JP2002332613A - Bridge removal working machine - Google Patents

Bridge removal working machine

Info

Publication number
JP2002332613A
JP2002332613A JP2002184138A JP2002184138A JP2002332613A JP 2002332613 A JP2002332613 A JP 2002332613A JP 2002184138 A JP2002184138 A JP 2002184138A JP 2002184138 A JP2002184138 A JP 2002184138A JP 2002332613 A JP2002332613 A JP 2002332613A
Authority
JP
Japan
Prior art keywords
bridge
hoist
work machine
rails
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002184138A
Other languages
Japanese (ja)
Inventor
Hisashi Yamaguchi
尚志 山口
Tsuneto Kuno
恒人 久野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP2002184138A priority Critical patent/JP2002332613A/en
Publication of JP2002332613A publication Critical patent/JP2002332613A/en
Pending legal-status Critical Current

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Control And Safety Of Cranes (AREA)
  • Bridges Or Land Bridges (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a bridge removal working machine suspending concrete pieces on a bridge and having excellent stability. SOLUTION: In the bridge removal working machine 1, a plurality of shifters 5 are arranged horizontally and installed to a fixed number of longitudinal rails 12 mounted in the longitudinal direction to a device body 2 capable of traveling, cranes 3 are secured movably in the horizontal direction to one of a plurality of longitudinally fitted traverse rails 22 in the shifters 5, and the cranes 3 are moved in the horizontal direction among each shifter 5 by utilizing the empty traverse rails 22, to which the cranes 3 are not set up.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、橋梁を切断しなが
ら解体していく橋梁撤去作業において使用するものであ
って、解体位置に応じて橋梁上を所定の位置に移動し、
そこで切断された橋梁のコンクリート片を吊り下げてト
ラックなどに積載する橋梁撤去作業機に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is used in a bridge removal operation in which a bridge is dismantled while being cut, and is moved to a predetermined position on the bridge in accordance with the dismantling position.
Therefore, the present invention relates to a bridge removing work machine that suspends a concrete piece of a bridge that has been cut and loads the concrete piece on a truck.

【0002】[0002]

【従来の技術】例えば、老朽化や事業見積もりの誤りな
どによって高架橋を撤去しなければならない場合があ
る。こうした場合、橋梁は様々な場所を通って架けられ
ているため、ビルなどのように一度に崩壊させてしまう
ことはできず、撤去の対象となる部分を端から順に切り
崩していかなければならない。そうした撤去作業では、
橋梁が搬送トラックに積み込み可能な大きさに切断さ
れ、そのコンクリート片が橋の下で待機しているトラッ
クに積まれて順次搬出される。
2. Description of the Related Art In some cases, it is necessary to remove viaducts due to aging, erroneous business estimates, and the like. In such a case, since the bridge is passed through various places, it cannot be collapsed at once like a building, and the part to be removed must be cut down sequentially from the end. In such removal work,
The bridge is cut to a size that can be loaded on a transport truck, and the concrete pieces are loaded on a truck waiting under the bridge and sequentially discharged.

【0003】従って、橋梁の撤去作業には、高い位置に
ある橋桁部分などのコンクリート片を下のトラックに積
むため、コンクリート片を吊り下げるクレーンが必要に
なってくる。また、そのクレーンは、切り崩しによって
後退する橋梁の解体位置に従って移動できるものでなく
てはならない。そこで橋梁の撤去作業には例えばクレー
ン車の利用が考えられる。クレーン車は橋桁の上に配置
され、橋梁の撤去では切断部分にアンカを介してワイヤ
を掛け、切断後にはそのコンクリート片を吊り下げてト
ラックへと積み込む。そして、クレーン車は橋桁上を移
動し、切り崩しを行う橋桁先端の作業位置で常にコンク
リート片の吊り下げ作業を行うことができるようにす
る。
[0003] Therefore, in the work of removing the bridge, a crane for suspending the concrete pieces is required in order to load concrete pieces such as a bridge girder located at a high position on a lower truck. In addition, the crane must be able to move in accordance with the demolition position of the bridge that is retracted by breaking down. Therefore, for example, the use of a crane truck can be considered for removing the bridge. The crane truck is placed on the bridge girder, and when the bridge is removed, a wire is wrapped around the cut section via an anchor, and after cutting, the concrete piece is hung and loaded onto a truck. Then, the crane truck moves on the bridge girder so that the concrete piece can be always suspended at the work position at the tip of the bridge girder for cutting and breaking.

【0004】[0004]

【発明が解決しようとする課題】しかし、橋桁の上にあ
って常に高い位置で作業するレーン車は強風の影響を受
けやすく、万一転倒したような場合には作業者自身にと
って危険であるばかりか、近隣には建物や道路、或いは
線路などある場合にそれらへの影響も大きい。従って、
こうした高所作業となる橋梁の撤去作業にはクレーン車
などではなく、より安定して作業の行えるものが必要に
なってくる。
However, a lane vehicle that is always on a bridge girder and works at a high position is susceptible to strong winds, and if it falls down, it is dangerous for the operator himself. Or, if there are buildings, roads, railway tracks, etc. in the vicinity, the influence on them is large. Therefore,
For the removal of bridges, which are high-altitude operations, it is necessary to use something that can be operated more stably, instead of crane trucks.

【0005】そこで本発明は、橋梁上でコンクリート片
の吊り下げを行う安定性の良い橋梁撤去作業機を提供す
ることを目的とする。
Accordingly, an object of the present invention is to provide a bridge removing work machine with good stability for suspending concrete pieces on the bridge.

【0006】[0006]

【課題を解決するための手段】本発明に係る橋梁撤去作
業機は、走行可能な装置本体に対し前後方向に設けられ
た所定数の前後レールに、複数の移動装置が横並びに取
り付けられ、その移動装置は、前後して設けられた複数
の横行レールの一つに揚重装置が左右方向に移動可能に
取り付けられたものであって、揚重装置の装着されてい
ない空いた横行レールを利用して、揚重装置が各移動装
置間を左右方向に移動できるようにしたものであること
を特徴とする。
In the bridge removing work machine according to the present invention, a plurality of moving devices are mounted side by side on a predetermined number of front and rear rails provided in a front and rear direction with respect to a movable device main body. The moving device is one in which a lifting device is attached to one of a plurality of traversing rails provided before and after so as to be movable in the left-right direction, and uses an empty traversing rail without a lifting device attached. Then, the lifting device is characterized in that it can move between the moving devices in the left-right direction.

【0007】よって本発明の橋梁撤去作業機によれば、
揚重装置は、移動装置が前後レールを移動することによ
って前後方向に移動し、更にそれ自体が移動装置の横行
レールを左右に移動することができる。従って橋梁撤去
作業機は、揚重装置が前後レールのある範囲で前後左右
にコンクリート片を吊って移動することができ、このよ
うに揚重装置を水平移動させるレールを備えるものは、
背を低くした構造とすることができるので安定性の良い
ものとなる。
Therefore, according to the bridge removing work machine of the present invention,
The lifting device moves in the front-rear direction by moving the moving device on the front and rear rails, and itself can move the traversing rail of the moving device left and right. Therefore, the bridge removal work machine, the lifting device can move the concrete pieces suspended in the front and rear and left and right within a certain range of the front and rear rails, such a device equipped with a rail that horizontally moves the lifting device,
Since the height can be reduced, the stability is improved.

【0008】そして、本発明に係る橋梁撤去作業機の実
施態様としては次のようなものが好ましい。前記装置本
体が、フレーム構造をして前方部分に前記複数の前後レ
ールを、後方部分に自走式の走行装置と装置本体の安定
を図るアウトリガーを有するものであり、前記複数の移
動装置が、各移動装置が異なる前後レールに車輪を掛け
て懸垂状態で取り付けられ、モータによる車輪の回転に
よって当該前後レールに沿った移動を可能にしたもので
あり、前記揚重装置が、前記移動装置の横行レールに車
輪を掛けて懸垂状態で取り付けられ、モータによる車輪
の回転によって当該横行レールに沿って移動を可能にし
たものであること。また、前記装置本体後方部分には、
ウエイトを搭載していること。更に、前記装置本体後方
端部には、反力支持用のアンカを有すること。
The following is a preferred embodiment of the bridge removing work machine according to the present invention. The device body has a frame structure, the plurality of front and rear rails in a front portion, and a self-propelled traveling device and an outrigger for stabilizing the device body in a rear portion, and the plurality of moving devices, Each moving device is mounted in a suspended state by hanging wheels on different front and rear rails, and is enabled to move along the front and rear rails by rotation of wheels by a motor, and the lifting device is traversed by the moving device. The vehicle is mounted in a suspended state with a wheel mounted on a rail, and is movable along the traversing rail by rotation of the wheel by a motor. Also, in the rear part of the device main body,
The weight must be mounted. Further, an anchor for supporting a reaction force is provided at a rear end of the apparatus main body.

【0009】[0009]

【発明の実施の形態】次に、本発明に係る橋梁撤去作業
機について、その一実施形態を図面を参照しながら以下
に説明する。図1乃至図3は、本実施形態における橋梁
撤去作業機の側面図、平面図、そして正面図を簡略化し
て示したものである。橋梁撤去作業機1は、図示するよ
うなフレーム構造をした作業機本体2に対し、その前方
部分にはコンクリート片を吊り下げるための揚重装置で
あるホイスト3a,3b,3c,3d(まとめて「ホイ
スト3」と記す)を移動可能に備え、後方部分には移動
できるように走行装置4を備えたものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, an embodiment of a bridge removing work machine according to the present invention will be described below with reference to the drawings. 1 to 3 show simplified side views, plan views, and front views of a bridge removing work machine according to the present embodiment. The bridge removing work machine 1 has a hoist 3a, 3b, 3c, 3d (collectively) as a lifting device for suspending concrete pieces in front of a work machine main body 2 having a frame structure as shown in the figure. (Hereinafter referred to as "hoist 3"), and a traveling device 4 is provided at the rear portion so as to be movable.

【0010】橋梁撤去作業機1は、ホイスト3が移動す
る前方部分を作業領域とし、各ホイスト3がこの領域を
前後左右に移動できるように構成されている。すなわち
作業機本体2の張出ビーム11には各ホイスト3毎に2
本ずつ、計8本の前後レール12が平行に設けられてお
り、ホイスト3を備えたホイスト移動装置5a,5b,
5c,5d(まとめて「ホイスト移動装置5」と記す)
が、その前後レール12に取り付けられ前後方向に移動
可能に構成されている。
The bridge removing work machine 1 is configured such that a front part where the hoist 3 moves is used as a work area, and each hoist 3 can move in this area forward, backward, left and right. That is, the overhanging beam 11 of the working machine body 2 has two
A total of eight front and rear rails 12 are provided in parallel, and a hoist moving device 5a, 5b,
5c, 5d (collectively referred to as "hoist moving device 5")
Are attached to the front and rear rails 12 so as to be movable in the front and rear direction.

【0011】ホイスト移動装置5は、図4に示すように
前後レール12に沿って移動可能な左右一対の懸垂形サ
ドル21,21に型鋼からなる横行レール22a,22
b(まとめて「横行レール22」と記す)が前後して固
定され、ホイスト3が一方の横行レール22bに移動可
能に取り付けられている。その懸垂形サドル21は、U
字型をした枠体の内側に車輪を備え、前後レール12に
その車輪を掛けて内側に挟み込むようにして懸垂状態で
取り付けられている。そして、一対の懸垂形サドル2
1,21には各々モータ23を有し、その駆動によって
車輪を回転させ前後レール12に沿った前後方向の移動
が可能になっている。
As shown in FIG. 4, the hoist moving device 5 includes a pair of left and right suspended saddles 21 and 21 movable along the front and rear rails 12, and traverse rails 22a and 22 made of steel.
b (collectively referred to as “traversing rails 22”) is fixed back and forth, and the hoist 3 is movably attached to one of the traversing rails 22b. The suspended saddle 21 is U
Wheels are provided inside the character-shaped frame, and the wheels are hung on the front and rear rails 12 so as to be sandwiched inside and attached in a suspended state. And a pair of suspended saddles 2
Each of the motors 1 and 21 has a motor 23, which can rotate the wheels by driving the motor 23 to move in the front-rear direction along the front-rear rail 12.

【0012】一方、そうした懸垂形サドル21,21の
下に固定された横行レール22には、ホイスト3が同じ
ように車輪を掛けて懸垂状態で取り付けられ、その車輪
を回転させるモータ24を有し、横行レール22に沿っ
た左右横方向に移動が可能になっている。従って、ホイ
スト3は、ホイスト移動装置5の操作によって前後レー
ル12に沿って前後方向に移動するとともに、それ自身
のモータ24の操作によって横行レール22に沿った左
右横方向の移動が可能になっている。
On the other hand, the hoist 3 is mounted on the traversing rail 22 fixed under the hanging saddles 21 and 21 in the same manner with the wheels hung, and has a motor 24 for rotating the wheels. , Can be moved in the horizontal direction along the traversing rail 22. Accordingly, the hoist 3 can move in the front-rear direction along the front-rear rail 12 by operating the hoist moving device 5 and can move in the left-right lateral direction along the traversing rail 22 by operating the motor 24 itself. I have.

【0013】また、左右に配置された4機のホイスト移
動装置5は、横行レール22の前後の位置が合わせられ
た場合、隣り合うもの同士僅かな隙間をあけて連続する
ようになっている。そのため特定の横行レール22同士
を横方向に連続させることにより、ホイスト3が別のホ
イスト移動装置5の横行レール22を利用して左右方向
に自由に移動できるようになっている。
When the front and rear positions of the traversing rails 22 are aligned, the four hoist moving devices 5 arranged on the left and right are continuous with a slight gap between adjacent ones. For this reason, the specific hoist rails 22 are made continuous with each other in the horizontal direction, so that the hoist 3 can freely move in the left-right direction using the horizontal rail 22 of another hoist moving device 5.

【0014】次に、橋梁撤去作業機1は、図1及び図2
に示すように、作業機本体2の後方部分に走行装置4,
4,4,4と作業時の安定を図るためのアウトリガー
6,6,6,6が設けられている。この走行装置4は、
旋回可能に設けられたサスペンションブラケットのアー
ムに対し、上下方向に揺動可能なスイングアームが枢着
され、そのスイングアームが油圧シリンダで支持された
ジャッキアップ機構を構成している。従って、油圧シリ
ンダの伸長作動によって作業機本体2を持ち上げて走行
可能にし、収縮作動によって図示するようにタイヤを浮
かせた状態にするようになっている。また、各走行装置
4はそれぞれが油圧モータなどを備え、各自独立した走
行を可能にした構成になっている。
Next, the bridge removing work machine 1 is shown in FIGS.
As shown in FIG.
Outriggers 6, 6, 6, and 6 for stabilizing the work are provided. This traveling device 4
A swing arm capable of swinging up and down is pivotally attached to an arm of a suspension bracket that is rotatably provided, and the swing arm constitutes a jack-up mechanism supported by a hydraulic cylinder. Accordingly, the working machine body 2 is lifted to be able to run by the extension operation of the hydraulic cylinder, and the tire is floated as shown by the contraction operation. Each traveling device 4 is provided with a hydraulic motor or the like, and is configured to be able to travel independently.

【0015】更に橋梁撤去作業機1は、走行装置4の油
圧制御、ホイスト3やホイスト移動装置5に設けられた
モータなどの電気制御をそれぞれ運転席7又はペンダン
トスイッチ等での操作からの操縦によってコントロール
できるようになっており、モータを駆動させるための発
電機8や、油圧シリンダや油圧モータを作動させる作動
油を供給するための油圧ユニット9がそれぞれ後方に配
置されている。また、この橋梁撤去作業機1では前方部
分で吊り下げ作業を行うため、バランスをとるためのウ
エイト17が後方部分に載置され、更にその後端部には
橋桁51に打ち込む反力取アンカ18が設けられてい
る。
Further, the bridge removing work machine 1 controls the hydraulic pressure of the traveling device 4 and the electric control of the motor provided in the hoist 3 and the hoist moving device 5 by operating the driver's seat 7 or a pendant switch or the like, respectively. Controllable, a generator 8 for driving the motor and a hydraulic unit 9 for supplying hydraulic oil for operating a hydraulic cylinder and a hydraulic motor are arranged at the rear, respectively. Further, in the bridge removing work machine 1, a suspending work is carried out at a front portion, so that a weight 17 for balancing is placed on a rear portion, and a reaction force anchor 18 to be driven into a bridge girder 51 is provided at a rear end portion. Is provided.

【0016】続いて、この橋梁撤去作業機1を使用した
橋梁撤去作業について説明する。先ず橋梁撤去作業機1
は、それ自体が大型なため橋桁51の上で組み立てられ
る。そして、橋桁51上を移動して所定の作業位置でア
ウトリガー6を伸長作動させるなどして安定した作業状
態を整える。本実施形態では橋梁撤去作業機1が撤去対
象となる橋梁50に対応して設計されており、アウトリ
ガー6の前後の間隔が橋脚52の間隔に合わせられてい
るため、橋桁51上で作業を行う場合には、図1に示す
ように少なくとも図の中央位置のアウトリガー6が橋脚
52上に位置するようにして作業位置が決められる。こ
のとき橋梁撤去作業機1においてホイスト3の移動が可
能な前方部分の作業スペースは、そのアウトリガー6が
設置された更に前方の橋脚52までの範囲となる。
Next, a bridge removing operation using the bridge removing machine 1 will be described. First, bridge removal work machine 1
Is assembled on the bridge girder 51 because of its large size. Then, a stable work state is prepared by moving on the bridge girder 51 and extending the outrigger 6 at a predetermined work position. In this embodiment, the bridge removal work machine 1 is designed corresponding to the bridge 50 to be removed, and the space before and after the outrigger 6 is matched with the space between the piers 52, so that the work is performed on the bridge girder 51. In this case, the work position is determined such that at least the outrigger 6 at the center position in the figure is located on the pier 52 as shown in FIG. At this time, the work space in the front part of the bridge removing work machine 1 where the hoist 3 can be moved is a range up to the pier 52 further forward where the outrigger 6 is installed.

【0017】ところで橋梁撤去作業機1の移動は、走行
装置4による橋桁51上の走行によって行われる。その
場合、走行装置4は油圧シリンダが伸長作動してタイヤ
が橋桁51に接地し、更に伸ばして作業機本体2が持ち
上げられて走行可能な状態となる。そして、走行装置4
によって橋桁51上を移動した橋梁撤去作業機1は、前
述した位置で停止し、その位置で走行装置4は油圧シリ
ンダを収縮作動させてタイヤを浮かせ、アウトリガー6
で橋梁撤去作業機1全体を支え水平出しを行う。更に、
撤去作業に当たっては前方のホイスト3によって吊り下
げが行われるため、全体のバランスが前方に傾かないよ
うにウエイト17に加え、その作業位置にて反力取アン
カ18が橋桁51に打ち込まれる。
Incidentally, the movement of the bridge removing work machine 1 is performed by traveling on the bridge girder 51 by the traveling device 4. In this case, the traveling device 4 is in a state in which the hydraulic cylinder is extended and the tire is in contact with the bridge girder 51, and the traveling device 4 is further extended so that the work implement body 2 is lifted and can travel. And traveling device 4
The bridge removing work machine 1 having moved on the bridge girder 51 stops at the above-mentioned position, and at that position the traveling device 4 contracts the hydraulic cylinder to lift the tire, and the outrigger 6
To support the entire bridge removal machine 1 and level out. Furthermore,
In the removal work, the suspension is carried out by the front hoist 3, so that the whole balance is added to the weight 17 so as not to tilt forward, and the reaction force anchor 18 is driven into the bridge girder 51 at the work position.

【0018】橋梁50の下では図1及び図3に示すよう
に搬出トラック60が待機し、これに切り出された橋梁
50のコンクリート片が載せられて順次搬出が行われ
る。搬出には搬出トラック60の積載重量を超えない範
囲で行わなければならないため、橋梁50は適当な大き
さに切断され、そのコンクリート片が橋梁撤去作業機1
によって積まれることになる。
As shown in FIGS. 1 and 3, a carry-out truck 60 stands by under the bridge 50, and the cut-out concrete pieces of the bridge 50 are placed thereon and sequentially carried out. Since the unloading must be performed within a range not exceeding the loading weight of the unloading truck 60, the bridge 50 is cut to an appropriate size, and the concrete pieces are removed from the bridge removing work machine 1.
Will be piled up.

【0019】そこで、例えば図1及び図3に示すように
橋桁51部分を撤去する場合、橋桁先端の切断部分に吊
り用アンカが打ち込まれ、4機のホイスト3には、その
巻上げロープの先端に取り付けられたフック25にワイ
ヤが掛けられる(図4参照)。そうした後、ワイヤソー
等によって左右に4分割、前後方向には例えば橋脚52
の幅程度にコンクリート片が切り出され、順次搬出トラ
ック60へと積み込まれる。コンクリート片の搬出トラ
ック60への積み込みは、ホイスト3の移動によって以
下のようにして行われる。
In order to remove the bridge girder 51 as shown in FIGS. 1 and 3, for example, a suspension anchor is driven into the cut end of the bridge girder, and the four hoists 3 are attached to the ends of the hoisting ropes. A wire is hooked on the attached hook 25 (see FIG. 4). After that, it is divided into four parts by a wire saw or the like.
The concrete pieces are cut out to a width of about and are sequentially loaded on the unloading truck 60. Loading of the concrete pieces onto the unloading truck 60 is performed by moving the hoist 3 as follows.

【0020】先ず、図5に示すように停車した搬出トラ
ック60の直上にあるホイスト3bによって、そこに吊
られたコンクリート片が降ろされて搬出トラック60へ
と積み込まれる。その際、ホイスト移動装置5によって
ホイスト3の前後位置が調整される。すなわち、ホイス
ト移動装置5bは、懸垂形サドル21のモータ23(図
4参照)が駆動して図6に示すように前後レール12を
前方に移動し、そのホイスト3bに吊られたコンクリー
ト片の搬出トラック60への積み込み位置が調節され
る。そこで、ホイスト3の巻上げロープが送り出され、
吊り下げられたコンクリート片が搬出トラック60の荷
台へと降ろされて積み込まれる。通常は、トラック1台
にコンクリート片1個を積んで搬出する。
First, as shown in FIG. 5, the concrete piece suspended there is lowered by the hoist 3b immediately above the stopped delivery truck 60 and loaded on the delivery truck 60. At that time, the front and rear positions of the hoist 3 are adjusted by the hoist moving device 5. That is, the hoist moving device 5b drives the motor 23 (see FIG. 4) of the suspension saddle 21 to move the front and rear rails 12 forward as shown in FIG. 6, and carries out the concrete pieces suspended on the hoist 3b. The loading position on the truck 60 is adjusted. Then, the hoisting rope of the hoist 3 was sent out,
The suspended concrete pieces are unloaded to the loading platform of the unloading truck 60 and loaded. Usually, one concrete piece is loaded on one truck and carried out.

【0021】次に、ホイスト3aによって吊られたコン
クリート片は、ホイスト3aがホイスト3bのホイスト
移動装置5bまで移動し、そこからコンクリート片の下
降・積み込みが行われる。コンクリート片の下降位置を
搬出トラック60に合わせるようにする。そのためには
先ず、コンクリート片を搬出トラック60に積み込んだ
ホイスト3bが、図3に示す位置に再び後退して他のホ
イスト移動装置5と左右の位置が揃えられる。
Next, the concrete piece suspended by the hoist 3a moves to the hoist moving device 5b of the hoist 3b, from which the concrete piece is lowered and loaded. The descending position of the concrete piece is adjusted to the unloading truck 60. For this purpose, first, the hoist 3b loaded with the concrete pieces on the unloading truck 60 is retreated again to the position shown in FIG. 3, and the left and right positions are aligned with the other hoist moving devices 5.

【0022】ホイスト移動装置5は、図4に示すように
前後2つあるうちの前方の横行レール22bが空いた状
態になっている。そこで、図3に示す位置に搬出トラッ
ク60が停車している場合には、ホイスト3aによって
吊られたコンクリート片を、このホイスト3aをホイス
ト移動装置5bの空いた横行レール22bへと移動さ
せ、搬出トラック60の上に位置するようにする。
As shown in FIG. 4, the hoist moving device 5 is in a state where the front transverse rail 22b of the two front and rear rails is empty. Therefore, when the unloading truck 60 is stopped at the position shown in FIG. 3, the concrete piece suspended by the hoist 3a is moved by the hoist 3a to the empty traversing rail 22b of the hoist moving device 5b and unloaded. It is located above the track 60.

【0023】そこで、先ずホイスト移動装置5aが懸垂
形サドル21が図8に示すように前後レール12を移動
して前進し、ホイスト移動装置5aの横行レール22a
をホイスト移動装置5bの空いた横行レール22bに一
致させる。これによてホイスト3aが、ホイスト移動装
置5a,5b間で連続した横行レール22a,22bを
移動し、ホイスト移動装置5bへと移って図7に示すよ
うに、ホイスト3aに吊られたコンクリート片が搬出ト
ラック60上に位置することとなる。
Therefore, first, the hoist moving device 5a moves forward with the suspended saddle 21 moving on the front and rear rails 12 as shown in FIG. 8, and the traversing rail 22a of the hoist moving device 5a.
To the free traversing rail 22b of the hoist moving device 5b. As a result, the hoist 3a moves along the continuous traverse rails 22a, 22b between the hoist moving devices 5a, 5b, and moves to the hoist moving device 5b, as shown in FIG. Are located on the unloading truck 60.

【0024】そこで更にホイスト移動装置5bの前後方
向の移動により搬出トラック60への積み込み位置が調
節され、ホイスト3aの巻上げロープの送り出しによっ
てコンクリート片が下降し、搬出トラック60の荷台に
積み込まれる。コンクリート片の積み込み後は、再び横
行レール22a,22bの位置が重ねられ、ホイスト3
aがホイスト移動装置5aに戻される。更に、ホイスト
3c,3dに吊られたコンクリート片を積み込む場合
は、ホイスト3a,3bの場合と対称的な動きで同様の
操作が繰り返される。
Then, the loading position on the unloading truck 60 is adjusted by further moving the hoist moving device 5b in the front-rear direction, and the concrete piece descends by sending out the hoisting rope of the hoist 3a and is loaded on the loading platform of the unloading truck 60. After loading the concrete pieces, the positions of the traversing rails 22a and 22b are again overlapped, and the hoist 3
a is returned to the hoist moving device 5a. Further, when loading concrete pieces suspended on the hoists 3c and 3d, the same operation is repeated with a symmetrical movement as in the case of the hoists 3a and 3b.

【0025】このように4機のホイスト3は、ホイスト
移動装置5の移動とホイスト3自身の横行レール22間
の移動によって、ホイスト移動装置5が移動可能な前後
レール12の設けられた領域において前後左右に自由に
移動することが可能である。そのため、図1に示すよう
に橋梁撤去作業機1を一旦設置すれば、そのままの状態
で前方に位置するアウトリガー6(図1左側)手前まで
の範囲で橋桁51及び橋脚52の撤去を行うことができ
る。
As described above, the four hoists 3 are moved forward and backward in the area where the front and rear rails 12 are provided, in which the hoist moving device 5 can move, by the movement of the hoist moving device 5 and the movement between the traverse rails 22 of the hoist 3 itself. It is possible to move freely left and right. Therefore, once the bridge removal work machine 1 is installed as shown in FIG. 1, the bridge girder 51 and the pier 52 can be removed in a range up to the outrigger 6 (left side in FIG. 1) located in front of the bridge removal work machine 1. it can.

【0026】従って、橋梁撤去作業機1を定置させ、一
定範囲で橋桁51の撤去を行う場合には、切り出される
コンクリート片の前後方向切断幅に合わせてホイスト移
動装置5を段階的に後退させ、前述したようにホイスト
3がホイスト移動装置5間を横方向に移動し、コンクリ
ート片の搬出トラック60への積み込みが行われる。こ
のとき、橋桁51の下に建物などがあって搬出トラック
60が切断位置の下に入れない場合でも、ホイスト移動
装置5を橋梁撤去作業機1の先端部分まで移動させ、切
り出したコンクリート片の下降可能な位置で積み込みが
行われる。
Therefore, when the bridge removing work machine 1 is fixed and the bridge girder 51 is to be removed within a certain range, the hoist moving device 5 is retracted stepwise in accordance with the longitudinal cutting width of the concrete piece to be cut out. As described above, the hoist 3 moves in the horizontal direction between the hoist moving devices 5, and the concrete pieces are loaded on the unloading truck 60. At this time, even if there is a building or the like under the bridge girder 51 and the unloading truck 60 cannot enter below the cutting position, the hoist moving device 5 is moved to the tip portion of the bridge removing work machine 1 to lower the cut concrete pieces. Loading takes place where possible.

【0027】また、橋桁51の他にも橋脚52の撤去を
行う場合には、図9に示すように所定のホイスト3が橋
脚52や梁53の切断されたコンクリート片を吊り、同
様にホイスト3がホイスト移動装置5間で左右に移動し
て下降位置が調整され、そこで吊られたコンクリート片
が搬出トラック60に積み込まれる。
When the pier 52 is to be removed in addition to the bridge girder 51, a predetermined hoist 3 suspends the concrete piece from which the pier 52 or the beam 53 has been cut as shown in FIG. Moves right and left between the hoist moving devices 5 to adjust the lowered position, and the suspended concrete pieces are loaded on the unloading truck 60.

【0028】よって、本実施形態の橋梁撤去作業機1に
よれば、ホイスト3を前後左右に水平移動させる構成と
したので、背を低くした構造とすることができ、橋桁5
1の上で作業を行うのに安定性の良いものとなった。ま
た、ホイスト3が移動可能な作業領域が広いため、橋梁
撤去作業機1を移動させることなくある程度の範囲に渡
って撤去作業することができ、橋桁51の下に搬出トラ
ック60が入れないような場所でも適切な位置にコンク
リート片を移動させて積み込みを行うことができるの
で、作業効率が良く、かつ安全に作業を進めることがで
きる。
Therefore, according to the bridge removing work machine 1 of the present embodiment, the hoist 3 is horizontally moved to the front, rear, left and right.
1 has a good stability to work on. Further, since the work area in which the hoist 3 can be moved is wide, it is possible to perform the removal work over a certain range without moving the bridge removal work machine 1, so that the unloading truck 60 cannot enter under the bridge girder 51. Even in a place, the concrete piece can be moved to an appropriate position and loaded, so that work can be performed efficiently and safely.

【0029】また、橋桁51の幅方向に分割されるコン
クリート片の数に合わせてホイスト3を4機備えている
ため、一列毎に切断から搬出トラック60への積み込み
までを一連の作業として行うことができるので、この点
でも作業効率が良い。また、走行装置4を備えて橋桁5
1上を走行可能なので、橋梁撤去作業機1の移動をスム
ーズに行うことができる。
Further, since the four hoists 3 are provided in accordance with the number of concrete pieces divided in the width direction of the bridge girder 51, cutting from loading to loading into the unloading truck 60 is performed as a series of operations for each row. Work efficiency is also good in this regard. In addition, a bridge girder 5 having a traveling device 4 is provided.
1, the bridge removal work machine 1 can be moved smoothly.

【0030】以上、本発明に係る橋梁撤去作業機につい
て一実施形態を示して説明したが、本発明はこれに限定
されることなくその趣旨を逸脱しない範囲で様々な変更
が可能である。例えば、前記実施形態では、ホイスト移
動装置5には横行レールを前後2列設けたが、更に3列
以上であってもよい。
As described above, the bridge removing work machine according to the present invention has been described with reference to one embodiment, but the present invention is not limited to this, and various changes can be made without departing from the gist of the present invention. For example, in the above-described embodiment, the hoist moving device 5 is provided with two rows of traversing rails in front and rear, but may be three or more rows.

【0031】[0031]

【発明の効果】本発明は、走行可能な装置本体に対し前
後方向に設けられた所定数の前後レールに、複数の移動
装置が横並びに取り付けられ、その移動装置は、前後し
て設けられた複数の横行レールの一つに揚重装置が左右
方向に移動可能に取り付けられたものであって、揚重装
置の装着されていない空いた横行レールを利用して、揚
重装置が各移動装置間を左右方向に移動できるようにし
たので、橋梁上でコンクリート片の吊り下げを行う安定
性の良い橋梁撤去作業機を提供することが可能となっ
た。
According to the present invention, a plurality of moving devices are mounted side by side on a predetermined number of front and rear rails provided in the front and rear direction with respect to the main body which can travel, and the moving devices are provided in front and rear. A lifting device is attached to one of the plurality of traversing rails so as to be movable in the left-right direction, and the lifting device is attached to one of the moving devices by using an empty traversing rail to which no lifting device is attached. Since the space between the bridges can be moved in the left-right direction, it is possible to provide a stable bridge removing machine capable of suspending concrete pieces on the bridge.

【図面の簡単な説明】[Brief description of the drawings]

【図1】橋梁撤去作業機の一実施形態を示した側面図で
ある。
FIG. 1 is a side view showing an embodiment of a bridge removing work machine.

【図2】橋梁撤去作業機の一実施形態を示した平面図で
ある。
FIG. 2 is a plan view showing an embodiment of a bridge removing work machine.

【図3】橋梁撤去作業機の一実施形態を示した正面図で
ある。
FIG. 3 is a front view showing an embodiment of a bridge removing work machine.

【図4】ホイスト及びホイスト移動装置を示した斜視図
である。
FIG. 4 is a perspective view showing a hoist and a hoist moving device.

【図5】橋梁撤去作業機による橋桁部分の撤去作業を示
した正面図である。
FIG. 5 is a front view showing a removal work of a bridge girder part by a bridge removal work machine.

【図6】図5に示す作業状態に合わせて橋梁撤去作業機
の一部を示した平面図である。
6 is a plan view showing a part of the bridge removing work machine according to the work state shown in FIG. 5;

【図7】橋梁撤去作業機による橋桁部分の撤去作業を示
した正面図である。
FIG. 7 is a front view showing a removal work of a bridge girder part by a bridge removal work machine.

【図8】図7に示す作業状態に合わせて橋梁撤去作業機
の一部を示した平面図である。
8 is a plan view showing a part of the bridge removing work machine according to the work state shown in FIG. 7;

【図9】橋梁撤去作業機による一作業状態を示した正面
図である。
FIG. 9 is a front view showing one working state by the bridge removing work machine.

【符号の説明】[Explanation of symbols]

1 橋梁撤去作業機 3 ホイスト 4 走行装置 5 ホイスト移動装置 6 アウトリガー 12 前後レール 17 ウエイト 18 反力取りアンカ 22 横行レール DESCRIPTION OF SYMBOLS 1 Bridge removal work machine 3 Hoist 4 Traveling device 5 Hoist moving device 6 Outrigger 12 Front and rear rail 17 Weight 18 Reaction force anchor 22 Crossing rail

フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) B66C 15/00 B66C 15/00 Z Fターム(参考) 2D059 BB37 BB39 DD02 GG41 3F202 AA05 AC08 3F203 AA10 BA01 CA02 CB04 CC01 DA06 EA01 FA01 3F204 AA03 BA02 CA05 Continued on the front page (51) Int.Cl. 7 Identification symbol FI Theme coat II (reference) B66C 15/00 B66C 15/00 Z F term (reference) 2D059 BB37 BB39 DD02 GG41 3F202 AA05 AC08 3F203 AA10 BA01 CA02 CB04 CC01 DA06 EA01 FA01 3F204 AA03 BA02 CA05

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 走行可能な装置本体に対し前後方向に設
けられた所定数の前後レールに、複数の移動装置が横並
びに取り付けられ、その移動装置は、前後して設けられ
た複数の横行レールの一つに揚重装置が左右方向に移動
可能に取り付けられたものであって、揚重装置の装着さ
れていない空いた横行レールを利用して、揚重装置が各
移動装置間を左右方向に移動できるようにしたものであ
ることを特徴とする橋梁撤去作業機。
1. A plurality of moving devices are mounted side by side on a predetermined number of front and rear rails provided in a front and rear direction with respect to a main body of a traveling device, and the moving devices are provided with a plurality of traversing rails provided in front and behind. In one of the above, a lifting device is mounted so as to be movable in the left-right direction. A bridge removal work machine characterized in that it can be moved to a bridge.
【請求項2】 請求項1に記載の橋梁撤去作業機におい
て、 前記装置本体は、フレーム構造をして前方部分に前記複
数の前後レールを、後方部分に自走式の走行装置と装置
本体の安定を図るアウトリガーを有するものであり、 前記複数の移動装置は、各移動装置が異なる前後レール
に車輪を掛けて懸垂状態で取り付けられ、モータによる
車輪の回転によって当該前後レールに沿った移動を可能
にしたものであり、 前記揚重装置は、前記移動装置の横行レールに車輪を掛
けて懸垂状態で取り付けられ、モータによる車輪の回転
によって当該横行レールに沿って移動を可能にしたもの
であることを特徴とする橋梁撤去作業機。
2. The bridge removal work machine according to claim 1, wherein the device body has a frame structure, and the front and rear rails are provided at a front portion, and a self-propelled traveling device and a device body are provided at a rear portion. The plurality of moving devices are mounted in a suspended state by hanging wheels on different front and rear rails, and the plurality of moving devices can move along the front and rear rails by rotation of wheels by a motor. The lifting device is mounted in a suspended state by hanging a wheel on a traversing rail of the moving device, and is capable of moving along the traversing rail by rotation of a wheel by a motor. A bridge removal work machine characterized by the following.
【請求項3】 請求項1又は請求項2に記載の橋梁撤去
作業機において、 前記装置本体後方部分には、ウエイトを搭載しているこ
とを特徴とする橋梁撤去作業機。
3. The bridge removing work machine according to claim 1, wherein a weight is mounted on a rear portion of the apparatus main body.
【請求項4】 請求項1乃至請求項3のいずれかに記載
の橋梁撤去作業機において、 前記装置本体後方端部には、反力支持用のアンカを有す
ることを特徴とする橋梁撤去作業機。
4. The bridge removing machine according to claim 1, further comprising an anchor for supporting a reaction force at a rear end of the device body. .
JP2002184138A 2002-06-25 2002-06-25 Bridge removal working machine Pending JP2002332613A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002184138A JP2002332613A (en) 2002-06-25 2002-06-25 Bridge removal working machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002184138A JP2002332613A (en) 2002-06-25 2002-06-25 Bridge removal working machine

Publications (1)

Publication Number Publication Date
JP2002332613A true JP2002332613A (en) 2002-11-22

Family

ID=19195396

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002184138A Pending JP2002332613A (en) 2002-06-25 2002-06-25 Bridge removal working machine

Country Status (1)

Country Link
JP (1) JP2002332613A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004300689A (en) * 2003-03-28 2004-10-28 Pc Bridge Co Ltd Mobile pre-cast floor slab erection machine
JP2007239313A (en) * 2006-03-09 2007-09-20 Arai Gumi Ltd Bridge batch removal method
JP2007321476A (en) * 2006-06-01 2007-12-13 Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd Bridge and its construction method
JP2017020290A (en) * 2015-07-14 2017-01-26 オリエンタル白石株式会社 Disassembling method of bridge
CN108439206A (en) * 2018-04-09 2018-08-24 中交武汉港湾工程设计研究院有限公司 A kind of rachis face steel box-girder monoblock type erection crane
WO2019196660A1 (en) * 2018-04-09 2019-10-17 中交武汉港湾工程设计研究院有限公司 Integral bridge deck crane for central cable plane steel box girder
JP2021050512A (en) * 2019-09-24 2021-04-01 Jr東日本コンサルタンツ株式会社 Bridge replacement method and bridge upper structure
CN113697665A (en) * 2021-09-14 2021-11-26 中铁五局集团第六工程有限责任公司 Gantry crane with cantilever for translating steel rail

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6424092U (en) * 1987-07-31 1989-02-09
JPH09136788A (en) * 1995-09-11 1997-05-27 Ohbayashi Corp Hoist and transfer device and method thereof
JPH11131427A (en) * 1997-10-31 1999-05-18 Mitsui Miike Mach Co Ltd Floor board replacing machine for concrete bridge
JP2000110114A (en) * 1998-10-02 2000-04-18 Ps Corp Construction method for overhang-erected girder bridge using corrugated steel plate web and equipment for overhang erection work

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6424092U (en) * 1987-07-31 1989-02-09
JPH09136788A (en) * 1995-09-11 1997-05-27 Ohbayashi Corp Hoist and transfer device and method thereof
JPH11131427A (en) * 1997-10-31 1999-05-18 Mitsui Miike Mach Co Ltd Floor board replacing machine for concrete bridge
JP2000110114A (en) * 1998-10-02 2000-04-18 Ps Corp Construction method for overhang-erected girder bridge using corrugated steel plate web and equipment for overhang erection work

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004300689A (en) * 2003-03-28 2004-10-28 Pc Bridge Co Ltd Mobile pre-cast floor slab erection machine
JP2007239313A (en) * 2006-03-09 2007-09-20 Arai Gumi Ltd Bridge batch removal method
JP2007321476A (en) * 2006-06-01 2007-12-13 Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd Bridge and its construction method
JP4704279B2 (en) * 2006-06-01 2011-06-15 三菱重工鉄構エンジニアリング株式会社 Bridge construction method
JP2017020290A (en) * 2015-07-14 2017-01-26 オリエンタル白石株式会社 Disassembling method of bridge
CN108439206A (en) * 2018-04-09 2018-08-24 中交武汉港湾工程设计研究院有限公司 A kind of rachis face steel box-girder monoblock type erection crane
WO2019196660A1 (en) * 2018-04-09 2019-10-17 中交武汉港湾工程设计研究院有限公司 Integral bridge deck crane for central cable plane steel box girder
CN108439206B (en) * 2018-04-09 2024-04-09 中交武汉港湾工程设计研究院有限公司 Integral bridge floor crane of central cable plane steel box girder
JP2021050512A (en) * 2019-09-24 2021-04-01 Jr東日本コンサルタンツ株式会社 Bridge replacement method and bridge upper structure
JP7368685B2 (en) 2019-09-24 2023-10-25 Jr東日本コンサルタンツ株式会社 Bridge reconstruction method and bridge superstructure
CN113697665A (en) * 2021-09-14 2021-11-26 中铁五局集团第六工程有限责任公司 Gantry crane with cantilever for translating steel rail
CN113697665B (en) * 2021-09-14 2024-03-26 中铁五局集团第六工程有限责任公司 Gantry crane with cantilever for translating steel rail

Similar Documents

Publication Publication Date Title
JP5198973B2 (en) Bridge overhang installation device and installation method
US4537317A (en) Heavy duty travel crane
JP6701362B2 (en) STS Multi Trolley Portal Gantry Container Crane
JP3039445B2 (en) Container crane
JPS6317757B2 (en)
JP5890060B1 (en) Bridge dismantling method using erection girder
JPH10292317A (en) Installation method and device of bridge girder member
JP2002332613A (en) Bridge removal working machine
KR101160273B1 (en) Straddle carrier for bridge construction
KR20170109476A (en) Airduct slab lifting and mounting carriage and Airduct slab construction method using the same
JPH0415330B2 (en)
JP2002167170A (en) High lift crane vehicle
EP1673304B1 (en) A mobile crane
JP2004115174A (en) Movable carriage for member erection, and bridging member erection method using it
SE418278B (en) LIFTING DEVICE, SPECIAL FOR VESSEL MACHINERY SPACES
CN113481972A (en) Steel reinforcement cage material loading transportation and lower cage device
JP6569768B2 (en) Mobile crane
JP6428714B2 (en) Mobile crane
JP2991423B2 (en) Slope work equipment
JP3268260B2 (en) Double link crane
JP7230895B2 (en) crane hitch beam
CN108033361A (en) A kind of overhead crane with electric hoists
JP3470801B2 (en) Hanging equipment swing steady rest device
JP3685778B2 (en) Bearing loading / unloading device and bearing loading / unloading method
KR100633058B1 (en) Battery car crane

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040901

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041019

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050322