JP2002256329A JP2001054342A JP2001054342A JP2002256329A JP 2002256329 A JP2002256329 A JP 2002256329A JP 2001054342 A JP2001054342 A JP 2001054342A JP 2001054342 A JP2001054342 A JP 2001054342A JP 2002256329 A JP2002256329 A JP 2002256329A
Authority
JP
Japan
Prior art keywords
ladle
pot
pan
rail
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001054342A
Other languages
Japanese (ja)
Inventor
Kanji Hide
寛治 日出
Eiji Sakurai
栄司 櫻井
Masanori Yamagishi
正典 山岸
Hiroyuki Hide
寛之 日出
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP2001054342A priority Critical patent/JP2002256329A/en
Publication of JP2002256329A publication Critical patent/JP2002256329A/en
Pending legal-status Critical Current

Links

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for replacing a ladle in a ladle refining facility and its apparatus with which the operating rate of a degassing-treating facility, etc., is improved and a wide setting space is unnecessary. SOLUTION: The method and the apparatus for replacing the ladle in the ladle refining facility, comprises the process in which an unprocessed ladle B transported from the upstream process is lifted and moved with a crane 6 to the upper part of the standby position for the cart 20a on the rail of the ladle refining facility for standby, the process in which a 2 ladle-carrying cart 20a loaded with a processed ladle A on one loading position 9a comes out from the ladle refining facility 2 and stops at the standby position and then an unprocessed ladle B standing by on an empty loading position 9b is hung down for loading, the process in which the processed ladle A is lifted with the crane and while the crane is moving toward a cart in the downstream, the 2 ladle-carrying cart loaded with the unprocessed ladle B is sent to the ladle refining facility where degassing is performed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、クレーンヤードと
取鍋精錬設備との間に敷設した一本の軌条を走行して取
鍋精錬設備に出入りする台車に載った溶鋼鍋を交換する
方法およびその装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for exchanging a molten steel pot mounted on a bogie entering and exiting a ladle refining facility by traveling on one rail laid between a crane yard and a ladle refining facility. It concerns the device.

【0002】[0002]

【従来の技術】製鋼工場から鋳造工場までの間には取鍋
精錬設備が設けられ、転炉などの酸素製鋼炉から出鋼さ
れた溶鋼に対して脱ガス、溶鋼加熱、粉体吹込みなどの
処理を行うようになっている。各設備間における溶鋼鍋
の搬送は台車を軌条に沿って走行させることによってな
される。軌条には受鋼鍋の搬送台車が走行する主軌条の
他に脱ガス処理設備などに出入りする引き込み軌条があ
る。主軌条は転炉ごとに一本が敷設され、引き込み軌条
は脱ガス処理設備ごとに1本が敷設されている。
2. Description of the Related Art Ladle refining equipment is provided between a steelmaking plant and a foundry to degas, heat molten steel, and inject powder into molten steel discharged from an oxygen steelmaking furnace such as a converter. Is performed. The transfer of the molten steel pot between the equipments is performed by moving the bogie along a rail. The rail includes a main rail on which a carrier truck of a steel pan travels, and a pull-in rail which enters and exits a degassing treatment facility. One main rail is laid for each converter, and one pull-in rail is laid for each degassing facility.

【0003】一般に、引き込み軌条は主軌条に対してほ
ぼ平行に設けられている。
[0003] Generally, the retracting rail is provided substantially parallel to the main rail.

【0004】そして、処理済み溶鋼を収容した鍋Aを載
せた台車が脱ガス設備から出ると、引き込み軌条上で台
車から鍋Aをクレーンで吊りだし、これを下流工程に繋
がる軌条上の台車に載せ、鋳造工程などに搬送する。次
いで、転炉に繋がる主軌条上の台車から未処理溶鋼を収
容した鍋Bを吊り上げ、これを引き込み軌条上の台車に
載せる。そして、引き込み軌条に沿って台車が脱ガス設
備に入り、未処理溶鋼(以下、未処理鍋という)を脱ガ
ス処理する。処理済み溶鋼鍋(以下、処理済み鍋とい
う)Bが、下流工程に繋がる軌条上の台車に載せられ次
の工程へ搬送される。
When the truck carrying the pot A containing the processed molten steel exits the degassing facility, the pot A is suspended from the truck by a crane on the pull-in rail, and this is transferred to a rail-mounted bogie connected to the downstream process. And transport it to the casting process. Next, the pot B containing the untreated molten steel is lifted from the bogie on the main rail connected to the converter, and this is drawn in and placed on the bogie on the rail. Then, the bogie enters the degassing facility along the drawing rail, and degasses the untreated molten steel (hereinafter, referred to as an untreated pan). A processed molten steel pot (hereinafter, referred to as a processed pot) B is placed on a carriage on a rail leading to a downstream process and transported to the next process.

【0005】しかし、上述の方法においては、クレーン
による主軌条の台車から引き込み線上の台車への溶鋼鍋
の吊り替え時間、および引き込み線上の台車から下流工
程に繋がる軌条の台車への処理済み鍋の吊り替え時間が
共に長くなる。このため、未処理溶鋼を収容した鍋が主
軌条の台車上で長時間にわたり待たされ、脱ガス設備の
稼働率が低いという問題がある。
[0005] However, in the above-mentioned method, a crane is used to suspend the molten steel pot from the bogie on the main rail to the bogie on the service line, and the transfer of the pot from the bogie on the service line to the bogie on the rail connected to the downstream process. The re-hanging time becomes longer. For this reason, there is a problem that the pot containing the untreated molten steel is kept on the bogie of the main rail for a long time, and the operation rate of the degassing equipment is low.

【0006】特開平7−41821号は、前記の問題を
次のように解決することを提案している。これは、脱ガ
ス処理設備の直下で交差する2本の引き込み線を設け
て、一方の引き込み線の台車が脱ガス処理設備に入って
いるとき、他方の引き込み線の台車に未処理鍋をクレー
ンで積み込むことにより、脱ガス処理を開始するまでの
待ち時間を短縮するものである。
Japanese Patent Application Laid-Open No. 7-41821 proposes to solve the above problem as follows. This is to provide two intersecting lines underneath the degassing equipment, and when the bogie of one of the entraining lines enters the degassing equipment, the untreated pan is craneed to the bogie of the other. This reduces the waiting time before starting the degassing process.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、特開平
7−41821号のように、2本の引き込み線を敷設す
ると、敷設工事費用が高価となり、広いスペースが必要
となる。また、引き込み線が脱ガス処理設備の直下で交
差しているため、点検がし難いという問題があり、また
交差部に不具合が生じると復旧に時間を要し、設備稼働
率が低下するという問題がある。
However, when two service lines are laid as in Japanese Patent Application Laid-Open No. Hei 7-41821, the laying work cost is high and a large space is required. In addition, there is a problem that inspection is difficult because the service lines cross right below the degassing equipment, and if a problem occurs at the intersection, it takes time to recover and the equipment operation rate decreases. There is.

【0008】本発明は、脱ガス処理設備等の稼働率を向
上させ、広い設置スペースを要しない取鍋精錬設備の鍋
交換方法およびその設備を提供することを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a method of replacing a ladle refining facility which does not require a large installation space, and which improves the operation rate of a degassing facility and the like and a facility therefor.

【0009】[0009]

【課題を解決するための手段】本発明は上記目的を以下
の方法および装置によって達成する。
The present invention achieves the above object by the following method and apparatus.

【0010】請求項1の方法は、台車に載せた処理済み
鍋と未処理鍋を交換しながら溶鋼の脱ガス処理等を行う
取鍋精錬設備の鍋交換方法において、上流工程から搬送
されてきた未処理鍋Bをクレーンで吊り上げ、取鍋精錬
用軌条の台車の待機位置上方に移動し、待機する工程
と、処理済み鍋Aを一方の搭載位置に載せた2鍋搭載台
車が、取鍋精錬設備から出てきて待機位置に停止した
後、他方の空き搭載位置に待機していた未処理鍋Bを吊
り降ろして載せる工程と、処理済み鍋Aをクレーンで吊
り上げ、クレーンが下流工程の台車に移動している間
に、未処理鍋Bを搭載した2鍋搭載台車を取鍋精錬設備
に送り、脱ガス処理等を行う工程とを有する取鍋精錬設
備の鍋交換方法である。
[0010] The method of claim 1 is a ladle refining equipment ladle exchanging method for performing degassing treatment of molten steel while exchanging a treated pan and an untreated pan placed on a cart, wherein the ladle is conveyed from an upstream process. The process of lifting the unprocessed pot B with a crane, moving it above the stand-by position of the truck on the ladle refining rail, and waiting, and the two-pan-mounted cart with the treated pot A placed on one mounting position, After coming out of the equipment and stopping at the standby position, the step of hanging down the untreated pot B waiting at the other empty loading position and loading the same, and the step of lifting the treated pot A with a crane, and the crane is used as a bogie in the downstream process This is a method for replacing ladle in a ladle refining facility, which includes a step of sending a two-panel loading cart loaded with an untreated pan B to a ladle refining facility while moving, and performing a degassing process or the like.

【0011】この方法によれば、前鍋の脱ガス処理終了
から後続鍋が脱ガス処理設備に入るまでの待ち時間が大
幅に短縮することができる。これにより、待ち時間中の
溶鋼の放熱量を低減することができ、また、脱ガス処理
設備で処理できる鍋(溶鋼収容量:320t)数量が増加
(130〜160鍋/月)する。
According to this method, the waiting time from the end of the degassing process of the front pan to the subsequent pan entering the degassing facility can be greatly reduced. As a result, the amount of heat released from the molten steel during the waiting time can be reduced, and the number of pots (capacity of molten steel: 320 t) that can be processed by the degassing treatment equipment increases (130 to 160 pans / month).

【0012】請求項2の装置は、クレーンヤードと取鍋
精錬設備との間に敷設した一本の軌条と、この軌条に沿
って走行し、かつ、二つの鍋を同時搭載できる台車とを
有する取鍋精錬設備の鍋交換装置である。
[0012] The apparatus according to claim 2 has one rail laid between the crane yard and the ladle refining equipment, and a bogie running along the rail and capable of simultaneously mounting two pans. This is a ladle exchanging device for ladle refining equipment.

【0013】この装置を使用すれば、前鍋の脱ガス処理
終了から後続鍋が脱ガス処理設備に入るまでの待ち時間
が大幅に短縮することができる。これにより、待ち時間
中の溶鋼の放熱量を低減することができ、また、脱ガス
処理設備で処理できる鍋(溶鋼収容量:320t)数量が増
加(130〜160鍋/月)する。また、軌条は一本で
よいから、特開平7−41821号のようにスペースを
広くとる必要がない。
By using this apparatus, the waiting time from the end of the degassing processing of the front pan to the subsequent pan entering the degassing equipment can be greatly reduced. As a result, the amount of heat released from the molten steel during the waiting time can be reduced, and the number of pots (capacity of molten steel: 320 t) that can be processed by the degassing treatment equipment increases (130 to 160 pans / month). Also, since only one rail is required, there is no need to provide a large space as in JP-A-7-41821.

【0014】請求項3の装置は、クレーンヤードと取鍋
精錬設備との間に敷設した一本の軌条と、この軌条に沿
って走行し、かつ、二つの鍋受台を有しているが二つの
鍋を同時搭載できない台車と、クレーンヤードの前記軌
条の間に設けられた鍋受け台昇降手段とを有する取鍋精
錬設備の鍋交換装置である。
According to a third aspect of the present invention, there is provided an apparatus having one rail laid between a crane yard and a ladle refining facility, and two pan cradles running along the rail. A pot exchange device for a ladle refining facility, comprising a bogie on which two pans cannot be mounted at the same time, and a pan receiving stand elevating means provided between the rails of a crane yard.

【0015】この装置を使用すれば、前鍋の脱ガス処理
終了から後続鍋が脱ガス処理設備に入るまでの待ち時間
が大幅に短縮することができる。これにより、待ち時間
中の溶鋼の放熱量を低減することができ、また、脱ガス
処理設備で処理できる鍋(溶鋼収容量:320t)数量が増
加(130〜160鍋/月)する。また、この装置は、
2鍋搭載可能であるが、溶鋼収容量が大きな鍋(例:32
0t容量)を同時積載するには台車フレームの強度が不足
する既設台車がある場合、鍋受け台昇降手段を取付ける
だけで、本発明の鍋交換方法を実現できるから、投資す
る設備費用が安価である。また、軌条は一本でよいか
ら、特開平7−41821号のようにスペースを広くと
る必要がない。
By using this apparatus, the waiting time from the end of the degassing process of the front pan to the subsequent pan entering the degassing facility can be greatly reduced. As a result, the amount of heat released from the molten steel during the waiting time can be reduced, and the number of pots (capacity of molten steel: 320 t) that can be processed by the degassing treatment equipment increases (130 to 160 pans / month). This device also
Pots that can be loaded with 2 pots but have a large molten steel capacity (eg 32
(0t capacity) at the same time, if there is an existing bogie with insufficient strength of the bogie frame, the pan replacement method of the present invention can be realized only by attaching the pan receiving stand elevating means. is there. Also, since only one rail is required, there is no need to provide a large space as in JP-A-7-41821.

【0016】[0016]

【発明の実施の形態】本発明の実施の形態を図面に基づ
いて以下に説明する。図1は、脱ガス処理のための鍋搬
送設備の配置図である。図において、1はクレーンヤー
ド、2はクレーンヤード1に隣接して設けられた脱ガス
処理設備である。クレーンヤード1には、転炉から出鋼
された溶鋼を収容した鍋を台車によりクレーンヤード1
内に運び入れる軌条3、クレーンヤード1内の待機位置
から脱ガス処理する溶鋼を収容した鍋(未処理鍋とい
う)を脱ガス処理槽の下に運び入れ、脱ガス処理した溶
鋼を収容した鍋(処理済み鍋という)をクレーンヤード
1内の待機位置まで運び出す軌条4および処理済み鍋を
連鋳設備に運搬する軌条5a、5bが敷設されている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a layout diagram of a pot transfer facility for degassing. In the figure, 1 is a crane yard, and 2 is a degassing treatment facility provided adjacent to the crane yard 1. In the crane yard 1, a pot containing molten steel discharged from the converter is placed on a crane yard 1 by a bogie.
A rail containing the molten steel to be degassed from a stand-by position in the crane yard 1 and a rail (a non-treated pan) carried under the degassing tank, and a pan containing the degassed molten steel. Rails 4 for carrying the treated pot (called a treated pot) to a standby position in the crane yard 1 and rails 5a and 5b for carrying the treated pot to a continuous casting facility are laid.

【0017】そして、台車8は、転炉から出鋼された溶
鋼を収容した鍋12を搭載して軌条3を走行する。台車
9は、二つの鍋12、12を搭載できる台車で、未処理
鍋または処理済み鍋を搭載して軌条4を走行する。台車
10は、処理済み鍋を搭載して軌条5aを走行する。台
車11は、処理済み鍋を搭載して軌条5bを走行する。
なお、前記した台車およびこれ以降に記す台車は、自走
可能なものまたは、機関車で牽引されるものを意味す
る。
The truck 8 carries the pan 12 containing molten steel discharged from the converter and runs on the rail 3. The trolley 9 is a trolley on which two pans 12 and 12 can be mounted, and runs on the rail 4 with an untreated pan or a processed pan mounted thereon. The carriage 10 travels on the rail 5a with the treated pot mounted thereon. The trolley 11 carries the treated pan and runs on the rail 5b.
In addition, the above-mentioned trolley and the trolley described hereinafter mean a trolley which can be driven by itself or a trolley which is towed by a locomotive.

【0018】クレーン6は、クレーンヤード1内を走行
し、未処理鍋12を台車8から台車9へ、処理済み鍋1
2を台車9から台車10または台車11へ運搬する。
The crane 6 travels in the crane yard 1 and moves the untreated pot 12 from the trolley 8 to the trolley 9,
2 is transported from the trolley 9 to the trolley 10 or the trolley 11.

【0019】脱ガス処理設備2の脱ガス処理槽7は、稼
働中の槽であり、脱ガス処理槽7aおよび7bは予備槽で
ある。各脱ガス処理槽7、7aおよび7bは、稼働してい
る脱ガス処理槽の修理時、稼働槽と予備槽を入れ替える
ために、稼働位置〜待機位置間を矢印で示すように移動
できるようになっている。
The degassing tank 7 of the degassing equipment 2 is an operating tank, and the degassing tanks 7a and 7b are spare tanks. Each of the degassing tanks 7, 7a and 7b can be moved between the operating position and the standby position as indicated by arrows to replace the operating tank and the spare tank when repairing the operating degassing tank. Has become.

【0020】次に、上述の鍋搬送設備における脱ガス処
理等のための鍋交換方法について説明する。 (1)転炉からクレーンヤードに台車8に搭載されて搬
送されてきた未処理鍋Aをクレーン6で吊り上げ、運搬
して、2鍋搭載の台車9の搭載位置9aに載せる。 (2)台車9を移動し、搭載位置9aの未処理鍋Aを脱
ガス処理槽7の下に位置合わせして、未処理溶鋼に脱ガ
ス処理等がなされる。 (3)転炉からクレーンヤードに台車8に搭載されて搬
送されてきた未処理鍋Bをクレーン6で吊り上げ、軌条
4の待機位置の上方に移動し、待機する。 (4)脱ガス処理を終えた処理済み鍋Aが、台車9に載
って軌条4の待機位置に出てくる。クレーン6で吊って
待機していた未処理鍋Bを搭載位置9bに載せる。 (5)台車9の搭載位置9aの処理済み鍋Aをクレーン
6で吊り上げ、軌条5aの待機位置に停止している台車
10に載せる。この間に、台車9を移動し、搭載位置9
bの未処理鍋Bを脱ガス処理槽7の下に位置合わせし
て、未処理溶鋼に脱ガス処理等がなされる。なお、台車
10は処理済み鍋Aを連鋳設備に渡し、軌条5aの待機
位置に戻ってくる。 (6)転炉からクレーンヤードへ台車8に搭載されて搬
送されてきた未処理鍋Cをクレーン6で吊り上げ、軌条
4の待機位置の上方に移動し、待機する。 (7)脱ガス処理を終えた処理済み鍋Bが、台車9に載
って軌条4の待機位置に出てくる。クレーン6で吊って
待機していた未処理鍋Cを搭載位置9aに載せる。 (8)台車9の搭載位置9bの処理済み鍋Bをクレーン
6で吊り上げ、軌条5bの待機位置に停止している台車
11に載せる。この間に、台車9を移動し、搭載位置9
aの未処理鍋Cを脱ガス処理槽7の下に位置合わせし
て、未処理溶鋼に脱ガス処理等がなされる。なお、台車
11は処理済み鍋Bを連鋳設備に渡し、軌条5bの待機
位置に戻ってくる。
Next, a method of replacing a pot for degassing or the like in the above-described pot transfer facility will be described. (1) The untreated pot A mounted on the carriage 8 and conveyed from the converter to the crane yard is lifted by the crane 6, transported, and placed on the mounting position 9a of the carriage 9 equipped with two pans. (2) The carriage 9 is moved, the untreated pot A at the mounting position 9a is positioned below the degassing tank 7, and the untreated molten steel is degassed. (3) The untreated pot B, which is mounted on the carriage 8 and conveyed from the converter to the crane yard, is lifted by the crane 6, moved to a position above the stand-by position of the rail 4, and stands by. (4) The treated pot A after the degassing process is put on the carriage 9 and comes out to the standby position of the rail 4. The unprocessed pot B suspended by the crane 6 and put on standby is placed on the mounting position 9b. (5) The processed pot A at the mounting position 9a of the carriage 9 is lifted by the crane 6 and placed on the carriage 10 stopped at the standby position of the rail 5a. During this time, the carriage 9 is moved to the
The untreated pot B is positioned below the degassing tank 7, and the untreated molten steel is degassed. The cart 10 passes the processed pot A to the continuous casting facility and returns to the standby position of the rail 5a. (6) The untreated pot C mounted on the carriage 8 and conveyed from the converter to the crane yard is lifted by the crane 6, moved to a position above the stand-by position of the rail 4, and stands by. (7) The treated pan B that has been degassed is put on the carriage 9 and comes out to the standby position of the rail 4. The untreated pot C suspended by the crane 6 and put on standby is placed on the mounting position 9a. (8) The processed pot B at the mounting position 9b of the carriage 9 is lifted by the crane 6 and placed on the carriage 11 stopped at the standby position of the rail 5b. During this time, the carriage 9 is moved to the
The untreated pot C of a is positioned below the degassing tank 7, and the untreated molten steel is subjected to degassing and the like. The cart 11 passes the processed pot B to the continuous casting facility, and returns to the standby position of the rail 5b.

【0021】この後、処理済み鍋Cは、鍋Aと同じく、
工程(4)、工程(5)を経て連鋳設備に運搬される。
Thereafter, the treated pot C is the same as the pot A,
After the process (4) and the process (5), it is transported to the continuous casting facility.

【0022】すなわち、脱ガス処理設備において、未処
理鍋と処理済み鍋の交換は2鍋搭載台車を使用して次の
ように行われる:図2参照。 上流工程(転炉)から搬送されてきた未処理鍋Bが、
台車8からクレーン6で吊り上げられ、脱ガス処理軌条
の待機位置の上方に移動し、待機する:(S1)。 処理済み鍋Aが脱ガス処理設備から2鍋搭載可能な台
車9に載って待機位置に出てくる:(S2)。 台車9の空き搭載位置に待機していた未処理鍋Bを載
せる:(S3)。 処理済み鍋Aをクレーン6で吊り上げ、台車10また
は11に載せる。この後、台車10または11が処理済
み鍋Aを下流工程(連鋳設備)に渡す。この間、台車9
は脱ガス処理設に移動し、未処理鍋Bの溶鋼に脱ガス処
理等がなされる:(S4)。
That is, in the degassing treatment equipment, the exchange between the untreated pot and the treated pot is carried out as follows using a two-panel mounted cart: see FIG. The untreated pot B transported from the upstream process (converter)
It is lifted by the crane 6 from the cart 8, moves above the standby position of the degassing rail, and waits: (S1). The treated pot A comes out of the degassing processing equipment on the trolley 9 on which two pots can be mounted and comes out to the standby position: (S2). The untreated pot B waiting on the empty loading position of the cart 9 is placed: (S3). The processed pot A is lifted by the crane 6 and placed on the cart 10 or 11. Thereafter, the cart 10 or 11 transfers the processed pot A to the downstream process (continuous casting facility). During this time, trolley 9
Moves to the degassing facility, where the molten steel in the untreated pan B is subjected to degassing and the like: (S4).

【0023】この後、上流工程(転炉)から搬送されて
きた未処理鍋C,D,…は、上記工程〜を経て処理
済み鍋となり、下流工程(連鋳設備)に運搬される。
After that, the untreated pots C, D,... Conveyed from the upstream process (converter) become processed pots through the above-mentioned steps and are conveyed to the downstream process (continuous casting equipment).

【0024】以上のように、一本の脱ガス処理用軌条を
走行する2鍋搭載可能な台車を使用し、上記工程〜
を実施することにより、前鍋の脱ガス処理終了から後続
鍋が脱ガス処理設備に入るまでの待ち時間が、従来、平
均13.2分であったものが、5分に短縮された。これによ
り、待ち時間中における溶鋼の放熱量を大幅に低減する
ことができ、待ち時間の短縮により脱ガス処理設備で処
理できる鍋(溶鋼収容量:320t)の数量が、130〜1
60鍋/月増加した。
As described above, using the two-panel mountable cart traveling on one degassing treatment rail,
The waiting time from the end of the degassing process of the front pot to the end of the subsequent pot entering the degassing facility was reduced from 13.2 minutes on average to 5 minutes. As a result, the amount of heat released from the molten steel during the waiting time can be significantly reduced, and the number of pots (the molten steel capacity: 320 tons) that can be processed by the degassing equipment by shortening the waiting time is 130 to 1
Increased by 60 pots / month.

【0025】次に、上述した鍋交換方法を実施するため
の装置について説明する。図3は2鍋搭載可能な台車の
概念図であり、この図には、溶鋼収容量320tの2鍋を同
時に搭載できる台車と、鍋受け台を2個有しているが、
台車の強度が不足しているため2鍋(溶鋼収容量:320
t)を同時搭載できない台車を併せて表示している。
Next, a description will be given of an apparatus for carrying out the above-mentioned method of replacing a pot. FIG. 3 is a conceptual diagram of a bogie that can be mounted with two pans. In this figure, a bogie that can simultaneously mount two pans with a molten steel capacity of 320 tons and two pan trays are provided.
2 pots (capacity of molten steel: 320)
The carts that cannot be equipped with t) are also displayed.

【0026】第1装置:この装置は、二つの鍋受け台2
1a、21bを有し、二つの鍋を同時搭載できる台車20
aと、クレーンヤード1の待機位置と脱ガス処理槽7下
との間を台車20aが走行する脱ガス処理軌条4と備え
ているものである。なお、前記台車20aに替え、一つ
の鍋受け台を有する台車を2台連結したものとすること
もできる。
First device: This device comprises two pan rests 2
A trolley 20 having 1a and 21b and capable of simultaneously mounting two pots
a, and a degassing rail 4 on which the bogie 20a runs between the standby position of the crane yard 1 and the bottom of the degassing tank 7. Instead of the truck 20a, two trucks having one pot receiving stand may be connected.

【0027】第2装置:この装置は、鍋受け台を2個有
しているが、台車の強度が不足しているため2鍋(溶鋼
収容量:320t)を同時搭載できない台車を使用する例で
ある。
Second device: Although this device has two pan receivers, an example in which a bogie in which two pans (capacity of molten steel: 320 t) cannot be simultaneously mounted due to insufficient strength of the bogie is used. It is.

【0028】この装置は、鍋受け台を2個有し、二つの
鍋を同時搭載できない台車20bと、クレーンヤード1
の待機位置と脱ガス処理槽7下との間を台車20bが走
行する脱ガス処理軌条4と、待機位置に敷設された脱ガ
ス処理軌条4の軌条間に配設され、未処理鍋を載せた鍋
受け台(21aまたは21b)を走行車輪を有する台車
フレーム上面から上方に若干上昇させたり、鍋受台を下
降させて、鍋受け台を台車フレーム上面に載せる鍋受け
台昇降手段30とを備えているものである。
This apparatus has two pan receivers, and a truck 20b in which two pans cannot be loaded simultaneously, and a crane yard 1
The untreated pot is placed between the degassing rail 4 in which the bogie 20b runs between the standby position and the degassing tank 7 and the rail of the degassing rail 4 laid at the standby position. The pan support (21a or 21b) is slightly raised upward from the upper surface of the trolley frame having the running wheels, or the pan cradle is lowered, and the pan cradle elevating means 30 for placing the pan cradle on the upper surface of the trolley frame includes: It is equipped.

【0029】鍋受け台昇降手段30は、次のように配設
されている。図4に示すように、待機位置(図1参照)
の軌条4のレール基礎梁4aとレール基礎梁4bの間に、
コンクリート層33を造成し、このコンクリート層33
の上面に鋼スラブ板34を配設して溶鋼の入った鍋12
および鍋受台21aまたは21bの重量を受けられるよう
床面造成してある。鋼スラブ板34上面、軌条の幅方向
において左右に、複数本油圧ジャッキ31をロッドを上
にして取付けてある。この油圧ジャッキ31のロッドヘ
ッドに鍋受台21の下面を受ける受け板32が取付けら
れている。
The pan holder raising / lowering means 30 is arranged as follows. As shown in FIG. 4, the standby position (see FIG. 1)
Between the rail foundation beam 4a and the rail foundation beam 4b of the rail 4
A concrete layer 33 is formed, and the concrete layer 33
The steel slab plate 34 is disposed on the upper surface of the
The floor is formed so that it can receive the weight of the pan support 21a or 21b. A plurality of hydraulic jacks 31 are mounted on the upper surface of the steel slab plate 34 and on the left and right in the width direction of the rail with the rod facing upward. A receiving plate 32 for receiving the lower surface of the pan receiving table 21 is attached to the rod head of the hydraulic jack 31.

【0030】次に、上述した第2実施形態の装置による
鍋交換方法を説明する。 (1)図3を参照して、鍋受台21aに処理済み鍋Aを
載せ、鍋受け台21bが空の台車20bが脱ガス処理設
備から軌条4の待機位置に出てくる。 (2)空の鍋受け台21bが、鍋受け台昇降手段30の
上に位置すると、リミットスイッチが作動し、台車20
bが自動停止する。 (3)台車20bが自動停止すると、鍋受け台昇降手段
30の油圧ジャッキ31により受け板32が上昇し、受
け板32が空の鍋受け台21bを台車フレーム22の上
面から上方に若干寸法離れる高さレベル(上昇限)に達
すると、油圧ジャッキ31の作動が停止し、受け板32
の上昇が止まる。このときのジャッキ31の速度は、高
速、低速の2段切換を自動的に行い、ジャッキ31のロ
ッド上昇に要する時間の短縮を図っている。
Next, a method of replacing a pot by the above-described apparatus of the second embodiment will be described. (1) Referring to FIG. 3, the processed pot A is placed on the pan receiver 21 a, and the truck 20 b with the empty pan receiver 21 b comes out of the degassing equipment to the standby position of the rail 4. (2) When the empty pan receiver 21b is positioned on the pan receiver raising / lowering means 30, the limit switch is activated and the carriage 20
b stops automatically. (3) When the bogie 20b automatically stops, the receiving plate 32 is raised by the hydraulic jack 31 of the pan receiving stand elevating means 30, and the receiving plate 32 slightly moves the empty pan receiving base 21b upward and away from the upper surface of the bogie frame 22. When the height level (ascending limit) is reached, the operation of the hydraulic jack 31 stops, and the receiving plate 32
Stops rising. At this time, the speed of the jack 31 is automatically switched between high speed and low speed to reduce the time required for the rod of the jack 31 to rise.

【0031】この後、複数の落下防止用ストッパー35
が受け板32の下に挿入、停止し、油圧ジャッキ31等
の故障により受け板32が下降する場合、受け板32を
支持し、後述の未処理鍋Bの荷重が台車フレーム22に
負荷するのを防止するようになっている。また、受け板
32が上昇開始すると、台車20bが走行できないよう
に、インターロック回路を設けて操作ミスの防止を図っ
ている。また、受け板32が上限高さで停止すると、鍋
の吊り降ろしが可能であることをクレーンの運転手に伝
える表示灯が点灯する。 (4)図示してないが、このとき、軌条4の待機位置上
方で未処理鍋Bを吊って待機しているクレーン6(図1
参照)が、未処理鍋Bを鍋受け台21bに吊り降ろして
載せる。
Thereafter, a plurality of stoppers 35 for preventing fall are formed.
When the receiving plate 32 is inserted and stopped under the receiving plate 32 and the receiving plate 32 descends due to a failure of the hydraulic jack 31 or the like, the receiving plate 32 is supported, and the load of the untreated pot B described later is applied to the bogie frame 22. Is to be prevented. In addition, an interlock circuit is provided to prevent an operation error so that the carriage 20b cannot run when the receiving plate 32 starts to rise. In addition, when the receiving plate 32 stops at the upper limit height, an indicator light that tells the crane driver that the pan can be hung is lit. (4) Although not shown, at this time, the crane 6 (FIG. 1) which stands by waiting the unprocessed pan B above the standby position of the rail 4
However, the untreated pot B is suspended and placed on the pan receiving stand 21b.

【0032】このとき、台車20bの鍋受け台21aに処
理済み鍋Aが、鍋受け台21bに未処理鍋Bが載ってい
る。そこで、図5、図6に示すように、軌条4の両側に
投光器36a、36bと受光器37a、37bからなる光セ
ンサーを設けて鍋の積載状態を検知するようにしてい
る。そして、処理済み鍋Aおよび未処理鍋Bを検知した
ら、油圧ジャッキ31が下降動作しないようにインター
ロック回路を設けて、操作ミスによる台車20bの破壊
防止を図っている。 (5)クレーン6が鍋受台21aの処理済み鍋Aを吊り
上げ、下流工程に鍋を運搬する台車に向かって移動を開
始する。 (6)処理済み鍋Aが台車20b上に無いことを光セン
サーが検知すると、前記落下防止用ストッパー35が引
抜き限まで戻る。同時に油圧ジャッキ31が下降動作
し、未処理鍋Bを載せた鍋受け台21bが台車フレーム
22の上面に載る。この後も、油圧ジャッキ31の下降
動作が継続し、受け板32の上面が鍋受け台21bの下
面から所定寸法離れた下降限に達すると油圧ジャッキ3
1の下降動作が停止する。
At this time, the processed pot A is placed on the pot receiver 21a of the cart 20b, and the unprocessed pot B is placed on the pot receiver 21b. Therefore, as shown in FIGS. 5 and 6, an optical sensor including light emitters 36a and 36b and light receivers 37a and 37b is provided on both sides of the rail 4 to detect the loaded state of the pot. When the treated pot A and the untreated pot B are detected, an interlock circuit is provided to prevent the hydraulic jack 31 from descending, thereby preventing the bogie 20b from being broken due to an operation error. (5) The crane 6 lifts the processed pot A in the pot receiving stand 21a, and starts moving toward the cart that transports the pot to the downstream process. (6) When the optical sensor detects that the processed pot A is not on the trolley 20b, the drop prevention stopper 35 returns to the drawing limit. At the same time, the hydraulic jack 31 descends, and the pan receiving table 21b on which the unprocessed pan B is placed rests on the upper surface of the bogie frame 22. Thereafter, the lowering operation of the hydraulic jack 31 continues, and when the upper surface of the receiving plate 32 reaches a lowering limit separated by a predetermined distance from the lower surface of the pan receiving stand 21b, the hydraulic jack 3 is moved.
The descending operation of 1 stops.

【0033】そして、操作ミスを防止するために、受け
板32が下降限に達するまで台車20bが走行できない
ように、インターロック回路を設けている。 (7)台車20bが未処理鍋Bを載せて、脱ガス処理設
備に入る。これで、処理済み鍋Aと未処理鍋Bの鍋交換
が完了。
In order to prevent an operation error, an interlock circuit is provided so that the carriage 20b cannot travel until the receiving plate 32 reaches the lower limit. (7) The cart 20b places the untreated pot B and enters the degassing facility. This completes the replacement of the processed pot A and the unprocessed pot B.

【0034】上述した第1装置および第2装置を使用す
れば、処理済み鍋をクレーンで吊り上げた後、短時間で
未処理鍋を脱ガス処理設備に送り込むことができる。こ
れにより、前鍋の脱ガス処理終了から後続鍋が脱ガス処
理設備に入るまでの待ち時間が大幅に短縮されるから、
待ち時間中の溶鋼の放熱量を低減することができる。ま
た、待ち時間の短縮により脱ガス処理設備で処理できる
鍋(溶鋼収容量:320t)数量が増加(130〜160鍋
/月)する。
By using the above-mentioned first and second devices, the untreated pot can be sent to the degassing equipment in a short time after the treated pot is lifted by the crane. As a result, the waiting time from the end of the degassing process of the front pan to the subsequent pan entering the degassing facility is greatly reduced,
The amount of heat released from the molten steel during the waiting time can be reduced. In addition, shortening the waiting time increases the number of pots (capacity of molten steel: 320 t) that can be processed by the degassing equipment (130 to 160 pots / month).

【0035】特に、第2装置は、2鍋搭載可能である
が、溶鋼収容量が大きな鍋(例:320t容量)を同時積載
するには台車フレームの強度が不足する既設台車がある
場合、鍋受け台昇降手段を取付けるだけで、本発明の鍋
交換方法を実現できるから、投資する設備費用が安価で
ある。
In particular, the second device can be mounted in two pans, but if there is an existing bogie whose strength of the bogie frame is insufficient for simultaneous loading of pans having a large molten steel capacity (eg, 320 t capacity), Since the method of replacing a pot according to the present invention can be realized only by attaching the cradle elevating means, the equipment cost to invest is low.

【0036】なお、上述した鍋交換方法および装置は脱
ガス処理設備と類似の処理を行う他の取鍋精錬設備にも
適用できる。
The above-described ladle replacement method and apparatus can also be applied to other ladle refining facilities that perform processing similar to degassing processing equipment.

【0037】[0037]

【発明の効果】本発明により以下の効果を得ることがで
きる。
According to the present invention, the following effects can be obtained.

【0038】請求項1の方法によれば、前鍋の脱ガス処
理終了から後続鍋が脱ガス処理設備に入るまでの待ち時
間が大幅に短縮することができる。これにより、待ち時
間中の溶鋼の放熱量を低減することができ、また、脱ガ
ス処理設備で処理できる月間鍋数量が増加する。
According to the method of the first aspect, the waiting time from the end of the degassing processing of the front pan to the subsequent pan entering the degassing equipment can be greatly reduced. As a result, the amount of heat released from the molten steel during the waiting time can be reduced, and the number of monthly pots that can be processed by the degassing equipment increases.

【0039】請求項2および3の装置によれば、前鍋の
脱ガス処理終了から後続鍋が脱ガス処理設備に入るまで
の待ち時間が大幅に短縮することができる。これによ
り、待ち時間中の溶鋼の放熱量を低減することができ、
また、脱ガス処理設備で処理できる月間鍋数量が増加す
る。特に、請求項3の装置は、2鍋搭載可能であるが、
溶鋼収容量が大きな鍋を同時積載するには台車フレーム
の強度が不足する既設台車がある場合、鍋受け台昇降手
段を取付けるだけで、本発明の鍋交換方法を実現できる
から、投資する設備費用が安価である。
According to the apparatus of the second and third aspects, the waiting time from the end of the degassing process of the front pan to the subsequent pan entering the degassing facility can be greatly reduced. This makes it possible to reduce the amount of heat released from the molten steel during the waiting time,
In addition, the number of pots that can be processed by the degassing equipment per month increases. In particular, the device of claim 3 can be mounted on two pots,
If there is an existing bogie with insufficient strength of the bogie frame to simultaneously load a pan with a large molten steel capacity, the pot replacement method of the present invention can be realized simply by attaching the pan receiving stand elevating means. Is cheaper.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る脱ガス処理のための鍋搬送設備の
配置図である。
FIG. 1 is a layout view of a pot transfer facility for degassing according to the present invention.

【図2】本発明方法のフローチャートを示す図である。FIG. 2 shows a flowchart of the method of the present invention.

【図3】本発明に係る2鍋搭載可能な台車の概念図であ
る。
FIG. 3 is a conceptual diagram of a truck capable of mounting two pots according to the present invention.

【図4】本発明に係る鍋受け台昇降手段を示す正面図で
ある。
FIG. 4 is a front view showing a pan receiving stand elevating means according to the present invention.

【図5】台車に載っている鍋を検知する光センサーの取
付け状態を示す平面図である。
FIG. 5 is a plan view showing an attached state of an optical sensor for detecting a pot placed on a cart.

【図6】図5のA−A矢視図である。FIG. 6 is a view as viewed in the direction of arrows AA in FIG. 5;

【符号の説明】[Explanation of symbols]

1 クレーンヤード 2 脱ガス処理設備 3、4、5a、5b 軌条 6 クレーン 7 脱ガス処理槽 8、、10、11 台車 9 台車(2鍋搭載可能) 9a、9b 鍋搭載位置 12 鍋 20a 台車(2鍋同時搭載可能) 20b 台車(2鍋受け台があるが、2鍋同時搭載不
可) 21、21a、21b 鍋受け台 22 台車フレーム 30 鍋受け台昇降手段 31 油圧ジャッキ 32 受け板 33 コンクリート層 34 鋼スラブ板 35 落下防止用ストッパー 36a、36b 投光器 37a、37b 受光器
DESCRIPTION OF SYMBOLS 1 Crane yard 2 Degassing treatment equipment 3, 4, 5a, 5b Rail 6 Crane 7 Degassing treatment tank 8, 10, 11 Bogie 9 bogies (2 pans can be mounted) 9a, 9b Pan mounting position 12 Pans 20a bogies (2 20b trolley (there are two pan cradles, but not two pan cradles) 21, 21a, 21b pan cradle 22 bogie frame 30 pan cradle elevating means 31 hydraulic jack 32 receiving plate 33 concrete layer 34 steel Slab plate 35 Fall prevention stopper 36a, 36b Emitter 37a, 37b Receiver

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山岸 正典 東京都千代田区丸の内一丁目1番2号 日 本鋼管株式会社内 (72)発明者 日出 寛之 東京都千代田区丸の内一丁目1番2号 日 本鋼管株式会社内 Fターム(参考) 4E014 HA01 HA02 HA03 4K013 CF11  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Masanori Yamagishi, 1-2-1, Marunouchi, Chiyoda-ku, Tokyo Inside Nihon Kokan Co., Ltd. (72) Hiroyuki Hiji 1-2-1, Marunouchi, Chiyoda-ku, Tokyo Nippon Kokan Co., Ltd. F-term (reference) 4E014 HA01 HA02 HA03 4K013 CF11

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】台車に載せた処理済み鍋と未処理鍋を交換
しながら溶鋼の脱ガス処理等を行う取鍋精錬設備の鍋交
換方法において、 上流工程から搬送されてきた未処理鍋Bをクレーンで吊
り上げ、取鍋精錬用軌条の台車の待機位置上方に移動
し、待機する工程と、 処理済み鍋Aを一方の搭載位置に載せた2鍋搭載台車
が、取鍋精錬設備から出てきて待機位置に停止した後、
他方の空き搭載位置に待機していた未処理鍋Bを吊り降
ろして載せる工程と処理済み鍋Aをクレーンで吊り上
げ、クレーンが下流工程の台車に移動している間に、未
処理鍋Bを搭載した2鍋搭載台車を取鍋精錬設備に送
り、脱ガス処理等を行う工程とを有することを特徴とす
る取鍋精錬設備の鍋交換方法。
1. A ladle refining equipment ladle replacement method for performing degassing treatment of molten steel while exchanging a treated ladle and an untreated ladle placed on a cart, wherein the untreated ladle B conveyed from an upstream process is removed. The process of lifting with a crane, moving above the stand-by position of the truck of the ladle refining rail, and waiting, and the two-pan-mounted truck with the treated pan A placed at one of the mounting positions emerges from the ladle refining facility. After stopping at the standby position,
The step of hanging down the untreated pot B waiting at the other empty loading position and loading the untreated pot B, lifting the treated pot A with a crane, and loading the untreated pot B while the crane is moving to the bogie in the downstream process. Sending the two-panel-mounted cart to the ladle refining facility and performing degassing treatment and the like.
【請求項2】クレーンヤードと取鍋精錬設備との間に敷
設した一本の軌条と、この軌条に沿って走行し、かつ、
二つの鍋を同時搭載できる台車とを有することを特徴と
する取鍋精錬設備の鍋交換装置。
2. A rail laid between a crane yard and a ladle refining facility, traveling along the rail, and
A ladle refining equipment ladle exchanging device, comprising a dolly capable of simultaneously mounting two ladles.
【請求項3】クレーンヤードと取鍋精錬設備との間に敷
設した一本の軌条と、この軌条に沿って走行し、かつ、
二つの鍋受台を有しているが二つの鍋を同時搭載できな
い台車と、クレーンヤードの前記軌条の間に設けられた
鍋受け台昇降手段とを有することを特徴とする取鍋精錬
設備の鍋交換装置。
3. A rail laid between a crane yard and a ladle refining facility, traveling along the rail, and
A ladle refining facility characterized by having a bogie having two pan receivers but not capable of simultaneously mounting two pans, and a pan receiver elevating means provided between the rails of a crane yard. Pot changing device.
JP2001054342A 2001-02-28 2001-02-28 Method for replacing ladle in ladle refining facility and its apparatus Pending JP2002256329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001054342A JP2002256329A (en) 2001-02-28 2001-02-28 Method for replacing ladle in ladle refining facility and its apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001054342A JP2002256329A (en) 2001-02-28 2001-02-28 Method for replacing ladle in ladle refining facility and its apparatus

Publications (1)

Publication Number Publication Date
JP2002256329A true JP2002256329A (en) 2002-09-11

Family

ID=18914692

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001054342A Pending JP2002256329A (en) 2001-02-28 2001-02-28 Method for replacing ladle in ladle refining facility and its apparatus

Country Status (1)

Country Link
JP (1) JP2002256329A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006322023A (en) * 2005-05-17 2006-11-30 Kobe Steel Ltd Steelmaking facility and ladle-carrying method
JP2008255413A (en) * 2007-04-04 2008-10-23 Kobe Steel Ltd Molten steel processing method
WO2013161014A1 (en) * 2012-04-25 2013-10-31 新日鐵住金株式会社 Secondary refining equipment and secondary refining method for molten steel
JP2020164884A (en) * 2019-03-28 2020-10-08 日本製鉄株式会社 Construction method of rail track for carriage travelling
CN112059163A (en) * 2020-09-19 2020-12-11 北京首钢国际工程技术有限公司 Molten iron transportation system of iron-making-steel interface

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006322023A (en) * 2005-05-17 2006-11-30 Kobe Steel Ltd Steelmaking facility and ladle-carrying method
JP2008255413A (en) * 2007-04-04 2008-10-23 Kobe Steel Ltd Molten steel processing method
WO2013161014A1 (en) * 2012-04-25 2013-10-31 新日鐵住金株式会社 Secondary refining equipment and secondary refining method for molten steel
KR20140008530A (en) * 2012-04-25 2014-01-21 신닛테츠스미킨 카부시키카이샤 Secondary refining equipment and secondary refining method for molten steel
KR101588942B1 (en) * 2012-04-25 2016-01-26 신닛테츠스미킨 카부시키카이샤 Secondary refining equipment and secondary refining method for molten steel
JP2020164884A (en) * 2019-03-28 2020-10-08 日本製鉄株式会社 Construction method of rail track for carriage travelling
JP7188861B2 (en) 2019-03-28 2022-12-13 日本製鉄株式会社 Installation method of track for truck running
CN112059163A (en) * 2020-09-19 2020-12-11 北京首钢国际工程技术有限公司 Molten iron transportation system of iron-making-steel interface

Similar Documents

Publication Publication Date Title
JP6427585B2 (en) Receiving truck with lifting function and receiving method
JP2002256329A (en) Method for replacing ladle in ladle refining facility and its apparatus
JPH0581328B2 (en)
JPH09169032A (en) Feed truck for replacing mold
JP3503938B2 (en) Hot metal transfer equipment between converters and hot metal setting equipment used for the equipment
JP2002248560A (en) Bearing exchanging equipment for ladle turlet and method therefor
JP3685781B2 (en) Melting equipment for molten cast iron for ductile castings
JP4230479B2 (en) Stop positioning method and apparatus for ladle transport cart
JP4110283B2 (en) Transport cart
JPS6145806A (en) Facility for strip coil storing
CN110846448A (en) Unmanned control system and control process for slag pot logistics in slag treatment workshop by drum method
US3446269A (en) Apparatus for the transporting of the intermediate container of continuous casting machines
JP2853518B2 (en) Ladle refining equipment
JP4150694B2 (en) Roller table for ladle transport
JP2008023544A (en) Carriage lifting apparatus
JP2695882B2 (en) Waste transfer equipment in continuous casting equipment
CN218367819U (en) Steel car derails processing apparatus
JP2780586B2 (en) Lifting type high efficiency molten steel processing equipment
CN220468032U (en) Platform, trolley and system for replacing immersion hood
US3877612A (en) Ladle handling apparatus for continuous casting
CN114054729B (en) Efficient automatic molten iron transfer system
JPH023441Y2 (en)
JP2922071B2 (en) Ladle changing equipment in continuous casting equipment
JP3930661B2 (en) Steelmaking equipment
JPH0659458U (en) Ladle transfer device

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20060921