Tunnel interior plate direct-placing construction method and device therefor

Info

Publication number
JP2001032689A
JP2001032689A JP11210394A JP21039499A JP2001032689A JP 2001032689 A JP2001032689 A JP 2001032689A JP 11210394 A JP11210394 A JP 11210394A JP 21039499 A JP21039499 A JP 21039499A JP 2001032689 A JP2001032689 A JP 2001032689A
Authority
JP
Japan
Prior art keywords
tunnel interior
tunnel
interior plate
formwork
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11210394A
Other languages
Japanese (ja)
Other versions
JP4099293B2 (en
Inventor
Toshio Fukumura
敏男 福村
Yuji Funahira
裕二 船平
Tsutomu Kitagawa
勉 北川
Takeshi Aizaki
毅 相崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INFURATETSUKU KK
Gifu Industry Co Ltd
Original Assignee
INFURATETSUKU KK
Gifu Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INFURATETSUKU KK, Gifu Industry Co Ltd filed Critical INFURATETSUKU KK
Priority to JP21039499A priority Critical patent/JP4099293B2/en
Publication of JP2001032689A publication Critical patent/JP2001032689A/en
Application granted granted Critical
Publication of JP4099293B2 publication Critical patent/JP4099293B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily fix a tunnel interior plate to a form and to execute work simultaneously with placing of secondary lining concrete. SOLUTION: In this construction method and device for fitting a tunnel interior plate 18 to the surface of secondary lining concrete 14 placed in a tunnel, the tunnel interior plate 18 is made to abut on the outer peripheral surface of a form 16, and a drawing body 30 of a fixture 28 is inserted in a fastening hole of the tunnel interior plate 18 from the inside of the form 16. The drawing body 30 is then tilted and locked to the tunnel interior plate 18, and drawn to the inside of the form 16 and fixed in close contact with the form 16. After concrete is placed, the drawing body 30 is separated from the fixture 28, and the form 16 is removed. The drawing body 30 is thereby embedded in the concrete 14, and the tunnel interior plate 18 is directly fitted to the surface of the concrete 14.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、トンネル内に打設
した二次覆工用コンクリート表面の防護と美観を向上さ
せるためのトンネル内装板を、二次覆工用コンクリート
打設と同時施工することができるトンネル内装板の直打
設工法およびその装置に関するものである。なお、本明
細書中、「打設」とは、養生硬化してない流動性コンク
リートを型枠と、トンネル内壁面または一次覆工用コン
クリートと、の間に充填させることをいう。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to the simultaneous construction of a tunnel interior plate for protecting the surface of a secondary lining concrete placed in a tunnel and improving the appearance of the tunnel at the same time as the concrete placing for a secondary lining. The present invention relates to a method and a device for directly placing a tunnel interior plate. In the present specification, “placement” refers to filling fluid concrete that has not been cured and hardened between the formwork and the inner wall surface of the tunnel or the concrete for primary lining.

【0002】[0002]

【従来の技術】元来、トンネル壁面(二次覆工させたコ
ンクリートの表面)との輝度差から視線誘導を促し、ド
ライバーの視認性を向上させ、自動車の安定走行を支援
すると共に、トンネル壁面の漏水、配管の露出、トンネ
ル壁面の不揃いを被覆することによりトンネル壁面の防
護と美観を向上させる措置として、通常トンネル壁面の
下方部分に、白色系塗装を施したトンネル内装板を施工
し(取付け)ていた。
2. Description of the Related Art Originally, a gaze guidance is promoted from a luminance difference from a tunnel wall surface (the surface of a secondary lining concrete) to improve a driver's visibility, support a stable driving of a car, and enhance a tunnel wall surface. As a measure to improve the protection and aesthetics of the tunnel wall by covering the water leakage of the pipe, the exposure of the pipes, and the irregularity of the tunnel wall, a white interior painted tunnel interior plate is usually installed below the tunnel wall (installation). ).

【0003】その工程は、まずトンネル壁面である二次
覆工用コンクリートの表面に固定金具を固着させた後、
各固定金具にそれぞれトンネル内装板を固定させたり、
あるいは固定金具を使用することなく、トンネル内装板
を貼着用モルタルを介して直に二次覆工用コンクリート
の表面に固定していた。
[0003] In that process, first, after fixing metal fittings are fixed to the surface of the secondary lining concrete, which is the tunnel wall surface,
Fixing the tunnel interior plate to each fixing bracket,
Alternatively, the tunnel interior board was directly fixed to the surface of the concrete for secondary lining via a mortar for attaching without using a fixing bracket.

【0004】[0004]

【発明が解決しようとする課題】従来、トンネル内装板
の施工は、二次覆工用コンクリートの打設後に別途行わ
れていたため、トンネルの全長が長い程その工期も長く
なり、一年近くかかる場合もあり、施工期間が長いこと
が問題となっていた。
Conventionally, the construction of a tunnel interior board has been performed separately after the concrete for secondary lining has been cast. Therefore, the longer the total length of the tunnel, the longer the construction period, and it takes nearly one year. In some cases, a long construction period was a problem.

【0005】また、各固定金具に、個々にトンネル内装
板を固定したり、貼着用モルタルを介して個々にトンネ
ル内装板を固定していたため、作業能率が良くないこと
が問題となっていた。
[0005] Further, since a tunnel interior plate is individually fixed to each fixing metal, or a tunnel interior plate is individually fixed via a mortar to be attached, there has been a problem that work efficiency is not good.

【0006】また、トンネル内は、湧水や高い湿度、冬
季の凍結防止剤、自動車の排気ガス等もあり、汚損し易
く、金属の腐食が進行する環境であるため、固定金具が
腐食したり、貼着用モルタルが劣化すると共に、自動車
からの衝撃、清掃作業時の清掃具の圧力等によりトンネ
ル内装板の表面が汚損するため、永年使用中、固定金具
の取替え、トンネル内装板の洗浄、取替え等を何度も行
う必要があり、この維持管理に大きな負担が掛かること
が問題となっていた。
[0006] In addition, since the inside of the tunnel has spring water, high humidity, anti-freezing agent in winter, exhaust gas from automobiles, etc., it is easily polluted, and metal fittings are corroded. In addition, the mortar to be attached deteriorates, and the surface of the tunnel interior plate becomes dirty due to the impact from the car, the pressure of the cleaning tool during cleaning work, etc. It is necessary to perform such operations many times, and a great burden is imposed on this maintenance.

【0007】また、固定金具の取替え、トンネル内装板
の洗浄、取替え等の補修工事において、トンネル内の片
側車線を止めて行う必要があり、このため交通渋滞とな
り、トンネル内装板の補修工事の際にも容易に施工可能
な工法が強く要望されている。
Further, in repair work such as replacement of fixing brackets, cleaning and replacement of a tunnel interior board, it is necessary to stop one side of the lane in the tunnel, which results in traffic congestion, and when repair work of the tunnel interior board is required. There is a strong demand for a construction method that can be easily constructed.

【0008】本発明は、この要望に対処すべく、型枠へ
のトンネル内装板の止着がし易く、二次覆工用コンクリ
ート打設と同時施工ができるトンネル内装板の直打設工
法およびその装置を提供することを目的とするものであ
る。
In order to address this demand, the present invention provides a method for directly installing a tunnel interior board to a formwork which can be easily fixed to a formwork and which can be simultaneously installed with concrete for secondary lining. It is intended to provide such an apparatus.

【0009】[0009]

【課題を解決するための手段】本発明は、トンネル内に
打設した二次覆工用コンクリートの表面にトンネル内装
板を取付ける工法および装置において、トンネル内に二
次覆工用コンクリートを打設する型枠の外周面に、基板
に内装板を多数固着させ、かつ基板の適所に止着孔を貫
通させてなるトンネル内装板を、トンネル内装板の表面
を型枠に当接させると共に、トンネル内装板の止着孔に
型枠内側から、先端に傾倒自在の引寄体を着脱自在に装
着させた止着金具の引寄体を、挿入後、引寄体を自重に
より垂直方向に傾倒させてトンネル内装板に係止させ、
止着金具を型枠内側に引寄せてトンネル内装板を型枠に
密着させた後、止着金具を型枠内側に固定することによ
り、トンネル内装板を型枠に止着させた後、トンネル内
に型枠を介して二次覆工用コンクリートを打設し、二次
覆工用コンクリートの養生硬化後、止着金具の先端から
引寄体を分離し、型枠を脱型させることにより、引寄体
を二次覆工用コンクリート内に埋設すると共に、二次覆
工用コンクリートの表面にトンネル内装板を直に取付け
ることを特徴とするもの、または型枠内側からトンネル
内装板の止着孔への止着金具の引寄体の挿入において、
止着金具を挿入チューブに内挿させた後、挿入チューブ
と共に引寄体をトンネル内装板の止着孔に挿入させた
後、挿入チューブのみをトンネル内装板の止着孔から抜
出すことにより、引寄体を自重により垂直方向に傾倒さ
せることを特徴とするもの、またはトンネル内装板の型
枠外周面への当接において、型枠外周下方に配設させた
突出板上にトンネル内装板を載置させた後、このトンネ
ル内装板の上方に順次トンネル内装板を積上げ、各トン
ネル内装板を型枠に止着後、二次覆工用コンクリートを
打設することを特徴とするもの、またはトンネル内装板
の型枠外周面への当接において、型枠外周に略格子状に
配設させた突出板の各区画内にトンネル内装板を載置さ
せた後、各トンネル内装板を型枠に止着後、二次覆工用
コンクリートを打設することを特徴とするもの、または
トンネル内装板の基板を、柔軟性素材により成形し、型
枠外周面への密着性を向上させ、打設した二次覆工用コ
ンクリートのトンネル内装板表面への浸出を防止するこ
とを特徴とするものである。
SUMMARY OF THE INVENTION The present invention relates to a method and an apparatus for mounting a tunnel interior plate on a surface of a concrete for secondary lining cast in a tunnel, wherein the concrete for secondary lining is cast in a tunnel. On the outer peripheral surface of the formwork, a number of interior boards are fixedly attached to the substrate, and a tunnel interior plate formed by passing through a fixing hole at an appropriate position on the substrate is brought into contact with the surface of the tunnel interior plate to the formwork. After inserting the retractable fastener with the tiltable retractable body detachably attached to the tip from the inside of the formwork in the fastening hole of the interior plate, insert the retractor and tilt the retractor vertically by its own weight. To the tunnel interior plate,
After the fastener is pulled inside the mold and the tunnel interior plate is brought into close contact with the mold, the fastening metal is fixed to the interior of the mold to fix the tunnel interior plate to the mold, and then the tunnel By casting concrete for secondary lining through a mold inside, curing and curing the concrete for secondary lining, separating the attracting body from the tip of the fastener and removing the mold , With the buried body buried in the secondary lining concrete and the tunnel interior panel being directly attached to the surface of the secondary lining concrete, or the tunnel interior panel being stopped from the inside of the formwork. In the insertion of the fastener of the fastener into the hole,
After inserting the fastening fitting into the insertion tube, after inserting the drawer together with the insertion tube into the fastening hole of the tunnel interior plate, by pulling out only the insertion tube from the fastening hole of the tunnel interior plate, Characterized in that the attracting body is tilted in the vertical direction by its own weight, or when the tunnel interior plate abuts on the outer peripheral surface of the mold, the tunnel interior plate is placed on a protruding plate arranged below the outer periphery of the mold. After being placed, the tunnel interior boards are sequentially stacked on top of the tunnel interior boards, and after fastening each tunnel interior board to the formwork, concrete for secondary lining is poured, or At the time of contact of the tunnel interior plate with the outer peripheral surface of the formwork, the tunnel interior plate is placed in each section of the projecting plate arranged in a substantially lattice shape on the outer periphery of the mold, and then each tunnel interior plate is attached to the formwork. After fixing to the ground, concrete for secondary lining is poured Or the substrate of the tunnel interior plate is molded from a flexible material to improve the adhesion to the outer peripheral surface of the formwork, and to the surface of the cast secondary lining concrete for the tunnel interior plate. It is characterized by preventing leaching of water.

【0010】[0010]

【発明の実施の形態】本発明に係るトンネル内装板の直
打設装置は、図1〜図8に示すように、型枠16、トン
ネル内装板18および止着金具28からなるものであ
り、その構造を以下に詳述する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A direct installation device for a tunnel interior plate according to the present invention comprises a formwork 16, a tunnel interior plate 18, and a fastening member 28, as shown in FIGS. The structure will be described in detail below.

【0011】型枠16は、トンネル12内に二次覆工用
コンクリート14を打設するためのものであり、正面略
半円状で、移動機構(図示略)を装備している。
The formwork 16 is for placing concrete 14 for secondary lining into the tunnel 12 and has a substantially semicircular front face and is equipped with a moving mechanism (not shown).

【0012】トンネル内装板18は、基板20表面に内
装板22を多数固着させ、かつ基板20の適所に止着孔
24を貫通させてある。
The tunnel interior plate 18 has a large number of interior plates 22 adhered to the surface of the substrate 20, and a fixing hole 24 penetrates at an appropriate position on the substrate 20.

【0013】本例において、トンネル内装板18は、基
板20がガラス繊維混入の柔軟性コンクリート板であ
り、内装板22がタイルであり、隣接する各内装板22
間に目地26が形成され、この目地26上に止着孔24
を貫通させてある。
In the present embodiment, the tunnel interior board 18 is such that the substrate 20 is a flexible concrete board mixed with glass fibers, the interior board 22 is a tile, and the adjacent interior boards 22 are tiles.
Joints 26 are formed between the joints 26, and the fixing holes 24 are formed on the joints 26.
Through.

【0014】止着金具28は、先端に傾倒自在の引寄体
30を着脱自在に装着させたものである。
The fastening fitting 28 has a tipping body 30 detachably attached to the tip thereof.

【0015】本例において、引寄体30は平板であり、
止着金具28先端と軸着させることにより、自重により
垂直方向に傾倒自在の構造とし、また引寄体30の着脱
手段はネジ機構32によるものである。
In this embodiment, the drawer 30 is a flat plate,
By attaching it to the tip of the fastening member 28, it can be tilted in the vertical direction by its own weight, and the attachment / detachment means of the attracting body 30 is provided by a screw mechanism 32.

【0016】また、止着金具28の引寄体30を、トン
ネル内装板18の止着孔24へ挿入し、挿入後引寄体3
0を自重により垂直方向に傾倒させ易くするために、止
着金具28を内挿し、止着金具24と共に止着孔24へ
挿入する挿入チューブ34が設けられている。
Further, the attracting member 30 of the fastening member 28 is inserted into the fastening hole 24 of the tunnel interior plate 18, and after the insertion, the attracting member 3 is inserted.
In order to make it easy to incline 0 vertically by its own weight, a fastening tube 28 is provided for inserting the fastening member 28 and inserting it into the fastening hole 24 together with the fastening member 24.

【0017】この挿入チューブ34を採用することによ
り、予め止着金具28を内挿した後、トンネル内装板1
8の止着孔24へ止着金具28と共に挿入チューブ34
を挿入した後、挿入チューブ34のみを型枠16内側に
抜出すことにより、容易に引寄体30を自重により垂直
方向に傾倒させ、トンネル内装板18へ係止させること
ができる。
By adopting the insertion tube 34, after the fastening fitting 28 is inserted in advance, the tunnel interior plate 1
8 together with the fastening fitting 28 into the fastening hole 24 of FIG.
By inserting only the insertion tube 34 into the inside of the mold 16 after the insertion, the pulling body 30 can be easily tilted vertically by its own weight and locked to the tunnel interior plate 18.

【0018】また、型枠16へのトンネル内装板18の
止着作業を効率的に行うため、型枠16の外周下方に突
出板36が出没自在に配設されている。
In order to efficiently attach the tunnel interior plate 18 to the mold 16, a protruding plate 36 is provided below the outer periphery of the mold 16 so as to be freely retractable.

【0019】この突出板36は型枠16にトンネル内装
板18を当接させる際、外側に突出させた後、この突出
させた突出板36上に上下方向の位置の基準となる最下
段のトンネル内装板18を載置させ、このトンネル内装
板18上に順次トンネル内装板18を積上げて、型枠1
6へのトンネル内装板18の当接作業を行い、各トンネ
ル内装板18の型枠16への止着作業完了後、型枠16
内へ収納し、次工程である二次覆工用コンクリート打設
作業に備える。
The projecting plate 36 is made to project outward when the tunnel interior plate 18 is brought into contact with the formwork 16 and then placed on the projecting projecting plate 36 at the lowermost level of the tunnel which serves as a reference for the vertical position. The interior panel 18 is placed, and the tunnel interior panel 18 is sequentially stacked on the tunnel interior panel 18 to form the form 1
6 and the tunnel interior plate 18 is brought into contact with each other.
It is stored inside and ready for the next step of placing concrete for secondary lining.

【0020】このトンネル内装板18の止着作業完了
後、型枠16内へ突出板36を収納するのは、型枠16
外側に突出板36を突出させた状態で二次覆工用コンク
リート14を打設すると、養生硬化後、型枠16脱型時
に二次覆工用コンクリート表面に突出板36の痕跡が凹
部として残存し、美観を損なうばかりか、強度低下の要
因となるため、二次覆工用コンクリート14の打設前に
型枠16内に収納し、打設した二次覆工用コンクリート
表面を平滑にし、強度低下を防止するためである。
After the fastening operation of the tunnel interior plate 18 is completed, the projecting plate 36 is housed in the form 16 by the form 16
When the secondary lining concrete 14 is cast in a state where the protruding plate 36 is protruded outward, after curing and curing, the traces of the protruding plate 36 remain as recesses on the surface of the secondary lining concrete when the mold 16 is removed from the mold. However, since it not only impairs the appearance but also causes a decrease in strength, it is stored in the formwork 16 before the concrete for secondary lining is cast, and the surface of the concrete for secondary lining is smoothed. This is for preventing a decrease in strength.

【0021】また、各トンネル内装板18の止着孔24
がそれぞれ所定位置に貫通され、かつ突出板36上に上
下方向の位置の基準となる最下段のトンネル内装板18
を載置させるため、止着孔24の上下方向の位置ズレは
生ずることがないが、止着孔24の左右方向の位置ズレ
を調整するために型枠16内側に以下の調整機構38が
装備されている。
Also, the fastening holes 24 of each tunnel interior plate 18
Are respectively penetrated to predetermined positions, and the lowermost tunnel interior plate 18 serving as a reference for the vertical position on the protruding plate 36 is provided.
Since the mounting hole is placed, no vertical displacement of the fastening hole 24 occurs, but the following adjusting mechanism 38 is provided inside the formwork 16 to adjust the horizontal displacement of the fastening hole 24. Have been.

【0022】予め型枠16周面には、トンネル内装板1
8の止着孔24に対応する長孔40が穿孔され、この長
孔40に対応する型枠16内部に、止着金具28の挿通
孔42を貫通させた支持板44を、移動自在に配設させ
ることにより調整機構38が構成されている。
The tunnel interior plate 1 is previously provided on the peripheral surface of the mold 16.
8, a support plate 44, which penetrates the insertion hole 42 of the fastening fitting 28, is movably disposed inside the mold 16 corresponding to the long hole 40. The adjusting mechanism 38 is constituted by the provision.

【0023】この調整機構38により、まず支持板44
を型枠16の長孔40内を左右方向に移動させ、型枠1
6の外周面に当接させたトンネル内装板18の止着孔2
4の位置に対応させ、支持板44の挿通孔42、型枠1
6の長孔40およびトンネル内装板18の止着孔24を
合致させた後、型枠16の内側から止着金具28をトン
ネル内装板18の止着孔24へ挿入させることが可能と
なり、止着金具28の各孔42,40,24への挿入が
極めて容易になる。
First, the support plate 44 is adjusted by the adjusting mechanism 38.
Is moved in the long hole 40 of the mold 16 in the left-right direction, and the mold 1 is moved.
6 and the fixing hole 2 of the tunnel interior plate 18 which is in contact with the outer peripheral surface
4, the insertion hole 42 of the support plate 44,
6 and the fastening holes 24 of the tunnel interior plate 18 are aligned, and then the fastening fitting 28 can be inserted into the fastening holes 24 of the tunnel interior plate 18 from inside the formwork 16. Insertion of the fitting 28 into each of the holes 42, 40, 24 becomes extremely easy.

【0024】この際、型枠16の外周面に穿孔された長
孔40は、トンネル内装板18の型枠16への止着時
に、トンネル内装板18により完全に被覆されるため、
打設された二次覆工用コンクリート14が型枠16内部
に浸入することはない。
At this time, the elongated hole 40 formed in the outer peripheral surface of the mold 16 is completely covered by the tunnel interior plate 18 when the tunnel interior plate 18 is fixed to the mold 16.
The poured secondary lining concrete 14 does not enter the inside of the formwork 16.

【0025】なお、図中46は各トンネル内装板18の
外周縁に装着されたシール部材、48は内装板22表面
に貼付された保護シート、50は止着金具24の外周面
に形成されたネジ部、52は止着金具24のネジ部50
に対応する止着ナット、54は止着金具24を支持板4
4へ支持させるための座板、56はトンネル内壁面を示
す。
In the drawing, reference numeral 46 denotes a sealing member attached to the outer peripheral edge of each tunnel interior plate 18, reference numeral 48 denotes a protection sheet attached to the surface of the interior plate 22, and reference numeral 50 denotes an outer peripheral surface of the fastening fitting 24. The screw portion 52 is a screw portion 50 of the fastening fitting 24.
A fixing nut 54 corresponding to the fixing plate 24 supports the fixing fitting 24.
Reference numeral 56 denotes a seat plate for supporting the inner wall surface of the tunnel.

【0026】本装置を使用してトンネル12内の二次覆
工用コンクリート14の表面にトンネル内装板18を直
に取付ける工法を以下に詳述する。
A method for directly attaching the tunnel interior plate 18 to the surface of the secondary lining concrete 14 in the tunnel 12 using the present apparatus will be described in detail below.

【0027】まず、型枠16をトンネル12の所定位置
まで移動させる。
First, the mold 16 is moved to a predetermined position in the tunnel 12.

【0028】この際、型枠16のトンネル坑口側(トン
ネル掘削側と反対側)は、既二次覆工用コンクリート打
設部(図示略)と重合させる。
At this time, the tunnel entrance side (the side opposite to the tunnel excavation side) of the formwork 16 is overlapped with a concrete placing part (not shown) for the secondary lining.

【0029】次に、型枠16の外周下方の突出板36を
外側に突出させ、予めトンネル12内のトンネル内壁面
56の近部に運び込まれたトンネル内装板18を、突出
させた突出板36上に、載置させ、型枠16の外周面に
トンネル内装板18を当接させる。
Next, the protruding plate 36 on the lower side of the outer periphery of the formwork 16 is protruded outward, and the protruding plate 36 on which the tunnel interior plate 18 previously carried near the inner wall surface 56 of the tunnel 12 is protruded is projected. It is placed on top, and the tunnel interior plate 18 is brought into contact with the outer peripheral surface of the formwork 16.

【0030】次に、基準となる最下段のトンネル内装板
18上に、順次各トンネル内装板18を積上げる。
Next, the tunnel interior plates 18 are sequentially stacked on the lowermost tunnel interior plate 18 serving as a reference.

【0031】この際、上下、左右に隣接する各トンネル
内装板18間は、シール部材46により確実にシールさ
れ、打設される二次覆工用コンクリート14のトンネル
内装板18表面への浸出および型枠16内への浸入を防
止することができる。
At this time, the space between the tunnel interior plates 18 adjacent vertically and horizontally is surely sealed by the seal member 46, and the secondary lining concrete 14 to be poured is leached into the surface of the tunnel interior plate 18 and Intrusion into the mold 16 can be prevented.

【0032】次に、型枠16内側の支持板44を移動さ
せ、支持板44の挿通孔42を、型枠16の外周面に当
接させた各トンネル内装板18の止着孔24に合致させ
て位置させる。
Next, the support plate 44 inside the mold 16 is moved so that the insertion hole 42 of the support plate 44 matches the fastening hole 24 of each tunnel interior plate 18 which is in contact with the outer peripheral surface of the mold 16. Let it be positioned.

【0033】この支持板44の挿通孔42と、トンネル
内装板18の止着孔24と、の位置調整作業は各トンネ
ル内装板18に対して個別に行う。
The operation of adjusting the positions of the insertion hole 42 of the support plate 44 and the fastening hole 24 of the tunnel interior plate 18 is performed individually for each tunnel interior plate 18.

【0034】次に、型枠16の内側から挿入チューブ3
4に内挿させた止着金具28を、支持板44の挿通孔4
2、型枠16の長孔40を経てトンネル内装板18の止
着孔24へ挿入させた後、挿入チューブ34のみを型枠
16内側に抜出し、止着金具28の先端の引寄体30を
自重により垂直方向に傾倒させ、トンネル内装板18へ
係止させる。
Next, the insertion tube 3 is inserted from the inside of the mold 16.
4 is inserted into the through hole 4 of the support plate 44.
2. After being inserted into the fastening hole 24 of the tunnel interior plate 18 through the long hole 40 of the mold 16, only the insertion tube 34 is pulled out to the inside of the mold 16, and the pulling body 30 at the tip of the fastening fitting 28 is removed. It is tilted vertically by its own weight and locked to the tunnel interior plate 18.

【0035】この際、止着金具28は挿入チューブ34
に内挿されているため、挿通孔42、長孔40および止
着孔24への、止着金具28の挿入が容易となると共
に、挿入チューブ34のみを各孔44、40、24から
抜出すことにより、止着金具28の先端の引寄体30を
容易に自重により垂直方向に傾倒させることができる。
At this time, the fitting 28 is inserted into the insertion tube 34.
, It is easy to insert the fastening fitting 28 into the insertion hole 42, the long hole 40, and the fastening hole 24, and only the insertion tube 34 is extracted from each of the holes 44, 40, and 24. Thus, the pulling body 30 at the tip of the fastening member 28 can be easily tilted in the vertical direction by its own weight.

【0036】次に、トンネル内装板18を、止着金具2
8を介して型枠16内側に引寄せることにより、型枠1
6の外周面にトンネル内装板18を密着させる。
Next, the tunnel interior plate 18 is attached to the fastening fitting 2.
8 to the inside of the mold 16 so that the mold 1
The tunnel interior plate 18 is brought into close contact with the outer peripheral surface of 6.

【0037】この際、トンネル内装板18の基板20が
柔軟性コンクリート板であるため、型枠16外周面へ確
実に密着し、打設した二次覆工用コンクリート14のト
ンネル内装板18表面への浸出をより効果的に防止する
ことができる。
At this time, since the substrate 20 of the tunnel interior plate 18 is a flexible concrete plate, the substrate 20 is securely adhered to the outer peripheral surface of the formwork 16 and adheres to the surface of the tunnel interior interior plate 18 of the concrete 14 for secondary lining. Leaching can be more effectively prevented.

【0038】次に、型枠16内側において、止着金具2
8を、座板54を介して支持板44に、止着金具28の
ネジ部50に止着ナット52を螺着させることにより、
支持固定する。
Next, on the inner side of the mold 16, the fastening fitting 2 is mounted.
8 is screwed to the support plate 44 via the seat plate 54 and the fixing nut 52 is screwed to the screw portion 50 of the fixing metal fitting 28.
Support and fix.

【0039】次に、各トンネル内装板18の型枠16へ
の止着作業完了後、打設した二次覆工用コンクリート表
面を平滑にし、強度低下を防止するため、突出板36を
型枠16内へ収納する。
Next, after the work of fixing each tunnel interior plate 18 to the formwork 16 is completed, the projecting plate 36 is attached to the formwork in order to smooth the surface of the cast concrete for secondary lining and prevent the strength from being reduced. 16 and stored.

【0040】次に、型枠16のトンネル妻側(トンネル
掘削側)周縁を確実に被覆(妻止め)する。
Next, the peripheral edge of the formwork 16 on the tunnel wive side (tunnel excavation side) is securely covered (wife stop).

【0041】次に、トンネル内壁面56と型枠16との
間に二次覆工用コンクリート14を打設させ、養生硬化
させる。
Next, the concrete for secondary lining 14 is poured between the inner wall surface 56 of the tunnel and the formwork 16 and cured and cured.

【0042】次に、止着金具28を、先端の引寄体30
との着脱手段であるネジ機構32を解除することによ
り、引寄体30から分離する。
Next, the fastening fitting 28 is attached to the tip of the attracting body 30.
By releasing the screw mechanism 32 which is the attaching / detaching means, the member is separated from the attracting body 30.

【0043】この引寄体30を止着金具28の先端から
分離するのは、引寄体30がトンネル内装板18と共に
養生硬化した二次覆工用コンクリート14内に埋設状態
となるため、このままの状態では型枠16脱型作業がで
きなくなり、この脱型作業を行うためである。
The pulling body 30 is separated from the tip of the fastening member 28 because the pulling body 30 is buried together with the tunnel interior plate 18 in the cured and hardened secondary lining concrete 14. In this state, the mold 16 cannot be removed, and this removal is performed.

【0044】また、引寄体30を分離させた止着金具2
8は、支持板44から取外し、次回使用に備えて新たな
引寄体30を取付ける。
Also, the fastening 2 from which the attracting body 30 is separated.
8 removes from the support plate 44, and attaches a new delivery body 30 for the next use.

【0045】次に、型枠16を脱型させる。Next, the mold 16 is removed.

【0046】この際、型枠16の外周面にトンネル内装
板18が止着されているため、二次覆工用コンクリート
14打設時に、トンネル内装板18の基板20側が二次
覆工用コンクリート14内に埋設された状態となり、二
次覆工用コンクリート14の養生硬化完了後、打設した
二次覆工用コンクリート14の表面に、トンネル内装板
18が固着される。
At this time, since the tunnel interior plate 18 is fixed to the outer peripheral surface of the formwork 16, when the secondary lining concrete 14 is cast, the substrate 20 side of the tunnel interior plate 18 is placed on the secondary lining concrete. After curing and curing of the secondary lining concrete 14 is completed, the tunnel interior plate 18 is fixed to the surface of the cast secondary lining concrete 14.

【0047】また、型枠16の脱型時、型枠16の外周
面に止着されたトンネル内装板18は、基板20が養生
硬化した二次覆工用コンクリート14に固着され、この
固着力が強大であるため、トンネル内装板18は型枠1
6から容易に剥離する。
Further, when the mold 16 is removed from the mold, the tunnel interior plate 18 fixed to the outer peripheral surface of the mold 16 is fixed to the secondary lining concrete 14 in which the substrate 20 has been cured and hardened. Is strong, the tunnel interior plate 18 is
6 easily peels off.

【0048】次に、二次覆工用コンクリート14の表面
に固着されたトンネル内装板18の内装板22の表面側
の保護シート48を除去すると共に、トンネル内装板1
8の表面を洗浄する。
Next, the protective sheet 48 on the surface of the interior panel 22 of the tunnel interior panel 18 fixed to the surface of the secondary lining concrete 14 is removed, and the tunnel interior panel 1 is removed.
8 is cleaned.

【0049】前記工程により、型枠16が設置された個
所に、二次覆工用コンクリート14の打設と共に、トン
ネル内装板18の施工が完了する。
According to the above-described process, the construction of the tunnel interior plate 18 is completed together with the placement of the secondary lining concrete 14 at the place where the formwork 16 is installed.

【0050】このトンネル内装板18の施工を、トンネ
ル妻側へ向けて順次型枠16を移動させて行い、トンネ
ル12の全長にわたり行う。
The construction of the tunnel interior plate 18 is performed by sequentially moving the form 16 toward the tunnel wife, and is performed over the entire length of the tunnel 12.

【0051】また、図9〜図11に本発明に係る装置の
別の例が示してある。
FIGS. 9 to 11 show another example of the apparatus according to the present invention.

【0052】本例は、三角突条型の突出板36を型枠1
6の外周に略格子状に配設させたものであり、トンネル
内装板18の型枠16の外周面への当接において、突出
板36により形成された各区画58内にトンネル内装板
18をそれぞれ載置させた後、各トンネル内装板18を
型枠16に止着金具28を介して止着後、二次覆工用コ
ンクリート14を打設するものである。
In this embodiment, the triangular ridge-shaped projecting plate 36 is attached to the form 1
6 are arranged in a substantially lattice shape on the outer periphery of the inner wall 6. When the tunnel interior plate 18 abuts on the outer peripheral surface of the formwork 16, the tunnel interior plate 18 is placed in each section 58 formed by the projecting plate 36. After each of them is placed, each tunnel interior plate 18 is fastened to the mold 16 via a fastening fitting 28, and then the secondary lining concrete 14 is cast.

【0053】この際、前例と同様、打設した二次覆工用
コンクリート表面を平滑にし、強度低下を防止するた
め、トンネル内装板18の型枠16への止着作業完了
後、突出板36を型枠16内へ収納させるために出没自
在とすることが望ましいが、突出板36の型枠16から
の突出長を短くし、型枠脱型時のトンネル内装板18お
よび打設した二次覆工用コンクリート表面へのダメージ
を最小限に抑える配慮をすることにより、必ずしも突出
板36は出没自在としなくてもよい。
At this time, in the same manner as in the previous example, in order to smooth the surface of the cast concrete for secondary lining and prevent the strength from being reduced, after the work of fastening the tunnel interior plate 18 to the formwork 16 is completed, the projecting plate 36 It is desirable that the projecting plate 36 be able to be retracted and retracted in order to be accommodated in the formwork 16. However, the projecting length of the protruding plate 36 from the formwork 16 is shortened, and the tunnel interior plate 18 and By taking care to minimize damage to the lining concrete surface, the protruding plate 36 does not necessarily have to be freely retractable.

【0054】また、本例において、トンネル内装板18
は突出板36により形成された各区画58内にそれぞれ
1個ずつ載置させるため、型枠16の上下左右方向に対
してトンネル内装板18の位置ズレがなく、正確にトン
ネル内装板18の直打設作業が行え、また前例のように
型枠16に調整機構38を設ける必要がない。
In this embodiment, the tunnel interior plate 18
Are placed one by one in each section 58 formed by the protruding plate 36, so that there is no displacement of the tunnel interior plate 18 in the vertical and horizontal directions of the formwork 16 and the tunnel interior plate 18 The casting operation can be performed, and there is no need to provide the adjusting mechanism 38 on the formwork 16 as in the previous example.

【0055】なお、両例において、トンネル内装板18
を柔軟性を有しないコンクリート板とすることは自由で
あり、また内装板22はタイルに限定されることはな
く、壁面パネル等の板材を使用することは自由である。
In both examples, the tunnel interior plate 18
Is not limited to a concrete board having no flexibility, and the interior board 22 is not limited to a tile, and a board material such as a wall panel can be used freely.

【0056】また、トンネル内装板18の止着孔24へ
の止着金具28の挿入は、挿入チューブ34へ内挿させ
て挿入するものであるが、挿入チューブ34を省略して
止着金具28をそのままトンネル内装板18の止着孔2
4へ挿入することは自明のことである。
The fastening fitting 28 is inserted into the fastening hole 24 of the tunnel interior plate 18 by inserting it into the insertion tube 34, but the insertion tube 34 is omitted and the fastening fitting 28 is omitted. To the fastening hole 2 of the tunnel interior plate 18
Inserting into 4 is self-evident.

【0057】また、型枠16外周上方からワイヤー等を
使用してトンネル内装板18を吊持させることにより、
突出板36を省略できることは自明のことである。
Further, by suspending the tunnel interior plate 18 from above the outer periphery of the form 16 using a wire or the like,
It is obvious that the projecting plate 36 can be omitted.

【0058】また、型枠16外周へのトンネル内装板1
8の止着は、先端に傾倒自在の引寄体30を着脱自在に
装着させた止着金具28によるものであるが、型枠16
内側からボルトをトンネル内装板18へ貫通させ、作業
者が型枠16とトンネル内壁面56との間でボルトにナ
ットを止着させることにより、止着金具28に代えてボ
ルトを使用することが可能となる。
Further, the tunnel interior plate 1 on the outer periphery of the
The fastening of the mold 8 is performed by a fastening metal fitting 28 having a tipping body 30 which can be freely attached and detached at the tip thereof.
A bolt can be used instead of the fastening fitting 28 by allowing a bolt to penetrate through the tunnel interior plate 18 from the inside and fastening a nut to the bolt between the formwork 16 and the tunnel inner wall surface 56 by an operator. It becomes possible.

【0059】また、前例において、型枠16へのトンネ
ル内装板18の当接作業は、型枠16の外周下方の出没
自在に突出させた突出板36を利用するものであるが、
突出板36の型枠16からの突出長を短くし、型枠脱型
時のトンネル内装板18および打設した二次覆工用コン
クリート14表面へのダメージを最小限に抑える配慮を
することにより、必ずしも突出板36は出没自在としな
くてもよい。
Further, in the previous example, the work of abutting the tunnel interior plate 18 on the form 16 utilizes the projecting plate 36 protruding below the outer periphery of the form 16 so as to be able to protrude and retract.
The length of the projecting plate 36 protruding from the formwork 16 is shortened, and consideration is given to minimizing damage to the tunnel interior plate 18 and the surface of the concrete 14 for secondary lining when the formwork is removed. However, the projecting plate 36 does not necessarily have to be able to come and go.

【0060】また、トンネル内装板18の型枠16への
止着個所は主に型枠16の下方部分であるが、型枠16
の他の個所へも止着させることは自由である。
The place where the tunnel interior plate 18 is fixed to the mold 16 is mainly a lower portion of the mold 16.
It is free to stop at other places.

【0061】また、後例において、突出板36は三角突
条型であるが、矩形型、等その他の形状の突条とするこ
とは自由であり、また上下左右方向に直線状に配設させ
てあるが、所定間隔を隔てて点在させることは自明のこ
とである。
In the later example, the protruding plate 36 is a triangular ridge, but may be a ridge of other shapes such as a rectangular shape, and may be linearly arranged in the vertical and horizontal directions. However, it is obvious that they are scattered at predetermined intervals.

【0062】また、両例は略半円形のトンネル等のコン
クリート打設におけるものであるが、円形のトンネル、
例えば海中トンネル、下水道等にも利用できる。
[0062] In both cases, the concrete casting of a semi-circular tunnel or the like is performed.
For example, it can be used for underwater tunnels, sewers, and the like.

【0063】[0063]

【発明の効果】本発明に係るトンネル内装板の直打設工
法およびその装置によれば、二次覆工用コンクリートを
打設するための型枠の外周面に、トンネル内装板を、型
枠内側からトンネル内装板の止着孔に、先端に傾倒自在
の引寄体を備えた止着金具を挿入させ、引寄体を自重に
より垂直方向に傾倒させて係止させ、止着金具を型枠内
側に引寄せることにより、密着させ、二次覆工用コンク
リート打設と同時にトンネル内装板の施工をするため、
型枠へのトンネル内装板の止着作業が極めて容易であ
り、また二次覆工と別にトンネル内装板の施工を行う必
要がなく、トンネル内装板の施工期間を大幅に短縮でき
る。
According to the method and the apparatus for directly placing a tunnel interior board according to the present invention, a tunnel interior board is formed on the outer peripheral surface of a mold for placing concrete for secondary lining. Insert a fastener with a tiltable pulling body at the tip from the inside into the fastening hole of the tunnel interior plate, tilt the pulling body vertically by its own weight and lock it, and mold the fastener By pulling it to the inside of the frame to make it closely adhere, and to install the tunnel interior board at the same time as placing concrete for secondary lining,
The work of fastening the tunnel interior board to the formwork is extremely easy, and there is no need to perform the tunnel interior board separately from the secondary lining, so that the construction period of the tunnel interior board can be greatly reduced.

【0064】また、トンネル内装板を直に二次覆工用コ
ンクリートの表面に取付けることにより、従来使用して
いた固定金具、貼着用モルタルを省くことができるた
め、固定金具の腐食、貼着用モルタルの劣化によるトン
ネル内装板の損傷が皆無となるばかりか、固定金具の取
替え、トンネル内装板の取替え等の補修工事の回数が激
減し、維持管理に掛かる負担を激減させることができ
る。
In addition, by directly attaching the tunnel interior plate to the surface of the concrete for secondary lining, it is possible to omit the fixing bracket and the mortar to be used conventionally. Not only is there no damage to the tunnel interior plate due to the deterioration of the tunnel, but also the number of repair work such as replacement of fixing brackets and replacement of the tunnel interior plate is drastically reduced, and the burden on maintenance can be drastically reduced.

【0065】また、トンネル内装板の止着孔への止着金
具の引寄体の挿入において、止着金具を挿入チューブに
内挿させることにより、トンネル内装板の止着孔への、
止着金具の挿入が容易となると共に、挿入チューブのみ
を止着孔から抜出すことにより、止着金具の引寄体を容
易に自重により垂直方向に傾倒させることができる。
In addition, in inserting the drawer of the fastener into the fastening hole of the tunnel interior plate, the fastener is inserted into the insertion tube so that the fastening hole of the tunnel interior plate can be inserted into the fastening hole.
Insertion of the fastener is facilitated, and by pulling out only the insertion tube from the fastener hole, the attracting body of the fastener can be easily tilted vertically by its own weight.

【0066】また、トンネル内装板の型枠外周面への当
接時に、型枠外周下方に配設させた突出板上に載置させ
た後、このトンネル内装板の上方に順次トンネル内装板
を積上げ、各トンネル内装板を型枠に止着後、二次覆工
用コンクリートを打設することより、突出板上に上下方
向の位置の基準となる最下段のトンネル内装板が載置さ
れるため、トンネル内装板の止着孔の上下方向の位置ズ
レが生ずることがない。
Further, when the tunnel interior plate abuts on the outer peripheral surface of the mold, the tunnel interior plate is placed on a projecting plate disposed below the outer periphery of the mold, and the tunnel interior plate is sequentially placed above the tunnel interior plate. After stacking and fixing each tunnel interior board to the formwork, by casting concrete for secondary lining, the lowermost tunnel interior board, which is a reference for the vertical position, is placed on the protruding board Therefore, there is no displacement of the fastening hole of the tunnel interior plate in the vertical direction.

【0067】また、トンネル内装板の型枠外周面への当
接において、型枠外周に略格子状に配設させた突出板の
各区画内にトンネル内装板を載置させた後、各トンネル
内装板を型枠に止着後、二次覆工用コンクリートを打設
することにより、トンネル内装板が突出板により形成さ
れた各区画内にそれぞれ1個ずつ載置されるため、型枠
の上下左右方向に対してトンネル内装板の位置ズレがな
く、正確にトンネル内装板の直打設作業を行うことがで
きる。
When the tunnel interior plate abuts on the outer peripheral surface of the mold, the tunnel interior plate is placed in each section of the protruding plate disposed substantially in a lattice shape on the outer periphery of the mold. After the interior panel is fixed to the formwork, the concrete for the secondary lining is cast, so that one tunnel interior panel is placed in each section formed by the protruding plate. There is no positional deviation of the tunnel interior board in the up, down, left and right directions, and the direct installation work of the tunnel interior board can be performed accurately.

【0068】また、トンネル内装板の基板を、柔軟性素
材により成形することにより、型枠外周面への密着性を
向上させ、打設した二次覆工用コンクリートのトンネル
内装板表面への浸出を防止することができる。
Also, by forming the substrate of the tunnel interior board from a flexible material, the adhesiveness to the outer peripheral surface of the formwork is improved, and the poured secondary lining concrete is leached into the surface of the tunnel interior board. Can be prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るトンネル内装板の直打設装置を示
す要部拡大側面図。
FIG. 1 is an enlarged side view of a main part showing a direct installation device for a tunnel interior plate according to the present invention.

【図2】同、正面図。FIG. 2 is a front view of the same.

【図3】トンネル内装板の正面図。FIG. 3 is a front view of a tunnel interior plate.

【図4】同、側面図。FIG. 4 is a side view of the same.

【図5】図4のA部拡大正面図。FIG. 5 is an enlarged front view of a portion A in FIG. 4;

【図6】止着金具および挿入チューブの分解正面図。FIG. 6 is an exploded front view of the fastening fitting and the insertion tube.

【図7】トンネル内装板の型枠への止着作業工程を示す
正面図。
FIG. 7 is a front view showing the process of fastening the tunnel interior plate to the formwork.

【図8】本発明のトンネル内装板の直打設工程を示す簡
略正面図。
FIG. 8 is a simplified front view showing a step of directly placing a tunnel interior board according to the present invention.

【図9】本発明に係るトンネル内装板の直打設装置の別
の例を示す要部拡大正面図。
FIG. 9 is an enlarged front view of a main part showing another example of a direct installation device for a tunnel interior plate according to the present invention.

【図10】同、側面図。FIG. 10 is a side view of the same.

【図11】図10のB部拡大図。FIG. 11 is an enlarged view of a portion B in FIG. 10;

【符号の説明】[Explanation of symbols]

12 トンネル 14 二次覆工用コンクリート 16 型枠 18 トンネル内装板 20 基板 22 内装板 24 支持孔 28 止着金具 30 引寄体 34 挿入チューブ 36 突出板 56 トンネル内壁面 58 区画 DESCRIPTION OF SYMBOLS 12 Tunnel 14 Secondary lining concrete 16 Formwork 18 Tunnel interior board 20 Substrate 22 Interior board 24 Support hole 28 Fastener 30 Puller 34 Insert tube 36 Projection plate 56 Tunnel inner wall surface 58 Section

フロントページの続き (72)発明者 船平 裕二 鹿児島県姶良郡姶良町平松3141の1 イン フラテック株式会社内 (72)発明者 北川 勉 岐阜県本巣郡真正町十四条144番地 岐阜 工業株式会社内 (72)発明者 相崎 毅 岐阜県本巣郡真正町十四条144番地 岐阜 工業株式会社内 Fターム(参考) 2D055 CA03 CA04 Continued on the front page. (72) Inventor Yuji Funahira 3141 in Hiramatsu, Aira-cho, Aira-gun, Kagoshima Prefecture Inside Infratec Co., Ltd. (72) Inventor Takeshi Aizaki 144 144, Shinjyo-machi, Masamitsu-gun, Motosu-gun, Gifu F-term in Gifu Industries Co., Ltd. (reference) 2D055 CA03 CA04

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】 トンネル(12)内に打設した二次覆工用コ
ンクリート(14)の表面にトンネル内装板(18)を取付ける
工法において、トンネル(12)内に二次覆工用コンクリー
ト(14)を打設する型枠(16)の外周面に、基板(20)に内装
板(22)を多数固着させ、かつ基板(20)の適所に止着孔(2
4)を貫通させてなるトンネル内装板(18)を、トンネル内
装板(18)の表面を型枠(16)に当接させると共に、トンネ
ル内装板(18)の止着孔(24)に型枠(16)内側から、先端に
傾倒自在の引寄体(30)を着脱自在に装着させた止着金具
(28)の引寄体(30)を、挿入後、引寄体(30)を自重により
垂直方向に傾倒させてトンネル内装板(18)に係止させ、
止着金具(28)を型枠(16)内側に引寄せてトンネル内装板
(18)を型枠(16)に密着させた後、止着金具(28)を型枠(1
6)内側に固定することにより、トンネル内装板(18)を型
枠(16)に止着させた後、トンネル(12)内に型枠(16)を介
して二次覆工用コンクリート(14)を打設し、二次覆工用
コンクリート(14)の養生硬化後、止着金具(28)の先端か
ら引寄体(30)を分離し、型枠(16)を脱型させることによ
り、引寄体(30)を二次覆工用コンクリート(14)内に埋設
すると共に、二次覆工用コンクリート(14)の表面にトン
ネル内装板(18)を直に取付けることを特徴とするトンネ
ル内装板の直打設工法。
1. A method of attaching a tunnel interior plate (18) to a surface of a secondary lining concrete (14) cast into a tunnel (12), wherein the secondary lining concrete (18) is placed in the tunnel (12). A large number of interior boards (22) are fixedly attached to the substrate (20) on the outer peripheral surface of the formwork (16) on which the 14) is cast, and the fixing holes (2
4) Insert the tunnel interior plate (18) through which the surface of the tunnel interior plate (18) comes into contact with the formwork (16), and insert it into the fastening hole (24) of the tunnel interior plate (18). A fastening fitting with a detachable body (30) that can be freely tilted attached to the tip from the inside of the frame (16)
After inserting the retracting body (30) of (28), the retracting body (30) is tilted vertically by its own weight and locked to the tunnel interior plate (18),
Pull the fastening fitting (28) inside the formwork (16) and place it inside the tunnel interior plate.
After the (18) is brought into close contact with the formwork (16), the fastening fitting (28) is attached to the formwork (1).
6) After fixing the tunnel interior plate (18) to the formwork (16) by fixing it inside, the concrete (14) for secondary lining (14) is inserted into the tunnel (12) via the formwork (16). After curing and curing of the concrete for secondary lining (14), the drawn body (30) is separated from the tip of the fastening fitting (28), and the mold (16) is removed from the mold. , Burying the delivery body (30) in the secondary lining concrete (14) and mounting the tunnel interior plate (18) directly on the surface of the secondary lining concrete (14). Direct installation of tunnel interior panels.
【請求項2】 型枠(16)内側からトンネル内装板(18)の
止着孔(24)への止着金具(28)の引寄体(30)の挿入におい
て、止着金具(28)を挿入チューブ(34)に内挿させた後、
挿入チューブ(34)と共に引寄体(30)をトンネル内装板(1
8)の止着孔(24)に挿入させた後、挿入チューブ(34)のみ
をトンネル内装板(18)の止着孔(24)から抜出すことによ
り、引寄体(30)を自重により垂直方向に傾倒させること
を特徴とする請求項1記載のトンネル内装板の直打設工
法。
2. When inserting the pulling body (30) of the fastening member (28) into the fastening hole (24) of the tunnel interior plate (18) from the inside of the formwork (16), the fastening member (28). After inserting into the insertion tube (34),
Insert the delivery body (30) together with the insertion tube (34) into the tunnel interior plate (1
After the insertion tube (34) is inserted into the fastening hole (24) of (8), only the insertion tube (34) is pulled out from the fastening hole (24) of the tunnel interior plate (18), so that the pulling body (30) is pulled by its own weight. The method for directly placing a tunnel interior plate according to claim 1, wherein the tunnel interior plate is tilted in a vertical direction.
【請求項3】 トンネル内装板(18)の型枠(12)外周面へ
の当接において、型枠(16)外周下方に配設させた突出板
(36)上にトンネル内装板(18)を載置させた後、このトン
ネル内装板(18)の上方に順次トンネル内装板(18)を積上
げ、各トンネル内装板(18)を型枠(16)に止着後、二次覆
工用コンクリート(14)を打設することを特徴とする請求
項1または請求項2記載のトンネル内装板の直打設工
法。
3. A protruding plate disposed below the outer periphery of the formwork (16) when the tunnel interior plate (18) abuts on the outer peripheral surface of the formwork (12).
After placing the tunnel interior board (18) on the (36), the tunnel interior boards (18) are sequentially stacked above the tunnel interior board (18), and each tunnel interior board (18) is 3. The method of claim 1 or 2, wherein the concrete for secondary lining (14) is cast after fixing.
【請求項4】 トンネル内装板(18)の型枠(12)外周面へ
の当接において、型枠(16)外周に略格子状に配設させた
突出板(36)の各区画(58)内にトンネル内装板(18)を載置
させた後、各トンネル内装板(18)を型枠(16)に止着後、
二次覆工用コンクリート(14)を打設することを特徴とす
る請求項1または請求項2記載のトンネル内装板の直打
設工法。
4. When the tunnel interior plate (18) abuts on the outer peripheral surface of the formwork (12), each section (58) of the projecting plate (36) arranged in a substantially lattice shape on the outer periphery of the formwork (16). After placing the tunnel interior plate (18) in the), after fastening each tunnel interior plate (18) to the formwork (16),
The method according to claim 1 or 2, wherein concrete for secondary lining (14) is cast.
【請求項5】 トンネル内装板(18)の基板(20)を、柔軟
性素材により成形し、型枠(16)外周面への密着性を向上
させ、打設した二次覆工用コンクリート(14)のトンネル
内装板(18)表面への浸出を防止することを特徴とする請
求項1、請求項2、請求項3または請求項4記載のトン
ネル内装板の直打設工法。
5. A method for forming a substrate (20) of a tunnel interior plate (18) from a flexible material to improve the adhesion to an outer peripheral surface of a formwork (16) and casting a concrete for secondary lining (20). 5. The method according to claim 1, wherein the leaching to the surface of the tunnel interior board (18) is prevented.
【請求項6】 トンネル(12)内に打設した二次覆工用コ
ンクリート(14)の表面にトンネル内装板(18)を取付ける
装置において、基板(20)に内装板(22)を多数固着させ、
かつ基板(20)の適所に止着孔(24)を貫通させてなるトン
ネル内装板(18)と、先端に傾倒自在の引寄体(30)を着脱
自在に装着させた止着金具(28)と、トンネル(12)内に二
次覆工用コンクリート(14)を打設する型枠(16)と、から
なり、トンネル(12)内に二次覆工用コンクリート(14)を
打設する型枠(16)の外周面に、トンネル内装板(18)を、
トンネル内装板(18)の表面を型枠(16)に当接させると共
に、トンネル内装板(18)の止着孔(24)に型枠(16)内側か
ら止着金具(28)の引寄体(30)を挿入後、引寄体(30)を自
重により垂直方向に傾倒させてトンネル内装板(18)に係
止させ、止着金具(28)を型枠(16)内側に引寄せてトンネ
ル内装板(18)を型枠(16)に密着させた後、止着金具(28)
を型枠(16)内側に固定することにより、トンネル内装板
(18)を型枠(16)に止着させた後、トンネル(12)内に型枠
(16)を介して二次覆工用コンクリート(14)を打設し、二
次覆工用コンクリート(14)の養生硬化後、止着金具(28)
の先端から引寄体(30)を分離し、型枠(16)を脱型させる
ことにより、引寄体(30)を二次覆工用コンクリート(14)
内に埋設すると共に、二次覆工用コンクリート(14)の表
面にトンネル内装板(18)を直に取付けることを特徴とす
るトンネル内装板の直打設装置。
6. An apparatus for mounting a tunnel interior plate (18) on a surface of a secondary lining concrete (14) cast in a tunnel (12), wherein a number of interior plates (22) are fixed to a substrate (20). Let
A tunnel fitting plate (18) having a fastening hole (24) penetrated at an appropriate position on the substrate (20), and a fastening fitting (28) having a tipping freely retractable body (30) attached at its tip in a detachable manner. ) And a formwork (16) for placing concrete for secondary lining (14) in the tunnel (12), and placing concrete (14) for secondary lining in the tunnel (12). On the outer peripheral surface of the formwork (16) to be
The surface of the tunnel interior plate (18) is brought into contact with the formwork (16), and the fastening fitting (28) is drawn into the fastening hole (24) of the tunnel interior plate (18) from inside the formwork (16). After inserting the body (30), the attracting body (30) is tilted vertically by its own weight and locked to the tunnel interior plate (18), and the fastening metal fitting (28) is pulled inside the formwork (16) After the tunnel interior plate (18) is brought into close contact with the formwork (16), the fastening fitting (28)
By fixing the inside of the formwork (16),
After fixing (18) to the formwork (16), the formwork is placed in the tunnel (12).
Pour the secondary lining concrete (14) through (16), and after curing and curing of the secondary lining concrete (14), fastening fittings (28)
The drawn body (30) is separated from the tip of the concrete body, and the formwork (16) is removed from the form.
A device for directly placing a tunnel interior plate, wherein the tunnel interior plate is directly mounted on a surface of the concrete for secondary lining.
【請求項7】 型枠(16)内側からトンネル内装板(18)の
止着孔(24)への止着金具(28)の引寄体(30)の挿入におい
て、止着金具(28)を挿入チューブ(34)に内挿させた後、
挿入チューブ(34)と共に引寄体(30)をトンネル内装板(1
8)の止着孔(24)に挿入させた後、挿入チューブ(34)のみ
をトンネル内装板(18)の止着孔(24)から抜出すことによ
り、引寄体(30)を自重により垂直方向に傾倒させること
を特徴とする請求項6記載のトンネル内装板の直打設装
置。
7. When inserting the pulling body (30) of the fastening member (28) from the inside of the formwork (16) into the fastening hole (24) of the tunnel interior plate (18), the fastening member (28). After inserting into the insertion tube (34),
Insert the delivery body (30) together with the insertion tube (34) into the tunnel interior plate (1
After the insertion tube (34) is inserted into the fastening hole (24) of (8), only the insertion tube (34) is pulled out from the fastening hole (24) of the tunnel interior plate (18), so that the pulling body (30) is pulled by its own weight. 7. The apparatus according to claim 6, wherein the apparatus is tilted in a vertical direction.
【請求項8】 トンネル内装板(18)の型枠(16)外周面へ
の当接において、型枠(16)外周下方に配設させた突出板
(36)上にトンネル内装板(18)を載置させた後、このトン
ネル内装板(18)の上方に順次トンネル内装板(18)を積上
げ、各トンネル内装板(18)を型枠(16)に止着後、二次覆
工用コンクリート(14)を打設することを特徴とする請求
項6または請求項7記載のトンネル内装板の直打設装
置。
8. A protruding plate disposed below the outer periphery of the formwork (16) when the tunnel interior plate (18) abuts on the outer peripheral surface of the formwork (16).
After placing the tunnel interior board (18) on the (36), the tunnel interior boards (18) are sequentially stacked above the tunnel interior board (18), and each tunnel interior board (18) is 8.) The direct installation device for a tunnel interior plate according to claim 6 or 7, wherein a concrete for secondary lining (14) is cast after fixing to the tunnel interior plate.
【請求項9】 トンネル内装板(18)の型枠(12)外周面へ
の当接において、型枠(16)外周に略格子状に配設させた
突出板(36)の各区画(58)内にトンネル内装板(18)を載置
させた後、各トンネル内装板(18)を型枠(16)に止着後、
二次覆工用コンクリート(14)を打設することを特徴とす
る請求項6または請求項7記載のトンネル内装板の直打
設装置。
9. When the tunnel interior plate (18) abuts on the outer peripheral surface of the formwork (12), each section (58) of the projecting plate (36) arranged in a substantially lattice shape on the outer periphery of the formwork (16). After placing the tunnel interior plate (18) in the), after fastening each tunnel interior plate (18) to the formwork (16),
8. The device for directly placing a tunnel interior plate according to claim 6, wherein a concrete for secondary lining is placed.
【請求項10】 トンネル内装板(18)の基板(20)を、柔
軟性素材により成形し、型枠(16)外周面への密着性を向
上させ、打設した二次覆工用コンクリート(14)のトンネ
ル内装板(18)表面への浸出を防止することを特徴とする
請求項6、請求項7、請求項8または請求項9記載のト
ンネル内装板の直打設装置。
10. The substrate (20) of the tunnel interior plate (18) is formed of a flexible material to improve the adhesion to the outer peripheral surface of the formwork (16), and the concrete for secondary lining ( 10. The direct installation apparatus for a tunnel interior board according to claim 6, wherein the leaching to the surface of the tunnel interior board (18) of (14) is prevented.
JP21039499A 1999-07-26 1999-07-26 Tunnel interior board direct installation method and equipment Expired - Fee Related JP4099293B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21039499A JP4099293B2 (en) 1999-07-26 1999-07-26 Tunnel interior board direct installation method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21039499A JP4099293B2 (en) 1999-07-26 1999-07-26 Tunnel interior board direct installation method and equipment

Publications (2)

Publication Number Publication Date
JP2001032689A true JP2001032689A (en) 2001-02-06
JP4099293B2 JP4099293B2 (en) 2008-06-11

Family

ID=16588610

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21039499A Expired - Fee Related JP4099293B2 (en) 1999-07-26 1999-07-26 Tunnel interior board direct installation method and equipment

Country Status (1)

Country Link
JP (1) JP4099293B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005290756A (en) * 2004-03-31 2005-10-20 Railway Technical Res Inst Method of reinforcing blockwork tunnel lining, and its structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913625A (en) * 1995-07-03 1997-01-14 Nakata Kensetsu:Kk Mounting structure of tile-adhered panel
JPH10205290A (en) * 1997-01-27 1998-08-04 Gifu Kogyo Kk Direct mounting method of tunnel interior finishing plate and device thereof
JPH11131988A (en) * 1997-10-30 1999-05-18 Kajima Corp Inner surface resin covering material for cast-in-place shield tunnel, construction method for inner surface resin-covered cast-in-place shield tunnel, and inner surface resin-covered cast-in-place shield tunnel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913625A (en) * 1995-07-03 1997-01-14 Nakata Kensetsu:Kk Mounting structure of tile-adhered panel
JPH10205290A (en) * 1997-01-27 1998-08-04 Gifu Kogyo Kk Direct mounting method of tunnel interior finishing plate and device thereof
JPH11131988A (en) * 1997-10-30 1999-05-18 Kajima Corp Inner surface resin covering material for cast-in-place shield tunnel, construction method for inner surface resin-covered cast-in-place shield tunnel, and inner surface resin-covered cast-in-place shield tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005290756A (en) * 2004-03-31 2005-10-20 Railway Technical Res Inst Method of reinforcing blockwork tunnel lining, and its structure

Also Published As

Publication number Publication date
JP4099293B2 (en) 2008-06-11

Similar Documents

Publication Publication Date Title
CA3068904C (en) Method for producing a ceiling element and ceiling formwork
CN105040743B (en) Underground structure post-cast strip detachable support replacement method and structure
JP3728728B2 (en) Column and steel pipe pile positioning device
JP2001032689A (en) Tunnel interior plate direct-placing construction method and device therefor
CN206016827U (en) A kind of chassis bulkhead
JP4175658B2 (en) Construction method of composite panel on concrete outer wall of reinforced concrete building
KR100810660B1 (en) Medial strip reform method
JP2000096989A (en) Air bleeder device in secondary lining of tunnel
KR100683558B1 (en) Drainage way construction method at tunnel site and it's device
JPH07317188A (en) Constructing method of reinforced concrete structure
JP3278371B2 (en) Direct casting method of tunnel interior plate and its equipment
CN211178478U (en) Positioning system for horizontal prefabricated parts
JP4789201B2 (en) Protective fence
CN217299661U (en) Prefabricated hood
JP2012144869A (en) Tile wall repair method of damaged vertical wall of tunnel monitor passage
JP2004003186A (en) Building structure with track guide disposed therein
US20230265649A1 (en) Devices, systems and methods forming vertical tilt-up walls around window frames
JP2016145483A (en) Repairing method of wall surface for setting up watchman passage in tunnel
JP2022158643A (en) Repair construction method and repair structure using stainless steel repair panel for wall of expressway tunnel watchman passage
JP2883273B2 (en) Strainer installation jig and drain repair method
JP2005256467A (en) Japanese and western style remodeling method of toilet
JP3049767U (en) Bracket for mounting goods etc. in shield tunnel
JPH1150796A (en) Method for constructing passage for watchman in tunnel
JP2000265790A (en) Resin sheet unit for coating pipe line and coating method of secondarily placing concrete for pipe line
JP2007239315A (en) Side ditch refurbishing member and side ditch refurbishing method

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040217

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060725

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20061005

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20061005

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080226

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080317

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees