JP2001209629A - Method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced - Google Patents

Method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced

Info

Publication number
JP2001209629A
JP2001209629A JP2000015251A JP2000015251A JP2001209629A JP 2001209629 A JP2001209629 A JP 2001209629A JP 2000015251 A JP2000015251 A JP 2000015251A JP 2000015251 A JP2000015251 A JP 2000015251A JP 2001209629 A JP2001209629 A JP 2001209629A
Authority
JP
Japan
Prior art keywords
plan
sales
production
period
planned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000015251A
Other languages
Japanese (ja)
Inventor
Hiroyoshi Suzuki
浩佳 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2000015251A priority Critical patent/JP2001209629A/en
Publication of JP2001209629A publication Critical patent/JP2001209629A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an improved method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced so as to be applied also to a commodity whose delivery period from the reception of an order up to selling is sharply changed due to the trend of a market, a restriction condition to a production line or the like. SOLUTION: A selling/production planning processing part 4 makes a plan concerned with a demand including the backlog and the number of commodities planned to be sold on the basis of the number SKn of commodities planned to be produced in a period N entered from each result information/plan information storage part 8 before a period N-1 entered from a result information storage part 10 and the number of commodities predicted to be ordered after the previously specified period N through an input processing part 2 for inputting the number of commodities predicted to be ordered and makes a plan concerned with supply including the number of commodities planned to be produced and the number of commodities planned to be stored. When the number of commodities planned to be supplied is found out, the backlog and the number of commodities planned to be sold are corrected as necessary on the basis of respective values and corrects the number of commodities planned to be produced and the number of commodities planned to be stored as necessity on the basis of respective corrected values. The processing described above is repeated to make a plan.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は商品の販売計画数量
又は生産計画数量を算出する方法、特に受注を受けてか
ら販売するまでに要する期間が、市場動向や生産ライン
の制約条件などにより大きく変動しうる商品にも適用可
能な販売計画数量又は生産計画数量の算出方法に関す
る。
BACKGROUND OF THE INVENTION The present invention relates to a method for calculating a planned sales quantity or a planned production quantity of a product, particularly, a period required from receiving an order to selling the product greatly fluctuates due to market trends, production line constraints, and the like. The present invention relates to a method of calculating a sales plan quantity or a production plan quantity that can be applied to a possible product.

【0002】[0002]

【従来の技術】販売計画又は生産計画を立案する際に
は、商品の販売計画数量又は生産計画数量を算出するわ
けであるが、従来から市場動向等を加味して将来におけ
る需要数を予測し、その予測値に適正な在庫数を考慮す
ることで生産計画数量等を決定している。
2. Description of the Related Art When a sales plan or a production plan is made, a sales plan quantity or a production plan quantity of a product is calculated. The production plan quantity and the like are determined by considering an appropriate stock quantity in the predicted value.

【0003】しかしながら、市場動向等を考慮すること
で算出する需要数の予測精度を向上させることはできる
が、例えば乗用車のように市場動向のみならず生産工場
における作業負荷や期間内最大生産可能台数等の制約条
件により生産台数が制限される商品に対する販売数量又
は生産数量の予測は複雑になり予測が大きく外れてしま
うおそれがあった。
[0003] However, it is possible to improve the prediction accuracy of the number of demands calculated by taking into account market trends and the like. For example, the prediction of the sales quantity or the production quantity of a product whose production number is limited by the constraint conditions becomes complicated, and the prediction may be largely deviated.

【0004】そこで、本願特許出願人は、特開平10−
49597号公報(以下、「先行文献1」)に開示した
ように、受注したがまだ販売していない注残実績(又は
注残計画)を分子とし、受注実績(又は受注計画)を分
母として求める注残率という概念を導入して注残計画を
含む各計画数量の予測精度を向上できるようにした。
Therefore, the applicant of the present application filed Japanese Patent Application Laid-Open
As disclosed in Japanese Patent Publication No. 49597 (hereinafter referred to as “Prior Art Document 1”), a backlog record (or a backlog plan) that has been ordered but not yet sold is used as a numerator, and an actual order record (or an order plan) is obtained as a denominator. The concept of the back-order rate was introduced to improve the forecast accuracy of each planned quantity including the back-order plan.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、従来に
おいては、与えられた受注予測計画及び注残率に基づき
販売計画及び注残計画を含む需要計画を立案している
が、需要計画が立案した販売計画を参考に立案する供給
計画を需要計画とは別個に算出し立案していたので立案
した計画に精度上問題が生じる。
Conventionally, however, a demand plan including a sales plan and a backlog plan is made based on a given order forecast plan and a backlog rate. Since the supply plan to be made with reference to the plan is calculated and made separately from the demand plan, there is a problem in accuracy in the plan made.

【0006】本発明は以上のような問題を解決するため
になされたものであり、その目的は、受注を受けてから
販売するまでに要する期間が市場動向や生産ラインの制
約条件などにより大きく変動しうる商品にも適用可能な
改良された商品の販売計画数量又は生産計画数量の算出
方法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-described problems, and an object of the present invention is that the period required from receiving an order to selling the product greatly varies depending on market trends, production line constraints, and the like. It is an object of the present invention to provide an improved method of calculating a sales plan quantity or a production plan quantity of a product that can be applied to a product that can be used.

【0007】[0007]

【課題を解決するための手段】以上のような目的を達成
するために、本発明に係る商品の販売計画数量又は生産
計画数量の算出方法は、特定の商品について所定期間毎
に、生産実績、在庫実績、販売実績、受注したがまだ販
売していない注残実績の各実績数量データを逐次蓄積
し、将来の所定期間における商品の販売計画数量又は生
産計画数量を、各実績数量データ及び与えられた受注予
測数量に基づき立案するシステムで実行される商品の販
売計画数量又は生産計画数量の算出方法において、注残
実績、与えられた受注予測数量に基づき注残計画、販売
計画及び受注予測数量が与えられた期間以降の期間にお
ける受注予測数量を立案することによって商品の将来に
おける需要計画を立案する需要計画立案ステップと、在
庫実績、与えられた生産計画数量に基づき在庫計画数量
及び生産計画数量が与えられた期間以降の期間における
生産計画数量を立案することによって商品の供給計画を
立案する供給計画立案ステップとを含み、前記供給計画
立案ステップにより得られた指標値に基づき販売計画又
は与えられた生産計画を補正することを特徴とする。
In order to achieve the above object, a method of calculating a sales plan quantity or a production plan quantity of a product according to the present invention comprises the steps of: The actual quantity data of the actual stock, actual sales, and the number of back orders that have been ordered but not yet sold are sequentially accumulated, and the sales plan quantity or production plan quantity of the product in the future predetermined period is given to each actual quantity data and given. In the method of calculating the sales plan quantity or production plan quantity of the product executed by the system that plans based on the forecasted order quantity, the back order plan, sales plan, and the forecasted order quantity are calculated based on the backlog result and the given forecasted order quantity. A demand planning step for planning the future demand for the product by planning the expected order quantity for a period after the given period; A supply planning step of preparing a supply plan of the product by planning a production plan quantity in a period after a given period based on the production plan quantity and the inventory plan quantity and the production plan quantity. The present invention is characterized in that a sales plan or a given production plan is corrected based on the obtained index value.

【0008】また、前記供給計画立案ステップにより得
られた指標値は、販売計画を在庫実績及び生産実績の和
で除算して得られる総受注販売実現率であることを特徴
とする。
The index value obtained in the supply planning step is a total order sales realization rate obtained by dividing the sales plan by the sum of the actual stock and the actual production.

【0009】更にまた、販売計画数量を在庫実績と生産
計画数量の和で除算して得られる総生産販売実現率に基
づいて販売計画を立案することを特徴とする。
Further, the present invention is characterized in that a sales plan is made based on a total production / sales realization rate obtained by dividing the sales plan quantity by the sum of the actual stock quantity and the production plan quantity.

【0010】また、商品の販売計画数量又は生産計画数
量の算出後において、実行中の期間内における現時点ま
での計画値と当該期間内における実績数量データとに基
づき当該期間の実績推定値を算出することを特徴とす
る。
After calculating the sales plan quantity or the production plan quantity of the product, the actual estimated value of the period is calculated based on the plan value up to the present time in the active period and the actual quantity data in the current period. It is characterized by the following.

【0011】ここで、予測数量とは、現時点において将
来のある時点におけるある商品の販売数量又は生産数量
がどのようになっているのかを推測した値をいう。計画
数量とは、おかれている状況下において、ある目的を達
成するために必要な値として決定された数量、あるいは
他の要因の計画数量との関係上必然的に発生しうる数量
をいう。
Here, the predicted quantity is a value obtained by estimating the sales quantity or production quantity of a certain commodity at a certain point in the future at the present time. The planned quantity refers to a quantity determined as a value necessary to achieve a certain purpose or a quantity that can inevitably occur in relation to the planned quantity due to other factors in a given situation.

【0012】[0012]

【発明の実施の形態】以下、図面に基づいて、本発明の
好適な実施の形態について説明する。本実施の形態で
は、商品として受注を受けてから生産を開始する車両を
例として説明する。
Preferred embodiments of the present invention will be described below with reference to the drawings. In the present embodiment, a vehicle that starts production after receiving an order as a product will be described as an example.

【0013】図1は、本発明に係る商品の販売生産計画
数量算出方法を実施するシステムのブロック構成図であ
る。本システムは、受注予測台数入力処理部2と販売・
生産計画立案処理部4と結果出力処理部6とを有してい
る。受注予測台数入力処理部2は、入力された期間N以
降必要な時期までの受注台数の予測値を受け付け計画情
報格納部8に格納する。販売・生産計画立案処理部4
は、実績情報格納部10に蓄積されている販売実績等の
実績情報、計画情報格納部8に格納されている受注予測
台数及び計画台数に販売計画、生産計画を立案する。結
果出力処理部6は、販売・生産計画立案処理部4が立案
した販売計画、生産計画を計画情報格納部8に格納する
とともに図示しないディスプレイに表示する。
FIG. 1 is a block diagram of a system for carrying out a method of calculating a sales and production plan quantity of a product according to the present invention. This system is based on the sales forecast input unit 2
It has a production plan drafting processing section 4 and a result output processing section 6. The predicted order quantity input processing unit 2 receives the predicted value of the ordered quantity from the input period N to the required time and stores it in the plan information storage unit 8. Sales and production planning process 4
Makes a sales plan and a production plan based on actual information such as actual sales accumulated in the actual information storage unit 10 and the estimated number of orders and the planned number stored in the plan information storage unit 8. The result output processing unit 6 stores the sales plan and the production plan created by the sales / production planning processing unit 4 in the plan information storage unit 8 and displays them on a display (not shown).

【0014】図2は、本実施の形態において、ある商品
の供給計画及び需要計画を立案する際に関係してくる実
績情報と計画情報を模式的に表した図であり、本実施の
形態では、これを需給表と称している。ここでは、この
需給表を参照しながら各実績情報、各計画情報並びに各
種情報の関係について説明する。
FIG. 2 is a diagram schematically showing actual information and plan information related to making a supply plan and a demand plan for a certain product in the present embodiment. This is called the supply and demand table. Here, the relationship between each result information, each plan information, and various information will be described with reference to this supply and demand table.

【0015】需給表の上段は供給、下段は需要を構成す
る各情報の関係を表している。供給に関する情報は、生
産実績、販売実績及び在庫実績から構成される実績情報
と、生産計画、販売計画及び在庫計画から構成される計
画情報により構成される。需要に関する情報は、受注実
績、販売実績及び注残実績から構成される実績情報と、
受注予測から構成される予測情報と、販売計画及び注残
計画から構成される計画情報により構成される。実績情
報は、実際に販売、生産をした車両台数を示す情報であ
る。予測情報というのは、現在において、将来における
計画台数を推測したときの車両台数を含む情報である。
計画情報というのは、目的を達成するために必要な数量
として意思決定された車両台数を含む情報である。
The upper part of the supply and demand table shows the supply, and the lower part shows the relationship between each piece of information constituting the demand. The information on supply is composed of performance information including production results, sales results, and inventory results, and plan information including production plans, sales plans, and inventory plans. Information on demand includes performance information consisting of actual orders, sales, and backlogs,
It is composed of forecast information composed of an order prediction and plan information composed of a sales plan and a backlog plan. The performance information is information indicating the number of vehicles actually sold and produced. The prediction information is information including the number of vehicles at the time of estimating the planned number of vehicles in the future at present.
The plan information is information including the number of vehicles determined as the quantity required to achieve the purpose.

【0016】なお、「計画」は立案するものであり車両
台数ではないが、立案する計画の具体的な内容は各計画
における販売数量あるいは生産数量、すなわち車両台数
である。従って、本実施の形態における説明において
「計画」という語を説明の便宜上、台数を指す場合もあ
る。
Note that the "plan" is to be made, not the number of vehicles, but the specific contents of the plan to be made are the sales quantity or production quantity in each plan, that is, the number of vehicles. Therefore, in the description of the present embodiment, the term “plan” may refer to the number of units for convenience of description.

【0017】本実施の形態においては、需要計画を立案
してから供給計画を立案する。供給計画を立案する過程
において不具合が生じた場合は需要計画を見直し修正し
た後に改めて供給計画を立案する。このように、本実施
の形態においては、需要計画と供給計画のすりあわせを
行いながら最終的に供給計画及び需要計画を確定するこ
とで、各期間における販売計画及び生産計画を立案する
ことを特徴としている。更に、計画を立案する際に、詳
細は後述する総受注販売実現率及び総生産販売実現率と
いう概念を導入したことでより高精度な計画を立案でき
るようにしたことを特徴としている。なお、車両の販売
管理、生産管理の場合、期間というのは通常月単位であ
るため本実施の形態においてもそれに準じて説明をする
が、商品によって任意に設定することができる。以下、
本実施の形態における計画立案処理の詳細について図3
に示したフローチャートを用いて説明する。
In this embodiment, a supply plan is made after a demand plan is made. If a problem occurs during the process of drawing up the supply plan, the demand plan is reviewed and revised, and then the supply plan is drawn up again. As described above, the present embodiment is characterized in that a supply plan and a demand plan are finally determined while reconciling a demand plan and a supply plan, thereby drafting a sales plan and a production plan in each period. And Further, when planning a plan, the concept of a total order sales realization rate and a total production sales realization rate, which will be described later in detail, is introduced, so that a more accurate plan can be made. In the case of vehicle sales management and production management, the period is usually in units of months, and therefore, the description will be made in accordance with this embodiment, but it can be set arbitrarily depending on the product. Less than,
FIG. 3 shows details of the planning process in the present embodiment.
This will be described with reference to the flowchart shown in FIG.

【0018】販売・生産計画立案処理部4は、期間N−
1以前の各実績情報を実績情報格納部10から取り込む
(ステップ101)。つまり、実績情報を全て読み出す
ことになる。続いて、販売・生産計画立案処理部4は、
既に実施段階にあり計画済みの生産計画、具体的には期
間Nの生産計画台数SKを計画情報格納部8から取り
出す(ステップ102)。更に、販売・生産計画立案処
理部4は、受注予測台数入力処理部2が受け付けたこと
によって計画情報格納部8に格納されている期間N以降
の受注予測台数を取り出す(ステップ103)。図2に
よれば、需給表におけるJY,JYn+1の値を用意
したことになる。
The sales / production plan drafting processing section 4 executes a period N-
Each piece of performance information before 1 is fetched from the performance information storage unit 10 (step 101). That is, all the result information is read. Subsequently, the sales / production planning processing section 4
Already in the implementation phase planned production plan, specifically taking out a production plan number SK n periods N from the planning information storage section 8 (step 102). Further, the sales / production plan drafting processing unit 4 takes out the predicted number of orders received after the period N stored in the plan information storage unit 8 by receiving the predicted number of orders input processing unit 2 (step 103). According to FIG. 2, the values of JY n and JY n + 1 in the supply and demand table are prepared.

【0019】以上の準備段階における処理の結果、図2
に示した需給表における期間N−1以前の全情報、期間
Nの生産計画台数SK及び受注予測台数JY,JY
n+ の部分が埋まったことになる。本実施の形態で
は、これ以降の処理で各計画台数を算出して需給表を埋
めていくことで期間N以降の計画を立案していく。
As a result of the processing in the above preparatory stage, FIG.
Period N-1 all previous information in supply and demand table shown in, the period N of the production plan number SK n and order prediction number JY n, JY
This means that the portion of n + 1 is filled. In the present embodiment, a plan for the period N or later is drafted by calculating each planned number of units in the subsequent processing and filling the supply and demand table.

【0020】ステップ104において、本実施の形態に
おいて特徴的な処理の一つである注残、販売計画台数を
決定する。
In step 104, the number of unsold and planned sales units, which are one of the characteristic processes of this embodiment, is determined.

【0021】先行文献1においては、計画期間における
受注予測台数に対する注残台数の比率である注残率の季
節性、安定性に着目して注残や販売の各計画値、図2で
言えばHKやCKの値を導いたが、本実施の形態で
は、注残率に代えて総受注販売実現率及び総生産販売実
現率という指標を新たに提供して更に高精度な計画立案
を可能にした。なお、注残率とは、前述したように受注
を受けたがまだ販売していない商品の注残実績を分子と
し、受注実績を分母として求めたものである。ここで、
総受注販売実現率及び総生産販売実現率について詳述す
る。
In Prior Document 1, each planned value of back-ordering and sales is described by focusing on the seasonality and stability of the back-ordering rate, which is the ratio of the number of back-ordered vehicles to the predicted number of ordered vehicles during the planning period. Although the values of HK n and CK n were derived, in the present embodiment, in place of the backlog rate, new indexes such as the total order sales realization rate and the total production sales realization rate are newly provided, and a more accurate planning is performed. Made it possible. As described above, the backlog rate is obtained by using the actual backlog of a product that has received an order but not yet sold as a numerator and the actual order received as a denominator. here,
The total order sales realization rate and the total production sales realization rate will be described in detail.

【0022】図2に示した需要計画を構成する注残、受
注、販売において成立する関係は以下の式で表すことが
できる。
The relations established in the back-order, order-receiving, and sales constituting the demand plan shown in FIG. 2 can be expressed by the following equations.

【0023】 CK=CZn−1+JY−HK ・・・(1) これは、期間Nに限らず実績期間、予測/計画期間の全
ての期間において成立する関係である。一方、供給計画
を構成する在庫、生産、販売において成立する関係は以
下の式で表すことができる。
CK n = CZ n−1 + JY n −HK n (1) This is a relationship that is established not only in the period N but also in all periods of the actual period and the prediction / planning period. On the other hand, the relations established in inventory, production, and sales that constitute the supply plan can be expressed by the following equations.

【0024】 ZK=ZZn−1+SK−HK ・・・(2) これも全ての期間において成立する関係である。ZK n = ZZ n−1 + SK n −HK n (2) This is also a relation that holds in all periods.

【0025】次に、期間Nにおける総受注販売実現率α
を以下のように定義する。
Next, the total order sales realization rate α in the period N
n is defined as follows.

【0026】 α=HK/(CZn−1+JY) ・・・(3) また、総生産販売実現率βを以下のように定義する。Α n = HK n / (CZ n−1 + JY n ) (3) Further, the total production / sales realization rate β n is defined as follows.

【0027】 β=HK/(SK+ZZn−1) ・・・(4) 以上の式から理解できるように、総受注販売実現率は、
その期間における注残実績(あるいは注残予測)と受注
実績(あるいは受注予測)の総和のうちそれだけ販売す
ることができたかを示す比率であるが、販売チャネルに
おける顧客からの引合いの総和(受注総数)に対してど
れだけ販売することができるかといった販売能力を示す
指標であるということができる。商品の発売直後などで
需要が販売チャネルの販売能力を大きく上回っている状
況ではこの値が販売計画を規定する主要因となってい
る。つまり、計画立案の際に総受注販売実現率という指
標を用いるようにしたのは、販売能力によって販売計画
を決めざるを得ない場合があるからである。なお、注残
実績と注残予測、受注実績と受注予測とは、需給表にお
いて各期間の同じ位置関係にあるため、各実績及び各計
画の関係を表す計算式は同様になる。このような場合
は、上記のように注残実績(あるいは注残予測)と記載
せずに単に「注残」と総称して記載している。
Β n = HK n / (SK n + ZZ n−1 ) (4) As can be understood from the above equation, the total order sales realization rate is
This is a ratio that indicates whether or not the total of the backlog actual (or predicted backorder) and the actual order received (or predicted order) during that period could be sold, but the total sum of inquiries from customers in the sales channel (total number of received orders) ) Can be said to be an index indicating the sales ability such as how much can be sold. This is the main factor that determines the sales plan when demand exceeds the sales capacity of the sales channel, such as immediately after product launch. That is, the reason why the index called the total order sales realization rate is used in the planning is that the sales plan may have to be determined depending on the sales ability. It should be noted that the back-order performance and the back-order forecast, and the order-received result and the order-received forecast have the same positional relationship in each period in the supply and demand table, and therefore the formulas for expressing the relationship between each result and each plan are the same. In such a case, it is simply referred to as "remaining order" without being described as the actual backing order (or the predicted operation) as described above.

【0028】一方、総生産販売実現率は、その期間にお
ける在庫と生産の総和がどれだけ販売に結びついたかを
示す比率である。これは、何らかの理由で需要が生産側
の供給能力を大きく上回っている状態における販売台数
を規定する主要因となっている。つまり、計画を修正す
る際に総生産販売実現率という指標を用いるようにした
のは、いくら膨大な数量の受注があったとしても供給側
における制約条件等により制限せざるを得ない場合があ
るからである。以上のことは、需要が販売能力や供給能
力を大幅に上回っている期間においては、総受注販売実
現率や総生産販売実現率を過去における同一商品や他の
商品の同様の状態の期間における同様の実績に比率を使
い、計画を立案しておく本実施の形態の作用の有用性を
示すものである。
On the other hand, the total production / sales realization rate is a ratio indicating how much the sum of inventory and production in that period has led to sales. This is the main factor that regulates the number of units sold when the demand for some reason exceeds the supply capacity on the production side. In other words, when the plan is revised, the index of the gross production / sales realization rate is used, even if there is an enormous number of orders, there are cases where it is necessary to limit due to constraints on the supply side etc. Because. The above indicates that during periods when demand significantly exceeds sales and supply capacities, the total order-to-order sales realization rate and the total production-to-sales realization rate are similar to those of the same product and other products in the same period in the past. This shows the usefulness of the operation of the present embodiment in which a plan is drafted using the ratio for the actual results.

【0029】まず、総受注販売実現率による計画作成処
理について説明する。過去の同一商品又は類似商品の同
一状態の期間Nにおける総受注販売実現率は、上記式
(3)により求めることができるが、この式のCZ
n−1は実績値であるため既値であり、JYはステッ
プ103において与えられているので、 HK=α(CZn−1+JY) ・・・(5) この式(5)と式(1)から注残計画CKは、 CK=(CZn−1+JY)(1−α) ・・・(6) で求めることができる。期間N+1以降においても同様
の関係式により販売、注残の各計画を導いていくことに
なる。
First, the process of creating a plan based on the total order sales realization rate will be described. The total order sales realization rate in the same period N of the same product or similar product in the past can be obtained by the above equation (3).
n-1 is already values for a result value, JY n since given in step 103, HK n = α n ( CZ n-1 + JY n) ··· (5) This equation (5) DOO Note remaining planning CK n from equation (1) can be obtained by CK n = (CZ n-1 + JY n) (1-α n) ··· (6). Even after the period N + 1, the same relational expression is used to derive sales and backlog plans.

【0030】このようにして、注残及び販売の各計画台
数を決定すると、販売・生産計画立案処理部4は、続い
て期間N,N+1以降必要な時期までの在庫計画台数を
決定する(ステップ105)。ところで、在庫率とは、
商品の在庫実績(在庫計画)を分子とし、販売実績(販
売計画)を分母として求めたもの、すなわち在庫率=在
庫/販売という式で定義できる。なお、「在庫」は、上
記説明したように在庫実績又は在庫計画を指す。「販
売」についても同様である。在庫率は、受注予測台数入
力部2から予め入力され計画情報格納部8に格納されて
いる値である。各機関の在庫率の求め方については、先
行文献1と同じ方法でよいので、本実施の形態において
その詳細は省略する。従って、例えば期間N+1の在庫
計画ZK +1は、 ZKn+1=期間(N+1)の在庫率×HKn+1 で求めることができる。期間N+1以降の各在庫計画も
この式により算出できる。なお、期間Nにおける在庫計
画台数ZKは、決定済みであり変更不可として、 ZK=ZZn−1+HK−SK で算出される値である。以上のようにして各在庫計画台
数を算出できる。
When the planned and unsold units are determined in this way, the sales / production planning unit 4 subsequently determines the planned number of units from the period N, N + 1 to the required time (step S1). 105). By the way, the inventory ratio is
It can be defined by a formula obtained by using the actual stock (inventory plan) of a product as a numerator and the actual sales (sales plan) as a denominator, that is, the formula of stock ratio = stock / sales. Note that “stock” refers to the actual stock or stock plan as described above. The same applies to “sales”. The stock ratio is a value that is input in advance from the predicted order number input unit 2 and stored in the plan information storage unit 8. Since the method of obtaining the stock ratio of each engine may be the same as that of the prior art document 1, the details are omitted in the present embodiment. Therefore, for example, the inventory plan ZK n +1 for the period N + 1 can be obtained by ZK n + 1 = the inventory ratio for the period (N + 1) × HK n + 1 . Each stock plan after the period N + 1 can also be calculated by this formula. Incidentally, the inventory planning number ZK n in the period N, as the determined a is not changed, is a value calculated by the ZK n = ZZ n-1 + HK n -SK n. As described above, each planned stock quantity can be calculated.

【0031】次に、需給表において最後に残った生産計
画を立案する(ステップ106)。期間N+1の生産計
画SKn+1は、 SKn+1=HKn+1−ZK+ZKn+1 ・・・(7) により求めることができる。このようにして、需給表を
用いることによって容易に裏付けできる上記各式に従い
需給表内の各計画台数を算出できる。
Next, the last remaining production plan in the supply and demand table is drafted (step 106). Period N + 1 of the production plan SK n + 1 can be determined by SK n + 1 = HK n + 1 -ZK n + ZK n + 1 ··· (7). In this way, each planned number in the demand-supply table can be calculated according to the above-mentioned equations that can be easily supported by using the demand-supply table.

【0032】続いて、ステップ107における総生産販
売実現率による販売計画台数の修正処理について説明す
る。この処理は、総受注販売実現率を用いた注残、販売
計画台数の決定処理(ステップ104)と異なり、修正
処理であるため生産並びに在庫の各計画が立案されてい
ることが前提となる。過去の同一商品又は類似商品の同
一状態の期間Nにおける総生産販売実現率は、上記式
(4)により求めることができるが、この式のZZ
n−1及びSKは既値なので販売計画HKは、 HK=β(ZZn−1+SK) ・・・(8) となる。この式(8)と式(1)から注残計画CK
は、 CK=(CZn−1+JYn−)−β(ZZn−1+SK) ・・・(9 ) と修正され、在庫計画ZKも式(8)と式(2)から ZK=(ZZn−1+SK)(1−β) ・・・(10) と修正される。以上のようなロジックによって、あるい
は商品の状態に合わせて注残率のロジックと任意に組み
合わせることによって精度の高い計画を立案することが
できる。
Next, the process of correcting the planned sales volume based on the total production / sales realization rate in step 107 will be described. This process is different from the process of determining the back-order and planned sales volume using the total order sales realization rate (step 104), and is a correction process. Therefore, it is assumed that production and inventory plans have been drafted. The total production and sales realization rate in the same period N of the same product or similar product in the past can be obtained by the above equation (4).
n-1 and SK n is the sales plan HK n Since the already-value, HK n = β n the (ZZ n-1 + SK n ) ··· (8). From this equation (8) and equation (1), the backlog schedule CK
n is, CK n = and modified (CZ n-1 + JY n- ) -β n (ZZ n-1 + SK n) ··· (9), inventory planning ZK n also equation (8) and equation (2) Is corrected as follows: ZK n = (ZZ n−1 + SK n ) (1−β n ) (10) A highly accurate plan can be prepared by the above logic or by arbitrarily combining with the logic of the backlog rate according to the state of the product.

【0033】この後、販売・生産計画立案処理部4は、
販売計画及び在庫計画が修正されると、生産計画の修正
を行う(ステップ108)。これは、上記式(7)に従
い修正すればよい。
Thereafter, the sales / production planning processing section 4
When the sales plan and the inventory plan are corrected, the production plan is corrected (step 108). This may be corrected according to the above equation (7).

【0034】そして、期間N+1以降、必要な時期まで
の生産計画台数が生産の稼働状況にマッチしているか否
かのチェックを行い、その結果を表示する(ステップ1
09)。チェックの内容については、先行文献1と同じ
手法を用いればよいので、この処理の詳細については省
略する。
Then, after the period N + 1, it is checked whether or not the planned production number up to the required time matches the operation status of the production, and the result is displayed (step 1).
09). For the contents of the check, the same method as in the prior art document 1 may be used, so that the details of this processing will be omitted.

【0035】以上の処理の結果、生産計画台数が最終的
に決定すると、その処理結果が結果出力処理部6により
計画情報格納部8に格納されると同時に画面出力される
(ステップ110)。
As a result of the above processing, when the planned production quantity is finally determined, the processing result is stored in the plan information storage section 8 by the result output processing section 6 and simultaneously output to the screen (step 110).

【0036】次に、受注ピッチによる計画の評価、修正
の作用について説明する。
Next, the operation of evaluating and correcting the plan based on the order pitch will be described.

【0037】受注ピッチというのは、計画期間内におけ
る更に詳細な最小単位の計画並びに実績を示すものであ
る。例えば、期間内における日を最小単位とすれば、日
別の計画並びに実績が受注ピッチに相当する。以下、最
小単位を日別とした場合を例にして本実施の形態の作用
を図4に示したフローチャートを用いて説明する。
The order pitch indicates more detailed minimum unit plans and actual results within the planning period. For example, if the day within the period is the minimum unit, the daily plan and actual result correspond to the order pitch. Hereinafter, the operation of the present embodiment will be described with reference to the flowchart shown in FIG.

【0038】日毎に集計された各実績台数がその日の各
計画台数に対応させて実績情報格納部10に格納される
と(ステップ201)、販売・生産計画立案処理部4
は、計画期間Nの途中においてそれまでの受注実績とそ
の期間Nにおける受注予測に基づいて当該期間Nにおけ
る受注実績台数を推定する(ステップ202)。この推
定を行うために、本実施の形態では、乖離率キープロジ
ック、残日数計画キープパターンロジック及び累計前年
比キープロジックという3つのロジックを用意してい
る。
When each of the actual numbers counted for each day is stored in the actual information storage unit 10 in correspondence with each planned number of the day (step 201), the sales / production plan planning processing unit 4
Estimates the number of actual orders received during the period N based on the actual orders received so far and the expected orders received during the period N in the middle of the planning period N (step 202). In order to perform this estimation, in the present embodiment, three logics are prepared: a deviation rate keep logic, a remaining days plan keep pattern logic, and a cumulative previous year keep logic.

【0039】このうち、乖離率キープロジックというの
は、受注ピッチの乖離率kを、 k=(推定日時点までの日別実績の累計)/(推定日時
点までの日別計画の累計) と定義すると、期間Nの受注実績の推定値は
Among them, the deviation rate keep logic is as follows: deviation rate k of the order pitch is calculated by: k = (cumulative daily result up to estimated date) / (cumulative daily plan up to estimated date) By definition, the estimated value of the actual orders received in period N is

【数1】 という式により求めることができる。このロジックは、
推定日時点での状態を素直に期末まで延長するので、言
うならば成り行きでみる推定値である。
(Equation 1) Can be obtained by the following equation. This logic is
Since the state at the time of the estimation date is extended straightforwardly to the end of the term, it is an estimated value to be viewed as a consequence.

【0040】残日数計画キープパターンロジックは、推
定日時点での日別実績の累計値をx、(推定日+1)日
以降月末までの日別計画の累計値をyとしたときの受注
実績の推定値は、
The remaining days plan keep pattern logic is based on the assumption that the cumulative value of the daily result at the estimated date is x, and the cumulative value of the daily plan from the (estimated date + 1) day to the end of the month is y. The estimate is

【数2】 という式により求めることができる。このロジックは、
(推定日+1)日以降努力して既に決定している日別計
画を維持することを前提とした推定値である。
(Equation 2) Can be obtained by the following equation. This logic is
The estimated value is based on the premise that the daily plan that has already been determined is maintained by making an effort after the (estimated date + 1) day.

【0041】そして、累計前年比キープロジックは、m
年前の同月の受注実績をZm、推定日時時点での日別実
績の累計値をx、m年前の同月の同一推定時点での日別
実績の累計値をXmとしたときの受注実績の推定値は、
Then, the accumulated logic for the previous year is m
Zm is the order received for the same month a year ago, x is the cumulative daily result at the estimated date and time, and Xm is the cumulative daily result for the same month at the same estimated date m years ago. The estimate is

【数3】 という式により求めることができる。このロジックは、
m年前の同一時期と同じような状況推移をするであろう
との仮説のもとに求められる推定値である。
(Equation 3) Can be obtained by the following equation. This logic is
This is an estimated value obtained based on the hypothesis that the situation will be similar to that at the same time m years ago.

【0042】販売・生産計画立案処理部4は、推定を要
するときにその商品の状況に応じて計画の立案をする者
により選択された上記3つのロジックのいずれかを実行
して受注実績の推定値を求めることになる。
The sales and production planning processing section 4 executes any one of the three logics selected by the person who drafts the plan according to the situation of the product when estimation is required, and estimates the actual order received. Value.

【0043】次に、前述したステップ104において計
画の基本として用いた注残率又は総受注販売実現率、総
生産販売実現率、在庫率という各比率データと上記ステ
ップ202において求めた受注実績の推定値を用いて計
画実行中の期間Nにおける注残、販売の各実績台数を期
間N内において推定し(ステップ203)、更に生産計
画を変化させない場合の在庫や在庫率を推定したり、在
庫率を固定して適正な生産計画の修正値を算出する(ス
テップ204)。以下、初期段階すなわち図2に示した
フローチャートにおけるステップ101〜110におい
て注残率に基づき計画を設定した場合、総受注販売実現
率に基づき計画を設定した場合、総生産販売実現率に基
づき計画を設定した場合の3つのパターンにおける台数
の推定並びに適正な計画への修正手順について説明す
る。
Next, at step 104 described above, the ratio data such as the backlog rate or the total order sales realization rate, the total production sales realization rate, and the stock ratio used as the basis of the plan, and the estimation of the order actual obtained at the above step 202 Using the values, the actual number of units sold and sold in the period N during the execution of the plan is estimated in the period N (step 203), and the inventory and the inventory ratio when the production plan is not changed are estimated. Is fixed, and an appropriate correction value of the production plan is calculated (step 204). Hereinafter, when the plan is set based on the backlog rate in the initial stage, that is, in steps 101 to 110 in the flowchart shown in FIG. 2, when the plan is set based on the total order sales realization rate, the plan is set based on the total production sales realization rate. A description will be given of a procedure for estimating the number of units in the three patterns and setting a proper plan.

【0044】まず、注残率に基づき計画を設定した場
合、注残計画の推定値は、
First, when a plan is set based on the back order rate, the estimated value of the back order plan is

【数4】 また、販売計画の推定値は、式(1)と式(14)より(Equation 4) In addition, the estimated value of the sales plan is obtained from the equations (1) and (14).

【数5】 と求めることができる。また、生産計画が固定であると
した場合、在庫計画の推定値は、
(Equation 5) Can be requested. Also, if the production plan is fixed, the estimated value of the inventory plan is

【数6】 と求めることができる。また、在庫率が固定であるとし
た場合における適正な在庫計画の推定値は、式(2)と
式(15)と在庫率の定義により、
(Equation 6) Can be requested. Also, the estimated value of the appropriate inventory plan when the inventory rate is assumed to be fixed is calculated by the equations (2) and (15) and the definition of the inventory rate.

【数7】 となり、よって在庫計画の推定値は、(Equation 7) And thus the inventory plan estimate is

【数8】 と求めることができる。(Equation 8) Can be requested.

【0045】続いて、総受注販売実現率に基づき計画を
設定した場合の販売及び注残の各計画の推定値は、それ
ぞれ
Subsequently, when a plan is set based on the total order sales realization rate, the estimated values of the sales and backlog plans are respectively

【数9】 (Equation 9)

【数10】 と求めることができる。また、生産計画を固定であると
した場合の在庫計画の推定値は、式(2)及び式(1
9)により、
(Equation 10) Can be requested. In addition, when the production plan is fixed, the estimated value of the inventory plan is calculated by the equations (2) and (1).
9)

【数11】 と求めることができる。また、在庫率が固定であるとし
た場合における適正な在庫計画の推定値は、式(2)と
式(15)と在庫率の定義により、
[Equation 11] Can be requested. Also, the estimated value of the appropriate inventory plan when the inventory rate is assumed to be fixed is calculated by the equations (2) and (15) and the definition of the inventory rate.

【数12】 となり、よって在庫計画の推定値は、(Equation 12) And thus the inventory plan estimate is

【数13】 と求めることができる。(Equation 13) Can be requested.

【0046】最後に、総生産販売実現率に基づき計画を
設定した場合の販売及び注残の各計画の推定値は、それ
ぞれ
Finally, when a plan is set based on the total production / sales realization rate, the estimated values of the sales and backlog plans are respectively

【数14】 [Equation 14]

【数15】 と求めることができる。販売は、需給表から明らかなよ
うに供給側である在庫や生産によって決定されるわけで
あるが、受注の状態が変わっても販売は変化しない。よ
って、適正な生産計画の値も従来設定していた値と変化
しない。
(Equation 15) Can be requested. As is clear from the supply and demand table, sales are determined by inventory and production on the supply side, but sales do not change even if the order status changes. Therefore, the value of the appropriate production plan does not change from the value set conventionally.

【0047】以上のような要領で期間N+1以降の推定
値、適正値も計算されていくことができる。前述した注
残率、総受注販売実現率あるいは総生産販売実現率に基
づき計画を設定する3つのパターンに従って生産計画を
固定せざるを得ない場合における在庫率の推移や生産計
画を変更できる場合での最適な生産計画の値を受注の状
況変化に応じて確認をすることができ、従来にも増して
適正な生産・販売活動を可能にする。
In the manner described above, the estimated value and the appropriate value after the period N + 1 can be calculated. If the production plan has to be fixed in accordance with the three patterns of setting the plan based on the above-mentioned backlog rate, total order sales realization rate or total production sales realization rate, and the change of the inventory rate or the case where the production plan can be changed. The optimal production plan value can be checked according to changes in the status of orders, enabling more appropriate production and sales activities than before.

【0048】本実施の形態によれば、需要計画を立案
し、その後供給計画を立案する。そして、供給計画を立
案する過程において計画した数量に不都合が生じた場合
は需要計画を見直し修正した後に改めて供給計画を立案
する。このように、需要計画と供給計画のすりあわせを
行いながら最終的に供給計画及び需要計画を確定するよ
うにしたので、販売計画及び生産計画をより高精度に立
案することができる。また、本実施の形態では、計画立
案をする際に総受注販売実現率及び総生産販売実現率と
いう指標を新たに提供している。
According to the present embodiment, a demand plan is made, and then a supply plan is made. Then, in the course of drafting the supply plan, if the planned quantity becomes inconvenient, the demand plan is reviewed and corrected, and then the supply plan is drafted again. In this way, since the supply plan and the demand plan are finally determined while reconciling the demand plan and the supply plan, the sales plan and the production plan can be drafted with higher accuracy. Further, in the present embodiment, in making a plan, indexes such as a total order sales realization rate and a total production sales realization rate are newly provided.

【0049】なお、本実施の形態では、商品として車両
の場合を想定し、車両の販売計画又は生産計画を立案す
るシステムに本発明を適用した場合で説明したが、他の
商品にも適用可能であることは言うまでもない。
In the present embodiment, the case where the present invention is applied to a system for drafting a sales plan or a production plan of a vehicle, assuming the case of a vehicle as a product, is applicable to other products. Needless to say,

【0050】[0050]

【発明の効果】本発明によれば、注残等の需要に関する
計画と生産等の供給に関する計画とを連係させ、立案し
た供給計画の内容次第で需要計画を見直し生産計画又は
販売計画を補正しながら立案していくようにしたので、
より高精度な計画立案を実現することができる。
According to the present invention, a plan relating to demand such as backlog and a plan relating to supply such as production are linked, and the demand plan is reviewed depending on the contents of the planned supply plan to correct the production plan or the sales plan. While planning,
More accurate planning can be realized.

【0051】また、総受注販売実現率又は総生産販売実
現率という概念を導入することにより計画そのものの予
測精度を向上させることができる。
Also, by introducing the concept of the total order sales realization rate or the total production sales realization rate, the prediction accuracy of the plan itself can be improved.

【0052】また、実行中の期間内における実績推定値
を算出するようにしたので、最適な生産計画数量を受注
の状況変化に応じて確認をすることができる。このた
め、管理者は、計画と実績との乖離率を縮小する補正を
行うなど適切な処置をとることができるようになるの
で、従来にも増して適正な生産・販売活動を行うことが
できる。
Further, since the actual estimated value is calculated during the execution period, the optimum production plan quantity can be confirmed in accordance with the change in the status of the order. For this reason, the administrator can take appropriate measures such as making a correction to reduce the divergence rate between the plan and the actual, and thus can perform more appropriate production and sales activities than ever before. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る商品の販売生産計画数量算出方
法を実施するシステムのブロック構成図である。
FIG. 1 is a block diagram of a system for implementing a method for calculating a sales and production plan quantity of a product according to the present invention.

【図2】 本実施の形態における計画立案の際に用いる
各種情報の関係を模式的に表した需給表を示した図であ
る。
FIG. 2 is a diagram showing a supply-and-demand table schematically showing a relationship between various types of information used for planning in the present embodiment.

【図3】 本実施の形態における販売生産計画数量算出
方法の処理を示したフローチャートである。
FIG. 3 is a flowchart showing a process of a sales production plan quantity calculation method according to the embodiment.

【図4】 本実施の形態における受注ピッチによる計画
の評価、修正の処理を示したフローチャートである。
FIG. 4 is a flowchart showing a process of evaluating and correcting a plan based on an order pitch in the present embodiment.

【符号の説明】[Explanation of symbols]

2 受注予測台数入力処理部、4 販売・生産計画立案
処理部、6 結果出力処理部、8 計画情報格納部、1
0 実績情報格納部、12 生産条件入力格納部。
2 Input unit for forecasted order quantity, 4 Sales / production planning processing unit, 6 Result output processing unit, 8 Planning information storage unit, 1
0 Result information storage, 12 Production condition input storage.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 特定の商品について所定期間毎に、生産
実績、在庫実績、販売実績、受注したがまだ販売してい
ない注残実績の各実績数量データを逐次蓄積し、将来の
所定期間における商品の販売計画数量又は生産計画数量
を、各実績数量データ及び与えられた受注予測数量に基
づき立案するシステムで実行される商品の販売計画数量
又は生産計画数量の算出方法において、 注残実績、与えられた受注予測数量に基づき注残計画、
販売計画及び受注予測数量が与えられた期間以降の期間
における受注予測数量を立案することによって商品の将
来における需要計画を立案する需要計画立案ステップ
と、 在庫実績、与えられた生産計画数量に基づき在庫計画数
量及び生産計画数量が与えられた期間以降の期間におけ
る生産計画数量を立案することによって商品の供給計画
を立案する供給計画立案ステップと、 を含み、前記供給計画立案ステップにより得られた指標
値に基づき販売計画又は与えられた生産計画を補正する
ことを特徴とする商品の販売生産計画数量又は生産計画
数量の算出方法。
For each specific period of time, actual quantity data of a production result, an inventory result, a sales result, and an order receipt but not yet sold result are sequentially accumulated for a specific product, and the product in a future predetermined period is accumulated. In the calculation method of the sales plan quantity or production plan quantity of the product, which is executed by the system that plans the sales plan quantity or production plan quantity of each product based on each actual quantity data and the given forecasted order quantity, Backlog schedule based on the forecasted order quantity
A demand planning step for planning the future demand of the product by planning the sales order and the forecasted order quantity in the period after the given period, and the inventory based on the actual stock and the given production plan quantity. A supply planning step of drafting a supply plan of the product by drafting a production plan quantity in a period after the period in which the planned quantity and the production plan quantity are given, and an index value obtained in the supply planning step. A method of calculating a sales production plan quantity or a production plan quantity of a product, wherein a sales plan or a given production plan is corrected based on the sales plan.
【請求項2】 前記供給計画立案ステップにより得られ
た指標値は、販売計画を在庫実績及び生産実績の和で除
算して得られる総受注販売実現率であることを特徴とす
る請求項1記載の商品の販売計画数量又は生産計画数量
の算出方法。
2. The total order sales realization rate obtained by dividing the sales plan by the sum of the actual inventory and the actual production in the supply planning step. Calculation method of sales plan quantity or production plan quantity of the product.
【請求項3】 販売計画数量を在庫実績と生産計画数量
の和で除算して得られる総生産販売実現率に基づいて販
売計画を立案することを特徴とする請求項2記載の商品
の販売計画数量又は生産計画数量の算出方法。
3. The product sales plan according to claim 2, wherein a sales plan is made based on a total production sales realization rate obtained by dividing the sales plan quantity by the sum of the actual stock and the production plan quantity. How to calculate quantity or production plan quantity.
【請求項4】 商品の販売計画数量又は生産計画数量の
算出後において、実行中の期間内における現時点までの
計画値と当該期間内における実績数量データとに基づき
当該期間の実績推定値を算出することを特徴とする請求
項1記載の商品の販売計画数量又は生産計画数量の算出
方法。
4. After calculating the sales plan quantity or the production plan quantity of the product, the actual estimated value of the period is calculated based on the plan value up to the present time in the active period and the actual quantity data in the current period. 2. The method according to claim 1, wherein the sales plan quantity or the production plan quantity of the product is calculated.
JP2000015251A 2000-01-25 2000-01-25 Method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced Pending JP2001209629A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000015251A JP2001209629A (en) 2000-01-25 2000-01-25 Method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000015251A JP2001209629A (en) 2000-01-25 2000-01-25 Method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced

Publications (1)

Publication Number Publication Date
JP2001209629A true JP2001209629A (en) 2001-08-03

Family

ID=18542578

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000015251A Pending JP2001209629A (en) 2000-01-25 2000-01-25 Method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced

Country Status (1)

Country Link
JP (1) JP2001209629A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003107234A1 (en) * 2002-06-18 2003-12-24 本田技研工業株式会社 Parts market share calculation system
JP2006285400A (en) * 2005-03-31 2006-10-19 Toyota Motor Corp Device, method, and program for preparing demand-supply plan
KR100782921B1 (en) 2005-12-23 2007-12-07 주식회사농심 Supply chain management system for efficient inventory control
JP2019215796A (en) * 2018-06-14 2019-12-19 株式会社日立パワーソリューションズ Business amount prediction apparatus and business amount prediction method
CN113393041A (en) * 2021-06-21 2021-09-14 湖南大学 Retail field supply chain inventory optimization method based on sales prediction
CN118212004A (en) * 2024-03-01 2024-06-18 南京大学 Production strategy taking product requirements into consideration, channel selection strategy generation system and method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003107234A1 (en) * 2002-06-18 2003-12-24 本田技研工業株式会社 Parts market share calculation system
JP2006285400A (en) * 2005-03-31 2006-10-19 Toyota Motor Corp Device, method, and program for preparing demand-supply plan
JP4665587B2 (en) * 2005-03-31 2011-04-06 トヨタ自動車株式会社 Supply and demand plan creation device, supply and demand plan creation method, and supply and demand plan creation program
KR100782921B1 (en) 2005-12-23 2007-12-07 주식회사농심 Supply chain management system for efficient inventory control
JP2019215796A (en) * 2018-06-14 2019-12-19 株式会社日立パワーソリューションズ Business amount prediction apparatus and business amount prediction method
CN113393041A (en) * 2021-06-21 2021-09-14 湖南大学 Retail field supply chain inventory optimization method based on sales prediction
CN118212004A (en) * 2024-03-01 2024-06-18 南京大学 Production strategy taking product requirements into consideration, channel selection strategy generation system and method

Similar Documents

Publication Publication Date Title
US6119102A (en) MRP system with viewable master production schedule
US8160906B2 (en) System and method for improved rental vehicle reservation management
US20070219929A1 (en) Planning granularity in manufacturing computing systems
WO2004022463A1 (en) Safe stock amount calculation method, safe stock amount calculation device, order making moment calculation method, order making moment calculation device, and order making amount calculation method
US20100023352A1 (en) System and Method for Improved Information Sharing by Repair Facilities for Managing Rental Vehicle Reservations
WO2010039407A1 (en) System and methods for pricing markdown with model refresh and reoptimization
US20240028983A1 (en) Method of production scheduling for product, electronic device and storage medium
EP1701302A1 (en) Ordering/order receiving system
US20060041466A1 (en) Methods and systems for performing an availability check for a product
US8046252B2 (en) Sales plan evaluation support system
US20150120394A1 (en) Markdown optimization system having benefits analysis and reporting
US8027857B2 (en) Rough-cut manufacturing operations for use in planning
JP2001209629A (en) Method for calculating the number of commodities planned to be sold or the number of commodities planned to be produced
US7890201B2 (en) Production planning system
US20030074377A1 (en) Method and apparatus for reporting the status of work in progress
JP2003016245A (en) System, program and method for predicting sales
JP2004292101A (en) System and method for supporting order processing
JP2005242816A (en) Order reception bargaining support method by computer
JP4308554B2 (en) PRODUCTION MANAGEMENT SUPPORT DEVICE, PRODUCTION MANAGEMENT SUPPORT COMPUTER PROGRAM, AND RECORDING MEDIUM CONTAINING THE COMPUTER PROGRAM
US20090216614A1 (en) Availability Check for a Ware
JP4162920B2 (en) Production plan determination period calculation system, method, and program for causing computer to execute the method
JPH0930616A (en) Inventory managing device
US20070282624A1 (en) System and method for generating a value retention schedule
JPH10315100A (en) Production planning system
JPH0778209A (en) Shipping quantity prediction system

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040420

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040618

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040618

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040831

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041020

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20041102

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20041217