JP2002054144A - Vegetative base concrete and greening method of slope making use thereof - Google Patents

Vegetative base concrete and greening method of slope making use thereof

Info

Publication number
JP2002054144A
JP2002054144A JP2000243314A JP2000243314A JP2002054144A JP 2002054144 A JP2002054144 A JP 2002054144A JP 2000243314 A JP2000243314 A JP 2000243314A JP 2000243314 A JP2000243314 A JP 2000243314A JP 2002054144 A JP2002054144 A JP 2002054144A
Authority
JP
Japan
Prior art keywords
base material
vegetation base
slope
vegetation
filling hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000243314A
Other languages
Japanese (ja)
Inventor
Nagao Wagahara
長男 我原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UG KIZAI KK
Original Assignee
UG KIZAI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by UG KIZAI KK filed Critical UG KIZAI KK
Priority to JP2000243314A priority Critical patent/JP2002054144A/en
Publication of JP2002054144A publication Critical patent/JP2002054144A/en
Pending legal-status Critical Current

Links

Landscapes

  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a vegetative base concrete capable of smoothly and surely greening a slope even under the severe condition that it is in an environment such as ground easy to dry or the like. SOLUTION: The vegetative base concrete forms a vegetative base concrete body by hardening excelsoir tips with cement, and since borrow filling holes with bottoms for filling the borrow reaching a specific depth from the upper surface are recessed in the vegetative base concrete body, the borrow filling holes with the bottoms are filled with the borrow containing seeds or planted with young plants for trees, and after the seeds or the young plants in the borrow filling holes with the bottoms are brought up to a certain extent of trees or plants in a place having a good environment different from the slope required to be greened, the vegetative base concrete can be laid on the slope required to be greened, and accordingly, even if the slope required to be greened is an environmentally severe place, since the trees and the plants are brought up to a certain extent, the trees and the plants are not withered on the way, the trees and the plants are surely rooted, and the greening of the slope can be smoothly and surely executed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、法面の緑化を図る
ための植生基材及びこの植生基材を用いた法面の緑化方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a vegetation substrate for greening a slope and a method for greening a slope using the vegetation substrate.

【0002】[0002]

【従来の技術】従来から河川の堤防の法面や開発のため
に樹木が伐採された山の法面を景観を向上させる目的で
緑化することが行われている。そして、従来の緑化方法
としては、上下面間に亘って貫通する客土充填孔を穿設
してなる植生基材を緑化すべき法面に添って敷設、固定
した後、この植生基材の客土充填孔内における法面上に
種子を含有する客土を充填する方法が採られている。
2. Description of the Related Art Conventionally, greening of slopes of river embankments and slopes of trees where trees have been cut down for development has been carried out for the purpose of improving the landscape. And, as a conventional greening method, after laying and fixing a vegetation base material formed by piercing a soil filling hole penetrating between upper and lower surfaces along a slope to be greened, A method of filling seed soil containing seed on a slope in a soil filling hole is employed.

【0003】しかしながら、上記植生基材の客土充填孔
は、上下方向に貫通した状態に穿設されていることか
ら、上記植生基材を上記法面上に敷設する前に予め上記
植生基材の客土充填孔内に客土を充填、保持させておく
ことができず、上記植生基材の客土充填孔内への客土の
充填は、上記植生基材を上記法面上に敷設した後に行わ
ざるを得なかった。
[0003] However, since the soil filling hole of the vegetation base material is drilled in a vertically penetrating state, the vegetation base material is previously laid before the vegetation base material is laid on the slope. It is not possible to fill and hold the soil in the soil filling hole, and fill the soil into the soil filling hole of the vegetation base by laying the vegetation base on the slope. After that I had to do it.

【0004】従って、緑化すべき法面が乾燥し易い地盤
であるような環境の厳しい条件下では、上記植生基材の
客土充填孔内に種子を含有する客土を充填し、この種子
を発芽させて草木に成長させるまでには困難を伴い、こ
のような環境の厳しい条件下にある法面への草木の活着
率は低く、法面の緑化を確実に行うことができないとい
った問題点があった。
[0004] Therefore, under severe environmental conditions, such as when the slope to be revegetated is a soil that is easy to dry, the soil containing seeds is filled in the soil filling hole of the vegetation base material, and the seeds are removed. It is difficult to germinate and grow into plants, and the survival rate of plants on slopes under such severe environmental conditions is low, making it difficult to replant slopes reliably. there were.

【0005】[0005]

【発明が解決しようとする課題】本発明は、乾燥し易い
地盤等の環境の厳しい条件下にあっても円滑に且つ確実
に法面の緑化を図ることができる植生基材を提供する。
SUMMARY OF THE INVENTION The present invention provides a vegetation base material that can smoothly and surely revegetate a slope even under severe environmental conditions such as a ground that is easily dried.

【0006】[0006]

【課題を解決するための手段】請求項1に記載の植生基
材は、木毛チップをセメントで固めることによって植生
基材主体を形成し、この植生基材主体に上面から所定深
さに達した客土を充填するための有底客土充填穴を凹設
していることを特徴とする。
The vegetation base material according to claim 1 forms a vegetation base body by solidifying a wood wool chip with cement, and reaches a predetermined depth from the upper surface of the vegetation base body. Characterized in that it is provided with a bottomed soil filling hole for filling the soil.

【0007】請求項2に記載の植生基材は、請求項1に
記載の植生基材において、植生基材主体の外周部を緻密
にして該植生基材主体内に含有する水分の蒸散を防止し
ていることを特徴とする。
The vegetation base material according to claim 2 is the vegetation base material according to claim 1, wherein the outer peripheral portion of the vegetation base material is made dense to prevent the evaporation of water contained in the vegetation base material. It is characterized by doing.

【0008】請求項3に記載の植生基材は、請求項1又
は請求項2に記載の植生基材において、有底客土充填穴
は、緑化すべき法面に対して垂直方向よりも上向きに指
向する傾斜穴であることを特徴とする。
The vegetation base material according to claim 3 is the vegetation base material according to claim 1 or 2, wherein the bottomed soil filling hole faces upward from a vertical direction with respect to a slope to be greened. Characterized in that it is an inclined hole directed to

【0009】請求項4に記載の植生基材は、請求項1乃
至請求項3の何れか1項に記載の植生基材において、有
底客土充填穴は、植生基材を緑化すべき法面に敷設した
際に鉛直方向を指向する鉛直穴であることを特徴とす
る。
The vegetation base material according to claim 4 is the vegetation base material according to any one of claims 1 to 3, wherein the bottomed soil filling hole is a method for greening the vegetation base material. It is a vertical hole that is oriented in the vertical direction when laid on a surface.

【0010】請求項5に記載の法面の緑化方法は、木毛
チップをセメントで固めることによって形成された植生
基材主体の上面から所定深さに達した有底客土充填穴内
に、予め所定大きさに成長した草木を植生させておき、
この植生基材を緑化すべき法面上に敷設、固定すること
を特徴とする。
[0010] According to a fifth aspect of the present invention, there is provided a method for greening a slope, comprising: a step of filling a bottomed soil filling hole reaching a predetermined depth from an upper surface of a vegetation base material formed by cementing a wool chip with cement. Vegetation that has grown to a predetermined size is vegetated,
The vegetation base material is laid and fixed on a slope to be greened.

【0011】請求項6に記載の法面の緑化方法は、請求
項5に記載の法面の緑化方法において、植生基材を緑化
すべき法面上に敷設する際に、上記植生基材をこれらの
植生基材に凹設している有底客土充填穴を法面に対して
垂直方向よりも上方に向けて上記法面上に敷設、固定す
ることを特徴とする。
According to a sixth aspect of the present invention, in the method of greening a slope according to the fifth aspect, when the vegetation base material is laid on the slope to be greened, the vegetation base material is removed. It is characterized by laying and fixing the bottomed soil filling hole recessed in the vegetation base material above the slope so as to be higher than the vertical direction with respect to the slope.

【0012】請求項7に記載の法面の緑化方法は、請求
項5又は請求項6に記載の法面の緑化方法において、植
生基材に凹設している有底客土充填穴は、その上側開口
端から内底面に向かって傾斜した傾斜穴に形成されてあ
り、この傾斜した有底客土充填穴を鉛直方向に向けた状
態で上記植生基材を法面上に敷設、固定することを特徴
とする。
According to a seventh aspect of the present invention, there is provided a method for greening a slope according to the fifth or sixth aspect, wherein the bottomed soil filling hole recessed in the vegetation base material comprises: The vegetation base material is laid and fixed on the slope in a state where the inclined hole with the inclined bottomed soil is oriented vertically in the inclined hole from the upper open end toward the inner bottom surface. It is characterized by the following.

【0013】[0013]

【作用】本発明の植生基材によれば、客土充填穴は有底
穴であるから、上記植生基材を緑化すべき法面上に敷設
する前に、予め上記有底客土充填穴内に種子を含有する
客土を充填し又は高木等の幼苗を植え、これらが所定大
きさの草木になるまで環境の良い場所で予め育てておく
ことができる。
According to the vegetation base material of the present invention, since the soil filling hole is a bottomed hole, before laying the vegetation base material on the slope to be greened, the soil filling hole is required beforehand. Can be filled with seed soil or seedlings such as trees can be planted and grown in advance in an environment-friendly place until they become plants of a predetermined size.

【0014】従って、上記植生基材を砂地等の環境の厳
しい法面上に敷設した場合にあっても、上記植生基材の
有底客土充填穴内の草木は所定大きさまで成長している
ことから一定の生命力を有して順調に成長し、法面の緑
化を円滑に且つ確実に行うことができる。
Therefore, even when the vegetation base material is laid on a slope having a severe environment such as sandy ground, the vegetation in the bottomed soil filling hole of the vegetation base material has grown to a predetermined size. , It has a certain vitality and grows smoothly, so that the slope can be greened smoothly and reliably.

【0015】[0015]

【発明の実施の形態】本発明の植生基材の一例を図面を
参照しつつ説明する。植生基材Aの植生基材主体1は、
図1及び図2に示したように、木毛チップ11をセメント
で固めることによって上下面が平坦面で且つ一定厚みを
有する直方体形状の複数個の植生基材要素1a、1a・・・
を上下方向に積層一体化して略立方体形状に形成されて
なる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One example of a vegetation base material of the present invention will be described with reference to the drawings. The vegetation base 1 of the vegetation base A is
As shown in FIGS. 1 and 2, a plurality of rectangular vegetation base elements 1a, 1a,...
Are stacked and integrated in the vertical direction to form a substantially cubic shape.

【0016】上記植生基材要素1a、1a・・・同士は、結
合剤によって一体化されている。上記結合剤としては、
例えば、アクリル系重合体、酢酸ビニル系重合体或いは
これらの共重合体等が挙げられ、これら重合体にピート
モース及びバーミキュライトを70重量%以下含有する
結合剤が好ましく、初期接着力及び土壌の水分によって
硬度が低下して草木の根張りを阻害しないといった観点
から、上記重合体にピートモース及びバーミキュライト
を40〜50重量%含有する結合剤がより好ましい。な
お、ピートモースとバーミキュライトとの混合重量比
は、1:3〜3:1が好ましく、1:1がより好まし
い。具体的には、上記結合剤は、日本エヌエスシー株式
会社から商品名「ナクリリック A−4100」「ナク
リリック 125−4280」で販売されている。
The vegetation base elements 1a are integrated by a binder. As the binder,
For example, an acrylic polymer, a vinyl acetate polymer, or a copolymer thereof may be used. A binder containing peat mose and vermiculite in an amount of 70% by weight or less is preferable. From the viewpoint that the hardness is reduced and the rooting of the vegetation is not hindered, a binder containing 40 to 50% by weight of peat moose and vermiculite in the polymer is more preferable. The mixing weight ratio of peat moose to vermiculite is preferably 1: 3 to 3: 1, and more preferably 1: 1. Specifically, the binder is sold under the trade names “Nacrylic A-4100” and “Nacrylic 125-4280” by NSC Japan, Ltd.

【0017】なお、上記植生基材要素1aは崩壊し分解し
易いように、木質材を厚さ1〜3mm、幅5〜150m
m、長さ50〜500mmにスライスしてなる木毛チッ
プ11から形成することが好ましく、厚さ1.5〜2m
m、幅20〜50mm、長さ100〜300mmにスラ
イスしてなる木毛チップ11から形成することがより好ま
しい。
The vegetation base element 1a is made of a wood material having a thickness of 1 to 3 mm and a width of 5 to 150 m so that the vegetation base element 1a is easily broken down and decomposed.
m, preferably formed from wood wool chips 11 sliced to a length of 50 to 500 mm, and a thickness of 1.5 to 2 m
More preferably, it is formed from a wood wool chip 11 sliced into a m, a width of 20 to 50 mm and a length of 100 to 300 mm.

【0018】そして、上記植生基材主体1の厚さは、厚
いと、植生基材主体1の側面から該植生基材主体1中の
水分が蒸散して客土中の種子又は幼苗の草木への成長に
悪影響をおよぼすことがあり、又、薄いと、上記植生基
材主体1の有底客土充填穴12内に充填する客土量が少な
くなってその客土中に含まれる種子量も少なくなり、法
面Aの緑化が不十分となることがあるので、上記植生基
材要素1aの厚さの2〜10倍となるように調整すること
が好ましく、4〜8倍となるように調整することがより
好ましい。
If the thickness of the vegetation base material 1 is large, the water in the vegetation base material 1 evaporates from the side surface of the vegetation base material 1 to the seeds or seedlings in the soil. If the soil is thin, the amount of soil to be filled in the bottomed soil filling hole 12 of the vegetation base material 1 is reduced, and the amount of seeds contained in the soil is also reduced. Since the greening of the slope A may become insufficient, the thickness of the vegetation base element 1a is preferably adjusted to be 2 to 10 times, preferably 4 to 8 times. It is more preferable to adjust.

【0019】更に、上記植生基材主体1には、図1及び
図2に示したように、その上面中央部から所定深さに達
した有底客土充填穴12が凹設されており、具体的には、
最上部の植生基材要素1aの上面中央部から下から二番目
に位置する植生基材要素1aの下面に達し且つ最下部の植
生基材要素1aの上面を底面にした有底客土充填穴12が凹
設されており、この有底客土充填穴12に種子を含有する
客土Eが充填或いは高木等の幼苗が植えられる。
Further, as shown in FIGS. 1 and 2, the vegetation base body 1 is provided with a bottomed soil filling hole 12 reaching a predetermined depth from the center of the upper surface thereof, In particular,
A bottomed soil filling hole that reaches the lower surface of the vegetation base element 1a located second from the top from the center of the upper surface of the uppermost vegetation base element 1a and has the upper surface of the lowermost vegetation base element 1a as the bottom surface. The bottomed soil filling hole 12 is filled with a soil E containing seeds or a seedling such as a tree is planted.

【0020】そして、上記有底客土充填穴12は、上側開
口端から内底面に向かって上記植生基材主体1の厚さ方
向の垂直面に対し一定の角度でもって傾斜させた筒状に
形成されている。上記植生基材Aを緑化すべき法面B上
に敷設した際、図2に示したように、上記有底客土充填
穴12は、鉛直方向を指向するように、上記植生基材主体
1の厚さ方向に対する上記傾斜度を設定しておくことが
好ましい。
The bottomed soil filling hole 12 is formed in a cylindrical shape inclined at a predetermined angle from the vertical surface in the thickness direction of the vegetation base body 1 from the upper open end toward the inner bottom surface. Is formed. When the vegetation base material A is laid on the slope B to be greened, as shown in FIG. 2, the bottomed soil filling hole 12 is oriented vertically so that the vegetation base material 1 It is preferable that the above-mentioned inclination with respect to the thickness direction is set.

【0021】具体的には、図3に示したように、上記有
底客土充填穴12の中心線Y1 と、上記植生基材主体1の
上下面に垂直な面Y2 とがなす角度αが30〜60°と
なるように上記有底客土充填穴12を形成するのが好まし
く、40〜50°となるように上記有底客土充填穴12を
形成するのがより好ましい。
More specifically, as shown in FIG. 3, the angle formed between the center line Y 1 of the bottomed soil filling hole 12 and the plane Y 2 perpendicular to the upper and lower surfaces of the vegetation base material main body 1. It is preferable to form the bottomed soil filling hole 12 so that α is 30 to 60 °, and it is more preferable to form the bottomed soil filling hole 12 so that α is 40 to 50 °.

【0022】このように、上記植生基材主体1を上記法
面B上に配設した状態では、上記植生基材主体1の有底
客土充填穴12は、上記法面Bに対して垂直方向よりも上
向きに指向する傾斜孔とされていることから、上記有底
客土充填穴12内から成長した草木の成長方向と水平方向
に対する鉛直方向とが略一致した状態となり、上記草木
は、順調に成長し短期間のうちに法面Bの緑化を完了さ
せることができる。
As described above, in the state where the vegetation base material 1 is disposed on the slope B, the bottomed soil filling hole 12 of the vegetation base material 1 is perpendicular to the slope B. Since the inclined hole is directed upward from the direction, the growth direction of the vegetation grown from the bottomed soil filling hole 12 and the vertical direction with respect to the horizontal direction are substantially in a state, and the vegetation is It grows smoothly and can complete the greening of the slope B in a short period of time.

【0023】特に、上記植生基材Aを緑化すべき法面B
に敷設した際、上記有底客土充填穴12を鉛直方向を指向
する鉛直穴に形成し且つこの鉛直穴の凹設方向と草木の
成長方向とを一致させている場合には、上記植生基材A
を上記法面B上に敷設する前後における上記草木の成長
方向を変化させることなく、上記植生基材Aを上記法面
B上に敷設することができ、よって、上記植生基材Aの
上記法面Bへの敷設後も上記植生基材Aの有底客土充填
穴12内の草木の成長方向を変更させることなく上記草木
を順調に成長させて上記法面Bに円滑に且つ確実に根張
りさせ、上記法面Bの緑化を短期間のうちに完了するこ
とができる。
In particular, a slope B on which the vegetation base material A is to be greened
When the vegetation base is formed, the bottomed soil filling hole 12 is formed as a vertical hole oriented in the vertical direction, and the direction in which the vertical hole is recessed and the direction in which the vegetation grows match. Material A
Can be laid on the slope B without changing the growth direction of the vegetation before and after laying the vegetation on the slope B. Even after laying on the surface B, the vegetation grows smoothly without changing the growth direction of the vegetation in the bottomed soil filling hole 12 of the vegetation base material A, and the roots are smoothly and reliably rooted on the slope B. The greening of the slope B can be completed in a short time.

【0024】そして、上記有底客土充填穴12の開口面積
は、適宜調整されればよいが、具体的には、上記有底客
土充填穴12が傾斜した円筒形状である場合には、上記植
生基材1の一辺の長さの30〜70%が好ましく、50
〜70%がより好ましい。
The opening area of the bottomed soil filling hole 12 may be appropriately adjusted. Specifically, when the bottomed soil filling hole 12 has an inclined cylindrical shape, The length of one side of the vegetation substrate 1 is preferably 30 to 70%,
~ 70% is more preferred.

【0025】これは、上記有底客土充填穴12の径が大き
いと、上記植生基材主体1の機械的強度が低下して上記
植生基材Aの取り扱い中に破損することがあり、又、小
さいと、上記植生基材主体1に占める上記有底客土充填
穴12の体積が小さくなり、該有底客土充填穴12内に充填
した客土中の種子又は幼苗から成長した草木が上記植生
基材主体1内に根張りして該植生基材主体1を崩壊、分
解させるのに長期間がかかったり、或いは、根張りの力
の弱い草木にあっては上記植生基材主体1内に根張りで
きずに成長が抑制され、更には、上記植生基材主体1の
底面部を貫通して法面Bへの活着率も低下することがあ
るといった問題点があるためである。
This is because if the diameter of the bottomed soil filling hole 12 is large, the mechanical strength of the vegetation base material 1 may be reduced and the vegetation base material A may be damaged during handling. If the size is small, the volume of the bottomed soil filling hole 12 occupying the vegetation base material main body 1 becomes small, and plants or plants growing from seeds or seedlings in the soil filled in the bottomed soil soil filling hole 12 are removed. It takes a long time for the vegetation base material 1 to be rooted in the vegetation base material 1 and to disintegrate and decompose the vegetation base material 1, or for vegetation with weak rooting power, the vegetation base material 1 This is because there is a problem that growth is suppressed because it cannot be rooted inside, and furthermore, the survival rate on the slope B may be reduced by penetrating the bottom surface of the vegetation base material 1.

【0026】又、上記植生基材主体1の外周部にバイン
ダを吹き付けることによって該植生基材主体1の外周部
における木毛チップ11間の隙間を埋めて植生基材主体1
の外周部を緻密化し、上記植生基材主体1内に含まれる
水分が外部に蒸散するのを防止して上記有底客土充填穴
12内の草木の成長を促進させるようにしてもよい。
The gap between the wool chips 11 in the outer peripheral portion of the vegetative base material 1 is filled by spraying a binder to the outer peripheral portion of the vegetative base material 1 to thereby fill the vegetative base material 1.
Of the vegetation base material 1 to prevent water contained in the vegetation base material 1 from evaporating to the outside, and to fill the bottomed soil filling hole.
The growth of vegetation within 12 may be promoted.

【0027】更に、上記植生基材主体1の色を白色系と
することにより該植生基材主体1の日光の照射による温
度上昇を抑えて上記植生基材主体1内に含まれる水分が
外部に蒸散するのを防止して上記有底客土充填穴12内の
草木の成長を促進させるようにしてもよい。
Further, by making the color of the vegetation base material 1 white, it is possible to suppress a rise in temperature due to the irradiation of the vegetation base material 1 with sunlight, and to reduce the moisture contained in the vegetation base material 1 to the outside. Transpiration may be prevented to promote the growth of vegetation in the bottomed soil filling hole 12.

【0028】次に、上記植生基材Aの使用要領について
説明する。先ず、緑化しようとする法面Bに上記植生基
材Aが全体的に或いは下部三分の一以上が埋没する凹部
B1を複数個、凹設する。
Next, how to use the vegetation base material A will be described. First, a concave portion in which the vegetation base material A is entirely or buried in a lower third or more on a slope B to be greened.
A plurality of B1s are recessed.

【0029】そして、予め、上記有底客土充填穴12内に
草木を所定大きさに成長させた状態の植生基材Aを、そ
の有底客土充填穴12が上記法面Bに対して垂直方向より
も上向きに指向した状態となるように、好ましくは、有
底客土充填穴12が水平面に対して鉛直方向を指向した状
態となるように上記凹部B1内に上記植生基材1の全体又
は下部三分の一以上の部分を埋没させた状態に配設する
ことによって、複数個の植生基材1を上記法面Bに沿っ
て上下方向及び左右方向に所定間隔毎に或いは敷きつめ
た状態に敷設する。
The vegetation base material A in which vegetation has been grown to a predetermined size in the bottomed soil filling hole 12 is placed in advance with respect to the slope B. The vegetation base material 1 is placed in the recess B1 so that the bottomed soil filling hole 12 is oriented vertically with respect to the horizontal plane, so that the vegetation base material 1 is oriented upward from the vertical direction. By arranging the whole or at least one-third of the lower part in a buried state, a plurality of vegetation base materials 1 were laid down at predetermined intervals in the vertical and horizontal directions along the slope B. Laying in the state.

【0030】このように、上記植生基材Aを上記凹部B1
内にその全体又は下部三分の一以上を埋没させた状態に
上記法面B上に敷設することによって、上記植生基材1
の側面から該植生基材1内の水分が蒸散するのを防止す
ることができ、よって、上記植生基材1の有底客土充填
穴11内の草木を順調に且つ確実に成長させて法面Bの緑
化を確実なものとすることができる。
As described above, the vegetation base material A is placed in the recess B1
The vegetation substrate 1 is laid on the slope B in a state where the whole or lower third is buried therein.
The water in the vegetation base material 1 can be prevented from evaporating from the side surface of the vegetation base material 1, so that the vegetation in the bottomed soil filling hole 11 of the vegetation base material 1 can be grown smoothly and reliably. The greening of the surface B can be ensured.

【0031】そして、図2に示したように、必要に応じ
て、上記植生基材Aの有底客土充填穴12以外の部分に、
徐々に雨水によって肥料分が溶出する徐効性肥料から形
成された楔Cを上記法面Bに突き刺さるまで上記植生基
材1の上面から突き刺して上記植生基材Aを上記法面B
上に確実に固定する。
Then, as shown in FIG. 2, if necessary, a portion of the vegetation base material A other than the bottomed soil filling hole 12 may include:
The vegetation base material A is pierced from the upper surface of the vegetation base material 1 until the wedge C formed from the slow-acting fertilizer in which the fertilizer component is gradually eluted by the rainwater is pierced into the slope surface B.
Securely fix on top.

【0032】このように、上記植生基材Aを上記法面B
上に敷設するにあたっては、該法面B上に凹部B1を形成
してこの凹部B1内に上記植生基材1を敷設し、必要に応
じて、上記植生基材Aに楔Cを打ち込むといった作業だ
けで済み、短時間のうちに上記植生基材Aを上記法面B
上に敷設することができる。
Thus, the vegetation base material A is replaced with the slope B
When laying the vegetation base material on the vegetation base material A, a concave part B1 is formed on the slope B, the vegetation base material 1 is laid in the concave part B1, and a wedge C is driven into the vegetation base material A as necessary. And the vegetation base material A is removed from the slope B in a short time.
Can be laid on top.

【0033】しかも、上記植生基材Aの有底客土充填穴
12から成長した草木は、予め所定大きさに成長させられ
てから上記法面B上に配設されることから、上記法面B
が乾燥地等の環境の厳しい条件下であっても強い生命力
でもって確実に成長して上記法面Bの緑化を円滑に且つ
確実に行うことができる。
Further, the bottomed soil filling hole of the vegetation base material A.
The vegetation that has grown from 12 is grown on a predetermined size before being placed on the slope B.
Can grow with a strong vitality even under severe conditions such as an arid land, and the slope B can be smoothly and reliably greened.

【0034】又、上記植生基材Aを法面B上に配設した
状態では、上記植生基材Aの客土充填穴12は、上記法面
Bに対して垂直方向よりも上向きに指向した傾斜孔とな
っていることから、別の場所で上記有底客土充填穴12内
から成長させた草木の成長方向と水平方向に対する鉛直
方向とが略一致した状態となり、上記草木は、上記植生
基材Aの上記法面Bへの敷設後も成長方向を殆ど変える
ことなく順調に成長して短期間のうちに法面Bに根張り
して法面Bの緑化を確実なものとすることができる。
In the state where the vegetation base material A is disposed on the slope B, the soil filling hole 12 of the vegetation base material A is directed upward from the vertical direction with respect to the slope B. Because of the inclined hole, the growth direction of the vegetation grown from the inside of the bottomed soil filling hole 12 at another location is substantially coincident with the vertical direction with respect to the horizontal direction, and the vegetation is Even after laying the base material A on the slope B, it grows smoothly with almost no change in the growth direction and takes root in the slope B in a short period of time to ensure the greening of the slope B Can be.

【0035】特に、上記植生基材Aをその傾斜した客土
充填穴12を鉛直方向に向けた状態で上記法面B上に敷設
している場合には、上記植生基材Aを上記法面B上に敷
設した後も、予め上記客土充填穴12内において成長させ
た草木の成長方向と水平方向に対する鉛直方向とを合致
させることができ、よって、上記植生基材Aを上記法面
B上に敷設、固定した後も上記草木をその成長方向を変
化させることなく極めて順調に成長させて上記法面Bの
緑化を確実に行うことができる。
In particular, when the vegetation base material A is laid on the slope B with the inclined soil filling hole 12 directed vertically, the vegetation base material A is placed on the slope. Even after laying the vegetation base material A on the slope B, the growth direction of the vegetation previously grown in the soil filling hole 12 and the vertical direction with respect to the horizontal direction can be matched. Even after being laid and fixed on the top, the above-mentioned vegetation can be grown very smoothly without changing its growth direction, and the slope B can be surely greened.

【0036】更に、上記植生基材Aには徐効性肥料から
なる楔Cが打ち込まれており、上記植生基材A全体には
雨水等によって上記楔Cから溶出した肥料分が行き渡っ
ている。従って、上記植生基材Aの客土充填穴12から成
長した草木は、上記肥料分に向かって積極的に根張りを
して上記植生基材Aの崩壊、分解を促進するとともに法
面Bへの根張りも促進され、法面Bの緑化を短期間のう
ちに確実に行うことができる。
Further, a wedge C made of a slow-acting fertilizer is driven into the vegetation base material A, and the fertilizer eluted from the wedge C by rainwater or the like spreads over the entire vegetation base material A. Therefore, the vegetation grown from the soil filling hole 12 of the vegetation base material A actively roots toward the fertilizer to promote the collapse and decomposition of the vegetation base material A and to the slope B. And the greening of the slope B can be surely performed in a short period of time.

【0037】なお、上記植生基材Aでは、複数個の植生
基材要素1a、1a・・・を上下方向に積層一体化させるこ
とによって上記植生基材主体1を形成した場合を説明し
たが、図4に示したように、上記植生基材要素1aを上記
植生基材主体1と同程度の厚さに形成し、一つの植生基
材要素1aで植生基材主体1を形成するようにしてもよ
い。
In the vegetation base material A, a case was described in which the vegetation base body 1 was formed by stacking and integrating a plurality of vegetation base elements 1a, 1a,. As shown in FIG. 4, the vegetation base element 1a is formed to have a thickness similar to that of the vegetation base body 1 and one vegetation base element 1a forms the vegetation base body 1. Is also good.

【0038】[0038]

【発明の効果】請求項1に記載の植生基材は、木毛チッ
プをセメントで固めることによって植生基材主体を形成
し、この植生基材主体に上面から所定深さに達した客土
を充填するための有底客土充填穴を凹設していることを
特徴とするので、有底客土充填穴に種子を含有する客土
を充填し又は高木等の幼苗を植え、緑化すべき法面とは
異なる環境の良い場所において上記有底客土充填穴内の
種子又は幼苗をある程度の大きさの草木にまで育てた
後、上記植生基材を上記緑化すべき法面上に敷設するこ
とができ、よって、緑化すべき法面が環境的に厳しい場
所であったとしても上記草木はある程度の大きさに育っ
ているので所定の生命力を有し途中で枯れたりするとい
ったことはなく、上記草木は上記法面に確実に根張り
し、法面の緑化を円滑に且つ確実に行うことができる。
According to the vegetation base material of the present invention, the vegetation base material is formed by solidifying the wood wool chips with cement, and the vegetation base material is provided with the soil that reaches a predetermined depth from the upper surface. Since the bottomed soil filling hole for filling is characterized by being recessed, the bottomed soil filling hole should be filled with soil containing seeds or planted with seedlings such as trees and greened. After growing the seeds or seedlings in the bottomed soil filling hole to a plant of a certain size in a place with a good environment different from the slope, lay the vegetation base material on the slope to be greened. Therefore, even if the slope to be greened is an environmentally harsh place, the vegetation grows to a certain size, so it has a certain vitality and does not wither in the middle. The plants are firmly rooted on the above slopes, and the greening of the slopes is smooth. It can be carried out and reliably.

【0039】又、上記の如く、上記植生基材の有底客土
充填穴内に草木をある程度成長させた状態で現場に搬入
することができるので、現場においては、上記植生基材
を上記法面上に敷設するといった作業だけで足り、よっ
て、現場における上記植生基材の敷設作業の短縮化を図
ることができる。
Further, as described above, the vegetation base material can be carried to the site in a state where the vegetation has grown to some extent in the bottomed soil filling hole of the vegetation base material. Only the work of laying the vegetation base material on the top is sufficient, so that the work of laying the vegetation base material on site can be shortened.

【0040】請求項2に記載の植生基材は、請求項1に
記載の植生基材において、植生基材主体の外周部を緻密
にして該植生基材主体内に含有する水分の蒸散を防止し
ていることを特徴とするので、植生基材内の水分が該植
生基材の外部に蒸散するのを防止することができ、よっ
て、植生基材を敷設する場所が砂地等のような環境の厳
しい場所であっても上記植生基材内の水分を確実に保持
して該植生基材の有底客土充填穴内の草木の成長を確実
なものとし法面の緑化を確実に遂行することができる。
The vegetation base material according to the second aspect is the vegetation base material according to the first aspect, in which the outer peripheral portion of the vegetation base material is made dense to prevent evaporation of water contained in the vegetation base material. Therefore, it is possible to prevent moisture in the vegetation base material from evaporating to the outside of the vegetation base material. Even in severe places, the water in the vegetation base material is securely retained to ensure the growth of vegetation in the bottomed soil filling hole of the vegetation base material, and to ensure the greening of the slope. Can be.

【0041】請求項3に記載の植生基材は、請求項1又
は請求項2に記載の植生基材において、有底客土充填穴
は、緑化すべき法面に対して垂直方向よりも上向きに指
向する傾斜穴であることを特徴とするので、上記植生基
材を上記法面上に敷設した後も上記有底客土充填穴内か
ら成長させた草木の成長方向と水平方向に対する鉛直方
向とが略一致した状態となり、上記草木は、順調に成長
し短期間のうちに法面の緑化を完了させることができ
る。
The vegetation base material according to claim 3 is the vegetation base material according to claim 1 or 2, wherein the bottomed soil filling hole is directed upward from a direction perpendicular to a slope to be greened. Since it is characterized by inclined holes directed to the, the vegetation base material even after laying on the slope, the growth direction and the vertical direction to the horizontal direction of the vegetation grown from the bottomed soil filling hole. , And the vegetation grows smoothly, and the greening of the slope can be completed in a short period of time.

【0042】請求項4に記載の植生基材は、請求項1乃
至請求項3の何れか1項に記載の植生基材において、有
底客土充填穴は、植生基材を緑化すべき法面に敷設した
際に鉛直方向を指向する鉛直穴であることを特徴とする
ので、上記有底客土充填穴内から成長した草木の成長方
向と水平方向に対する鉛直方向とが一致した状態とな
り、上記草木は、より順調に成長し短期間のうちに法面
の緑化を完了させることができる。
The vegetation base material according to claim 4 is the vegetation base material according to any one of claims 1 to 3, wherein the bottomed soil filling hole is a method for greening the vegetation base material. Since it is characterized by being a vertical hole oriented in the vertical direction when laid on the surface, the growth direction of the vegetation grown from inside the bottomed soil filling hole and the vertical direction with respect to the horizontal direction are in a state in which The vegetation grows more smoothly and can complete the slope greening in a short time.

【0043】請求項5に記載の法面の緑化方法は、木毛
チップをセメントで固めることによって形成された植生
基材主体の上面から所定深さに達した有底客土充填穴内
に、予め所定大きさに成長した草木を植生させておき、
この植生基材を緑化すべき法面上に敷設、固定すること
を特徴とするので、種子から育てる場合と異なり、草木
は所定大きさに成長した状態とされて所定の生命力を有
しており、よって、緑化すべき法面が砂地等の環境的に
厳しい場所であったとしても途中で枯れたりするといっ
たことはなく、上記草木は上記法面に確実に根張りし、
法面の緑化を円滑に且つ確実に行うことができる。
According to a fifth aspect of the present invention, there is provided a method for revegetating a slope having a bottom-filled soil filling hole reaching a predetermined depth from an upper surface of a vegetation base material formed by cementing wood wool chips with cement. Vegetation that has grown to a predetermined size is vegetated,
Since this vegetation base material is laid and fixed on the slope to be greened, unlike plants grown from seeds, plants and plants are grown to a predetermined size and have a predetermined vitality. Therefore, even if the slope to be greened is an environmentally harsh place such as sandy land, it does not die on the way, and the above-mentioned vegetation is firmly rooted on the slope,
Greening of the slope can be performed smoothly and reliably.

【0044】請求項6に記載の法面の緑化方法は、請求
項5に記載の法面の緑化方法において、有底客土充填穴
は、植生基材を緑化すべき法面上に敷設する際に、上記
植生基材をこれらの植生基材に凹設している有底客土充
填穴を法面に対して垂直方向よりも上方に向けて上記法
面上に敷設、固定することを特徴とするので、植生基材
の有底客土充填穴から予め植生させている草木の成長方
向は、上記植生基材を上記法面上に敷設した後も殆ど変
化することはない。
According to a sixth aspect of the present invention, there is provided a method for greening a slope according to the fifth aspect, wherein the bottomed soil filling hole is laid on the slope where the vegetation base material is to be greened. At this time, the vegetation base material should be laid and fixed on the slope with the bottomed soil filling hole recessed in the vegetation base facing upward from the vertical direction with respect to the slope. Because of this feature, the growth direction of the vegetation previously vegetated from the bottomed soil filling hole of the vegetation base material hardly changes even after the vegetation base material is laid on the slope.

【0045】即ち、上記植生基材の客土充填穴から植生
させている草木は、上記植生基材を上記法面上に敷設し
た後もその成長方向を殆ど変化させられることなく同一
方向に順調に成長して上記法面に円滑に且つ確実に根張
りし、上記法面の緑化を円滑に且つ確実に行うことがで
きる。
That is, even after the vegetation base material is laid on the slope, the vegetation vegetated from the soil filling hole of the vegetation base material can be smoothly grown in the same direction without substantially changing its growth direction. The slope can be smoothly and reliably rooted on the slope, and the slope can be smoothly and reliably greened.

【0046】請求項7に記載の法面の緑化方法は、請求
項5又は請求項6に記載の法面の緑化方法において、植
生基材に凹設している有底客土充填穴は、その上側開口
端から内底面に向かって傾斜した傾斜穴に形成されてあ
り、この傾斜した有底客土充填穴を鉛直方向に向けた状
態で上記植生基材を法面上に敷設、固定することを特徴
とするので、上記法面上に凹所をわざわざ形成すること
なく上記植生基材を単に上記法面上に敷設するだけで、
上記植生基材の有底客土充填穴から予め一定大きさに成
長させた草木の成長方向と水平方向に対する鉛直方向と
を合致させ、上記植生基材の上記法面への敷設前後にお
ける上記草木の成長方向を同一方向にでき、よって、上
記草木は極めて順調に成長して上記法面に対して円滑に
且つ確実に根張りし、上記法面の緑化を短期間のうちに
確実に行うことができる。
According to a seventh aspect of the present invention, there is provided a method for greening a slope according to the fifth or sixth aspect, wherein: The vegetation base material is laid and fixed on the slope in a state where the inclined hole with the inclined bottomed soil is oriented vertically in the inclined hole from the upper open end toward the inner bottom surface. Because it is characterized by simply laying the vegetation base material on the slope without forming a recess on the slope,
The growth direction of the vegetation grown to a certain size in advance from the bottomed soil filling hole of the vegetation base material matches the vertical direction with respect to the horizontal direction, and the vegetation material before and after laying the vegetation base material on the slope. Can grow in the same direction, so that the vegetation grows very smoothly and firmly and securely roots on the slope, so that the slope can be greened within a short period of time. Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】植生基材を示した模式斜視図である。FIG. 1 is a schematic perspective view showing a vegetation base material.

【図2】図1の植生基材を緑化すべき法面上に敷設、固
定した状態を示した模式縦断面図である。
FIG. 2 is a schematic longitudinal sectional view showing a state where the vegetation base material of FIG. 1 is laid and fixed on a slope to be greened.

【図3】図1の植生基材を示した模式縦断面図である。FIG. 3 is a schematic vertical sectional view showing the vegetation base material of FIG.

【図4】植生基材の他の一例を示した模式斜視図であ
る。
FIG. 4 is a schematic perspective view showing another example of a vegetation base material.

【符号の説明】[Explanation of symbols]

1 植生基材主体 1a 植生基材要素 11 木毛チップ 12 有底客土充填穴 A 植生基材 B 法面 C 楔 Reference Signs List 1 Vegetation base material 1a Vegetation base element 11 Wood wool chip 12 Bottom soil filling hole A Vegetation base B Slope C Wedge

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 木毛チップをセメントで固めることによ
って植生基材主体を形成し、この植生基材主体に上面か
ら所定深さに達した客土を充填するための有底客土充填
穴を凹設していることを特徴とする植生基材。
1. A vegetation base material is formed by solidifying a wood wool chip with cement, and a bottomed soil filling hole for filling the vegetation base material with a soil reaching a predetermined depth from an upper surface. A vegetation substrate characterized by being recessed.
【請求項2】 植生基材主体の外周部を緻密にして該植
生基材主体内に含有する水分の蒸散を防止していること
を特徴とする請求項1に記載の植生基材。
2. The vegetation base material according to claim 1, wherein an outer peripheral portion of the vegetation base material is made dense to prevent evaporation of water contained in the vegetation base material.
【請求項3】 有底客土充填穴は、緑化すべき法面に対
して垂直方向よりも上向きに指向する傾斜穴であること
を特徴とする請求項1又は請求項2に記載の植生基材。
3. The vegetation base according to claim 1, wherein the bottomed soil filling hole is an inclined hole directed upward from a vertical direction with respect to a slope to be greened. Wood.
【請求項4】 有底客土充填穴は、植生基材を緑化すべ
き法面に敷設した際に鉛直方向を指向する鉛直穴である
ことを特徴とする請求項1乃至請求項3の何れか1項に
記載の植生基材。
4. The bottomed soil filling hole is a vertical hole oriented in a vertical direction when the vegetation base material is laid on a slope to be greened. A vegetation substrate according to claim 1.
【請求項5】 木毛チップをセメントで固めることによ
って形成された植生基材主体の上面から所定深さに達し
た有底客土充填穴内に、予め所定大きさに成長した草木
を植生させておき、この植生基材を緑化すべき法面上に
敷設、固定することを特徴とする法面の緑化方法。
5. A vegetation which has grown in advance to a predetermined size is vegetated in a bottomed soil filling hole reaching a predetermined depth from an upper surface of a vegetation base mainly formed by hardening a wool chip with cement. And laying and fixing the vegetation base material on the slope to be greened.
【請求項6】 植生基材を緑化すべき法面上に敷設する
際に、上記植生基材をこれらの植生基材に凹設している
有底客土充填穴を法面に対して垂直方向よりも上方に向
けて上記法面上に敷設、固定することを特徴とする請求
項5に記載の法面の緑化方法。
6. When laying a vegetation base material on a slope to be greened, the vegetation base material has a bottomed soil filling hole which is recessed in the vegetation base material and is perpendicular to the slope. The method for greening a slope according to claim 5, wherein the slope is laid and fixed on the slope so as to face upward.
【請求項7】 植生基材に凹設している有底客土充填穴
は、その上側開口端から内底面に向かって傾斜した傾斜
穴に形成されてあり、この傾斜した有底客土充填穴を鉛
直方向に向けた状態で上記植生基材を法面上に敷設、固
定することを特徴とする請求項5又は請求項6に記載の
法面の緑化方法。
7. The bottomed soil filling hole formed in the vegetation base material is formed as an inclined hole inclined from the upper open end toward the inner bottom surface. The method for greening a slope according to claim 5 or 6, wherein the vegetation base material is laid and fixed on the slope with the holes oriented in the vertical direction.
JP2000243314A 2000-08-10 2000-08-10 Vegetative base concrete and greening method of slope making use thereof Pending JP2002054144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000243314A JP2002054144A (en) 2000-08-10 2000-08-10 Vegetative base concrete and greening method of slope making use thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000243314A JP2002054144A (en) 2000-08-10 2000-08-10 Vegetative base concrete and greening method of slope making use thereof

Publications (1)

Publication Number Publication Date
JP2002054144A true JP2002054144A (en) 2002-02-20

Family

ID=18734188

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000243314A Pending JP2002054144A (en) 2000-08-10 2000-08-10 Vegetative base concrete and greening method of slope making use thereof

Country Status (1)

Country Link
JP (1) JP2002054144A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112392057A (en) * 2020-12-25 2021-02-23 河南省前坪水库管理局 Honeycomb type rock soil excavation slope ecological restoration structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112392057A (en) * 2020-12-25 2021-02-23 河南省前坪水库管理局 Honeycomb type rock soil excavation slope ecological restoration structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105248023A (en) Fertilization rod and using method thereof
CN103556642A (en) High rock slope green covered plant underground habitat reconstruction method
CN104705059A (en) Planting method for steep hill mixed forest of trees and shrubs in Dabie Mountain Area in Anhui province
JP2001303574A (en) Simple method of planting face of slope or wall face and planting base and planting auxiliary member for use therein
KR100671719B1 (en) A method for tree planting and a pot for planting trees
JP2789460B2 (en) Vegetation bag body and slope planting method using it
JP2002054144A (en) Vegetative base concrete and greening method of slope making use thereof
CN114342727A (en) Dry rocky sunny slope pinus sylvestris forestation method
JP4841890B2 (en) Bamboo tool for planting, planting method using the bamboo tool, and slope greening method
CN210094189U (en) Big tree abrupt slope of oriental cherry structure of planting
JP3977527B2 (en) Revetment block device for planting
JPH10150862A (en) Vegetation protective cylinder and its method of use
JP3066785B2 (en) Planting method
JP2002054143A (en) Greening structure of slope
KR100352889B1 (en) Method for landscape planting of rock slope using pots
JP2002054142A (en) Vegetative base concrete and greening method of slope making use thereof
JP3009808U (en) Miyama Kirishima cultivation equipment
LU506663B1 (en) Method for manufacturing new planting stick for plant-growing hole, and application of new planting stick for plant-growing hole in re-greening of high and steep rock slope
JPH09107820A (en) Tree planting on slope
KR101069309B1 (en) A method of revegetation for retaining wall using vegetation filter
RU2444891C1 (en) Method of creation forest ranges on seasonally inundated lands
JP2000120071A (en) Device for greening slope
JPS62296816A (en) Method for laying turf to slope land
JPH05272148A (en) Vegetation block and face of slope vegetation method using same block
JP2001016992A (en) Planting structure of plant seedling, planting method and planting structure of plant seedling in planting apparatus