JP2002355866A - Injection molding method - Google Patents

Injection molding method

Info

Publication number
JP2002355866A
JP2002355866A JP2001165388A JP2001165388A JP2002355866A JP 2002355866 A JP2002355866 A JP 2002355866A JP 2001165388 A JP2001165388 A JP 2001165388A JP 2001165388 A JP2001165388 A JP 2001165388A JP 2002355866 A JP2002355866 A JP 2002355866A
Authority
JP
Japan
Prior art keywords
gate
molten resin
injection
cavity
injected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001165388A
Other languages
Japanese (ja)
Other versions
JP3310271B1 (en
Inventor
Sotoji Saeki
外司 佐伯
Makoto Suzuki
鈴木  誠
Katsumasa Isotani
勝正 磯谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa Kasei Industry Co Ltd
Original Assignee
Daiwa Kasei Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa Kasei Industry Co Ltd filed Critical Daiwa Kasei Industry Co Ltd
Priority to JP2001165388A priority Critical patent/JP3310271B1/en
Application granted granted Critical
Publication of JP3310271B1 publication Critical patent/JP3310271B1/en
Publication of JP2002355866A publication Critical patent/JP2002355866A/en
Priority to JP2003196425A priority patent/JP3911494B2/en
Priority to US10/632,844 priority patent/US7338627B2/en
Priority to EP03255076A priority patent/EP1498250B1/en
Priority to CNA031581978A priority patent/CN1575953A/en
Priority to US11/353,425 priority patent/US7422426B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/03Injection moulding apparatus
    • B29C45/13Injection moulding apparatus using two or more injection units co-operating with a single mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C2045/0089Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor successive filling of parts of a mould cavity, i.e. one cavity part being filled before another part is filled

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an injection molding method making a contribution to energy saving and the reduction of equipment cost and manufacturing cost by reducing a mold clamping force in terms of both projected area of a molded product and injection pressure. SOLUTION: A first gate 21 which first injects a first molten resin 101 at one end (a filling start side) in the longer direction, to a cavity 13 formed in an injection molding die 5 and a second gate 22 which injects a second molten resin 102 consecutively at the other end (a filling completion side), are arranged to a cavity 13 formed in the injection-molding die 5. Before the flow head part of the first molten resin 101 injected from the first gate 21 reaches the position of the second gate 22, the second molten resin 102 is injected anew from the second gate 22. In addition, the first molten resin 101 is almost cooled and solidified before the second molten resin 102 reaches the terminal of the filling completion side in the cavity 13.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、自動車用樹脂部品
等の、特に長尺状の成形品に適した射出成形方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an injection molding method suitable for a long molded article, such as a resin part for automobiles.

【0002】[0002]

【従来の技術】例えば、自動車のワイヤリングハーネス
用プロテクタのような長尺状の樹脂製品は、射出成形機
により製造されるのが一般的である。射出成形機は、樹
脂材料を溶かして射出する射出装置と、金型を高圧で締
め付ける型締め装置とを有しており、その能力を「型締
め力」で表示することが多い。「型締め力」は、「金型
の移動方向に垂直な面での成形品の投影面積」と、「金
型内の平均樹脂圧力」との積で表わされ、この数値(ト
ン数で表わす)が大きくなるほど装置が大型化し、それ
につれて設備費もかさむことになる。例えば、長さ数十
cm程度の長尺状樹脂製品でも200t前後の型締め力
を必要とするので、型締め力の低減化による設備の小型
化が要望されている。
2. Description of the Related Art For example, an elongated resin product such as a protector for a wiring harness of an automobile is generally manufactured by an injection molding machine. An injection molding machine has an injection device that melts and injects a resin material and a mold clamping device that clamps a mold at high pressure, and its capability is often indicated by “mold clamping force”. The “clamping force” is represented by the product of “the projected area of the molded product on a plane perpendicular to the mold moving direction” and “average resin pressure in the mold”. The larger the value of (representation), the larger the device, and the higher the equipment cost. For example, even a long resin product having a length of about several tens of cm requires a mold clamping force of about 200 tons, and therefore, there is a demand for downsizing of equipment by reducing the mold clamping force.

【0003】従来から、型締め力の低減化を図るため
に、主として射出圧力を低くする(結果的に、金型内の
平均樹脂圧力も低くなる)手法が取られてきた。このよ
うな低圧成形法として、半開状態の金型のキャビティ内
に溶融樹脂を射出して、固化する前に型締めする方法
や、キャビティ内に溶融樹脂を所定量だけ射出してお
き、これとは別の副室(樹脂溜り)に充填しておいた溶
融樹脂をキャビティ内に押し込んで、固化する前に型締
めする方法等が知られている。
[0003] Conventionally, in order to reduce the mold clamping force, a method of mainly reducing the injection pressure (and, consequently, the average resin pressure in the mold has been reduced) has been adopted. As such a low-pressure molding method, a method of injecting a molten resin into a cavity of a mold in a half-open state and clamping the mold before solidifying, or injecting a predetermined amount of the molten resin into a cavity, and There is known a method in which a molten resin filled in another sub-chamber (resin reservoir) is pushed into a cavity and clamped before solidification.

【0004】[0004]

【発明が解決しようとする課題】しかしこれらの低圧成
形法においても、キャビティ内の隅々まで溶融樹脂を行
き渡らせる必要性は変わらないから、射出圧力(ひいて
は金型内の平均樹脂圧力)を十分に下げることができ
ず、型締め力の低減化にも限界がある。
However, even in these low-pressure molding methods, the necessity of distributing the molten resin to every corner in the cavity does not change, so that the injection pressure (and, consequently, the average resin pressure in the mold) is sufficiently increased. And there is a limit in reducing the mold clamping force.

【0005】本発明の課題は、成形品の投影面積と射出
圧力との両面から型締め力の低減化を図り、省エネルギ
ーと設備費・製造コストの低減にも寄与する射出成形方
法を提供することにある。
An object of the present invention is to provide an injection molding method which reduces the mold clamping force from both the projected area of the molded product and the injection pressure, and also contributes to energy saving and reduced equipment and manufacturing costs. It is in.

【0006】[0006]

【課題を解決するための手段及び発明の効果】上記課題
を解決するために、本発明に係る射出成形方法は、射出
成形用金型に形成されたキャビティの長手方向一端側を
溶融樹脂の充填開始側、その他端側を充填完了側に設定
し、このキャビティ内に前記溶融樹脂を射出するゲート
が前記充填開始側から充填完了側に向けて複数配置され
るとともに、前記充填開始側のゲートの射出開始から所
定の時間差にて、前記溶融樹脂が順次前記キャビティ内
へ射出されることを特徴とする。
Means for Solving the Problems and Effects of the Invention In order to solve the above-mentioned problems, an injection molding method according to the present invention provides a method of filling one end of a cavity formed in an injection molding die in a longitudinal direction with a molten resin. The start side, the other end side is set to the filling completion side, and a plurality of gates for injecting the molten resin into the cavity from the filling start side to the filling completion side are arranged, and the gate of the filling start side is The molten resin is sequentially injected into the cavity at a predetermined time difference from the start of injection.

【0007】そして本発明では、複数のゲートのうち最
終ゲートから射出された溶融樹脂が充填完了側末端に達
する(すなわち、キャビティ内の充填を完了する)とき
までに、その他のゲートから射出された溶融樹脂がほぼ
冷却・固化した状態を実現できる。
According to the present invention, the molten resin injected from the last gate among the plurality of gates is injected from the other gates by the time the resin reaches the end on the filling completion side (ie, the filling of the cavity is completed). A state in which the molten resin is substantially cooled and solidified can be realized.

【0008】このことから、最終ゲートから射出される
溶融樹脂が埋めるべき実質的な投影面積は、キャビティ
の全投影面積よりかなり小さくなる(既に冷却・固化し
た部分の投影面積が減少する)。一方、最終ゲートから
射出される溶融樹脂が埋めるべき範囲が、キャビティ内
で既に冷却・固化した部分だけ縮小することで、キャビ
ティ内の隅々まで溶融樹脂を行き渡らせなくてもよくな
り、それに対応して射出圧力(ひいては金型内の平均樹
脂圧力)を下げることができる。したがって、最大型締
め力を決定する最終ゲートからの射出時において、実質
的な成形品の投影面積を小さくでき、かつ射出圧力も低
くできるので、成形品の投影面積と射出圧力との両面か
ら型締め力の低減化を図ることができる。
Accordingly, the substantial projected area to be filled with the molten resin injected from the final gate is considerably smaller than the total projected area of the cavity (the projected area of the already cooled and solidified portion is reduced). On the other hand, the area to be filled by the molten resin injected from the final gate is reduced only in the already cooled and solidified part of the cavity, so that it is not necessary to spread the molten resin to every corner of the cavity. As a result, the injection pressure (and, consequently, the average resin pressure in the mold) can be reduced. Therefore, at the time of injection from the final gate for determining the maximum mold clamping force, the actual projected area of the molded article can be reduced and the injection pressure can be reduced, so that the mold can be obtained from both the projected area of the molded article and the injection pressure. The tightening force can be reduced.

【0009】また、本発明に係る射出成形方法を、2つ
のゲートを有する射出成形用金型に適用した場合には、
上記課題を解決するために、射出成形用金型に形成され
たキャビティの長手方向一端側を溶融樹脂の充填開始
側、その他端側を充填完了側に設定し、前記充填開始側
に第一ゲート、前記充填完了側に第二ゲートがそれぞれ
配置されるとともに、前記第一ゲートから射出された第
一溶融樹脂の流動先頭部が前記第二ゲートの位置に達す
る前に、その第二ゲートから第二溶融樹脂が新たに射出
され、その第二溶融樹脂が前記キャビティ内の前記充填
完了側末端に達するときまでに、前記第一溶融樹脂がほ
ぼ冷却・固化した状態となることを特徴とする。
When the injection molding method according to the present invention is applied to an injection mold having two gates,
In order to solve the above-mentioned problem, one end in the longitudinal direction of a cavity formed in an injection mold is set to a filling start side of a molten resin, and the other end is set to a filling completion side, and a first gate is set to the filling start side. A second gate is arranged on the filling completion side, respectively, and before the flow leading portion of the first molten resin injected from the first gate reaches the position of the second gate, the second gate is moved from the second gate to the second gate. By the time that the second molten resin is newly injected and the second molten resin reaches the end of the cavity on the filling completion side, the first molten resin is substantially cooled and solidified.

【0010】この場合、第二ゲートから射出される第二
溶融樹脂が埋めるべき実質的な投影面積は、第一ゲート
から射出された第一溶融樹脂がキャビティ内で既に冷却
・固化した部分の投影面積だけ減少し、例えばキャビテ
ィの全投影面積の1/3程度にまで小さくすることもで
きる。一方、この第二溶融樹脂が埋めるべき範囲は、上
記の通り第一溶融樹脂がキャビティ内で既に冷却・固化
した部分だけ縮小し、それに対応して射出圧力を下げる
ことができる。このように、成形品の投影面積と射出圧
力との両面から大幅な型締め力の低減化を図ることがで
きる。
In this case, the substantial projected area to be filled by the second molten resin injected from the second gate is the projection area of the portion where the first molten resin injected from the first gate has already cooled and solidified in the cavity. The area can be reduced, for example, to about 1/3 of the total projected area of the cavity. On the other hand, the range in which the second molten resin is to be filled can be reduced only in the portion where the first molten resin has already been cooled and solidified in the cavity as described above, and the injection pressure can be correspondingly reduced. As described above, the mold clamping force can be significantly reduced from both the projected area of the molded product and the injection pressure.

【0011】[0011]

【発明の実施の形態】次に、本発明の実施の形態を、図
面に示す実施例を参照して説明する。図1は本発明に用
いられる射出成形機の一実施例を示す断面図である。こ
の射出成形機1は、射出成形用金型5(以下、単に金型
という)を用いて自動車用樹脂部品等の成形品(例え
ば、自動車のワイヤリングハーネス用プロテクタのよう
な長尺状部品)を製造するもので、合成樹脂等の成形材
料を溶融して金型5へ射出する射出装置3と、金型5を
開閉したり高圧で締め付け固定したりする型締め装置
(図示せず)とを備えている。
Embodiments of the present invention will now be described with reference to the embodiments shown in the drawings. FIG. 1 is a sectional view showing one embodiment of an injection molding machine used in the present invention. The injection molding machine 1 uses an injection mold 5 (hereinafter simply referred to as a mold) to mold a molded article such as a resin part for an automobile (for example, a long part such as a protector for a wiring harness of an automobile). An injection device 3 for manufacturing and melting a molding material such as a synthetic resin and injecting it into a mold 5, and a mold clamping device (not shown) for opening and closing the mold 5 and fixing it with high pressure. Have.

【0012】金型5は、図中上側に位置する固定型7と
下側に位置する可動型9とに分割されている。可動型9
には、その中央部にコア部11(オス型)が突出状に形
成される一方、固定型7には、コア部11に対応して溶
融樹脂の充填される空間であるキャビティ13(メス
型)が形成されている。そして、固定型7はさらにその
上方に位置する固定側ダイプレート15に取り付けら
れ、可動型9はさらにその下方に位置する可動側ダイプ
レート17に取り付けられている。可動側ダイプレート
17は固定側ダイプレート15に対して上下方向に接近
離間可能とされ、これにより金型5を開閉可能とする型
締め装置(図示せず)に連結されている。
The mold 5 is divided into a fixed mold 7 located on the upper side in the figure and a movable mold 9 located on the lower side. Movable type 9
Has a core portion 11 (male type) formed at the center thereof in a protruding shape, while the fixed die 7 has a cavity 13 (female type) which is a space filled with the molten resin corresponding to the core portion 11. ) Is formed. The fixed mold 7 is attached to a fixed die plate 15 located further above, and the movable mold 9 is attached to a movable die plate 17 located further below. The movable die plate 17 is vertically movable toward and away from the fixed die plate 15, and is connected to a mold clamping device (not shown) that allows the mold 5 to be opened and closed.

【0013】図1で左右方向に長尺状のキャビティ13
の上面には、その長手方向(左右方向)の一端側に設定
される充填開始側に開口する第一ゲート21と、他端側
に設定される充填完了側に開口する第二ゲート22とが
形成されている。さらに、第一ゲート21は、固定型7
の内部を上下方向に貫通状に設けられているスプルー1
9を介して第一射出装置3先端の第一ノズル23と、他
方、第二ゲート22は、同じくスプルー20を介して第
二射出装置4先端の第二ノズル24と、それぞれ連通連
結されている。
In FIG. 1, the cavity 13 is elongated in the left-right direction.
A first gate 21 opening at one end in the longitudinal direction (left-right direction) and opening on the filling start side, and a second gate 22 opening on the other end and opening on the filling completion side. Is formed. Further, the first gate 21 is fixed 7
Sprue 1 penetrating vertically through the inside of the
The first nozzle 23 at the tip of the first injection device 3 is connected to the second nozzle 24 at the tip of the second injection device 4 via the sprue 20. .

【0014】なお、第一射出装置3及び第二射出装置4
は、それぞれ樹脂等の成形材料を溜めておくホッパ25
と、成形材料150を加熱溶融させた溶融樹脂を貯蔵す
るシリンダ27と、シリンダ27内において溶融樹脂を
キャビティ13へ送り込むスクリュ29とを有してい
る。
The first injection device 3 and the second injection device 4
Are hoppers 25 for storing molding materials such as resin, respectively.
And a cylinder 27 for storing a molten resin obtained by heating and melting the molding material 150, and a screw 29 for feeding the molten resin to the cavity 13 in the cylinder 27.

【0015】つぎに、この射出成形機1と金型5とを用
いた射出成形方法について、図1〜図3を用いて説明す
る。まず、射出成形工程の準備段階として、可動側ダイ
プレート17を固定側ダイプレート15に接近させて、
金型5のコア部11(オス型)とキャビティ13(メス
型)とを閉じる型締め工程、及び射出装置3,4のノズ
ル23,24を固定側ダイプレート15のノズル受け部
に移動固定するノズルタッチ工程等が実施される(図1
参照)。
Next, an injection molding method using the injection molding machine 1 and the mold 5 will be described with reference to FIGS. First, as a preparation stage of the injection molding process, the movable die plate 17 is brought close to the fixed die plate 15,
A mold clamping step for closing the core 11 (male type) and the cavity 13 (female type) of the mold 5, and the nozzles 23 and 24 of the injection devices 3 and 4 are moved and fixed to the nozzle receiving portions of the fixed die plate 15. A nozzle touch process and the like are performed (FIG. 1
reference).

【0016】このような状態において、第一射出装置3
のシリンダ27内で加熱溶融された所定温度の溶融樹脂
を、スクリュー29の前進によって第一ノズル23から
第一ゲート21を経て、金型5のキャビティ13内に射
出する第一射出工程が実施される。第一ゲート21から
射出された第一溶融樹脂101(先行溶融樹脂)の流動
先頭部は、図2(a)に示すように、キャビティ13内
において長手方向の始端側(図の左側)にも終端側(図
の右側)にも徐々に流動する。そして、この第一溶融樹
脂101の流動先頭部は、まずキャビティ13内の長手
方向始端に達して充填開始側への充填を完了するととも
に、充填領域を終端側へも広げていく。なお、第一射出
工程においては第二ゲート22からの射出は行われな
い。
In such a state, the first injection device 3
A first injection step of injecting a molten resin at a predetermined temperature heated and melted in the cylinder 27 from the first nozzle 23 through the first gate 21 into the cavity 13 of the mold 5 by advancement of the screw 29 is performed. You. As shown in FIG. 2A, the flow leading portion of the first molten resin 101 (preceding molten resin) injected from the first gate 21 is also located at the longitudinal start end (left side in the figure) in the cavity 13. It also gradually flows to the terminal side (right side in the figure). Then, the flow leading portion of the first molten resin 101 first reaches the longitudinal start end in the cavity 13 to complete the filling to the filling start side, and expands the filling region to the end side. Note that no injection is performed from the second gate 22 in the first injection step.

【0017】次に、第一溶融樹脂101の流動先頭部
が、第二ゲート22の位置よりも若干長手方向始端側
(第一ゲート21寄り)の位置に到達すると、第一ゲー
ト21からの射出を停止し、第二ゲート22から第二溶
融樹脂102(後続溶融樹脂)をキャビティ13内に新
たに射出する第二射出工程が実施される(図2
(b))。第一溶融樹脂101の流動先頭部によって第
二ゲート22を塞がれずに第二溶融樹脂102の射出が
行えるので、第二溶融樹脂102の射出圧力(実質的に
射出成形機1全体の射出圧力となる)を低くすることが
できる。
Next, when the leading portion of the flow of the first molten resin 101 reaches a position slightly closer to the longitudinal end (closer to the first gate 21) than the position of the second gate 22, the injection from the first gate 21 is performed. Is stopped, and a second injection step of newly injecting the second molten resin 102 (subsequent molten resin) from the second gate 22 into the cavity 13 is performed (FIG. 2).
(B)). Since the second molten resin 102 can be injected without closing the second gate 22 by the flow leading portion of the first molten resin 101, the injection pressure of the second molten resin 102 (substantially the injection pressure of the entire injection molding machine 1) ) Can be reduced.

【0018】第二溶融樹脂102の流動先頭部は、キャ
ビティ13内において長手方向の始端側に流動し、第一
溶融樹脂101の流動先頭部と接触する。このとき、第
一溶融樹脂101の流動先頭部と第二溶融樹脂102の
流動先頭部とはともに溶融状態であるので、両流動先頭
部は互いの樹脂材料が強度上の問題が生じない程度にま
で混ざり合うことになる(図3(a))。
The leading portion of the second molten resin 102 flows toward the longitudinal start end in the cavity 13 and comes into contact with the leading portion of the first molten resin 101. At this time, since the flow head of the first molten resin 101 and the flow head of the second molten resin 102 are both in a molten state, both flow heads are in such a degree that the resin materials do not cause a problem in strength. (FIG. 3A).

【0019】一方、第二溶融樹脂102の流動先頭部
は、キャビティ13内において長手方向の終端側にも流
動し、充填完了側末端に達すると第二ゲート22からキ
ャビティ13内への充填を完了する(図3(b))。た
だし、第二溶融樹脂102の流動先頭部がキャビティ1
3内の充填完了側末端に達するときまでに、第一溶融樹
脂101はほぼ冷却・固化した状態となっている。その
ため、第二溶融樹脂102が充填する実質的な投影面積
は、第一溶融樹脂101がキャビティ13内で既に冷却
・固化した部分の投影面積だけ減少し、それに対応して
射出圧力も低くてすむようになる。
On the other hand, the flow leading portion of the second molten resin 102 also flows to the terminal end in the longitudinal direction in the cavity 13, and when reaching the filling end, filling of the cavity 13 from the second gate 22 is completed. (FIG. 3B). However, the flow head of the second molten resin 102 is the cavity 1
By the time it reaches the end on the filling completion side in 3, the first molten resin 101 is in a substantially cooled and solidified state. Therefore, the substantial projected area filled with the second molten resin 102 is reduced by the projected area of the portion where the first molten resin 101 has already been cooled and solidified in the cavity 13, and the injection pressure is correspondingly reduced. I get stuck.

【0020】以上のようにしてキャビティ13内で射出
成形された成形品は、金型5内を流通する冷却水によっ
てさらに冷却される冷却工程、型締め装置の上記型締め
工程と逆方向の作動によって金型5が分離される型開き
工程、突出し機構(図示せず)等によって突き出される
突出し工程等を経て、金型5から取り出される(図示省
略)。
The molded product injection-molded in the cavity 13 as described above is further cooled by the cooling water flowing through the mold 5, and the operation of the mold clamping device in the direction opposite to the above-described mold clamping process. The mold 5 is removed from the mold 5 through a mold opening step in which the mold 5 is separated by a pressing mechanism, a projecting step in which the mold is ejected by an ejecting mechanism (not shown), and the like.

【0021】ところで、第二射出工程において、第一溶
融樹脂101の流動先頭部が所定の位置に到達したと
き、第二ゲート22からの射出開始から所定の時間経過
後に第一ゲート21からの射出を停止し、射出成形時間
の短縮化を図ってもよい。この場合、第二ゲート22か
らの射出開始とともに、第一ゲート21からの射出流量
を徐々に減少させて所定の時間経過後に射出停止するこ
ともできる。
In the second injection step, when the leading portion of the flow of the first molten resin 101 reaches a predetermined position, the injection from the first gate 21 after a predetermined time has elapsed from the start of injection from the second gate 22. May be stopped to shorten the injection molding time. In this case, the injection flow from the first gate 21 may be gradually reduced simultaneously with the start of the injection from the second gate 22, and the injection may be stopped after a predetermined time has elapsed.

【0022】また、第二射出工程において、第二ゲート
22からの射出開始タイミング(射出を開始するときの
第一溶融樹脂101の流動先頭部の位置)、第一溶融樹
脂101の冷却・固化タイミング等は試行によって決定
することができるが、例えば流動先頭部の位置センサ等
を用いて自動調整してもよい。
In the second injection step, the injection start timing from the second gate 22 (the position of the leading edge of the flow of the first molten resin 101 at the start of injection), the cooling / solidification timing of the first molten resin 101 Can be determined by trial, but may be automatically adjusted using, for example, a position sensor at the head of the flow.

【0023】さらに、本実施例では各ゲート21,22
に対応させて2つの射出装置3,4を設けたが、共通す
る射出装置とスプルーからランナにより2つの射出径路
に分岐して各ゲート21,22に連結することもでき
る。この場合、射出の開始・停止操作は各ゲート21,
22に設けるゲートバルブの開閉で行うとよい。
Further, in this embodiment, each gate 21, 22
Although the two injection devices 3 and 4 are provided in correspondence with the above, the common injection device and a sprue may be branched into two injection paths by a runner and connected to the gates 21 and 22. In this case, the injection start / stop operation is performed at each gate 21,
The opening and closing of the gate valve provided at 22 may be performed.

【0024】なお、本発明において、第一溶融樹脂10
1と第二溶融樹脂102とは、色・材質等において同一
のもの以外に、例えば色及び/又は材質が異なるもので
あってもよい。また、ゲート数が3個以上の場合にも適
用される。
In the present invention, the first molten resin 10
The first and second molten resins 102 may be different in color and / or material, for example, besides being the same in color and material. Also, the present invention is applied to a case where the number of gates is three or more.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に用いられる射出成形機の一実施例を示
す断面図。
FIG. 1 is a sectional view showing an embodiment of an injection molding machine used in the present invention.

【図2】本発明に係る射出成形工程を説明する図1のA
−A断面図。
FIG. 2A illustrates an injection molding process according to the present invention.
-A sectional drawing.

【図3】図2に続く説明図。FIG. 3 is an explanatory view following FIG. 2;

【符号の説明】[Explanation of symbols]

1 射出成形機 5 金型(射出成形用金型) 13 キャビティ 21 第一ゲート(先行ゲート) 22 第二ゲート(後続ゲート) 101 第一溶融樹脂(先行溶融樹脂) 102 第二溶融樹脂(後続溶融樹脂) REFERENCE SIGNS LIST 1 injection molding machine 5 mold (injection molding mold) 13 cavity 21 first gate (preceding gate) 22 second gate (subsequent gate) 101 first molten resin (preceding molten resin) 102 second molten resin (subsequent melting) resin)

【手続補正書】[Procedure amendment]

【提出日】平成13年11月26日(2001.11.
26)
[Submission date] November 26, 2001 (2001.11.
26)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Correction target item name] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【特許請求の範囲】[Claims]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0006[Correction target item name] 0006

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0006】[0006]

【課題を解決するための手段及び発明の効果】上記課題
を解決するために、本発明に係る射出成形方法は、射出
成形用金型に形成されたキャビティの長手方向一端側を
溶融樹脂の充填開始側、その他端側を充填完了側に設定
し、このキャビティ内に前記溶融樹脂を射出するゲート
が前記充填開始側から充填完了側に向けて複数配置
れ、前記各ゲートには固定型内を貫通状に設けたスプル
ーを介して独立した射出装置を連結し、前記充填開始側
射出装置によるゲートの射出開始から所定の時間差に
て、前記溶融樹脂が順次前記キャビティ内へ射出される
とともに、前記複数のゲートのうち先行するゲートから
射出された先行溶融樹脂の流動先頭部が後続のゲートの
位置に達する前に、その後続のゲートから後続溶融樹脂
が新たに射出されるよう前記時間差が調整されることを
特徴とする。
Means for Solving the Problems and Effects of the Invention In order to solve the above-mentioned problems, an injection molding method according to the present invention provides a method of filling one end of a cavity formed in an injection molding die in a longitudinal direction with a molten resin. initiator, and set the other end to the completion of filling side, a plurality disposed of toward the completion of filling side gate for injecting the molten resin into the cavity from the fill initiator
Each gate has a sprue provided through the inside of the fixed mold.
The molten resin is sequentially injected into the cavity at a predetermined time difference from the start of injection of the gate by the injection device on the filling start side by connecting an independent injection device through a cavity.
Together with the preceding gate of the plurality of gates
The flow front of the injected molten resin is
Before reaching the position, the subsequent molten resin from its subsequent gate
The time difference is adjusted so that is newly ejected .

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0009[Correction target item name] 0009

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0009】また、本発明に係る射出成形方法を、2つ
のゲートを有する射出成形用金型に適用した場合には、
上記課題を解決するために、射出成形用金型に形成され
たキャビティの長手方向一端側を溶融樹脂の充填開始
側、その他端側を充填完了側に設定し、前記充填開始側
に第一ゲート、前記充填完了側に第二ゲートがそれぞれ
配置され、 前記第一ゲートには固定型内を貫通状に設け
たスプルーを介して第一射出装置の先端の第一ノズルが
連結し、前記第二ゲートには固定型内を貫通状に設けた
スプルーを介して第二射出装置の先端の第二ノズルが連
結するとともに、前記充填開始側の第一射出装置によっ
第一ゲートから射出された第一溶融樹脂の流動先頭部
が前記第二ゲートの位置に達する前に、他端側の前記第
二射出装置によってその第二ゲートから第二溶融樹脂が
新たに射出され、その第二溶融樹脂が前記キャビティ内
の前記充填完了側末端に達するときまでに、前記第一溶
融樹脂がほぼ冷却・固化した状態となることを特徴とす
る。
When the injection molding method according to the present invention is applied to an injection mold having two gates,
In order to solve the above-mentioned problem, one end in the longitudinal direction of a cavity formed in an injection mold is set to a filling start side of a molten resin, and the other end is set to a filling completion side, and a first gate is set to the filling start side. , The second gate on the filling completion side
The first gate is disposed so as to penetrate the inside of the fixed mold.
The first nozzle at the tip of the first injection device through the sprue
Connected, the second gate was provided with a penetrating shape inside the fixed mold
The second nozzle at the tip of the second injection device is connected via the sprue.
As well as binding, by the first injection unit of the filling initiator
Before the flow leading portion of the first molten resin injected from the first gate Te reaches the position of the second gate, wherein the other end the
The second molten resin is newly injected from the second gate by the two injection devices , and the first molten resin is substantially cooled and solidified by the time the second molten resin reaches the end of the filling completion side in the cavity. It is characterized in that it is in a state in which

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0023[Correction target item name] 0023

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0023】なお、本発明において、第一溶融樹脂10
1と第二溶融樹脂102とは、色・材質等において同一
のもの以外に、例えば色及び/又は材質が異なるもので
あってもよい。また、ゲート数が3個以上の場合にも適
用される。
In the present invention, the first molten resin 10
The first and second molten resins 102 are the same in color, material, etc.
In addition to the ones, for example, those with different colors and / or materials
There may be. It is also suitable when there are three or more gates.
Used.

【手続補正5】[Procedure amendment 5]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0024[Correction target item name] 0024

【補正方法】削除 ─────────────────────────────────────────────────────
[Correction method] Deleted ───────────────────────────────────────────── ────────

【手続補正書】[Procedure amendment]

【提出日】平成14年3月22日(2002.3.2
2)
[Submission date] March 22, 2002 (2002.3.2.
2)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Correction target item name] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【特許請求の範囲】[Claims]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0006[Correction target item name] 0006

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0006】[0006]

【課題を解決するための手段及び発明の効果】上記課題
を解決するために、本発明に係る射出成型方法は、射出
成形用金型に形成されたキャビティの長手方向一端側を
溶融樹脂の充填開始側、その他端側を充填完了側に設定
し、このキャビティ内に前記溶融樹脂を射出する前記充
填開始側の第一ゲートと充填完了側の第二ゲートとを配
置し、前記第一ゲートには第一射出装置を、第二ゲート
には第二射出装置をそれぞれ独立に連結し、まず第一射
出装置により第一ゲートからキャビティ内に樹脂を射出
し、次に第二射出装置により第二ゲートからキャビティ
内に樹脂を射出し、第二ゲートから射出された溶融樹脂
が充填完了側のキャビティ端に達するときまでに、第一
ゲートから射出された溶融樹脂がほぼ冷却・固化した状
態となるように、第一及び第二ゲートに対応する第一及
び第二射出装置の射出時期に時間差を設け、さらに、第
一ゲートから射出された先行溶融樹脂の流動先頭部は、
第二ゲートの位置までは達しないようにし、かつ、第一
ゲートから射出される樹脂の投影面積を第二ゲートから
射出される樹脂の投影面積より大きくして、第一ゲート
から射出された樹脂で充填されなかったキャビティ部分
が、第一ゲートからの樹脂の投影面積に比べて小さい投
影面積の第二ゲートからの樹脂で充填されるように、第
一及び第二ゲートの射出樹脂に投影面積差を設けて、最
終的に前記キャビティの全体を樹脂で充填することを特
徴とする。
Means for Solving the Problems and Effects of the Invention In order to solve the above-mentioned problems, an injection molding method according to the present invention comprises filling a cavity formed in an injection mold with one end in a longitudinal direction of a molten resin. initiator, and set the other end to the completion of filling side, wherein the charging and for emitting said molten resin in the cavity
The first gate on the filling start side and the second gate on the filling completion side are arranged.
A first injection device at the first gate, a second gate
The second injection device is connected to each
Inject resin into the cavity from the first gate by the ejection device
And then the cavity from the second gate by the second injection device
Inject resin into the inside, molten resin injected from the second gate
By the time the
The molten resin injected from the gate is almost cooled and solidified
The first and second gates corresponding to the first and second gates
Time difference between the injection timings of the
The leading part of the preceding molten resin injected from one gate is
Do not reach the position of the second gate, and
From the second gate, the projected area of the resin injected from the gate
Make the first gate larger than the projected area of the injected resin
Cavity not filled with resin injected from
Is smaller than the projected area of the resin from the first gate.
So that it is filled with resin from the second gate in the shadow area
Provide a difference in projected area between the injection resin of the first and second gates,
Finally, the entire cavity is filled with resin.
To sign.

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0007[Correction target item name] 0007

【補正方法】削除[Correction method] Deleted

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0008[Correction target item name] 0008

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0008】このことから、充填完了側の第二ゲート
ら射出される溶融樹脂が埋めるべき実質的な投影面積
は、キャビティの全投影面積よりかなり小さくなる(既
に冷却・固化した部分の投影面積が減少する)。一方、
第二ゲートから射出される溶融樹脂が埋めるべき範囲
が、キャビティ内で既に冷却・固化した部分だけ縮小す
ることで、キャビティ内の隅々まで溶融樹脂を行き渡ら
せなくてもよくなり、それに対応して射出圧力(ひいて
は金型内の平均樹脂圧力)を下げることができる。した
がって、最大型締め力を決定する第二ゲートからの射出
時において、実質的な成型品の投影面積を小さくでき、
かつ射出圧力も低くできるので、成型品の投影面積と射
出圧力との両面から型締め力の低減化を図ることができ
る。
From this, the substantial projected area to be filled with the molten resin injected from the second gate on the filling completion side is considerably smaller than the total projected area of the cavity (the cooling area has already been cooled and solidified). The projected area of the part is reduced). on the other hand,
The area to be filled by the molten resin injected from the second gate is reduced only by the already cooled and solidified part in the cavity, so that it is not necessary to spread the molten resin to every corner of the cavity. Thus, the injection pressure (and, consequently, the average resin pressure in the mold) can be reduced. Therefore, at the time of injection from the second gate that determines the maximum mold clamping force, it is possible to reduce the substantial projected area of the molded product,
In addition, since the injection pressure can be reduced, the mold clamping force can be reduced from both the projected area of the molded product and the injection pressure.

【手続補正5】[Procedure amendment 5]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0009[Correction target item name] 0009

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0009】さらに、本発明に係る射出成形方法は、第
一ゲートからの射出の投影面積は、キャビティ全体の全
投影面積の約3分の2、残るキャビティ部分を充填する
第二ゲートからの射出樹脂の投影面積はキャビティ全体
の全投影面積の約3分の1とされる。また、射出成型用
金型が固定型と可動型に分割され、その可動型には中央
部にコア部が突出状に形成され、前記固定型にはそのコ
ア部に対応して長手状のキャビティが形成されていて、
そのコア部をキャビティに嵌合して型締め状態とし、
の後第一ゲート及び第二ゲートから時間差をおいて溶融
樹脂を射出することができる。 ─────────────────────────────────────────────────────
Furthermore, the injection molding method according to the present invention is characterized in that
The projected area of injection from one gate is the total area of the entire cavity.
Fill the remaining cavity, about two-thirds of the projected area
The projected area of the injection resin from the second gate is the entire cavity
Is about one-third of the total projected area. Also for injection molding
The mold is divided into a fixed mold and a movable mold.
A core portion is formed in a protruding shape at the portion, and
A long cavity is formed corresponding to the
A mold clamping state fitted to the core portion in the cavity, its
After a time difference from the first gate and the second gate
Resin can be injected. ────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成14年4月17日(2002.4.1
7)
[Submission date] April 17, 2002 (2002.4.1.
7)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Correction target item name] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【特許請求の範囲】[Claims]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0006[Correction target item name] 0006

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0006】[0006]

【課題を解決するための手段及び発明の効果】上記課題
を解決するために、本発明に係る射出成型方法は、射出
成形用金型に形成されたキャビティの長手方向一端側を
溶融樹脂の充填開始側、その他端側を充填完了側に設定
し、このキャビティ内に前記溶融樹脂を射出する前記充
填開始側の第一ゲートと充填完了側の第二ゲートとを配
し、まず第一ゲートからキャビティ内に樹脂を射出
し、次に第二ゲートからキャビティ内に樹脂を射出し、
第二ゲートから射出された溶融樹脂が充填完了側のキャ
ビティ端に達するときまでに、第一ゲートから射出され
た溶融樹脂がほぼ冷却・固化した状態となるように、
一ゲート及び第二ゲートの射出時期に時間差を設け、さ
らに、第一ゲートから射出された先行溶融樹脂の流動先
頭部は、第二ゲートの位置までは達しないようにし、か
つ、第一ゲートから射出される樹脂の投影面積を第二ゲ
ートから射出される樹脂の投影面積より大きくして、第
一ゲートから射出された樹脂で充填されなかったキャビ
ティ部分が、第一ゲートからの樹脂の投影面積に比べて
小さい投影面積の第二ゲートからの樹脂で充填されると
ともに、第二ゲートからの射出樹脂の投影面積がキャビ
ティ全体の全投影面積の約3分の1以下となるように
一及び第二ゲートの射出樹脂に投影面積差を設けて、最
終的に前記キャビティの全体を樹脂で充填することを特
徴とする。
Means for Solving the Problems and Effects of the Invention In order to solve the above-mentioned problems, an injection molding method according to the present invention comprises filling a cavity formed in an injection mold with one end in a longitudinal direction of a molten resin. initiator, and set the other end to the completion of filling side, wherein the second gate of the first gate and the filling completion side of the filling starting side disposed, or not a first gate for injecting the molten resin into the cavity Inject resin into the cavity from, then inject resin into the cavity from the second gate,
By the time the molten resin injected from the second gate reaches the cavity end on the filling completion side, the molten resin injected from the first gate is substantially cooled and solidified .
A time difference is provided between the injection timings of the first gate and the second gate, and the flow leading portion of the preceding molten resin injected from the first gate does not reach the position of the second gate, and from the first gate. The projected area of the injected resin is made larger than the projected area of the resin injected from the second gate, and the cavity portion not filled with the resin injected from the first gate is the projected area of the resin from the first gate. When Ru is filled with a resin from the second gate of the smaller projected area than the
In both cases, the projected area of the injection resin from the second gate is
The injection resin of the first and second gates is provided with a projection area difference so as to be about one third or less of the total projection area of the entire tee , and finally the entire cavity is filled with the resin. I do.

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0007[Correction target item name] 0007

【補正方法】削除[Correction method] Deleted

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0009[Correction target item name] 0009

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0009】さらに、本発明に係る射出成形方法は、
出成型用金型が固定型と可動型に分割され、その可動型
には中央部にコア部が突出状に形成され、前記固定型に
はそのコア部に対応して長手状のキャビティが形成され
ていて、そのコア部をキャビティに嵌合して型締め状態
とし、その後第一ゲート及び第二ゲートから時間差をお
いて溶融樹脂を射出することができる。
Furthermore, the injection molding method according to the present invention, morphism <br/> out mold is divided into the fixed mold and the movable mold, the core part is formed in the protruding shape in the central portion in the movable mold In the fixed mold, a longitudinal cavity is formed corresponding to the core portion, and the core portion is fitted into the cavity to be in a mold-clamped state, and thereafter there is a time lag from the first gate and the second gate. And the molten resin can be injected.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 磯谷 勝正 愛知県岡崎市保母町字上平地1番地 大和 化成工業株式会社内 Fターム(参考) 4F202 AH17 AM19 AR11 CA11 CB01 CK02 CK06 4F206 AH17 AM19 AR11 JA07 JL02 JM04 JN12 JQ81  ────────────────────────────────────────────────── ─── Continuing on the front page (72) Inventor Katsumasa Isotani 1-Family Land, Hobo-cho, Okazaki-shi, Aichi F-term (reference) in Yamato Kasei Kogyo Co., Ltd. 4F202 AH17 AM19 AR11 CA11 CB01 CK02 CK06 4F206 AH17 AM19 AR11 JA07 JL02 JM04 JN12 JQ81

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 射出成形用金型に形成されたキャビティ
の長手方向一端側を溶融樹脂の充填開始側、その他端側
を充填完了側に設定し、このキャビティ内に前記溶融樹
脂を射出するゲートが前記充填開始側から充填完了側に
向けて複数配置されるとともに、 前記充填開始側のゲートの射出開始から所定の時間差に
て、前記溶融樹脂が順次前記キャビティ内へ射出される
ことを特徴とする射出成形方法。
1. A gate for setting one end in a longitudinal direction of a cavity formed in an injection molding die to a filling start side of a molten resin and setting the other end to a filling completion side, and injecting the molten resin into the cavity. Are arranged from the filling start side toward the filling completion side, and the molten resin is sequentially injected into the cavity at a predetermined time difference from the injection start of the gate on the filling start side. Injection molding method.
【請求項2】 前記複数のゲートのうち最終ゲートから
射出された溶融樹脂が前記充填完了側末端に達するとき
までに、その他のゲートから射出された溶融樹脂がほぼ
冷却・固化した状態となるよう前記時間差が調整されて
いる請求項1に記載の射出成形方法。
2. By the time the molten resin injected from the last gate among the plurality of gates reaches the end of the filling completion side, the molten resin injected from the other gates is substantially cooled and solidified. The injection molding method according to claim 1, wherein the time difference is adjusted.
【請求項3】 前記複数のゲートのうち先行するゲート
から射出された先行溶融樹脂の流動先頭部が後続のゲー
トの位置に達する前に、その後続のゲートから後続溶融
樹脂が新たに射出されるよう前記時間差が調整されてい
る請求項1又は2に記載の射出成形方法。
3. A subsequent molten resin is newly injected from a subsequent gate before a flow leading portion of a preceding molten resin injected from a preceding gate among the plurality of gates reaches a position of a subsequent gate. 3. The injection molding method according to claim 1, wherein the time difference is adjusted.
【請求項4】 前記後続ゲートからの前記後続溶融樹脂
の射出開始とほぼ同時又は所定の時間経過後に、前記先
行ゲートからの前記先行溶融樹脂の射出が停止される請
求項3に記載の射出成形方法。
4. The injection molding according to claim 3, wherein the injection of the preceding molten resin from the preceding gate is stopped substantially simultaneously with the start of the injection of the subsequent molten resin from the subsequent gate or after a predetermined time has elapsed. Method.
【請求項5】 前記先行ゲートから射出された前記先行
溶融樹脂の流動先頭部と、前記後続ゲートから新たに射
出された前記後続溶融樹脂の流動先頭部とが、前記後続
ゲートの位置よりも前記先行ゲート寄りの位置におい
て、ともに溶融状態で接触することができるよう前記時
間差が調整されている請求項3又は4に記載の射出成形
方法。
5. The flow leading portion of the preceding molten resin injected from the preceding gate and the flowing leading portion of the subsequent molten resin newly injected from the succeeding gate are more than the position of the subsequent gate. The injection molding method according to claim 3 or 4, wherein the time difference is adjusted so that the two can contact each other in a molten state at a position near the preceding gate.
【請求項6】 射出成形用金型に形成されたキャビティ
の長手方向一端側を溶融樹脂の充填開始側、その他端側
を充填完了側に設定し、前記充填開始側に第一ゲート、
前記充填完了側に第二ゲートがそれぞれ配置されるとと
もに、 前記第一ゲートから射出された第一溶融樹脂の流動先頭
部が前記第二ゲートの位置に達する前に、その第二ゲー
トから第二溶融樹脂が新たに射出され、 その第二溶融樹脂が前記キャビティ内の前記充填完了側
末端に達するときまでに、前記第一溶融樹脂がほぼ冷却
・固化した状態となることを特徴とする射出成形方法。
6. A longitudinal direction of a cavity formed in an injection molding die is set at a filling start side of a molten resin, and the other end is set at a filling completion side.
A second gate is arranged on the filling completion side, respectively, and before the flow leading portion of the first molten resin injected from the first gate reaches the position of the second gate, the second gate is moved from the second gate to the second gate. Injection molding characterized in that the first molten resin is substantially cooled and solidified by the time the molten resin is newly injected and the second molten resin reaches the end of the filling completion side in the cavity. Method.
JP2001165388A 2001-05-31 2001-05-31 Injection molding method Expired - Fee Related JP3310271B1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2001165388A JP3310271B1 (en) 2001-05-31 2001-05-31 Injection molding method
JP2003196425A JP3911494B2 (en) 2001-05-31 2003-07-14 Injection molding method and injection molding apparatus
US10/632,844 US7338627B2 (en) 2001-05-31 2003-08-04 Injection molding method and injection molding apparatus
EP03255076A EP1498250B1 (en) 2001-05-31 2003-08-15 Injection molding method and injection molding apparatus
CNA031581978A CN1575953A (en) 2001-05-31 2003-09-17 Injection molding method and injection molding apparatus
US11/353,425 US7422426B2 (en) 2001-05-31 2006-02-14 Injection molding method and injection molding apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001165388A JP3310271B1 (en) 2001-05-31 2001-05-31 Injection molding method

Publications (2)

Publication Number Publication Date
JP3310271B1 JP3310271B1 (en) 2002-08-05
JP2002355866A true JP2002355866A (en) 2002-12-10

Family

ID=19008057

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001165388A Expired - Fee Related JP3310271B1 (en) 2001-05-31 2001-05-31 Injection molding method

Country Status (1)

Country Link
JP (1) JP3310271B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004314624A (en) * 2003-03-31 2004-11-11 Sumitomo Chem Co Ltd Method for designing resin product and method for manufacturing the resin product
EP1498250A2 (en) * 2001-05-31 2005-01-19 Daiwa Kasei Industry Co., Ltd. Injection molding method and injection molding apparatus
JP2006043956A (en) * 2004-08-02 2006-02-16 Toyo Tire & Rubber Co Ltd Continuous injection molding system, continuous injection molding method and tire molding method
US7465416B2 (en) 2003-03-31 2008-12-16 Sumitomo Chemical Company, Limited Method for designing a mold, method for producing an injection molding, program and injection molding device
US7470382B2 (en) 2003-03-31 2008-12-30 Sumitomo Chemical Company, Limited Method for determining a production parameter of an injection molding, method for producing an injection molding, injection molding device and program
US7521008B2 (en) 2003-03-31 2009-04-21 Sumitomo Chemical Company, Limited Method for designing a resin product, method for producing a resin product and injection molding device
JP2011093232A (en) * 2009-10-30 2011-05-12 Honda Motor Co Ltd Injection molding process
JP2012172632A (en) * 2011-02-23 2012-09-10 Denso Corp Glow plug control device, and method for manufacturing the same
JP2015155158A (en) * 2014-02-20 2015-08-27 マツダ株式会社 Method of producing fiber-reinforced resin-made lid member
US11267175B2 (en) * 2019-10-15 2022-03-08 King Steel Machinery Co., Ltd. Injection molding system
WO2022247596A1 (en) * 2021-05-28 2022-12-01 Shanghai Yanfeng Jinqiao Automotive Trim Systems Co., Ltd. Component for vehicle interior

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107671260A (en) * 2017-10-09 2018-02-09 广东伊之密精密机械股份有限公司 The semisolid injection (mo(u)lding) machine of multistation injection

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1498250A2 (en) * 2001-05-31 2005-01-19 Daiwa Kasei Industry Co., Ltd. Injection molding method and injection molding apparatus
EP1498250A3 (en) * 2001-05-31 2005-04-06 Daiwa Kasei Industry Co., Ltd. Injection molding method and injection molding apparatus
US7338627B2 (en) 2001-05-31 2008-03-04 Daiwa Kasei Industry Co., Ltd. Injection molding method and injection molding apparatus
JP4676713B2 (en) * 2003-03-31 2011-04-27 住友化学株式会社 Design method and manufacturing method of resin products
JP2004314624A (en) * 2003-03-31 2004-11-11 Sumitomo Chem Co Ltd Method for designing resin product and method for manufacturing the resin product
US7465416B2 (en) 2003-03-31 2008-12-16 Sumitomo Chemical Company, Limited Method for designing a mold, method for producing an injection molding, program and injection molding device
US7470382B2 (en) 2003-03-31 2008-12-30 Sumitomo Chemical Company, Limited Method for determining a production parameter of an injection molding, method for producing an injection molding, injection molding device and program
US7521008B2 (en) 2003-03-31 2009-04-21 Sumitomo Chemical Company, Limited Method for designing a resin product, method for producing a resin product and injection molding device
JP2006043956A (en) * 2004-08-02 2006-02-16 Toyo Tire & Rubber Co Ltd Continuous injection molding system, continuous injection molding method and tire molding method
JP2011093232A (en) * 2009-10-30 2011-05-12 Honda Motor Co Ltd Injection molding process
JP2012172632A (en) * 2011-02-23 2012-09-10 Denso Corp Glow plug control device, and method for manufacturing the same
JP2015155158A (en) * 2014-02-20 2015-08-27 マツダ株式会社 Method of producing fiber-reinforced resin-made lid member
US11267175B2 (en) * 2019-10-15 2022-03-08 King Steel Machinery Co., Ltd. Injection molding system
WO2022247596A1 (en) * 2021-05-28 2022-12-01 Shanghai Yanfeng Jinqiao Automotive Trim Systems Co., Ltd. Component for vehicle interior

Also Published As

Publication number Publication date
JP3310271B1 (en) 2002-08-05

Similar Documents

Publication Publication Date Title
TW200300388A (en) A molding method of a resin molded article by a mold apparatus, the mold apparatus, the resin molded article, and a molding machine having the mold apparatus
JP2002355866A (en) Injection molding method
US20010040313A1 (en) Process and equipment for hot moulding of articles made of thermoplastic material
JPH06254895A (en) Injection molding method
JP3129594B2 (en) Injection mold
JP3191276B2 (en) Runnerless mold
JPH0957794A (en) Injection compression molding method
JPH08118418A (en) Injection unit for sandwich molded product
JP3710605B2 (en) Injection molding method
JP2001225354A (en) Injection molding method
JP2003025392A (en) Method for injection molding plastic product
JPH06262645A (en) Injection molder and injection molding method
JP3914476B2 (en) Injection mold
JPH0752205A (en) Injection mold
JP2001138373A (en) Injection molding method and injection mold
JP2665101B2 (en) Injection molding method and injection mold
JP3745350B2 (en) Injection mold and injection molding method
JP2000202615A (en) Metal injection molding method and metal injection molding apparatus
JP2002018910A (en) Structure of valve gate of mold for injection molding and molding
JPH10100207A (en) Mold for injection molding
JPH0623811A (en) Secondary pressurization mold and injection molding method
JPS5889334A (en) Injection molding metal die
JP2002283404A (en) Mold assembly for injection molding and injection molding method using the same
JPH08323820A (en) Injection molding method for resin product with thick-walled part
JP2000000850A (en) Metal mold for injection molding

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120524

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150524

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees