JP2002061385A - Temporary scaffold member of overhung bracket, etc. - Google Patents

Temporary scaffold member of overhung bracket, etc.

Info

Publication number
JP2002061385A
JP2002061385A JP2000249141A JP2000249141A JP2002061385A JP 2002061385 A JP2002061385 A JP 2002061385A JP 2000249141 A JP2000249141 A JP 2000249141A JP 2000249141 A JP2000249141 A JP 2000249141A JP 2002061385 A JP2002061385 A JP 2002061385A
Authority
JP
Japan
Prior art keywords
box body
support
branching
bracket
tenon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000249141A
Other languages
Japanese (ja)
Other versions
JP4387568B2 (en
Inventor
Kota Ueno
弘太 上野
Minoru Ueda
実 上田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KOYO KIKAI SANGYO
KYC Machine Industry Co Ltd
Original Assignee
KOYO KIKAI SANGYO
KYC Machine Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KOYO KIKAI SANGYO, KYC Machine Industry Co Ltd filed Critical KOYO KIKAI SANGYO
Priority to JP2000249141A priority Critical patent/JP4387568B2/en
Publication of JP2002061385A publication Critical patent/JP2002061385A/en
Application granted granted Critical
Publication of JP4387568B2 publication Critical patent/JP4387568B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a temporary scaffold member of an overhung bracket, etc., capable of easily, speedily and certainly adjusting height of a support for branching and capable of constantly positioning corresponding upper and lower stage box members at the same high level and extremely favourable in facility. SOLUTION: This temporary scaffold member is constituted by forming a pair of upper and lower part hooking holes 52, 53 communicatively with a specified interval vertically on a tenon 4 constituting the temporary scaffold member of the overhung bracket 51, etc., and fitting a collar 57 for height adjustment free to hook through each of hooking pins 57 on the upper and lower part hooking holes 52, 53, and it is constituted to adjust an engagement box body 18 of the support 17 for branching to connect by hooking the collar 55 for height adjustment properly on the upper and lower hooking holes 52, 53 at the same height level as an upper part engagement box body 11 of the support 10 to correspond with.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、仮設足場を構成す
る係合ボックス付き支柱に取付けて使用する張り出しブ
ラケットや梁わく等の仮設足場部材に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary scaffold member such as an overhang bracket or a beam frame which is used by being attached to a column with an engaging box which constitutes a temporary scaffold.

【0002】[0002]

【従来の技術、及び発明が解決しようとする課題】従来
より、この種の仮設足場部材、例えば張り出しブラケッ
トとしては、図6乃至図8に示すものが知られており、
これを同図に基づいて説明する。即ち、同図中、1aは
略三角形状とされた金属パイプ製の仮設足場用張り出し
ブラケット、2は該張り出しブラケット1aを構成する
所要の長さを備えた水平部材、3は該水平部材2の一端
部に垂設されたクサビ、4は同他端部に立設された所要
高の掛止孔5付きホゾ、6は該ホゾ4の基端部に環状形
成されたストッパ−、7は水平部材2のホゾ4側よりク
サビ3側方向に向けて斜め下向き状に取付けられた補剛
材、8は該補剛材7の自由端に取付けられた当て金具、
9は補剛材7の自由端と水平部材2とを連結せしめる垂
直部材である。
2. Description of the Related Art Conventionally, as a temporary scaffold member of this kind, for example, an overhang bracket shown in FIGS. 6 to 8 is known.
This will be described with reference to FIG. That is, in the figure, reference numeral 1a denotes an overhang bracket for a temporary scaffold made of a metal pipe having a substantially triangular shape, 2 denotes a horizontal member having a required length constituting the overhang bracket 1a, and 3 denotes a horizontal member of the horizontal member 2. A wedge 4 hangs vertically from one end, 4 is a tenon with a hook hole 5 of a required height erected at the other end, 6 is a stopper formed annularly at the base end of the tenon, and 7 is a horizontal. A stiffener attached diagonally downward from the tenon 4 side of the member 2 toward the wedge 3 side; 8 is a metal fitting attached to a free end of the stiffener 7;
Reference numeral 9 denotes a vertical member that connects the free end of the stiffener 7 and the horizontal member 2.

【0003】その他、10は所要の長さと径を備えた金
属パイプ製支柱、11・12は前記クサビ3を係合せし
めるべく該支柱10の上部と下部との外周面に各々形成
された上部係合ボックス体と下部係合ボックス体で、該
各上下部係合ボックス体11・12は各々2個一対の上
段ボックス部材13・14と下段ボックス部材15・1
6とが所定間隔をおいて互い違いに放射状に形成されて
いる。17は前記ホゾ4に掛止ピン(図示略)を介して
嵌着掛止自在とされた短尺状の金属パイプ製分岐用支
柱、18は該分岐用支柱17の上部外周面に形成された
係合ボックス体で、該係合ボックス体18は2個一対の
上段ボックス部材19と下段ボックス部材20とが所定
間隔をおいて互い違いに放射状に形成されている。そし
て、上記分岐用支柱17の長さは、前記支柱10におけ
る下部係合ボックス体12の下段ボックス部材16に張
り出しブラケット1aを取付けたさいに、係合ボックス
体18の上下段ボックス部材19・20が前記上部係合
ボックス体11の上下段ボックス部材13・15に各々
対応すべく所要の長さに設定せしめられている。21は
支柱10のジャッキベ−ス、22はクサビ付きブラケッ
ト、23はクサビ付き手摺、24は建築物などの外壁
面、25は該外壁面24における出張り部を示す。
In addition, reference numeral 10 denotes a metal pipe support having a required length and diameter, and reference numerals 11 and 12 denote upper support members formed on the outer peripheral surface of the upper and lower portions of the support 10 for engaging the wedge 3. Each of the upper and lower engaging box bodies 11 and 12 is a pair of upper box members 13 and 14 and lower box members 15 and 1.
6 are alternately radially formed at a predetermined interval. Reference numeral 17 denotes a short-length metal pipe branching support that is fitted and hung on the tenon 4 via a locking pin (not shown). Reference numeral 18 denotes a member formed on the upper outer peripheral surface of the branching support 17. In the combined box body 18, two pairs of upper box members 19 and lower box members 20 are alternately formed radially at a predetermined interval. The length of the branch post 17 is such that when the bracket 1a is attached to the lower box member 16 of the lower engaging box body 12 of the post 10, the upper and lower box members 19 and 20 of the engaging box body 18 are attached. Are set to required lengths so as to correspond to the upper and lower box members 13 and 15 of the upper engagement box body 11, respectively. Reference numeral 21 denotes a jack base of the column 10, reference numeral 22 denotes a bracket with wedges, reference numeral 23 denotes a handrail with wedges, reference numeral 24 denotes an outer wall surface of a building or the like, and reference numeral 25 denotes a projecting portion on the outer wall surface 24.

【0004】そして、上述の如く構成された従来例によ
り出張り部25を有する建築物などの外壁面24に沿っ
て仮設足場を構築せしめるさいには、図7に示すよう
に、先ず、下端部にジャッキベ−ス21を取付けた支柱
10を外壁面24に沿って所定間隔毎に2列に並列せし
め、各列の左右方向(外壁面24に沿う方向をいう)に
相隣る支柱10を手摺(図示略)により連結せしめると
共に、前後方向(外壁面24に対して直交する方向をい
う)に相隣る支柱10をブラケット22により連結せし
める。そして、出張り部25の下端に接近すると、後方
支柱10の下部ボックス体12を構成する下段ボックス
部材16にクサビ3を係合せしめることにより張り出し
ブラケット1aを取付けると共に、ホゾ4に分岐用支柱
17を嵌合せしめ、掛止ピン(図示略)により掛止せし
めて立設する。このさい、分岐用支柱17の係合ボック
ス体18を構成する上下段ボックス部材19・20は、
後方支柱10における上部係合ボックス体11に各々対
応せしめられている。分岐用支柱17の連結が完了する
と、該分岐用支柱17および後方の支柱10に順次支柱
10を連結すると共に、対応する上部係合ボックス体1
1及び係合ボックス体18の下段ボックス部材15・2
0にクサビを介して手摺23を取付け、所要高の仮設足
場を構築せしめるものである(図6及び図7参照)。
In order to construct a temporary scaffold along the outer wall 24 of a building or the like having a projecting portion 25 according to the conventional example constructed as described above, first, as shown in FIG. The columns 10 having the jack bases 21 attached thereto are arranged in two rows at predetermined intervals along the outer wall surface 24, and the columns 10 adjacent to each other in the left and right direction (the direction along the outer wall surface 24) of each row are handrailed. (Not shown), and the columns 10 adjacent to each other in the front-rear direction (a direction perpendicular to the outer wall surface 24) are connected by the bracket 22. When approaching the lower end of the projecting portion 25, the wedge 3 is engaged with the lower box member 16 constituting the lower box body 12 of the rear support 10, so that the projecting bracket 1 a is attached, and the branch post 17 is attached to the tenon 4. Are fitted, and are erected by a hook pin (not shown). At this time, the upper and lower step box members 19 and 20 constituting the engagement box body 18 of the branching support 17 are
The upper support box body 11 of the rear support 10 is respectively associated with the upper support box body 11. When the connection of the branch support 17 is completed, the support 10 is sequentially connected to the branch support 17 and the rear support 10, and the corresponding upper engagement box body 1 is connected.
1 and lower box member 15.2 of engagement box body 18
A handrail 23 is attached to the vehicle through a wedge to construct a temporary scaffold with a required height (see FIGS. 6 and 7).

【0005】ところで、上述の如く構成された従来例
は、図6及び図7に示すように、張り出しブラケット1
aをクサビ3でもって支柱10における下部係合ボック
ス体12の下段ボックス部材16に取付けるさいには、
連結すべき分岐用支柱17の上下段ボックス19・20
を各々対応する上部係合ボックス体11の上下段ボック
ス部材13・15と同高レベルに位置せしめて手摺23
などを容易に取付けることが出来るものである。しかし
ながら、図8に示すように、支柱10の向きが異なる場
合においては、張り出しブラケット1aをクサビ3でも
って下部係合ボックス体12の上段ボックス部材14に
取付けざるを得ないものとなり、ひいては、上段ボック
ス部材14の高さに応じて分岐用支柱17が必然的に上
方に突出するものである。このため、分岐用支柱17の
下段ボックス部材20を支柱10における上部係合ボッ
クス体11の下段ボックス部材15に対応せしめること
が出来ないものであって、仮設足場の組立てに支障を来
たし、極めて使い勝手の悪いものとなっていた。
[0005] By the way, in the conventional example configured as described above, as shown in FIGS.
When a is attached to the lower box member 16 of the lower engagement box body 12 of the support 10 with the wedge 3,
Upper and lower boxes 19 and 20 of branching posts 17 to be connected
Are positioned at the same level as the upper and lower box members 13 and 15 of the corresponding upper engagement box body 11, and the handrail 23
Can be easily attached. However, as shown in FIG. 8, when the direction of the column 10 is different, the overhang bracket 1a must be attached to the upper box member 14 of the lower engagement box body 12 with the wedge 3, and as a result, The branching posts 17 inevitably protrude upward according to the height of the box member 14. For this reason, the lower box member 20 of the branching column 17 cannot be made to correspond to the lower box member 15 of the upper engaging box body 11 in the column 10, which hinders the assembly of the temporary scaffold, and is extremely convenient. Was bad.

【0006】上記従来例の問題点を解決するものとし
て、図9及び図10に示すように、ホゾ4に適宜嵌合せ
しめるべく上段ボックス部材13・14と同長の高さ調
整用カラ−26がチェン27を介し付設された張り出し
ブラケット1bが提案されている。なお、その他の構成
は上記従来例と同一であり、同一符号は同一部分を示
す。
As a solution to the problem of the prior art, as shown in FIGS. 9 and 10, a height adjusting collar 26 having the same length as the upper box members 13 and 14 is fitted to the tenon 4 as appropriate. Has been proposed an overhang bracket 1b provided with a chain 27 interposed therebetween. The other configuration is the same as that of the above-described conventional example, and the same reference numerals indicate the same parts.

【0007】そして、上述の如く構成された従来例は、
張り出しブラケット1bをクサビ3でもって支柱10に
おける下部係合ボックス体12の下段ボックス部材16
に係合せしめることにより支柱10に取付け、そのホゾ
4に高さ調整用カラ−26を嵌合せしめたのち、分岐用
支柱17を嵌合して立設せしめ、対応する下段ボックス
部材15・20どうしを同高レベルに位置せしめるもの
である(図9参照)。逆に、張り出しブラケット1bを
支柱10における下部係合ボックス体12の上段ボック
ス部材14に係合して取付けるさいには、高さ調整用カ
ラ−26を嵌合せしめることなくホゾ4に直接分岐用支
柱17を嵌合して立設せしめ、対応する上下段ボックス
部材13・15・19・20どうしを同高レベルに位置
せしめるものである(図10参照)。
[0007] Then, the conventional example configured as described above,
The lower box member 16 of the lower engagement box body 12 on the support post 10 with the overhanging bracket 1b
Then, after the height adjusting collar 26 is fitted to the tenon 4 and the branching pillar 17 is fitted and set up, the corresponding lower box members 15 and 20 are fitted. They are positioned at the same level (see FIG. 9). Conversely, when the overhanging bracket 1b is engaged with the upper box member 14 of the lower engaging box body 12 of the support column 10 and mounted, the branch bracket 1b is directly branched to the tenon 4 without fitting the height adjusting collar 26. The pillars 17 are fitted and erected, and the corresponding upper and lower box members 13, 15, 19, and 20 are positioned at the same level (see FIG. 10).

【0008】ところで、上述の如く構成された従来例
は、支柱10に対する張り出しブラケット1bの取付け
位置に拘らず、高さ調整用カラ−26を介して分岐用支
柱17の高さを適宜調整せしめ、常に対応する上下段ボ
ックス部材13・15・19・20どうしを同高レベル
に位置せしめることが出来る反面、張り出しブラケット
1bの取付け位置に応じて高さ調整用カラ−26を嵌脱
しなければならず、極めて面倒で煩しいものとなってい
た。また、高さ調整用カラ−26は単にチエン27でも
って張り出しブラケット1bに連結されているにすぎな
いものであるから、不使用時には図10に示すように下
方に垂れ下り、極めて見苦しいのみならず、場合によっ
てはチエン27の損傷により落下するなどのおそれがあ
り、安全性の面において問題があるものである。
By the way, in the conventional example constructed as described above, the height of the branching post 17 is appropriately adjusted via the height adjusting collar 26 irrespective of the mounting position of the overhang bracket 1b with respect to the post 10, The corresponding upper and lower box members 13, 15, 19, 20 can always be positioned at the same level, but the height adjustment collar 26 must be fitted and removed according to the mounting position of the overhang bracket 1b. , It was extremely troublesome and troublesome. Further, since the height adjusting collar 26 is merely connected to the overhang bracket 1b by the chain 27, when not in use, it hangs down as shown in FIG. In some cases, the chain 27 may fall due to damage to the chain 27, and there is a problem in terms of safety.

【0009】本発明は、かかる従来例の問題点を解決
し、分岐用支柱の高さを容易に、しかも、迅速、かつ確
実に調整せしめ、対応する上下段ボックス部材どうしを
常に同高レベルに位置せしめることが出来る、極めて使
い勝手のよい張り出しブラケットなどの仮設足場部材を
提供しようとするものである。
The present invention solves such a problem of the prior art, and makes it possible to easily, quickly and surely adjust the height of the branching column, so that the corresponding upper and lower box members are always at the same level. An object of the present invention is to provide a temporary scaffolding member such as an extremely easy-to-use overhang bracket that can be positioned.

【0010】[0010]

【課題を解決するための手段】即ち、本発明は、仮設足
場を構成する上下部係合ボックス体11・12付き支柱
10に取付けるべく少なくとも一端にクサビ3が垂設さ
れると共に、所要個所に係合ボックス体18付き分岐用
支柱17を連結せしめるべくホゾ4が立設されてなる張
り出しブラケットなどの仮設足場部材において、上記ホ
ゾ4には所定間隔をおいて上下一対の上下部掛止孔52
・53が連通状に形成されると共に、該上下部掛止孔5
2・53に各々掛止ピン57を介して掛止自在とされた
高さ調整用カラ−55が嵌装されてなり、上記高さ調整
用カラ−55を適宜上下部掛止孔52・53に掛止せし
めることにより連結すべき分岐用支柱17の係合ボック
ス体18を対応する支柱10の上部係合ボックス体11
と同高レベルに調整せしめるべく構成されてなることを
特徴とする、張り出しブラケットなどの仮設足場部材を
要旨とするものである。
That is, according to the present invention, a wedge 3 is vertically provided at least at one end to be attached to a column 10 having upper and lower engaging box bodies 11 and 12 constituting a temporary scaffold. In a temporary scaffolding member such as a projecting bracket on which a tenon 4 is erected to connect the branching column 17 with the engaging box body 18, a pair of upper and lower retaining holes 52 are provided at a predetermined interval in the tenon 4.
53 is formed in a communication shape, and the upper and lower
A height adjusting collar 55, which can be hooked freely via a hooking pin 57, is fitted into each of the hooks 2 and 53, and the height adjusting collar 55 is appropriately fitted to the upper and lower portion hook holes 52 and 53. The engaging box body 18 of the branching column 17 to be connected by being hooked on the upper column 10 of the corresponding column 10
The present invention provides a temporary scaffolding member such as an overhanging bracket, which is configured to be adjusted to the same level as the above.

【0011】[0011]

【発明の実施の形態】以下に、本発明の実施の形態を図
面に示す一実施例に基づいて説明する。図1乃至図5は
本発明の一実施例を示すもので、同図中、52・53は
張り出しブラケット51を構成するホゾ4の基端がわに
上下に食違い状に形成された上部掛止孔と下部掛止孔、
54は該上下部掛止孔52・53を連通せしめるべく倒
L字形状に形成されたガイド溝孔で、上部掛止孔52と
下部掛止孔53との間隔は支柱10における下部係合ボ
ックス体12の上下段ボックス部材14・16の高さと
同長に形成されている。55はホゾ4に嵌合された高さ
調整用カラ−、56は該高さ調整用カラ−55に形成さ
れたピン挿通孔、57は該ピン挿通孔56を通して上下
部掛止孔52・53に各々挿通掛止自在とされた掛止ピ
ンで、該掛止ピン57はその一端部を折曲せしめること
により高さ調整用カラ−55の外周面に抱持支持せしめ
られている。その他は従来例と同一であり、同一符号は
同一部分を示す。
Embodiments of the present invention will be described below with reference to an embodiment shown in the drawings. FIGS. 1 to 5 show an embodiment of the present invention. In the drawings, reference numerals 52 and 53 denote staggered upper and lower portions of the tenon 4 constituting the overhanging bracket 51. Stop hole and lower hook hole,
Numeral 54 is a guide groove formed in an inverted L-shape to allow the upper and lower hook holes 52 and 53 to communicate with each other. The distance between the upper hook hole 52 and the lower hook hole 53 is the lower engagement box of the support post 10. It is formed to have the same height as the height of the upper and lower box members 14 and 16 of the body 12. Reference numeral 55 denotes a height adjustment collar fitted to the tenon 4, 56 denotes a pin insertion hole formed in the height adjustment collar 55, and 57 denotes upper and lower portion locking holes 52 and 53 through the pin insertion hole 56. The hook pin 57 is supported by being supported on the outer peripheral surface of the height adjusting collar 55 by bending one end of the hook pin 57. Other parts are the same as those of the conventional example, and the same reference numerals indicate the same parts.

【0012】そして、上述の如く構成された実施例は、
クサビ3を下部係合ボックス体12の下段ボックス部材
16に係合せしめ、張り出しブラケット51を支柱10
に取付けると共に、掛止ピン57を上部掛止孔52に掛
止せしめて高さ調整用カラ−55を所要の高さに調整せ
しめる。しかるのち、ホゾ4に分岐用支柱17を嵌合し
て立設せしめ、対応する下段ボックス部材15・20ど
うしを同高レベルに位置せしめる(図3及び図4参
照)。逆に、張り出しブラケット51を下部係合ボック
ス体12の上段ボックス部材14に取付けるさいには、
クサビ3を上段ボックス部材14に係合せしめて支柱1
0に取付けると共に、掛止ピン57をガイド溝孔54に
沿って下降せしめ、下部掛止孔53に掛止せしめる。し
かるのち、ホゾ4に分岐用支柱17を嵌合せしめて立設
せしめ、対応する上段ボックス部材13・19どうしを
同高レベルに位置せしめるものである(図5参照)。
The embodiment configured as described above is
The wedge 3 is engaged with the lower box member 16 of the lower engagement box body 12, and the overhang bracket 51 is attached to the support 10.
And the locking pin 57 is locked in the upper locking hole 52 to adjust the height adjusting collar 55 to a required height. Thereafter, the branching column 17 is fitted to the tenon 4 and erected, and the corresponding lower box members 15 and 20 are positioned at the same level (see FIGS. 3 and 4). Conversely, when attaching the overhang bracket 51 to the upper box member 14 of the lower engagement box body 12,
The wedge 3 is engaged with the upper box member 14 and the support 1
At the same time, the retaining pin 57 is lowered along the guide groove 54 so as to be retained in the lower retaining hole 53. Thereafter, the branching post 17 is fitted to the tenon 4 and is erected, and the corresponding upper box members 13 and 19 are positioned at the same level (see FIG. 5).

【0013】なお、上記実施例において、ホゾ4には上
下部掛止孔52・53が形成されているが、高さ調整用
カラ−55の高さをさらに微調整せしめるべくその個数
を増加せしめてもよいものである。また、仮設足場部材
として張り出し用ブラケット51が示されているが、こ
れに限定されるものでなく、梁わく等他の仮設足場部材
にも適用せしめることが出来るものである。
In the embodiment described above, the upper and lower retaining holes 52 and 53 are formed in the tenon 4, but the number of the height adjusting collars 55 is increased in order to further finely adjust the height. It may be. Also, the overhang bracket 51 is shown as a temporary scaffold member, but the present invention is not limited to this and can be applied to other temporary scaffold members such as beam frames.

【0014】[0014]

【発明の効果】本発明によれば以上の次第で、張り出し
ブラケット51などの仮設足場部材を構成するホゾ4に
は所定間隔をおいて上下一対の上下部掛止孔52・53
が連通状に形成されると共に、該上下部掛止孔52・5
3に各々掛止ピン57を介して掛止自在とされた高さ調
整用カラ−55が嵌装されてなり、上記高さ調整用カラ
−55を適宜上下部掛止孔52・53に掛止せしめるこ
とにより連結すべき分岐用支柱17の係合ボックス体1
8を対応する支柱10の上部係合ボックス体11と同高
レベルに調整せしめるべく構成されているから、常に高
さ調整用カラ−55をホゾ4に嵌合保持せしめつつ、支
柱10に対する張り出しブラケット51などの取付け位
置に応じてその高さを適宜調整せしめ、嵌合すべき分岐
用支柱17の高さを適正に位置せしめることにより対応
する上下段ボックス部材13・15・19・20どうし
を同高レベルに容易に、しかも、迅速かつ確実に位置せ
しめることが出来るものであって、極めて使い勝手がよ
いのみならず、高さ調整用カラ−55がホゾ4より抜け
落ちるおそれは全くなく、極めて安全に使用することが
出来るものである。
As described above, according to the present invention, a pair of upper and lower engaging holes 52 and 53 are provided at predetermined intervals in the tenon 4 constituting a temporary scaffolding member such as the overhanging bracket 51.
Are formed in communication with each other, and the upper and lower portion retaining holes 52.5 are formed.
A height adjusting collar 55, which can be hooked freely via a locking pin 57, is fitted into each of the hooks 3 and the height adjusting collar 55 is appropriately hooked to the upper and lower hook holes 52, 53. Engaging box body 1 of branching column 17 to be connected by being stopped
8 is adapted to be adjusted to the same level as the upper engaging box body 11 of the corresponding column 10, so that the height adjusting collar 55 is always fitted and held in the tenon 4, and the projecting bracket for the column 10 is extended. The height of the branching posts 17 to be fitted is appropriately adjusted by adjusting the height of the branching posts 17 to be fitted, so that the corresponding upper and lower box members 13, 15, 19, and 20 are the same. It can be easily positioned at a high level and quickly and reliably. Not only is it extremely easy to use, but also there is no danger that the height adjusting collar 55 will fall out of the tenon 4, and it will be extremely safe. It can be used.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す要部拡大分解斜視図で
ある。
FIG. 1 is an enlarged exploded perspective view of a main part showing an embodiment of the present invention.

【図2】本発明の一実施例を示す要部拡大斜視図であ
る。
FIG. 2 is an enlarged perspective view of a main part showing one embodiment of the present invention.

【図3】実施例の張り出しブラケット51を支柱10に
おける下部係合ボックス体12の下段ボックス部材16
に取付けたさいにおける分岐用支柱17の連結状態を示
す側面図である。
FIG. 3 shows the overhanging bracket 51 of the embodiment and the lower box member 16 of the lower engagement box body 12 in the support post 10.
It is a side view which shows the connection state of the branch support | pillar 17 at the time of attaching to.

【図4】実施例の張り出しブラケット51を支柱10に
おける下部係合ボックス体12の下段ボックス部材16
に取付けたさいにおける分岐用支柱17の連結状態を示
す平面図である。
FIG. 4 is a perspective view showing the overhang bracket 51 of the embodiment and the lower box member 16 of the lower engagement box body 12 in the support column 10;
It is a top view which shows the connection state of the branch support | pillar 17 at the time of attaching to (1).

【図5】実施例の張り出しブラケット51を支柱10に
おける下部係合ボックス体12の上段ボックス部材14
に取付けたさいにおける分岐用支柱17の連結状態を示
す側面図である。
FIG. 5 shows the overhang bracket 51 of the embodiment in which the upper box member 14 of the lower engagement box body 12 in the support column 10 is provided.
It is a side view which shows the connection state of the branch support | pillar 17 at the time of attaching to.

【図6】従来例の張り出しブラケット1aを支柱10に
おける下部係合ボックス体12の下段ボックス部材16
に取付けたさいにおける分岐用支柱17の連結状態を示
す側面図である。
6 is a perspective view of a conventional overhang bracket 1a and a lower box member 16 of a lower engagement box body 12 of a support post 10. FIG.
It is a side view which shows the connection state of the branch support | pillar 17 at the time of attaching to.

【図7】従来例の張り出しブラケット1aの使用状態を
示す側面図である。
FIG. 7 is a side view showing a use state of a conventional overhang bracket 1a.

【図8】従来例の張り出しブラケット1aを支柱10に
おける下部係合ボックス体12の上段ボックス部材14
に取付けたさいにおける分岐用支柱17の連結状態を示
す側面図である。
FIG. 8 shows a conventional overhanging bracket 1a and an upper box member 14 of a lower engaging box body 12 in a column 10;
It is a side view which shows the connection state of the branch support | pillar 17 at the time of attaching to.

【図9】他の従来例の張り出しブラケット1bを支柱1
0における下部係合ボックス体12の下段ボックス部材
16に取付けたさいにおける分岐用支柱17の連結状態
を示す側面図である。
FIG. 9 shows another conventional example of an overhang bracket 1b and a support 1;
FIG. 10 is a side view showing a connection state of the branching support pillar 17 when the branch support pillar 17 is attached to the lower box member 16 of the lower engagement box body 12 at 0.

【図10】他の従来例の張り出しブラケット1bを支柱
10における下部係合ボックス体12の上段ボックス部
材14に取付けたさいにおける分岐用支柱17の連結状
態を示す側面図である。
FIG. 10 is a side view showing a connection state of a branching post 17 when another conventional overhang bracket 1b is attached to an upper box member 14 of a lower engaging box body 12 of the post 10.

【符号の説明】[Explanation of symbols]

3 クサビ 4 ホゾ 10 支柱 11 上部係合ボックス体 12 下部係合ボックス体 13 上段ボックス部材 14 上段ボックス部材 15 下段ボックス部材 16 下段ボックス部材 17 分岐用支柱 18 係合ボックス体 19 上段ボックス部材 20 下段ボックス部材 51 張り出しブラケット 52 上部掛止孔 53 下部掛止孔 55 高さ調整用カラ− 57 掛止ピン REFERENCE SIGNS LIST 3 wedge 4 tenon 10 support 11 upper engaging box body 12 lower engaging box body 13 upper box member 14 upper box member 15 lower box member 16 lower box member 17 branching support 18 engaging box body 19 upper box member 20 lower box Member 51 Overhang bracket 52 Upper hook hole 53 Lower hook hole 55 Height adjustment collar 57 Hanging pin

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】仮設足場を構成する上下部係合ボックス体
11・12付き支柱10に取付けるべく少なくとも一端
にクサビ3が垂設されると共に、所要個所に係合ボック
ス体18付き分岐用支柱17を連結せしめるべくホゾ4
が立設されてなる張り出しブラケットなどの仮設足場部
材において、上記ホゾ4には所定間隔をおいて上下一対
の上下部掛止孔52・53が連通状に形成されると共
に、該上下部掛止孔52・53に各々掛止ピン57を介
して掛止自在とされた高さ調整用カラ−55が嵌装され
てなり、上記高さ調整用カラ−55を適宜上下部掛止孔
52・53に掛止せしめることにより連結すべき分岐用
支柱17の係合ボックス体18を対応する支柱10の上
部係合ボックス体11と同高レベルに調整せしめるべく
構成されてなることを特徴とする、張り出しブラケット
などの仮設足場部材。
1. A wedge 3 is provided at least at one end to be attached to a column 10 with upper and lower engaging box bodies 11 and 12 constituting a temporary scaffold, and a branching column 17 with an engaging box body 18 is provided at a required position. Tenon to connect
In a temporary scaffolding member such as an overhanging bracket having an upright, a pair of upper and lower upper and lower retaining holes 52 and 53 are formed in the tenon 4 at predetermined intervals so as to communicate with each other. The holes 52 and 53 are fitted with height-adjusting collars 55 that can be freely hooked via hooking pins 57, respectively. 53, the engagement box body 18 of the branching column 17 to be connected is adjusted to the same level as the upper engagement box body 11 of the corresponding column 10 to be connected. Temporary scaffolding members such as overhang brackets.
JP2000249141A 2000-08-21 2000-08-21 Temporary scaffold members such as overhang brackets Expired - Lifetime JP4387568B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000249141A JP4387568B2 (en) 2000-08-21 2000-08-21 Temporary scaffold members such as overhang brackets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000249141A JP4387568B2 (en) 2000-08-21 2000-08-21 Temporary scaffold members such as overhang brackets

Publications (2)

Publication Number Publication Date
JP2002061385A true JP2002061385A (en) 2002-02-28
JP4387568B2 JP4387568B2 (en) 2009-12-16

Family

ID=18738922

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000249141A Expired - Lifetime JP4387568B2 (en) 2000-08-21 2000-08-21 Temporary scaffold members such as overhang brackets

Country Status (1)

Country Link
JP (1) JP4387568B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005048432A (en) * 2003-07-28 2005-02-24 Kyc Machine Industry Co Ltd Handrail for frame scaffold and its bracket
JP2013104288A (en) * 2011-11-10 2013-05-30 Kyc Machine Industry Co Ltd Temporary scaffold member
KR101420378B1 (en) * 2012-12-18 2014-07-16 최완석 Supporting scaffold
KR101434356B1 (en) * 2012-12-18 2014-08-27 최완석 Fixing apparatus for inclined plane

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200469990Y1 (en) * 2011-07-12 2013-11-18 유림가설(주) Bracket for scaffold and scaffold thereof
CN108612296A (en) * 2018-05-31 2018-10-02 中国二十冶集团有限公司 Builder's jack steel pipe locating support and its application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005048432A (en) * 2003-07-28 2005-02-24 Kyc Machine Industry Co Ltd Handrail for frame scaffold and its bracket
JP2013104288A (en) * 2011-11-10 2013-05-30 Kyc Machine Industry Co Ltd Temporary scaffold member
KR101420378B1 (en) * 2012-12-18 2014-07-16 최완석 Supporting scaffold
KR101434356B1 (en) * 2012-12-18 2014-08-27 최완석 Fixing apparatus for inclined plane

Also Published As

Publication number Publication date
JP4387568B2 (en) 2009-12-16

Similar Documents

Publication Publication Date Title
US7748195B2 (en) Bracket and method for supporting a platform from concrete form tabs
US20020053486A1 (en) New process for mounting handrails in scaffolds
KR102113599B1 (en) Lifting System
JP2002061385A (en) Temporary scaffold member of overhung bracket, etc.
JP3878277B2 (en) Scaffolding unit
KR101387296B1 (en) Rail hanger type passage for inspection and maintenance of bridge
JP4683595B2 (en) Mounting method of handrail on frame scaffold
EP1691007A2 (en) Detachable cross-piece for supporting platforms in scaffolds
EP4127358B1 (en) Assembly for arranging temporary preceding guardrail on a scaffolding system
CN104196221B (en) Large area is encorbelmented the construction bearing platform of building and erection method thereof
KR101991906B1 (en) Gang form safety apparatus with upper and lower cover
JP2001173222A (en) Temporary scaffold bracket and temporary scaffold
JP4002869B2 (en) Safety handrail
JPH09202563A (en) Installation method for elevator
JP4695433B2 (en) Handrail for scaffolding scaffold
JP4098213B2 (en) Scaffolding frame
JP2003314054A (en) Temporary scaffold for steel work
JP2003247337A (en) Fall preventive handrail device for prefabricated scaffolding and method for using the same
JP3943391B2 (en) Mounting method of handrail on frame scaffold
JPH0547982U (en) Board signboard device
JPH0431412Y2 (en)
JP2008163740A (en) Standard frame for scaffolding
WO2016025984A1 (en) Cantilever bracket
JPH0222441Y2 (en)
JP5858358B2 (en) Temporary scaffold members

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070813

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090814

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090825

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091001

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4387568

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121009

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121009

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131009

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term