering loads the shaft of vertikapEOmu trunk in at №emah with balancing ropes, comprising a container Mr. iotsveshkvanie with the load side of uravnovesh- 1vayuschego rope shmuck kpetyu not schpgevoy barrel pposchatske, institution its nat barrel by perepotsema kn & ti, lowering it to the mine level, pulling the winch at the lower end, setting it to transport sternity and returning the chain to the C23 surface. The disadvantage of this method is the presence of distortions of the cage and its conductors, especially Bend due vnetsengrennogo g HEAT-voltage since the container can be suspended shmuck center tsnischa kpeti so KNK placed in the center (fixed) balancing ropes. According to this

562562

чшт не обеспечиваетс  iiant.vKnriCTi, (csh is not provided by iiant.vKnriCTi, (

песса спуска грузов в шахту.Pessation of goods into the mine.

Цепь изобретени  - повышение пнце/-.ности спуска.The chain of the invention is to raise the bottom of the descent.

Поставленна  цепь достигаетс  тем, что согласно способу спуска грузов в шахту по вертикальному стволу в поцъв- мах с уравнове ливаюшими канатами, включающему поцвешивание коЕ1тейнера с грузом сбоку от уравновешиваюлего 1шната поц клетью на нулевой плолааке ствола, заведение его над стволом путем перепоцъема клети, опускание его на уровень руцничного цвора, выт гивание лебекой за нижний конец, установку на транпортное срецство и возврат клети на по--верхность , в клеть на период спуска временно з станавливают дополнительный груз со стороны, свободной от основного груза, а после опускани  контейнере на Зфовень руднич 1ого цвора и установки его на транспортное срецство дополнительный груз перемещают в центр клети и послав возврата ее на поверхность удал ют из кпети.Delivered circuit is achieved in that according to the method of descent of cargo into the mine in the vertical trunk with potsv- max uravnove livayushimi ropes comprising potsveshivanie koE1teynera with the load side of uravnoveshivayulego 1shnata shmuck stand at zero plolaake barrel, its institution over the barrel by perepotsema stand, lowering its to the level of the scarlet collar, drawdown by the lebek at the lower end, installation on transport sretstvo and return of the cage to the surface, to the cage for the period of descent, temporarily install additional load from the side free from the main cargo, and after the container is lowered onto the Zfuveni mine of the first color and installed on transport sretstvo, the additional cargo is moved to the center of the cage and sending it back to the surface is removed from the network.

На фиг. 1 изображена схема выполненн  операций при поцвеске контейнера с длинномерными грузами поц клетью в подъеме с уравновешивающими каната ми и заведении контейнера нац стволом; на фиг„ схема выполнени  операций при выт гивашш контейнера с длинномерными материалами в рудничном цворе из-поц клети в подъеме с уравновешиваю, щими канатами и установке его на репь--. сы.FIG. Figure 1 shows the scheme of operations performed when a container with long loads is pied by a stand in a lift with balancing cables and when the container is placed on the barrel; Fig. shows the scheme for performing operations when the container is pulled out with lengthy materials in the mine site from the stand in the ascent with the balancing cables and its installation on the turnkey line. sy.

Контейнер 1 {фигД, о , 5) с длиннамерными грузами на нулевой плошацке ствола прицепл ют оцним концом с помощью стропов 2 под днищем клети 3 c6oKj от уравновешивающих канатов 4. В клеть устанавливают дополнительный груз 5 на стороне клети, противополож.ной той, с которой прицеплен контейнер 1, Контейнер прицеплен с левой стороны от уравновешивающих канатов 4, а цополнительный груз 5 установпен в кпети с правой стороны от уравноввЕии.-вающих канатов.Container 1 {figd, o, 5) with long-sized loads on the zero side of the trunk is attached with the dead end using slings 2 under the bottom of the stand 3 c6oKj from the balancing ropes 4. The additional load 5 on the side of the stand, opposite to that the container 1 is attached to, the container is attached on the left side of the balancing ropes 4, and the additional weight 5 is attached to the net on the right side of the balance ropes.

Осуществл   перепоцъем клети (цвижение клети вверх по стрелке) произвс-- ц т заведение контейнера 1 нац стволом (фиг. 1 S , в). При этом второй ка--нец контейнера удерживают канатом О наматываемым на барабан лебецки 7. После отцепки каната 6 от ко гтейнера поспецний опускают по стволу в ujaxTy.Carried out the re-cage of the cage (the cage moves up along the arrow) produced container 1 of the nat barrel (Fig. 1 S, c). At the same time, the second end of the container is held by cable O with the winches 7 being wound onto the drum. After uncoupling the rope 6, the latter is lowered from the catener along the trunk in ujaxTy.

В рудничном дворе шахть нижний конец контейнера 1 зацепл юг втогч м кп31 (17),ЧIn the mine yard mine the lower end of the container 1 hooks south vogtch m kp31 (17), H

()M 8, цпмпт1Л1ШРмым но б рабан вто- poii 11обк 1ки О (фиг-.2, а). Опуска  контейнер 1 вместо с киетью 3 его устана&пивпют на репьсьт ипи тепежки (фиг.2 б , В ). Поспе установки контейнера 1 на5() M 8, tsmppt1L1ShRmym but Rabbi vtopoii 11obk 1 O (Fig-.2, a). Putting down the container 1 instead of with the kitty 3, its installation is & bustyping on reps ipi tepezhki (Fig.2 b, C). After installing the container 1 on 5

реаьсы нпп транспортировочные тепеж- ки цопопнитепьный груз 5 перемешают в центр кпети (фиг.2 с9), отцепа ют стро ш 2 от контейнера и поспе поцъема кпети }ia поверхность уцап ют груз 510RPCs of the CPP transportation wrecks of the same cargo 5 are mixed into the center of the k peti (figure 2 c9), they are uncoupled from the container and after the removal of the k peti} ia the surface is loaded with the load 510

из нее (фиг. 2€ ). Поспе отцепки второго каната 8 от контейнера, поспецний транспортируют к месту назначени  по горным выработкам,from it (Fig. 2 €). After uncoupling the second rope 8 from the container, the lateral transport is transported to the place of destination through mine workings,

Испопьзование способа позвол ет15Using the method allows 15

осуществить спуск цпинномерных грузовcarry out the descent of cargo

в шахту по вертикальному ствопу в поцъеме с уравновешивак1итми канатамк и обеспечивает устранение перекосов кпети и ее провоцников, особенно канат ных за счет гтквицации внецентренной нагрузки кпети, надежный процесс спуо ка цпинномерных грузов при поцбешива нтш контейнера поц кпетью в поцъеме с ypaвнoвeшивaюu и ЛI канатами резкое повышение произвоцитепьности проце х:а спуска цт1нномерных; грузов поц киэтью в поцъеме с ypaвнoвoшивaю IШtvffi кана-TBMHf сш1жпние затрат pj jHoro трупа прт спуске в шахту цпинномерных грузов в поцъеме с уравновешивающими канатами.in the mine along the vertical valve in the field with balancing rope and eliminating distor- ments in the PWHC and its provocateurs, especially cable cars, through the reliance on off-center load, the reliable process of relieving large-sized loads during the cracking of the container, and in the hunt for the APC, the reliable process of dumping uniform loads during the cracking of the container, and the APC Productibility of the processes: a descent mtnnomernyh; cargo pes kietiyu in psemёv with the equalization of Ishtvffi kana-TBMHf with the total cost of pj jHoro corpse prit descent into the mine pinpoint loads in psemёr with balancing ropes.

w; . 4 - cptts.Z V//w; . 4 - cptts.Z V //

Claims (1)

СПОСОБ СПУСКА ГРУЗОВWAY OF DOWNLOAD OF GOODS В ШАХТУ ПО. ВЕРТИКАЛЬНОМУ СТВОЛУ В ПОДЪЕМАХ С УРАВНОВЕШИВАЮЩИМИ КАНАТАМИ, включающий подвешивание контейнера с грузом сбоку от уравновешивающего каната под клетью г на нулевой площадке ствола, заведение его над стволом путем перепоцъема . клети, опускание его на уровень рудничного двора, вытягивание лебедкой за нижний конец, установку на транспортное средство и возврат клети на поверхность, отличающийся тем, что, с цепью повышения надежности спуска, в клеть на период спуска временно устанавливают дополнительный груз со стороны, свободной от основного груза, а после опускания контейнера на уровень рудничного двора и установки его на транспортное средство дополнительный груз перемещают в центр клети и после возврата ее на поверхность удаляют из клети.IN MINES ON. VERTICAL BAR IN LIFTS WITH BALANCING ROPES, including hanging the container with the load on the side of the balancing rope under cage d on the zero platform of the trunk, re-opening it above the trunk by re-lifting. the stand, lowering it to the level of the mine yard, pulling the winch to the lower end, installing it on the vehicle and returning the stand to the surface, characterized in that, with a chain for increasing the reliability of descent, an additional load is temporarily placed in the stand for the descent period, from the side free from the main cargo, and after lowering the container to the level of the mine yard and installing it on the vehicle, the additional cargo is moved to the center of the stand and, after returning to the surface, is removed from the stand. SU п„ 1079856SU p „1079856 1074785 61074785 6
SU823466998A 1982-07-07 1982-07-07 Method of running loads into mines through vertical shaft with hoists of the balancing rope type SU1079856A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823466998A SU1079856A1 (en) 1982-07-07 1982-07-07 Method of running loads into mines through vertical shaft with hoists of the balancing rope type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823466998A SU1079856A1 (en) 1982-07-07 1982-07-07 Method of running loads into mines through vertical shaft with hoists of the balancing rope type

Publications (1)

Publication Number Publication Date
SU1079856A1 true SU1079856A1 (en) 1984-03-15

Family

ID=21021269

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823466998A SU1079856A1 (en) 1982-07-07 1982-07-07 Method of running loads into mines through vertical shaft with hoists of the balancing rope type

Country Status (1)

Country Link
SU (1) SU1079856A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106882708A (en) * 2017-02-13 2017-06-23 太原理工大学 A kind of perpendicular lifting apparatus and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Апь^м средств и схем доставки материапов от скпаца цо забо шахты. Харьков, 1977, ВНИИОМШС, с. 38, схема 2,2.11.^. Ткаченко А. А. и цр. Опьтт эксплуатации платформ ПДМ цп спуска и доставки в шахты длинномерных ма- териапов.- "Новое горношахтное оборудование и аппаратура. Испытани и опыт эксплуатации', выпуск 30, ЦНИЭИУгопь, М., 1975, с. 13-16 (прототип).(^54) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106882708A (en) * 2017-02-13 2017-06-23 太原理工大学 A kind of perpendicular lifting apparatus and method
CN106882708B (en) * 2017-02-13 2018-02-16 太原理工大学 A kind of perpendicular lifting apparatus and method
US11479449B2 (en) 2017-02-13 2022-10-25 Taiyuan University Of Technology Vertical lifting device and method

Similar Documents

Publication Publication Date Title
AU2010205618B2 (en) A method and apparatus for supporting a load
JP3057085B2 (en) Deep sea descent device
JP2562235B2 (en) A method of mooring a floating platform to a predetermined mooring place, and a method of lifting and recovering any part of the mooring line.
US3774780A (en) Portable pipe pick-up, conveying and racking device
US5915906A (en) Apparatus for loading and unloading a ship
GB1400090A (en) Crane suspension system
US4099630A (en) Pipe handling apparatus
US2934905A (en) Barge-carried oil well drilling equipment
SU1079856A1 (en) Method of running loads into mines through vertical shaft with hoists of the balancing rope type
WO1999011518A1 (en) Apparatus for a mobile installation, especially an offshore vessel
US3102642A (en) List compensating device
US2286765A (en) Hoisting drag bucket
US2239750A (en) Device of the crane type for the loading and unloading of magnetic materials
PL189043B1 (en) Method of replacing hoisting ropes of mine shaft hoists
US1785090A (en) Crane
US949961A (en) Hoisting and conveying mechanism.
CN219081612U (en) Waterproof board trolley automatic feeding mechanism
GB2226539A (en) Improvements in load handling
RU2662500C2 (en) Method of moving component or material to and within level of shaft boring system
US3600030A (en) Materials handling device with guides
US2365818A (en) Marine leg unloading apparatus
SU1266827A1 (en) Method for mounting lift guides
CA2040716C (en) Mine shaft sinking
US3384410A (en) Tong gear
SU1291470A2 (en) Rope arrangement for hauling timber