JP2002205686A - Bulk cargo carrier - Google Patents

Bulk cargo carrier

Info

Publication number
JP2002205686A
JP2002205686A JP2001002224A JP2001002224A JP2002205686A JP 2002205686 A JP2002205686 A JP 2002205686A JP 2001002224 A JP2001002224 A JP 2001002224A JP 2001002224 A JP2001002224 A JP 2001002224A JP 2002205686 A JP2002205686 A JP 2002205686A
Authority
JP
Japan
Prior art keywords
bulk
sub
boom
transport
bulk material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001002224A
Other languages
Japanese (ja)
Other versions
JP4502241B2 (en
Inventor
Mikio Iio
三樹男 飯尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Original Assignee
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Miike Machinery Co Ltd, Mitsui Miike Engineering Corp filed Critical Mitsui Miike Machinery Co Ltd
Priority to JP2001002224A priority Critical patent/JP4502241B2/en
Publication of JP2002205686A publication Critical patent/JP2002205686A/en
Application granted granted Critical
Publication of JP4502241B2 publication Critical patent/JP4502241B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

PROBLEM TO BE SOLVED: To load and unload a bulk cargo by cargo handling facilities on the ship side even at a wharf without harbor cargo handling facilities. SOLUTION: In addition to a takeout means A and first, second and third conveying means B, C, D for taking out the bulk cargo in a cargo hold 6 from the bottom and feeding it to the end of a hold and further feeding it above an upper deck 2 to land it onto the wharf, this bulk cargo carrier is provided with a loading conveying means E projecting onto the wharf to receive the bulk cargo, and a transfer conveying means F for guiding the bulk cargo to the inlet of the second conveying means C. Further, a boom 21 equipped with the third conveying means D is formed in extensible structure comprising a main frame 21A on the base end side of the boom 21, and a sub-frame 21B on the tip side movable in the longitudinal direction. The main frame 21A is provided with a discharge means G, and the bulk cargo conveyance section length of the third conveying means D is made adjustable following the extension of the boom 21. The bulk cargo is loaded into the whole cargo hole 6 by the tip of the sub-frame 21B and the discharge means G moving on the main frame 21A.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は荷積み設備と荷揚げ
設備とを具えており、殊に荷揚げ設備の一部が荷積みに
使用されるばら物運搬船に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bulk carrier having a loading facility and a discharging facility, and more particularly to a bulk carrier in which a part of the discharging facility is used for loading.

【0002】[0002]

【従来の技術】鉱石、石炭、石灰石、木材チップ、穀
物、セメントなどの小塊、粒体、粉体からなる不定形固
体貨物、即ちばら物を海上輸送するばら物運搬船の内
で、主に沿海区域を航行するものは港湾荷役設備が不完
全な埠頭に接岸して荷役作業を行なわなければならない
ことが多い。
2. Description of the Related Art Amorphous solid cargoes composed of ores, coals, limestones, wood chips, grains, cement, and other small lumps, granules, and powders, ie, bulk carriers for transporting bulk materials by sea, are mainly used in bulk carriers. Those navigating along coastal areas often have to carry out cargo handling work at piers with incomplete harbor handling equipment.

【0003】そのために、荷役設備をばら物運搬船に具
えさせることが行なわれており、荷揚げ設備について
は、例えば実開平2−33196号公報に記載されてい
るものがある。このものは、船倉内に設けた船体前後方
向へ長いホッパ形状の貨物倉の底に沿って船体前後方向
へ往復走行し貨物倉内のばら物を少しずつ下方へ排出す
る払出機と、船体前後方向へ延び排出されたばら物を船
底に沿い船首側または船尾側の船倉端部に送る第一コン
ベヤと、それより上方へ向かって延びばら物を上甲板の
上方に送る第二コンベヤと、更にこれより埠頭の所定個
所にばら物を陸揚げする第三コンベヤとを具えており、
第三コンベヤは上甲板の上に旋回可能に設置したブーム
に装備されている。
[0003] For this purpose, a bulk carrier is provided with a cargo handling facility, and there is an unloading facility described in, for example, Japanese Utility Model Laid-Open No. 2-33196. This is a dispensing machine that reciprocates in the longitudinal direction of the hull along the bottom of a hopper-shaped cargo hold that is long in the longitudinal direction of the hull in the hold and discharges loose bulk in the cargo hold gradually, and a longitudinal direction of the hull. A first conveyor for extending the discharged bulk material along the bottom of the ship to the bow or stern side of the hold, and a second conveyor for extending the bulk material upward and above the upper deck; It is equipped with a third conveyor that discharges bulk materials at predetermined locations on the pier,
The third conveyor is mounted on a boom that is pivotally mounted on the upper deck.

【0004】一方、荷積み設備については、例えば特開
平11−227682号公報に記載されているものがあ
る。このものは、船体長手方向へ長い貨物倉の上方に配
置されて中心線上で長手方向へ往復走行するシャトル・
コンベヤと、このシャトル・コンベヤにばら物を供給す
るホッパとを具えており、埠頭からホッパに供給したば
ら物をシャトル・コンベヤによって貨物倉に配分投入す
るものである。尚、この特開平11−227682号公
報に記載されているばら物運搬船は、前記実開平2−3
3196号公報記載のものと同様の荷揚げ設備を具えて
いる。
On the other hand, there is a loading facility described in, for example, JP-A-11-227682. This shuttle is located above a cargo hold that is long in the longitudinal direction of the hull and reciprocates longitudinally on the center line.
The shuttle conveyor is provided with a hopper for supplying bulk material to the shuttle conveyor, and the bulk material supplied to the hopper from the wharf is distributed to the cargo hold by the shuttle conveyor. The bulk carrier described in Japanese Patent Application Laid-Open No. H11-227682 is disclosed in
It is equipped with a discharge facility similar to that described in US Pat.

【0005】[0005]

【発明が解決しようとする課題】前記のような荷積み設
備を具えていないばら物運搬船については、埠頭からコ
ンベヤ、バケットなどの搬送機を用いてハッチより貨物
倉にばら物を投入することによって荷積みが行なわれ、
その際に搬送機を埠頭上で船体長手方向へ移動させて均
等に積載し船体が不安定とならないようにしている。ま
た、前記の荷積み設備を具えたばら物運搬船において
は、埠頭から搬送機を用いて船体に装備したホッパにば
ら物を供給し、これをシャトル・コンベヤによって貨物
倉に均等に投入積載する。
In the case of bulk carriers not equipped with the above-mentioned loading equipment, the bulk can be transferred from a quay to a cargo hold from a hatch using a conveyor such as a conveyor or a bucket. Loading is done,
At this time, the transporter is moved in the longitudinal direction of the hull on the wharf to load evenly so that the hull does not become unstable. In a bulk carrier equipped with the above-mentioned loading equipment, bulk materials are supplied from a pier to a hopper mounted on a hull using a carrier, and the bulk materials are uniformly loaded and loaded into a cargo hold by a shuttle conveyor.

【0006】従って、後者のものは搬送機を船体長手方
向へ移動させる必要がないため、前者のものと比較して
埠頭側の荷役設備を簡単なものとすることができる。
Accordingly, in the latter case, there is no need to move the transporter in the longitudinal direction of the hull, so that the cargo handling equipment on the pier side can be simplified as compared with the former case.

【0007】しかしながら、いずれにしても埠頭側の荷
役設備は陸側から海側に張り出し且つ陸側に待避する部
分を具えており、このような部分を具えた荷役設備を埠
頭に設置することは、安全面で問題があるばかりか、保
守管理が面倒である、運転者や管理者が必要である、設
置や保守に要する経費負担が大きい、などの問題があ
る。このため、ばら物積込み埠頭に陸側から海側に張り
出す部分を具えた荷役設備を設置することを嫌う傾向が
ある。
However, in any case, the wharf-side cargo handling equipment is provided with a portion that extends from the land side to the sea side and is evacuated to the land side, and it is not possible to install the cargo handling equipment having such a part on the wharf. In addition to problems in safety, there are problems such as troublesome maintenance management, the need for a driver and an administrator, and a large burden of costs for installation and maintenance. For this reason, there is a tendency to dislike to install a cargo handling facility having a portion projecting from the land side to the sea side at the bulk loading wharf.

【0008】本発明はこのような状況に対処するために
なされたものであって、陸側から海側に張り出す部分を
具えた荷役設備を埠頭に設置することを不要とするばら
物運搬船を提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in order to cope with such a situation, and there is provided a bulk carrier which does not need to install a cargo handling facility having a portion projecting from a land side to a sea side on a pier. The purpose is to provide.

【0009】[0009]

【課題を解決するための手段】本発明は船倉内に設けら
れた船体前後方向へ長いホッパ形状の貨物倉の底からば
ら物を順次下方へ取り出す取出手段と、船体前後方向へ
延び排出されたばら物を船底に沿い船首側または船尾側
の船倉端部に送る第一搬送手段と、それより上方へ向か
って延びばら物を上甲板の上方に送る第二搬送手段と、
更にこれより埠頭にばら物を陸揚げする第三搬送手段と
を具えており、第三搬送手段が上甲板の上に旋回可能に
設置したブームに設備されている荷役設備を具えたばら
物運搬船を次のようにすることによって前記課題を解決
させることとした。
SUMMARY OF THE INVENTION According to the present invention, there is provided a take-out means for sequentially pulling bulk materials downward from the bottom of a hopper-shaped cargo hold long in the longitudinal direction of the hull provided in the hold, and extending and discharging in the longitudinal direction of the hull. A first conveying means for sending the bulk material along the bottom of the ship to the hold side on the bow side or the stern side, and a second conveying means for extending the bulk material upward and feeding the bulk material above the upper deck;
In addition, there is provided a third transport means for unloading bulk material from the wharf, and the third transport means is provided with a bulk carrier equipped with a cargo handling facility which is installed on a boom rotatably mounted on the upper deck. The above problem has been solved by the following method.

【0010】即ち、上甲板の上に旋回可能に設置した積
込ブームと、この積込ブームに装備されてばら物を先端
部から旋回中心側である基端部へ向かって搬送する積込
搬送手段と、搬送されたばら物を第二搬送手段の入口上
方に誘導する中継搬送手段とを前記の荷役設備に付加し
た。そして、ブームを旋回中心側の固定長部分とその前
方領域に突出する可変長部分とからなるものとして、第
三搬送手段のばら物搬送区間長を可変長部分の移動に追
従して可変とした。更に、第三搬送手段が搬送するばら
物を固定長部分の途中で排出させるための排出手段を具
えさせてこの排出手段を第三搬送手段に沿って移動可能
とし、且つばら物を側方へ排出する位置からばら物との
非接触位置に待避可能なスクレーパを有するものとし
た。
That is, a loading boom rotatably mounted on an upper deck, and a loading transport mounted on the loading boom for transporting loose objects from a distal end portion to a base end portion which is a turning center side. Means and a relay conveyance means for guiding the conveyed bulk material above the entrance of the second conveyance means are added to the cargo handling equipment. Then, assuming that the boom is composed of a fixed length portion on the turning center side and a variable length portion protruding in a region in front of the boom, the bulk transport section length of the third transport means is made variable following the movement of the variable length portion. . Further, a discharging means is provided for discharging the bulk material transported by the third transport means in the middle of the fixed length portion, so that the discharging means can be moved along the third transport means, and the bulk material is laterally moved. It has a scraper that can be evacuated from the discharging position to a position where it does not come into contact with loose objects.

【0011】積込ブームを旋回して埠頭の上に突出させ
且つブームの可変長部分を最大に前進させて貨物倉の上
方に位置させる。積込搬送手段はばら物を埠頭で受取っ
て中継搬送手段に送り、ばら物はこれより第二搬送手
段、第三搬送手段を経て可変長部分の先端から貨物倉に
投入される。ばら物が所定高さの積山を作ったとき可変
長部分を後退させて隣接個所に所定高さの積山を作るこ
とを順次繰り返すか、または可変長部分を繰り返し往復
動させることによって、貨物倉のほぼ半分の領域にばら
物を積み込む。可変長部分が最大後退した後は排出手段
によって第三搬送手段のばら物搬送区間の途中、即ちブ
ームの固定長部分でばら物を排出して貨物倉に投入し残
りの領域に積み込むことを、排出手段を旋回中心へ向か
って順次移動させるか、或いは繰り返し往復させること
によって行なう。
The loading boom is pivoted to protrude above the pier and the variable length portion of the boom is advanced to the maximum position above the cargo hold. The loading / transporting means receives the bulk goods at the wharf and sends them to the relay carrying means. The bulk materials are then fed into the cargo hold from the tip of the variable length portion via the second carrying means and the third carrying means. When the bulk material makes a pile with a predetermined height, the variable length part is retracted to make a pile with a predetermined height at an adjacent location. Load bulk in approximately half the area. After the variable-length portion has been retracted to the maximum, the discharging means means that the bulk material is discharged in the middle of the bulk transport section of the third transport means, that is, the bulk material is discharged at the fixed length portion of the boom, loaded into the cargo hold, and loaded into the remaining area, This is performed by sequentially moving the discharging means toward the center of rotation, or by repeatedly reciprocating.

【0012】貨物倉のばら物は取出手段によって下方へ
取り出されて第一搬送手段、第二搬送手段、第三搬送手
段により埠頭に陸揚げされる。
[0012] The bulk material in the cargo hold is taken out downward by the take-out means, and is landed on the wharf by the first transfer means, the second transfer means, and the third transfer means.

【0013】このように、陸揚げのためのブームおよび
第三搬送手段のばら物搬送区間を長さ可変とし、積込ブ
ームおよび積込搬送手段と中継搬送手段とを具えさせた
ことにより、海側に張り出す部分を具えた荷役設備をも
たない埠頭において、荷積みおよび荷揚げを船側の設備
によって行なうことができる。また、搬送手段の一部を
荷積みと荷揚げに両用させていることにより、荷役設備
全体が簡略化される。
As described above, the boom for unloading and the bulk transport section of the third transport means are variable in length, and the loading boom, the loading transport means and the relay transport means are provided, so that the sea side is provided. Loading and unloading can be carried out by ship-side equipment on a wharf without cargo handling equipment with overhanging parts. Further, since a part of the transporting means is used for both loading and unloading, the entire cargo handling equipment is simplified.

【0014】尚、ブームについては貨物倉の前方または
後方であって船体中心線上に旋回中心を置くとともに、
第三搬送手段の搬送区間終端で放出されたばら物を誘導
するシュートを可変長部分の先端部に設け、更に可変長
部分を最大前進時に先端部が貨物倉の反対端近くに達す
るようにすることが、ばら物を貨物倉に均等に積み込む
ことと従来同様の陸揚げを行なうこととを両立させるう
えで好ましい形態である。
The boom is positioned at the center of rotation on the center line of the hull in front of or behind the cargo hold,
A chute for guiding the bulk material discharged at the end of the transport section of the third transport means is provided at the distal end of the variable-length portion, and the variable-length portion is made to reach near the opposite end of the cargo hold during maximum forward movement. This is a preferable mode for achieving both the uniform loading of bulk materials in the cargo hold and the conventional landing.

【0015】また、積込ブームについては旋回中心をブ
ームの旋回中心の側方に置き、上甲板の上に置かれた待
機位置と舷側から突出した受取位置との間で旋回可能と
するとともに、ばら物受け取りのためのホッパを先端部
に具えたものとするのが、陸側で受け取ったばら物を最
短距離で第二搬送手段の入口に搬送させる点で好ましい
形態である。更に、積込ブームを旋回可能としたことに
加えて俯仰可能とすることは、上甲板と埠頭との高低差
が変動してもばら物を支障なく受け取ることを可能とす
る点で好ましい形態である。
[0015] Further, with respect to the loading boom, the turning center is placed beside the turning center of the boom so that the loading boom can turn between a standby position placed on the upper deck and a receiving position protruding from the side of the ship. It is preferable that a hopper for receiving bulk materials is provided at the tip end in that the bulk material received on the land side is transported to the entrance of the second transport means at the shortest distance. Furthermore, in addition to enabling the loading boom to be turned, it is possible to ascend and descend in a preferable form in that it can receive loose objects without trouble even if the height difference between the upper deck and the pier changes. is there.

【0016】尚また、ブームについては固定長部分を形
成する主フレームと主フレームに沿って前後方向へ移動
可能とされ可変長部分を形成する副フレームとからな
り、主フレームが排出手段を具えているものとするのが
好適である。
The boom comprises a main frame forming a fixed length portion and a sub-frame movable in the front-rear direction along the main frame and forming a variable length portion, and the main frame includes a discharging means. It is preferred that

【0017】そして、第三手段搬送手段については二つ
のフレームにまたがって装備したベルトコンベヤであっ
て主フレームに支持されて基端から先端へ向かって走行
する部分が第二搬送手段からのばら物を基端部で受け取
る主搬送部を形成するとともに、副フレームに支持され
て基端から先端へ向かって走行する部分が主搬送部の下
方に位置して副搬送部を形成し、副搬送部は副フレーム
の前進時に主搬送部からばら物を受け取って先端から貨
物倉に投入するものとすること、または主フレームに装
備されて第二搬送手段からのばら物を基端部で受け取る
主搬送手段とその下方に位置して副フレームに装備され
た副搬送手段とからなり、副搬送手段は副フレームの前
進時に主搬送手段からばら物を受け取って先端から貨物
倉に投入するものとし、更に主搬送手段と副搬送手段と
は個別に駆動されることとするのが好適な形態である。
The third means conveying means is a belt conveyor provided over two frames, and a portion supported by the main frame and traveling from the base end to the tip is a bulk material from the second conveying means. Forming a main transport section that receives the base transport section, and a portion that is supported by the sub-frame and travels from the base end toward the distal end is located below the main transport section to form a sub-transport section, Is to receive bulk material from the main transport section when the sub-frame advances, and to load it into the cargo hold from the front end, or main transport provided on the main frame and receiving bulk material from the second transport means at the base end Means and sub-transporting means located below and mounted on the sub-frame. The sub-transporting means receives bulk material from the main conveying means when the sub-frame advances and throws it into the cargo hold from the tip. And, further to the main conveying means and the sub-carrier means is a preferred embodiment that an be driven separately.

【0018】[0018]

【発明の実施の形態】図面を参照して本発明の実施の形
態を説明すると、図1,図2および図3に示したように
船体1の船尾近くに機関室3と船橋4とが設置されてい
るとともに、機関室3より船首近くに亘って延びる船倉
5の内部に貨物倉6が設けられている。貨物倉6は船体
長手方向へ長く形成され、底壁が左右の傾斜部と中央の
平坦部とからなるホッパ形状とされているとともに、頂
面が上甲板2の上に開放して開閉可能なハッチ7を形成
しており、また、底壁の平坦部を覆って山形のカバー体
8を前後方向へ貫通させて内装している。
DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to the drawings. As shown in FIGS. 1, 2 and 3, an engine room 3 and a bridge 4 are installed near the stern of a hull 1. FIG. A cargo hold 6 is provided inside a hold 5 extending from the engine room 3 to the vicinity of the bow. The cargo hold 6 is formed to be long in the longitudinal direction of the hull, has a bottom wall in the shape of a hopper composed of left and right inclined portions and a central flat portion, and has a top surface that is open above the upper deck 2 and can be opened and closed. A hatch 7 is formed, and a mountain-shaped cover body 8 is penetrated in the front-rear direction so as to cover the flat portion of the bottom wall and is housed therein.

【0019】カバー体8の内部には走行用レールが敷設
されており、機体9と回転羽根9 とを具えた払出機
9の機体9を走行用レールに乗せてカバー体8の内部
を往復走行させながら回転羽根9を底壁の平坦部の上
面に沿って回転させることにより、平坦部に形成したス
リット状の排出口10から貨物倉6のばら物が順次下方
へ排出される。底壁と船底との間には排出口10の下方
に位置して船体前後方向へ延びるベルトコンベヤ11が
設置され、その船首側の端部に船倉5の船底近くから上
甲板2の上方に延びる垂直ベルトコンベヤ12が設置さ
れている。
A traveling rail is laid inside the cover body 8.
Aircraft 9aAnd rotating blade 9 bDispenser equipped with
9 aircraft 9aOn the traveling rail and the inside of the cover body 8
Rotating the shuttle blade 9bOn the flat part of the bottom wall
By rotating along the plane, the flat
Bulk material in the cargo hold 6 descends sequentially from the lit discharge port 10
Is discharged to Below the outlet 10 between the bottom wall and the ship bottom
The belt conveyor 11 extending in the longitudinal direction of the hull
It is installed on the bow-side end from near the bottom of the hold 5
A vertical belt conveyor 12 extending above the deck 2 is installed.
Have been.

【0020】排出口10から落下して貨物倉6から取り
出されたばら物はベルトコンベヤ11に乗って船首側の
先端に送られ、次に垂直ベルトコンベヤ12によって上
甲板の上方に送られ、更に先端を埠頭の上に突出させた
陸揚げ用のベルトコンベヤ13によって所定場所に陸揚
げされる。このような払出機9とベルトコンベヤ11,
12,13の配列とからなる荷揚げのための荷役設備
は、前記実開平2−33196号公報、特開平11−2
27682号公報などに記載されていてそれ自体は目新
しいものではなく、払出機9とスリット状の排出口10
とは貨物倉6からばら物を取り出す取出手段A,ベルト
コンベヤ11はばら物を船底に沿って船倉5の端部に送
る第一搬送手段B,垂直ベルトコンベヤ12はばら物を
上甲板2の上方に送る第二搬送手段C,ベルトコンベヤ
13はばら物を陸揚げする第三搬送手段Dの実施の形態
である。
The bulk material dropped from the discharge port 10 and taken out of the cargo hold 6 is sent to the tip of the bow side on a belt conveyor 11, and then sent to the upper deck by a vertical belt conveyor 12, and The landing is carried out at a predetermined place by a landing belt conveyor 13 having a tip protruding above the pier. Such a dispensing machine 9 and a belt conveyor 11,
The cargo handling equipment for unloading consisting of the arrangement of 12, 13 is disclosed in Japanese Utility Model Application Laid-Open No. 2-33196 and Japanese Unexamined Patent Application Publication No.
No. 27682 and the like are not new in themselves, and the dispensing machine 9 and the slit-shaped discharge port 10
Means for taking out bulk materials from the cargo hold 6, a belt conveyor 11 for transporting bulk materials to the end of the hold 5 along the bottom of the ship, and a vertical belt conveyor 12 for transporting bulk materials to the upper deck 2. The second conveying means C for feeding upward and the belt conveyor 13 are an embodiment of the third conveying means D for discharging bulk materials.

【0021】尚、取出手段Aは貨物倉6の底部に船体長
手方向へ多数のシュートを設け、その下端を順次開閉す
ることによってばら物を取り出すものであってもよい。
また、第一搬送手段Bおよび第三搬送手段Dのベルトコ
ンベヤ11,13を例えばエプロンコンベヤに置換し、
第二搬送手段Cの垂直ベルトコンベヤ12を例えばバケ
ットエレベータに置換することが可能である。
The unloading means A may be one in which a large number of chutes are provided at the bottom of the cargo hold 6 in the longitudinal direction of the hull and the lower ends thereof are sequentially opened and closed to extract loose objects.
Further, the belt conveyors 11 and 13 of the first conveying means B and the third conveying means D are replaced with, for example, an apron conveyor,
The vertical belt conveyor 12 of the second conveying means C can be replaced with, for example, a bucket elevator.

【0022】ベルトコンベヤ11および垂直ベルトコン
ベヤ12は船体1の中心線上に配置されており、垂直ベ
ルトコンベヤ12の入口付近の一側方に位置する上甲板
2の上に基端部を旋回可能に保持させて積込ブーム15
が配備されており、この片持ち式の積込ブーム15は舷
側に沿って上甲板2の上に置かれた図2に符号Wで示す
待機位置と、これより180度以内の範囲、一般には9
0度旋回して舷側から最大限に突出する図2に符号Rで
示す受取位置との間で旋回させられる。また、この積込
ブーム15は図示しない液圧シリンダによって俯仰可能
とされており、潮の干満や積荷の重量によって上甲板2
と埠頭との高低差が変化しても、常に先端と埠頭との高
低差を一定に調節してばら物の積み込み作業に支障を与
えないようにすることができる。
The belt conveyor 11 and the vertical belt conveyor 12 are arranged on the center line of the hull 1, and can pivot at their base ends on the upper deck 2 located on one side near the entrance of the vertical belt conveyor 12. Hold the loading boom 15
The cantilevered loading boom 15 has a standby position indicated by W in FIG. 2 placed on the upper deck 2 along the side of the ship, and a range within 180 degrees, generally 9
It is pivoted between a receiving position indicated by a symbol R in FIG. The loading boom 15 can be raised by a hydraulic cylinder (not shown).
Even if the height difference between the pier and the wharf changes, the height difference between the tip and the wharf can be constantly adjusted so as not to hinder the work of loading bulk materials.

【0023】積込ブーム15は先端部にホッパ16を具
えているとともに、そのほぼ全長に亘ってベルトコンベ
ヤ17が装備されており、その上面が積込ブーム15の
先端から基端へ向かって走行するように図示しない原動
機によって駆動される。また、積込ブーム15の基端下
方領域には上甲板2に設置したシュート18が配備され
ており、このシュート18の下方と垂直ベルトコンベヤ
12の入口上方との間に中継用のベルトコンベヤ19が
設置されている。このベルトコンベヤ19は船倉5の上
甲板2に近い高所に船体中心線と直角の方向に配置され
ていて、その上面が舷側に近いシュート18の下方から
船体中心線上の垂直ベルトコンベヤ12の入口上方へ向
かって走行するように図示しない原動機によって駆動さ
れる。また、これより放出されたばら物を飛散させるこ
となく垂直ベルトコンベヤ12の入口に誘導するシュー
ト20が必要に応じて設置される。
The loading boom 15 has a hopper 16 at its distal end, and is provided with a belt conveyor 17 over substantially the entire length thereof, and its upper surface runs from the distal end to the proximal end of the loading boom 15. Driven by a prime mover (not shown). A chute 18 installed on the upper deck 2 is provided below the base end of the loading boom 15, and a relay belt conveyor 19 is provided between the chute 18 below the chute 18 and above the entrance of the vertical belt conveyor 12. Is installed. The belt conveyor 19 is arranged at a height near the upper deck 2 of the hold 5 in a direction perpendicular to the hull center line, and the upper surface thereof is located below the chute 18 near the side of the ship and the entrance of the vertical belt conveyor 12 on the hull center line. It is driven by a prime mover (not shown) so as to travel upward. In addition, a chute 20 for guiding the bulk material discharged from the entrance to the entrance of the vertical belt conveyor 12 without scattering is provided as necessary.

【0024】前記の積込ブーム15に装備したベルトコ
ンベヤ17は埠頭で受け取ったばら物を搬送する積込搬
送手段E,船倉5に配置したベルトコンベヤ19はばら
物を垂直ベルトコンベヤ12の入口上方に誘導する中継
搬送手段Fの実施の形態であり、これらのベルトコンベ
ヤ17,19を例えばエプロンコンベヤに置換すること
が可能である。
A belt conveyor 17 mounted on the loading boom 15 has a loading / conveying means E for transporting bulk materials received at the wharf, and a belt conveyor 19 disposed on the hold 5 holds the bulk materials above the entrance of the vertical belt conveyor 12. In this embodiment, the belt conveyors 17 and 19 can be replaced with, for example, an apron conveyor.

【0025】次に、第三搬送手段Dであるベルトコンベ
ヤ13は、船体中心線上であって積込ブーム15の旋回
中心の側方において上甲板2の上に基端部を旋回可能に
保持させて配備したブーム21に装備されている。この
ブーム21は図示しない液圧シリンダによって俯仰可能
とされており、ハッチ7の上方であって船体中心線上に
延在する図2に符号Lで示す待機または荷積み位置と、
これより180度以内の範囲、一般には90度旋回して
舷側から最大限に突出する図2に符号Uで示す陸揚げ位
置との間で旋回させられる。
Next, the belt conveyor 13, which is the third transport means D, pivotally holds the base end on the upper deck 2 on the center line of the hull and beside the center of rotation of the loading boom 15. It is equipped on the boom 21 which is deployed. The boom 21 can be raised and lowered by a hydraulic cylinder (not shown), and extends above the hatch 7 and on the hull center line, as shown in FIG.
It is turned within a range of 180 degrees or less, generally 90 degrees, between a landing position indicated by U in FIG.

【0026】図1,図2に示した実施の形態に係るブー
ム21および第三搬送手段Dであるベルトコンベヤ13
の詳細を主に図4,図5(A),(B),(C)を参照
して説明すると、ブーム21は旋回中心上に俯仰中心を
有して旋回可能且つ俯仰可能に基端部を上甲板2の上に
支持させた主フレーム21と、主フレーム21に嵌
め込まれて前後方向へ移動可能な副フレーム21とか
らなり、固定長部分を形成する主フレーム21は両側
に前後方向へ延びるシュート23を有しているととも
に、排出手段Gを前後方向へ移動可能に搭載している。
可変長部分を形成する副フレーム21は最大後退位置
で先端部を主フレーム21からその前方領域に少し突
出させており、最大前進時にこの先端部が貨物倉6の船
尾側端部付近に達するようになっていて、この先端部に
シュート24を有している。
The boom 21 and the belt conveyor 13 as the third conveying means D according to the embodiment shown in FIGS.
4 and 5 (A), 5 (B) and 5 (C), the boom 21 has a center of elevating on the center of swiveling, and is rotatable and capable of elevating at the base end. a main frame 21 a which is supported on the upper deck 2, consists of a sub-frame 21 B that is movable in the longitudinal direction is fitted to the main frame 21 a, the main frame 21 a on both sides to form a fixed-length portion And a discharging means G is mounted movably in the front-rear direction.
Subframe 21 B to form a variable-length portion has a distal end portion by slightly projecting its front region from the main frame 21 A at maximum retracted position, the distal end portion at the time of maximum advancement in the vicinity of the aft end of the cargo hold 6 And has a chute 24 at its tip.

【0027】第三搬送手段Dであるベルトコンベヤ13
は、主フレーム21の基端部および先端部に設置した
プーリイ27,27と、副フレーム21の基端部
および先端部に設置したプーリィ28,28とにベ
ルト26を巻掛けて反転させており、このベルト26の
主フレーム21のプーリィ27,27間に延在し
て基端から先端へ向かって走行する部分が固定長の主搬
送部Dを形成するとともに、副フレーム21のプー
リィ28,28間に延在して基端から先端へ向かっ
て走行する部分が主搬送部Dの下方に位置して可変長
の副搬送部Dを形成している。副フレーム21の前
進、後退に追従して主搬送部Dの前方へ突出する副搬
送部Dの突出長が変わることにより、ばら物搬送区間
長が変えられる。
The belt conveyor 13 as the third conveying means D
Mainly the frame 21 A Purii 27 installed in the proximal and distal ends of a, 27 b and, Puryi 28 a, 28 b and the belt 26 wound installed at proximal and distal ends of the sub-frame 21 B multiplied by and is inverted, the main frame 21 a Puryi 27 a, 27 b extending Mashimashi in part traveling toward from the proximal end to the distal end between the of the belt 26 to form a main transfer section D a fixed length with the sub-frame 21 B of Puryi 28 a, 28 b extending Mashimashi with the portion travels toward from the proximal end to the distal end of variable length sub-transfer section D B located below the main transfer section D a between Has formed. Advancement of the sub-frame 21 B, by the projecting length of the sub-transfer unit D B projecting to follow the receding toward the front of the main transfer section D A changes, rose conveying section length is changed.

【0028】排出手段Gはベルト26が搬送するばら物
を主フレーム21の領域内、即ち主搬送部Dの途中
で排出して貨物倉6の船首側領域に積み込むものであ
る。即ち、この排出手段Gはベルト26をまたいでその
上方に設置されたフレーム31に支軸32をベルト横断
方向に支持させ、この支軸32に固着した二本の第一腕
部材33の先端にスクレーパ34を固結するとともに、
これと反対方向へ突出させて支軸32に固着した第二腕
部材35の先端に液圧シリンダ36のピストン杆を連結
したものとされている。
The discharge means G are those loading loose material belt 26 transports the main frame 21 A of the region, that is, the discharge in the middle of the main transfer section D A bow-side region of the cargo hold 6. That is, the discharging means G supports the support shaft 32 in the transverse direction of the belt by the frame 31 installed over the belt 26, and the discharge device G is attached to the tips of the two first arm members 33 fixed to the support shaft 32. While consolidating the scraper 34,
The piston rod of the hydraulic cylinder 36 is connected to the tip of the second arm member 35 that is fixed to the support shaft 32 by projecting in the opposite direction.

【0029】スクレーパ34は平面二等辺三角形であっ
て、液圧シリンダ36のピストン杆を収縮させると第二
腕部材35,支軸32,第一腕部材33と一体に回動し
てベルト26の上面に頂点を基端側へ向け且つベルト中
心線上に置いて重ねられ、その両側の斜辺がばら物を両
側方へ誘導してシュート23から貨物倉6に落下投入さ
せる。ピストン杆を伸長させるとスクレーパ34は支軸
32を中心に回動しながら持ち上げられ、ベルト26に
乗ったばら物と接触しない位置に待避する。
The scraper 34 is a flat isosceles triangle, and when the piston rod of the hydraulic cylinder 36 is contracted, the scraper 34 rotates integrally with the second arm member 35, the support shaft 32, and the first arm member 33 to rotate the belt 26. The piles are superimposed on the upper surface with the apex directed toward the base end and on the center line of the belt, and the oblique sides on both sides guide the bulk material to both sides, and fall from the chute 23 into the cargo hold 6. When the piston rod is extended, the scraper 34 is lifted while rotating about the support shaft 32, and retracts to a position where the scraper 34 does not come in contact with the loose objects on the belt 26.

【0030】ブーム21の副フレーム21および排出
手段Gのフレーム31は、ブーム21の主フレーム21
に前後方向移動可能に装備されており、これらの移動
手段は走行用レールと車輪および走行原動機からなるも
の、ラックとピニオンおよび走行用原動機からなるも
の、ワイヤケーブルとウインチからなるものなど、所定
区間を往復し且つ任意位置で停止可能な周知のものを適
用することができるので、その図示説明は省略した。
The sub frame 21 B of the boom 21 and the frame 31 of the discharging means G are connected to the main frame 21 B of the boom 21.
A is provided so as to be able to move in the front-rear direction, and these moving means include predetermined ones such as one consisting of a traveling rail and wheels and a traveling motor, one consisting of a rack, a pinion and a traveling motor, and one consisting of a wire cable and a winch. Since a well-known device that can reciprocate in a section and stop at an arbitrary position can be applied, the illustration and description thereof are omitted.

【0031】以上の構成とした本実施の形態に係る設備
によって荷積みを行なうときは、積込ブーム15を受取
位置Rまで旋回して先端部のホッパ16を埠頭の上に位
置させる。また、ブーム21を荷積み位置Lに置いて副
フレーム21を最大限に前進させ、その先端部のシュ
ート24を貨物倉6の船尾に近い端部の上方に位置させ
るとともに、スクレーパ34を非接触位置に待避させ
る。
When loading is performed by the above-configured equipment according to the present embodiment, the loading boom 15 is swiveled to the receiving position R and the tip hopper 16 is positioned on the pier. Further, to advance at a boom 21 to the loading position L sub-frame 21 B maximally with to position the chute 24 of the tip above the end near the stern of the cargo hold 6, a scraper 34 non Retreat to the contact position.

【0032】ばら物はベルトコンベヤ、小形車両などを
用いて埠頭の上でホッパ16に投入され、ベルトコンベ
ヤ17で基端方向へ送られてシュート18に放出され、
これがベルトコンベヤ19によって船体中心線へ向かっ
て送られシュート20に放出される。放出されたばら物
は垂直ベルトコンベヤ12によって上甲板の上方へ送ら
れ、ブーム21の主フレーム21に支持させた主搬送
部Dの基端部に落下する。ばら物は主搬送部Dの先
端で副搬送部Dに落下して乗り換え、その先端からシ
ュート24を通って貨物倉6に落下投入される。
The bulk material is put into a hopper 16 on a pier using a belt conveyor, a small-sized vehicle, or the like, sent in a proximal direction by a belt conveyor 17 and discharged to a chute 18.
This is sent toward the hull center line by the belt conveyor 19 and discharged to the chute 20. Released loose material is fed to above the upper deck by a vertical belt conveyor 12, it falls into the proximal end of the main transfer section D A which is supported on the main frame 21 A of the boom 21. Rose was transfer to fall to the auxiliary carrier section D B at the tip of the main transfer section D A, it is dropped put into the cargo hold 6 through the chute 24 from the tip.

【0033】貨物倉6の端部に所定高さの積山が作られ
たとき、副フレーム21を後退させて隣接個所に所定
高さの積山を作ることを、副フレーム21が最大後退
位置に到達するまで順次繰り返す。最大後退位置で積山
を作ったとき、排出手段Gを主フレーム21の先端近
くに置いてスクレーパ34を主搬送部Dのベルト26
の上面に重ねる。これにより、ばら物がスクレーパ34
の側方からシュート23を通って貨物倉6に落下投入さ
れることとなり、所定高さの積山が作られたとき排出手
段Gを基端方向へ移動して隣接個所に積山を作ること
を、貨物倉6の船首側端部に達するまで順次繰り返す。
[0033] When the product mountain predetermined height on the end of the cargo hold 6 was made, that the sub-frame 21 B is retracted making Tsumusan of predetermined height to the adjacent location, the sub-frame 21 B is the maximum retracted position Is repeated in order until the value reaches. When made Tsumusan a maximum retracted position, the belt of the discharge means G main frame 21 main transfer section scraper 34 placed near the tip of A D A 26
On top of As a result, the scraps are removed from the scraper 34.
Is dropped into the cargo hold 6 from the side through the chute 23, and when a pile having a predetermined height is formed, the discharging means G is moved in the proximal direction to form a pile at an adjacent location. This operation is sequentially repeated until the cargo hold 6 reaches the bow-side end.

【0034】以上により、貨物倉6へのばら物の荷積み
が完了するが、副フレーム21を最大前進位置と最大
後退位置との間で繰り返し往復動させながらばら物貨物
倉6に投入し、またスクレーバ34をその最大前進位置
と最大後退位置との間で繰り返し往復動させながらばら
物を貨物倉に投入することによって荷積みを行なうこと
もできる。
The [0034] above, although loading of loose material into the cargo hold 6 is complete, poured into loose material cargo hold 6 while repeating is reciprocated between a maximum advanced position and the maximum retracted position by-frame 21 B Alternatively, loading can be performed by throwing bulk materials into the cargo hold while repeatedly reciprocating the scraper 34 between its maximum advance position and maximum retract position.

【0035】貨物倉6のばら物を埠頭に陸揚げする荷揚
げ作業は、取出手段A,第一、第二、第三搬送手段B,
C,Dを用いて従来のものと同様に行なわれる。このと
き、本実施の形態ではブーム21の副フレーム21
前後方向へ移動可能としているので、接岸した船体と埠
頭のばら物受け取り場所との距離にばらつきがあって
も、副フレーム21を前後移動させることにより、そ
の先端のシュート24を受け取り場所に確実に届かせる
ことができる、という利点を有している。
The unloading work for unloading the bulk material from the cargo hold 6 to the wharf includes the unloading means A, the first, second, and third transport means B,
This is performed in the same manner as the conventional one using C and D. At this time, since in this embodiment the sub-frame 21 B of the boom 21 are movable in the longitudinal direction, even if there are variations in the distance between the loose material receiving location of berthing the hull and Pier, the sub frame 21 B By moving it back and forth, there is an advantage that the chute 24 at its tip can reliably reach the receiving location.

【0036】尚、第三搬送手段Dにおける固定長の主搬
送部Dとその前方へ突出する可変長の副搬送部D
を一基のベルトコンベヤで形成した本実施の形態による
と、駆動用原動機が一台で足りるという利点がある。ま
た、副フレーム21の最大後退位置での副搬送部D
の先端が主搬送部Dの先端よりも前方であっても、副
搬送部Dが走行していることによって主搬送部D
放出したばら物を貨物倉6に円滑に落下投入させること
ができるので、ブーム21および第三搬送手段Dの設計
の自由度が大きいという利点もある。
[0036] Incidentally, according to the third transport means present embodiment formed the main transfer section D A fixed length and a sub-transfer section D B of variable length protruding to the front belt conveyor one group in D, There is an advantage that only one prime mover is required. Further, sub-transfer unit D B at the maximum retracted position of the sub-frame 21 B
Even forward a than the tip of the main transfer section D A tip, the main transfer section D A is to smoothly drop put into the cargo hold 6 roses product released by the auxiliary carrier section D B is traveling Therefore, there is also an advantage that the degree of freedom in designing the boom 21 and the third transport means D is large.

【0037】図6は第三搬送手段Dの異なる実施の形態
を示すものであって、この実施の形態におけるブーム2
1の主フレーム21,副フレーム21,排出手段G
は前記実施の形態のものと同じである。
FIG. 6 shows a different embodiment of the third conveying means D.
1 of the main frame 21 A, sub-frame 21 B, the discharge means G
Is the same as in the previous embodiment.

【0038】第三搬送手段Dは主フレーム21に装備
されその基端部から先端部に亘って延びるベルトコンベ
ヤからなる主搬送手段Dと、その下方に位置して副フ
レーム21に装備されその基端部から先端部に亘って
延びるベルトコンベヤからなる副搬送手段Dとからな
り、これらの搬送手段D,Dは個別に駆動される。
The equipment and the third conveying means D main transport means comprises a belt conveyor extending over the distal end portion from its proximal end is mounted on the main frame 21 A D C, located beneath the sub-frame 21 B is composed of a sub-carrier means D D consisting of a belt conveyor extending over the distal portion from the proximal end, these conveying means D C, D D is driven separately.

【0039】この実施の形態によるばら物の積込み作業
は前記実施の形態のものと同様に副フレーム21,排
出手段Gを動作させることによって行なわれ、副フレー
ム21の前進時に副搬送手段Dが主搬送手段D
らばら物を受け取って先端部のシュート24を経て貨物
倉6に落下投入させ、副フレーム21が最大後退した
後は排出手段Gが主搬送手段Dの途中からばら物を貨
物倉6に落下投入させる。
The loading operation of the bulk material according to this embodiment is performed by operating the sub-frame 21 B and the discharging means G in the same manner as in the above-described embodiment, and the sub-transporting means D is moved when the sub-frame 21 B advances. D is dropped put into the cargo hold 6 through the chute 24 of the front end portion receiving a main transfer means D C Karabara product, after secondary frame 21 B is the maximum retracted from the middle exhaust unit G is in the main conveying means D C The bulk material is dropped into the cargo hold 6.

【0040】尚、本実施の形態によると二つの搬送手段
,Dが個別に駆動されるので、副搬送手段D
最大後退位置でその先端が主搬送手段Dの先端前方へ
突出しないようにすることにより、副搬送手段Dを停
止して主搬送手段Dの先端から貨物倉6へのばら物投
入および埠頭へのばら物陸揚げを行なうことができ、ま
た荷揚げ作業の際に副フレーム21を前進させて先端
のシュート24を埠頭の受け取り場所に確実に届かせる
ことができる。更に、副搬送手段Dは荷役作業中にか
かわらず最大後退時に停止させておくことができるの
で、無駄な動力消費がないという利点をもたらす。
According to the present embodiment, since the two transfer means D C and D D are individually driven, the leading end of the auxiliary transfer means D D moves forward at the maximum retreat position of the main transfer means D C. by not protrude, to stop the sub-carrier means D D main transport means D C tip can be made loose material unloading into rose was on and wharf to cargo holds 6, also the unloading work the chute 24 of the tip to advance the sub-frame 21 B may be outside the reach of reliably receiving location wharf when. Furthermore, sub-carrier means D D since it can remain off during maximum retraction regardless during loading and unloading, offers the advantage that there is no unnecessary power consumption.

【0041】尚また、前記二つの実施の形態における排
出手段Gのスクレーパ34は、主搬送部D,主搬送手
段Dの上面に重ねられてばら物を側方へ誘導落下させ
る位置とばら物に接触しない待避位置との間を、回動す
ることなく重ねられたときの姿勢のまま上下移動するよ
うにしてもよい。
[0041] Note also, the scraper 34 of the discharge means G in the two embodiments, the position and roses main transfer section D A, is superimposed on the upper surface of the main transfer means D C to induce falling loose material sideward It may also be possible to move up and down between the retracted position where it does not come into contact with the object and the posture when they are stacked without rotating.

【0042】[0042]

【発明の効果】以上のように、上甲板の上に設置されて
ばら物を陸揚げするブームと搬送手段に伸縮性をもたせ
るとともに、埠頭の上でばら物を受け取りこれを船底か
ら上甲板の上にばら物を搬送する手段の入口に導入する
手段を付加する、という本発明によると、海側に張り出
す部分を具えた積込み用の荷役設備が不要となり、港湾
荷役設備が著しく不備な、或いはこれをもたない埠頭に
おいてばら物の積み込みと陸揚げとを行なうことができ
る。
As described above, the boom and the transport means installed on the upper deck for landing bulk materials have elasticity, and the bulk materials are received on the wharf and received from the ship bottom on the upper deck. According to the present invention, which adds a means for introducing bulk materials to the entrance of the means for transporting bulk materials, loading and unloading equipment having a portion projecting to the sea side is unnecessary, and the port cargo handling equipment is significantly inadequate, or Bulk loading and unloading can be performed at a pier without this.

【0043】また、荷役設備の一部を荷積みと荷揚げの
両方に利用するものであるため、船体に装備させる荷役
設備全体が簡略化されるとともに効率よく使用できるも
のである。
Further, since a part of the cargo handling equipment is used for both loading and unloading, the entire cargo handling equipment mounted on the hull can be simplified and used efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態を示す縦断面概略図。FIG. 1 is a schematic longitudinal sectional view showing an embodiment of the present invention.

【図2】図1の平面図。FIG. 2 is a plan view of FIG. 1;

【図3】図1のA−A線に沿う拡大断面図。FIG. 3 is an enlarged sectional view taken along the line AA of FIG. 1;

【図4】図1に示す形態におれるブームの拡大縦断面
図。
FIG. 4 is an enlarged longitudinal sectional view of the boom in the form shown in FIG.

【図5】図4の拡大断面図であって、(A)は図4のA
−A線、(B)は図4のB−B線、(C)は図4のC−
C線に沿うもの。
FIG. 5 is an enlarged sectional view of FIG.
-A line, (B) is a BB line in FIG. 4, (C) is a C- line in FIG.
Along the C line.

【図6】異なる実施の形態におけるブームの縦断面図。FIG. 6 is a longitudinal sectional view of a boom according to another embodiment.

【符号の説明】[Explanation of symbols]

1 船体, 2 上甲板, 5 船倉, 6 貨物倉,
13 ベルトコンベヤ, 15 積込ブーム, 16
ホッパ, 21 ブーム, 21 主フレーム,
21 副フレーム, 23,24 シュート, 34
スクレーパ,A 取出手段, B 第一搬送手段,
C 第二搬送手段, D 第三搬送手段, D 主搬
送部, D 副搬送部, D 主搬送手段, D
副搬送手段, E 積込搬送手段, E 中継搬送手
段, G 排出手段,
1 hull, 2 upper deck, 5 hold, 6 cargo hold,
13 belt conveyor, 15 loading boom, 16
Hopper, 21 boom, 21 A main frame,
21 B sub-frame, 23 and 24 chute, 34
Scraper, A take-out means, B first transport means,
C second conveying means, D third conveying means, D A main transfer section, D B sub-transfer section, D C main carrier means, D D
Sub-transportation means, E loading conveyance means, E relay conveyance means, G discharging means,

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 船倉内に設けられた船体前後方向へ長い
ホッパ形状の貨物倉の底からばら物を順次下方へ取り出
す取出手段と、船体前後方向へ延び排出されたばら物を
船底に沿い船首側または船尾側の船倉端部に送る第一搬
送手段と、それより上方へ向かって延びばら物を上甲板
の上方に送る第二搬送手段と、更にこりより埠頭にばら
物を陸揚げする第三搬送手段とを具えており、前記第三
搬送手段が上甲板の上に旋回可能に設置したブームに装
備されている荷役設備を具えたばら物運搬船において、 上甲板の上に旋回可能に設置された積込ブームと、前記
積込ブームに装備されてばら物を先端部から旋回中心側
である基端部へ向かって搬送する積込搬送手段と、搬送
されたばら物を前記第二搬送手段の入口上方に誘導する
中継搬送手段とが前記荷役設備に付加されており、 そして、前記ブームが旋回中心側の固定長部分とその前
方領域に突出する可変長部分とからなり、前記第三搬送
手段のばら物搬送区間長が前記可変長部分の移動に追従
して可変とされており、 更に、前記第三搬送手段が搬送するばら物を前記固定長
部分の途中で排出させるため前記第三搬送手段に沿って
移動可能とされ、且つばら物を側方へ排出する位置から
ばら物との非接触位置に待避可能なスクレーパを有する
排出手段を具えている、 ことを特徴とするばら物運搬船。
1. A taking-out means for sequentially pulling bulk materials downward from the bottom of a hopper-shaped cargo hold long in the longitudinal direction of a hull provided in a hold, and a bulk material extending in the longitudinal direction of the hull and discharging the bulk materials along the bottom of the ship. First conveying means for sending to the side or the stern side of the hold end, second conveying means for extending the bulk material upward and sending the bulk material above the upper deck, and third for discharging the bulk material to the wharf from the dust A transporting means, wherein the third transporting means is mounted on a boom rotatably mounted on the upper deck and has a bulk carrier equipped with a cargo handling equipment, wherein the third transporting means is rotatably installed on the upper deck. Loading boom, loading / conveying means mounted on the loading boom for conveying bulk materials from a distal end toward a base end which is a turning center side, and the second bulk conveying means for conveying the carried bulk materials. Relay transportation means to guide above the entrance of the Wherein the boom is composed of a fixed length portion on the turning center side and a variable length portion protruding in a region in front of the boom, and the bulk transport section length of the third transport means is the variable length. It is variable following the movement of the portion, and is further movable along the third transport means for discharging the bulk material transported by the third transport means in the middle of the fixed length portion, and A bulk carrier comprising: a discharging means having a scraper capable of retracting from a position where the bulk material is discharged laterally to a position where the bulk material is not in contact with the bulk material.
【請求項2】 前記ブームが前記貨物倉の前方または後
方であって船体中心線上に旋回中心を置いているととも
に、前記第三搬送手段の搬送区間終端で放出されたばら
物を誘導するシュートが前記可変長部分の先端部に設け
られており、前記可変長部分は最大前進時に先端部が前
記貨物倉の反対端近くに達するようにされている請求項
1に記載したばら物運搬船。
2. The boom is located at the center of rotation on the hull center line in front of or behind the cargo hold, and a chute for guiding bulk materials discharged at the end of the transport section of the third transport means is provided. 2. The bulk carrier according to claim 1, wherein the bulk carrier is provided at a tip of the variable length portion, and the variable length portion is configured to reach a position near an opposite end of the cargo hold at the time of maximum forward movement.
【請求項3】 前記積込ブームが旋回中心を前記ブーム
の旋回中心の側方に置いており、上甲板の上に置かれた
待機位置と舷側から突出した受取位置との間で旋回可能
とされているとともに、ばら物受け取りのためのホッパ
を先端部に具えている請求項1に記載したばら物運搬
船。
3. The loading boom has a pivot center located beside the pivot center of the boom, and is capable of pivoting between a standby position placed on an upper deck and a receiving position protruding from a shore side. 2. The bulk carrier according to claim 1, wherein the bulk carrier is provided with a hopper at a tip end for receiving bulk materials.
【請求項4】 前記積込ブームが旋回可能であることに
加えて俯仰可能とされている請求項1または3に記載し
たばら物運搬船。
4. The bulk carrier according to claim 1, wherein the loading boom is capable of turning and, in addition, is capable of descending.
【請求項5】 前記ブームが固定長部分を形成する主フ
レームと前記主フレームに沿って前後方向へ移動可能と
され可変長部分を形成する副フレームとからなるととも
に、前記主フレームが前記排出手段を具えており、前記
第三搬送手段が前記二つのフレームにまたがって装備さ
れたベルトコンベヤであって前記主フレームに支持され
て基端から先端へ向かって走行する部分が前記第二搬送
手段からのばら物を基端部で受け取る主搬送部を形成す
るとともに、前記副フレームに支持されて基端から先端
へ向かって走行する部分が前記主搬送部の下方に位置し
て副搬送部を形成し、前記副搬送部は前記副フレームの
前進時に前記主搬送部からばら物を受け取って先端から
前記貨物倉に投入するようにされている請求項1または
2に記載したばら物運搬船。
5. The apparatus according to claim 1, wherein the boom comprises a main frame forming a fixed length portion, and a sub-frame forming a variable length portion movable along the main frame in the front-rear direction. Wherein the third transport means is a belt conveyor equipped over the two frames, and a portion that is supported by the main frame and travels from the base end to the distal end is from the second transport means. A main transport unit for receiving loose objects at the base end is formed, and a portion supported by the sub-frame and traveling from the base end toward the distal end is positioned below the main transport unit to form a sub-transport unit. 3. The bulk material according to claim 1, wherein the sub-transport portion receives the bulk material from the main transport portion when the sub-frame advances, and puts the bulk material into the cargo hold from the tip. Transport ship.
【請求項6】 前記ブームが固定長部分を形成する主フ
レームと前記主フレームに沿って前後方向へ移動可能と
され可変長部分を形成する副フレームとからなるととも
に、前記主フレームが前記排出手段を具えており、前記
第三搬送手段が前記主フレームに装備されて前記第二搬
送手段からのばら物を基端部で受け取る主搬送手段と前
記主搬送手段の下方に位置して前記副フレームに装備さ
れた副搬送手段とからなり、前記副搬送手段は前記副フ
レームの前進時に前記主搬送手段からばら物を受け取っ
て先端から前記貨物倉に投入するようにされており、更
に前記主搬送手段と副搬送手段とは個別に駆動される請
求項1または2に記載したばら物運搬船。
6. The boom comprises a main frame forming a fixed length portion, and a sub-frame forming a variable length portion movably in the front-rear direction along the main frame. Wherein the third transport means is mounted on the main frame and receives bulk material from the second transport means at a base end, and the sub-frame located below the main transport means. A sub-transporting means mounted on the sub-frame, wherein the sub-transporting means receives bulk material from the main transporting means when the sub-frame advances, and loads the bulk material into the cargo hold from the tip thereof, and further comprises the main transporting means. The bulk carrier according to claim 1 or 2, wherein the means and the sub-transport means are separately driven.
JP2001002224A 2001-01-10 2001-01-10 Bulk carrier Expired - Lifetime JP4502241B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001002224A JP4502241B2 (en) 2001-01-10 2001-01-10 Bulk carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001002224A JP4502241B2 (en) 2001-01-10 2001-01-10 Bulk carrier

Publications (2)

Publication Number Publication Date
JP2002205686A true JP2002205686A (en) 2002-07-23
JP4502241B2 JP4502241B2 (en) 2010-07-14

Family

ID=18870769

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001002224A Expired - Lifetime JP4502241B2 (en) 2001-01-10 2001-01-10 Bulk carrier

Country Status (1)

Country Link
JP (1) JP4502241B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006044347A (en) * 2004-08-02 2006-02-16 Hitachi Plant Eng & Constr Co Ltd Carrying-out device for bulk cargo in hold
CN113548504A (en) * 2021-07-23 2021-10-26 重庆市涪陵区大业建材有限公司 Wharf pontoon feeding system
CN117141656A (en) * 2023-10-08 2023-12-01 国家海洋局北海海洋工程勘察研究院 Throwing equipment of marine survey instrument for geophysical survey

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0233196U (en) * 1988-08-29 1990-03-01
JPH0496484U (en) * 1991-01-25 1992-08-20
JP2000038193A (en) * 1998-07-22 2000-02-08 Mitsui Miike Mach Co Ltd Automatic loading device for bulk cargo carrier
JP2002053230A (en) * 2000-08-09 2002-02-19 Mitsui Miike Mach Co Ltd Loading-unloading system of bulk carrier

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0233196U (en) * 1988-08-29 1990-03-01
JPH0496484U (en) * 1991-01-25 1992-08-20
JP2000038193A (en) * 1998-07-22 2000-02-08 Mitsui Miike Mach Co Ltd Automatic loading device for bulk cargo carrier
JP2002053230A (en) * 2000-08-09 2002-02-19 Mitsui Miike Mach Co Ltd Loading-unloading system of bulk carrier

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006044347A (en) * 2004-08-02 2006-02-16 Hitachi Plant Eng & Constr Co Ltd Carrying-out device for bulk cargo in hold
JP4645940B2 (en) * 2004-08-02 2011-03-09 株式会社日立プラントメカニクス Unloading device for bulk goods in the hold
CN113548504A (en) * 2021-07-23 2021-10-26 重庆市涪陵区大业建材有限公司 Wharf pontoon feeding system
CN117141656A (en) * 2023-10-08 2023-12-01 国家海洋局北海海洋工程勘察研究院 Throwing equipment of marine survey instrument for geophysical survey
CN117141656B (en) * 2023-10-08 2024-01-30 国家海洋局北海海洋工程勘察研究院 Throwing equipment of marine survey instrument for geophysical survey

Also Published As

Publication number Publication date
JP4502241B2 (en) 2010-07-14

Similar Documents

Publication Publication Date Title
US3876059A (en) Vertically shiftable conveyor device
US6390006B1 (en) Sea bulk transfer vessel
JPH11322083A (en) Bulk cargo unloading device for self-unloader vessel
JP2002205686A (en) Bulk cargo carrier
US3618744A (en) Apparatus for stacking and reclaiming bulk materials
US1942839A (en) Self-unloading boat
US1313928A (en) Apparatus for loading and unloading
US3487910A (en) Scraper and conveyor apparatus
JP4071367B2 (en) Automatic loading equipment for bulk carriers
US5709517A (en) Apparatus for unloading of bulk material from the cargo holds of ships
JP2515955B2 (en) Method for unloading space and device for implementing this method
US3536208A (en) Self-discharging bulk cargo vessel
EP0566575B1 (en) Unloading means for bulk material
JP2000043784A (en) Automatic cargo handling device for bulk carrying vessel
US3414144A (en) Apparatus for handling bulk cargo
JP3987189B2 (en) Unloading equipment for bulk carriers
US3228539A (en) Water-borne transport and dispensing vehicle
US4231467A (en) Dry stacker and reclaimer
US2939570A (en) Ship unloading apparatus
JP4051642B2 (en) Bulk carrier
US6048153A (en) System, apparatus and method for loading and/or unloading a barge
JP2002053230A (en) Loading-unloading system of bulk carrier
JPH10264883A (en) Bulk carrier
US1585268A (en) Apparatus for unloading boats
JP3211761B2 (en) Unloader for loose objects

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100316

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

R150 Certificate of patent or registration of utility model

Ref document number: 4502241

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100415

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130430

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term