JP2002342409A - Information management system at construction site - Google Patents
Information management system at construction siteInfo
- Publication number
- JP2002342409A JP2002342409A JP2001143590A JP2001143590A JP2002342409A JP 2002342409 A JP2002342409 A JP 2002342409A JP 2001143590 A JP2001143590 A JP 2001143590A JP 2001143590 A JP2001143590 A JP 2001143590A JP 2002342409 A JP2002342409 A JP 2002342409A
- Authority
- JP
- Japan
- Prior art keywords
- information
- construction
- user
- server
- site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000010276 construction Methods 0.000 title claims abstract description 171
- 238000007726 management method Methods 0.000 claims description 49
- 238000007689 inspection Methods 0.000 claims description 21
- 238000000034 method Methods 0.000 claims description 9
- 238000004891 communication Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 238000009430 construction management Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、例えば、建築工事
や建築構造物の修復工事等の建設現場に於いて、その関
連する諸情報を施工会社や設計者等のユーザが迅速かつ
正確に共有して、当該建築工事等を円滑かつ速やかに完
了させる建設現場に於ける情報管理システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction site such as a construction work or a repair work of a building structure, and the related information is quickly and accurately shared by users such as a construction company and a designer. Then, the present invention relates to an information management system at a construction site for smoothly and promptly completing the building work and the like.
【0002】[0002]
【従来の技術】従来の技術に於いては、建築工事や建築
構造物の修復工事等を施工する場合、例えば、発注から
施工完了までに発注条件に基づき工程管理や報告書の作
成及び管理等各種の情報を当該建設現場等で当該工事に
携わる人達が交換しながら当該工事を推進するものであ
って、当該各種の情報は、書類等による紙媒体の直接の
手渡しや書類を郵送したり、運搬して情報交換の目的を
達成していた。又、他の従来の技術に於いては、各建築
工事現場にパソコンを設置し、当該パソコンに表示され
る画面を通じて、当該工事に携わる人達が当該建築工事
等の進捗度合いや必要な資材等の調達を確認するもので
あった。2. Description of the Related Art In the prior art, when performing a construction work or a repair work of a building structure, for example, from the ordering to the completion of the construction, the process management and the preparation and management of a report based on the ordering conditions. People involved in the construction at the construction site exchange various types of information to promote the construction, and the various kinds of information can be handed directly to paper media such as documents or mailed It had been transported to achieve the purpose of information exchange. In another conventional technique, a personal computer is installed at each building construction site, and persons involved in the relevant construction work can use the screen displayed on the personal computer to determine the degree of progress of the building work and necessary materials. It was to confirm procurement.
【0003】[0003]
【発明が解決しようとする課題】従来の技術は、叙上の
構成、方法であるので次の課題が存在した。 建築工事や建築構造物修復工事等の現場での前記各種
の情報が書類等であって、紙媒体による場合は、情報伝
達が遅れると共に正確さに欠けたり、書類作成や紛失防
止管理の工数が増大し、又当該紙媒体の保存用書庫が必
要とし、現場等にスペースを占有する等問題があった。 大規模な建築工事等施工する場合は、工事現場以外の
場所に所在する発注者、設計者、下請業者等のユーザの
協力が不可欠であり、これらユーザからの各種の情報の
入手が必要であるが、従来の技術に於ける現場等に設置
されたパソコンでは、これらユーザからの各種の必要不
可欠な諸情報を入手することができず又、当該工事を進
捗するに当り、当該パソコンの画面での当該ユーザ等相
互から諸情報の交換に基づく認証を得ることはできな
く、また工事の進捗性が悪いと共に工事管理費用が増大
する問題点があった。The prior art has the following problems because it has the above described configuration and method. When the various types of information at the site of construction work or building structure restoration work are documents, etc., and using paper media, information transmission is delayed and lacks accuracy, and man-hours for document creation and loss prevention management are reduced. However, there is a problem that the storage space for the paper medium is required and the space is occupied at the site or the like. When constructing a large-scale building, etc., the cooperation of users such as the orderer, designer, and subcontractor located in places other than the construction site is indispensable, and it is necessary to obtain various information from these users. However, in the case of a personal computer installed at a site or the like in the conventional technology, it is not possible to obtain various indispensable information from the user, and in the course of the construction, the personal computer screen is displayed. However, there has been a problem that it is not possible to obtain authentication based on the exchange of various information from the users and the like, and that the construction progress is poor and the construction management cost increases.
【0004】[0004]
【課題を解決するための手段】本発明は、工事の発注か
ら工事完了後の引渡しまでに於ける一切の諸情報をユー
ザから送信を受けて記憶すると共に、当該諸情報を配信
するサーバを備え、該サーバから当該諸情報を受信する
と共に他のユーザに送信する通信機器手段を有したユー
ザで構成し、前記諸情報を迅速かつ正確に各ユーザに伝
達すると共に前記工事の速やかな進捗を図ると共に工事
管理費の削減を目的としたものであって、次の構成、手
段を採用した。SUMMARY OF THE INVENTION The present invention is provided with a server which receives and stores all kinds of information from the order of construction to delivery after completion of construction and receives the information and distributes the information. A user having communication device means for receiving the various information from the server and transmitting the information to other users, to quickly and accurately transmit the various information to each user and to promptly progress the construction. In addition, the aim was to reduce construction management costs, and the following configuration and means were adopted.
【0005】請求項1記載の発明によれば、工事の発注
から工事完了後の引渡しまでに於ける一切の諸情報を配
信するサーバと、該サーバからの前記諸情報を受信する
と共に、前記諸情報のうち自己保有の情報を外のユーザ
群及び前記サーバに送信するユーザとで構成されたこと
を特徴とする建設現場に於ける情報管理システムであ
る。According to the first aspect of the present invention, there is provided a server for distributing all kinds of information from the order of construction to delivery after completion of construction, receiving the information from the server, and An information management system at a construction site, comprising a group of external users and a user who transmits self-owned information to the server among the information.
【0006】請求項2記載の発明によれば、工事の発注
から工事完了後の引渡しまでに於ける一切の諸情報を配
信するサーバと、該サーバから配信された前記諸情報を
現出するWebサイトを設けると共に前記諸情報データ
を前記サーバに送信するユーザ群とでなる建設現場に於
ける情報管理システムである。According to the second aspect of the present invention, a server for distributing all kinds of information from the order of construction to delivery after completion of the construction, and a Web for displaying the information distributed from the server An information management system at a construction site comprising a site and a group of users transmitting the information data to the server.
【0007】請求項3記載の発明によれば、前記ユーザ
が発注者、設計者、建設現場、施工会社又は下請会社で
なることを特徴とする請求項1又は2記載の建設現場に
於ける情報管理システムである。According to the third aspect of the invention, the user is an orderer, a designer, a construction site, a construction company or a subcontractor, and the information at the construction site according to claim 1 or 2, It is a management system.
【0008】請求項4記載の発明によれば、前記工事の
発注から工事完了後の引渡しまでに於ける一切の諸情報
が発注条件の情報、工程管理の情報、施工写真の情報、
議事録の情報、報告書の情報、検査状況の情報、現場書
類の情報、現場労務管理情報又は資機材管理情報等でな
る請求項1又は2記載の建設現場に於ける情報管理シス
テムである。According to the invention described in claim 4, all the information from the order of the construction to the delivery after the completion of the construction includes information on order conditions, information on process management, information on construction photos,
3. An information management system for a construction site according to claim 1 or 2, wherein the information management system comprises minutes information, report information, inspection status information, site document information, site labor management information, or equipment management information.
【0009】請求項5記載の発明によれば、前記サーバ
が各ユーザからの諸情報を記憶しかつ配信すると共にユ
ーザ側の配信ルートを特定することを特徴とする請求項
1、2又は3記載の建設現場に於ける情報管理システム
である。According to the invention described in claim 5, the server stores and distributes various information from each user and specifies a distribution route on the user side. Is an information management system at a construction site.
【0010】請求項6記載の発明によれば、ユーザの前
記諸情報に於ける配信ルートに基づいて該ユーザのWe
bサイトに承認項目を現出させることを特徴とする請求
項5記載の建設現場に於ける情報管理システムである。[0010] According to the invention of claim 6, based on the distribution route in the various information of the user, the user's We
6. An information management system at a construction site according to claim 5, wherein an approval item is made to appear at the site b.
【0011】請求項7記載の発明によれば、前記ユーザ
に備えたWebサイトが携帯情報端末器の画面に現出さ
せることを特徴とする請求項2又は6記載の建設現場に
於ける情報管理システムである。According to the seventh aspect of the present invention, the Web site provided for the user is displayed on the screen of the portable information terminal, and the information management at the construction site according to the second or sixth aspect, System.
【0012】[0012]
【発明の実施の形態】本発明に係る建設現場に於ける情
報管理システムの実施の形態について、添付図面に基づ
き、詳細に説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of an information management system in a construction site according to the present invention will be described in detail with reference to the accompanying drawings.
【0013】図1は、インターネット回線を利用して、
本発明の実施例を示した建築現場に於ける情報管理シス
テムの配線図である。これについて詳述する。1はユー
ザとしての発注者Aに設置した通信機器手段の一例のパ
ソコンであって、専用回線2に接続されている。該専用
回線2は、通信線であってアナログ専用回線又はデジタ
ル専用回線で構成される。3は、前記発注者Aのパソコ
ン1からの建設工事の伴う工事費納期等の条件等諸情報
のデータ信号をパケットリレー方式に転送するルータで
ある。該ルータ3は専用回線2を介して、インターネッ
ト回線Fに接続され、LANを構成している。前記発注
者Aは、例えば、建設工事等や建築構造物等の修復工事
を施工会社や設計者に依頼する施主である。建設条件等
諸情報としては、建設工事場所、建物構造の希望概要や
工事費等各種の発注に伴う情報がある。FIG. 1 shows an example using an Internet line.
1 is a wiring diagram of an information management system in a building site showing an embodiment of the present invention. This will be described in detail. Reference numeral 1 denotes a personal computer as an example of a communication device installed in an orderer A as a user, and is connected to a dedicated line 2. The dedicated line 2 is a communication line and is configured by an analog dedicated line or a digital dedicated line. Reference numeral 3 denotes a router that transfers a data signal of various information such as conditions such as a delivery time of construction cost accompanying construction work from the personal computer 1 of the orderer A to a packet relay system. The router 3 is connected to the Internet line F via the dedicated line 2 and forms a LAN. The orderer A is, for example, an owner who requests a construction company or a designer to perform a construction work or a repair work of a building structure or the like. The construction conditions and other information include information associated with various orders, such as a construction site, a desired outline of the building structure, and construction costs.
【0014】4はユーザとしての設計者Bに設置した通
信機器手段の一例のパソコンであって、前記発注者Aに
回線したものと同一の専用回線5に接続されている。6
は前記設計者Bに設置された各パソコン4からの動作に
応じて所望の建設工事関連情報データを取出すためのパ
ケットリレー方式に転送するルータである。該ルータ6
は専用回線5を介してインターネット回線Fに接続され
LANを構成している。該設計者BはLANを構成して
いる。上記設計者Bは、前記発注者Aからの建設工事等
に伴う建設条件等の建設関連諸情報に基づき当該工事の
設計を行なう者であって設計事務所や大規模工事に於い
ては施工会社の設計部門等が担当する。Reference numeral 4 denotes a personal computer as an example of a communication device installed in a designer B as a user, which is connected to the same dedicated line 5 as the one connected to the orderer A. 6
Is a router for transferring to a packet relay system for extracting desired construction work-related information data according to an operation from each personal computer 4 installed in the designer B. The router 6
Are connected to an Internet line F via a dedicated line 5 to form a LAN. The designer B configures a LAN. The designer B is a person who designs the work based on various construction-related information such as construction conditions accompanying the construction work from the orderer A. In a design office or a large-scale work, the designer B is a construction company. The design department etc. is in charge.
【0015】7はユーザとしての建設現場Cに設置した
通信機器手段の一例のパソコンであって、前記発注者A
に回線したものと同一の専用回線8に接続されている。
9は前記建設現場Cからの各種の建設現場関連情報のデ
ータ信号をパケットリレー方式に転送するルータであ
る。該ルータ9は専用回線8を介してインターネット回
線Fに接続されLANを構成している。上記建設現場C
はLANを構成している。前記建設現場Cは前記発注者
Aから建設工事等の依頼を受けた前記設計者B又は施工
会社が建設工事を施工する場所であって、各種の建設工
事に伴う情報を有している。例えば、現場書類の情報、
施工写真の情報、検査状況の情報、現場労務管理情報等
である。Reference numeral 7 denotes a personal computer as an example of a communication device installed at the construction site C as a user.
Is connected to the same dedicated line 8 as the one connected to.
Reference numeral 9 denotes a router for transferring data signals of various construction site-related information from the construction site C to a packet relay system. The router 9 is connected to the Internet line F via the dedicated line 8 to form a LAN. The above construction site C
Constitutes a LAN. The construction site C is a place where the designer B or a construction company that has received a request for construction work or the like from the orderer A performs construction work, and has information associated with various construction works. For example, information on site documents,
Information on construction photos, information on inspection status, on-site labor management information, etc.
【0016】10はユーザとしての施工会社Dに設置し
た通信機器手段の一例のパソコンであって、前記発注者
Aに回線したものと同一の専用回線11に接続されてい
る。12は前記施工会社Dに設置されたパソコン10か
らの建設工事に伴う施工会社の諸情報のデータ信号をパ
ケットリレー方式に転送するルータである。該ルータ1
2は専用回線11を介してインターネット回線Fに接続
されLANを構成している。上記施工会社DはLANを
構成している。前記施工会社Dは、前記発注者A又は設
計者Bからの依頼の応じて建設工事等を請負う第1次請
負業者である。施工会社Dの建設工事等の諸情報として
は、例えば、工程管理の情報、前記発注者A又は設計者
Bからの承認に伴う情報、議事録の情報、報告書の情報
等がある。Reference numeral 10 denotes a personal computer which is an example of a communication device installed in the construction company D as a user, and is connected to the same dedicated line 11 as the line to the orderer A. Reference numeral 12 denotes a router for transferring a data signal of various information of the construction company from the personal computer 10 installed in the construction company D to a packet relay system. The router 1
Reference numeral 2 is connected to an Internet line F via a dedicated line 11 to form a LAN. The construction company D constitutes a LAN. The construction company D is a first contractor that undertakes construction work and the like in response to a request from the orderer A or the designer B. Examples of the information on the construction work and the like of the construction company D include process management information, information accompanying approval from the orderer A or the designer B, minutes information, report information, and the like.
【0017】13はユーザとしての下請会社Eに設置し
た通信機器手段の一例のパソコンであって、前記発注者
Aに回線したものと同一の専用回線14に接続されてい
る。15は前記下請会社Eに設置したパソコン13から
の建設工事に伴う前記施工会社Dの下請つまり、第2次
請負業者としての諸情報のデータ信号をパケットリレー
方式に転送するルータである。該ルータ15は専用回線
14を介してインターネット回線Fに接続され、LAN
を構成している。上記下請会社EはLANを構成してい
る。前記下請会社Eは前記施工会社Dの建設工事の一部
又は全部を担当して当該建設工事を完成させるための必
要とする設備機器や資材の情報提供等を前記建設現場C
や施工会社Dに行なう。このため、前記下請会社Eの諸
情報としては、資機材管理情報等がある。尚、各ユーザ
に設置した通信機器手段としては、パソコンいついて上
述したが本発明はこれに代えて、携帯情報端末器で構成
することができる。その場合、専用回線2、5、8、1
1又は14の一部を省略することがある。Reference numeral 13 denotes a personal computer which is an example of a communication device installed in a subcontracting company E as a user, and is connected to the same dedicated line 14 as the line connected to the orderer A. Reference numeral 15 denotes a router for transferring a data signal of various information as a subcontractor of the construction company D accompanying the construction work from the personal computer 13 installed in the subcontractor company E to a packet relay system. The router 15 is connected to the Internet line F via the dedicated line 14,
Is composed. The subcontractor E constitutes a LAN. The subcontractor E is in charge of a part or all of the construction work of the construction company D and provides information on necessary equipment and materials for completing the construction work, and the like.
And construction company D. Therefore, the various information of the subcontractor E includes material management information and the like. As the communication device means provided for each user, a personal computer has been described above, but the present invention can be replaced with a portable information terminal. In that case, dedicated lines 2, 5, 8, 1
A part of 1 or 14 may be omitted.
【0018】16はサーバであり、経路制御装置17を
介して前記発注者Aに回線したものと同一の専用回線1
8に接続されている。該専用回線18は、前記サーバ1
6の入力制御手段及び出力制御手段に接続されている。
そして該専用回線18はインターネット回線Fに接続さ
れLANを構成している。19は前記サーバ15からの
前記建設工事の発注から工事完了後の引渡しまでに於け
る一切の諸情報等のデータ信号をパケットリレー方式に
転送するルータである。該ルータ19は専用回線18を
介してインターネット回線Fに接続されLANを構成し
ている。Reference numeral 16 denotes a server, which is the same dedicated line 1 as that connected to the orderer A via the path control device 17.
8 is connected. The dedicated line 18 is connected to the server 1
6 input control means and output control means.
The dedicated line 18 is connected to the Internet line F to form a LAN. Reference numeral 19 denotes a router which transfers a data signal such as all kinds of information from the order of the construction work from the server 15 to the delivery after the completion of the work in a packet relay system. The router 19 is connected to an Internet line F via a dedicated line 18 to form a LAN.
【0019】次に、本発明に係る建設現場に於ける情報
管理システムの実施の形態について動作を説明する。先
づ、前記サーバ16の動作について説明すれば、当該サ
ーバ16内には、CPU等で構成された制御手段を備え
ており、該制御手段は、前記ユーザ例えば、発注者A、
設計者B、建設現場C、施工会社D及び下請会社Eから
の建設工事に伴う自己保有の諸情報のデータを制御し、
又記憶させると共に、当該データの転送、種々の演算や
該データの一時的な格納等を行なう。そして、前記サー
バ16では本システムを会員制利用として構築すること
ができ、当該サーバ16内に別の記憶手段を設け、顧客
ファイルを記憶させる。また登録者ID、パスワード、
会員情報等を設定し、指定ユーザのみが当該建設工事関
連情報として得られるようにしている。Next, the operation of the embodiment of the information management system in the construction site according to the present invention will be described. First, the operation of the server 16 will be described. The server 16 includes a control unit including a CPU and the like, and the control unit includes the user, for example, the orderer A,
Controls the data of various information owned by the designer B, the construction site C, the construction company D and the subcontractor E associated with the construction work,
In addition to storing the data, transfer of the data, various calculations, temporary storage of the data, and the like are performed. In the server 16, the present system can be constructed for membership use, and another storage means is provided in the server 16 to store a customer file. Registrant ID, password,
Member information and the like are set so that only designated users can obtain the construction-related information.
【0020】前記したように、サーバ16にはインター
ネット回線Fによって、前記発注者A、設計者B、建設
現場C、施工会社D及び下請会社E等の各ユーザの各パ
ソコン1、4、7、10及び13が接続されている。As described above, the server 16 is connected to each of the personal computers 1, 4, and 7 of each user such as the orderer A, the designer B, the construction site C, the construction company D, and the subcontractor E via the Internet line F. 10 and 13 are connected.
【0021】次に図2ないし図4に示す前記各パソコン
1、4、7、10及び13のWeb画面に基づき、本発
明の動作を説明する。図2は例えば、建設現場Cに設置
したパソコン7のトップWeb画面を示している。前記
建設現場Cはサーバ16にユーザとして登録されてお
り、オペレーターがパソコン7を起動すれば当該パソコ
ン7のログインWeb画面が表示され、該ログインWe
b画面中に登録者ID及びパスワードを入力する。而し
て、前記図2のようなトップWeb画面Gがパソコン7
の表示部に現出される。当該パソコン7のトップWeb
画面Gについて説明する。20はユーザ名表示部であ
り、当該建設工事現場Cを呼称するものである。21は
建設工事名称表示部であり、新築工事か修復工事等や施
工場所を示しており発注者A又は施工会社D等が決定
し、工事名称を冠している。当該建設工事名称は前記サ
ーバ16からデータとして出力されたものを当該トップ
Web画面Gに表示する。22は当該建設工事に伴う諸
情報等をパソコン7のWeb画面に現出するための各ボ
タンであって、会員情報ボタン22a、物件情報ボタン
22b、スケジュールボタン22c、工事内容ボタン2
2d、掲示板ボタン22e、申請処理ボタン22f、報
告書ボタン22g、議事録ボタン22h、検査情報ボタ
ン22i、工程表ボタン22j、施工写真ボタン22
k、名簿ボタン22l、現場一覧ボタン22mで構成さ
れている。Next, the operation of the present invention will be described based on the Web screens of the personal computers 1, 4, 7, 10 and 13 shown in FIGS. FIG. 2 shows, for example, a top Web screen of the personal computer 7 installed at the construction site C. The construction site C is registered as a user in the server 16, and when the operator starts the personal computer 7, a login Web screen of the personal computer 7 is displayed, and the login Web screen is displayed.
b Enter the registrant ID and password in the screen. Thus, the top Web screen G as shown in FIG.
Appears on the display unit. Top Web of the personal computer 7
The screen G will be described. Reference numeral 20 denotes a user name display section, which names the construction site C. Reference numeral 21 denotes a construction work name display section, which indicates a new construction work, a repair work, or the like, and a construction place. The orderer A or the construction company D or the like determines the construction work name and bears the construction name. The construction work name output as data from the server 16 is displayed on the top Web screen G. Reference numeral 22 denotes buttons for displaying various information related to the construction work on the Web screen of the personal computer 7, and includes a member information button 22a, a property information button 22b, a schedule button 22c, and a construction content button 2.
2d, bulletin board button 22e, application processing button 22f, report button 22g, minutes button 22h, inspection information button 22i, process schedule button 22j, construction photograph button 22
k, a list button 221 and a site list button 22m.
【0022】尚、前記トップWeb画面Gには、現場現
況写真欄26、本日の工事内容欄27、明日の工事内容
欄28、工事現場掲示板29、週間スケジュール欄30
を設けており、現場の状況や工事内容等が他のユーザに
ビジュアルにWeb画面によって点滅させる。また、前
記現場現況写真欄26は常に工事の進捗度合いが判明す
るように工事が進む段階毎に書換えられ各ユーザに配信
される。On the top Web screen G, there are a current site photo column 26, a today's construction content column 27, a tomorrow's construction content column 28, a construction site bulletin board 29, and a weekly schedule column 30.
Is provided, and the status of the site, the contents of the construction, and the like are blinked visually by another user on the Web screen. Further, the on-site actual condition photograph column 26 is rewritten at each stage of the construction progress so that the degree of the progress of the construction is always known and distributed to each user.
【0023】例えば、オペレータが該トップWeb画面
Gの検査情報ボタン22iをマウスでクリックすれば、
当該パソコン7表示部に図3及び図4に示すWeb画面
Hが現出される。そして、他のユーザ、つまり相手側に
もEメール等で配信した旨の情報が自動的に送信され
る。当該Web画面Hは検査情報であって、前記建設現
場C内に於ける他のユーザからの当該建設工事に伴う諸
情報や発注者A、設計者B、施工会社D又は下請会社E
等からの諸情報が、前記サーバ16の制御手段で制御さ
れて当該Web画面Hに現出する。該Web画面Hは、
例えば、検査内容欄23、指摘事項欄24及び配信ルー
トを特定した申請経路欄25を設けており、該検査内容
欄23は、状況写真表示欄等を設け検査状況や施工変更
等が分るように表示している。又当該検査内容欄23
は、検査名や検査場所又は検査立会者等を明記し又必要
に応じて添付資料表示やコメント欄を設けている。前記
指示事項欄24としては、例えば、「鉄筋のかぶり厚不
足」等建設工事の不適切な部位について説明が表示され
る。前記申請経路欄25は、コメント欄や承認する旨の
認否欄を設けており、前記サーバ16に指定登録した各
ユーザのみが配信を受けるので、配信を受けた該ユーザ
はコメントや認否を決定して、次の配信経路に送信す
る。当該特定された配信ルートの特定者が当該Web画
面Hを現出させ、当該指定登録したユーザ間でのみ諸情
報が共有される。そして、当該諸情報が配信ルートのど
の段階であるのかも該Web画面Hに現出させることが
でき、配信進捗状況が判明できる。For example, if the operator clicks the inspection information button 22i on the top Web screen G with a mouse,
The Web screen shown in FIG. 3 and FIG.
H appears. Then, information indicating that the content has been distributed by e-mail or the like is automatically transmitted to another user, that is, the other party. The web screen H is inspection information, and various information related to the construction work from another user in the construction site C and the orderer A, the designer B, the construction company D, or the subcontractor E
And the like appear on the Web screen H under the control of the control means of the server 16. The Web screen H is
For example, an inspection content column 23, a pointed-out item column 24, and an application route column 25 that specifies a distribution route are provided. The inspection content column 23 is provided with a status photo display column and the like so that the inspection status and construction change can be understood. Is displayed. In addition, the inspection content column 23
Specifies the inspection name, inspection location, inspection witnesses, etc., and provides an attachment display and a comment column as necessary. In the instruction item column 24, for example, an explanation is given of an inappropriate part of the construction work such as "insufficient cover thickness of reinforcing bar". The application route column 25 is provided with a comment column and an approval / denial column for approval. Only each user registered and designated in the server 16 receives the distribution. To the next distribution route. The specified person of the specified distribution route causes the Web screen H to appear, and various information is shared only between the designated and registered users. Then, the stage of the distribution route of the various information can be displayed on the Web screen H, and the distribution progress status can be determined.
【0024】前記した本発明の動作はパソコン7の前記
トップWeb画面Gに於ける検査情報ボタン22iを操
作した場合であるが、前記工程表ボタン22j、施工写
真ボタン22k、その他の各ボタンを操作することによ
り、前記と同様にパソコン7のその他のWeb画面に当
該諸情報を現出させて、建築工事に於ける円滑な事務処
理効率を向上させる。また、前記した発明の動作説明は
ユーザとしての建設現場Cについてであるが、他のユー
ザ例えば、発注者A、設計者B、施工会社D、又は下請
会社Eの設置したパソコン1、4、10、又は13や携
帯情報端末器等でもって、前記と同様に建設工事に伴う
諸情報の配信を受けることができる。The operation of the present invention described above is a case where the inspection information button 22i on the top Web screen G of the personal computer 7 is operated. However, the operation table button 22j, the construction photograph button 22k, and other buttons are operated. By doing so, the various information is displayed on the other Web screens of the personal computer 7 in the same manner as described above, and the smooth office work efficiency in the construction work is improved. The operation of the invention described above is for the construction site C as a user, but other users, for example, the personal computers 1, 4, 10 installed by the orderer A, the designer B, the construction company D, or the subcontractor E , Or 13 or the portable information terminal, etc., can receive distribution of various information associated with the construction work in the same manner as described above.
【0025】また、本発明に係る建設現場に於ける情報
管理システムは、建設現場のみならず情報を一元化し又
は情報を加工して新情報に基づくビジネスを業とする会
社又は団体間に於いて、当該システムを適用することも
できる。Further, the information management system in the construction site according to the present invention can be used not only at the construction site but also between companies or organizations that integrate information or process information to conduct business based on new information. The system can also be applied.
【0026】[0026]
【発明の効果】本発明に係る建設現場に於ける情報管理
システムは上述した構成、動作を有するので次の効果が
ある。Since the information management system in the construction site according to the present invention has the above-described configuration and operation, the following effects can be obtained.
【0027】請求項1記載の発明によれば、工事の発注
から工事完了後の引渡しまでに於ける一切の諸情報を配
信するサーバと、該サーバからの前記諸情報を受信する
と共に、前記諸情報のうち自己保有の情報を外のユーザ
群及び前記サーバに送信するユーザとで構成されたこと
を特徴とする建設現場に於ける情報管理システムを提供
する。このような構成としたので、サーバを介して建設
工事に伴う諸情報を特定ユーザ間で配信できるので、建
設工事の管理工数が大幅に削減でき、実用性の高いシス
テムを提供できる効果がある。According to the first aspect of the present invention, there is provided a server for distributing all kinds of information from the ordering of the work to the delivery after the work is completed, the server receiving the information from the server, and Provided is an information management system at a construction site, wherein the information management system comprises a group of external users and a user who transmits information owned by the user to the server. With such a configuration, various information related to the construction work can be distributed between specific users via the server, so that the number of man-hours required for the construction work can be significantly reduced, and a highly practical system can be provided.
【0028】請求項2記載の発明によれば、工事の発注
から工事完了後の引渡しまでに於ける一切の諸情報を配
信するサーバと、該サーバから配信された前記諸情報を
現出するWebサイトを設けると共に前記諸情報データ
を前記サーバに送信するユーザ群とでなる建設現場に於
ける情報管理システムを提供する。このような構成とし
たので、各ユーザに於いてパソコン等のWeb画面で建
築工事に伴う諸情報を正確であって、リアルタイムかつ
多種、多量に当該ユーザ間に配信することができると共
に、小規模から大規模工事に至るまで工事進捗の円滑化
が図れ、広範囲に利用できる効果がある。According to the second aspect of the present invention, there is provided a server for distributing all kinds of information from the order of construction to delivery after completion of construction, and a Web for displaying the information distributed from the server. Provided is an information management system at a construction site comprising a site and a group of users transmitting the various information data to the server. With such a configuration, each user can accurately and variously distribute various kinds of information related to the construction work on a Web screen of a personal computer or the like in real time, in a large amount, and in a small scale. From large to large-scale construction, the progress of the construction can be smoothed, and there is an effect that it can be widely used.
【0029】請求項3記載の発明によれば、前記ユーザ
が発注者、設計者、建設現場、施工会社又は下請会社で
なることを特徴とする請求項1又は2記載の建設現場に
於ける情報管理システムを提供する。このような構成と
したので、建設工事に関連する各ユーザすべてに適用さ
せることができる効果がある。According to the third aspect of the present invention, the user is one of an orderer, a designer, a construction site, a construction company, and a subcontractor. Provide a management system. With such a configuration, there is an effect that it can be applied to all users related to the construction work.
【0030】請求項4記載の発明によれば、前記工事の
発注から工事完了後の引渡しまでに於ける一切の諸情報
が発注条件の情報、工程管理の情報、施工写真の情報、
議事録の情報、報告書の情報、検査状況の情報、現場書
類の情報、現場労務管理情報又は資機材管理情報等でな
る請求項1又は2記載の建設現場に於ける情報管理シス
テムを提供する。このような構成としたので、建設工事
に伴う膨大かつ複雑な情報であっても各情報の保管場所
を要することなく本システムに取り込むことができる効
果がある。According to the invention described in claim 4, all the information from the order of the construction to the delivery after the completion of the construction includes information on order conditions, information on process management, information on construction photos,
3. A construction site information management system according to claim 1 or 2, comprising: minutes information, report information, inspection status information, site document information, site labor management information, and equipment management information. . With such a configuration, there is an effect that even huge and complicated information associated with construction work can be taken into the present system without requiring a storage place for each piece of information.
【0031】請求項5記載の発明によれば、前記サーバ
が各ユーザからの諸情報を記憶しかつ配信すると共にユ
ーザ側の配信ルートを特定することを特徴とする請求項
1、2又は3記載の建設現場に於ける情報管理システム
を提供する。このような構成としたので、サーバに登録
されたユーザ間のみ配信ルートを決定して当該建設工事
に伴う諸情報を共有しかつ配信できるので、当該諸情報
に関するセキュリティを確保できる効果がある。According to a fifth aspect of the present invention, the server stores and distributes various information from each user and specifies a distribution route on the user side. To provide an information management system at the construction site. With such a configuration, since a distribution route can be determined only among users registered in the server to share and distribute various information related to the construction work, there is an effect that security regarding the various information can be secured.
【0032】請求項6記載の発明によれば、ユーザの前
記諸情報に於ける配信ルートに基づいて該ユーザのWe
bサイトに承認項目を現出させることを特徴とする請求
項5記載の建設現場に於ける情報管理システムを提供す
る。このような構成としたので、ユーザのWebサイト
で当該諸情報の承認有無を決定でき、業務処理の正確か
つ迅速化を図り、事務効率を高めることができる効果が
ある。According to the invention of claim 6, based on the distribution route in the various information of the user, the user's We
6. An information management system at a construction site according to claim 5, wherein an approval item is made to appear at the site b. With such a configuration, it is possible to determine whether or not to approve the various information on the user's Web site, thereby achieving accurate and speedy business processing and improving office efficiency.
【0033】請求項7記載の発明によれば、前記ユーザ
に備えたWebサイトが携帯情報端末器の画面に現出さ
せることを特徴とする請求項2又は6記載の建設現場に
於ける情報管理システムを提供する。このような構成と
したので、パソコンに代えてモバイル機器等携帯情報端
末器でもって、本システムを簡便に利用できる効果があ
る。According to the present invention, the Web site provided for the user is displayed on the screen of the portable information terminal, and the information management at the construction site according to claim 2 or 6, Provide system. With such a configuration, there is an effect that the present system can be easily used with a portable information terminal such as a mobile device instead of a personal computer.
【図1】本発明に係る建設現場に於ける情報管理システ
ムの実施の形態を示す配線図である。FIG. 1 is a wiring diagram showing an embodiment of an information management system in a construction site according to the present invention.
【図2】本発明に係る建設現場における情報管理システ
ムを利用するユーザとしての建設現場に備えたパソコン
のトップWeb画面の一例を示す図である。FIG. 2 is a diagram showing an example of a top Web screen of a personal computer provided at a construction site as a user who uses the information management system at the construction site according to the present invention.
【図3】本発明に係る建設現場における情報管理システ
ムを利用するユーザとしての建設現場に備えたパソコン
の検査情報に係るWeb画面の一例を示す図であって、
検査内容欄を示す図である。FIG. 3 is a diagram showing an example of a Web screen related to inspection information of a personal computer provided at a construction site as a user who uses the information management system at the construction site according to the present invention;
It is a figure showing an inspection content column.
【図4】本発明に係る建設現場における情報管理システ
ムを利用するユーザとしての建設現場に備えたパソコン
の検査情報に係るWeb画面の一例を示す図であって、
指摘事項欄及び申請経路欄を示す図である。FIG. 4 is a diagram showing an example of a Web screen relating to inspection information of a personal computer provided at the construction site as a user who uses the information management system at the construction site according to the present invention;
It is a figure which shows an indication matter column and an application route column.
1 発注者のパソコン 2、5、8、11、14、18、 専用回線 3、6、9、12、15、19 ルータ 4 設計者のパソコン 7 建設現場のパソコン 10 施工会社のパソコン 13 下請会社のパソコン 16 サーバ 17 経路制御装置 20 ユーザ名表示部 21 建設工事名表示部 22 Web画面上のボタン 22a 会員情報ボタン 22b 物件情報ボタン 22c スケジュールボタン 22d 工事内容ボタン 22e 掲示板ボタン 22f 申請処理ボタン 22g 報告書ボタン 22h 議事録ボタン 22i 検査情報ボタン 22j 工程表ボタン 22k 施工写真ボタン 22l 名簿ボタン 22m 現場一覧ボタン 23 検査内容欄 24 指摘事項欄 25 申請経路欄 26 現場現況写真欄 27 本日の工事内容欄 28 明日の工事内容欄 29 工事現場掲示板 30 週間スケジュール欄 A 発注者 B 設計者 C 建設現場 D 施工会社 E 下請会社 F インターネット回線 G トップWeb画面 H 検査情報のWeb画面 1 Orderer's personal computer 2, 5, 8, 11, 14, 18, Dedicated line 3, 6, 9, 12, 15, 19 Router 4 Personal computer of designer 7 Personal computer at construction site 10 Personal computer of construction company 13 Subcontract company Personal computer 16 Server 17 Route control device 20 User name display section 21 Construction work name display section 22 Button on Web screen 22a Member information button 22b Property information button 22c Schedule button 22d Construction content button 22e Bulletin board button 22f Application processing button 22g Report button 22h Minutes button 22i Inspection information button 22j Process schedule button 22k Construction photo button 22l List button 22m Site list button 23 Inspection content column 24 Points to be noted column 25 Application route column 26 Site status photo column 27 Today's construction content column 28 Tomorrow's construction Contents column 29 Construction site示板 30-week schedule column A purchaser B designer C construction site D construction company E subcontractors F internet access G top Web screen H Web screen of the inspection information
Claims (7)
於ける一切の諸情報を配信するサーバと、該サーバから
の前記諸情報を受信すると共に、前記諸情報のうち自己
保有の情報を外のユーザ群及び前記サーバに送信するユ
ーザとで構成されたことを特徴とする建設現場に於ける
情報管理システム。1. A server for distributing all kinds of information from the order of construction to the delivery after completion of construction, receiving the information from the server, and distributing the information owned by the user among the information. An information management system at a construction site, comprising an external user group and a user transmitting to the server.
於ける一切の諸情報を配信するサーバと、該サーバから
配信された前記諸情報を現出するWebサイトを設ける
と共に前記諸情報データを前記サーバに送信するユーザ
群とでなる建設現場に於ける情報管理システム。2. A server for distributing all kinds of information from the order of construction to delivery after completion of construction, a Web site for displaying the information distributed from the server, and the various information data. An information management system at a construction site comprising a group of users transmitting the information to the server.
施工会社又は下請会社でなることを特徴とする請求項1
又は2記載の建設現場に於ける情報管理システム。3. The system according to claim 1, wherein the user is an orderer, a designer, a construction site,
2. A construction company or a subcontracting company.
Or an information management system in a construction site according to 2.
でに於ける一切の諸情報が発注条件の情報、工程管理の
情報、施工写真の情報、議事録の情報、報告書の情報、
検査状況の情報、現場書類の情報、現場労務管理情報又
は資機材管理情報等でなる請求項1又は2記載の建設現
場に於ける情報管理システム。4. All the information from the ordering of the construction to the delivery after the completion of the construction includes ordering condition information, process management information, construction photograph information, minutes information, report information,
3. The information management system for a construction site according to claim 1, wherein the information management system comprises inspection status information, site document information, site labor management information, or equipment management information.
しかつ配信すると共にユーザ側の配信ルートを特定する
ことを特徴とする請求項1、2又は3記載の建設現場に
於ける情報管理システム。5. The information management at a construction site according to claim 1, wherein the server stores and distributes various information from each user and specifies a distribution route on the user side. system.
基づいて該ユーザのWebサイトに承認項目を現出させ
ることを特徴とする請求項5記載の建設現場に於ける情
報管理システム。6. An information management system at a construction site according to claim 5, wherein an approval item appears on the user's Web site based on a distribution route in the user's various information.
報端末器の画面に現出させることを特徴とする請求項2
又は6記載の建設現場に於ける情報管理システム。7. A Web site provided for the user is displayed on a screen of a portable information terminal.
Or an information management system in a construction site according to 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001143590A JP2002342409A (en) | 2001-05-14 | 2001-05-14 | Information management system at construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001143590A JP2002342409A (en) | 2001-05-14 | 2001-05-14 | Information management system at construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2002342409A true JP2002342409A (en) | 2002-11-29 |
Family
ID=18989714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001143590A Withdrawn JP2002342409A (en) | 2001-05-14 | 2001-05-14 | Information management system at construction site |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2002342409A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110991982A (en) * | 2019-10-28 | 2020-04-10 | 中船重工海鑫工程管理(北京)有限公司 | Construction project building information management method and system |
JP2021108040A (en) * | 2019-12-27 | 2021-07-29 | 福井コンピュータホールディングス株式会社 | Invitation system, management server, and invitation method |
-
2001
- 2001-05-14 JP JP2001143590A patent/JP2002342409A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110991982A (en) * | 2019-10-28 | 2020-04-10 | 中船重工海鑫工程管理(北京)有限公司 | Construction project building information management method and system |
JP2021108040A (en) * | 2019-12-27 | 2021-07-29 | 福井コンピュータホールディングス株式会社 | Invitation system, management server, and invitation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Abudayyeh et al. | An intranet-based cost control system | |
Hadikusumo et al. | Construction material procurement using internet-based agent system | |
JP2000076342A (en) | Device and method for purchase request authentication and computer-readable storage medium | |
JP2003036162A (en) | Apparatus, system, program and method for supporting printing material production | |
JP2009129080A (en) | Anonymous online mail-order system | |
JP2002342409A (en) | Information management system at construction site | |
KR20000054851A (en) | Bidding method of using cyber construction firm on internet | |
JP2002197303A (en) | Method and system for operating building design competition and recording medium readable by computer | |
JP4262655B2 (en) | Workflow system and workflow system management method | |
JP2004280610A (en) | Order reception/ordering support system, management server, and order reception/ordering support program | |
JP2002073934A (en) | Project management system | |
JPH11232329A (en) | Cost management system | |
KR100798274B1 (en) | The company working process system using the internet remote control to the personal computer | |
JP7297111B1 (en) | Business matching system, business matching method and business matching program | |
JPH10187859A (en) | Business processing method, system and device, and storage medium storing business processing program | |
US20240020655A1 (en) | Method and system for tracking assets | |
JP2004110604A (en) | Service system for supporting collaborative creation of material | |
KR100842672B1 (en) | The working process system using the internet remote control to the personal computer of both direction | |
JP2002352051A (en) | Financial management support method and its system | |
JP2002269327A (en) | System and program for supporting business development | |
JP2002133211A (en) | Method and system for materials supply and program recording medium | |
JP2002073736A (en) | Work distribution controller | |
JP2004334411A (en) | Business control system | |
KR20020009143A (en) | The consulting system for construction-remodeling and the service providing method | |
JP2001312636A (en) | System and method for inter-enterprise product sale and recording medium stored with program thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Application deemed to be withdrawn because no request for examination was validly filed |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20080805 |