JP2001287877A - Main rope replacement method and device for elevator - Google Patents

Main rope replacement method and device for elevator

Info

Publication number
JP2001287877A
JP2001287877A JP2000102492A JP2000102492A JP2001287877A JP 2001287877 A JP2001287877 A JP 2001287877A JP 2000102492 A JP2000102492 A JP 2000102492A JP 2000102492 A JP2000102492 A JP 2000102492A JP 2001287877 A JP2001287877 A JP 2001287877A
Authority
JP
Japan
Prior art keywords
main rope
rope
existing
new
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000102492A
Other languages
Japanese (ja)
Other versions
JP3841616B2 (en
Inventor
Noriyuki Sahoda
典之 佐保田
Isato Uragami
勇人 浦上
Koichi Gondo
浩一 権藤
Kazutake Yokoyama
一威 横山
Masahiro Murase
正宏 村瀬
Daisuke Fukunaga
大助 福永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2000102492A priority Critical patent/JP3841616B2/en
Publication of JP2001287877A publication Critical patent/JP2001287877A/en
Application granted granted Critical
Publication of JP3841616B2 publication Critical patent/JP3841616B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a main rope replacement method and device allowing the replacement of a main rope dividedly without requiring any special work or frame. SOLUTION: This method and device comprises a rope connector 17 for connecting one end of a new main rope 20 to one end of an existing main rope 4, a pulling means 15 for successively pulling the existing main rope 4 having the new main rope 20 connected thereto from the other end side, and fitting bodies 30a-30f and guide bodies 31a-31c interposed between a sheave 3a and the main ropes 4 and 20 to reduce the friction force generated in the movement of the main ropes 4 and 20. The existing main rope 4 is pulled by the pulling means 15, whereby the new main rope 20 connected to the existing main rope 4 through the rope connector 17 is successively laid.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、主ロープを既設の
ものから新設のものへと交換する際に用いられるエレベ
ータの主ロープ交換方法とその装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for replacing a main rope of an elevator used when replacing a main rope from an existing one to a new one.

【0002】[0002]

【従来の技術】従来、主ロープを既設のものから新設の
ものへと交換する場合、例えば特開平7−252052
号公報に記載されるように、既設主ロープのうちの少な
くとも1本を巻上機に設置された案内装置に掛け替える
とともに、前記案内装置に掛けられた前記既設主ロープ
の両端部を乗かごおよびつり合いおもりから取り外し、
その一端部に新設主ロープを接続する。次いで、前記案
内装置に掛けられた主ロープをこの案内装置の案内で移
動させた後、前記新設主ロープから前記既設主ロープを
切り離し、前記新設主ロープの一端を前記乗かご、他端
を前記つり合いおもりにそれぞれ接続する工程からなる
エレベータの主ロープ交換方法が提案されている。
2. Description of the Related Art Conventionally, when replacing a main rope from an existing one to a new one, for example, Japanese Patent Laid-Open No. 7-252052
As described in the publication, at least one of the existing main ropes is replaced with a guide device installed in a hoisting machine, and both ends of the existing main rope hung on the guide device are placed in a car. And remove from the counterweight,
Connect the new main rope to one end. Next, after moving the main rope hung on the guide device by the guidance of the guide device, the existing main rope is separated from the new main rope, one end of the new main rope is the car, and the other end is the car. There has been proposed a method of exchanging a main rope of an elevator, which comprises a step of connecting each to a counterweight.

【0003】また、特開平2−249885号公報に記
載されるように、まず、つり合いおもりを昇降路下部に
て台により保持するとともに、乗かごを昇降路上部にて
チェーンブロックで吊り上げた後、ロープ把持装置を前
記つり合いおもりの上方に配置し、既設主ロープを把持
する。次いで、既設主ロープのつり合いおもり側の端部
をロープ止め金具から切り離して、その端部にドラムに
より新設主ロープを接続するとともに、乗かご側の端部
をロープ止め金具から切り離して、その端部をドラムに
取付ける。この後、巻上機を低速にて作動させ、既設主
ロープをドラムに巻き取るとともに、新設主ロープをド
ラムから繰り出し、この新設主ロープを順次掛け渡す。
そして、新設主ロープのそれぞれの端部をロープ止め金
具に接続する工程からなるエレベータの主ロープ交換方
法が提案されている。
As described in JP-A-2-249885, first, a counterweight is held by a platform at a lower portion of a hoistway, and a car is lifted by a chain block at an upper portion of a hoistway. A rope gripping device is disposed above the counterweight to grip an existing main rope. Then, the end of the existing main rope on the counterweight side is separated from the rope stopper, the new main rope is connected to the end by a drum, and the end on the car side is separated from the rope stopper, and the end is removed. Attach the part to the drum. Thereafter, the hoist is operated at a low speed, the existing main rope is wound around the drum, the new main rope is unwound from the drum, and the new main rope is sequentially wound.
Then, there has been proposed an elevator main rope replacement method including a step of connecting each end of a new main rope to a rope stopper.

【0004】[0004]

【発明が解決しようとする課題】ところで、前述した従
来の前者の方法では、案内装置を配置するために、例え
ば機械室の天井部にアンカーボルト等を新規に設ける必
要があった。また、天井部以外に配置する場合、前記機
械室内に枠体を設置する必要があり、この枠体の設置作
業に労力を要するとともに、比較的狭い機械室への前記
枠体の設置に伴う作業性および安全性の低下を免れなか
った。
However, in the above-described conventional method, it is necessary to newly provide an anchor bolt or the like, for example, on a ceiling of a machine room in order to dispose the guide device. Further, in the case of disposing the frame at a place other than the ceiling, it is necessary to install a frame in the machine room, and the work of installing the frame requires labor and the work involved in installing the frame in a relatively narrow machine room. The sexuality and safety declined.

【0005】また、前述した従来の後者の方法では、巻
上機を作動させて主ロープの交換作業を行うため、例え
ば6本の主ロープ掛けのものであれば、6本を同時に交
換可能であるが、新設主ロープ6本と、既設主ロープ6
本を配置する領域が必要となり、この比較的広い領域が
確保できない場合に、主ロープ交換を分割して行うこと
ができないという問題があった。
In the above-mentioned conventional method, the main rope is exchanged by operating the hoist. For example, if the main rope is hung with six ropes, the six ropes can be exchanged simultaneously. There are 6 new main ropes and 6 existing main ropes.
There is a problem that a region for arranging books is required, and when this relatively large region cannot be secured, the main rope exchange cannot be performed in a divided manner.

【0006】本発明はこのような従来技術における実情
に鑑みてなされたもので、その目的は、特別な加工や枠
体を要することなく、かつ分割して主ロープ交換を行う
ことのできるエレベータの主ロープ交換方法とその装置
を提供することにある。
The present invention has been made in view of such a situation in the prior art, and an object of the present invention is to provide an elevator capable of performing main rope replacement by dividing without requiring special processing or a frame. An object of the present invention is to provide a main rope replacement method and a device thereof.

【0007】[0007]

【課題を解決するための手段】この目的を達成するため
に本発明の請求項1記載の発明は、昇降路頂部近傍に設
置される巻上機と、前記昇降路内を昇降可能な乗かごお
よびつり合いおもりと、一方が前記乗かごに、他方が前
記つり合いおもりに連結されるか巻掛けられ、かつその
中間部が前記巻上機のシーブに巻き掛けられる少なくと
も1本の主ロープを備え、この主ロープを既設のものか
ら新設のものへと交換する際に用いられるエレベータの
主ロープ交換方法において、前記乗かごおよび前記つり
合いおもりを固定し、次いで、既設主ロープの一端に新
設主ロープの一端を接続し、この後、前記シーブと前記
主ロープ間に前記主ロープの移動時に生じる摩擦力を低
減するロープ案内手段を介設し、次に、引き込み手段に
より前記新設主ロープが接続された前記既設主ロープを
他端側から順次引き込んで前記新設主ロープを掛け渡す
ようにしてある。
In order to achieve this object, an invention according to claim 1 of the present invention comprises a hoisting machine installed near the top of a hoistway and a car capable of moving up and down in the hoistway. And a counterweight and at least one main rope one of which is connected or wrapped around the car, the other with the counterweight, and the middle of which is wrapped around the sheave of the hoist, In an elevator main rope replacement method used when replacing the main rope from an existing one to a new one, the car and the counterweight are fixed, and then the new main rope is attached to one end of the existing main rope. One end is connected, and thereafter, a rope guide means for reducing a frictional force generated when the main rope is moved is interposed between the sheave and the main rope, and then the new main rope is connected by a retracting means. It is sequentially draw the existing main rope flop is connected from the other end are to pass over the newly main rope.

【0008】前記のように構成した本発明の請求項1記
載の発明によれば、まず、前記乗かごおよび前記つり合
いおもりを所定の位置で固定し、次いで、既設主ロープ
のどちらか一端に新設主ロープの一端を接続する。この
後、前記シーブと前記主ロープ間に前記主ロープの移動
時に生じる摩擦力を低減するロープ案内手段を介設し、
次に、前記引き込み手段により前記新設主ロープが接続
された前記既設主ロープを他端側から順次引き込み、前
記新設主ロープを掛け渡す。これによって、従来のよう
な特別な加工や枠体を要することないとともに、巻上機
の作動を必要とせずに前記引き込み手段により順次主ロ
ープを引き込むため、分割して主ロープ交換を行うこと
ができる。
According to the first aspect of the present invention, the car and the counterweight are first fixed at predetermined positions, and then the car and the counterweight are newly installed at one end of the existing main rope. Connect one end of the main rope. Thereafter, a rope guiding means is provided between the sheave and the main rope to reduce a frictional force generated when the main rope moves,
Next, the existing main rope, to which the new main rope is connected, is sequentially drawn in from the other end by the drawing-in means, and the new main rope is bridged. This eliminates the need for special processing and a frame body as in the related art, and sequentially pulls in the main ropes by the drawing-in means without requiring the operation of the hoisting machine. it can.

【0009】また、前記目的を達成するために本発明の
請求項2記載の発明は、昇降路頂部近傍に設置される巻
上機と、前記昇降路内を昇降可能な乗かごおよびつり合
いおもりと、一方が前記乗かごに、他方が前記つり合い
おもりに連結されるか巻掛けられ、かつその中間部が前
記巻上機のシーブおよびプーリに巻き掛けられる少なく
とも1本の主ロープを備え、この主ロープを既設のもの
から新設のものへと交換する際に用いられるエレベータ
の主ロープ交換装置において、既設主ロープの一端に新
設主ロープの一端を接続するロープ接続手段と、前記新
設主ロープが接続された前記既設主ロープを他端側から
順次引き込む引き込み手段と、前記シーブと前記主ロー
プ間に介設され、前記主ロープの移動時に生じる摩擦力
を低減するロープ案内手段とを備えた構成にしてある。
According to another aspect of the present invention, there is provided a hoist installed near a top of a hoistway, and a car and a counterweight capable of moving up and down in the hoistway. , One of which is connected or wound around the car and the other is connected to the counterweight, and an intermediate portion of which is provided with at least one main rope wound around sheaves and pulleys of the hoisting machine. In an elevator main rope exchanging device used when exchanging a rope from an existing one to a new one, a rope connecting means for connecting one end of the new main rope to one end of the existing main rope, wherein the new main rope is connected. A pull-in means for sequentially pulling the existing main rope from the other end side, and a rope interposed between the sheave and the main rope for reducing a frictional force generated when the main rope moves. It is a configuration that includes an inner unit.

【0010】前記のように構成した本発明の請求項2記
載の発明によれば、まず、前記乗かごおよび前記つり合
いおもりを所定の位置で固定し、次いで、既設主ロープ
のどちらか一端に新設主ロープの一端を接続する。この
後、前記シーブと前記主ロープ間に前記主ロープの移動
時に生じる摩擦力を低減するロープ案内手段を介設し、
次に、前記引き込み手段により前記新設主ロープが接続
された前記既設主ロープを他端側から順次引き込み、前
記新設主ロープを掛け渡す。このように前記引き込み手
段により順次主ロープを引き込むが、このとき前記ロー
プ案内手段により引き込み自重を低減できるため前記引
き込み手段を小型かつ軽量なものとすることが可能であ
り、したがって、従来のような特別な加工や枠体を要す
ることない。また、巻上機の作動を必要とせずに前記引
き込み手段により順次主ロープを引き込むため、分割し
て主ロープ交換を行うことができる。
According to the second aspect of the present invention constructed as described above, first, the car and the counterweight are fixed at predetermined positions, and then a new one is installed at one end of the existing main rope. Connect one end of the main rope. Thereafter, a rope guiding means is provided between the sheave and the main rope to reduce a frictional force generated when the main rope moves,
Next, the existing main rope, to which the new main rope is connected, is sequentially drawn in from the other end by the drawing-in means, and the new main rope is bridged. As described above, the main rope is sequentially pulled in by the pull-in means. At this time, the pull-in means can reduce the weight of the pull-in by the rope guide means. No special processing or frame is required. Further, since the main ropes are sequentially drawn in by the drawing means without requiring the operation of the hoisting machine, the main ropes can be divided and exchanged.

【0011】[0011]

【発明の実施の形態】以下、本発明のエレベータの主ロ
ープ交換方法とその装置の実施の形態を図に基づいて説
明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing an embodiment of an elevator main rope replacing method and apparatus according to the present invention.

【0012】図1は本発明のエレベータの主ロープ交換
装置の一実施形態を示す縦断面図、図2は本発明のエレ
ベータの主ロープ交換方法を示すフローチャート、図3
は図1の主ロープ交換装置のロープ案内手段を示す要部
拡大図、図4は主ロープが巻き掛けられる巻上機を示す
要部拡大図、図5は図1の主ロープ交換装置のロープ接
続手段を示す要部拡大図である。
FIG. 1 is a longitudinal sectional view showing an embodiment of an elevator main rope exchanging apparatus according to the present invention, FIG. 2 is a flowchart showing an elevator main rope exchanging method according to the present invention, and FIG.
Is an enlarged view of a main part showing a rope guide means of the main rope exchanging apparatus of FIG. 1, FIG. 4 is an enlarged view of a main part showing a hoist around which the main rope is wound, and FIG. 5 is a rope of the main rope exchanging apparatus of FIG. It is a principal part enlarged view which shows a connection means.

【0013】エレベータは一般に図1に示すように、昇
降路1上方の機械室2に設置されるマシーンビーム19
上に配置される巻上機3と、この巻上機3のシーブ3a
に中間部が巻き掛けられ、両側部が昇降路1内で懸垂さ
れてそれぞれループ状に形成され、かつ両端部が機械室
2の床2aにロープ止め金具10、11を介してそれぞ
れ支持される例えば6本の既設主ロープ4と、この既設
主ロープ4の一方の懸垂部分に係合するプーリ5を上部
に備え、このプーリ5を介し昇降路1内で吊り上げられ
る乗かご6と、既設主ロープ4の他方の懸垂部分に係合
するプーリ7を上部に備え、このプーリ7を介し昇降路
1内で吊り上げられるつり合いおもり8と、機械室2に
設置され、既設主ロープ4が巻き掛けられるそらせ車プ
ーリ9とを有している。
The elevator is generally equipped with a machine beam 19 installed in the machine room 2 above the hoistway 1 as shown in FIG.
A hoisting machine 3 disposed above and a sheave 3a of the hoisting machine 3
, And both sides are suspended in the hoistway 1 to form loops, respectively, and both ends are supported on the floor 2a of the machine room 2 via the rope fasteners 10 and 11, respectively. For example, six existing main ropes 4, a pulley 5 which is engaged with one suspended portion of the existing main ropes 4 provided on the upper part, a car 6 which is lifted in the hoistway 1 via the pulleys 5, A pulley 7 that engages with the other suspended portion of the rope 4 is provided at the upper portion, and a counterweight 8 that is lifted in the hoistway 1 via the pulley 7 and is installed in the machine room 2 and the existing main rope 4 is wound therearound. And a deflector pulley 9.

【0014】そして、本実施形態の主ロープ交換装置
は、主ロープ交換の際に昇降路1下部のピット18に設
置され、乗かご6およびつり合いおもり8のいずれか一
方の昇降体、例えば図1においてはつり合いおもり8を
保持する保持台12と、機械室2に設置され、他方の昇
降体、例えば図1においては乗かご6を昇降路1上部に吊
り上げた状態で保持するチェーンブロック13と、新設
主ロープ20をガイドするガイド手段14a、14b
と、乗かご6上に設置され、新設主ロープ20が接続さ
れた既設主ロープ4を順次引き込む引き込み手段15
と、既設主ロープ4を例えばつり合いおもり用レール8
aに固定する固定体16と、既設主ロープ4の一端に新
設主ロープ20の一端を接続するロープ接続手段、例え
ばロープ接続体17と、エレベータホール24に配置さ
れ、新設主ロープ20が巻かれたドラム28と、引き込
み手段15により引き込まれた既設主ロープ4を収納す
る収納容器21と、図3に示すようにシーブ3aと既設
主ロープ4d、4e、4f、4g、4h、4i間に介設
され、この既設主ロープ4d〜4iの移動時に生じる摩
擦力を低減するロープ案内手段、例えばシーブ3aの各
溝部に嵌合される嵌合体30a、30b、30c、30
d、30e、30fと、シーブ3aの凸部間に掛け渡し
て配置され隣り合う既設主ロープ4d〜4iが干渉しな
いようにする案内体31a、31b、31cとを備えて
いる。なお、前述した引き込み手段15は、動力により
ドラムを回転させてロープを巻き取るものよりも、エン
ドレスにロープを送り出す方式が望ましく、本実施形態
は後者のものとなっている。
The main rope exchanging device of this embodiment is installed in a pit 18 below the hoistway 1 at the time of main rope exchanging, and is one of the car 6 and the counterweight 8, for example, FIG. A holding table 12 for holding the counterweight 8, a chain block 13 installed in the machine room 2 and holding the other elevating body, for example, the car 6 in FIG. 1 while being lifted above the hoistway 1, Guide means 14a, 14b for guiding the new main rope 20
A pull-in means 15 installed on the car 6 for sequentially pulling in the existing main ropes 4 to which the new main ropes 20 are connected.
And the existing main ropes 4 are, for example, balanced weight rails 8.
a, a rope connecting means for connecting one end of the new main rope 20 to one end of the existing main rope 4, for example, a rope connecting body 17, and the new main rope 20 are wound around the elevator hall 24. The drum 28, the storage container 21 for storing the existing main rope 4 drawn in by the drawing means 15, and the sheave 3a and the existing main ropes 4d, 4e, 4f, 4g, 4h, 4i as shown in FIG. Rope guide means for reducing frictional force generated when the existing main ropes 4d to 4i move, for example, fitting bodies 30a, 30b, 30c, 30 fitted in respective grooves of the sheave 3a.
d, 30e, and 30f, and guides 31a, 31b, and 31c that are arranged so as to extend between the convex portions of the sheave 3a so that adjacent main ropes 4d to 4i do not interfere with each other. In addition, the above-mentioned retraction means 15 is more preferably a system in which the rope is sent out endlessly than a device in which the drum is rotated by power to wind up the rope, and the present embodiment is the latter.

【0015】この実施形態にあっては図2に示すよう
に、まず手順S1として昇降路1下部のピット18に保
持台12を設置し、この保持第12にてつり合いおもり
8を保持するとともに、マシーンビーム19にチェーン
ブック13を設置し、このチェーンブロック13を乗か
ご6に係合させ、あらかじめ算出される新設主ロープ2
0の初期伸びの長さ寸法分巻き上げた状態で保持する。
次いで、手順S2として引き込み手段15を乗かご6上
の図示しないクロスヘッドに固定し、手順S3として既
設主ロープ4を例えばつり合いおもり用レール16に固
定体16により固定する。この後、手順S4として既設
主ロープを手順S3で示した固定位置より機械室2側で
切断するとともに、この既設主ロープ4を乗かご6上の
プーリ5とロープ止め金具10との間にて切断し、エレ
ベータホール24に設置されたドラム28からガイド手
段14a、14bを介して新設主ロープ20を引き込
み、この新設主ロープ20と既設主ロープ4とをロープ
接続体17により接続する。このロープ接続体17は図
5に示すように、それぞれのロープ4、20を付き合わ
せた部分を包むように設置され、互いのロープ4、20
が引っ張られることにより円筒形の網状に形成されたロ
ープ接続体17が収縮することによりそれぞれのロープ
4、20を接続するようになっている。
In this embodiment, as shown in FIG. 2, first, as a step S1, a holding table 12 is set in a pit 18 below the hoistway 1, and the counterweight 8 is held by the holding twelfth. The chain book 13 is installed on the machine beam 19, the chain block 13 is engaged with the car 6, and the newly installed main rope 2 is calculated in advance.
It is held in a state of being wound up by the length of the initial elongation of 0.
Next, in step S2, the retraction means 15 is fixed to a crosshead (not shown) on the car 6, and in step S3, the existing main rope 4 is fixed to, for example, the counterweight rail 16 by the fixed body 16. Thereafter, as step S4, the existing main rope is cut from the fixed position shown in step S3 on the machine room 2 side, and the existing main rope 4 is placed between the pulley 5 on the car 6 and the rope stopper 10. After the cutting, the new main rope 20 is pulled in from the drum 28 installed in the elevator hall 24 via the guide means 14a and 14b, and the new main rope 20 and the existing main rope 4 are connected by the rope connector 17. As shown in FIG. 5, the rope connector 17 is installed so as to wrap around a portion where the ropes 4 and 20 are attached to each other.
When the rope is pulled, the rope connection body 17 formed in a cylindrical net shape contracts, thereby connecting the ropes 4 and 20 with each other.

【0016】次に、手順S5として図4に示すようにシ
ーブ3aにて既設主ロープ4d〜4iを持ち上げ、図3
に示すようにシーブ3aと既設主ロープ4d〜4i間に
嵌合体30a〜30fを介設し、この既設主ロープ4d
〜4iの移動時に生じる摩擦力を低減するとともに、シ
ーブ3aの凸部間に案内体31a〜31cを掛け渡すよ
うにして配置し、隣り合う既設主ロープ4d〜4iが移
動時に干渉しないようにする。そして、手順S6として
既設主ロープ4を引き込み手段15に装着し、手順S7
として引き込み手段15を動作させ、既設主ロープ4を
順次引き込んで収納容器21に収納するとともに、新設
主ロープ20はプーリ7、そらせ車プーリ9、シーブ3
a、プーリ5を順次通過して掛け渡されていく。このと
きシーブ3aを当初は既設主ロープ4、次いで新設主ロ
ープ20が順次移動するが、前述したようにシーブ3a
と既設主ロープ4ないし新設主ロープ20との間に嵌合
体30a〜30fが介設されているため、移動時に生じ
る摩擦力が低減される。この後、手順S8として新設主
ロープ20のそれぞれの端部をロープ止め金具10、1
1に接続する。この一連の工程を6本の既設主ロープ4
および新設主ロープ20に対して順次行っていく。次い
で、手順S9としてチェーンブロック13を緩め新設主
ロープ20により乗かご6を吊り下げ、新設主ロープ2
0のロープテンション調整をロープ止め金具10、11
により行い、ロープ交換作業が完了する。
Next, in step S5, the existing main ropes 4d to 4i are lifted by the sheave 3a as shown in FIG.
As shown in the figure, fitting bodies 30a to 30f are interposed between the sheave 3a and the existing main ropes 4d to 4i, and the existing main ropes 4d
To reduce the frictional force generated at the time of movement of the guide ropes 4a to 4i, and arrange the guides 31a to 31c between the projections of the sheave 3a so that the adjacent existing main ropes 4d to 4i do not interfere at the time of movement. . Then, as step S6, the existing main rope 4 is attached to the pull-in means 15, and step S7 is performed.
The existing main ropes 4 are sequentially drawn into the storage container 21 and the new main ropes 20 are connected to the pulley 7, the deflector pulley 9, and the sheave 3.
a, sequentially passing through the pulley 5 and being bridged. At this time, the existing main rope 4 and then the new main rope 20 sequentially move the sheave 3a at first, but as described above, the sheave 3a
Since the fitting bodies 30a to 30f are interposed between the existing main rope 4 and the new main rope 20, the frictional force generated during the movement is reduced. Thereafter, in step S8, each end of the new main rope 20 is connected to the rope stoppers 10, 1
Connect to 1. This series of steps is carried out using six existing main ropes 4
And the new main rope 20 is sequentially performed. Next, in step S9, the chain block 13 is loosened, and the car 6 is suspended by the newly installed main rope 20.
0 rope tension adjustment
And the rope replacement work is completed.

【0017】このように構成した本実施形態では、引き
込み手段15により順次主ロープ4、20を引き込む
が、このときロープ案内手段、すなわち嵌合体30a〜
30fにより引き込み自重を低減できるため引き込み手
段15を小型かつ軽量なものとすることが可能であり、
したがって、従来のような特別な加工や枠体を要するこ
とない。また、巻上機3の作動を必要とせずに引き込み
手段15により順次主ロープ4、20を引き込むため、
分割して主ロープ交換を行うことができる。
In this embodiment constructed as described above, the main ropes 4 and 20 are sequentially pulled in by the pull-in means 15, but at this time, the rope guide means, that is, the fitting bodies 30a to 30a are connected.
30f can reduce the weight of the pull-in, so that the pull-in means 15 can be reduced in size and weight.
Therefore, there is no need for special processing and a frame body as in the related art. Further, since the main ropes 4 and 20 are sequentially pulled in by the pull-in means 15 without requiring the operation of the hoisting machine 3,
The main rope can be replaced separately.

【0018】図6は図3に示したロープ案内手段の他の
実施形態を示す要部拡大図である。
FIG. 6 is an enlarged view of a main part showing another embodiment of the rope guide means shown in FIG.

【0019】他の実施形態のロープ案内手段は図6に示
すように、例えばシーブ3aに装着され、既設主ロープ
4d〜4iが比較的小さな接地面積にて係合可能な溝部
を有する他の案内体32を備えている。
As shown in FIG. 6, the rope guide means of another embodiment is mounted on, for example, a sheave 3a and has another groove having a groove with which the existing main ropes 4d to 4i can be engaged with a relatively small ground contact area. A body 32 is provided.

【0020】他の実施形態にあっては前述した手順S5
にてシーブ3aと既設主ロープ4d〜4i間にロープ案
内手段を介設する場合、シーブ3aにて既設主ロープ4
d〜4iを持ち上げ、図6に示すようにシーブ3aと既
設主ロープ4d〜4i間に他の案内体32を介設し、こ
の既設主ロープ4d〜4iの移動時に生じる摩擦力を低
減する。
In another embodiment, the above-described procedure S5
When the rope guide means is interposed between the sheave 3a and the existing main ropes 4d to 4i, the existing main rope 4 is connected to the sheave 3a.
d to 4i are lifted, and another guide body 32 is interposed between the sheave 3a and the existing main ropes 4d to 4i as shown in FIG. 6 to reduce the frictional force generated when the existing main ropes 4d to 4i move.

【0021】また、他の実施形態として、図1に示すよ
うな昇降路1の上部に機械室2が設置されず、巻上機3
が昇降路1の上方に設置されているエレベータの全体図
を図8に示す。
In another embodiment, the machine room 2 is not installed above the hoistway 1 as shown in FIG.
8 shows an overall view of an elevator installed above the hoistway 1. FIG.

【0022】図8において乗かご6は昇降路1内に装着
されたかご側ガイドレール6a,6bに沿って垂直に走
行する。つり合いおもり8もまた昇降路1内に設置され
たつり合いおもり側ガイドレール8a,8bに沿って垂
直に走行する。乗かご6およびつり合いおもり8はロー
プ4によって支持され、走行する。ロープ4は2つの端
部を有し数本の平行なロープから成る。巻上機3は、こ
れらのガイドレール8a,8bの内の1本6bの上端部
に装着されている。この巻上機3にはシーブ3aが設け
られている。ロープ4の両端のうちの一方はガイドレー
ル6aの上端部へロープ止め金具10によって固定さ
れ、そこからこのロープ4はガイドレール6bの上端部
に装着された巻上機3のシーブ3aへ送られる。ここか
ら、ロープ4はつり合いおもり8のプーリ7を介し、つ
り合いおもり側ガイドレール8bの上端部にそう茶され
たロープ止め金具11まで送られて固定される。このよ
うな構成のエレベータのロープ交換を行う場合におい
て、図1の場合と異なる点は、既設主ロープ4は、乗か
ご6の下部のプーリ40a,40bを介し、ロープ止め
金具10へ立上がるので、ガイド手段14cを追加し、
このガイド手段14cを介してロープ4の引込み手段1
5へ装着される。よってこのような構造のエレベータに
おいても図2に示す工程で既設主ロープ4を新設主ロー
プ20へ交換することができる。
In FIG. 8, the car 6 runs vertically along car-side guide rails 6a and 6b mounted in the hoistway 1. The counterweight 8 also runs vertically along the counterweight-side guide rails 8a, 8b installed in the hoistway 1. The car 6 and the counterweight 8 are supported by the rope 4 and run. The rope 4 has two ends and consists of several parallel ropes. The hoist 3 is mounted on the upper end of one of the guide rails 8a, 8b. The hoist 3 is provided with a sheave 3a. One of both ends of the rope 4 is fixed to the upper end of the guide rail 6a by a rope stopper 10, from which the rope 4 is sent to the sheave 3a of the hoisting machine 3 mounted on the upper end of the guide rail 6b. . From here, the rope 4 is sent through the pulley 7 of the counterweight 8 to the rope stopper 11 fitted to the upper end of the counterweight-side guide rail 8b and fixed. The difference from the case of FIG. 1 in performing the rope replacement of the elevator having such a configuration is that the existing main rope 4 rises to the rope stopper 10 via the pulleys 40a and 40b below the car 6. , Adding a guide means 14c,
The pull-in means 1 of the rope 4 through the guide means 14c
5 is attached. Therefore, even in the elevator having such a structure, the existing main rope 4 can be replaced with the new main rope 20 in the process shown in FIG.

【0023】このように構成した他の実施形態では、前
述と同様に引き込み手段15により順次主ロープ4、2
0を引き込むが、このときロープ案内手段、すなわち他
の案内体32により引き込み自重を低減できるため引き
込み手段15を小型かつ軽量なものとすることが可能で
あり、したがって、従来のような特別な加工や枠体を要
することない。
In another embodiment constructed as described above, the main ropes 4, 2
At this time, the pull-in means 15 can be reduced in size and weight because the weight of the pull-in means can be reduced by the rope guide means, that is, the other guide body 32. And no frame is required.

【0024】図7は図5に示すロープ接続手段の他の実
施形態を示す要部拡大図である。
FIG. 7 is an enlarged view of a main part showing another embodiment of the rope connecting means shown in FIG.

【0025】他の実施形態のロープ接続手段は図7に示
すように、例えば既設主ロープ4および新設主ロープ2
0の端部をほぐすことにより形成されるストランド4a
とストランド20a、ストランド4bとストランド20
bおよびストランド4cとストランド20cをそれぞれ
圧着接続する圧着部材22a、22b、22cを備えて
いる。
As shown in FIG. 7, the rope connecting means of another embodiment is, for example, an existing main rope 4 and a new main rope 2.
Strand 4a formed by unraveling the end of zero
And strand 20a, strand 4b and strand 20
b and crimp members 22a, 22b, 22c for crimping the strands 4c and the strands 20c, respectively.

【0026】他の実施形態にあっては、前述した手順S
4にて既設主ロープ4の一端に新設主ロープ20の一端
を接続する場合、既設主ロープ4および新設主ロープ2
0の端部をほぐし、ストランド4aとストランド20
a、ストランド4bとストランド20bおよびストラン
ド4cとストランド20cをそれぞれ圧着部材22a〜
22cにより圧着接続し、接続部の断面径が既設主ロー
プ4および新設主ロープ20の断面径より小さくなるよ
うにする。
In another embodiment, the procedure S
4, when one end of the new main rope 20 is connected to one end of the existing main rope 4, the existing main rope 4 and the new main rope 2 are connected.
0, loosen the strand 4a and strand 20
a, the strands 4b and the strands 20b and the strands 4c and the strands 20c are respectively bonded to the crimping members 22a to 22c.
The crimp connection is performed by 22c so that the cross-sectional diameter of the connection portion is smaller than the cross-sectional diameters of the existing main rope 4 and the new main rope 20.

【0027】[0027]

【発明の効果】本発明は以上のように構成したので、小
型かつ軽量な引き込み手段により主ロープの交換作業を
行うため、従来のような特別な加工や枠体を要すること
なく、したがって、作業性や安全性を向上することがで
きる。
Since the present invention is constructed as described above, the main rope is replaced by a small and lightweight pull-in means, so that there is no need for special processing or a frame as in the prior art. Performance and safety can be improved.

【0028】また、分割して主ロープ交換を行うことが
でき、これによって、比較的小規模の作業領域しか確保
できないエレベータであっても主ロープの交換作業を円
滑に行うことができる。
Further, the main ropes can be replaced separately, so that the main ropes can be replaced smoothly even in an elevator in which only a relatively small work area can be secured.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のエレベータの主ロープ交換装置の一実
施形態を示す縦断面図である。
FIG. 1 is a longitudinal sectional view showing an embodiment of an elevator main rope exchanging device of the present invention.

【図2】本発明のエレベータの主ロープ交換方法を示す
フローチャートである。
FIG. 2 is a flowchart showing an elevator main rope replacement method of the present invention.

【図3】図1の主ロープ交換装置のロープ案内手段を示
す要部拡大図である。
FIG. 3 is an enlarged view of a main part showing a rope guiding means of the main rope changing device of FIG. 1;

【図4】主ロープが巻き掛けられる巻上機を示す要部拡
大図である。
FIG. 4 is an enlarged view of a main part showing a hoist around which a main rope is wound.

【図5】図1の主ロープ交換装置のロープ接続手段を示
す要部拡大図である。
FIG. 5 is an enlarged view of a main part showing a rope connecting means of the main rope changing device of FIG. 1;

【図6】図3に示したロープ案内手段の他の実施形態を
示す要部拡大図である。
6 is an essential part enlarged view showing another embodiment of the rope guiding means shown in FIG. 3;

【図7】図5に示すロープ接続手段の他の実施形態を示
す要部拡大図である。
FIG. 7 is an enlarged view of a main part showing another embodiment of the rope connecting means shown in FIG. 5;

【図8】本発明のエレベータの主ロープ交換装置の他の
実施形態を示す縦断面図である。
FIG. 8 is a longitudinal sectional view showing another embodiment of the elevator main rope exchanging device of the present invention.

【符号の説明】[Explanation of symbols]

1 昇降路 2 機械室 3 巻上機 3a シーブ 4 既設主ロープ 5、7 プーリ 6 乗かご 6a,6b かご側ガイドレール 8 つり合いおもり 8a,8b つり合いおもり側ガイドレール 9 そらせ車プーリ 10、11 ロープ止め金具 12 保持台 13 チェーンブロック 14c ガイド手段 15 引き込み手段 17 ロープ接続体(ロープ接続手段) 20 新設主ロープ 21 収納容器 22a、22b、22c 圧着部材(ロープ接続手段) 28 ドラム 30a、30b、30c、30d、30e、30f 嵌
合体(ロープ案内手段) 31a、31b、31c 案内体(ロープ案内手段) 32 他の案内体(ロープ案内手段) 40a,40b かご下プーリ
DESCRIPTION OF SYMBOLS 1 Hoistway 2 Machine room 3 Hoist 3a Sheave 4 Existing main rope 5, 7 Pulley 6 Car 6a, 6b Car side guide rail 8 Balancing weight 8a, 8b Balancing weight side guide rail 9 Deflector wheel pulley 10, 11 Rope stopper Hardware 12 Holder 13 Chain block 14c Guide means 15 Retraction means 17 Rope connection body (rope connection means) 20 New main rope 21 Storage container 22a, 22b, 22c Crimping member (rope connection means) 28 Drum 30a, 30b, 30c, 30d , 30e, 30f Fitting body (rope guide means) 31a, 31b, 31c Guide body (rope guide means) 32 Other guide bodies (rope guide means) 40a, 40b Car pulley

───────────────────────────────────────────────────── フロントページの続き (72)発明者 権藤 浩一 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 横山 一威 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 村瀬 正宏 東京都足立区中川4丁目16番29号 日立エ レベータテクノサービス株式会社内 (72)発明者 福永 大助 東京都足立区中川4丁目16番29号 日立エ レベータテクノサービス株式会社内 Fターム(参考) 3F304 BA27 3F305 BB02 DA15  ──────────────────────────────────────────────────続 き Continuing from the front page (72) Inventor Koichi Gondo 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Japan Inside the Hitachi Building System Co., Ltd. (72) Inventor Kazutake Yokoyama 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Japan (72) Inventor Masahiro Murase 4-16-29 Nakagawa, Adachi-ku, Tokyo Inside Hitachi Elevator Techno Service Co., Ltd. (72) Daisuke Fukunaga 4-16-29 Nakagawa, Adachi-ku, Tokyo F term in Hitachi Elevator Techno Service Co., Ltd. (reference) 3F304 BA27 3F305 BB02 DA15

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 昇降路頂部近傍に設置される巻上機と、
前記昇降路内を昇降可能な乗かごおよびつり合いおもり
と、一方が前記乗かごに、他方が前記つり合いおもりに
連結されるか巻掛けられ、かつその中間部が前記巻上機
のシーブに巻き掛けられる少なくとも1本の主ロープを
備え、この主ロープを既設のものから新設のものへと交
換する際に用いられるエレベータの主ロープ交換方法に
おいて、 前記乗かごおよび前記つり合いおもりを固定し、次い
で、既設主ロープの一端に新設主ロープの一端を接続
し、この後、前記シーブと前記主ロープ間に前記主ロー
プの移動時に生じる摩擦力を低減するロープ案内手段を
介設し、次に、引き込み手段により前記新設主ロープが
接続された前記既設主ロープを他端側から順次引き込ん
で前記新設主ロープを掛け渡すことを特徴とするエレベ
ータの主ロープ交換方法。
1. A hoisting machine installed near the top of a hoistway,
A car and a counterweight that can be raised and lowered in the hoistway, one of which is connected or wound around the car and the other of which is connected to the counterweight, and an intermediate portion of which is wound around a sheave of the hoisting machine. A main rope replacement method for an elevator used when replacing the main rope from an existing one to a new one, fixing the car and the counterweight, One end of the new main rope is connected to one end of the existing main rope, and thereafter, rope guiding means for reducing a frictional force generated when the main rope is moved is interposed between the sheave and the main rope, and then the pull-in is performed. A main rope of an elevator, wherein the existing main rope to which the new main rope is connected is pulled in from the other end side and the new main rope is bridged by means. Exchange method.
【請求項2】 昇降路頂部近傍に設置される巻上機と、
前記昇降路内を昇降可能な乗かごおよびつり合いおもり
と、一方が前記乗かごに、他方が前記つり合いおもりに
連結されるか巻掛けられ、かつその中間部が前記巻上機
のシーブに巻き掛けられる少なくとも1本の主ロープを
備え、この主ロープを既設のものから新設のものへと交
換する際に用いられるエレベータの主ロープ交換装置に
おいて、 既設主ロープの一端に新設主ロープの一端を接続するロ
ープ接続手段と、前記新設主ロープが接続された前記既
設主ロープを他端側から順次引き込む引き込み手段と、
前記シーブと前記主ロープ間に介設され、前記主ロープ
の移動時に生じる摩擦力を低減するロープ案内手段とを
備えたことを特徴とするエレベータの主ロープ交換装
置。
2. A hoist installed near the top of the hoistway,
A car and a counterweight that can be raised and lowered in the hoistway, one of which is connected or wound around the car and the other of which is connected to the counterweight, and an intermediate portion of which is wound around a sheave of the hoisting machine. An elevator main rope exchange device used for exchanging this main rope from an existing one to a new one, wherein one end of the new main rope is connected to one end of the existing main rope. Rope connecting means, and a retraction means for sequentially pulling in the existing main rope to which the new main rope is connected from the other end side,
A main rope changing device for an elevator, comprising: rope guide means interposed between the sheave and the main rope to reduce frictional force generated when the main rope moves.
JP2000102492A 2000-04-04 2000-04-04 Elevator main rope replacement method and apparatus Expired - Fee Related JP3841616B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000102492A JP3841616B2 (en) 2000-04-04 2000-04-04 Elevator main rope replacement method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000102492A JP3841616B2 (en) 2000-04-04 2000-04-04 Elevator main rope replacement method and apparatus

Publications (2)

Publication Number Publication Date
JP2001287877A true JP2001287877A (en) 2001-10-16
JP3841616B2 JP3841616B2 (en) 2006-11-01

Family

ID=18616364

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000102492A Expired - Fee Related JP3841616B2 (en) 2000-04-04 2000-04-04 Elevator main rope replacement method and apparatus

Country Status (1)

Country Link
JP (1) JP3841616B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1591406A2 (en) 2004-04-29 2005-11-02 Kone Corporation Method and apparatus for changing the rope of a traction sheave elevator
JP2007008669A (en) * 2005-06-30 2007-01-18 Hitachi Ltd Elevator device
JP2011148609A (en) * 2010-01-22 2011-08-04 Hitachi Ltd Rope wrapping method and member of elevator
JP2018012575A (en) * 2016-07-20 2018-01-25 株式会社日立ビルシステム Replacement method of car position adjustment rope
JP6417459B1 (en) * 2017-09-19 2018-11-07 東芝エレベータ株式会社 Elevator rope change assist device
CN113844980A (en) * 2020-06-26 2021-12-28 三菱电机大楼技术服务株式会社 Method for replacing chain

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5571708B2 (en) * 2012-01-26 2014-08-13 株式会社日立ビルシステム How to replace the main rope of the elevator

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1591406A2 (en) 2004-04-29 2005-11-02 Kone Corporation Method and apparatus for changing the rope of a traction sheave elevator
EP1591406A3 (en) * 2004-04-29 2008-05-28 Kone Corporation Method and apparatus for changing the rope of a traction sheave elevator
JP2007008669A (en) * 2005-06-30 2007-01-18 Hitachi Ltd Elevator device
JP4580828B2 (en) * 2005-06-30 2010-11-17 株式会社日立製作所 Elevator equipment
JP2011148609A (en) * 2010-01-22 2011-08-04 Hitachi Ltd Rope wrapping method and member of elevator
JP2018012575A (en) * 2016-07-20 2018-01-25 株式会社日立ビルシステム Replacement method of car position adjustment rope
JP6417459B1 (en) * 2017-09-19 2018-11-07 東芝エレベータ株式会社 Elevator rope change assist device
JP2019052043A (en) * 2017-09-19 2019-04-04 東芝エレベータ株式会社 Elevator rope replacement auxiliary device
CN113844980A (en) * 2020-06-26 2021-12-28 三菱电机大楼技术服务株式会社 Method for replacing chain

Also Published As

Publication number Publication date
JP3841616B2 (en) 2006-11-01

Similar Documents

Publication Publication Date Title
US9561935B2 (en) Method and elevator arrangement
EP1591406A2 (en) Method and apparatus for changing the rope of a traction sheave elevator
JP2001287877A (en) Main rope replacement method and device for elevator
JP3807775B2 (en) How to lift the construction elevator
JP6798644B2 (en) Elevator balance weight lifting device and lifting method
JP4491110B2 (en) Elevator rope hanging method
JP2003128359A (en) Roping method for elevator
JP2001114484A (en) Construction method for suspending elevator main rope
JPH11199157A (en) Existing main rope take-up device for elevator
JP2011102177A (en) Confinement rescue method for elevator
JPH09240957A (en) Main rope guide device of elevator
CN114728762B (en) Rope conveying support auxiliary device for elevator rope replacing operation
JP3020325B2 (en) Elevator main cable replacement method
JP5058181B2 (en) How to hang an elevator rope
JP2603730B2 (en) How to change the elevator main rope
JPH0818774B2 (en) How to change the elevator main rope
JP6950458B2 (en) Elevator weight removal device and weight removal method
JP2003206083A (en) Main rope changing method and device for elevator
JPH0881155A (en) Main rope length adjusting device of hydraulic elevator
JP2002356285A (en) Main rope replacing method and main rope replacing device for elevator
JP2002003125A (en) Method for replacing main rope of elevator
JP2003146556A (en) Main rope changing device of elevator
JP2654409B2 (en) Elevator main cable replacement method
JP2003073052A (en) Rope installing method of elevator and rope guide device
JP2002265164A (en) Main rope replacing method and main rope replacing device for two-to-one roping elevator

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051129

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060801

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060808

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees