JP2002070481A - Open shield machine and open shield method making use thereof - Google Patents

Open shield machine and open shield method making use thereof

Info

Publication number
JP2002070481A
JP2002070481A JP2000268537A JP2000268537A JP2002070481A JP 2002070481 A JP2002070481 A JP 2002070481A JP 2000268537 A JP2000268537 A JP 2000268537A JP 2000268537 A JP2000268537 A JP 2000268537A JP 2002070481 A JP2002070481 A JP 2002070481A
Authority
JP
Japan
Prior art keywords
shield machine
open shield
retaining plate
side wall
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000268537A
Other languages
Japanese (ja)
Other versions
JP4279441B2 (en
Inventor
Makoto Uemura
誠 植村
Hiroaki Takegawa
廣明 竹川
Takayoshi Fuse
孝義 布施
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Uemura Engineering Co Ltd
Original Assignee
Taisei Corp
Uemura Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Uemura Engineering Co Ltd filed Critical Taisei Corp
Priority to JP2000268537A priority Critical patent/JP4279441B2/en
Publication of JP2002070481A publication Critical patent/JP2002070481A/en
Application granted granted Critical
Publication of JP4279441B2 publication Critical patent/JP4279441B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide an open shield machine capable of surely preventing the collapse of a bedrock side section of the upper part of a baserock when a downward baserock layer of the bedrock is excavated after the bedrock of the upper part of the baserock layer when there is a hard baserock layer in the bottom in an excavated section and in the case the bedrock of the upper part of the baserock layer and the baserock layer are divided into two stages to separately excavate them and also having a simple structure for accomplishing the purpose. SOLUTION: Pipe jacks 2 are arranged at the insides of right and left side wall boards 1a as a side earth retaining board, and in the open shield machine opening the front, the rear and the upper surface, a preceding earth retaining board 12 is constituted of a partition wall 12a set between the right and left side wall boards 1a so as to close ahead of the front section 1d and the right and left side wall boards 1a, the preceding earth retaining board 12 is mounted on the front section 1d in a slidable manner, the bedrock of the upper part of the baserock in front of the preceding earth retaining board 12 is excavated to drive the preceding earth retaining board 12 forward, an excavation working space is formed in front of a cutting face section of the shield machine between the cutting face section and the preceding earth retaining board 12, and after the baserock layer in the bottom of the cutting face is excavated in the space to remove earth, the open shield machine is driven forward.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、市街地に上下水
道、地下道等の地下構造物を施工するオープンシールド
機およびこのオープンシールド機を使用するオープンシ
ールド工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an open shield machine for constructing underground structures such as water and sewage systems and underpasses in an urban area, and an open shield method using the open shield machine.

【0002】[0002]

【従来の技術】オープンシールド工法は開削工法(オー
プンカット工法)とシールド工法の長所を生かした合理
性に富む工法であり、このオープンシールド工法で使用
するオープンシールド機1の概略は図14に示すように左
右の側壁板1aとこれら側壁板1aに連結する底板1b
とからなる前面、後面及び上面を開口したもので、前記
側壁板1aと底板1bの先端を刃口として形成し、また
側壁板1aの中央又は後端近くに推進ジャッキ2を後方
に向け上下に並べて配設する。図中3は隔壁を示す。
2. Description of the Related Art The open shield method is a highly rational method utilizing the advantages of the open-cut method (open cut method) and the shield method. The outline of the open shield machine 1 used in this open shield method is shown in FIG. Left and right side walls 1a and bottom plate 1b connected to these side walls 1a
The front, rear and upper surfaces of the side wall 1a and the bottom plate 1b are formed as cutting edges, and the propulsion jack 2 is vertically moved toward the center or near the rear end of the side wall 1a. Arrange them side by side. In the figure, reference numeral 3 denotes a partition.

【0003】かかるオープンシールド機1を使用して施
工するオープンシールド工法は、図示は省略するが、発
進坑内にこのオープンシールド機1を設置して、オープ
ンシールド機1の推進ジャッキ2を伸長して発進坑内の
反力壁に反力をとってオープンシールド機1を前進さ
せ、地下構造物を形成する第1番目のコンクリート函体
4を上方から吊り降し、オープンシールド機1のテール
部1c内で縮めた推進ジャッキ2の後方にセットする。
推進ジャッキ2と反力壁の間にはストラットを配設して
適宜間隔調整をする。
[0003] The open shield method using the open shield machine 1 is not shown in the drawings, but the open shield machine 1 is installed in a starting pit, and the propulsion jack 2 of the open shield machine 1 is extended. The open shield machine 1 is advanced by applying a reaction force to the reaction wall in the starting mine, and the first concrete box 4 forming the underground structure is suspended from above, and the tail portion 1c of the open shield machine 1 is lowered. Set it behind the propelled jack 2 that was shortened.
A strut is provided between the propulsion jack 2 and the reaction force wall to adjust the distance as appropriate.

【0004】また、発進坑は土留壁で構成し、オープン
シールド機1を発進させるにはこの土留壁を一部鏡切り
するが、必要に応じて薬液注入等で発進坑の前方部分に
地盤改良を施しておくこともある。
The starting pit is constituted by a retaining wall, and the retaining wall is partially mirror-cut in order to start the open shield machine 1. However, if necessary, a ground improvement is performed on a front portion of the starting pit by injecting a chemical solution or the like. May be given.

【0005】ショベル等の掘削機9でオープンシールド
機1の前面又は上面から土砂を掘削しかつ排土する。こ
の排土工程と同時またはその後に推進ジャッキ2を伸長
してオープンシールド機1を前進させる。この前進工程
の場合、コンクリート函体4の前にはボックス鋼材又は
型鋼を用いた枠体よりなる押角8を配設する。
An excavator 9 such as a shovel excavates earth and sand from the front or upper surface of the open shield machine 1 and discharges the earth. Simultaneously with or after this earth removal step, the propulsion jack 2 is extended to move the open shield machine 1 forward. In the case of this advancing process, a pressing angle 8 composed of a frame using a box steel material or a mold steel is disposed in front of the concrete box 4.

【0006】そして前記第1番目のコンクリート函体4
の前に第2番目のコンクリート函体4をオープンシール
ド機1のテール部1c内に吊り降す。以下、同様の排土
工程、前進工程、コンクリート函体4のセット工程を適
宜繰返して、順次コンクリート函体4をオープンシール
ド機1の前進に伴い縦列に地中に残置し、さらにこのコ
ンクリート函体4の上面に埋戻土5を入れる。
[0006] The first concrete box 4
Before the second concrete box 4 is suspended in the tail part 1c of the open shield machine 1. Hereinafter, the same earth removal process, advance process, and setting process of the concrete box 4 are appropriately repeated, and the concrete box 4 is sequentially left under the ground as the open shield machine 1 advances, and the concrete box 4 is further removed. Put backfill soil 5 on the upper surface of 4.

【0007】なお、コンクリート函体4をオープンシー
ルド機1のテール部1c内に吊り降す際には、コンクリ
ートブロック等による高さ調整材7をコンクリート函体
4の下に配設し、このテール部1c内でコンクリート函
体4の左右および下部の空隙にグラウト材6を充填す
る。
When suspending the concrete box 4 in the tail portion 1c of the open shield machine 1, a height adjusting member 7 such as a concrete block is disposed under the concrete box 4, and the tail is removed. The grout material 6 is filled into the left and right and lower spaces of the concrete box 4 in the portion 1c.

【0008】このようにして、オープンシールド機1が
到達坑まで達したならばこれを撤去して工事を完了す
る。
In this way, when the open shield machine 1 reaches the destination pit, it is removed and the construction is completed.

【0009】このようなオープンシールド工法では、前
記のごとくコンクリート函体4をオープンシールド機1
の前進に伴い縦列に地中に残置し、コンクリート函体4
は、オープンシールド機1のテール部内に吊り降され、
オープンシールド機1の前進とともに該テール部1cか
ら出て地中に残されていくものである。
In such an open shield method, the concrete box 4 is connected to the open shield machine 1 as described above.
Left in the ground in tandem with the advance of
Is suspended in the tail of the open shield machine 1,
As the open shield machine 1 advances, it leaves the tail portion 1c and remains in the ground.

【0010】コンクリート函体4は鉄筋コンクリート製
のもので、図15に示すように左側板4a,右側板4bと
上床板4cと下床板4dとからなるもので、前後面が開
口10として開放されている。
The concrete box 4 is made of reinforced concrete and comprises a left side plate 4a, a right side plate 4b, an upper floor plate 4c, and a lower floor plate 4d as shown in FIG. I have.

【0011】[0011]

【発明が解決しようとする課題】オープンシールド機1
を掘進するとき、左右の側板板1aが土留め板として機
能し、ショベル等の掘削機9でオープンシールド機1の
前面又は上面から土砂を掘削しかつ排土するものである
が、掘削断面内底部に硬い岩盤層が存在する場合は、シ
ョベル等の掘削機9では硬い岩盤層を掘削することは困
難である。
Problems to be Solved by the Invention Open Shield Machine 1
When excavating, the left and right side plates 1a function as earth retaining plates, and excavate and excavate earth and sand from the front or upper surface of the open shield machine 1 with an excavator 9 such as a shovel. When a hard rock layer exists at the bottom, it is difficult to excavate the hard rock layer with an excavator 9 such as a shovel.

【0012】そこで、岩盤層上部の地山と岩盤層とを分
けて、土砂などによる柔らかい岩盤層上部の地山はバッ
クホウなどの掘削機で掘削排土し、その下の硬い岩盤層
は、上部の地山の掘削によって、岩盤層の掘削スペース
を確保し、ブレーカーなどの掘削機を別途使用して掘削
排土している。
[0012] Therefore, the ground above the bedrock layer is separated from the bedrock layer, and the bedrock above the soft bedrock made of earth and sand is excavated and excavated by an excavator such as a backhoe. Excavation of the ground has secured a space for excavation of the bedrock layer, and excavation and excavation are performed using a separate excavator such as a breaker.

【0013】かかる掘削断面内底部の硬い岩盤層を掘削
するとき、左右の側壁板1aだけでは岩盤上部の地山側
部の崩壊を防ぐことが困難であった。
When excavating a hard rock layer at the bottom of the excavated cross section, it is difficult to prevent collapse of the top of the rock mass on the ground side only by the left and right side walls 1a.

【0014】本発明の目的は前記従来例の不都合を解消
し、掘削断面内底部に硬い岩盤層が存在し、岩盤層上部
の地山と岩盤層とを2段階に分けて別々に掘削する場
合、岩盤層上部の地山の掘削後にその下方の岩盤層の掘
削をするときに、岩盤上部の地山側部の崩壊を確実に防
ぐことができ、しかもそのための構造も簡単なもので足
りるオープンシールド機およびこのオープンシールド機
を使用するオープンシールド工法を提供することにあ
る。
An object of the present invention is to solve the problem of the prior art, wherein a hard rock layer is present at the bottom of an excavated cross section, and the ground at the upper part of the rock layer and the rock layer are separately excavated in two stages. An open shield that can reliably prevent the collapse of the upper part of the rock layer when excavating the lower rock layer after excavating the rock layer above the rock layer, and a simple structure is sufficient for that. And an open shield method using the open shield machine.

【0015】[0015]

【課題を解決するための手段】本発明は前記目的を達成
するため、第1に、オープンシールド機として、左右側
壁板の内側に推進ジャッキを配設し、前面、後面及び上
面を開口したオープンシールド機において、フロント部
の前方を塞ぐように前記左右側壁板間に配設した隔壁と
前記左右側壁板とで先行土留め板を構成し、該先行土留
め板をフロント部にスライド自在に取り付けたことを要
旨とするものである。
In order to achieve the above object, the present invention firstly provides an open shield machine in which propulsion jacks are arranged inside left and right side wall plates, and the front, rear and upper surfaces are opened. In the shield machine, a leading earth retaining plate is formed by the partition wall disposed between the left and right side wall plates and the left and right side wall plates so as to close the front of the front part, and the preceding earth retaining plate is slidably attached to the front part. The gist is that

【0016】第2に、先行土留め板はフロント部の上方
部分にのみ配設することを要旨とするものである。
Secondly, the preceding earth retaining plate is to be disposed only in the upper part of the front part.

【0017】第3に、先行土留め板とフロント部との間
に先行土留め板の上部方向修正用の牽引ジャッキを配設
することを要旨とするものである。
Thirdly, the gist of the invention is to provide a towing jack for correcting the upper direction of the preceding retaining plate between the preceding retaining plate and the front portion.

【0018】第4に、オープンシールド工法として、左
右側壁板の内側に推進ジャッキを配設し、前面、後面及
び上面を開口したオープンシールド機の前面または上面
開口より前方の土砂を掘削排土する工程と、推進ジャッ
キを伸長してコンクリート函体を反力にしてシールド機
を前進させる工程と、シールド機のテール部内で縮めた
推進ジャッキの後方に新たなコンクリート函体を上方か
ら吊り降してセットする工程とを適宜繰り返して順次コ
ンクリート函体を縦列に接続して埋設するオープンシー
ルド工法において、フロント部の前方を塞ぐように前記
左右側壁板間に配設した隔壁と前記左右側壁板とで先行
土留め板を構成し、該先行土留め板をフロント部にスラ
イド自在に取り付け、先行土留め板の前方の岩盤上部の
地山を掘削して先行土留め板を前進させ、シールド機の
切羽部の前方に先行土留め板との間に掘削作業空間を形
成し、該空間内で切羽底部の岩盤層を掘削排土した後、
オープンシールド機を前進させることを要旨とするもの
である。
Fourth, as an open shield method, a propulsion jack is arranged inside the left and right side wall plates, and excavates and removes earth and sand in front of the front or upper surface opening of the open shield machine having the front, rear and upper surfaces opened. The process and the process of extending the propulsion jack to advance the shield machine with the reaction force of the concrete box, and suspending the new concrete box from above behind the propelled jack shrunk in the tail part of the shield machine In the open shield method of connecting and embedding concrete boxes sequentially in a row by repeating the setting step as appropriate, in the open shield construction method, the partition wall and the left and right side wall plates disposed between the left and right side wall plates so as to block the front of the front part. A preceding earth retaining plate is formed, the preceding earth retaining plate is slidably attached to the front portion, and the ground above the bedrock in front of the preceding earth retaining plate is excavated. Advancing the earth retaining plates, the excavation work space is formed between the leading soil retaining plate in front of the working face of the shield machine, after a rock layer of tunnel face bottom excavated earth removal in the space,
The gist is to advance the open shield machine.

【0019】第5に、オープンシールド機の推進工程で
は、切羽底部の岩盤掘削部分に掘削残土を適量投入し、
オープンシールド機の推進時に切羽底部と上部とで一定
土圧が加わるようにすることを要旨とするものである。
Fifth, in the propulsion process of the open shield machine, an appropriate amount of excavated soil is injected into a rock excavation portion at the bottom of the face,
The gist of the present invention is to apply a constant earth pressure to the bottom and top of the face during propulsion of the open shield machine.

【0020】第6に、先行土留め板の前進は、先行土留
め板側に設けた推進ジャッキ、先行土留め板とオープン
シールド機のフロント部との間に設けたスライドジャッ
キ、オープンシールド機に配設してあるシールド機推進
用の推進ジャッキを適宜使用して行うことを要旨とする
ものである。
Sixth, the advancement of the preceding retaining plate is performed by a propulsion jack provided on the preceding retaining plate side, a slide jack provided between the preceding retaining plate and the front portion of the open shield machine, and the open shield machine. The gist of the invention is to appropriately use a propulsion jack for propelling the shield machine provided.

【0021】請求項1、4記載の本発明によれば、先行
土留め板の前方の岩盤上部の地山を掘削して先行土留め
板を前進させ、シールド機の切羽部の前方に先行土留め
板との間に掘削作業空間を形成し、該空間内で切羽底部
の岩盤層を掘削排土すれば、該空間は側方と前方を先行
土留め板に囲まれているから岩盤上部の地山の崩壊を防
止でき安全を確保できる。
According to the first and fourth aspects of the present invention, the ground above the bedrock in front of the preceding retaining plate is excavated to advance the preceding retaining plate, and the preceding soil is disposed in front of the face of the shield machine. If the excavation work space is formed between the retaining plate and the rock layer at the bottom of the face is excavated and discharged in the space, the space is surrounded by the preceding retaining plate on both sides and the front, so that the upper part of the rock is The collapse of the ground can be prevented and safety can be ensured.

【0022】請求項2記載の本発明によれば、前記作用
に加えて、先行土留め板はフロント部の上方部分にのみ
配設することにより、先行土留め板の前方の岩盤上部の
地山を掘削した後、先行土留め板を前進させるときに、
先行土留め板は切羽底部の岩盤層にぶつかることなく、
その上をスムーズに掘進する。
According to the second aspect of the present invention, in addition to the above operation, the preceding retaining plate is disposed only on the upper portion of the front portion, so that the ground at the top of the bedrock in front of the preceding retaining plate is provided. After excavation, when the preceding retaining plate is advanced,
The preceding retaining plate does not hit the bedrock layer at the bottom of the face,
Dig over it smoothly.

【0023】請求項3記載の本発明によれば、前記作用
に加えて、先行土留め板とフロント部との間に先行土留
め板の上部方向修正用の牽引ジャッキを配設することに
より、土圧などの影響を排除して先行土留め板を所定位
置に正しくセットできる。
According to the third aspect of the present invention, in addition to the above operation, by providing a tow jack for correcting the upper direction of the preceding earth retaining plate between the preceding earth retaining plate and the front portion, The preceding retaining plate can be correctly set at a predetermined position by eliminating the influence of earth pressure and the like.

【0024】請求項5記載の本発明によれば、請求項4
記載の本発明の作用に加えて、オープンシールド機の推
進工程では、切羽底部の岩盤掘削部分に掘削残土を適量
投入したから、オープンシールド機の推進時に切羽底部
と上部とで一定土圧が加わり、オープンシールド機を所
定方向にスムーズに前進させることができる。
According to the present invention described in claim 5, according to claim 4,
In addition to the operation of the present invention described, in the propulsion process of the open shield machine, since an appropriate amount of excavated soil is injected into the rock excavation portion at the bottom of the face, a constant earth pressure is applied between the bottom face and the upper portion during the propulsion of the open shield machine. Thus, the open shield machine can be smoothly advanced in a predetermined direction.

【0025】請求項6記載の本発明によれば、前記作用
に加えて、先行土留め板の前進は、基本的には先行土留
め板側に設けた推進ジャッキ、先行土留め板とオープン
シールド機のフロント部との間に設けたスライドジャッ
キを使用して行うが、これらのジャッキでは推進力が不
足する場合は、オープンシールド機に配設してあるシー
ルド機推進用の推進ジャッキをさらに使用することで所
定の推進力を確保できる。
According to the sixth aspect of the present invention, in addition to the above operation, the advancement of the preceding retaining plate is basically performed by a propulsion jack provided on the preceding retaining plate side, the preceding retaining plate and the open shield. Use the slide jack provided between the front of the machine and the jack.If these jacks do not have enough propulsion, use the propulsion jack for the propulsion of the shield machine provided in the open shield machine. By doing so, a predetermined propulsive force can be secured.

【0026】[0026]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明のオープンシー
ルド機の実施形態を示す要部の平面図、図2は同上側面
図、図3は同上正面図、図4は同上図1のA−A線断面
図で、オープンシールド機1の全体構成は図9について
既に説明したとおり左右の側壁板1aの内側に推進ジャ
ッキ2を配設し、前面、後面及び上面を開口したもので
あるからここでの詳細な説明は省略する。
Embodiments of the present invention will be described below in detail with reference to the drawings. 1 is a plan view of a main part showing an embodiment of the open shield machine of the present invention, FIG. 2 is a side view of the same, FIG. 3 is a front view of the same, FIG. 4 is a sectional view taken along line AA of FIG. As described above with reference to FIG. 9, the overall configuration of the shield machine 1 is such that the propulsion jacks 2 are disposed inside the left and right side wall plates 1a and the front, rear and upper surfaces are opened, so that detailed description is omitted here. I do.

【0027】本発明のオープンシールド機1も、フロン
ト部1dの前部の左右側部に設けた左右の側壁板1aが
側方の土留め板として機能するものであり、該左右の側
壁板1aをフロント部1dの前方に突出するようにスラ
イド自在に設ける。この場合、図2にも示すように左右
の側壁板1aはフロント部1dの高さ方向の長さよりも
短く形成し、フロント部1dの上方部分の部位にのみ配
設する。
In the open shield machine 1 of the present invention, the left and right side wall plates 1a provided on the left and right side portions in front of the front portion 1d also function as side earth retaining plates. Is slidably provided so as to protrude forward of the front portion 1d. In this case, as shown in FIG. 2, the left and right side wall plates 1a are formed to be shorter than the length of the front portion 1d in the height direction, and are disposed only in a portion above the front portion 1d.

【0028】さらに本発明では左右の側壁板1aの長さ
方向のほぼ中央に位置させて、該左右の側壁板1a間に
これと直交する方向に隔壁12aを配設し、前記左右の側
壁板1aと隔壁12aとで先行土留め板12を構成する。
Further, according to the present invention, a partition wall 12a is disposed substantially at the center of the left and right side wall plates 1a in the longitudinal direction, and a partition wall 12a is arranged between the left and right side wall plates 1a in a direction orthogonal to the left and right side wall plates 1a. The preceding earth retaining plate 12 is constituted by 1a and the partition wall 12a.

【0029】図中11はフロント部1dに配設したスライ
ドジャッキを示し、該スライドジャッキ11に連結させて
先行土留め板12の推進用の推進ジャッキ13を隔壁12aの
側部に例えば上下2基ずつ配設した。
In the figure, reference numeral 11 denotes a slide jack disposed on the front portion 1d, and a propulsion jack 13 for propelling the preceding earth retaining plate 12 is connected to the slide jack 11 by, for example, two upper and lower propulsion jacks on the side of the partition wall 12a. Were arranged one by one.

【0030】図中14は先行土留め板12の側部の上部に配
設した方向修正用の牽引ジャッキを示し、該牽引ジャッ
キ14はフロント部1dに連結される。
In the figure, reference numeral 14 denotes a towing jack for correcting the direction, which is disposed on the upper side of the preceding retaining plate 12, and the towing jack 14 is connected to the front portion 1d.

【0031】次に、このようなオープンシールド機1を
使用するオープンシールド工法を図5〜図13について説
明する。オープンシールド工法は、工法の全体の概要と
しては前記図14に示す通りで詳細説明は省略するが、オ
ープンシールド機1での掘進及びコンクリート函体4の
セット工程を繰返して、順次コンクリート函体4をオー
プンシールド機1の前進に伴い縦列に地中に残置し、さ
らにこのコンクリート函体4の上面に埋戻土5を入れ
る。
Next, an open shield method using such an open shield machine 1 will be described with reference to FIGS. The open shield method is as shown in FIG. 14 as an outline of the entire method, and the detailed description is omitted. However, the excavation in the open shield machine 1 and the setting process of the concrete box 4 are repeated, and the concrete box 4 As the open shield machine 1 advances, the soil is left in the ground in a row, and the backfill soil 5 is put on the upper surface of the concrete box 4.

【0032】オープンシールド機1の掘削断面内底部に
硬い岩盤層15が存在する場合は、まず、図5、図6に示
すようにオープンシールド機1のフロント部1dの前方
に先行土留め板12を配置し、岩盤層15の上部の緩みやす
い土質部の土留めを行う。
When a hard rock layer 15 exists at the bottom of the excavated cross section of the open shield machine 1, first, as shown in FIGS. 5 and 6, a preceding earth retaining plate 12 is provided in front of the front portion 1d of the open shield machine 1. Is placed, and the loosened soil at the top of the bedrock layer 15 is retained.

【0033】次に図7に示すように、スライドジャッキ
11、先行土留め板12側の推進ジャッキ13を収縮させ、先
行土留め板12をフロント部1dの側に寄せた状態で、先
行土留め板12の前方の岩盤層15の上部の地山18をバック
ホウ等の掘削機16で掘削する。
Next, as shown in FIG.
11. The propulsion jack 13 on the side of the preceding retaining plate 12 is contracted, and the ground retaining plate 12 is moved toward the front portion 1d, and the ground 18 above the bedrock layer 15 in front of the preceding retaining plate 12. Is excavated by an excavator 16 such as a backhoe.

【0034】先行土留め板12の前方の地山掘削後、図8
に示すようにフロント部1dに配設してあるスライドジ
ャッキ11、先行土留め板12側の推進ジャッキ13を伸長し
て先行土留め板12を推進し、先行土留め板12とフロント
部1dとの間に岩盤層15の掘削作業スペース19を確保す
る。この場合、先行土留め板12はフロント部1dの高さ
方向の上部にのみ存在しているから、先行土留め板12は
岩盤層15の上を移動する。図中22はスライドジャッキ11
と推進ジャッキ13との間に介在させるコマであり、スラ
イドジャッキ11の頭部に推進ジャッキ13が適切に接合す
るようにさせるためのものである。
After excavating the ground in front of the preceding retaining plate 12, FIG.
As shown in the figure, the slide jack 11 disposed on the front portion 1d, the propulsion jack 13 on the preceding retaining plate 12 side is extended to propel the preceding retaining plate 12, and the preceding retaining plate 12 and the front portion 1d are connected to each other. In the meantime, an excavation work space 19 for the bedrock layer 15 is secured. In this case, since the preceding retaining plate 12 exists only above the front portion 1d in the height direction, the preceding retaining plate 12 moves on the bedrock layer 15. 22 in the figure is slide jack 11
This is a piece to be interposed between the slide jack 11 and the propulsion jack 13 so that the propulsion jack 13 is appropriately joined to the head of the slide jack 11.

【0035】また、必要に応じてオープンシールド機1
に設けてある推進ジャッキ2も同時に使用して先行土留
め板12の推進力を得る。さらに、牽引ジャッキ14を使用
して先行土留め板12の方向修正を適宜行う。
If necessary, the open shield machine 1
Is used at the same time to obtain the driving force of the preceding retaining plate 12. Further, the direction of the preceding earth retaining plate 12 is appropriately corrected using the towing jack 14.

【0036】次に、図9に示すようにブレーカなどの掘
削機17を使用して、掘削作業スペース19内で掘削断面内
底部の岩盤層15の壊しを行う。細部については人力によ
る掘削を行うこともある。切羽内の掘削した岩石はバッ
クホウなどの掘削機16で排出する(図10参照)。かかる
掘削断面内底部の岩盤層15の壊し作業は、前方を先行土
留め板12で、側方を土留め板として機能する左右の側壁
板1aで囲まれているから、地山崩壊のおそれはなく、
安全な空間で行える。
Next, as shown in FIG. 9, an excavator 17 such as a breaker is used to break the rock bed 15 at the bottom of the excavation section in the excavation work space 19. Excavation may be performed manually for details. The rock excavated in the face is discharged by an excavator 16 such as a backhoe (see FIG. 10). The work of breaking the bedrock layer 15 at the bottom of the excavation section is surrounded by the preceding earth retaining plate 12 at the front and the left and right side wall plates 1a functioning as the earth retaining plates on the sides. Not
It can be done in a safe space.

【0037】掘削断面内底部の岩盤層15の掘削終了後、
図11に示すように推進ジャッキ2によりオープンシール
ド機1を推進させる。なお、このオープンシールド機1
の推進時、先行土留め板12に対向する部分のオープンシ
ールド機1には先行土留め板12を介して前方の地山から
土圧が加わるが、その下方の岩盤層15を掘削した部分は
空間となるため、オープンシールド機1には圧が加わら
ない。そこで、オープンシールド機1の推進時に一定土
圧が加わるように、図12に示すように切羽底部の岩盤層
15の掘削部分に、岩盤上部の地山18の掘削残土20を適量
投入する。
After the excavation of the bedrock layer 15 at the bottom of the excavation section,
The open shield machine 1 is propelled by the propulsion jack 2 as shown in FIG. In addition, this open shield machine 1
At the time of propulsion, earth pressure is applied to the open shield machine 1 at the portion facing the preceding retaining plate 12 from the ground in front through the preceding retaining plate 12, but the portion where the bedrock layer 15 below it is excavated is Due to the space, no pressure is applied to the open shield machine 1. In order to apply a constant earth pressure when the open shield machine 1 is propelled, as shown in FIG.
An appropriate amount of excavated soil 20 from the ground 18 above the bedrock is put into the 15 excavated portions.

【0038】そして、図13に示すようにこの状態でスラ
イドジャッキ11および先行土留め板12の側の推進ジャッ
キ13を戻し、オープンシールド機1を推進する。
Then, as shown in FIG. 13, the slide jack 11 and the propulsion jack 13 on the side of the preceding retaining plate 12 are returned in this state, and the open shield machine 1 is propelled.

【0039】なお、ブレーカーなどの掘削機17を使用し
て掘削断面内底部の岩盤層15の壊しを行うとき、掘削機
17がオープンシールド機1のフロント部1dの下部掘削
のため、オープンシールド機1の下方に入り込めるよう
に、鋼棒などによる側部クリアランス確保材21を側壁板
1aの後部位置でフロント部1dとの間に設けておくこ
ともできる。この側部クリアランス確保材21は図1に示
した例では一方の側壁板1aにのみ設けたが、両方に設
けてもよい。
When the rock bed 15 at the bottom of the excavation section is broken using an excavator 17 such as a breaker,
In order to excavate the front part 1d of the open shield machine 1 below the open shield machine 1, a side clearance securing material 21 such as a steel rod is attached to the front part 1d at a rear position of the side wall plate 1a so that it can enter below the open shield machine 1. It can be provided in the middle. Although the side clearance securing member 21 is provided only on one side wall plate 1a in the example shown in FIG. 1, it may be provided on both sides.

【0040】[0040]

【発明の効果】以上述べたように本発明のオープンシー
ルド機およびこのオープンシールド機を使用するオープ
ンシールド工法は、掘削断面内底部に硬い岩盤層が存在
し、岩盤層上部の地山と岩盤層とを2段階に分けて別々
に掘削する場合、岩盤層上部の地山の掘削後にその下方
の岩盤層の掘削をするときに、オープンシールド機の前
方に先行土留め板を設けたから、この先行土留め板で岩
盤上部の地山側部の崩壊を確実に防ぐことができ、しか
もそのための構造も簡単なもので足りるものである。
As described above, according to the open shield machine of the present invention and the open shield method using this open shield machine, the hard rock layer exists at the bottom of the excavated cross section, When excavating the rock mass above the bedrock layer and excavating the bedrock layer below it, the preceding earth retaining plate was provided in front of the open shield machine. The earth retaining plate can surely prevent the collapse of the ground side on the upper part of the bedrock, and a simple structure is sufficient for that purpose.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のオープンシールド機の実施形態の要部
を示す平面図である。
FIG. 1 is a plan view showing a main part of an embodiment of an open shield machine of the present invention.

【図2】本発明のオープンシールド機の実施形態の要部
を示す側面図である。
FIG. 2 is a side view showing a main part of the embodiment of the open shield machine of the present invention.

【図3】本発明のオープンシールド機の実施形態の要部
を示す正面図である。
FIG. 3 is a front view showing a main part of the embodiment of the open shield machine of the present invention.

【図4】本発明のオープンシールド機の実施形態の要部
を示す図1のA−A線断面図である。
FIG. 4 is a sectional view taken along line AA of FIG. 1 showing a main part of the embodiment of the open shield machine of the present invention.

【図5】本発明のオープンシールド工法の第1工程を示
す平面図である。
FIG. 5 is a plan view showing a first step of the open shield method according to the present invention.

【図6】本発明のオープンシールド工法の第1工程を示
す正面図である。
FIG. 6 is a front view showing a first step of the open shield method according to the present invention.

【図7】本発明のオープンシールド工法の第2工程を示
す縦断側面図である。
FIG. 7 is a vertical sectional side view showing a second step of the open shield method according to the present invention.

【図8】本発明のオープンシールド工法の第3工程を示
す縦断側面図である。
FIG. 8 is a vertical sectional side view showing a third step of the open shield method according to the present invention.

【図9】本発明のオープンシールド工法の第4工程を示
す縦断側面図である。
FIG. 9 is a vertical sectional side view showing a fourth step of the open shield method according to the present invention.

【図10】本発明のオープンシールド工法の第5工程を
示す縦断側面図である。
FIG. 10 is a vertical sectional side view showing a fifth step of the open shield method according to the present invention.

【図11】本発明のオープンシールド工法の第6工程を
示す縦断側面図である。
FIG. 11 is a vertical sectional side view showing a sixth step of the open shield method of the present invention.

【図12】本発明のオープンシールド工法の他の例の第
6工程を示す縦断側面図である。
FIG. 12 is a vertical sectional side view showing a sixth step of another example of the open shield method of the present invention.

【図13】本発明のオープンシールド工法の他の例の第
7工程を示す縦断側面図である。
FIG. 13 is a vertical sectional side view showing a seventh step of another example of the open shield method of the present invention.

【図14】オープンシールド工法の概要を示す縦断側面
図である。
FIG. 14 is a vertical sectional side view showing an outline of the open shield method.

【図15】コンクリート函体の斜視図である。FIG. 15 is a perspective view of a concrete box.

【符号の説明】[Explanation of symbols]

1…オープンシールド機 1a…側壁板 1b…底板 1c…テール部 2…推進ジャッキ 1d…フロント部 3…隔壁 4…コンクリート
函体 4a…左側板 4b…右側板 4c…上床板 4d…下床板 5…埋戻土 6…グラウト材 7…高さ調整材 8…押角 9…掘削機 10…開口 11…スライドジャッキ 12…先行土留め板 12a…隔壁 13…推進ジャッキ 14…牽引ジャッキ 15…岩盤層 16…掘削機 17…掘削機 18…地山 19…掘削作業スペ
ース 20…掘削残土 21…側部クリアラ
ンス確保材 22…コマ
DESCRIPTION OF SYMBOLS 1 ... Open shield machine 1a ... Side wall plate 1b ... Bottom plate 1c ... Tail part 2 ... Propulsion jack 1d ... Front part 3 ... Partition wall 4 ... Concrete box 4a ... Left side plate 4b ... Right side plate 4c ... Upper floor plate 4d ... Lower floor plate 5 ... Backfill soil 6 ... Grout material 7 ... Height adjustment material 8 ... Push angle 9 ... Excavator 10 ... Opening 11 ... Slide jack 12 ... Preceding earth retaining plate 12a ... Partition 13 ... Propulsion jack 14 ... Towing jack 15 ... Roof bed 16 ... Excavator 17 ... Excavator 18 ... Ground 19 ... Excavation work space 20 ... Excavated soil 21 ... Side clearance securing material 22 ... Top

───────────────────────────────────────────────────── フロントページの続き (72)発明者 竹川 廣明 東京都国分寺市日吉町2丁目30番地7 植 村技研工業株式会社内 (72)発明者 布施 孝義 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 Fターム(参考) 2D054 AC16  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroaki Takekawa 2-30-30 Hiyoshicho, Kokubunji-shi, Tokyo Uemura Giken Kogyo Co., Ltd. (72) Inventor Takayoshi Fuse 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo No. Taisei Corporation F term (reference) 2D054 AC16

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 左右側壁板の内側に推進ジャッキを配設
し、前面、後面及び上面を開口したオープンシールド機
において、フロント部の前方を塞ぐように前記左右側壁
板間に配設した隔壁と前記左右側壁板とで先行土留め板
を構成し、該先行土留め板をフロント部にスライド自在
に取り付けたことを特徴とするオープンシールド機。
1. An open shield machine in which a propulsion jack is disposed inside left and right side wall plates and whose front, rear and upper surfaces are open, a partition wall disposed between the left and right side wall plates so as to close the front of a front portion. An open shield machine wherein a preceding earth retaining plate is constituted by the left and right side wall plates, and the preceding earth retaining plate is slidably attached to a front portion.
【請求項2】 先行土留め板はフロント部の上方部分に
のみ配設する請求項1記載のオープンシールド機。
2. The open shield machine according to claim 1, wherein the preceding earth retaining plate is provided only in an upper portion of the front portion.
【請求項3】 先行土留め板とフロント部との間に先行
土留め板の上部方向修正用の牽引ジャッキを配設する請
求項1または請求項2に記載のオープンシールド機。
3. The open shield machine according to claim 1, wherein a traction jack for correcting the upper direction of the preceding retaining plate is disposed between the preceding retaining plate and the front portion.
【請求項4】 左右側壁板の内側に推進ジャッキを配設
し、前面、後面及び上面を開口したオープンシールド機
の前面または上面開口より前方の土砂を掘削排土する工
程と、推進ジャッキを伸長してコンクリート函体を反力
にしてシールド機を前進させる工程と、シールド機のテ
ール部内で縮めた推進ジャッキの後方に新たなコンクリ
ート函体を上方から吊り降してセットする工程とを適宜
繰り返して順次コンクリート函体を縦列に接続して埋設
するオープンシールド工法において、フロント部の前方
を塞ぐように前記左右側壁板間に配設した隔壁と前記左
右側壁板とで先行土留め板を構成し、該先行土留め板を
フロント部にスライド自在に取り付け、先行土留め板の
前方の岩盤上部の地山を掘削して先行土留め板を前進さ
せ、シールド機の切羽部の前方に先行土留め板との間に
掘削作業空間を形成し、該空間内で切羽底部の岩盤層を
掘削排土した後、オープンシールド機を前進させること
を特徴とするオープンシールド工法。
4. A step of disposing a propulsion jack inside the left and right side wall plates, excavating and discharging earth and sand in front of the front or top opening of the open shield machine having the front, rear and top surfaces opened, and extending the propulsion jack. The concrete box as a reaction force to move the shield machine forward, and the step of hanging a new concrete box from above and setting it behind the propelled jack shrunk in the tail part of the shield machine as appropriate In the open shield method in which concrete boxes are connected in series and buried sequentially, the partition wall disposed between the left and right side wall plates and the left and right side wall plates constitute a preceding earth retaining plate so as to close the front of the front part. The preceding retaining plate is slidably attached to the front portion, the ground above the bedrock in front of the preceding retaining plate is excavated, the preceding retaining plate is advanced, and the shield machine is turned off. An open shield method characterized by forming an excavation work space in front of the wing portion with the preceding earth retaining plate, excavating and excavating the rock layer at the bottom of the face in the space, and then moving the open shield machine forward. .
【請求項5】 オープンシールド機の推進工程では、切
羽底部の岩盤掘削部分に掘削残土を適量投入し、オープ
ンシールド機の推進時に切羽底部と上部とで一定土圧が
加わるようにする請求項4記載のオープンシールド工
法。
5. In the propulsion process of the open shield machine, an appropriate amount of excavated soil is introduced into a rock excavation portion at the bottom of the face so that a constant earth pressure is applied to the bottom and upper portions of the face when the open shield machine is propelled. Open shield method described.
【請求項6】 先行土留め板の前進は、先行土留め板側
に設けた推進ジャッキ、先行土留め板とオープンシール
ド機のフロント部との間に設けたスライドジャッキ、オ
ープンシールド機に配設してあるシールド機推進用の推
進ジャッキを適宜使用して行う請求項4記載のオープン
シールド工法。
6. The advancement of the preceding retaining plate is carried out by a propulsion jack provided on the preceding retaining plate side, a slide jack provided between the preceding retaining plate and the front portion of the open shield machine, and an open shield machine. The open shield method according to claim 4, wherein the propulsion jack for propelling the shield machine is used as appropriate.
JP2000268537A 2000-09-05 2000-09-05 Open shield machine and open shield method using this open shield machine Expired - Lifetime JP4279441B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000268537A JP4279441B2 (en) 2000-09-05 2000-09-05 Open shield machine and open shield method using this open shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000268537A JP4279441B2 (en) 2000-09-05 2000-09-05 Open shield machine and open shield method using this open shield machine

Publications (2)

Publication Number Publication Date
JP2002070481A true JP2002070481A (en) 2002-03-08
JP4279441B2 JP4279441B2 (en) 2009-06-17

Family

ID=18755307

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000268537A Expired - Lifetime JP4279441B2 (en) 2000-09-05 2000-09-05 Open shield machine and open shield method using this open shield machine

Country Status (1)

Country Link
JP (1) JP4279441B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183841A (en) * 2018-10-24 2019-01-11 中铁工程机械研究设计院有限公司 Prefabricated piping lane assembling and construction method based on U-shaped shield machine
CN114718113A (en) * 2022-04-19 2022-07-08 中铁工程装备集团有限公司 U-shaped shield tunneling machine suitable for soft rock stratum and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183841A (en) * 2018-10-24 2019-01-11 中铁工程机械研究设计院有限公司 Prefabricated piping lane assembling and construction method based on U-shaped shield machine
CN114718113A (en) * 2022-04-19 2022-07-08 中铁工程装备集团有限公司 U-shaped shield tunneling machine suitable for soft rock stratum and construction method

Also Published As

Publication number Publication date
JP4279441B2 (en) 2009-06-17

Similar Documents

Publication Publication Date Title
JP4295272B2 (en) Friction cut plate used in open shield method and its fixing method
JPH0462230A (en) Setting construction for underground structure
JP2002070481A (en) Open shield machine and open shield method making use thereof
JP3512012B2 (en) How to excavate
JP4148047B2 (en) Open shield machine
JP3553523B2 (en) Open shield machine and open shield method
JP3923973B2 (en) Open shield machine
JP2668648B2 (en) Construction method of underground structure and starting pit used for it
JP3996597B2 (en) Open shield machine and open shield method using it
JP2976107B1 (en) How to advance open shield machine
JP6989483B2 (en) Open shield machine removal method
JP2759445B2 (en) How to build underground structures
JP3581332B2 (en) Earth retaining equipment and open-cutting method using it
JP3403386B2 (en) Concrete box used in open shield method
JP5081858B2 (en) Open shield machine
JP4060836B2 (en) Open shield method
JP4279818B2 (en) Open shield method
JP3926818B2 (en) Installation method of concrete box
JP3566236B2 (en) Open shield method
JP2002349187A (en) Open shield machine and open shield tunneling method
JPH07180485A (en) Construction method and construction device for underground structure
JP5015809B2 (en) Open shield machine
JPH09144475A (en) Excavator
JP2587311B2 (en) Underground structure installation method
JP3748152B2 (en) Tunnel digging method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070406

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081017

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081028

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090310

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090312

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120319

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4279441

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130319

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130319

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150319

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term