JP2003034475A - Main rope replacing method of elevator - Google Patents

Main rope replacing method of elevator

Info

Publication number
JP2003034475A
JP2003034475A JP2001220475A JP2001220475A JP2003034475A JP 2003034475 A JP2003034475 A JP 2003034475A JP 2001220475 A JP2001220475 A JP 2001220475A JP 2001220475 A JP2001220475 A JP 2001220475A JP 2003034475 A JP2003034475 A JP 2003034475A
Authority
JP
Japan
Prior art keywords
main rope
rope
car
hoistway
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001220475A
Other languages
Japanese (ja)
Inventor
Satoshi Tanakadate
聡 田中舘
Yoichi Yoshida
洋一 吉田
Mizuki Gomi
瑞樹 五味
Koji Inoue
幸次 井上
Yoshihiro Takeuchi
愛浩 竹内
Kiyoshi Naganuma
清 長沼
Koji Yamashita
浩二 山下
Noriyuki Sahoda
典之 佐保田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2001220475A priority Critical patent/JP2003034475A/en
Publication of JP2003034475A publication Critical patent/JP2003034475A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a main rope replacing method of an elevator capable of efficiently and economically replacing a main rope. SOLUTION: A holding position of a riding car 4 is not arranged in the vicinity of the uppermost floor, and is arranged in the vicinity of the lowest floor so that the main rope 6 in a car under pulley 4a can be hooked and removed from a bottom part 1a of a hoistway 1. A U-shaped part of the main rope 6 is respectively raised and lowered between the rope end 6a and a deflecting pulley 8a and between both deflecting pulleys 8a and 8b so that the existing main rope 6 can be easily pulled up, and a new main rope can be pulled down from a work scaffold 10 assembled in an upper part 1a of the hoistway 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、昇降路頂部に機械
室のないエレベータの主ロープ交換方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for replacing a main rope of an elevator having no machine room at the top of a hoistway.

【0002】[0002]

【従来の技術】従来、機械室を有する2:1ローピング
方式のエレベータにおける主ロープ交換方法は、特開平
2−249885号公報に記載のように、釣り合い錘を
昇降路下部に配置した支持体で保持し、乗かごを昇降路
上部で乗かご吊り上げ手段で吊り上げた後、ロープ保持
装置を釣合い錘の上方に配置し、既設主ロープを保持
し、次いで既設主ロープの端部をロープ止め金具から切
り離してその端部にドラムからの新設主ロープを接続
し、次に乗かご側の端部をロープ止め金具から切り離し
て端部をドラムに取り付け、その後、巻上機を低速で動
作させ、既設主ロープをドラムに巻き取りながらドラム
から新設主ロープを繰り出し、新設主ロープを順次掛け
回した後、新設主ロープのかご側の端部を既設主ロープ
から切り離して金具に接続し、新設主ロープの他方の端
部を金具に接続するようにしている。
2. Description of the Related Art Conventionally, a main rope replacing method in a 2: 1 roping type elevator having a machine room has been disclosed in Japanese Patent Laid-Open No. 249885/1990, in which a counterweight is provided at a lower portion of a hoistway. After holding the car and hoisting the car at the top of the hoistway with the car hoisting means, place the rope holding device above the counterweight to hold the existing main rope and then the end of the existing main rope from the rope stopper. Disconnect and connect the new main rope from the drum to the end, then disconnect the end on the car side from the rope stopper and attach the end to the drum, then operate the hoist at low speed While winding the main rope around the drum, unwind the new main rope from the drum, hang it around the new main rope in sequence, then disconnect the car-side end of the new main rope from the existing main rope and use it as a metal fitting. It continued to, and to connect the other end of the new main rope fittings.

【0003】これに対して、近年、特開平10−506
871号公報および特開平11−130365号公報に
記載のように昇降路頂部に機械室の無いエレベータが提
案されており、今後、この種エレベータの普及増加が見
込まれている。
On the other hand, in recent years, Japanese Patent Laid-Open No. 10-506
As disclosed in Japanese Patent Application No. 871 and Japanese Patent Application Laid-Open No. 11-130365, elevators having no machine room at the top of the hoistway have been proposed, and it is expected that the number of elevators of this kind will increase.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来の
2:1ローピング方式のエレベータにおけるロープ交換
方法を機械室の無いエレベータに適用すると、乗かごを
昇降路上部で乗かご吊り上げ手段によって吊り上げ保持
すると、作業中はかご下部プーリに手が届かないため、
新旧ロープを接続して行なう交換方法が必要となるが、
新旧ロープを接続すると接続部の径が大きくなるため、
交換作業時は、かごの下部に設けたかご下プーリ、巻上
機のシーブおよび転向プーリの既設プーリ用ロープ外れ
止めを外し、接続部径に合わせた交換時用のロープ外れ
止めを設置しなければならない。また、かご保持前にプ
ーリ用ロープ外れ止めの取り外しや作業終了後の復帰を
行なうために、乗かごを昇降路下部に一旦移動して行な
わなければならない。さらに、かご下プーリ、転向プー
リ、シーブ等昇降路内でロープ送りの抵抗となる部位が
機械室のあるエレベータよりも増加するため、新設主ロ
ープの引き出しに必要な力が増加し、複数の作業者また
は引き出し補助装置が必要となり、作業効率が悪く経済
的でなくなってしまう。
However, when the conventional rope replacement method for a 2: 1 roping type elevator is applied to an elevator without a machine room, when the car is hoisted and held by the car hoisting means above the hoistway, Because the lower pulley of the car cannot be reached during work,
A replacement method that connects the old and new ropes is required, but
When connecting the old and new ropes, the diameter of the connecting part increases,
During replacement work, remove the rope stoppers for existing car pulleys on the lower part of the car, the sheave of the hoisting machine and the existing pulleys of the turning pulley, and install the rope stoppers for replacement according to the diameter of the connection part. I have to. In addition, the car must be moved to the lower part of the hoistway once in order to remove the pulley rope stopper before the car is held and to return it after the work is completed. In addition, since the number of rope feed resistance parts in the hoistway such as under-car pulley, turning pulley, and sheave increases more than in elevators with machine rooms, the force required to pull out the new main rope increases, and multiple work operations are performed. A person or a drawer assistance device is required, resulting in poor work efficiency and uneconomical.

【0005】本発明の目的は、主ロープの交換を簡単か
つ効率的に行なうことができるようにしたエレベータの
主ロープ交換方法を提供することにある。
An object of the present invention is to provide a method of replacing a main rope of an elevator, which enables easy and efficient replacement of the main rope.

【0006】[0006]

【課題を解決するための手段】本発明は上述した目的を
達成するために、既設主ロープの両ロープ端を昇降路の
頂部付近に連結し、上記既設主ロープの中間部を、少な
くとも釣り合い錘の上部に設けた錘上プーリと、巻上機
のシーブと、この巻上機により駆動されて昇降する乗か
ごの下部に設けたかご下プーリに掛け回し、上記乗かご
および上記釣り合い錘を所定位置に保持した状態で上記
既設主ロープを新設主ロープに交換するエレベータの主
ロープ交換方法において、上記乗かごを上記昇降路の下
部近傍に保持すると共に、上記釣り合い錘を上記昇降路
の上部近傍で保持した状態とし、この状態で上記かご下
プーリにおける上記既設主ロープの掛かりを外し、上記
昇降路の上部に設けた作業足場から上記既設主ロープを
U字状に引き上げ、上記既設主ロープの所定位置を切断
し、この残った側の切断端に上記新設主ロープの一端を
連結した後、上記作業足場から上記新設主ロープをU字
状に降ろして上記かご下プーリに掛け回すようにしたこ
とを特徴とする。
In order to achieve the above-mentioned object, the present invention connects both rope ends of an existing main rope near the top of a hoistway, and at least an intermediate portion of the existing main rope has a balance weight. , The sheave of the hoisting machine, and the sheave of the hoisting machine, and the lower car of the car that is driven by the hoisting machine to move up and down. In a method of replacing the existing main rope with a new main rope in a state of being held in a position, the car is held near the bottom of the hoistway and the counterweight is held near the top of the hoistway. In this state, remove the existing main rope from the lower car pulley and pull up the existing main rope in a U-shape from the work scaffold provided at the top of the hoistway. After cutting the existing main rope at a predetermined position and connecting one end of the new main rope to the cut end on the remaining side, lower the new main rope into a U shape from the work scaffold and place it on the car lower pulley. It is characterized by being hung around.

【0007】本発明のエレベータの主ロープ交換方法
は、かごの保持位置を最上階近傍ではなく最下階近傍と
したため、作業中に乗かごが移動することなく、かご下
プーリの既設主ロープ掛かりの外しや復帰が昇降路の底
部から実施できるので、簡単かつ効率良く主ロープの交
換を行なうことができる。
In the elevator main rope replacement method according to the present invention, the car is held near the bottom floor instead of near the top floor, so that the car does not move during the work, and the existing main rope hanging on the car pulley is carried out. Since the removal and return of the main rope can be performed from the bottom of the hoistway, the main rope can be replaced easily and efficiently.

【0008】[0008]

【発明の実施の形態】以下、本発明の実施の形態を図面
によって説明する。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings.

【0009】図1は、本発明の第1実施形態によるエレ
ベータの主ロープ交換方法を採用したエレベータの作業
初期状態を示す断面図である。
FIG. 1 is a sectional view showing an initial state of work of an elevator adopting a method of replacing a main rope of an elevator according to a first embodiment of the present invention.

【0010】昇降路1の底部1aに設置した巻上機7の
シーブ7aに既設主ロープ6を掛け、この既設主ロープ
6のロープ端6a側は昇降路1の頂部1b付近に設けた
プーリビーム8に設けた転向プーリ8aに掛けた後、乗
かご4の下部に設けたかご下プーリ4aに掛けて立ち上
げプーリビーム8に適宜手段で連結している。一方、既
設主ロープ6のロープ端6b側はプーリビーム8に設け
た転向プーリ8bに掛けた後、釣り合い錘5の上部に設
けた錘上プーリ5aを介して立ち上げプーリビーム8に
適宜手段で連結している。こうして巻上機7により既設
主ロープ6を駆動すると、昇降路1の全行程に渡って立
設したガイドレール2に沿って乗かご4が昇降すると共
に、この乗かご4と相対して釣り合い錘5が昇降する。
An existing main rope 6 is hung on a sheave 7a of a hoisting machine 7 installed on the bottom 1a of the hoistway 1, and the rope end 6a side of the existing main rope 6 is a pulley beam 8 provided near the top 1b of the hoistway 1. After being hung on a turning pulley 8a provided on the vehicle, it is hung on a lower car pulley 4a provided on a lower portion of the car 4 and is connected to a rising pulley beam 8 by appropriate means. On the other hand, the rope end 6b side of the existing main rope 6 is hung on the turning pulley 8b provided on the pulley beam 8 and then connected to the rising pulley beam 8 by an appropriate means via the on-weight pulley 5a provided on the balance weight 5. ing. When the existing main ropes 6 are driven by the hoisting machine 7 in this way, the car 4 moves up and down along the guide rails 2 standing upright over the entire path of the hoistway 1, and at the same time, the balancing weights are opposed to the car 4. 5 moves up and down.

【0011】次に、既設主ロープ6の交換作業について
説明する。
Next, the replacement work of the existing main rope 6 will be described.

【0012】先ず第一行程として、昇降路1の頂部1b
付近で後にロープ端6a,6bを外したり、交換後の新
設主ロープを固定することができる位置に作業足場10
を設置する。次に、作業者は昇降路1の底部1aに出入
りできる最小隙間を確保できる位置まで乗かご4を下降
させ、この乗かご4の荷重を保持できる強度を持つかご
保持材11をガイドレール2にボルトで固定し、このか
ご保持材11で乗かご4を保持する。
First, as the first step, the top 1b of the hoistway 1
The work scaffolding 10 is located at a position where the rope ends 6a and 6b can be removed later in the vicinity and the newly-maintained main rope after replacement can be fixed.
Set up. Next, the worker lowers the car 4 to a position where a minimum clearance can be secured so that the car 1 can move in and out of the bottom 1a of the hoistway 1, and the car holding member 11 having a strength capable of holding the load of the car 4 is attached to the guide rail 2. It is fixed with bolts, and the car 4 is held by the car holding material 11.

【0013】次に第二行程として、釣り合い錘5を保持
用ワイヤロープ12と吊り上げ手段13で保持する。つ
まり、図2に示すように作業足場10から長尺の操作棒
14を降ろして錘上プーリ5aのリム5bの開口に操作
棒14のフック状先端を通した状態とし、その近傍に降
ろした保持用ワイヤロープ12の先端輪状部12aに操
作棒14の先端を係止させた後、この係止状態を保ちな
がら操作棒14を持ち上げて保持用ワイヤロープ12を
錘上プーリ5aのリム5bに通し、作業者はこの端を引
き上げる。続いて、作業者が引き上げた保持用ワイヤロ
ープ12の両端部を、プーリビーム8に取り付けた吊り
上げ手段13に係合させた後、吊り上げ手段13を操作
して乗かご4の位置に対して規定クリアランスを確保で
きる昇降路1の上方の所定位置まで釣り合い錘5を吊り
上げて保持する。
Next, in the second step, the counterweight 5 is held by the holding wire rope 12 and the lifting means 13. That is, as shown in FIG. 2, the long operating rod 14 is lowered from the work scaffold 10 so that the hook-shaped tip of the operating rod 14 is passed through the opening of the rim 5b of the weight pulley 5a, and is held near it. After the front end of the operating rod 14 is locked to the distal end ring-shaped portion 12a of the working wire rope 12, the operating rod 14 is lifted while keeping this locked state, and the holding wire rope 12 is passed through the rim 5b of the weight pulley 5a. The worker pulls up this end. Subsequently, both ends of the holding wire rope 12 pulled up by the operator are engaged with the hoisting means 13 attached to the pulley beam 8, and then the hoisting means 13 is operated to make a specified clearance with respect to the position of the car 4. The counterweight 5 is hoisted and held up to a predetermined position above the hoistway 1 where

【0014】次に、作業足場10より上部の位置でガイ
ドレール2または図示しない建屋梁など昇降路1内の強
度部材にロープ保持具15を固定し、このロープ保持具
15で既設主ロープ6を仮保持し、そのロープ端6aを
外したときに既設主ロープ6が自重で落下することを防
ぐ。また、転向プーリ8aのロープ端6a側に位置する
既設主ロープ6には、転向プーリ8aの溝より十分大き
く転向プーリ8aを通過できないロープクリップ16を
固定し、既設主ロープ6が巻上機7方向へ自重で落下す
るのを阻止する。
Next, the rope holder 15 is fixed to a strength member in the hoistway 1 such as the guide rail 2 or a building beam (not shown) at a position above the work scaffold 10, and the existing main rope 6 is fixed by the rope holder 15. It is temporarily held and prevents the existing main rope 6 from dropping by its own weight when the rope end 6a is removed. A rope clip 16 that is sufficiently larger than the groove of the turning pulley 8a and cannot pass through the turning pulley 8a is fixed to the existing main rope 6 located on the rope end 6a side of the turning pulley 8a. It prevents it from falling by its own weight in the direction.

【0015】次に第三行程として、昇降路1の底部1a
でかご下プーリ4aと巻上機7のシーブ7aから既設主
ロープ6の掛かりを外した後、昇降路1の上部1b付近
のロープ端部6aの固定を外し、図3に示すように最上
階ホールに設置したロープ回収ドラム17に取り外した
既設主ロープ6のロープ端部6aを接続する。その後、
作業足場10からロープ回収ドラム17と転向プーリ8
a間においてかご下プーリ4aに掛けられていた既設主
ロープ6のU字状部分を上方へ引き出し、ホールにいる
作業者がこの部分の既設主ロープ6をロープ回収ドラム
17に順次巻き取ってゆく。
Next, as a third step, the bottom 1a of the hoistway 1
After removing the existing main rope 6 from the car bottom pulley 4a and the sheave 7a of the hoisting machine 7, the rope end 6a near the upper part 1b of the hoistway 1 is unfixed, and as shown in FIG. The rope end 6a of the existing main rope 6 that has been removed is connected to the rope recovery drum 17 installed in the hall. afterwards,
From work scaffolding 10 to rope recovery drum 17 and turning pulley 8
The U-shaped portion of the existing main rope 6 hung on the car lower pulley 4a between a is pulled out upward, and the worker in the hall sequentially winds up the existing main rope 6 of this portion on the rope recovery drum 17. .

【0016】同部分の引き出しが完了したならロープク
リップ16を取り外し、同様に転向プーリ8aから転向
プーリ8b間で巻上機7のシーブ7aを掛け回していた
U字状部分の既設主ロープ6を引き出し、ロープ回収ド
ラム17で回収して行く。このU字状部分の回収が終わ
ると、転向プーリ8a,8bから釣り合い錘5の錘上プ
ーリ5aに掛けられている既設主ロープ6のU字状部位
が残っているが、その回収に先立って転向プーリ8aの
ロープ回収ドラム17で既設主ロープ6を切断する。
When the pulling out of the same portion is completed, the rope clip 16 is removed, and similarly, the existing main rope 6 of the U-shaped portion around which the sheave 7a of the hoisting machine 7 is wound between the turning pulley 8a and the turning pulley 8b. Pull out and collect with the rope recovery drum 17. When the collection of the U-shaped portion is completed, the U-shaped portion of the existing main rope 6 hung from the turning pulleys 8a, 8b to the on-weight pulley 5a of the counterweight 5 remains, but prior to the collection. The existing main rope 6 is cut by the rope collecting drum 17 of the turning pulley 8a.

【0017】次に第四行程として、新設主ロープの掛け
回しを行なう。先ず、図4に示すように既設主ロープ6
の除去時に残しておいた転向プーリ8aの近傍の既設主
ロープ切断部20と、新設主ロープ端部21とをそれぞ
れ所定長ほぐすと共に、ストランド23a,23bの1
本ずつを残して切断し、ビニールテープ22で端部をそ
れぞれ養生した後、ストランド23,23bの1本同志
を折り返して引っ掛け、その折り返し部をバインド線2
4でそれぞれ固定し、錘上プーリ5aの外れ止めの隙間
を通過できる太さの範囲でビニールテープ22で養生し
て図5に示す接続部25を形成する。次いで、既設主ロ
ープ6のロープ端6bにおける固定を外し、上述した接
続部25がプーリビーム8の同部から出るまでロープ端
部6bをホールへ引き出した後、接続部25を外して新
設主ロープ端部21を昇降路1の頂部1b付近のプーリ
ビーム8に連結する。
Next, as a fourth step, the newly installed main rope is laid around. First, as shown in FIG. 4, the existing main rope 6
The existing main rope cutting portion 20 and the new main rope end portion 21 in the vicinity of the turning pulley 8a left at the time of the removal of the
After cutting each piece of paper and curing the ends with the vinyl tape 22, one of the strands 23 and 23b is folded back and hooked, and the folded back portion is bound to the binding line 2
Each of them is fixed by 4 and is cured by a vinyl tape 22 within a thickness range capable of passing through a gap for preventing the weight pulley 5a from coming off, thereby forming a connecting portion 25 shown in FIG. Then, the fixing at the rope end 6b of the existing main rope 6 is released, and the rope end 6b is pulled out into the hole until the above-mentioned connecting portion 25 comes out of the same portion of the pulley beam 8. Then, the connecting portion 25 is removed and the new main rope end is removed. The part 21 is connected to the pulley beam 8 near the top 1b of the hoistway 1.

【0018】次に第五行程として、上述した既設主ロー
プ6の除去と逆の手順で新設主ロープ27の取付作業を
行なう。これは、図6に示すように作業足場10で転向
プーリ8aと転向プーリ8b間に位置する新設主ロープ
27を下方へ引き降ろし、これを昇降路の底部1aに配
置した巻上機7のシーブ7aに掛けた後、作業足場10
で新設主ロープ27に張力を加えた状態で、既設主ロー
プ6の除去時と同様に転向プーリ8aにおける最上階ホ
ールに設置した送りドラム26側にロープクリップ16
を固定し、巻上機7方向へのロープ自重による落下を阻
止する。次いで、図7に示すように作業足場10から送
りドラム26と転向プーリ8a間に位置する新設主ロー
プ27を引き降ろしてU字状にし、このU字状部分を昇
降路1の底部1aからかご下プーリ4aに掛け、手で張
力を加えながら先に使用したロープ保持具15に対応す
る位置の新設主ロープ27を仮保持する。この状態で、
新設主ロープ27を所定長さに切断し端末処理した後、
そのロープ端6aを昇降路1の頂部1b付近に連結し、
作業足場10、保持用ワイヤロープ12、吊り上げ手段
13およびロープ保持具15を取り外して主ロープ交換
作業を完了する。
Next, as a fifth step, the new main rope 27 is attached in the reverse order of the above-mentioned removal of the existing main rope 6. This is because, as shown in FIG. 6, the new main rope 27 located between the turning pulley 8a and the turning pulley 8b on the work scaffold 10 is pulled down, and the sheave 7a of the hoisting machine 7 arranged at the bottom 1a of the hoistway is pulled down. Work scaffolding 10 after hanging on
While tension is applied to the new main rope 27, the rope clip 16 is attached to the feed drum 26 side installed in the uppermost hall of the turning pulley 8a in the same manner as when removing the existing main rope 6.
To prevent the rope from falling in the direction of the hoisting machine 7 due to its own weight. Then, as shown in FIG. 7, the new main rope 27 located between the feed drum 26 and the turning pulley 8a is pulled down from the work scaffold 10 into a U-shape, and this U-shaped portion is moved from the bottom 1a of the hoistway 1 to the car lower position. The new main rope 27 at a position corresponding to the previously used rope holder 15 is temporarily held while being hung on the pulley 4a and being manually tensioned. In this state,
After cutting the new main rope 27 to a specified length and processing the terminal,
Connect the rope end 6a near the top 1b of the hoistway 1,
The work scaffold 10, the holding wire rope 12, the lifting means 13, and the rope holder 15 are removed to complete the main rope replacement work.

【0019】このように乗かご4の保持位置を最上階近
傍ではなく最下階近傍としたため、昇降路1の底部1a
からかご下プーリ4aでの主ロープ6,27の掛け作業
や外し作業が可能となり、従来のように作業中に乗かご
を移動させることなく、簡単かつ効率良く交換作業を行
なうことができる。また、ロープ端6aと転向プーリ8
aの間、さらに転向プーリ8aと転向プーリ8bの間
で、それぞれ主ロープ6,27のU字状部分を上げ下げ
するようにしたため、昇降路1の頂部1bに配置した作
業足場10から容易に既設主ロープ6を引き上げたり、
新設主ロープ27を引き降ろしたりすることができ、主
ロープ6,27のプーリ外れを気に掛けることもなく、
引き出し補助装置を用いる必要もないので、効率良く経
済的に交換作業を行なうことができる。さらに釣り合い
錘5を保持用ワイヤロープ12と吊り上げ手段13で保
持するために、保持用ワイヤロープ12を錘上プーリ5
aのリム5bに通すための操作棒14を用いたため、上
部作業用の作業足場10を1段のみ組むだけで行なえる
ので作業効率も一層良くなる。
As described above, since the holding position of the car 4 is set not near the uppermost floor but near the lowermost floor, the bottom portion 1a of the hoistway 1 is
The main ropes 6 and 27 can be hung on and removed from the lower cage pulley 4a, and the replacement work can be performed easily and efficiently without moving the car during the work as in the conventional case. In addition, the rope end 6a and the turning pulley 8
Since the U-shaped portions of the main ropes 6 and 27 are raised and lowered between a and between the turning pulley 8a and the turning pulley 8b, respectively, the work scaffold 10 arranged on the top 1b of the hoistway 1 can be easily installed from the existing work scaffold 10. Pulling up the main rope 6,
It is possible to pull down the new main rope 27, and do not worry about the pulleys of the main ropes 6 and 27 coming off.
Since it is not necessary to use a drawer auxiliary device, the replacement work can be performed efficiently and economically. Further, in order to hold the counterweight 5 by the holding wire rope 12 and the lifting means 13, the holding wire rope 12 is attached to the weight pulley 5.
Since the operation rod 14 for passing through the rim 5b of a is used, the work scaffold 10 for the upper work can be performed by assembling only one stage, so that the work efficiency is further improved.

【0020】図8は、本発明の第2実施形態によるロー
プ交換方法を採用したエレベータの作業初期状態を示す
断面図である。
FIG. 8 is a cross-sectional view showing an initial working state of an elevator adopting the rope replacing method according to the second embodiment of the present invention.

【0021】上述した第1実施形態では巻上機7を昇降
路1の底部1aに配置したが、この第2実施形態では巻
上機7を昇降路1の頂部1b近傍に設けたビーム8に支
持しており、既設主ロープ6の一方のロープ端6aをビ
ーム8に固定し、かご下プーリ4aに掛けた後に立ち上
げて巻上機7のシーブ7aに巻き回し、その後、釣り合
い錘5の錘上プーリ5aを介してビーム8に他方のロー
プ端1bを固定している。
In the above-described first embodiment, the hoisting machine 7 is arranged at the bottom portion 1a of the hoistway 1, but in the second embodiment, the hoisting machine 7 is provided on the beam 8 provided near the top portion 1b of the hoistway 1. It is supported, one rope end 6a of the existing main rope 6 is fixed to the beam 8, is hung up on the lower car pulley 4a, then is raised and wound around the sheave 7a of the hoisting machine 7, and then the balance weight 5 The other rope end 1b is fixed to the beam 8 via the weight pulley 5a.

【0022】主ロープ交換作業を行なう場合、先ず第一
行程として、先の第1実施形態と同様に昇降路1の頂部
1b付近に作業足場10を設置した後、作業者が昇降路
1の底部1aに出入りできる最小隙間を確保した位置ま
で乗かご4を下降させ、乗かご4の荷重を保持できる強
度を有するかご保持材11をガイドレール2にボルトで
固定し、このかご保持材11上に乗かご4を保持する。
When performing the main rope replacement work, first, as a first step, after the work scaffold 10 is installed near the top 1b of the hoistway 1 as in the first embodiment, the operator is allowed to set the bottom of the hoistway 1. The car 4 is lowered to a position where a minimum clearance for entering and exiting the car 1a is secured, and a car holding member 11 having a strength capable of holding the load of the car 4 is fixed to the guide rail 2 by bolts. Hold the car 4.

【0023】次に第二行程として、乗かご4と主ロープ
6を介して連結した釣り合い錘5を保持用ワイヤロープ
12と吊り上げ手段13で保持するが、この保持は先に
説明した実施の形態の場合と同様に行なう。その後、建
屋梁など昇降路1内の強度部材に固定したロープ保持具
15で既設主ロープ6の一方のロープ端6a近傍を仮保
持する。
Next, in the second step, the balance weight 5 connected to the car 4 via the main rope 6 is held by the holding wire rope 12 and the lifting means 13. This holding is carried out by the embodiment described above. Do the same as in. After that, the rope holder 15 fixed to a strength member in the hoistway 1 such as a building beam temporarily holds the vicinity of one rope end 6a of the existing main rope 6.

【0024】次に第三行程として、昇降路1の底部1a
でかご下プーリ4aから主ロープ6の掛かりを外した
後、既設主ロープ6の一方のロープ端部6aの固定を外
し、図9に示すように最上階ホールに設置したロープ回
収ドラム17に取り外したロープ端6aを接続する。そ
の後、作業足場10から作業者はロープ回収ドラム17
と巻上機7のシーブ7a間に位置する既設主ロープ6を
U字状部分を上部へ引き上げ、ホールに位置する作業者
が引き上げられた既設主ロープ6のU字状部分をロープ
回収ドラム17に順次巻き取って行く。この既設主ロー
プ6のU字状部分の引き出しが完了したら、釣り合い錘
5の錘上プーリ5aに掛け回したU字状部位を残してシ
ーブ7aのロープ回収ドラム17側を切断し、ロープ回
収ドラム17を撤去する。
Next, as the third step, the bottom 1a of the hoistway 1
After removing the hook of the main rope 6 from the pulley under the car 4a, the one end 6a of the existing main rope 6 is unfixed and removed to the rope collection drum 17 installed in the top floor hall as shown in FIG. And connect the rope end 6a. After that, the worker recovers the rope collecting drum 17 from the work scaffold 10.
And the U-shaped part of the existing main rope 6 located between the sheave 7a of the hoisting machine 7 and the U-shaped part of the existing main rope 6 lifted by the worker located in the hall. It winds up in sequence. When the pulling out of the U-shaped portion of the existing main rope 6 is completed, the rope collecting drum 17 side of the sheave 7a is cut, leaving the U-shaped portion wound around the counterweight pulley 5a of the counterweight 5. Remove 17

【0025】次に第四行程として、新設主ロープの掛け
回しを行なう。先ず、図4で説明したように既設主ロー
プ6を切断した既設主ロープ切断部20と、最上階ホー
ルに配置した送りドラム26に巻き回した新設主ロープ
27の新設主ロープ端部21とを同様に接続して図10
に示した接続部25を構成する。次いで、残っていた既
設主ロープ6のロープ端6bの固定を外し、接続部25
がシーブ7aおよび錘上プーリ5aを通過してビーム8
の上部に出るまでロープ端6bをホール側から引き上
げ、その後、接続部25を外して新設主ロープ27の新
設主ロープ端部21をビーム8に固定する。
Next, as a fourth step, the newly installed main rope is laid around. First, as described with reference to FIG. 4, the existing main rope cutting portion 20 obtained by cutting the existing main rope 6 and the new main rope end portion 21 of the new main rope 27 wound around the feed drum 26 arranged in the top floor hall are provided. Connect in the same way
The connection portion 25 shown in FIG. Next, the remaining rope end 6b of the existing main rope 6 is unfixed, and the connecting portion 25
Passes through the sheave 7a and the weight pulley 5a, and the beam 8
The rope end 6b is pulled up from the hole side until it comes out to the upper part, then the connecting portion 25 is removed and the new main rope end portion 21 of the new main rope 27 is fixed to the beam 8.

【0026】次に第五行程として、既設主ロープ6にお
ける除去作業と逆の手順で、図11に示すように作業足
場10からの作業者が新設主ロープ27におけるかご下
プーリ4aに巻け回す部分をU字状に引き降ろし、昇降
路の底部1aからの作業者がかご下プーリ4aに新設主
ロープ27を掛け、手で張力を加えた状態で新設主ロー
プ27を上述のロープ保持具15で保持する。その後、
新設主ロープ27を所定の長さに切断して端末処理を施
した後、新設主ロープ27のロープ端6aをビーム8に
連結し、作業足場10、保持用ワイヤロープ12、吊り
上げ手段13およびロープ保持具15を取り外して主ロ
ープ交換作業を完了する。
Next, as a fifth step, in a procedure reverse to the removal work for the existing main ropes 6, as shown in FIG. 11, a worker from the work scaffold 10 winds around the lower car pulley 4a of the new main ropes 27. Is pulled down in a U-shape, and the operator from the bottom 1a of the hoistway hangs the new main rope 27 on the car lower pulley 4a, and holds the new main rope 27 with the above-mentioned rope holder 15 while tension is applied by hand. To do. afterwards,
After cutting the new main rope 27 to a predetermined length and performing terminal treatment, the rope end 6a of the new main rope 27 is connected to the beam 8, and the work scaffold 10, the holding wire rope 12, the lifting means 13 and the rope are connected. The holder 15 is removed to complete the main rope replacement work.

【0027】このように乗かご4の保持位置を最上階近
傍ではなく最下階近傍としたため、昇降路1の底部1a
からかご下プーリ4aでの主ロープ6,27の掛け作業
や外し作業が可能となり、従来のように作業中に乗かご
を移動させることが無く、簡単かつ効率良く交換作業を
行なうことができる。また、ロープ端6aと巻上機7の
シーブ7a間で主ロープ6,27のU字状部分を上げ下
げするようにしたため、昇降路1の頂部1b近傍に配置
した作業足場10から容易に既設主ロープ6を引き上げ
たり、新設主ロープ27を引き降ろしたりすることがで
き、主ロープ6,27のプーリ外れを気に掛けることも
なく、引き出し補助装置を用いる必要もないので、効率
良く経済的に交換作業を行なうことができる。さらに釣
り合い錘5を保持用ワイヤロープ12と吊り上げ手段1
3で保持するために、第1実施形態と同様に保持用ワイ
ヤロープ12を錘上プーリ5aのリム5bに通すための
操作棒14を用いたため、上部作業用の作業足場10を
1段のみ組むだけで行なえるので作業効率も一層良くな
る。こうして昇降路1の頂部に機械室を形成することな
く、巻上機7を昇降路1内の頂部1bに設置したエレベ
ータの主ロープ交換においても適用することができる。
As described above, since the holding position of the car 4 is not near the uppermost floor but near the lowermost floor, the bottom portion 1a of the hoistway 1 is
The main ropes 6 and 27 can be hung up and removed from the lower basket pulley 4a, and the work can be performed easily and efficiently without moving the car during the work as in the conventional case. Further, since the U-shaped portions of the main ropes 6, 27 are raised and lowered between the rope end 6a and the sheave 7a of the hoisting machine 7, it is easy to use the existing scaffolding 10 from the work scaffolding 10 arranged near the top 1b of the hoistway 1. The rope 6 can be pulled up, the new main rope 27 can be pulled down, there is no need to worry about the pulleys of the main ropes 6 and 27 coming off, and it is not necessary to use a drawer auxiliary device, so efficient and economical replacement is possible. You can work. Further, the counterweight 5 is attached to the holding wire rope 12 and the lifting means 1
Since the operation rod 14 for passing the holding wire rope 12 through the rim 5b of the on-weight pulley 5a is used to hold the work scaffolding 3 in the same manner as in the first embodiment, the work scaffold 10 for upper work is assembled in only one stage. Since it can be done only by itself, work efficiency is further improved. Thus, the hoisting machine 7 can be applied to the main rope replacement of the elevator installed on the top 1b in the hoistway 1 without forming a machine room at the top of the hoistway 1.

【0028】尚、上述した実施形態では、ガイドレール
2にボルト固定したかご保持材11を用いて乗かご4を
保持するようにしたが、乗かご4の上位置に係合部を備
えたブラケットをガイドレール2に固定し、このブラケ
ットに係止した索状体を乗かご4の下部にかけて保持し
ても良い。
In the above-mentioned embodiment, the car 4 is held by using the car holding member 11 fixed to the guide rail 2 by bolts. However, the bracket having the engaging portion at the upper position of the car 4 May be fixed to the guide rail 2 and the cord-like body locked to this bracket may be held by hanging it on the lower part of the car 4.

【0029】上述した本発明の第1実施形態では、テー
ルコードの外し作業を前提に述べたが、テールコードの
抜き差しに伴うコネクタとの配線不良が懸念される場合
は、テールコードの抜き差しを行わずロープ交換を行う
ようにしてもよい。このようにして行う本発明の第3実
施形態を図12から図14により説明する。
In the above-described first embodiment of the present invention, the operation for removing the tail cord has been described as a premise. However, if there is a possibility of wiring failure with the connector due to the insertion / removal of the tail cord, the removal / attachment of the tail cord is performed. Instead, the rope may be replaced. The third embodiment of the present invention thus performed will be described with reference to FIGS.

【0030】本発明の第1実施形態の第三工程に対し
て、昇降路1の底部1aで図12の如くかご下プーリ4
aに掛かっている既設主ロープ6を一旦切断し、かご下
プーリ4aからの掛かりを外しテールコード28を避け
た後、図13の如く切断端をロープ接続手段29により
再接続する。以降、巻上機7のシーブ7aから既設主ロ
ープ6の掛かりを外した後、本発明の第1実施形態と同
様に行う。
For the third step of the first embodiment of the present invention, at the bottom 1a of the hoistway 1, as shown in FIG.
The existing main rope 6 hanging on a is temporarily cut, the hanging from the under car pulley 4a is removed to avoid the tail cord 28, and the cut end is reconnected by the rope connecting means 29 as shown in FIG. After that, after removing the hook of the existing main rope 6 from the sheave 7a of the hoisting machine 7, the same operation as in the first embodiment of the present invention is performed.

【0031】第五工程に対して、まず、本発明の第1実
施形態の新設主ロープ取付作業と同様、図14に示す作
業足場10で転向プーリ8aと転向プーリ8b間に位置
する新設主ロープ27を下方に引き降ろし、これを昇降
路1の底部1aに配置した巻上機7のシーブ7aに掛け
た後、作業足場10で新設主ロープ27に張力を加えた
状態で、既設ロープ6の除去時と同様に転向プーリ8a
における最上階ホールに設置した送りドラム26側にロ
ープクリップ16を固定し、巻上機7方向へのロープ自
重による落下を阻止する。次いで、乗かご4のテールコ
ード28により新設主ロープ27の降ろしが不可能な場
合は、図14の如くロープ端部6と転向プーリ8a間の
新設主ロープ27を全て昇降路1の底部1aに引き降ろ
し、かご下プーリ4aに掛けた後にロープ端部6を昇降
路1頂部1bに引き上げ、手で張力を加えロープホ治具
15に対応する位置の新設主ロープ27を仮保持する。
以降、本発明の第1実施形態と同様に行う。
For the fifth step, first, like the new main rope attaching work of the first embodiment of the present invention, the new main rope located between the turning pulley 8a and the turning pulley 8b on the work scaffolding 10 shown in FIG. After pulling down 27 and hanging it on the sheave 7a of the hoisting machine 7 arranged at the bottom 1a of the hoistway 1, the existing rope 6 is removed while tension is applied to the new main rope 27 by the work scaffold 10. Turning pulley 8a as at the time
The rope clip 16 is fixed to the side of the feed drum 26 installed in the hall on the uppermost floor in order to prevent the rope clip 16 from dropping toward the hoisting machine 7 due to its own weight. Next, when the new main rope 27 cannot be lowered by the tail cord 28 of the car 4, all the new main rope 27 between the rope end 6 and the turning pulley 8a is placed on the bottom 1a of the hoistway 1 as shown in FIG. After pulling down and hanging on the lower car pulley 4a, the rope end 6 is pulled up to the top 1b of the hoistway 1 and tension is manually applied to temporarily hold the new main rope 27 at a position corresponding to the rope e jig 15.
The subsequent steps are similar to those of the first embodiment of the present invention.

【0032】このように、第三工程と第五工程の作業を
行うことで、乗かご4のテールコード28により、ロー
プ端6aと転向プーリ8a間の既設主ロープ6をU字で
引き上げ、新設主ロープ27の降ろしが不可能な場合で
も、この第3実施形態を採用することにより主ロープ交
換作業が可能となる。
As described above, by performing the operations of the third step and the fifth step, the tail cord 28 of the car 4 pulls up the existing main rope 6 between the rope end 6a and the turning pulley 8a in a U-shape to newly install it. Even if the main rope 27 cannot be lowered, the main rope can be replaced by adopting the third embodiment.

【0033】また、本発明の第2実施形態においても、
テールコード28の外し作業を前提に述べたが、テール
コード28の抜き差しに伴うコネクタとの配線不良が懸
念される場合は、テールコード28の抜き差しを行わず
ロープ交換を行うようにしてもよい。このようにして行
う本発明の第4実施形態を図15から図17により説明
する。
Also, in the second embodiment of the present invention,
Although the operation for removing the tail cord 28 has been described as a premise, the rope may be exchanged without inserting / removing the tail cord 28 if there is a possibility of a wiring failure with the connector due to the insertion / removal of the tail cord 28. The fourth embodiment of the present invention thus performed will be described with reference to FIGS.

【0034】本発明の第2実施形態の第三工程に対し
て、昇降路1の底部1aで図15の如くかご下プーリ4
aに掛かっている既設主ロープ6を一旦切断し、かご下
プーリ4aからの掛かりを外しテールコード28を避け
た後、図16の如く切断端をロープ接続手段29により
再接続する。以降、第三工程の作業は本発明の第2実施
形態と同様に行う。
As compared with the third step of the second embodiment of the present invention, at the bottom 1a of the hoistway 1, as shown in FIG.
The existing main rope 6 hanging on a is temporarily cut, the hanging from the car lower pulley 4a is removed to avoid the tail cord 28, and the cut end is reconnected by the rope connecting means 29 as shown in FIG. After that, the work of the third step is performed in the same manner as in the second embodiment of the present invention.

【0035】第五工程に対しては、本発明の第2実施形
態の新設主ロープ取付作業と同様、図17に示す作業足
場10から図示の如くロープ端部6と転向プーリ8a間
の新設主ロープ27を全て昇降路1の底部1aに引き降
ろし、かご下プーリ4aに掛けた後にロープ端部6を昇
降路1頂部1bに引き上げ、手で張力を加えロープ保持
具15に対応する位置の新設主ロープ27を仮保持す
る。以降、前述した第2実施形態と同様に行う。このよ
うに、第三工程と第五工程の作業を行うことで、乗かご
4のテールコード28により、ロープ端6aと転向プー
リ8a間の既設主ロープ6をU字で引き上げ、新設主ロ
ープ27の降ろしが不可能な場合でも、この第4実施形
態を採用することにより主ロープ交換作業が可能とな
る。
For the fifth step, similar to the new main rope attaching work of the second embodiment of the present invention, the new main rope between the rope end 6 and the turning pulley 8a is shown from the work scaffold 10 shown in FIG. All the ropes 27 are pulled down to the bottom 1a of the hoistway 1 and hung on the lower car pulley 4a, and then the rope end 6 is pulled up to the top 1b of the hoistway 1 and tension is applied by hand to newly install a position corresponding to the rope holder 15. The rope 27 is temporarily held. The subsequent steps are the same as those in the second embodiment described above. In this way, by performing the operations of the third step and the fifth step, the tail cord 28 of the car 4 pulls up the existing main rope 6 between the rope end 6a and the turning pulley 8a in a U shape, and the new main rope 27 Even if it is impossible to unload the main rope, the main rope replacement work can be performed by adopting the fourth embodiment.

【0036】[0036]

【発明の効果】以上説明したように本発明によるエレベ
ータの主ロープ交換方法は、かごの保持位置を最上階近
傍ではなく最下階近傍としたため、かご下プーリにおけ
る既設主ロープの取り外し作業や新設主ロープの掛け作
業を昇降路の底部から実施できるので、従来のように作
業中に乗かごを移動させることなく、簡単かつ効率良く
交換作業を行なえるようになる。
As described above, in the method of replacing the main rope of the elevator according to the present invention, the car holding position is not near the uppermost floor but near the lowermost floor. Since the main rope can be hung from the bottom of the hoistway, it is possible to perform the replacement work easily and efficiently without moving the car during the work as in the conventional case.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施形態によるエレベータの主ロ
ープ交換方法を採用したエレベータの作業初期状態を示
す断面図である。
FIG. 1 is a cross-sectional view showing an initial working state of an elevator adopting a method of replacing an elevator main rope according to a first embodiment of the present invention.

【図2】図1に示したエレベータの主ロープ交換方法を
採用したエレベータの作業途中状態を示す要部拡大断面
図である。
FIG. 2 is an enlarged cross-sectional view of essential parts showing an intermediate state of operation of an elevator that employs the method of replacing the main rope of the elevator shown in FIG.

【図3】図1に示したエレベータの主ロープ交換方法を
採用したエレベータの他の作業途中状態を示す断面図で
ある。
FIG. 3 is a cross-sectional view showing another state in which the elevator adopting the method of replacing the main rope of the elevator shown in FIG. 1 is in the middle of another operation.

【図4】図1に示したエレベータの主ロープ交換方法を
採用したエレベータの既設主ロープと新設主ロープの接
続部を拡大して示す正面図である。
FIG. 4 is an enlarged front view showing a connecting portion between an existing main rope and a new main rope of an elevator adopting the elevator main rope replacement method shown in FIG. 1.

【図5】図1に示したエレベータの主ロープ交換方法を
採用したエレベータのさらに他の作業途中状態を示す断
面図である。
FIG. 5 is a cross-sectional view showing still another working state of the elevator adopting the method of replacing the main rope of the elevator shown in FIG. 1.

【図6】図1に示したエレベータの主ロープ交換方法を
採用したエレベータのさらに他の作業途中状態を示す断
面図である。
FIG. 6 is a cross-sectional view showing still another working state of the elevator adopting the method of replacing the main rope of the elevator shown in FIG. 1.

【図7】図1に示したエレベータの主ロープ交換方法を
採用したエレベータの作業終期状態を示す断面図であ
る。
FIG. 7 is a cross-sectional view showing an end-of-work state of an elevator adopting the elevator main rope replacement method shown in FIG.

【図8】本発明の第2実施形態によるエレベータの主ロ
ープ交換方法を採用したエレベータの作業初期状態を示
す断面図である。
FIG. 8 is a cross-sectional view showing an initial working state of an elevator that employs a method of replacing an elevator main rope according to a second embodiment of the present invention.

【図9】図8に示したエレベータの主ロープ交換方法を
採用したエレベータの作業途中状態を示す断面図であ
る。
9 is a cross-sectional view showing an intermediate state of operation of an elevator adopting the elevator main rope replacement method shown in FIG.

【図10】図8に示したエレベータの主ロープ交換方法
を採用したエレベータの他の作業途中状態を示す断面図
である。
FIG. 10 is a cross-sectional view showing another state of work in progress of the elevator adopting the method of replacing the main rope of the elevator shown in FIG.

【図11】図8に示したエレベータの主ロープ交換方法
を採用したエレベータの作業終期状態を示す断面図であ
る。
11 is a cross-sectional view showing an end-of-work state of an elevator adopting the elevator main rope replacement method shown in FIG.

【図12】本発明の第3実施形態による主ロープ交換方
法を採用したエレベータの作業途中状態を示す断面図で
ある。
FIG. 12 is a cross-sectional view showing an intermediate state of operation of an elevator adopting the main rope replacement method according to the third embodiment of the present invention.

【図13】本発明の第3の実施形態による主ロープ交換
方法を採用したエレベータの他の作業途中状態を示す断
面図である。
FIG. 13 is a cross-sectional view showing another state in which the elevator adopting the main rope replacing method according to the third embodiment of the present invention is in the middle of another operation.

【図14】本発明の第3の実施形態による主ロープ交換
方法を採用したエレベータのさらに他の作業途中状態を
示す断面図である。
FIG. 14 is a cross-sectional view showing still another midway work state of the elevator adopting the main rope replacing method according to the third embodiment of the present invention.

【図15】本発明の第4実施形態による主ロープ交換方
法を採用したエレベータの作業途中状態を示す断面図で
ある。
FIG. 15 is a cross-sectional view showing an intermediate state of operation of an elevator adopting the main rope replacement method according to the fourth embodiment of the present invention.

【図16】本発明の第4の実施形態による主ロープ交換
方法を採用したエレベータの他の作業途中状態を示す断
面図である。
FIG. 16 is a cross-sectional view showing another state in which the elevator adopting the main rope replacing method according to the fourth embodiment of the present invention is in the middle of another operation.

【図17】本発明の第4の実施形態による主ロープ交換
方法を採用したエレベータのさらに他の作業途中状態を
示す断面図である。
FIG. 17 is a cross-sectional view showing still another working state of the elevator adopting the main rope replacing method according to the fourth embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 昇降路 1a 底部 1b 頂部 4 乗かご 4a かご下プーリ 5 釣り合い錘 6 既設主ロープ 6a,6b ロープ端 7 巻上機 7a シーブ 10 作業足場 12 保持用ワイヤロープ 13 吊り上げ手段 14 操作棒 23a,23b ストランド 27 新設主ロープ 28 テールコード 1 hoistway 1a bottom 1b top 4 car 4a Lower basket pulley 5 Counterweight 6 Existing main rope 6a, 6b rope end 7 Hoisting machine 7a sheave 10 working scaffolds 12 Holding wire rope 13 Lifting means 14 Control rod 23a, 23b Strand 27 New main rope 28 tail cord

フロントページの続き (72)発明者 五味 瑞樹 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 井上 幸次 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 竹内 愛浩 茨城県日立市東多賀町一丁目1番1号 日 立多賀テクノロジー株式会社内 (72)発明者 長沼 清 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 山下 浩二 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 佐保田 典之 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 Fターム(参考) 3F305 BA03 BB02 BB19 DA11 DA15Continued front page    (72) Inventor Mizuki Gomi             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System (72) Inventor Koji Inoue             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System (72) Inventor Akihiro Takeuchi             1-1 1-1 Higashitaga-cho, Hitachi-shi, Ibaraki             Inside Titaga Technology Co., Ltd. (72) Inventor Kiyoshi Naganuma             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System (72) Inventor Koji Yamashita             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System (72) Inventor Noriyuki Sabota             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System F term (reference) 3F305 BA03 BB02 BB19 DA11 DA15

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 既設主ロープの両ロープ端を昇降路の頂
部付近に連結し、上記既設主ロープの中間部を、少なく
とも釣り合い錘の上部に設けた錘上プーリと、巻上機の
シーブと、この巻上機により駆動されて昇降する乗かご
の下部に設けたかご下プーリに掛け回し、上記乗かごお
よび上記釣り合い錘を所定位置に保持した状態で上記既
設主ロープを新設主ロープに交換するエレベータの主ロ
ープ交換方法において、上記乗かごを上記昇降路の下部
近傍に保持すると共に、上記釣り合い錘を上記昇降路の
上部近傍で保持した状態とし、この状態で上記かご下プ
ーリにおける上記既設主ロープの掛かりを外し、上記昇
降路の上部に設けた作業足場から上記既設主ロープをU
字状に引き上げ、上記既設主ロープの所定位置を切断
し、この残った側の切断端に上記新設主ロープの一端を
連結した後、上記作業足場から上記新設主ロープをU字
状に降ろして上記かご下プーリに掛け回すようにしたこ
とを特徴とするエレベータの主ロープ交換方法。
1. An overhead main pulley, wherein both ends of an existing main rope are connected near the top of a hoistway, and an intermediate portion of the existing main rope is provided with a hoisting pulley provided at least above a counterweight and a sheave of a hoisting machine. , The existing main rope is replaced with a new main rope while the car and the counterweight are held in place by being hung around the car lower pulley installed at the bottom of the car that is driven by this hoist to go up and down. In the elevator main rope replacement method described above, the car is held near the lower part of the hoistway, and the counterweight is held near the upper part of the hoistway. Remove the main rope from the main scaffolding provided above the hoistway and remove the existing main rope
Pull up in a letter shape, cut a predetermined position of the existing main rope, connect one end of the new main rope to the cut end on the remaining side, and then lower the new main rope in a U shape from the work scaffolding. A method for replacing the main rope of an elevator, characterized in that it is hung around the pulley under the car.
【請求項2】 請求項1記載のものにおいて、上記巻上
機は、上記昇降路の底部に配置し、上記巻上機のシーブ
に掛けた上記既設主ロープの両側を上記昇降路の頂部付
近に設けた転向プーリにそれぞれ掛け、上記既設主ロー
プの切断する所定位置とは、上記両転向プーリの上記か
ご下プーリ側としたことを特徴とするエレベータの主ロ
ープ交換方法。
2. The hoisting machine according to claim 1, wherein the hoisting machine is arranged at the bottom of the hoistway, and both sides of the existing main rope hung on the sheave of the hoisting machine are near the top of the hoistway. The main rope replacement method for an elevator, characterized in that the predetermined position at which the existing main rope is cut by being hung on each of the turning pulleys provided on the above is the car lower pulley side of both the turning pulleys.
【請求項3】 請求項1記載のものにおいて、上記既設
主ロープは、上記昇降路の上部近傍に保持した上記釣り
合い錘に掛け回されU字状部位を残して除去し、この残
した上記既設主ロープの端に上記新設主ロープの一端を
連結し、上記既設主ロープを回収しながら上記新設主ロ
ープの一端を昇降路の頂部近傍に固定した後、上記作業
足場から上記新設主ロープをU字状に降ろして上記かご
下プーリに掛け回すようにしたことを特徴とするエレベ
ータの主ロープ交換方法。
3. The existing main rope according to claim 1, wherein the existing main rope is hung around the counterweight held near the upper part of the hoistway and removed leaving a U-shaped portion, and the remaining existing rope is removed. Connect one end of the new main rope to the end of the main rope, fix one end of the new main rope near the top of the hoistway while collecting the existing main rope, and then attach the new main rope from the work scaffolding to the U A method for exchanging a main rope of an elevator, characterized in that the rope is lowered into a letter shape and hung around the pulley under the car.
【請求項4】 請求項1記載のものにおいて、上記既設
主ロープと上記新設主ロープの連結は、少なくともスト
ランド1本同志をそれぞれ折り返して引っ掛け、この引
っ掛け部を養生して所定の太さとしたことを特徴とする
エレベータの主ロープ交換方法。
4. The connection between the existing main rope and the new main rope according to claim 1, wherein at least one strand of each rope is folded back and hooked, and the hooked portion is cured to have a predetermined thickness. Main rope replacement method for elevators.
【請求項5】 請求項1記載のものにおいて、上記釣り
合い錘は、上記作業足場から長尺の操作棒を用いて上記
釣り合い錘の所定個所に保持用ワイヤロープを係り止め
させ、この保持用ワイヤロープを介して吊り上げ手段で
上記釣り合い錘を保持したことを特徴とするエレベータ
の主ロープ交換方法。
5. The balancing weight according to claim 1, wherein the holding wire rope is locked to a predetermined portion of the balancing weight from the working scaffold by using a long operating rod, and the holding wire is retained. A method of exchanging a main rope of an elevator, characterized in that the counterweight is held by a lifting means via a rope.
【請求項6】 請求項1記載のものにおいて、上記既設
主ロープの引き上げは、上記乗りかご下部に掛かってい
るロープを一旦切断して、上記かご下プーリへのロープ
の掛かりを外した後、上記ロープの切断端部同士を接続
してU字状に引き上げることを特徴とするエレベータの
主ロープ交換方法。
6. The rope according to claim 1, wherein the existing main rope is pulled up after the rope hanging on the lower portion of the car is temporarily cut and the rope under the car pulley is unhooked. A method for replacing a main rope of an elevator, characterized in that the cut ends of the rope are connected to each other and pulled up in a U-shape.
【請求項7】 請求項1記載のものにおいて、上記かご
下プーリへ上記新設主ロープを掛けるに際し、上記ロー
プを全て昇降路下部に引き降ろし、上記新設主ロープ端
部を上記かご下部のプーリに掛けた後に、上記新設主ロ
ープ端部を上記昇降路上部に引き上げることを特徴とす
るエレベータの主ロープ交換方法。
7. The method according to claim 1, wherein, when the new main rope is hung on the car lower pulley, all the rope is pulled down to the lower part of the hoistway, and the end of the new main rope is hung on the pulley under the car. After that, the main rope replacing method for an elevator is characterized in that the end portion of the new main rope is pulled up to the upper part of the hoistway.
JP2001220475A 2001-07-19 2001-07-19 Main rope replacing method of elevator Pending JP2003034475A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001220475A JP2003034475A (en) 2001-07-19 2001-07-19 Main rope replacing method of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001220475A JP2003034475A (en) 2001-07-19 2001-07-19 Main rope replacing method of elevator

Publications (1)

Publication Number Publication Date
JP2003034475A true JP2003034475A (en) 2003-02-07

Family

ID=19054288

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001220475A Pending JP2003034475A (en) 2001-07-19 2001-07-19 Main rope replacing method of elevator

Country Status (1)

Country Link
JP (1) JP2003034475A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112744665A (en) * 2019-10-31 2021-05-04 通力股份公司 Method for winding rope of elevator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112744665A (en) * 2019-10-31 2021-05-04 通力股份公司 Method for winding rope of elevator
CN112744665B (en) * 2019-10-31 2024-04-26 通力股份公司 Method for roping an elevator

Similar Documents

Publication Publication Date Title
JP4089986B2 (en) Hydraulic rope main rope replacement method
JP4491110B2 (en) Elevator rope hanging method
JP3277486B2 (en) Existing main rope winding device of the elevator
JP3841616B2 (en) Elevator main rope replacement method and apparatus
JP2003034475A (en) Main rope replacing method of elevator
JPH09151053A (en) Fixing device for car of elevator
JP2839970B2 (en) Elevator main cable replacement method
JP2003201074A (en) Confinement rescue method for elevator and its device
JPH082850A (en) Work method in elevator shaft
JP2912989B2 (en) Main rope hanging method of elevator
WO2024069711A1 (en) Elevator main cable replacement method and replacement assisting tool
CN114728762B (en) Rope conveying support auxiliary device for elevator rope replacing operation
JP2000344440A (en) Method of operation for hanging main rope of 2:1 roping elevator and main rope guide device therefor
JP3471257B2 (en) Elevator main cable replacement method
JP4790941B2 (en) Elevator main rope hanging method
JPH10203751A (en) Main rope replacing method of 2:1 roping elevator and device thereof
JP2003238046A (en) Main rope replacing method for elevator
JPH02117582A (en) Main rope exchange method for elevator
JPH11189378A (en) Main rope mounting jig for 2:1-roping elevator
JP2002265164A (en) Main rope replacing method and main rope replacing device for two-to-one roping elevator
JP3464395B2 (en) Elevator main cable replacement method
JPH0751432B2 (en) Main rope replacement method for elevators
JP2022126286A (en) Replacement assist device of governor rope and replacement method of governor rope
JP2002205886A (en) Main rope replacing method for elevator
JP2002003125A (en) Method for replacing main rope of elevator