JP2002266350A - Organic waste processing method, slope greening method, and net structure for wicket - Google Patents

Organic waste processing method, slope greening method, and net structure for wicket

Info

Publication number
JP2002266350A
JP2002266350A JP2001067194A JP2001067194A JP2002266350A JP 2002266350 A JP2002266350 A JP 2002266350A JP 2001067194 A JP2001067194 A JP 2001067194A JP 2001067194 A JP2001067194 A JP 2001067194A JP 2002266350 A JP2002266350 A JP 2002266350A
Authority
JP
Japan
Prior art keywords
slope
fence
net
knitting
organic waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001067194A
Other languages
Japanese (ja)
Other versions
JP4628565B2 (en
Inventor
Hideo Jitsumatsu
秀夫 實松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshoku Corp
Original Assignee
Nisshoku Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshoku Corp filed Critical Nisshoku Corp
Priority to JP2001067194A priority Critical patent/JP4628565B2/en
Publication of JP2002266350A publication Critical patent/JP2002266350A/en
Application granted granted Critical
Publication of JP4628565B2 publication Critical patent/JP4628565B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a processing method which can return and process a huge amount of organic waste generated in the field of road construction, preparation of housing site, etc., in a slope within the construction field. SOLUTION: The organic waste processing method is carried out by shredding the organic waste generated in the field of road construction, preparation of housing site, etc., and returning the shredded waste a in the slope N within the construction field. According to the method, fences A are erected along contour lines at suitable intervals in a slope length direction of the slope N, and a triangular recessed space Q is defined by each fence A and the slope N, on a slope side of the fence A. Then, the shredded organic waste a is filled in the recessed spaces Q.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、道路建設や宅地造
成などの工事現場で発生した有機廃棄物の処理工法と、
法面の緑化工法、及び、これらの工法に用いるための編
柵用のネット構造体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for treating organic waste generated at construction sites such as road construction and residential land development,
The present invention relates to a slope greening method and a net structure for knitting fences used in these methods.

【0002】[0002]

【従来の技術】自然崩壊した山肌や痩せた山肌、その
他、道路建設や宅地造成のために削り取られた山肌など
の法面の緑化に際して、一般には、草本種子を配合した
厚層基材の吹き付けなどによる植生工を法面に施工する
形態がとられている。
2. Description of the Related Art When greening slopes such as naturally collapsed mountain skins, thin mountain skins, and other mountain surfaces scraped off for road construction or residential land development, spraying a thick base material containing herbaceous seeds is generally performed. Vegetation works are performed on the slopes.

【0003】この他にも、法面の周辺景観との調和や早
期の永続的な安定化、自然界への回復などを図る上で、
木本種子を配合した厚層基材の吹き付けによる植生工
や、木本苗を移植する植生工を法面に施工して、いわゆ
る樹林化によって法面を緑化させる形態もとられるよう
になっている。
[0003] In addition, in order to achieve harmony with the surrounding landscape of the slope, early permanent stabilization, and restoration to the natural world,
Vegetation work by spraying a thick base material containing wood seeds and planting work by transplanting wood seedlings have been implemented on the slopes, so that the slopes can be greened by so-called forestation. I have.

【0004】[0004]

【発明が解決しようとする課題】この内の法面の樹林化
に際しては、種子から発芽・生育した木本苗や、移植し
た木本苗は、その初期の生育が遅いことから、周域に生
育する雑草や、特に生育の早い牧草などの草本植物によ
って被圧を受け易く、木本苗を確実に、しかも健全に生
育させることが困難であった。
In the forestation of the slopes, the tree seedlings germinated and grown from the seeds and the transplanted tree seedlings grow slowly in the initial stage. Growing weeds and herbaceous plants, especially fast-growing pastures, are susceptible to pressure and it has been difficult to grow tree seedlings reliably and soundly.

【0005】一方、例えば道路建設や宅地造成などの工
事によって発生する廃棄物は、その現場で処理すること
が原則的であって、現場からの持ち出しが禁止されてい
ると言っても過言ではなく、特に大量に発生する伐採木
やその根株の現場での処理に苦慮しているのが現状であ
る。
On the other hand, it is not an exaggeration to say that waste generated by construction such as road construction and residential land construction is basically treated at the site, and that taking out of the site is prohibited. In particular, the current situation is that it is difficult to treat cut trees and their root stocks generated in large quantities on site.

【0006】ここに至って、有機の廃棄物である伐採木
や根株を細かくチップ化して、この細断処理物を、法面
の緑化資材として再利用することが試みられたのである
が、この細断処理物を法面の全面に層状に撒くにして
も、移動流亡などを考慮した場合、その厚みには限度が
あることから、使用量は少なく限られるのであった。
[0006] At this point, attempts have been made to finely chip the felled trees and root stocks, which are organic wastes, and to reuse the shredded materials as greening materials for slopes. Even if the cut material is scattered in a layered manner on the entire surface of the slope, the thickness of the cut material is limited in consideration of the migration and the like, so that the amount of use is limited to a small amount.

【0007】また、細断処理物が年を経て腐食するまで
の間に、周辺の土壌から窒素分を消費して、いわゆる窒
素飢餓現象が生じることから、木本苗の生育はもとよ
り、草本種の生育までもが阻害される点で問題があっ
た。
[0007] In addition, the nitrogen content is consumed from the surrounding soil until the shredded material corrodes over the years, resulting in a so-called nitrogen starvation phenomenon. There was a problem in that even the growth of the plant was inhibited.

【0008】本発明は、かゝる実情に鑑みて成されたも
のであって、その目的は、道路建設や宅地造成などの工
事現場で発生した有機廃棄物を、その工事現場内の法面
に大量に戻し処理することができる処理工法を提供する
点にある。
The present invention has been made in view of the above circumstances, and has as its object to remove organic waste generated at a construction site such as a road construction or a residential land development by using a slope at the construction site. Another object of the present invention is to provide a processing method capable of performing a large amount of return processing.

【0009】別の観点からは、緑化対象現場の法面で発
生した有機廃棄物を、その現場内で有効に、しかも大量
に処理できる上に、特に法面の樹林化に際して、木本苗
が被圧を受け難くて、生育が良好に行われる法面の緑化
工法を提供することを目的としている。
[0009] From another viewpoint, organic waste generated on the slope at the site to be revegetated can be treated effectively and in large quantities in the site, and in addition, especially when the slope is made into a forest, the woody seedlings are used. It is an object of the present invention to provide a slope revegetation method that is hardly subjected to pressure and can be favorably grown.

【0010】また、有機廃棄物の大量処理工法あるいは
有機廃棄物を大量に処理しての法面の緑化工法に用いる
上で、頗る好適な編柵用のネット構造体を提供すること
も目的としている。
Another object of the present invention is to provide a net structure for knitting fences which is very suitable for use in a method for mass processing of organic waste or a method of greening a slope after treating a large amount of organic waste. I have.

【0011】[0011]

【課題を解決するための手段】請求項1記載の発明は、
道路建設や宅地造成などの工事現場で発生した有機廃棄
物を細断して、その細断処理物を工事現場内の法面に戻
す有機廃棄物の処理工法であって、法面の法長方向に適
宜の間隔を隔てて等高線方向に柵を立設して、この柵の
法面側に、柵と法面とによる三角状の凹入空間を形成
し、この凹入空間に、有機廃棄物の細断処理物を収容す
る点に特徴がある。
According to the first aspect of the present invention,
An organic waste treatment method that shreds organic waste generated at construction sites such as road construction and residential land development and returns the shredded products to the slopes at the construction site. A fence is erected in the contour direction at an appropriate interval in the direction, and a triangular recessed space is formed by the fence and the slope on the slope side of this fence. It is characterized by containing shredded products.

【0012】上記の工法によれば、編柵数を多くするほ
ど、また、編柵の高さを高くするほど、多数の大きな三
角状の凹入空間が法面上に階段状に形成されるのであっ
て、この三角状の凹入空間に有機廃棄物の細断処理物を
収容することで、細断処理物を法面に層状に撒くに比較
して、大量の細断処理物を安定的に、工事現場の法面内
に保持させることができる。
According to the above construction method, as the number of knitting fences is increased and the height of the knitting fences is increased, a large number of large triangular recessed spaces are formed in steps on the slope. Therefore, by storing shredded organic waste in this triangular concave space, a large amount of shredded material can be stabilized compared to scattered shredded material in layers on the slope. Thus, it can be held on the slope of the construction site.

【0013】そして、三角状の凹入空間に収容された細
断処理物は、降雨による雨滴の衝撃を緩和し、法面表土
の移動流亡を防止する機能を発揮することから、法面の
侵食も効果的に防止される。
[0013] The shredded material accommodated in the triangular recessed space functions to reduce the impact of raindrops caused by rainfall and to prevent migration of runoff on the slope surface soil. Is also effectively prevented.

【0014】請求項2記載の発明は、緑化対象現場の法
面で発生した有機廃棄物の大量処理と法面の緑化とを両
立させることを目的としており、法面の法長方向に適宜
の間隔を隔てて等高線方向に柵を立設して、この柵の法
面側に、柵と法面とによる三角状の凹入空間を形成する
一方、緑化対象現場で発生した有機廃棄物を細断処理し
て、この細断処理物を、凹入空間とその直上の柵との間
に緑化用のスペースを形成する状態で三角状の凹入空間
に収容し、かつ、緑化用のスペースに植生工を施工する
点に特徴がある。
The object of the present invention is to achieve both the large-scale treatment of organic waste generated on the slope at the site to be greened and the greening of the slope. Fences are erected in the contour direction at intervals, and a triangular recessed space is created by the fences and the slopes on the slope side of the fences. After shredding, the shredded material is housed in a triangular recessed space in a state where a space for greening is formed between the recessed space and the fence immediately above it, and in the space for greening. The feature is that vegetation works are performed.

【0015】上記の工法によれば、有機廃棄物の細断処
理物を安定的に且つ大量に、緑化対象現場の法面内に保
持できると共に、細断処理物によって法面の侵食が効果
的に防止されることは既述した通りである。
According to the above-mentioned method, the shredded organic waste can be stably and massively retained on the slope at the site to be greened, and the shredded material effectively erodes the slope. Is as described above.

【0016】これに加えて、細断処理物の収容域を特定
して、有機廃棄物による窒素飢餓現象の発生域を制限さ
せるようにした上で、緑化用のスペースに植生工を施工
することから、緑化のために導入した植物は、窒素飢餓
現象による障害を受けることなく、良好に生育するよう
になる。
[0016] In addition to this, the storage area of the shredded material is specified to limit the generation area of the nitrogen starvation phenomenon due to the organic waste, and then the vegetation is constructed in the space for greening. Therefore, plants introduced for revegetation grow well without being damaged by the nitrogen starvation phenomenon.

【0017】更には、細断処理物が法面流下水を減殺し
て、法面全体の保水性を向上させることから、また、細
断処理物は、やがては腐食して土壌と同化し、これが養
分になることから、植物の健全なる生育が促進されるよ
うになり、法面の確実なる緑化を図ることができる。
Furthermore, since the shredded material reduces slope downflow sewage and improves the water retention of the entire slope, the shredded material eventually corrodes and assimilate with the soil, Since this becomes nutrients, healthy growth of the plant is promoted, and the slope can be reliably greened.

【0018】特に、上記の緑化スペースに樹木導入の植
生工を施工する場合は、細断処理物が被圧防止用のマル
チング材になることから、種子から発芽・生育した木本
苗や移植した木本苗は、被圧を受け難くなる結果、木本
苗の健全かつ確実なる生育を期することができるのであ
り、やがては法面の樹林化が達成されるのであって、こ
の発明によれば、厄介ものの有機廃棄物の大量処理と法
面の緑化とが効果的に達成されるのである。
In particular, when vegetation for introducing trees is constructed in the above-mentioned greening space, the shredded material becomes a mulching material for preventing pressure from being applied. As a result, the tree seedlings are less likely to be subjected to pressure, and as a result, healthy and reliable growth of the tree seedlings can be expected. In this case, efficient disposal of troublesome organic waste and greening of slopes can be effectively achieved.

【0019】上記の有機廃棄物の処理工法ならびに法面
の緑化工法に用いる柵の構造体として、例えば間伐材な
どを編柵用の支柱として、法長方向ならびに等高線方向
に適宜の間隔を隔てて法面に立設し、このうちの等高線
方向で間隔を隔てる支柱にわたって、例えば伐採木を積
み重ねるように配置したり、網状体などを掛け渡したり
することで、細断処理物の収容柵を構成することができ
る。
As a fence structure used in the above-mentioned organic waste treatment method and slope revegetation method, for example, a thinning material or the like is used as a knitting fence post, and at appropriate intervals in the length direction and the contour direction. Standing on a slope, of which, in the direction of the contour line, the fences of shredded material are constructed by arranging, for example, felling trees, or laying a net-like body, etc. can do.

【0020】しかし、この手段では、編柵に多大の人手
と時間とを必要とすることから、次なる構成の編柵用ネ
ット構造体、即ち、法長方向にわたって敷設される複数
本の紐状体に、編柵用ネットの幅方向の一端側を連結す
ると共に、この編柵用のネットを編柵支柱を用いて法面
上に立設させた状態で、このネットの倒れを防止するた
めの第2の紐状体を、ネットの幅方向の他端側と上記の
紐状体とにわたって連結して成るネット構造体を編柵用
に用いることが得策である(請求項3)。
However, this means requires a great deal of manpower and time for the knitting fence. Therefore, a net structure for a knitting fence having the following structure, that is, a plurality of cords laid in the lengthwise direction. To prevent one side of the net for the knitting fence from being connected to the body, and to prevent the net for the knitting fence from standing down on the slope by using the knitting fence posts while connecting the net for knitting fences to the body. It is advisable to use a net structure formed by connecting the second string-shaped member over the other end of the net in the width direction and the string-shaped member for a knitting fence (claim 3).

【0021】好適には、編柵用のネットに、等高線方向
で適宜の間隔を隔てて編柵支柱を一体に設けることであ
って(請求項4)、かゝる構成のネット構造体によれ
ば、複数枚の編柵用ネットを備えるものであっても、ネ
ットどうしを互いに重ね合わせて巻き取ることで、これ
をコンパクトに纏めることができるのであって、運搬車
などによる大量搬送が可能になるばかりか、軽量である
ことから、人為的な持ち運びや取り扱いが楽になる利点
がある。
Preferably, the knitting fence posts are integrally provided on the net for the knitting fence at appropriate intervals in the contour line direction (claim 4). For example, even if a net has several knitting fence nets, it can be compacted by stacking the nets on top of each other and winding them up. Not only that, because it is lightweight, it has the advantage of being easy to carry and handle artificially.

【0022】そして、編柵に際しては、例えばネット構
造体を法面の上方に持ち込んで、等高線方向で複数本の
紐状体を法長方向に向けるようにして、ネット構造体を
法面の上方から下方に向けて展開し、かつ、支柱を用い
て編柵用のネットを立ち上げて、紐状体を適宜にアンカ
ー等で法面に固定することで、編柵用のネットによる柵
が、第2の紐状体による倒れ防止の状態で法面上に形成
されるのであり、ネット構造体が複数枚の編柵用ネット
備える場合は、ネットによる柵が法面上に吊り棚の如く
して現出されることになる。
When the knitting fence is used, for example, the net structure is brought above the slope and the plurality of cords are directed in the contour direction in the contour line direction. From below, expand the net for knitting fences by using the pillars, and fix the string-like body on the slope with anchors or the like as appropriate. When the net structure is provided with a plurality of nets for knitting fences, the net fence is formed on a slope like a hanging shelf on the slope in a state where the second string-shaped body prevents falling. Will appear.

【0023】尚、上記の編柵支柱を編柵用のネットに一
体化させることなく、支柱とネットとを別々に用意し
て、この両者を例えばスティプラーを用いて一体化させ
るようにしてもよく、或いは、一体化の前に支柱を法面
に立設して、この支柱に例えばスティプラーを用いてネ
ットを止着するようにしてもよく、その他、支柱挿入用
の袋編み部をネットに備えて、この袋編み部に支柱を挿
入し、この支柱を法面に立設にしてもよいのである。
It should be noted that, without integrating the knitting fence post into the knitting fence net, the strut and the net may be separately prepared, and the two may be integrated using, for example, a stapler. Alternatively, a pillar may be erected on the slope before integration, and a net may be fixed to this pillar using, for example, a stippler. In addition, the net is provided with a bag-knitted portion for inserting a pillar. Then, a column may be inserted into the bag knitting portion, and the column may be erected on the slope.

【0024】いずれにしても、編柵用のネットは、その
幅方向の一端側が法面の凹凸に馴染むように撓んで、法
面上に柵を構成するのであって、従って、この柵と法面
との間の三角状の凹入空間に有機廃棄物の細断処理物を
収容し、かつ、緑化用のスペースに植生工を施工するこ
とで、有機廃棄物の大量処理と同時に、法面の緑化施工
の工事を完了するのである。
In any case, the net for the knitting fence is bent at one end in the width direction so as to conform to the unevenness of the slope, and constitutes a fence on the slope. By storing shredded organic waste in a triangular recessed space between the surface and vegetation in the space for greening, a large amount of organic waste can be treated at the same time The greening work is completed.

【0025】[0025]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。図1は本発明にかゝる編柵用のネ
ット構造体1を示し、このネット構造体1は、有機廃棄
物の処理工法や緑化工法に用いられるもので、法長方向
にわたって敷設される複数本の紐状体2に、等高線方向
で長い矩形状のフレキシブルな編柵用ネット3の幅方向
の一端側を連結し、この編柵用のネット3を編柵支柱4
を用いて法面上に立設させた状態で、このネット3の倒
れを防止するための第2の紐状体5を、ネット3の幅方
向の他端側と上記の紐状体2とにわたって連結して成
る。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a net structure 1 for knitting fences according to the present invention. This net structure 1 is used for a method of treating organic waste and a method of greening, and is laid in a plurality of lengthwise directions. One end in the width direction of a rectangular flexible knitting fence net 3 that is long in the contour direction is connected to the string-like body 2, and the knitting fence net 3 is connected to the knitting fence support 4.
In the state where the net 3 is erected on the slope by using the second string 5 for preventing the net 3 from falling, the other end of the net 3 in the width direction of the net 3 and the string 2 Are connected.

【0026】具体的には、法長方向での編柵用ネット3
の配備枚数やネット3の大きさ、紐状体2の本数や敷設
ピッチ、長さ寸法などは一切特定されるものではない
が、一体あたりのネット構造体1の単位長さを10mと
して、これを法面Nに配備させるものとして、このネッ
ト構造体1の一体の製造について説明すると、先ずは、
法長方向の長さを10mとした5本の紐状体2を、等高
線方向で50〜60cmのピッチで敷設するものとし
て、このピッチに合わせて、長さを200〜240cm
とし、幅を50〜70cmとした編柵用のネット3の1
0〜7枚を用意するのである。
Specifically, the knitting fence net 3 in the length direction
Although the number of the deployed nets, the size of the net 3, the number of the cords 2, the laying pitch, the length, etc. are not specified at all, the unit length of the net structure 1 per unit is assumed to be 10 m. The following is an explanation of the integrated production of the net structure 1 assuming that is disposed on the slope N. First,
Assuming that five cords 2 each having a length of 10 m in the normal length direction are laid at a pitch of 50 to 60 cm in the contour direction, the length is adjusted to 200 to 240 cm according to this pitch.
And a net 3 for a knitting fence with a width of 50 to 70 cm.
0-7 sheets are prepared.

【0027】そして、特に一致させる必要はないのであ
るが、紐状体2の敷設ピッチに合わせるように、例えば
スティプラーを用いて、編柵用ネット3の長さ方向の両
端部とその間とに5本の編柵支柱4を止着し、この編柵
支柱4の一端側またはその近傍のネット部分を、上記5
本の紐状体2に対してネット3の例えば幅寸法の2倍の
ピッチ(100〜140cm)で連結する。
Although it is not necessary to make them coincide with each other, the length of the knitting fence net 3 is set to 5 mm between the both ends in the longitudinal direction of the knitting fence net 3 by using, for example, a stippler so as to match the laying pitch of the cord-like body 2. The knitting fence support 4 is fixed, and the net portion on one end side of the knitting fence support 4 or in the vicinity thereof is connected to the above 5
It is connected to the string 2 of the book at a pitch (100 to 140 cm) twice the width of the net 3, for example.

【0028】一方、上記の紐状体2とは別に、第2の紐
状体5を、ネット3の1枚あたりについて5本を用意し
て、この第2の紐状体5を、上下のネット3,3間の紐
状体2の中央部分と、編柵支柱4の他端側またはその近
傍のネット部分とにわたって連結し、必要に応じて第3
の紐状体6を用意して、これを等高線方向に向けて紐状
体2,5の連結部に連結するのである。
On the other hand, separately from the above-mentioned string-like body 2, five second string-like bodies 5 are prepared for each net 3, and the second string-like body 5 The central portion of the cord 2 between the nets 3 and 3 is connected to the other end of the knitting fence support 4 or the net portion near the other end, and a third portion is provided as necessary.
Is prepared and connected to the connecting portions of the cords 2 and 5 in the contour direction.

【0029】以上をもってネット構造体1の一体が製造
されるのであり、例えば法面の緑化に際しては、複数枚
の編柵用ネット3を互いに重ね合わせて、これを巻き取
ってネット構造体1をコンパクトに纏め、このネット構
造体1を法面の緑化対象現場に搬送して、このネット構
造体1を、例えば人手によって適宜に法面の緑化対象域
に持ち上げて、法面の緑化施工に備えるのである。
The net structure 1 is integrally manufactured as described above. For example, when greening a slope, a plurality of knitting fence nets 3 are overlapped with each other, and the nets 3 are wound up to form the net structure 1. The net structure 1 is conveyed to a site where greening of the slope is carried out, and the net structure 1 is appropriately lifted to the greening target area of the slope, for example, by hand, to prepare for greening of the slope. It is.

【0030】一方、緑化対象の現場では、その現場で発
生した伐採木や根株といった有機廃棄物を、粉砕機など
を用いて、例えば長さが1〜20cmで太さが1〜3c
m程度のチップ状に細断処理して、この細断処理物aを
緑化対象域の適宜の場所にストックしておくのである。
On the other hand, at the site to be greened, organic waste such as cut trees and root stocks generated at the site is crushed using a crusher or the like, for example, with a length of 1 to 20 cm and a thickness of 1 to 3 cm.
The shreds are cut into chips of about m, and the shreds a are stocked at appropriate locations in the greening target area.

【0031】そして、図2に示すように、緑化対象域に
持ち上げたネット構造体1を、それの紐状体2の敷設ピ
ッチを特定させる状態で、かつ、30cm程度のアンカ
ー7aを用いて、紐状体2の上端側を法面Nに固定し、
このネット構造体1を法面Nの下方に向けて展開させ
て、例えば3本の紐状体2,5,6の連結部や、編柵用
ネット3と紐状体2との連結部などを、同じく30cm
程度のアンカー7bを用いて法面Nに固定し、編柵用の
ネット3を立ち姿勢に切り換えるのである。
Then, as shown in FIG. 2, the net structure 1 lifted to the area to be greened is specified by using the anchor 7a of about 30 cm in a state in which the laying pitch of the string 2 is specified. Fix the upper end side of the cord-like body 2 to the slope N,
The net structure 1 is unfolded toward the lower side of the slope N, for example, a connecting portion of three cords 2, 5, 6 or a connecting portion of the knitting fence net 3 and the cord 2. Is also 30cm
The net 3 for knitting fences is switched to the standing posture by fixing to the slope N by using the anchor 7b of the degree.

【0032】この時、編柵用のネット3には、第2の紐
状体5が連結されていることから、編柵用ネット3の法
面下方への倒れ込みは防止されるのであって、編柵用の
ネット3は、その立ち姿勢を自己保持するのであり、か
つ、編柵用のネット3は、フレキシブルであることか
ら、その幅方向の一端側が法面Nの凹凸に旨く馴染むの
であって、法面N上には、10〜7枚の編柵用ネット3
による10〜7個の柵Aが吊り棚の如くして現出される
ことになる。
At this time, since the second string-shaped body 5 is connected to the knitting fence net 3, the net 3 for knitting fence is prevented from falling down below the slope. The knitting fence net 3 holds its standing posture by itself, and the knitting fence net 3 is flexible, so that one end in the width direction is well adapted to the unevenness of the slope N. And, on the slope N, 10 to 7 knitting fence nets 3
10 to 7 fences A appear as hanging shelves.

【0033】ここで、ネット構造体1の複数体を、それ
の編柵用ネット3を等高線方向で互いに連ねるように設
置する際に、隣り合う編柵用ネット3,3を、例えばス
ティプラーを用いて直接的に連結してもよいのである
が、施工性の面からは、隣り合う編柵用ネット3,3間
に作業通路を形成することが望まれる。
Here, when a plurality of the net structures 1 are installed so that the knitting fence nets 3 thereof are connected to each other in the contour direction, the adjacent knitting fence nets 3 are used, for example, by using a stippler. However, from the viewpoint of workability, it is desired to form a work passage between the adjacent nets 3 and 3 for knitting fences.

【0034】このことから、図示は省略するが、隣り合
う編柵用のネット3,3間に、例えば50cm程度の作
業通路を形成するように、ネット構造体1を設置する一
方、作業通路を塞ぐためのネットを別途用意して、この
ネットを、適当な作業工程を見計らって、その一部を編
柵用ネット3,3に重ね合わせる状態で、スティプラー
を用いてネットどうしを連結させる形態をとることが好
ましい。
For this reason, although not shown, the net structure 1 is installed so as to form a work passage of, for example, about 50 cm between the adjacent nets 3 and 3 for the knitting fence, while the work passage is formed. A net for closing is prepared separately, and this net is connected to each other using a stapler in a state where a part of the net is superimposed on the nets 3 and 3 for knitting fences in anticipation of an appropriate work process. It is preferred to take.

【0035】このようにして、編柵用のネット3による
吊り棚状の柵Aを法面N上に現出させることで、この柵
Aの法面N側には、柵Aと法面Nとによる10〜7個の
三角状の凹入空間Qが形成されるのであって、この凹入
空間Qとその直上の柵Aとの間に緑化用のスペース(こ
の実施の形態では、編柵用ネット3の幅を50〜70c
mにして、法長方向において、この幅寸法の2倍のピッ
チで、編柵用ネット3を紐状体2に連結していることか
ら、スペース幅は50〜70cm程度であるが、30〜
100cm程度に設定してもよい。)Sを形成する状態
で、上記のストックした細断処理物aを三角状の凹入空
間Qに収容すると共に、植生のスペースSに緑化用の植
生工を施工することで、有機廃棄物の大量処理と同時の
法面緑化工を完了するのである。
In this manner, the hanging shelf-shaped fence A by the knitting fence net 3 is made to appear on the slope N, so that the fence A and the slope N To form a triangular recessed space Q, and a space for greening (in this embodiment, a knitted fence) between the recessed space Q and the fence A immediately above it. The width of the net 3 for 50-70c
m, the knitting fence net 3 is connected to the string 2 at a pitch twice as large as the width in the normal length direction, so that the space width is about 50 to 70 cm,
It may be set to about 100 cm. ) In the state where S is formed, the above-mentioned stock shredded material a is housed in the triangular recessed space Q, and vegetation for greening is constructed in the vegetation space S, so that the organic waste can be reduced. This completes the greening of the slope at the same time as mass processing.

【0036】尚、ネット構造体1を、それの編柵用ネッ
ト3を等高線方向で互いに連ねるように設置することに
限られるものではなく、三角状の凹入空間Qが法面N上
で市松状を呈するように、ネット構造体1ひいては編柵
用ネット3の配置位置を、法長方向で異ならせてもよい
のである。
It should be noted that the net structure 1 is not limited to being installed so that the nets 3 for knitting fences thereof are connected to each other in the contour line direction. The arrangement position of the net structure 1 and thus the net 3 for knitting fences may be made different in the normal length direction so as to assume the shape.

【0037】上記の緑化用の植生工として、この実施の
形態では、図3に示すように、木本種子b1と肥料と保
水剤と土壌改良剤をパルプ系の内袋8aに充填し、これ
の複数本をポリエチレンの外袋8bに収容して縫製した
植生マット8を用いて、この植生マット8を緑化用のス
ペースSに配置し、かつ、釘止めするマット工の施工形
態をとっているが、図4に示すように、法面Nにネット
構造体1を施工する前に、必要に応じて、合成樹脂製の
ネットや金属製のラス金網、ネットなどの網状体9を法
面2上に張設して、この網状体9を覆うように、木本種
子b1を配合した厚層基材8Aを吹き付ける形態をとっ
てもよいのである。
In this embodiment, as shown in FIG. 3, as a vegetation plant for greening, a pulp-based inner bag 8a is filled with a wood seed b1, a fertilizer, a water retention agent, and a soil conditioner. The vegetation mat 8 is placed in a space S for greening using a vegetation mat 8 which is sewn by accommodating a plurality of the vegetation in an outer bag 8b made of polyethylene, and a construction form of a mat construction for nailing is adopted. However, as shown in FIG. 4, before constructing the net structure 1 on the slope N, if necessary, a net-like body 9 such as a synthetic resin net, a metal lath wire net, or a net is formed on the slope 2. It is also possible to adopt a form in which the thick base material 8A containing the woody seed b1 is sprayed so as to cover the reticulated body 9 so as to be stretched upward.

【0038】また、図5に示すように、法面Nに苗植え
付け用の凹部Naを形成する一方、別の場所で栽培栽培
させた樹木のポット苗を用意して、木本苗b2をポット
cから取り出し、この木本苗b2を凹部Naに植え付け
たり、ポットcが腐食性の材料である場合は、ポットc
ごと木本苗b2を凹部Na植え付けたりする植生工の施
工形態であっもよいのであり、上記の木本種子b1に代
えて草本種子を選択してもよいのである。
Further, as shown in FIG. 5, while forming a concave portion Na for planting seedlings on the slope N, a pot seedling of a tree cultivated and cultivated in another place is prepared, and the woody seedling b2 is placed in the pot. c, and plant this tree seedling b2 in the concave portion Na, or if the pot c is a corrosive material,
It is also possible to adopt a vegetation construction in which the whole tree seedling b2 is planted with a concave portion Na, and a herbaceous seed may be selected instead of the above woody seed b1.

【0039】木本種子b1または木本苗b2として、ク
ヌギ、シャリンバイ、アラカシ、ネズミモチ、ケヤキ、
アカマツ、クロマツ、ナナカマド等々が任意に選択さ
れ、草本種子としては、稲科の禾本系植生を含めて、短
草の牧草種子や花の種子などが適宜に選択される。
As the woody seed b1 or the woody seedling b2, kunugi, sharinbai, arakashi, rat mochi, zelkova,
Pinus densiflora, Japanese black pine, rowan, and the like are arbitrarily selected, and as the herbaceous seeds, short grass pasture seeds, flower seeds, and the like are appropriately selected, including rice vegetation.

【0040】牧草種子としては、ホワイトクローバー、
クリーピングレッドフェスク、レッドトップ、バミュー
ダーグラス、ケンタッキーブルーグラス等が好適に選択
されるが、木本種子b1または木本苗b2は、草本によ
って被圧を受けることから、草本種子と併せての植生工
は避けるものとする。
As for grass seeds, white clover,
Creeping red fescue, red top, bermudagrass, Kentucky bluegrass, etc. are suitably selected, but the woody seed b1 or the woody seedling b2 is under pressure by the herbaceous plants, so the vegetation in combination with the herbaceous seeds Engineering shall be avoided.

【0041】上記の工法によれば、編柵Aの数を多くす
るほど、また、編柵Aの高さを高くするほど、等高線方
向に向けて法面N上に、多数の大きな三角状の凹入空間
Qが階段状に形成される。
According to the above construction method, the larger the number of knitting fences A and the higher the height of knitting fences A, the greater the number of large triangular shapes on the slope N in the contour direction. The recessed space Q is formed in a step shape.

【0042】従って、緑化対象現場で発生した厄介もの
の細断処理物aを、この緑化対象現場の法面Nに大量か
つ安定的に戻すことが可能となる。また、細断処理物a
が雨滴の衝撃を緩和して、法面表土の移動流亡を防止す
ることから、法面Nの侵食が効果的に防止されるように
なり、保水性の向上も達成される。
Accordingly, it is possible to return the troublesome shredded material a generated at the greening target site to the slope N at the greening target site in large quantities and stably. Also, shredded material a
However, since the impact of raindrops is alleviated and the slope of the topsoil is prevented from moving, the erosion of the slope N is effectively prevented, and the water retention is also improved.

【0043】そして、窒素飢餓現象を生じる細断処理物
aの収容域を特定して、この部位を除くスペースSに緑
化用の植生工を施工することから、また、上記したよう
に保水性も向上することから、緑化用の植物は良好に生
育するようになる。
Since the storage area of the shredded material a causing the nitrogen starvation phenomenon is specified and the vegetation for greening is constructed in the space S excluding this area, the water retention is also improved as described above. Because of the improvement, the plant for greening will grow well.

【0044】特に、上記のスペースSに樹木導入の植生
工を施工する場合は、細断処理物aが被圧防止用のマル
チング材になることから、木本種子b1から発芽・生育
した木本苗や移植した木本苗b2は、被圧を受け難くな
って、確実かつ健全に生育するのであり、加えて、細断
処理物aは、やがては腐食して土壌と同化し、これが養
分になることから、植物の健全なる生育が促進されるよ
うになる。
Particularly, when vegetation for introducing trees is constructed in the above-mentioned space S, since the shredded material a becomes a mulching material for preventing pressure, the xylem germinated and grown from the xylem seed b1 The seedlings and the transplanted woody seedlings b2 are less likely to be subjected to pressure and grow reliably and soundly. In addition, the shredded material a eventually corrodes and assimilates with the soil, which is nourished. As a result, healthy growth of plants is promoted.

【0045】このようにして、例えば5年ほどの年月を
経ると、木本苗b2が樹木化して、木本群落が階段状の
柵Aを覆い隠すようになることから、法面Nを直下から
見た場合あるいは遠目で見た場合の見栄えが良好なもの
となり、厄介ものの有機廃棄物の大量処理と同時に、樹
木導入による法面Nの緑化が効果的に達成されるのであ
る。
In this way, after about 5 years, for example, the tree seedlings b2 turn into trees, and the woody communities cover the stepped fence A. When viewed from directly below or when viewed from a distance, the appearance is good, and the greening of the slope N by the introduction of trees is effectively achieved at the same time as the large-scale treatment of the troublesome organic waste.

【0046】尚、道路建設や宅地造成などの工事現場で
発生した有機廃棄物の処理だけを目的とする場合は、緑
化用のスペースSに対する植生工の実施が省略される
が、この場合は、周辺の郷土種子が上記のスペースSに
飛来して、ここで発芽・生育することで、法面Nは、草
本によってベルト状に自然緑化されることになる。
In the case where only organic waste generated at a construction site such as road construction or residential land development is to be treated, the vegetation work for the greening space S is omitted. The surrounding native seeds fly into the space S and germinate and grow there, whereby the slope N is naturally greened in a belt shape by herbs.

【0047】或いは、緑化を期する必要がないならば、
柵Aの高さを更に高くし、又は/及び、法長方向での柵
Aの成長ピッチを小さくして、上記のスペースSをなく
すほどに、より大量の細断処理物aを三角状の凹入空間
Qに収容させてもよいのである。
Alternatively, if it is not necessary to achieve greening,
As the height of the fence A is further increased and / or the growth pitch of the fence A in the lengthwise direction is reduced, so that the space S is eliminated, a larger amount of the shredded material a is formed into a triangular shape. It may be accommodated in the recessed space Q.

【0048】上記の構成にかゝるネット構造体1では、
編柵用のネット3による柵Aは、法面Nに対して直角の
立ち姿勢となるが、この柵Aの法面Nに対する立ち姿勢
の角度は、第2の紐状体5の長さ設定によって任意に変
更可能である。
In the net structure 1 according to the above configuration,
The fence A formed by the net 3 for the knitting fence has a standing posture perpendicular to the slope N, and the angle of the standing posture of the fence A with respect to the slope N is determined by setting the length of the second cord-like body 5. Can be changed arbitrarily.

【0049】即ち、法面Nの傾斜角度によっては異なる
ものの、第2の紐状体5の長さを短くした場合は、図6
に示すように、編柵用のネット3による柵Aを鉛直の立
ち姿勢にするネット構造体1を得ることができる。
That is, although the length differs depending on the inclination angle of the slope N, when the length of the second cord-like body 5 is shortened, FIG.
As shown in (1), it is possible to obtain the net structure 1 in which the fence A by the net 3 for the knitting fence is set to a vertical standing posture.

【0050】この構成のネット構造体1によれば、緑化
用のスペースSの鉛直上に柵Aが存しないことから、法
面Nの緑化用に木本苗b2を導入した場合、木本苗b2
は、柵Aに阻害されることなく、真っ直ぐに成長するよ
うになる。
According to the net structure 1 of this configuration, since the fence A does not exist vertically above the space S for greening, when the tree seedling b2 is introduced for greening the slope N, the tree seedling b b2
Grows straight without being hindered by fence A.

【0051】尚、上記の紐状体2と編柵用ネット3との
材質は、エコロジー面からは、腐食して土壌と同質化す
る分解性のポリエチレンやポリプロピレンなどの合成樹
脂製であることが望ましいが、これに限られるものでは
なく、例えば編柵用のネット3として、これを金属製の
ラス金網やパンチングメタル、非腐食性の硬質または軟
質の合成樹脂製ネットなどに置き換えて実施可能であ
る。
The material of the cord 2 and the net 3 for knitting fences may be made of synthetic resin such as degradable polyethylene or polypropylene which is corroded and homogenized with soil from an ecological point of view. It is desirable, but not limited to this. For example, the net 3 for a knitting fence can be implemented by replacing it with a metal lath wire mesh, punching metal, a non-corrosive hard or soft synthetic resin net, or the like. is there.

【0052】別の実施の形態によるネット構造体1を図
7に示している。この実施の形態によるネット構造体1
は、例えば図4を参照して、厚層基材8Aの吹き付けを
対象にする上で好適な構成のものである。
FIG. 7 shows a net structure 1 according to another embodiment. Net structure 1 according to this embodiment
Has a structure suitable for spraying the thick layer base material 8A with reference to FIG. 4, for example.

【0053】具体的には、編柵用ネット3の周囲と長さ
方向の中央部とに、編柵の支柱4を兼ねる矩形状の保形
部材10を設ける一方、法面N上に張設される法長方向
で長い網状体9の内、例えば幅方向の両側と中央の網糸
を、法長方向にわたって敷設される複数本の紐状体2と
見做して、この紐状体2,5,6に編柵用ネット3の幅
方向の一端側を連結し、このネット3の倒れを防止する
ための第2の紐状体5を、ネット3の幅方向の他端側と
上記の紐状体2とにわたって連結して成る。
More specifically, a rectangular shape-preserving member 10 serving also as a support 4 of the knitting fence is provided around the knitting fence net 3 and a central portion in the longitudinal direction, while being stretched on the slope N. For example, the nets on both sides and the center in the width direction are regarded as a plurality of strings 2 laid in the direction of the length of the nets 9 which are long in the normal length direction. , 5 and 6, one end of the net 3 for knitting fence in the width direction is connected, and a second string-shaped body 5 for preventing the net 3 from falling down is connected to the other end of the net 3 in the width direction of the net 3. And the string-shaped body 2 is connected.

【0054】尚、図1及び図7に示したネット構造体1
では、その一体あたりのネット構造体1に対して10〜
7枚の編柵用ネット3を備えて、法面Nへの設置状態で
10〜7個の三角状の凹入空間Qを形成するように構成
しているが、編柵用ネット3の枚数ひいては三角状の凹
入空間Qの個数は、これに限られるものではなく、一体
あたりのネット構造体1に対して編柵用ネット3の1枚
だけを備えて、一体あたりのネット構造体1に対して、
三角状の凹入空間Qの1個の構成するようにしてもよ
い。
The net structure 1 shown in FIGS. 1 and 7
Then, for the net structure 1 per unit,
The knitting fence net 3 is provided with seven knitting fence nets 3 to form 10 to 7 triangular recessed spaces Q when installed on the slope N. As a result, the number of triangular recessed spaces Q is not limited to this, and only one knitting fence net 3 is provided for the net structure 1 per unit, and the net structure 1 per unit is provided. Against
One triangular recessed space Q may be configured.

【0055】これまでの実施の形態では、編柵Aの構造
体1として、コンパクトであって、軽量で且つ取り扱い
の面で優れたネット構成のものを採用しているが、図8
に示すように、これを木柵Aの構造体1にして実施可能
である。
In the embodiments described above, the structure 1 of the knitting fence A employs a compact, lightweight, and net structure which is excellent in handling.
As shown in (1), this can be implemented as a structure 1 of a wooden fence A.

【0056】具体的には、長さが1m程度の例えば間伐
材などを編柵用の支柱4として、この支柱4を、等高線
方向に例えば1〜2mの間隔を隔てて、かつ、50cm
程度の深さで法面Nに埋め込み、この等高線方向の支柱
4,4にわたって、例えば伐採木による帯鞘11を積み
重ねるように配置して、細断処理物aを収容するための
三角状の凹入空間Qを形成する柵Aを構成し、この三角
状の凹入空間Qに細断処理物aを収容すると共に、この
上方の緑化用のスペースSに植生工を施工する法面緑化
の形態をとってもよいのである。
Specifically, for example, a thinning material or the like having a length of about 1 m is used as a knitting fence post 4, and the post 4 is spaced at a distance of, for example, 1 to 2 m in the contour line direction and 50 cm in length.
A triangular recess for accommodating the shredded material a is buried in the slope N with a depth of about a degree, and is arranged so as to stack, for example, a band sheath 11 made of a cut tree over the struts 4 and 4 in the contour direction. A fence A forming a fence A forming an entry space Q, a shredded material a is accommodated in the triangular recessed space Q, and a vegetation is constructed in a space S for greening above the slope A. May be taken.

【0057】或いは、図9に示すように、上記の例えば
伐採木に代えて、網状体を帯鞘11とし、この帯鞘11
を等高線方向で間隔を隔てる支柱4,4にわたって掛け
渡して、細断処理物aの収容柵Aを構成してもよいので
ある。
Alternatively, as shown in FIG. 9, instead of the above-described cut tree, for example, a net-like body is used as a band sheath 11, and the band sheath 11 is used.
May be bridged over the columns 4 and 4 spaced apart in the contour line direction to form the storage fence A for the shredded material a.

【0058】尚、上記のスペースSに対する植生工の施
工を実施しないで、有機廃棄物の細断処理物aの処理の
みの工法を実施可能であり、或いは、支柱4と帯鞘11
とによる柵Aを高くし、又は/及び、法長方向での柵A
の成長ピッチを小さくして、より大量の細断処理物aの
処理工法を実施してもよいのである。
It is to be noted that, without performing the vegetation work on the space S, it is possible to carry out a method of processing only the shredded material a of the organic waste, or alternatively, the strut 4 and the band sheath 11 may be used.
And / or fence A in the length direction
It is also possible to reduce the growth pitch of, and carry out a processing method for a larger amount of the shred product a.

【0059】[0059]

【発明の効果】以上説明したように、請求項1記載の発
明によれば、道路建設や宅地造成などの工事現場で発生
した有機廃棄物を、その工事現場内の法面を対象にし
て、大量に戻し処理可能な有機廃棄物の処理工法が提供
される。
As described above, according to the first aspect of the present invention, the organic waste generated at a construction site such as a road construction or a residential land development can be processed on a slope at the construction site. A method for treating organic waste that can be returned in large quantities is provided.

【0060】請求項2記載の発明によれば、緑化対象現
場の法面で発生した有機廃棄物を、その現場内で有効に
且つ大量に処理できる上に、特に法面の樹林化に際し
て、木本苗が被圧を受け難くて、生育が良好に行われる
法面の緑化工法、即ち、有機廃棄物の大量処理と法面の
緑化とを両立させ得る法面の緑化工法が提供されるので
ある。
According to the second aspect of the present invention, the organic waste generated on the slope at the site to be revegetated can be treated effectively and in large quantities in the site. The present invention provides a slope revegetation method in which the seedlings are hardly subjected to pressure and the growth is favorably performed, that is, a slope revegetation method capable of realizing both mass treatment of organic waste and revegetation of the slope. is there.

【0061】そして、請求項3記載の発明によれば、有
機廃棄物の大量処理工法あるいは有機廃棄物を大量に処
理しての法面の緑化工法に用いる上で、頗る好適な編柵
用のネット構造体が提供される。
According to the third aspect of the present invention, it is very suitable for a knitting fence for use in a method of mass processing organic waste or a method of greening a slope after treating a large amount of organic waste. A net structure is provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】編柵用のネット構造体の展開状態を示す斜視図
である。
FIG. 1 is a perspective view showing an expanded state of a net structure for a knitting fence.

【図2】大量の有機廃棄物の処理と両立させての植生マ
ットによる植生工の施工説明図である。
FIG. 2 is an explanatory diagram of vegetation work using a vegetation mat that is compatible with the treatment of a large amount of organic waste.

【図3】植生マットの断面斜視図である。FIG. 3 is a sectional perspective view of a vegetation mat.

【図4】大量の有機廃棄物の処理と両立させての厚層基
材の吹き付けによる植生工の施工説明図である。
FIG. 4 is an explanatory diagram of construction of a vegetation work by spraying a thick base material, which is compatible with processing of a large amount of organic waste.

【図5】大量の有機廃棄物の処理と両立させての木本苗
の導入による植生工の施工説明図である。
FIG. 5 is an explanatory diagram of construction of vegetation by introducing woody seedlings while being compatible with processing of a large amount of organic waste.

【図6】編柵用のネットによる編柵の鉛直配置の形態を
示すネット構造体の断面図である。
FIG. 6 is a cross-sectional view of a net structure showing a vertical arrangement of knitting fences by a knitting fence net.

【図7】法面に張設する網状体に編柵用のネットを備え
た別の実施の形態によるネット構造体の斜視図である。
FIG. 7 is a perspective view of a net structure according to another embodiment in which a net for a knitting fence is provided on a net extending on a slope.

【図8】別の実施の形態による編柵構造体の施工状態を
示す斜視図である。
FIG. 8 is a perspective view showing a construction state of a knitted fence structure according to another embodiment.

【図9】更に別の実施の形態による編柵構造体の断面図
である。
FIG. 9 is a sectional view of a knitting fence structure according to still another embodiment.

【符号の説明】[Explanation of symbols]

1…ネット構造体、2…紐状体、3…編柵用のネット、
4…編柵支柱、5…第2の紐状体、a…有機廃棄物の細
断処理物、A…柵、N…法面、Q…三角状の凹入空間、
S…緑化用のスペース。
1 ... net structure, 2 ... string, 3 ... net for knitting fence,
4 ... knitting fence post, 5 ... second string, a ... shredded organic waste, A ... fence, N ... slope, Q ... triangular recessed space,
S: Space for greening.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 道路建設や宅地造成などの工事現場で発
生した有機廃棄物を細断して、その細断処理物を工事現
場内の法面に戻す有機廃棄物の処理工法であって、法面
の法長方向に適宜の間隔を隔てて等高線方向に柵を立設
して、この柵の法面側に、柵と法面とによる三角状の凹
入空間を形成し、この凹入空間に、有機廃棄物の細断処
理物を収容することを特徴とする有機廃棄物の処理工
法。
1. An organic waste treatment method for shredding organic waste generated at a construction site such as road construction or residential land development and returning the shredded material to a slope in the construction site. A fence is erected in the contour direction at appropriate intervals in the slope direction of the slope, and a triangular recessed space is formed by the fence and the slope on the slope side of this fence. A method for treating organic waste, wherein shredded organic waste is stored in a space.
【請求項2】 法面の緑化工法であって、法面の法長方
向に適宜の間隔を隔てて等高線方向に柵を立設して、こ
の柵の法面側に、柵と法面とによる三角状の凹入空間を
形成する一方、緑化対象現場で発生した有機廃棄物を細
断処理して、この細断処理物を、凹入空間とその直上の
柵との間に緑化用のスペースを形成する状態で三角状の
凹入空間に収容し、かつ、緑化用のスペースに植生工を
施工することを特徴とする法面の緑化工法。
2. A slope revegetation method, wherein a fence is erected in the contour direction at appropriate intervals in the length direction of the slope, and a fence and a slope are provided on the slope side of the fence. While forming a triangular recessed space, the organic waste generated at the greening target site is shredded, and this shredded material is placed between the recessed space and the fence immediately above it for greening. A slope revegetation method characterized in that it is housed in a triangular recessed space with a space formed, and vegetation is constructed in a space for revegetation.
【請求項3】 編柵用のネット構造体であって、法長方
向にわたって敷設される複数本の紐状体に、編柵用ネッ
トの幅方向の一端側を連結し、この編柵用のネットを編
柵支柱を用いて法面上に立設させた状態で、このネット
の倒れを防止するための第2の紐状体を、ネットの幅方
向の他端側と上記の紐状体とにわたって連結して成るこ
とを特徴とする編柵用のネット構造体。
3. A net structure for a knitting fence, wherein one end in the width direction of the knitting fence net is connected to a plurality of cords laid in a lengthwise direction. In a state where the net is erected on the slope using the knitting fence posts, a second string-shaped body for preventing the net from falling down is connected to the other end of the net in the width direction of the net and the above-described string-shaped body. And a net structure for knitting fences.
【請求項4】 編柵用のネットに、等高線方向で適宜の
間隔を隔てて編柵支柱を一体に設けて成る請求項3に記
載された編柵用のネット構造体。
4. The net structure for a knitting fence according to claim 3, wherein the net for the knitting fence is provided integrally with a knitting fence support at an appropriate interval in a contour line direction.
JP2001067194A 2001-03-09 2001-03-09 Net structure for braided fence and organic waste treatment method and slope planting method Expired - Fee Related JP4628565B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001067194A JP4628565B2 (en) 2001-03-09 2001-03-09 Net structure for braided fence and organic waste treatment method and slope planting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001067194A JP4628565B2 (en) 2001-03-09 2001-03-09 Net structure for braided fence and organic waste treatment method and slope planting method

Publications (2)

Publication Number Publication Date
JP2002266350A true JP2002266350A (en) 2002-09-18
JP4628565B2 JP4628565B2 (en) 2011-02-09

Family

ID=18925578

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001067194A Expired - Fee Related JP4628565B2 (en) 2001-03-09 2001-03-09 Net structure for braided fence and organic waste treatment method and slope planting method

Country Status (1)

Country Link
JP (1) JP4628565B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008019682A (en) * 2006-07-14 2008-01-31 Tokyo Seiko Co Ltd Anchor for slope
JP2019190096A (en) * 2018-04-24 2019-10-31 新東化成株式会社 Earth retaining member, earth retaining member installation method
CN114837202A (en) * 2022-05-20 2022-08-02 中国矿业大学 Ecological restoration method for slope-to-ladder change of steps of strip mine waste dump

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09316886A (en) * 1996-05-30 1997-12-09 Shimizu Corp Slope frame and its executing method
JPH11181777A (en) * 1997-12-19 1999-07-06 Saikou:Kk Planting foundation work and net fence support unit for use therein
JP2001030211A (en) * 1999-07-23 2001-02-06 Sato Kogyo Co Ltd Material for civil engineering utilizing tree material of felled wood or the like

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09316886A (en) * 1996-05-30 1997-12-09 Shimizu Corp Slope frame and its executing method
JPH11181777A (en) * 1997-12-19 1999-07-06 Saikou:Kk Planting foundation work and net fence support unit for use therein
JP2001030211A (en) * 1999-07-23 2001-02-06 Sato Kogyo Co Ltd Material for civil engineering utilizing tree material of felled wood or the like

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008019682A (en) * 2006-07-14 2008-01-31 Tokyo Seiko Co Ltd Anchor for slope
JP4630851B2 (en) * 2006-07-14 2011-02-09 東京製綱株式会社 Anchor for slope
JP2019190096A (en) * 2018-04-24 2019-10-31 新東化成株式会社 Earth retaining member, earth retaining member installation method
CN114837202A (en) * 2022-05-20 2022-08-02 中国矿业大学 Ecological restoration method for slope-to-ladder change of steps of strip mine waste dump

Also Published As

Publication number Publication date
JP4628565B2 (en) 2011-02-09

Similar Documents

Publication Publication Date Title
KR100723260B1 (en) Method for planting the willow
US20230354757A1 (en) Protective tree tube, method, and revetment using tree contained in same
KR100806148B1 (en) Afforestation method
KR20070009807A (en) Nutrition vegetation mat and method for transplanting tree using the same
US20110030273A1 (en) Method for making a plant wall
JP2012167529A (en) Slope greening method
KR100671719B1 (en) A method for tree planting and a pot for planting trees
JP2002266350A (en) Organic waste processing method, slope greening method, and net structure for wicket
ES2302107T3 (en) VEGETATION ELEMENT, SALE UNIT WITH A VEGETATION ELEMENT AND PROCEDURE FOR THE MANUFACTURE OF A SALE UNIT.
JP2004166701A (en) Construction method for applying weed-proof/weed-controlling/herbicidal material and covering plate and sheet body for weed-proof/weed-controlling/herbicidal material
JP2003176537A (en) Seeding and planting method and seeding and planting structure
JP4611124B2 (en) Natural restoration method
JP3605803B2 (en) Planting base and slope greening method
JPH11131480A (en) Slope greening method
JP3262719B2 (en) Revegetation method of hard slope and fences used for it
JP3205720B2 (en) Installation structure of slope greening frame and slope greening method
Carter Illinois trees: selection, planting, and care
JP2002021085A (en) Base and method for protecting slope face
JP2002161537A (en) Greening method for hard sloped face
JP2717368B2 (en) Slope planting method
KR20080048117A (en) The base soil and it's afforestation method
JPH0739261A (en) Method for planting tree
JP2896654B2 (en) Greening method of slope
Rose The Regenerative Garden: 80 Practical Projects for Creating a Self-sustaining Garden Ecosystem
JP2516179B2 (en) Natural grass

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080227

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091224

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100112

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100315

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101109

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101110

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131119

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4628565

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees