JP2001146747A - Earth-retaining method for deep, long ditch for embedding underground pipe or the like, and sheet pile wall retaining tower to be used therefor - Google Patents

Earth-retaining method for deep, long ditch for embedding underground pipe or the like, and sheet pile wall retaining tower to be used therefor

Info

Publication number
JP2001146747A
JP2001146747A JP33243899A JP33243899A JP2001146747A JP 2001146747 A JP2001146747 A JP 2001146747A JP 33243899 A JP33243899 A JP 33243899A JP 33243899 A JP33243899 A JP 33243899A JP 2001146747 A JP2001146747 A JP 2001146747A
Authority
JP
Japan
Prior art keywords
sheet pile
pile wall
earth
tower
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33243899A
Other languages
Japanese (ja)
Other versions
JP3272704B2 (en
Inventor
Tomiji Shudo
富次 首藤
Sadatsugu Wakabayashi
定嗣 若林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIN MIE GIJUTSU KAIHATSU KK
TOHO BUSSAN KAISHA
TOHO BUSSAN KK
Original Assignee
SHIN MIE GIJUTSU KAIHATSU KK
TOHO BUSSAN KAISHA
TOHO BUSSAN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIN MIE GIJUTSU KAIHATSU KK, TOHO BUSSAN KAISHA, TOHO BUSSAN KK filed Critical SHIN MIE GIJUTSU KAIHATSU KK
Priority to JP33243899A priority Critical patent/JP3272704B2/en
Publication of JP2001146747A publication Critical patent/JP2001146747A/en
Application granted granted Critical
Publication of JP3272704B2 publication Critical patent/JP3272704B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an earth-retaining method for embedding underground pipes or the like in a deep, long ditch with which noise and vibration from the work can be eliminated, the execution of the work can be carried out extremely safely and further the work can be completed in a short period of time and efficiently at a low cost, as well as sheet pile wall retaining towers used for the method. SOLUTION: Inside a deep, long ditch 1 for embedding pipes, sheet pile wall retaining towers 2A.2B... comprising inverted-U-shaped concrete block bodies as tower element bodies 10, which can be stacked and combined together, are erected and arranged to the form of bridge piers, sheet pile stiles 3 are set to the bridge piers in a multi- stage shape, and sheet pile wall retaining frame bodies 7 are erected and built, thereafter, the sheet piles 8 are inserted from the above to a space between the outer side of the sheet pile 3 and an earth wall 6 of the deep, long ditch and the sheet pile wall 9 is erected and set in this earth-retaining method in addition to the sheet pile wall retaining towers 2 made by the tower element bodies 10 collected and united as the features of this method and the towers in the configuration.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地中給排水管・地
中ガス管等の長大管類を地中埋設するにおいて、その埋
設用深長溝の土壁の溝内への崩落を防止するための「地
中管類の埋設用深長溝の土留工法と、それに用いる矢板
壁保持タワー」に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for preventing underground plumbing pipes from falling into the trenches of the earth wall when long pipes such as underground plumbing pipes and underground gas pipes are buried underground. The present invention relates to "a method of retaining a deep groove for burying underground pipes and a sheet pile holding tower used for the method."

【0002】[0002]

【従来の技術】従来、前記の長大管類を地中埋設する場
合は、機械的強度に優れる堅牢な矢板を必要な溝幅間隔
の連鎖状にして地中へ打ち込み、続いて、その連鎖状打
入の矢板間の土砂を除去して深長溝を形成し、しかるの
ち、その深長溝に作業員が入って不安定状態の矢板壁に
「ステー材による補強工事」を施して土留荷重に耐え得
る耐圧強度を確保した矢板壁を構築し、その矢板壁によ
って土留する対策が採られている。
2. Description of the Related Art Conventionally, when the above-mentioned long pipes are buried underground, a solid sheet pile having excellent mechanical strength is driven into the ground in a required chain width interval, and then driven into the ground. Remove the earth and sand between the driven sheet piles to form a deep groove.After that, workers enter the deep groove and apply `` reinforcement work with stay material '' to the unstable sheet pile wall to withstand the soil retention load. The sheet pile wall which secures the obtained pressure-resistant strength is constructed, and measures are taken to retain the pile with the sheet pile wall.

【0003】[0003]

【発明が解決しようとする課題】以上の従来の地中管類
の埋設用深長溝の土留工法は、深さ4メートル以上に及
ぶことがある深長溝の土留壁を打入した矢板によって形
成するので、堅い土中へ専用機によって深く(溝深さが
4メートルの場合は、約5メートル以上に打入する)打
入する必要があるので、その矢板打設工事は強い打込み
打音と打込み振動を生じて公害をもたらすと共に工事環
境が悪く、その上多大の手数を要して工事期間が長くな
る。
In the above-mentioned conventional method of retaining a deep trench for burying underground pipes, the above-mentioned method of retaining a deep trench, which may reach a depth of 4 meters or more, is formed by a sheet pile into which a retaining wall is inserted. Therefore, it is necessary to drive deep into the hard soil with a special machine (if the groove depth is 4 meters, drive it to about 5 meters or more). Vibration causes pollution and worsens the construction environment. In addition, it requires a lot of trouble and lengthens the construction period.

【0004】そして、その矢板は強打による強制打ち込
みのため、機械的強度に優れる高価なものが必要にして
工事コスト高の要因になると共に、地中管類の埋設後に
矢板群を専用機によって抜き取り撤去する煩雑な作業が
不可欠になり、さらに、溝内へ入って行う矢板壁の補強
工事は矢板壁が不安定な状態で行うので当然に人命に係
わる危険があり、土留用矢板壁の設定から撤去に至る一
連の工事プロセスが煩雑にして危険を伴う難点がある。
[0004] Since the sheet piles are forcibly driven by strong hitting, expensive piles having excellent mechanical strength are required, which increases the construction cost. In addition, after the underground pipes are buried, the sheet piles are extracted by a special machine. The complicated work of removing is indispensable, and furthermore, the reinforcement work of the sheet pile wall that enters the groove is performed in an unstable state of the sheet pile wall, so there is a danger that it will be potentially fatal to humans. There is a drawback in that the series of construction processes leading to removal is complicated and dangerous.

【0005】本発明は、以上の従来技術の難点を解消す
る「地中管類の埋設用深長溝の土留工法と、それに用い
る矢板壁保持タワー」を提供するものである。
The present invention provides a "method of retaining a deep trench for burying underground pipes and a sheet pile holding tower used therefor" which solves the above-mentioned drawbacks of the prior art.

【0006】[0006]

【課題を解決するための手段】以上の技術課題を解決す
る本発明は「地中管類の埋設用深長溝を矢板壁によって
土留するにおいて、広め溝幅に掘り形成した該埋設用深
長溝内に、埋設作業空間を備えた矢板壁保持タワーを橋
脚形態に立設すると共に、該矢板壁保持タワーの側壁間
に矢板桟を多段状に橋設して矢板壁保持骨組体を構築
し、しかるのち、該矢板桟の外側と前記深長溝の土壁と
の間の空間に矢板群を差し入れて該矢板桟に沿う矢板壁
を立設設定することを特徴とする地中管類の埋設用深長
溝の土留工法」と、
SUMMARY OF THE INVENTION The present invention for solving the above-mentioned technical problem is disclosed in "In the case of embedding a deep trench for burying underground pipes with a sheet pile wall, the inside of the deep trench is dug and formed to have a wide groove width. In addition, a sheet pile wall holding tower having a buried work space is erected in the form of a pier, and a sheet pile crosspiece is bridged between the side walls of the sheet pile wall holding tower in a multi-step manner to construct a sheet pile wall holding frame. Afterwards, a group of sheet piles is inserted into a space between the outside of the sheet pile and the earth wall of the deep groove to set up a sheet pile wall along the sheet pile, thereby setting a depth for burying underground pipes. Long-groove soil retaining method "

【0007】「上面部の両側に脚板を一体に垂設した逆
U字形状のコンクリートブロック体にして、前記上面部
の縁部と前記脚板の下端が相互に噛み合う相互連結部を
有して積層集合可能にして、さらに、前記脚板の外側に
矢板桟の端部を支承する矢板桟受部を設けたタワー素体
の集合からなる構造を特徴とする前記本発明の土留工法
に用いる矢板壁保持タワー」になっている。
[0007] An inverted U-shaped concrete block body in which leg plates are integrally provided on both sides of an upper surface portion, and an interconnecting portion in which an edge portion of the upper surface portion and a lower end of the leg plate mesh with each other is laminated. A sheet pile wall retainer for use in the earth retaining method according to the present invention, characterized by a structure comprising a set of tower bodies that are capable of being assembled and further provided with a sheet pile receiving portion that supports an end of the sheet pile outside the leg plate. Tower ".

【0008】即ち、本発明の土留工法は、予め広い溝幅
に掘り形成した深長溝内に、前記の矢板壁保持骨組体を
組立て構築し、その骨組体の矢板桟の外側へ矢板群を上
方から差し入れて連鎖状に並列セットすることによっ
て、地中管類を埋設作業する深長溝の土壁崩落による土
砂侵入を防止する矢板壁を設定する工法が特徴である。
That is, according to the earth retaining method of the present invention, the sheet pile wall holding skeleton is assembled and constructed in a deep groove previously dug and formed with a wide groove width, and the sheet pile group is moved upward to the outside of the sheet pile bar of the skeleton. It is characterized by a method of setting a sheet pile wall to prevent earth and sand intrusion due to the collapse of the soil wall in the deep trench where the underground pipes are buried by inserting them in parallel in a chain.

【0009】そして、その矢板壁保持骨組体の主要部と
なる矢板壁保持タワーは、土留荷重に充分に耐え得るコ
ンクリートブロック体または鉄骨枠体等の形態のものが
用いられ、前記構成の積層集合形態のものや単体独立形
態のものが用いられる。なお、本発明における地中管類
とは、地中埋設の給水管・排水管その他長尺物を含めた
ものをいう。
The sheet pile wall holding tower, which is a main part of the sheet pile wall holding frame, is a concrete block or a steel frame which can sufficiently withstand the earth retaining load. A form or a stand-alone form is used. The underground pipes in the present invention include those including water supply pipes and drain pipes buried underground and other long objects.

【0010】[0010]

【作用】以上の構成の本発明の土留工法は、溝内に構築
した矢板壁保持骨組体によって矢板壁を支承保持するの
で、溝土壁の崩落土の溝内侵入防止の土留機能が充分に
確保できる。そして、矢板を地中深く強打圧入する必要
がなく、予め形成した深長溝内に設定した矢板壁保持骨
組体の矢板桟に沿って存在する空間に矢板を差し込みセ
ットして土留用矢板壁が設定できるので、矢板壁による
土留対策が静音にして無振動状態で施工可能となる。
According to the soil retaining method of the present invention having the above-described structure, the sheet pile wall is supported and held by the sheet pile wall holding frame constructed in the groove, so that the soil retaining function of preventing the collapsed soil of the groove soil wall from entering the groove can be sufficiently achieved. Can be secured. Then, it is not necessary to strongly press and insert the sheet pile deep into the ground, and the sheet pile is set by inserting the sheet pile into the space existing along the sheet pile bar of the sheet pile wall holding frame set in the deep groove formed in advance, and setting the sheet pile wall for retaining. Since it can be done, the soil retention measures by the sheet pile wall are silent and can be performed without vibration.

【0011】そして、その矢板壁保持骨組体は、クレー
ン車等によって深長溝内に挿入設置した矢板壁保持タワ
ーに矢板桟を橋設すれば構築できるので、作業員が構内
に入って危険を侵す必要がなく、土留用矢板壁の設定か
ら撤去に至る一連の工事プロセスが前記従来の工法よ
り、安全にして短期間能率的になる。
The sheet pile wall holding frame can be constructed by piercing a sheet pile cross into a sheet pile wall holding tower inserted and installed in a deep groove by a crane truck or the like. There is no necessity, and a series of construction processes from setting of the pile sheet wall for retaining to removal are safer and more efficient than the conventional method.

【0012】さらに、その矢板壁を構成する矢板群は、
従来の強打による地中圧入が無用になることから、例え
ば「樹脂をガラス長繊維マットで強化した複合材料」か
らなる軽量安価なものが使用可能になる。そして、本発
明の土留工法に用いる前記構成の矢板壁保持タワーは、
順次積層重合できる単位タワー体の集合からなるので、
標準化量産したものを深長溝の深さに整合させて必要高
の矢板壁保持タワーが任意に設定できると共に、使用後
は積層重合のものを順次外すことによって簡便・迅速な
撤去ができる。
Further, a group of sheet piles constituting the sheet pile wall includes:
Since the underground press-fitting by the conventional banging becomes unnecessary, a lightweight and inexpensive material made of, for example, a "composite material reinforced with a long glass fiber mat" can be used. And the sheet pile wall holding tower having the above configuration used for the earth retaining method of the present invention,
Since it consists of a set of unit tower bodies that can be sequentially laminated and polymerized,
The sheet pile wall holding tower having the required height can be set arbitrarily by matching the standardized mass-produced one with the depth of the deep groove, and after use, the stacking-stacked one can be sequentially removed to allow easy and quick removal.

【0013】[0013]

【発明の実施の形態】以下、実施例の基づいて詳しく説
明する。まず、本発明の土留工法に用いる矢板壁保持タ
ワー(以下、単に保持タワーという)の一実施例を図2
を参照して説明する。即ち、この保持タワー2は「平坦
方形の表面部11の両端に板状脚12を一体に垂設した
逆U字状の鉄筋入りコンクリート製ブロック体のタワー
素体10」を多段状に積層重合して必要な高さにする構
造にして、地中管類(この実施例は下水道管5)を埋設
する深長溝1の土壁6に板状脚12の側面を臨ませる姿
勢にして溝内に載置セットされ、後述する矢板壁保持骨
組体7を構成する主要部材になっている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a detailed description will be given based on embodiments. First, an embodiment of a sheet pile holding tower (hereinafter simply referred to as a holding tower) used in the earth retaining method of the present invention is shown in FIG.
This will be described with reference to FIG. That is, the holding tower 2 is formed by stacking a multi-staged tower element body 10 of an inverted U-shaped concrete reinforced block in which plate-like legs 12 are integrally provided at both ends of a flat rectangular surface portion 11. To the required height, and place the side surface of the plate leg 12 on the earth wall 6 of the deep groove 1 in which the underground pipes (the sewer pipe 5 in this embodiment) are buried. And is a main member constituting the sheet pile wall holding frame 7 described later.

【0014】詳しくは、タワー素体10は、平均的な地
中管類埋設用の深長溝1の溝幅に適合する幅B(約1.
4メートル)と単位高さH(約1.0メートル)と長さ
L(約0.6メートル)を有する短小トンネル形態にし
て、表面部11と板状脚12で枠囲いして前後方向に貫
通する作業用空間を有している。そして、表面部11の
両側コーナー部位の切欠凹条13と板状脚12の外側下
端に設けた凸条14を備え、この凹条・凸条13・14
を相互に噛み合せることによって同一サイズのタワー素
体10が外力に対して安定した姿勢で上下連結できる相
互連結部を有している。なお、図中の16は吊下げ用フ
ックである。
More specifically, the tower body 10 has a width B (approximately 1....) That matches the average groove width of the deep groove 1 for burying underground pipes.
4 meters), a unit height H (approximately 1.0 meters) and a length L (approximately 0.6 meters). It has a penetrating working space. A notch 13 at both corners of the surface portion 11 and a ridge 14 provided at an outer lower end of the plate-like leg 12 are provided.
Are mutually engaged so that the tower body 10 of the same size has an interconnecting portion that can be vertically connected in a stable posture against external force. Reference numeral 16 in the figure is a hanging hook.

【0015】そして、このタワー素体10の板状脚12
の外周には、後述する矢板桟3の端部を載せて保持タワ
ー2の両側面に組合せ連結する矢板桟受部15が板状脚
12の高さHの概ね中間にして長さ方向の両端部分に設
けられている。そして、このタワー素体10の集合から
なる保持タワー2を用いて深長溝1の土壁6の崩落によ
る土砂の溝内侵入を防止する矢板壁9が下記の工法で構
築される。
The plate-like legs 12 of the tower body 10
At the outer periphery of the sheet pile 12, a sheet pile support 15 for carrying an end of a sheet pile 3 to be described later and combining and connecting the both ends to the both sides of the holding tower 2 is substantially at the middle of the height H of the plate-like leg 12, and both ends in the longitudinal direction. It is provided in the part. Then, a sheet pile wall 9 for preventing earth and sand from entering the groove by the collapse of the earth wall 6 of the deep groove 1 is constructed by the following construction method by using the holding tower 2 composed of the tower element body 10.

【0016】即ち、下水道管5の埋設工事に適用した本
発明一実施例の矢板壁土留工法の一実施例を示す図1を
参照して、まず下水道管5の埋設深さを有する深長溝1
を若干幅広の溝幅にして掘り形成し、その深長溝1の溝
内に図2実施例のタワー素体10を挿入セットとしてス
パンSの間隔を設けて配設すると共に、それぞれのタワ
ー素体10を2箇づつ重合積みした保持タワー2A・2
B…を溝内に橋脚形態にして立設設定する。
That is, with reference to FIG. 1 showing an embodiment of a sheet pile wall retaining method according to an embodiment of the present invention applied to the burial work of a sewer pipe 5, first, a deep groove 1 having a burial depth of the sewer pipe 5 will be described.
Are slightly dug and formed, and the tower element 10 of FIG. 2 is inserted into the groove of the deep groove 1 with an interval of a span S as an insertion set. Holding towers 2A and 2 in which 10 are stacked two by two
B ... is set up in the form of a pier in the trench.

【0017】続いて、その保持タワー2A・2B…の隣
接相互間にI形鋼・溝形鋼からなるストレートバー形態
の矢板桟3を橋設固定して橋脚形態の保持タワー2A・
2B…を相互連結して「保持タワー2A・2B…と矢板
桟3の組合せからなる矢板壁保持骨組体7」を深長溝1
内に構築設定する。
Subsequently, a straight bar type sheet pile 3 made of I-shaped steel and channel steel is bridged between adjacent holding towers 2A, 2B,.
2B are interconnected to form a “sheet pile wall holding frame 7 composed of a combination of the holding towers 2A and 2B and the sheet pile 3” into the deep groove 1.
Set to build within.

【0018】しかるのち、その矢板壁保持骨組体7の矢
板桟3の外側と深長溝1の土壁6との間の空間に、深長
溝1の上方から矢板8を順次差し入れて一列並列で連な
る矢板壁9を矢板桟3の外側に沿わせて立設設定する。
かくして土壁6の内側に対向して立設した矢板壁9によ
って土壁6の崩落による土砂の溝内侵入を防止する。な
お、矢板壁9を形成する矢板8は例えば出光エヌエスジ
ー株式会社製の軽量簡易矢板(熱可塑性樹脂をガラス長
繊維マットで強化した複合材料に、エキスパンドメタル
を組み込んだ構造のもの)が用いられ、矢板壁9の並設
姿勢の安定を図るために上端を軽く叩いて下端の若干を
土中に差し込み、矢板桟3に沿設支承した矢板壁9を設
定する。
Thereafter, the sheet piles 8 are sequentially inserted from above the deep groove 1 into the space between the outside of the sheet pile bar 3 of the sheet pile wall holding frame 7 and the earth wall 6 of the deep groove 1 so as to be connected in a row. The sheet pile wall 9 is set upright along the outside of the sheet pile 3.
Thus, the sheet pile wall 9 erected facing the inside of the earth wall 6 prevents earth and sand from entering the groove due to the collapse of the earth wall 6. The sheet pile 8 forming the sheet pile wall 9 is, for example, a lightweight simple sheet pile manufactured by Idemitsu NS Co., Ltd. (having a structure in which expanded metal is incorporated into a composite material in which a thermoplastic resin is reinforced with a long glass fiber mat). In order to stabilize the orientation of the sheet pile walls 9, the upper end is lightly tapped and a little of the lower end is inserted into the soil to set the sheet pile wall 9 that is supported along the sheet pile 3.

【0019】以上の実施例の土留工法は前記の作用があ
り、矢板8の強打土中圧入作業は無用にして軽量矢板を
溝上方から差し込んで頭部を軽く叩くのみで矢板壁9が
設定できるので、その設定工事は打音騒音・強打振動の
発生がなく静音状態で作業環境も良く極めて能率的にで
きる。そして、その矢板壁9を支承保持する矢板壁保持
骨組体7は、タワー素体10をクレーン車等によって吊
り上げて深長溝1内に載置積重して保持タワー2に成
し、その保持タワーに矢板桟3を掛け止め連結するのみ
で溝内構築ができるので、従来の土留工法より特段に能
率的にして短時間かつ安価に施工できると共に、矢板壁
9の設定・補強のために深長溝1内に作業員が入る必要
がないので、工事の安全性が特段に良くなる。そして、
前記の軽量安価な矢板8が使用可能になるので、埋設工
事終了後の矢板壁9の撤去も簡易にして、矢板8群の運
搬も従来工法の鋼板製重量物の矢板より特段にし易くな
る。
The earth retaining method of the above embodiment has the above-mentioned effect, and the sheet pile wall 9 can be set only by inserting a lightweight sheet pile from above the groove and tapping the head lightly without the need for press-fitting the sheet pile 8 into the hard soil. Therefore, the setting work can be performed very efficiently with no noise and strong hitting vibrations, a quiet state, and a good working environment. The sheet pile wall holding frame 7 for supporting and holding the sheet pile wall 9 is lifted by a crane truck or the like to form the holding tower 2 by lifting and stacking the tower body 10 in the deep groove 1. Can be constructed only by hooking and connecting the sheet pile 3 to the groove, so that it can be constructed more efficiently and in a shorter time and at lower cost than the conventional earth retaining method, and the deep groove is used for setting and reinforcing the sheet pile wall 9. Since there is no need for an operator to enter the area 1, the safety of the construction is particularly improved. And
Since the light and inexpensive sheet pile 8 can be used, removal of the sheet pile wall 9 after completion of the embedding work is simplified, and transport of the group of sheet piles 8 is particularly easy compared with the conventional sheet pile heavy sheet pile.

【0020】続いて、図3を参照して本発明の保持タワ
ー2の他の実施例を説明する。即ち、この図3のものは
4本の鋼製の主柱20によって方形に枠囲いした単一形
態のタワー体にして、多様な深さの溝に兼用可能にした
高い高さH(概ね4〜5メートル)を有している。そし
て、主柱20に設けた多段状の矢板桟受部15の任意の
2個を選んで矢板桟3を橋設し、図1実施例の工法によ
って矢板壁9を設定するようになっている。そして、こ
の図3の保持タワー2は、深長溝1の溝幅に整合させて
タワー幅Bを現地で調整設定可能にするため、主材20
を連結するタワー幅梁21を交換自在の構成にすること
がある。
Next, another embodiment of the holding tower 2 of the present invention will be described with reference to FIG. That is, the thing of FIG. 3 is a single-shaped tower body framed and surrounded by four steel main pillars 20 in a rectangular shape, and has a high height H (approximately 4 55 meters). Then, any two of the multi-staged sheet pile receiving portions 15 provided on the main pillar 20 are selected, the sheet pile beam 3 is bridged, and the sheet pile wall 9 is set by the method of the embodiment of FIG. . The holding tower 2 shown in FIG. 3 has a main material 20 in order to make it possible to adjust and set the tower width B on site by matching the groove width of the deep groove 1.
In some cases, the tower width beam 21 connecting the two may be configured to be exchangeable.

【0021】なお、本発明の土留工法は、溝底の土質に
よって保持タワー2の立設安定性に欠ける場合は、矢板
桟3以外の連結杆によって保持タワー2を相互連結固定
することがあり、矢板桟3は、保持タワー2の矢板桟受
部15にボルト締め等の機械的固定手段によって着脱自
在に連結することがある。さらに、矢板壁保持タワー2
は「強化プラスチック製フレームをコンクリート製ブロ
ックの基台の上に立設した土圧耐用構造形態」等にした
樹脂材質のもので構成することがある。
In the earth retaining method of the present invention, when the standing stability of the holding tower 2 is lacked due to the soil at the bottom of the groove, the holding tower 2 may be interconnected and fixed by a connecting rod other than the sheet pile 3. The sheet pile 3 may be detachably connected to the sheet pile receiving portion 15 of the holding tower 2 by mechanical fixing means such as bolting. Furthermore, sheet pile wall holding tower 2
May be made of a resin material such as "earth pressure resistant structure in which a reinforced plastic frame is erected on a concrete block base".

【0022】[0022]

【発明の効果】以上の説明のとおり、本発明の地中管類
の埋設用深長溝の土留工法は、工事騒音・工事振動によ
る公害発生がなく良好な作業環境で土留工事ができると
共に、工事上の安全性が極めて良く、その上、従来の土
留工法より短期間能率的にして安価に土留対策が可能に
なる実用性に優れる効果がある。そして、本発明の矢板
壁保持タワーは本発明の前記諸効果の円滑な達成を支援
することができる。
As described above, the earth retaining method for deep trenches for burying underground pipes according to the present invention can perform earth retaining work in a favorable working environment without generating pollution due to construction noise and vibration. In addition, the safety is extremely good, and in addition, there is an effect that the efficiency of the soil retaining method is shorter than that of the conventional soil retaining method, and that it is possible to take measures against the soil at a low cost, and the practicality is excellent. And the sheet pile wall holding tower of the present invention can support the smooth achievement of the various effects of the present invention.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の地中管類の埋設用深長溝の土留工法の
一実施例を示し、(A)はその工法の説明図、(B)は
(A)の工法による土留壁設定状態の溝断面図
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows an embodiment of a soil retaining method for a deep trench for burying underground pipes of the present invention, (A) is an explanatory view of the method, and (B) is a retaining wall setting state by the method (A). Cross section of groove

【図2】図1実施例の土留工法に用いた矢板壁保持タワ
ーを示し、(A)はその斜視図、(B)はその正面図
FIGS. 2A and 2B show a sheet pile holding tower used in the earth retaining method of the embodiment shown in FIG. 1, wherein FIG. 2A is a perspective view and FIG.

【図3】本発明の土留工法に用いる矢板壁保持タワーの
他の実施例を示し、(A)はその正面図、(B)はその
側面図
FIG. 3 shows another embodiment of a sheet pile wall holding tower used in the earth retaining method of the present invention, wherein (A) is a front view and (B) is a side view.

【符号の説明】[Explanation of symbols]

1 埋設用深長溝 2 矢板壁保持タワー 3 矢板桟 5 下水道管 6 土壁 7 矢板壁保持骨組体 8 矢板 9 矢板壁 10 タワー素体 11 表面部 12 脚板部 13 凹条 14 凸条 15 矢板桟受部 20 主柱 DESCRIPTION OF SYMBOLS 1 Deep groove for embedding 2 Sheet pile wall holding tower 3 Sheet pile bar 5 Sewer pipe 6 Soil wall 7 Sheet pile wall holding frame 8 Sheet pile 9 Sheet pile wall 10 Tower body 11 Surface part 12 Leg plate part 13 Concave strip 14 Convex strip 15 Part 20 Main pillar

───────────────────────────────────────────────────── フロントページの続き (72)発明者 若林 定嗣 三重県津市高茶屋小森上野町2856番地 東 方物産株式会社内 Fターム(参考) 2D044 AA12  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Sadatsugu Wakabayashi 2856, Takachaya Komori Ueno-cho, Tsu-shi, Mie F-term in Toho Bussan Co., Ltd. 2D044 AA12

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地中管類の埋設用深長溝を矢板壁によっ
て土留するにおいて、広め溝幅に掘り形成した該埋設用
深長溝内に、埋設作業空間を備えた矢板壁保持タワーを
橋脚形態に立設すると共に、該矢板壁保持タワーの側壁
間に矢板桟を多段状に橋設して矢板壁保持骨組体を構築
し、しかるのち、該矢板桟の外側と前記深長溝の土壁と
の間の空間に矢板群を差し入れて該矢板桟に沿う矢板壁
を立設設定することを特徴とする地中管類の埋設用深長
溝の土留工法。
When a deep trench for burying underground pipes is buried by a sheet pile wall, a sheet pile wall holding tower provided with a burying work space is pierced in the deep trench having a wide trench width. At the same time, a sheet pile is laid in a multi-stage manner between side walls of the sheet pile holding tower to form a sheet pile holding frame, and thereafter, the outside of the sheet pile and the earth wall of the deep groove are formed. A group of sheet piles is inserted into a space between the piles, and a sheet pile wall is erected along the sheet pile cross-section so as to bury a deep groove for burying underground pipes.
【請求項2】 上面部の両側に脚板を一体に垂設した逆
U字形状のコンクリートブロック体にして、前記上面部
の縁部と前記脚板の下端が相互に噛み合う相互連結部を
有して積層集合可能にして、さらに、前記脚板の外側に
矢板桟の端部を支承する矢板桟受部を設けたタワー素体
の集合からなる構造を特徴とする請求項1の土留工法に
用いる矢板壁保持タワー。
2. An inverted U-shaped concrete block in which leg plates are integrally provided on both sides of an upper surface portion, and an interconnecting portion in which an edge portion of the upper surface portion and a lower end of the leg plate mesh with each other. 2. A sheet pile wall for use in an earth retaining method according to claim 1, wherein said sheet pile wall is formed by assembling a tower element body capable of being stacked and assembled, and further comprising a sheet pile receiving portion for supporting an end of the sheet pile outside said leg plate. Holding tower.
JP33243899A 1999-11-24 1999-11-24 Soil retaining method for deep trench for burying underground pipes, and sheet pile retaining tower used for it Expired - Fee Related JP3272704B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33243899A JP3272704B2 (en) 1999-11-24 1999-11-24 Soil retaining method for deep trench for burying underground pipes, and sheet pile retaining tower used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33243899A JP3272704B2 (en) 1999-11-24 1999-11-24 Soil retaining method for deep trench for burying underground pipes, and sheet pile retaining tower used for it

Publications (2)

Publication Number Publication Date
JP2001146747A true JP2001146747A (en) 2001-05-29
JP3272704B2 JP3272704B2 (en) 2002-04-08

Family

ID=18254987

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33243899A Expired - Fee Related JP3272704B2 (en) 1999-11-24 1999-11-24 Soil retaining method for deep trench for burying underground pipes, and sheet pile retaining tower used for it

Country Status (1)

Country Link
JP (1) JP3272704B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101132232B1 (en) 2011-11-08 2012-03-30 (주)휴먼아키피아종합건축사사무소 Underground power transmission pipe spacer to preventing collapse for apartment house

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101228781B1 (en) * 2009-09-24 2013-01-31 (주)엘지하우시스 Long Fiber Reinforced Plastic Soil Retaining Plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101132232B1 (en) 2011-11-08 2012-03-30 (주)휴먼아키피아종합건축사사무소 Underground power transmission pipe spacer to preventing collapse for apartment house

Also Published As

Publication number Publication date
JP3272704B2 (en) 2002-04-08

Similar Documents

Publication Publication Date Title
CN101240550A (en) Construction method for lattice type steel column tower crane pedestal
JP6650257B2 (en) Mountain retaining structure and construction method thereof
JP4347846B2 (en) Bridge pier reinforcement method
JP5693778B1 (en) Temporary mountain retaining structure and temporary mountain retaining method
JP3272704B2 (en) Soil retaining method for deep trench for burying underground pipes, and sheet pile retaining tower used for it
CN115627781B (en) Slope reinforcement structure for rapidly treating existing slope collapse and construction method
KR20040031451A (en) Prestressed scaffolding method
US20050141970A1 (en) Earth retaining safety framework and system
JP2003268770A (en) Earth retaining construction method and reinforcing structure of sheet pile used for this construction method
KR200258921Y1 (en) construction of panel
JP4346029B2 (en) Protection device for earth retaining method and earth retaining method
JPH0995938A (en) Master pile lateral sheet pile and its execution method
JP3228199U (en) Construction structure of earth retaining support
KR102456102B1 (en) Assembly of temporary retaining facilities using 3-way piles and construction method of retaining temporary facilities using 3-way piles using the same
KR101150795B1 (en) The deepened sheet plate and the method of installation of the same
JP2022047737A (en) Construction method of retaining wall
CN217378921U (en) Partition structure for controlling deformation of deep and large foundation pit
KR102268882B1 (en) Three-way thumb pile reinforcement type self-supporting soil barrier construction method
JP2637680B2 (en) Underground beam foundation construction method for house building
JP3060195B2 (en) Construction method of steel basement reinforced concrete continuous underground wall
JPH0587023U (en) Iron sheet pile
JPS5840608B2 (en) Earth retaining method for ditch side walls
JPS58117137A (en) Retaining wall
JP2004176314A (en) Civil-engineered structure equipped with planting sections, and method of constructing the same
JPH10152853A (en) Method of building underground structure and structure member used therein

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees